Anda di halaman 1dari 18

HARGA SATUAN DASAR

NO BAHAN/PEKERJAAN SPESIFIKASI SATUAN


A PEKERJAAN PERSIAPAN
I PEMBERSIHAN LOKASI
Upah
1 pekerja oh
II PEMASANGAN BOWPLANK
Upah
1 pekerja oh
2 tukang oh
Bahan
1 paku paku 2-5 cm kg
2 papan 2/20 kayu meranti m3
3 benang roll
4 ususk 5/7 kayu meranti m3
B PEKERJAAN TANAH
I GALIAN TANAH
Upah
1 pekerja oh
2 mandor oh
II URUGAN PASIR
Upah
1 pekerja oh
2 mandor oh
Bahan
1 pasir urug m3
III URUGAN TANAH
Upah
1 pekerja oh
2 mandor oh
Bahan
1 tanah urug m3
IV URUGAN SIRTU
Upah
1 pekerja oh
2 mandor oh
Bahan
1 sirtu m3
V PEMADATAN
Upah
1 pekerja oh
2 mandor oh
Alat
1 steamper buah
C PEKERJAAN PASANGAN
I PASANGAN ANSTAMPING
Upah
1 pekerja oh
2 tukang oh
Bahan
1 batu kosong m3
II PASANGAN PONDASI BATU KALI
Upah
1 pekerja oh
2 tukang oh
3 kepala tukang oh
4 mandor oh
Bahan
1 pasir m3
2 semen kg
3 batu kali m3
III PONDASI CAKAR AYAM
Upah
1 pekerja oh
2 tukang oh
3 kepala tukang oh
4 mandor oh
Bahan
1 besi beton polos besi uk 12 kg
2 pasir m3
3 kerikil m3
4 semen kg
5 kawat beton kg
IV SLOOF
Upah
1 pekerja oh
2 tukang oh
3 kepala tukang oh
4 mandor oh
1 Bahan
2 pasir m3
3 semen kg
4 kerikil m3
5 besi beton polos besi uk 12 kg
6 kawat beton m3
7 kayu kelas III papan meranti m3
8 paku paku biasa 2-5cm kg
V KOLOM
Upah
1 pekerja oh
2 tukang oh
3 kepala tukang oh
4 mandor oh
Bahan
1 semen kg
2 pasir m3
3 kerikil m3
4 besi beton polos besi uk 12 kg
5 kayu kelas III papan meranti m3
6 paku paku biasa 2-5cm kg
7 kawat beton kg
8 kayu kelas II balok meranti m3
VI PASANGAN DINDING BATA MERAH
Upah
1 pekerja oh
2 tukang oh
3 kepala tukang oh
4 mandor oh
Bahan
1 pasir m3
2 semen kg
3 batu bata buah
VII RING BALOK
Upah
pekerja oh
tukang oh
keoala tukang oh
mandor oh
Bahan
kayu kelas III papan meranti m3
pasir m3
semen kg
kerikil m3
besi beton polos besi uk 12 kg
kawat beton kg
paku paku biasa 2-5cm kg
ASAR

HARGA SATUAN TOTAL

80,000.00

80,000.00
100,000.00

21,000.00
6,500,000.00
8,000.00
6,500,000.00

80,000.00
100,000.00

80,000.00
10,000.00

213,000.00

80,000.00
100,000.00

134,000.00

80,000.00
125,000.00

170,000.00

80,000.00
125,000.00
295,000.00

80,000.00
100,000.00

260,000.00

80,000.00
10,000.00
110,000.00
125,000.00

228,000.00
1,500.00
259,000.00

80,000.00
100,000.00
110,000.00
125,000.00

12,000.00
228,000.00
340,000.00
1,500.00
19,000.00

80,000.00
100,000.00
110,000.00
125,000.00

228,000.00
1,500.00
340,000.00
12,000.00
19,000.00
5,750,000.00
21,000.00
80,000.00
100,000.00
110,000.00
125,000.00

1,500.00
228,000.00
340,000.00
12,000.00
5,750,000.00
21,000.00
19,000.00
1,600,000.00

80,000.00
100,000.00
110,000.00
125,000.00

228,000.00
1,500.00
910.00

80,000.00
100,000.00
110,000.00
125,000.00

5,750,000.00
228,000.00
1,500.00
340,000.00
12,000.00
19,000.00
21,000.00
HARGA SATUAN PEKERJAAN
NO BAHAN/PEKERJAAN KOEFISIEN SATUAN
A PEKERJAAN PERSIAPAN
I PEMBERSIHAN LOKASI
Upah
1 pekerja 1 oh
II PEMASANGAN BOWPLANK
Upah
1 pekerja 0.1 oh
2 tukang 0.1 oh
Bahan
1 paku 0.02 kg
2 papan 2/20 0.007 m3
3 benang 1 roll
4 ususk 5/7 0.012 m3
B PEKERJAAN TANAH
I GALIAN TANAH
Upah
1 pekerja 0.75 oh
2 mandor 0.025 oh
II URUGAN PASIR
Upah
1 pekerja 0.75 oh
2 mandor 0.025 oh
Bahan
1 pasir urug 1.2 m3

III URUGAN TANAH


Upah
1 pekerja 0.75 oh
2 mandor 0.025 oh
Bahan
1 tanah urug 1.2 m3
IV URUGAN SIRTU
Upah
1 pekerja 0.75 oh
2 mandor 0.025 oh
Bahan
1 sirtu 1.2 m3
V PEMADATAN
Upah
1 pekerja 0.5 oh
2 mandor 0.5 oh
Alat
1 steamper 1 buah
C PEKERJAAN PASANGAN
I PASANGAN ANSTAMPING
Upah
1 pekerja 0.78 oh
2 tukang 0.39 oh
Bahan
1 batu kosong 1.2 m3
II PASANGAN PONDASI BATU KALI
Upah
1 pekerja 1.05 oh
2 tukang 0.7 oh
3 kepala tukang 0.07 oh
4 mandor 0.035 oh
Bahan
1 pasir 0.38 m3
2 semen 202 kg
3 batu kali 1.2 m3
III PONDASI CAKAR AYAM
Upah
1 pekerja 3.4 oh
2 tukang 0.85 oh
3 kepala tukang 0.085 oh
4 mandor 0.17 oh
Bahan
1 besi beton polos 126 kg
2 pasir 0.312 m3
3 kerikil 0.468 m3
4 semen 194 kg
5 kawat beton 1.8 kg
IV SLOOF
Upah
1 pekerja 0.565 oh
2 tukang 3.175 oh
3 kepala tukang 0.323 oh
4 mandor 0.283 oh
1 Bahan
2 pasir 0.54 m3
3 semen 336 kg
4 kerikil 0.81 m3
5 besi beton polos 210 kg
6 kawat beton 3 m3
7 kayu kelas III 0.27 m3
8 paku 2 kg
V KOLOM
Upah
1 pekerja 7.05 oh
2 tukang 4.025 oh
3 kepala tukang 0.403 oh
4 mandor 0.353 oh
Bahan
1 semen 336 kg
2 pasir 0.54 m3
3 kerikil 0.81 m3
4 besi beton polos 315 kg
5 kayu kelas III 0.4 m3
6 paku 4 kg
7 kawat beton 4.5 kg
8 kayu kelas II balok 0.15 m3
VI PASANGAN DINDING BATA MERAH
Upah
1 pekerja 0.3 oh
2 tukang 0.1 oh
3 kepala tukang 0.01 oh
4 mandor 0.015 oh
Bahan
1 pasir 0.05 m3
2 semen 8.32 kg
3 batu bata 70 buah
VII RING BALOK
Upah
pekerja 0.297 oh
tukang 0.99 oh
keoala tukang 0.01 oh
mandor 0.15 oh
Bahan
kayu kelas III 0.003 m3
pasir 0.009 m3
semen 5.5 kg
kerikil 0.015 m3
besi beton polos 3.6 kg
kawat beton 0.05 kg
paku 0.02 kg
TOTAL
N PEKERJAAN
HARGA SATUAN JUMLAH HARGA TOTAL

80,000 80,000 80,000

80,000 8,000
100,000 10,000

21,000 420
6,500,000 45,500
8,000 8,000
6,500,000 78,000 149,920

80,000 60,000
100,000 2,500 62,500

80,000 60,000
10,000 250

213,000 255,600 315,850

80,000 60,000
100,000 2,500

134,000 160,800 223,300

80,000 60,000
125,000 3,125

170,000 204,000 267,125

80,000 40,000
125,000 62,500
295,000 295,000 397,500

80,000 62,400
100,000 39,000

260,000 312,000 413,400

80,000 84,000
10,000 7,000
110,000 7,700
125,000 4,375

228,000 86,640
1,500 303,000
259,000 310,800 803,515

80,000 272,000
100,000 85,000
110,000 9,350
125,000 21,250

12,000 1,512,000
228,000 71,136
340,000 159,120
1,500 291,000
19,000 34,200 2,455,056

80,000 45,200
100,000 317,500
110,000 35,530
125,000 35,375

228,000 123,120
1,500 504,000
340,000 275,400
12,000 2,520,000
19,000 57,000
5,750,000 1,552,500
21,000 42,000 5,507,625
80,000 564,000
100,000 402,500
110,000 44,330
125,000 44,125

1,500 504,000
228,000 123,120
340,000 275,400
12,000 3,780,000
5,750,000 2,300,000
21,000 84,000
19,000 85,500
1,600,000 240,000 8,446,975

80,000 24,000
100,000 10,000
110,000 1,100
125,000 1,875

228,000 11,400
1,500 12,480
910 63,700 124,555

80,000 23,760
100,000 99,000
110,000 1,100
125,000 18,750

5,750,000 17,250
228,000 2,052
1,500 8,250
340,000 5,100
12,000 43,200
19,000 950
21,000 420 219,832
19,467,153
RAB
NO BAHAN/PEKERJAAN VOLUME SATUAN HARGA SATUAN
A PEKERJAAN PERSIAPAN
I PEMBERSIHAN LOKASI
Upah 87,5m2
1 pekerja oh 80,000
II PEMASANGAN BOWPLANK
Upah
1 pekerja oh 80,000
2 tukang oh 100,000
Bahan
39m2
1 paku kg 21,000
2 papan 2/20 m3 6,500,000
3 benang roll 8,000
4 ususk 5/7 m3 6,500,000
B PEKERJAAN TANAH
I GALIAN TANAH
Upah
71,5m3
1 pekerja oh 80,000
2 mandor oh 100,000
II URUGAN PASIR
Upah
1 pekerja oh 80,000
2 mandor oh 10,000
0,2145m3
Bahan
1 pasir urug m3 213,000

III URUGAN TANAH


Upah
1 pekerja oh 80,000
2 mandor 28,3075m3 oh 100,000
Bahan
1 tanah urug m3 134,000
IV URUGAN SIRTU
Upah
1 pekerja oh 80,000
2 mandor oh 125,000
Bahan
1 sirtu m3 170,000
V PEMADATAN
Upah
1 pekerja oh 80,000
2 mandor oh 125,000
Alat
1 steamper buah 295,000
C PEKERJAAN PASANGAN
I PASANGAN ANSTAMPING
Upah
1 pekerja oh 80,000
2 tukang 0,858m3 oh 100,000
Bahan
1 batu kosong m3 260,000
II PASANGAN PONDASI BATU KALI
Upah
1 pekerja oh 80,000
2 tukang oh 10,000
3 kepala tukang oh 110,000
4 mandor 42,12m3 oh 125,000
Bahan
1 pasir m3 228,000
2 semen kg 1,500
3 batu kali m3 259,000
III PONDASI CAKAR AYAM
Upah
1 pekerja oh 80,000
2 tukang oh 100,000
3 kepala tukang oh 110,000
4 mandor oh 125,000
Bahan
1 besi beton polos kg 12,000
2 pasir m3 228,000
3 kerikil m3 340,000
4 semen kg 1,500
5 kawat beton 19,000
IV SLOOF
Upah
1 pekerja oh 80,000
2 tukang oh 100,000
3 kepala tukang oh 110,000
4 mandor oh 125,000
1 Bahan
2 pasir 2,145m3 m3 228,000
3 semen kg 1,500
4 kerikil m3 340,000
5 besi beton polos kg 12,000
6 kawat beton m3 19,000
7 kayu kelas III m3 5,750,000
8 paku kg 21,000
V KOLOM
Upah
1 pekerja oh 80,000
2 tukang oh 100,000
3 kepala tukang oh 110,000
4 mandor oh 125,000

1,485m3
Bahan
1 semen kg 1,500
1,485m3
2 pasir m3 228,000
3 kerikil m3 340,000
4 besi beton polos kg 12,000
5 kayu kelas III m3 5,750,000
6 paku kg 21,000
7 kawat beton kg 19,000
8 kayu kelas II balok m3 1,600,000
VI PASANGAN DINDING BATA MERAH
Upah
1 pekerja oh 80,000
2 tukang oh 100,000
3 kepala tukang oh 110,000
4 mandor oh 125,000
Bahan
1 pasir m3 228,000
2 semen kg 1,500
3 batu bata buah 910
VII RING BALOK
Upah
pekerja oh 80,000
tukang oh 100,000
keoala tukang oh 110,000
mandor oh 125,000
Bahan
kayu kelas III 1,6125m3 m3 5,750,000
pasir m3 228,000
semen kg 1,500
kerikil m3 340,000
besi beton polos kg 12,000
kawat beton kg 19,000
paku kg 21,000
TOTAL
JUMLAH HARGA TOTAL

- -

-
-

-
-
-
- -

- -

- -

-
-

- -

-
-

- -

-
-

- -
-
-

- -

-
-
-
-

-
-
- -

-
-
-
-

-
-
-
-
- -

-
-
-
-

-
-
-
-
-
-
- -

-
-
-
-
-
-
-
-
-
-
-
- -

-
-
-
-

-
-
- -

-
-
-
-

-
-
-
-
-
-
- -
-