80,000.00
80,000.00
100,000.00
21,000.00
6,500,000.00
8,000.00
6,500,000.00
80,000.00
100,000.00
80,000.00
10,000.00
213,000.00
80,000.00
100,000.00
134,000.00
80,000.00
125,000.00
170,000.00
80,000.00
125,000.00
295,000.00
80,000.00
100,000.00
260,000.00
80,000.00
10,000.00
110,000.00
125,000.00
228,000.00
1,500.00
259,000.00
80,000.00
100,000.00
110,000.00
125,000.00
12,000.00
228,000.00
340,000.00
1,500.00
19,000.00
80,000.00
100,000.00
110,000.00
125,000.00
228,000.00
1,500.00
340,000.00
12,000.00
19,000.00
5,750,000.00
21,000.00
80,000.00
100,000.00
110,000.00
125,000.00
1,500.00
228,000.00
340,000.00
12,000.00
5,750,000.00
21,000.00
19,000.00
1,600,000.00
80,000.00
100,000.00
110,000.00
125,000.00
228,000.00
1,500.00
910.00
80,000.00
100,000.00
110,000.00
125,000.00
5,750,000.00
228,000.00
1,500.00
340,000.00
12,000.00
19,000.00
21,000.00
HARGA SATUAN PEKERJAAN
NO BAHAN/PEKERJAAN KOEFISIEN SATUAN
A PEKERJAAN PERSIAPAN
I PEMBERSIHAN LOKASI
Upah
1 pekerja 1 oh
II PEMASANGAN BOWPLANK
Upah
1 pekerja 0.1 oh
2 tukang 0.1 oh
Bahan
1 paku 0.02 kg
2 papan 2/20 0.007 m3
3 benang 1 roll
4 ususk 5/7 0.012 m3
B PEKERJAAN TANAH
I GALIAN TANAH
Upah
1 pekerja 0.75 oh
2 mandor 0.025 oh
II URUGAN PASIR
Upah
1 pekerja 0.75 oh
2 mandor 0.025 oh
Bahan
1 pasir urug 1.2 m3
80,000 8,000
100,000 10,000
21,000 420
6,500,000 45,500
8,000 8,000
6,500,000 78,000 149,920
80,000 60,000
100,000 2,500 62,500
80,000 60,000
10,000 250
80,000 60,000
100,000 2,500
80,000 60,000
125,000 3,125
80,000 40,000
125,000 62,500
295,000 295,000 397,500
80,000 62,400
100,000 39,000
80,000 84,000
10,000 7,000
110,000 7,700
125,000 4,375
228,000 86,640
1,500 303,000
259,000 310,800 803,515
80,000 272,000
100,000 85,000
110,000 9,350
125,000 21,250
12,000 1,512,000
228,000 71,136
340,000 159,120
1,500 291,000
19,000 34,200 2,455,056
80,000 45,200
100,000 317,500
110,000 35,530
125,000 35,375
228,000 123,120
1,500 504,000
340,000 275,400
12,000 2,520,000
19,000 57,000
5,750,000 1,552,500
21,000 42,000 5,507,625
80,000 564,000
100,000 402,500
110,000 44,330
125,000 44,125
1,500 504,000
228,000 123,120
340,000 275,400
12,000 3,780,000
5,750,000 2,300,000
21,000 84,000
19,000 85,500
1,600,000 240,000 8,446,975
80,000 24,000
100,000 10,000
110,000 1,100
125,000 1,875
228,000 11,400
1,500 12,480
910 63,700 124,555
80,000 23,760
100,000 99,000
110,000 1,100
125,000 18,750
5,750,000 17,250
228,000 2,052
1,500 8,250
340,000 5,100
12,000 43,200
19,000 950
21,000 420 219,832
19,467,153
RAB
NO BAHAN/PEKERJAAN VOLUME SATUAN HARGA SATUAN
A PEKERJAAN PERSIAPAN
I PEMBERSIHAN LOKASI
Upah 87,5m2
1 pekerja oh 80,000
II PEMASANGAN BOWPLANK
Upah
1 pekerja oh 80,000
2 tukang oh 100,000
Bahan
39m2
1 paku kg 21,000
2 papan 2/20 m3 6,500,000
3 benang roll 8,000
4 ususk 5/7 m3 6,500,000
B PEKERJAAN TANAH
I GALIAN TANAH
Upah
71,5m3
1 pekerja oh 80,000
2 mandor oh 100,000
II URUGAN PASIR
Upah
1 pekerja oh 80,000
2 mandor oh 10,000
0,2145m3
Bahan
1 pasir urug m3 213,000
1,485m3
Bahan
1 semen kg 1,500
1,485m3
2 pasir m3 228,000
3 kerikil m3 340,000
4 besi beton polos kg 12,000
5 kayu kelas III m3 5,750,000
6 paku kg 21,000
7 kawat beton kg 19,000
8 kayu kelas II balok m3 1,600,000
VI PASANGAN DINDING BATA MERAH
Upah
1 pekerja oh 80,000
2 tukang oh 100,000
3 kepala tukang oh 110,000
4 mandor oh 125,000
Bahan
1 pasir m3 228,000
2 semen kg 1,500
3 batu bata buah 910
VII RING BALOK
Upah
pekerja oh 80,000
tukang oh 100,000
keoala tukang oh 110,000
mandor oh 125,000
Bahan
kayu kelas III 1,6125m3 m3 5,750,000
pasir m3 228,000
semen kg 1,500
kerikil m3 340,000
besi beton polos kg 12,000
kawat beton kg 19,000
paku kg 21,000
TOTAL
JUMLAH HARGA TOTAL
- -
-
-
-
-
-
- -
- -
- -
-
-
- -
-
-
- -
-
-
- -
-
-
- -
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
- -
-