BILL OF QUANTITY (BOQ)

Program : Peningkatan Kualitas Kawasan Permukiman Kumuh


Kegiatan : Bantuan Prasarana/ Sarana Infrastruktur Skala kawasan
Nama Paket : Optimalisasi Peningkatan Kualitas Permukiman Kumuh Cileueur, Kabupaten Ciamis (NSUP)
Lokasi : Kelurahan Maleber Kecamatan Ciamis Kabupaten Ciamis Provinsi Jawa Barat

CCO2 PROGRES BULAN SEBELUMNYA PROGRES BULAN INI PROGRES BULAN S/D BULAN INI
No. Mata BOBOT PROGRES
NO URAIAN PEKERJAAN HARGA BOBOT JUMLAH HARGA BOBO JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT
Pembayaran JUMLAH HARGA (%) (%)
VOLUME SATUAN (%) VOLUME (Rp) T VOLUME (Rp) (%) VOLUME (Rp) (%)
(Rp)
(Rp) (%)
1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A KLASIFIKASI PEKERJAAN BIDANG BINA MARGA
I. DIVISI 1. UMUM
1 1.2 Mobilisasi dan Demobilisasi 1.00 ########### 30,200,000.00 0.76 0.78 23,556,000.00 0.59 0.22 6,644,000.00 0.17 1.00 30,200,000.00 0.76 0.76
100.00
- - 0.76
II DIVISI 3. PEKERJAAN TANAH - -
1 1.7.1.a Galian Biasa 460.30 77,500.00 35,673,262.84 0.89 403.40 31,263,345.00 0.78 56.90 4,409,917.84 0.11 460.30 35,673,262.84 0.89 0.89
100.00
- - 0.89
2 1.7.2.d ( c) Timbunan Pasir urug 196,000.00 - - - -
- -
3 1.7.2.d ( e ) Urugan Sirtu 853.40 226,000.00 192,868,067.73 4.82 440.21 99,487,008.00 2.49 413.19 93,381,059.73 2.34 853.40 192,868,067.73 4.82 4.57
105.48
- - 4.82
III DIVISI 7. PEKERJAAN STRUKTUR - -
1 2.1.2.a.2.c.(a) Pasangan Batu Kali 1 Pc : 4 Ps 120.03 1,023,000.00 122,790,690.00 3.07 120.03 122,790,690.00 3.07 - - - 120.03 122,790,690.00 3.07 3.07
100.00
- - 3.07
2 2.2.3.a.(a) Membuat 1 m3 beton mutu K 200 6.67 1,226,600.00 8,181,422.00 0.20 6.67 8,181,422.00 0.20 - - - 6.67 8,181,422.00 0.20 0.20
100.00
- - 0.20
3 2.2.6.1.c.(a) Baja Tulangan U 32 Ulir ######## 17,200.00 192,543,376.27 4.82 ####### 165,223,796.88 4.13 ####### 27,319,579.39 0.68 ######## 192,543,376.27 4.82 4.53
106.45
- - 4.82
4 1.5.2.1.1.a.(a) Pemasangan 1 m3 bronjong pabrikasi ukuran kawat 3 mm (2m x 1m x 0,5m) 63.00 849,600.00 53,524,800.00 1.34 63.00 53,524,800.00 1.34 - - - 63.00 53,524,800.00 1.34 1.34
100.00
- - 1.34
B KLASIFIKASI PEKERJAAN BIDANG CIPTA KARYA - -
I DIVISI 2 PEKERJAAN TANAH - -
1 T.06.b.1 Penggalian 1 m3 tanah biasa sedalam 1 m - 77,500.00 - - - - -
-
- - -
2 1.7.2.d ( c) Pengurugan 1 m3 dengan pasir urug - 196,000.00 - - - - -
-
- - -
3 1.7.2.c (c) Pemadatan tanah 1 m3 tanah ( per 20 cm) 1,527.43 56,100.00 85,688,542.50 2.14 759.03 42,581,599.83 1.07 768.39 43,106,942.67 1.08 1,527.43 85,688,542.50 2.14 2.14
100.00
- - 2.14
II DIVISI 3 PEKERJAAN PONDASI - - -
1 2.1.1.b.(a) Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 1,076.65 959,600.00 1,033,155,834.96 25.84 949.29 910,934,365.80 22.79 127.37 122,221,469.16 3.06 1,076.65 1,033,155,834.96 25.84 25.84
100.00
- - 25.84
III DIVISI 4.1 PEKERJAAN BESI & BETON - - -
1 2.2.12.b.(a) Membuat 1 m3 beton mutu K 175 141.78 941,300.00 133,456,572.70 3.34 127.60 120,110,915.43 3.00 14.18 13,345,657.27 0.33 141.78 133,456,572.70 3.34 3.34
100.00
- - 3.34
2 4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof 666.40 168,300.00 112,155,120.00 2.81 610.60 102,763,980.00 2.57 55.80 9,391,140.00 0.23 666.40 112,155,120.00 2.81 2.81
100.00
- - 2.81
3 2.2.6.1.c.(a) Pembesian 1 kg dengan besi polos - 17,200.00 - - - -
- -
4 A.4.1.1.6 Membuat 1 m3 beton mutu K 200 61.31 1,156,300.00 70,892,753.00 1.77 55.72 64,426,723.40 1.61 5.59 6,466,029.60 0.16 61.31 70,892,753.00 1.77 1.77
100.00
- - 1.77
IV DIVISI 4.2 PEKERJAAN STRUKTUR BAJA - -
1 A.4.2.2.1 Angkur 278.00 35,000.00 9,730,000.00 0.24 278.00 9,730,000.00 0.24 - - - 278.00 9,730,000.00 0.24 0.24
100.00
- - 0.24
CCO2 PROGRES BULAN SEBELUMNYA PROGRES BULAN INI PROGRES BULAN S/D BULAN INI
No. Mata BOBOT PROGRES
NO URAIAN PEKERJAAN HARGA BOBOT JUMLAH HARGA BOBO JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT
Pembayaran JUMLAH HARGA (%) (%)
VOLUME SATUAN (%) VOLUME (Rp) T VOLUME (Rp) (%) VOLUME (Rp) (%)
(Rp)
(Rp) (%)
1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
V DIVISI 4.4 PEKERJAAN PASANGAN - -
1 A.4.4.3.59a Pemasangan 1m² lantai Batu Andesit 836.54 291,400.00 243,767,756.00 6.10 466.96 136,072,726.80 3.40 369.58 107,695,029.20 2.69 836.54 243,767,756.00 6.10 6.10
100.00
- - 6.10
2 4.4.3.6. Pemasangan 1 m2 lantai Guiding Line 109.23 369,200.00 40,327,716.00 1.01 - 109.23 40,327,716.00 1.01 109.23 40,327,716.00 1.01 1.01
100.00
- - 1.01
3 4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:4PP 9.42 149,200.00 1,405,464.00 0.04 - 9.42 1,405,464.00 0.04 9.42 1,405,464.00 0.04 0.04
100.00
- - 0.04
4 4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 9.42 64,400.00 606,648.00 0.02 - 9.42 606,648.00 0.02 9.42 606,648.00 0.02 0.02
100.00
- - 0.02
5 A.5.2.1.B Pek Gravel U dia 30 440.20 121,000.00 53,264,200.00 1.33 175.30 21,211,300.00 0.53 264.90 32,052,900.00 0.80 440.20 53,264,200.00 1.33 1.33
100.00
- - 1.33
VI DIVISI 8 PEKERJAAN ELEKTRIKAL - -
1 A.8.6.1.4 Lampu PJU LED 100 Watt Cobra Phillips 19.00 1,048,300.00 19,917,700.00 0.50 - 19.00 19,917,700.00 0.50 19.00 19,917,700.00 0.50 0.50
100.00
- - 0.50
2 A.8.6.2.1 Pengadaan dan Pemasangan tiang PJU Pipa Besi Galvanised Dia. 3Inchi 19.00 1,760,000.00 33,440,000.00 0.84 - 19.00 33,440,000.00 0.84 19.00 33,440,000.00 0.84 0.84
100.00
- - 0.84
3 A.8.4.3.2 Pengadaan Kabel NYM 3x2,5 Supreme 257.00 83,000.00 21,331,000.00 0.53 192.51 15,978,059.22 0.40 64.49 5,352,940.78 0.13 257.00 21,331,000.00 0.53 0.53
100.00
- - 0.53
4 A.8.4.3.1 Pengadaan Kabel NYY 3x2,5 Supreme 475.00 196,300.00 93,242,500.00 2.33 355.80 69,843,616.65 1.75 119.20 23,398,883.35 0.59 475.00 93,242,500.00 2.33 2.33
100.00
- - 2.33
5 A.8.6.4.1 Panel Kontrol Lengkap MCB dan Rell dan Dudukan 1.00 2,265,500.00 2,265,500.00 0.06 - 1.00 2,265,500.00 0.06 1.00 2,265,500.00 0.06 0.06
100.00
- - 0.06
6 A.8.6.5.1 Pemasangan Daya Listrik Baru (Biaya Pasang Baru, UJL, SLO, JI dan Materai) 4,400.00 2,000.00 8,800,000.00 0.22 - ####### 8,800,000.00 0.22 4,400.00 8,800,000.00 0.22 0.22
100.00
- - 0.22
VII DIVISI 9 PEKERJAAN LAIN - LAIN - -
1 A.9.5.5.1 Pek. Railing besi Pipa GIP 2", Pipa GIP 1" & Ornamen 470.20 1,965,100.00 923,990,020.00 23.11 370.00 727,087,000.00 18.19 100.20 196,903,020.00 4.93 470.20 923,990,020.00 23.11 23.11
100.00
- - 23.11
2 A.9.6.3.4 Pemasangan 1 Unit Bak Kontrol Pas. Bata Uk. 60 x 60, T=65 cm + Penutup Plat beton 10.00 794,500.00 7,945,000.00 0.20 10.00 7,945,000.00 0.20 - - - 10.00 7,945,000.00 0.20 0.20
100.00
- - 0.20
3 5.1.1.34. Pemasangan 1 m' Pipa PVC Tipe D diameter 6" 175.00 195,500.00 34,212,500.00 0.86 140.00 27,370,000.00 0.68 35.00 6,842,500.00 0.17 175.00 34,212,500.00 0.86 0.86
100.00
- - 0.86
VII DIVISI 9 PEKERJAAN K3 - -
1 A.9.5.5.1 SMKK 1.00 ########### 56,225,000.00 1.41 0.93 52,045,587.69 1.30 0.07 4,179,412.31 0.10 1.00 56,225,000.00 1.41 1.41
100.00
- - 1.41
B PEKERJAAN TAMBAHAN BARU - -
1 4.1.1.21 Pemasangan Bekisting Untuk Kolom 300.26 130,400.00 39,153,252.00 0.98 230.27 30,026,751.60 0.75 69.99 9,126,500.40 0.23 300.26 39,153,252.00 0.98 0.98
100.00
- - 0.98
2 4.1.1.21 Pemasangan Bekisting Untuk Balok 314.22 168,300.00 52,883,226.00 1.32 245.45 41,308,561.80 1.03 68.77 11,574,664.20 0.29 314.22 52,883,226.00 1.32 1.32
100.00
- - 1.32
3 4.1.1.21 Pemasangan Bekisting Untuk Pondasi 180.19 96,500.00 17,388,335.00 0.43 93.66 9,037,900.50 0.23 86.53 8,350,434.50 0.21 180.19 17,388,335.00 0.43 0.43
100.00
- - 0.43
4 1.7.2.c (c) Pengurugan dengan Tanah urug 1,067.06 165,200.00 176,278,082.27 4.41 565.39 93,402,078.24 2.34 501.67 82,876,004.03 2.07 1,067.06 176,278,082.27 4.41 4.41
100.00
- - 4.41
5 1.7.14.a(a) Pengurugan Kembali Dari Hasil Galian 460.30 11,200.00 5,155,360.00 0.13 411.01 4,603,289.60 0.12 49.29 552,070.40 0.01 460.30 5,155,360.00 0.13 0.13
100.00
- - 0.13
6 3,2,2,c Pekerjaan Siaran 800.16 50,900.00 40,728,144.00 1.02 760.52 38,710,468.00 0.97 39.64 2,017,676.00 0.05 800.16 40,728,144.00 1.02 1.02
100.00
- - 1.02
7 3.2.2.1.2.a.(a) Pemasangan Acian 9.42 38,300.00 360,786.00 0.01 - 9.42 360,786.00 0.01 9.42 360,786.00 0.01
- -
8 1,7,3,1,b,2,(a) Pemotongan Pohon Pilihan diameter 30-50 cm 50.00 24,400.00 1,220,000.00 0.03 50.00 1,220,000.00 0.03 - - - 50.00 1,220,000.00 0.03 0.03
100.00
- - 0.03
9 1,7,3,1,b,2,(a) Tebas Tebang Tumbuhan dia 5 s/d 15 cm 100.00 5,600.00 560,000.00 0.01 100.00 560,000.00 0.01 - - - 100.00 560,000.00 0.01 0.01
100.00
- - 0.01
CCO2 PROGRES BULAN SEBELUMNYA PROGRES BULAN INI PROGRES BULAN S/D BULAN INI
No. Mata BOBOT PROGRES
NO URAIAN PEKERJAAN HARGA BOBOT JUMLAH HARGA BOBO JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT
Pembayaran JUMLAH HARGA (%) (%)
VOLUME SATUAN (%) VOLUME (Rp) T VOLUME (Rp) (%) VOLUME (Rp) (%)
(Rp)
(Rp) (%)
1 2 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
10 An.01 Bongkar MCK 1.00 300,700.00 300,700.00 0.01 1.00 300,700.00 0.01 - - - 1.00 300,700.00 0.01 0.01
100.00
- - 0.01
11 An.02 Batu Pualam 60x40 Untuk Prasati 1.00 3,000,000.00 3,000,000.00 0.08 - 1.00 3,000,000.00 0.08 1.00 3,000,000.00 0.08
- -
12 An.03 Bangku Taman 6.00 1,500,000.00 9,000,000.00 0.23 - 6.00 9,000,000.00 0.23 6.00 9,000,000.00 0.23 0.23
100.00
- - 0.23
13 An.04 Tempat Sampah Organik 3.00 800,000.00 2,400,000.00 0.06 - 3.00 2,400,000.00 0.06 3.00 2,400,000.00 0.06 0.06
100.00
- - 0.06
14 An.05 Bloom Bak 150x60x45 8.00 1,233,021.09 9,864,168.73 0.25 - 8.00 9,864,168.73 0.25 8.00 9,864,168.73 0.25 0.25
100.00
- - 0.25
15 An.06 Grill Besi 47.00 375,200.00 17,634,400.00 0.44 - 47.00 17,634,400.00 0.44 47.00 17,634,400.00 0.44 0.44 100.00
- - 0.44
JUMLAH 3,997,527,900.00 100.00 3,031,297,686.45 75.83 966,230,213.55 24.17 3,997,527,900.00 100.00