Anda di halaman 1dari 38

IOH

Site Model AAU Antenna IOH

Prepared by
IOH Project
Quality Assurance Department
V 1.1
Document Information
Email Approval & Output MOM
Document Name Site Model AAU Antenna IOH
Prepared by (QA) Elvian -260963 & Bagus MP - 84249609
Qinjiarong – 468733 & Sediaman Sitanggang -
Review by (TD) 742616
Acknowledge by (PD) Gaoqiang - 578145

TBD
Approval by (IOH)
Approval Date
Version V 1.0
Output MOM Site Model
Key Point Highlight Confirmed Confirmed by IOH
1. TBD

Note : If any exceptional/abnormal condition need to escalate and email to IOH RAN Solution to give advice.
Site Information

Customer Site ID 13PLR0519


Customer Site Name TITISAN_SUKALARANG_SUK_EP
DUID 13PLR0519_MIMO_TRIAL
Project Code 56A0HKH
Project Name IOH Trial Project
Longitude 107.028260
Latitude -6.876320
KP. CIKUPA RT.018 RW.007 DESA TITISAN KE
Address CAMATAN SUKALARANG KABUPATEN SUKABUMI PROVINSI JAWA BARAT
SOW Scenario
Tower Type Greenfield
Installation Subcon P.T. TRITAMA AJI LAKSANA.
On Site Supervisor Elvian -260963 & Bagus MP - 84249609
Information Existing site Ex-H3I use Rectifier Cabinet APM 30, RFC, Battery Cabinet.
Site Model Technical Solution AAU Antenna

Future Configure
Current Configure

Traditional Hard
Split Antenna
1 x (690-960) MHz
2 x (1695-2200)MHz
Traditional Hard
Split Antenna 1 x (690-960) MHz + AAU5726
32T32R
2 x (1695-2200)MHz

1.8+2.1GHz

2*Combiner RRU5909
(900M)
2*Combiner RRU5909
DCDU 16D
(900M)

RRU5502 RRU5904 RRU5904 RRU5904


4*60w 4*60w 4*80w 4*60w
(1800M) (2100M) (1800M) (2100M)

Remark1: 900M RRU no change


Remark2: 60M IBW License is required
Need to add one PCS UBBPg3
Coloring Label for AAU Installation

Sector 1 Sector 2 Sector 3

CPRI 0

CPRI 1

CPRI 0

CPRI 1

CPRI 0

CPRI 1
Power

Power

Power
Site Model Technical Solution AAU Antenna

Before:sector 3 connection AFTER:sector 3 connection

0-62-0 0-242-0 0-82-0 0-212-0 0-92-0 0-62-0 0-102-0


RRU5909 RRU5904 RRU5904 RRU5904 RRU5502 RRU5909 AAU5726
GL 900M LO HOS 2100M LO 2100M LO HOS 1800M LO 1800M GL 900M 1800+2100 Sec-3

UBBPe4 UBBPe4 UBBPg3


FANe FANe
UBBPe4 UBBPe4

UBBPg2 UBBPg2
UPEUd UPEUd
UMPTe2 UMPTe2

BBU5900-0-0 BBU5900-0-0
1. Dismantle 0-92-0 RRU5502 1800M in slot 4,port 5
2. Dismantle 0-212-0 RRU5904 1800M in slot 2,port 4
3. Dismantle 0-82-0 RRU5904 2100M in slot 2,port 2
4. Dismantle 0-242-0 RRU5904 2100M in slot 2,port 3
6. Install UBBPg3 in slot 1
7. Connect 2 CPRI for AAU5726 in slot 1 UBBPg3 port 2 and port 5 with SFP 25G
8. Install GPS antenna
EHS Task

PPE for Work Tools, FA Kit, and Fire Extinguisher Certificate (WAH, Electrical, and FA)
Note: Full APD untuk bekerja Note: Tools box & P3K dalam kondisi terbuka, dan Note: Sertifikat/Lisensi WAH dari Depnaker untuk
tambahan untuk APAR (SOW : Power, BSC, dan pekerja di atas tower, Sertifikat kelistrikan dan P3K.
Kelistrikan).
Site Overview
Configuration General based on ATP Checklist

Tower Full View


Note: Sebisa mungkin, tower harus terlihat secara utuh.
Ground Part – Site Access

Note :
1. Harus menunjukkan adanya jalan menuju site.
2. Harus memperlihatkan arah ke site
Ground Part – Fence & Gate

Note :
1. Harus menunjukkan kondisi pagar site.
2. Bila ada pagar atau pintu gerbang yang rusak, maka harus difoto.
Ground Part – Site identity (Information)

Note :
1. Perlihatkan detail informasi site (Name plate Tower/Banner).
Ground Part – Tower full view

Note :
1. Sebisa mungkin, tower harus terlihat secara utuh.
Ground Part – Site Clean & Tidy

Note :
Kondisi site harus bersih dan rapih, tidak ada sampah sisa instalasi, bekas bakaran ataupun sisa dismantle material.
Ground Part – New/Existing Grounding Bar

Note :
1. Pastikan koneksi grounding cabinet (3 GI Wire/Yellow green grounding) sudah terpasang di busbar, menggunakan metal conduit, skun, heatsrink, dan
label.
2. Jika Menggunakan kabinet existing, foto kondisi busbar existing saja.
Ground Part – CPRI Connection to Module inside service cabinet

Note :
1. Semua label CPRI harus terpasang.
2. Jalur kabel dan Optik harus rapih.
Ground Part – Spare CPRI cable inside cabinet Left & Right

Note :
1. Semua gulungan kabel optik, tertata dengan baik dan rapih.
2. Sektor 1 dan 2 di sebelah kiri, sektor 3 di sebelah kanan.
Ground Part – Power cable connection in MCBs and label

Source DCDU 16D terkoneksi


ke LLVD (non priority power
source)

1. Kabel yang terkirim


adalah 25mm atau
16mm
2. Pilihan utama adalah
menggunakan MCB
2*80A dengan kabel
minimal 16mm
3. Jika tidak lagi tersedia
MCB 2*80A, di izinkan
untuk menggunakan
MCB 1*125A dengan
kabel minimal 25mm
4. Point 4 hanya di izinkan
jika tidak lagi tersedia
MCB 2*80A
5. Jika tidak lagi tersedia
MCB 2*80A ataupun
MCB 1*125A,
diperkenankan
menggunakan MCB
2*63A dengan kabel
minimal 16mm

Note :
1.Semua koneksi kabel Power harus pakai skun. Kecuali DCDU konektor power (datasheet material tidak di rekomendasikan menggunakan skun).
2.Semua kabel Power harus di pasang label.
3.Koneksi kabel Power harus mengikuti standard.
Ground Part – Entry point CPRI and Power cable to the service cabinet

Note :
1. Jalur kabel harus searah,jangan ada kabel yang cross.
2. Setelah spare Optic di gulung dalam kabinet, sisanya di gulung di bawah Horizontal Tray dgn rapi sektor 1,2,3.
Ground Part – Grounding Kit Power RRU (upper bending)

Note :
1. Waterproofing grounding kit harus 3 layers; isolatip, rubber, isolatip dan ujung isolatip atas dan bawah di ikat kabel ties hitam.
2. Koneksi grounding kit di grounding bar harus kencang menggunakan ring plat dan ring per.
3. Label penanda system dan penanda sektor cukup isolatip warna, jika label papan terpasang tidak menjadi rejection.
Ground Part – Horizontal & Vertical Tray

Note :
1. Waterproofing grounding kit harus 3 layers; isolatip, rubber, isolatip dan ujung isolatip atas dan bawah di ikat kabel ties hitam.
2. Koneksi grounding kit di grounding bar harus kencang menggunakan ring plat dan ring per.
3. Label penanda system dan penanda sektor cukup isolatip warna, jika label papan terpasang tidak menjadi rejection.
Tower Part Before Swap – View Sector 1. Instalasi Assembly (Antenna, RRU, Filter, Combiner)

N/A
Note :
1. Harus terlihat jelas antenna secara utuh.
2. Stick rod yang di install jika menggunakan mounting Huawei harus di photo mengarah ke antenna Top and Bottom pakai(double mur, ring plat ring per) jgn
longgar.
Tower Part Before Swap – View Sector 2. Instalasi Assembly (Antenna, RRU, Filter, Combiner)

N/A
Note :
1. Harus terlihat jelas antenna secara utuh.
2. Stick rod yang di install jika menggunakan mounting Huawei harus di photo mengarah ke antenna Top and Bottom pakai(double mur, ring plat ring per) jgn
longgar.
Tower Part Before Swap – View Sector 3. Instalasi Assembly (Antenna, RRU, Filter, Combiner)

Note :
1. Harus terlihat jelas antenna secara utuh.
2. Stick rod yang di install jika menggunakan mounting Huawei harus di photo mengarah ke antenna Top and Bottom pakai(double mur, ring plat ring per) jgn
longgar.
Tower Part Routing CPRI & Power cable to RRU assembly on tower

Note :
1.Routing kabel harus rapi di clamp per 1 meter.
2.Pastikan tidak ada kabel power dan CPRI yang cross.
3.Clamp tidak boleh menghadap ke atas.
Tower Part Installation Assembly (Antenna,RRU,Filter,Combiner)

Note :
1. Harus terlihat jelas antenna secara utuh.
2. Photo mengarah ke antenna Top and Bottom pakai(double mur, ring plat ring per) jangan longgar.
3. Antenna AAU & Existing harus sama azimuthnya.
Tower Part Bracket Assembly Top & Bottom

Note :
1. Harus terlihat jelas antenna secara utuh.
2. Top and Bottom barcket pakai(double mur, ring plat ring per) jangan longgar.
Tower Part Antenna Height

Note :
Antenna height di ukur persis di tengah antenna. Tarik meteran dari atas tanah. Jika Tower Protelindo, Tarik meteran dari atas pondasi kaki tower.
Tower Part Electrical Tilt

N/A
Note :
Proposed take out E Tilt N/A
Tower Part Antenna Azimuth

Note :
1. Photo harus terlihat panoramic dan label (jika site Roof Top harus ambil photo view dari belakang antenna).
2. Azimuth antenna harus mengikuti existing dan terlihat jelas. (Toleransi photo dokumentasi +/- 5 derajat)
Tower Part Mechanical Tilting

Note :
1. Photo mechanical Tilt di ukur di bagian tengah antenna.
2. Label penanda sektor harus terlihat jelas.
3. Mechanical Tilt harus mengikuti existing.
4. Jarum merah mengarah ke Derajat Angle Meter, Gelembung udara persis di tengah garis.
Tower Part RRU Power cable and CPRI connection

N/A
Note :
Proposed N/A AAU use compact RRU
Tower Part RRU Power cable and CPRI connection

N/A
Note :
Proposed N/A AAU use compact RRU replace with GPS Antenna Installation
Tower Part AAU, Filter & Combiner (per set) Grounding Connection to Grounding Bar

Note :
1. Semua kabel grounding wajib di print, boleh menggunakan plat atau bendera.
2. Koneksi grounding pakai ring plat dan ring per pakai skun dan heat shrink atau vinyl dan koneksi kencang.
3. Posisi grounding bar tower yang di koneksikan harus di bawah antenna. Tidak boleh lebih tinggi dari antenna.
4. Jika koneksi lobang grounding penuh, maka maksimal 1 lobang bisa di isi 2 kabel grounding.
5. Jika Busbar Existing N/A maka perlu request ke TLP untuk pasang Busbar.
Tower Part GPS Antenna Installation

Note :
1. Koneksi GPS di BBU
2. Jalur kabel GPS inlet & tray
3. GPS Full view
4. GPS Label
Question & Answer (Q & A)
QHSE IOH

THANK YOU

Anda mungkin juga menyukai