BACKUP DATA QUANTITY
BACKUP DATA QUANTITY
PROGRAM :
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00
- Socket GIP Ø 2" Bh 1.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
- DOP GIP. Ø 50 mm Bh 1.00
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ...................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.0000
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00
- Socket GIP Ø 2" Bh 1.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
- DOP GIP. Ø 50 mm Bh 1.00
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ....................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00
- Socket GIP Ø 2" Bh 1.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
- DOP GIP. Ø 50 mm Bh 1.00
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.0000
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00
- Socket GIP Ø 2" Bh 1.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
- DOP GIP. Ø 50 mm Bh 1.00
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.0000
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00
- Socket GIP Ø 2" Bh 1.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
- DOP GIP. Ø 50 mm Bh 1.00
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.0000
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 0.8 243450.49590571 194760.39672457 0.06 Baik
- Socket GIP Ø 2" Bh 1.00 0.1 44069 4406.9 0.00 Baik
- Doubel Nipple Ø 2" Bh 1.00 0.1 48375 4837.5 0.00 Baik
- WaterMoor GIP Ø 2" Bh 1.00 0.1 136800 13680 0.00 Baik
- DOP GIP. Ø 50 mm Bh 1.00 0.1 68400 6840 0.00 Baik
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ....................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 1.80 243,450.50 438,210.89 0.14 Baik
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 0.50 59,875.00 29,937.50 0.01 Baik
- Socket GIP Ø 2" Bh 3.00 0.30 44,069.00 13,220.70 0.00 Baik
- Doubel Nipple Ø 2" Bh 1.0000 0.10 48,375.00 4,837.50 0.00 Baik
- WaterMoor GIP Ø 2" Bh 1.00 0.10 136,800.00 13,680.00 0.00 Baik
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 0.80 243,450.50 194,760.40 0.06 Baik
- Socket GIP Ø 2" Bh 1.00 0.10 44,069.00 4,406.90 0.00 Baik
- Doubel Nipple Ø 2" Bh 1.00 0.10 48,375.00 4,837.50 0.00 Baik
- WaterMoor GIP Ø 2" Bh 1.00 0.10 136,800.00 13,680.00 0.00 Baik
- DOP GIP. Ø 50 mm Bh 1.00 0.10 68,400.00 6,840.00 0.00 Baik
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 1.80 243,450.50 438,210.89 0.14 Baik
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 0.50 59,875.00 29,937.50 0.01 Baik
- Socket GIP Ø 2" Bh 3.00 0.30 44,069.00 13,220.70 0.00 Baik
- Doubel Nipple Ø 2" Bh 1.00 0.10 48,375.00 4,837.50 0.00 Baik
- WaterMoor GIP Ø 2" Bh 1.00 0.10 136,800.00 13,680.00 0.00 Baik
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 0.80 243,450.50 194,760.40 0.06 Baik
- Socket GIP Ø 2" Bh 1.00 0.10 44,069.00 4,406.90 0.00 Baik
- Doubel Nipple Ø 2" Bh 1.00 0.10 48,375.00 4,837.50 0.00 Baik
- WaterMoor GIP Ø 2" Bh 1.00 0.10 136,800.00 13,680.00 0.00 Baik
- DOP GIP. Ø 50 mm Bh 1.00 0.10 68,400.00 6,840.00 0.00 Baik
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ...........................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 18.00 243,450.50 4,382,108.93 1.39 Baik
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 5.00 59,875.00 299,375.00 0.09 Baik
- Socket GIP Ø 2" Bh 3.00 3.00 44,069.00 132,207.00 0.04 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 8.00 243,450.50 1,947,603.97 0.62 Baik
- Socket GIP Ø 2" Bh 1.00 1.00 44,069.00 44,069.00 0.01 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
- DOP GIP. Ø 50 mm Bh 1.00 1.00 68,400.00 68,400.00 0.02 Baik
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ....................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 18.00 243,450.50 4,382,108.93 1.39 Baik
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 5.00 59,875.00 299,375.00 0.09 Baik
- Socket GIP Ø 2" Bh 3.00 3.00 44,069.00 132,207.00 0.04 Baik
- Doubel Nipple Ø 2" Bh 1.0000 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 8.00 243,450.50 1,947,603.97 0.62 Baik
- Socket GIP Ø 2" Bh 1.00 1.00 44,069.00 44,069.00 0.01 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
- DOP GIP. Ø 50 mm Bh 1.00 1.00 68,400.00 68,400.00 0.02 Baik
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ....................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 18.00 243,450.50 4,382,108.93 1.39 Baik
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 5.00 59,875.00 299,375.00 0.09 Baik
- Socket GIP Ø 2" Bh 3.00 3.00 44,069.00 132,207.00 0.04 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 8.00 243,450.50 1,947,603.97 0.62 Baik
- Socket GIP Ø 2" Bh 1.00 1.00 44,069.00 44,069.00 0.01 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
- DOP GIP. Ø 50 mm Bh 1.00 1.00 68,400.00 68,400.00 0.02 Baik
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ....................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 18.00 243,450.50 4,382,108.93 1.39 Baik
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 5.00 59,875.00 299,375.00 0.09 Baik
- Socket GIP Ø 2" Bh 3.00 3.00 44,069.00 132,207.00 0.04 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 8.00 243,450.50 1,947,603.97 0.62 Baik
- Socket GIP Ø 2" Bh 1.00 1.00 44,069.00 44,069.00 0.01 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 48,375.00 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 136,800.00 136,800.00 0.04 Baik
- DOP GIP. Ø 50 mm Bh 1.00 1.00 68,400.00 68,400.00 0.02 Baik
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ....................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00
- Socket GIP Ø 2" Bh 1.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
- DOP GIP. Ø 50 mm Bh 1.00
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00
- Knie GIP Ø 50 mm - 90˚ Bh 5.00
- Socket GIP Ø 2" Bh 3.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00
- Socket GIP Ø 2" Bh 1.00
- Doubel Nipple Ø 2" Bh 1.00
- WaterMoor GIP Ø 2" Bh 1.00
- DOP GIP. Ø 50 mm Bh 1.00
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ...............................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.0000 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ........................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST .................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.0000 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ....................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 - - - -
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 - - - -
- Socket GIP Ø 2" Bh 3.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 - - - -
- Socket GIP Ø 2" Bh 1.00 - - - -
- Doubel Nipple Ø 2" Bh 1.00 - - - -
- WaterMoor GIP Ø 2" Bh 1.00 - - - -
- DOP GIP. Ø 50 mm Bh 1.00 - - - -
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA WATOTUTU
LOKASI : DESA WATOTUTU - KEC ILE MANDIRI - KAB FLORES TIMUR
TAHUN ANGGARAN : 2023
NILAI KONTRAK : Rp.350.462.000,00
KONSULTAN PENGAWAS : PT.DIPTA PERKASA KONSULTAN
KONTRAKTOR PELAKSANA : CV.CHEILLA
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI, PIPA DISTRIBUSI DAN PIPA RING
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa GIP. Ø 50 mm Beserta Aksesories
Outlet Transmisi
I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 18.00 18.00 Rp 243,450.50 4,382,109 1.39 Baik
- Knie GIP Ø 50 mm - 90˚ Bh 5.00 5.00 Rp 59,875.00 299,375 0.09 Baik
- Socket GIP Ø 2" Bh 3.00 3.00 Rp 44,069.00 132,207 0.04 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 Rp 48,375.00 48,375 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 Rp 136,800.00 136,800 0.04 Baik
Area 2
II PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA Distribusi Pipa GIP. Ø 50 mm Berserta Aksesories
- Pipa GIP Ø 2" M' 8.00 8.00 Rp 243,450.50 Rp 1,947,603.97 0.62 Baik
- Socket GIP Ø 2" Bh 1.00 1.00 Rp 44,069.00 Rp 44,069.00 0.01 Baik
- Doubel Nipple Ø 2" Bh 1.00 1.00 Rp 48,375.00 Rp 48,375.00 0.02 Baik
- WaterMoor GIP Ø 2" Bh 1.00 1.00 Rp 136,800.00 Rp 136,800.00 0.04 Baik
- DOP GIP. Ø 50 mm Bh 1.00 1.00 Rp 68,400.00 Rp 68,400.00 0.02 Baik
ADE MARYANI AFEN PAH,ST RICHARDUS GABRIEL KOFI,ST ................................................................................Anggota HENDRIKUS HURAT HURINT.SST
NIP. 19810911 200803 2 002 Nip. 19870210 201903 1 001 Kepala Perwakilan