Anda di halaman 1dari 26

LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG

PT. SANMAS

NO KAPAL : 01 TANGGAL : 13-03-2013/


TONGKANG : TIMUR 10 WAKTU MULAI LOADING : 13-03-2013/
TUG BOAT : OCEAN CAKRA 05 WAKTU SELESAI LOADING : 13-03-2013/
PRODUK : Bauxite WAKTU BERANGKAT : 13-03-2013/12-00 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.68 0.50 0.66 0.50 0.585 852.200
Draft Isi 3.90 4.25 3.80 4.23 4.045 6879.617
FINAL DRAFT 6027.417

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 02 TANGGAL : 13-03-2013/


TONGKANG : SVS 28 WAKTU MULAI LOADING : 13-03-2013/
TUG BOAT : S. Victory 15 WAKTU SELESAI LOADING : 13 -03-2013/
PRODUK : Bauxite WAKTU BERANGKAT : 13-03-2013/12-50 WIB
PENERIMA : MV. OWL

POIN
DRAFT'S (Meter)
Total Tonase / MT
A B C D Rata-rata

Draft kosong 0.62 0.70 0.55 0.70 0.6425 943.790


Draft Isi 4.13 4.63 3.86 4.36 4.245 7236.043
FINAL DRAFT 6292.253

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 03 TANGGAL : 13-03-2013/


TONGKANG : SVS 18 WAKTU MULAI LOADING : 13-03-2013/
TUG BOAT : BVS 01 WAKTU SELESAI LOADING : 13-03-2013/
PRODUK : Bauxite WAKTU BERANGKAT : 13-03-2013/15-00 WIB
PENERIMA : MV. OWL

POIN
DRAFT'S (Meter)
Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.66 0.61 0.76 0.71 0.685 841.154
Draft Isi 4.45 4.72 4.40 4.72 4.5725 6560.591
FINAL DRAFT 5719.437

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 04 TANGGAL 13-03-2013/07-15 WIB


TONGKANG : BVS 10 WAKTU MULAI LOADING : 13-03-2013/07.20 WIB
TUG BOAT : BVS 05 WAKTU SELESAI LOADING : 13-03-2013/09-35 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 14-03-2013/110-15 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.56 0.60 0.50 0.52 0.545 845.247
Draft Isi 1.50 1.90 1.50 1.90 1.70 2784.85
FINAL DRAFT 1939.603

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 05 TANGGAL : 13 -03-2013/07-15 WIB


TONGKANG : KARYA 10 WAKTU MULAI LOADING : 13-03-2013/07-30 WIB
TUG BOAT : BVS 07 WAKTU SELESAI LOADING : 13-03-2013/12-25 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 14-03-2013/16:20 WIB
PENERIMA : MV. 0WL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.58 0.55 0.59 0.59 0.5775 840.660
Draft Isi 1.92 1.98 1.81 1.92 1.9075 3023.140
FINAL DRAFT 2182.480

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 06 TANGGAL : 14-03-2013/13-15 WIB


TONGKANG : SVS 18 WAKTU MULAI IOADING :14-03-2013/14-40 WIB
TUG BOAT : BVS 01 WAKTU SELESAI LOADING : 14-03-2013/17-00 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 14-03-2013/18-25 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.61 0.66 0.64 0.66 0.6425 841.154
Draft Isi 1.90 1.93 1.82 1.85 1.875 2465.442
FINAL DRAFT 1624.288

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 07 TANGGAL : 15-03-2013/03-45 WIB


TONGKANG : BVS 10 TANGGAL : 15-03-2013/03-45 WIB
TUG BOAT : BVS 05 WAKTU SELESAI LOADING : 15-03-2013/06-15 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 15-03-2013/16:30 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.56 0.60 0.50 0.52 0.545 845.247
Draft Isi 1.83 1.84 1.78 1.75 1.80 2958.655
FINAL DRAFT 2113.408

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 08 TANGGAL : 15-03-2013/08-15 WIB


TONGKANG : KARYA 10 WAKTU MULAI LOADING : 15-03-2013/08:25 WIB
TUG BOAT : BVS 07 WAKTU SELESAI LOADING : 15-03-2013/10:30 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 15-03-2013/17-30 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.58 0.55 0.59 0.59 0.5775 840.660
Draft Isi 1.65 2.00 1.61 2.00 1.815 2864.356
FINAL DRAFT 2023.696

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 09 TANGGAL : 15-03-2013/17-00 WIB


TONGKANG : TIMUR 10 WAKTU MULAI LOADING : 15-03-2013/19:00 WIB
TUG BOAT : OCEAN CAKRA 05 WAKTU SELESAI LOADING : 15-03-2013/21:25 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 16-03-2013/05:05 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.68 0.50 0.66 0.50 0.585 852.200
Draft Isi 1.74 1.90 1.61 1.88 1.7825 2808.790
FINAL DRAFT 1956.590

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS PERIDOT

NO KAPAL : 10 TANGGAL : 16-03-2013/07-10 WIB


TONGKANG : SVS 18 WAKTU MULAI LOADING : 16-03-2013/07:20 WIB
TUG BOAT : BVS 01 WAKTU SELESAI LOADING :16-03-2013/08:30 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 16-03-2013/17:00 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.66 0.61 0.76 0.71 0.685 841.154
Draft Isi 1.88 2.05 1.52 1.70 1.7875 2341.095
FINAL DRAFT 1499.941

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 11 TANGGAL : 16-03-2013/08-40 WIB


TONGKANG : BVS 10 WAKTU MULAI LOADING : 16-03-2013/09-15 WIB
TUG BOAT : BVS 05 WAKTU SELESAI LOADING : 16-03-2013/11:25 WIB
PRODUK : Bauxite WAKTU BERANGKAT :16-03-2013/17:50 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.56 0.60 0.50 0.52 0.545 845.247
Draft Isi 1.70 1.84 1.62 1.75 1.7275 2832.647
FINAL DRAFT 1987.400

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 12 TANGGAL 16-03-2013/07-00 WIB


TONGKANG : KARYA 10 WAKTU MULAI LOADING : 16-03-2013/07-15 WIB
TUG BOAT : BVS 07 WAKTU SELESAI LOADING : 16-03-2013/08-40 WIB
PRODUK : Bauxite WAKTU BERANGKAT :17-03-2013/05:00 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.58 0.55 0.59 0.59 0.5775 840.660
Draft Isi 1.70 1.92 1.54 1.85 1.7525 2757.653
FINAL DRAFT 1916.993

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 13 TANGGAL : 16-03-2013/09-00 WIB


TONGKANG : TIMUR 10 WAKTU MULAI LOADING :16-03-2013/09:15 WIB
TUG BOAT : OCEAN CAKRA 05 WAKTU SELESAI LOADING : 16-03-2013/24-00 WIB
PRODUK : Bauxite WAKTU BERANGKAT :17-03-2013/05:05 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.68 0.50 0.66 0.50 0.585 852.200
Draft Isi 1.66 1.71 1.50 1.65 1.63 2549.642
FINAL DRAFT 1697.442

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 14 TANGGAL : 17-03-2013/06-25 WIB


TONGKANG : SVS 18 WAKTU MULAI LOADING : 17-03-2013/07-10 WIB
TUG BOAT : BVS 01 WAKTU SELESAI LOADING : 17-03-2013/08-30 WIB
PRODUK : Bauxite WAKTU BERANGKAT :17-03-13/018-30 WIB
PENERIMA : MV :OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.66 0.61 0.76 0.71 0.685 841.154
Draft Isi 1.64 1.78 1.61 1.80 1.7075 2228.041
FINAL DRAFT 1386.887

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 15 TANGGAL : 17-03-2013/16-00 WIB


TONGKANG : BVS 10 WAKTU MULAI LOADING : 17-03-2013/16:20 WIB
TUG BOAT : BVS 05 WAKTU SELESAI LOADING : 17-03-2013/18-00 WIB
PRODUK : Bauxite WAKTU BERANGKAT ;17-03-2013/19:10 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.56 0.60 0.50 0.52 0.545 845.247
Draft Isi 1.48 1.66 1.48 1.62 1.56 2543.311
FINAL DRAFT 1698.064

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 16 TANGGAL : 17-03-2013/19-15 WIB


TONGKANG : KARYA 10 WAKTU MULAI LOADING : 17-03-2013/19:20 WIB
TUG BOAT : BVS 07 WAKTU SELESAI LOADING : 17-03-2013/21:50 WIB
PRODUK : Bauxite WAKTU BERANGKAT :18-03-2013/05:05 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.58 0.55 0.59 0.59 0.5775 840.660
Draft Isi 1.70 1.92 1.31 1.53 1.615 2524.244
FINAL DRAFT 1683.584

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 17 TANGGAL : 17-03-2013/23-00 WIB


TONGKANG : TIMUR 10 WAKTU MULAI LOADING : 17-03-2013/01:00 WIB
TUG BOAT : OCEAN CAKRA 05 WAKTU SELESAI LOADING : 17-03-2013/03-45 WIB
PRODUK : Bauxite WAKTU BERANGKAT :18-03-2013/05:25 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.68 0.50 0.66 0.50 0.585 852.200
Draft Isi 1.40 1.89 1.25 1.80 1.585 2473.625
FINAL DRAFT 1621.425

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 18 TANGGAL : 18-03-2013/13-00 WIB


TONGKANG : BVS 10 WAKTU MULAI LOADING : 18-03-2013/014.15 WIB
TUG BOAT : BVS 05 WAKTU SELESAI LOADING : 18-03-2013/15.20 WIB
PRODUK : BAUXITE WAKTU BERANGKAT :18-03-2013/19:35 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.56 0.60 0.50 0.52 0.545 845.247
Draft Isi 1.70 1.74 1.59 1.62 1.6625 2720.046
FINAL DRAFT 1874.799

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 19 TANGGAL : 18-03-2013/16-20 WIB


TONGKANG : SVS 18 WAKTU MULAI LOADING : 18-03-2013/17:00 WIB
TUG BOAT : BVS 01 WAKTU SELESAI LOADING : 18-03-2013/18:20 WIB
PRODUK : Bauxite WAKTU BERANGKAT :18-03-2013/20:30 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.66 0.61 0.76 0.71 0.685 841.154
Draft Isi 1.59 1.60 1.72 1.75 1.665 2168.318
FINAL DRAFT 1327.164

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 20 TANGGAL : 18-03-2013/22-25 WIB


TONGKANG : TIMR 10 WAKTU MULAI LOADING : 18-03-2013/22:30 WIB
TUG BOAT : OCEAN CAKRA WAKTU SELESAI LOADING : 18-03-2013/23:50 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 19-03-2013/07-05 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.68 0.50 0.66 0.50 0.585 852.200
Draft Isi 1.61 1.58 1.54 1.59 1.58 2465.218
FINAL DRAFT 1613.018

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 21 TANGGAL : 18-03-2013/08-20 WIB


TONGKANG : karya 10 WAKTU MULAI LOADING : 18-03-2013/08:40 WIB
TUG BOAT : bvs 07 WAKTU SELESAI LOADING : 18-03-2013/09:50 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 19-03-2013/07:25 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft kosong 0.58 0.55 0.59 0.59 0.5775 840.660
Draft Isi 1.72 1.83 1.42 1.54 1.6275 2545.409
FINAL DRAFT 1704.749

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 22 TANGGAL : 19-03-2013/07-30 WIB


TONGKANG : BVS 10 WAKTU MULAI LOADING : 19-03-2013/08-25 WIB
TUG BOAT : BVS 05 WAKTU SELESAI LOADING : 19-03-2013/10-50 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 19-03-2013/20:40 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A C D Rata-rata
Draft kosong 0.56 0.60 0.50 0.52 0.545 845.247
Draft Isi 1.65 1.80 1.61 1.75 1.7025 2789.195
FINAL DRAFT 1943.948

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 23 TANGGAL : 19-03-2013/11-30 WIB


TONGKANG : SVS 18 WAKTU MULAI LOADING : 19-03-2013/11:45 WIB
TUG BOAT : BVS 01 WAKTU SELESAI LOADING : 19-03-2013/01:50 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 19-03-2013/21:20 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft ISI AWAL 0.66 0.61 0.76 0.71 0.685 841.154
Draft Isi AKHIR 1.49 1.79 1.65 1.93 1.715 2238.640
FINAL DRAFT 1397.486

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 24 TANGGAL : 20-03-2013/00.05 WIB


TONGKANG : TIMUR 10 WAKTU MULAI LOADING :20-03-2013/00.20 WIB
TUG BOAT : OCEAN CAKRA 05 WAKTU SELESAI LOADING : 20-03-2013/01.50 WIB
PRODUK : Bauxite WAKTU BERANGKAT : 20-03-13/07.15 WIB
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft ISI AWAL 0.68 0.50 0.66 0.50 0.585 852.200
Draft Isi AKHIR 1.43 1.56 1.70 1.90 1.6475 2579.272
FINAL DRAFT 1727.072

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 25 TANGGAL : 20-03-2013/


TONGKANG : KARYA 10 WAKTU MULAI LOADING :20-03-2013/
TUG BOAT : BVS 07 WAKTU SELESAI LOADING : 20-03-2013/
PRODUK : Bauxite WAKTU BERANGKAT : 20-03-2013/
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft ISI AWAL 0.58 0.55 0.59 0.59 0.5775 840.660
Draft Isi AKHIR 1.83 1.90 1.60 1.69 1.755 2761.914
FINAL DRAFT 1921.254

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master
LAPORAN DATA HASIL DRAFT SURVEY PER -TUGBOAT/TONGKANG
PT. SANMAS

NO KAPAL : 25-A TANGGAL : 21-03-2013


TONGKANG : KARYA 10 WAKTU MULAI LOADING :
TUG BOAT : BVS 07 WAKTU SELESAI LOADING :
PRODUK : Bauxite WAKTU BERANGKAT :
PENERIMA : MV. OWL

POIN DRAFT'S (Meter)


Total Tonase / MT
A B C D Rata-rata
Draft ISI AWAL 1.83 1.90 1.60 1.69 1.755 2761.914
Draft Isi AKHIR 1.14 1.70 0.70 1.30 1.21 1849.997
DRAFT MUATAN AWAL 1921.254
DRAFT MUATAN TERMUAT 911.917
FINAL DRAFT MUATAN SISA 1009.337

Pengawas Di buat oleh,

YUDI RAHMAN RIZAL


Loading Master Asst. Loading Master