C PEKERJAAN BETON
13 Stutwerk untuk 1 M3 Beton 1,343,650.00
Paku Kg 2.0000 14,000.00 28,000.00 28,000.00
Kayu Tahun M3 0.7000 1,000,000.00 700,000.00 700,000.00
Pajak untuk bahan 10 % 72,800.00
Tukang kayu Org 10.5000 37,500.00 393,750.00 393,750.00
Kepala tukang kayu Org 1.0500 36,000.00 37,800.00 37,800.00
Pekerja Org 3.5000 30,000.00 105,000.00 105,000.00
Mandor Org 0.1750 36,000.00 6,300.00 6,300.00 1,343,650.00
F PEKERJAAN LANTAI
34 1 M2 JENIS PEKERJAAN LANTAI KERAMIK 30/30 MULIA 84,689.60
Keramik 30/30 cm Muli M2 1.0000 30,000.00 30,000.00 30,000.00
Semen KG 11.3800 950.00 10,811.00 10,811.00
Semen Warna KG 1.5000 950.00 1,425.00 1,425.00
Pajak untuk bahan 10 % 4,223.60
Pasir pasang M3 0.0420 120,000.00 5,040.00 5,040.00
Pekerja Org 0.6200 30,000.00 18,600.00 18,600.00
Tukang batu Org 0.3500 35,000.00 12,250.00 12,250.00
Kepala tukang batu Org 0.0350 36,000.00 1,260.00 1,260.00
Mandor Org 0.0300 36,000.00 1,080.00 1,080.00 84,689.60
Terbilang : ( Enam puluh juta delapan ratus enam puluh sembilan ribu rupiah )
Total RAB
XIV JASA PERENCANA/PENGAWAS DAN DAOPS 5,783,000.00
Biaya Perencanaan & Pengawasan (≤
1 ls 1.00 4,406,000.00 4,406,000.00
3.850.000/40.000.000)
Biaya Operasional Tim Pelaksana (≤
2 ls 1.00 1,377,000.00 1,377,000.00
1.750.000/40.000.000)
TOTAL HARGA
DIBULATKAN
Rp.
3,140,000.00
3,111,000.00
8,691,000.00
24,280,000.00
450,000.00
13,074,000.00
2,340,000.00
55,086,000.00
5,783,000.00