REKAPITULASI

KEGIATAN : REHABILITASI FASILITAS POKOK PELABUHAN


PEKERJAAN : PENGADAAN DAN PEMASANGAN FENDER DERMAGA GOROM
LOKASI : PELABUHAN LAUT P. GOROM KAB. SBT
TAHUN : APBN 2025

NO URAIAN PEKERJAAN JUMLAH


I PERSIAPAN UMUM & KESELAMATAN KERJA 99,460,426.02
II MANAJEMEN KESELAMATAN KERJA KONSTRUKSI 13,528,000.00
III PEKERJAAN PENGADAAN DAN PEMASANGAN FENDER 629,999,999.96
IV PEKERJAAN AKHIR & LAIN - LAIN 15,000,000.00
JUMLAH 757,988,425.97
PPN (12%) 90,958,611.12
TOTAL BIAYA KONSTRUKSI FISIK 848,947,037.09
PEMBULATAN FISIK 848,947,000.00
SUPERVISI 5% 42,447,350.00
PPN (12%) 5,093,682.00
BIAYA SUPERVISI 47,541,032.00
PEMBULATAN SUPERVISI 47,541,000.00
ADMINISTRASI KEGIATAN 5,000,000.00
HONOR LELANG FISIK (5 ORG X Rp. 1.270.000,-) 6,350,000.00
TOTAL ADMINISTRASI KEGIATAN 11,350,000.00
PEMBULATAN ADMINISTRASI KEGIATAN 11,350,000.00
TOTAL KEGIATAN 907,838,000.00
Terbilang : SEMBILAN RATUS TUJUH JUTA DELAPAN RATUS TIGA PULUH DELAPAN RATUS RIBU RUPIAH

Rencana Anggaran Biaya (RAB) ini disusun dalam rangka penyusunan Rencana Kerja dan Anggaran (RKA). Untuk Pelaksanaan Pelelangan, dan
Penyusunan Harga Perhitungan Sendiri (HPS). Analisa dilaksanakan berdasarkan (i) Peraturan Menteri Perhubungan RI No. 78 Th. 2014 Standar Biaya
di Lingkungan Kemenhub; (ii) Peraturan Menteri PUPR RI No. 28/PRT/M/2016 Tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi;
dan (iii) Peraturan Presiden Nomor 54 Tahun 2010 tentang Pengadaan Barang dan Jasa Pemerintah sebagaimana telah diubah dengan Perpres No. 70
Tahun 2012 Bagian Ketujuh : Penetapan Harga Prakiraan Sendiri, Pasal 66

KEPALA KANTOR
UNIT PENYELENGGARA PELABUHAN
KELAS III GESER

IHSAN TIDORE, S.Sos, M.M


Penata (IV/a)
NIP. 19681113 199312 1 001
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI FASILITAS POKOK PELABUHAN


PEKERJAAN : PENGADAAN DAN PEMASANGAN FENDER DERMAGA GOROM
LOKASI : PELABUHAN LAUT P. GOROM KAB. SBT
TAHUN : APBN 2025

HARGA SATUAN
NO ITEM PEKERJAAN SAT VOL JUMLAH HARGA
(RP)

I PERSIAPAN UMUM & KESELAMATAN KERJA 99,460,426.02


1 Pek. Pembersihan Awal Lokasi Kerja M2 210.00 36,282.50 7,619,325.00
2 Pek. Barak Kerja/Gudang/Direksi Keet M2 18.00 1,623,879.12 29,229,824.16
3 Pek. Pengukuran dan Positioning M1 35.00 97,465.05 3,411,276.86
4 Papan Proyek LS 1.00 1,500,000.00 1,500,000.00
5 Persediaan Air Kerja 150 ltr x 30 Hr LTR 4,500.00 600.00 2,700,000.00
6 Mobilisasi dan Demobilisasi Tenaga Kerja & Peralatan LS 1.00 55,000,000.00 55,000,000.00

II MANAJEMEN KESELAMATAN KERJA KONSTRUKSI 13,528,000.00


1 Rencana Keselamatan & Kesehatan Kerja LS 1.00 2,000,000.00 2,000,000.00
2 Perlengkapan Keselamatan & Kesehatan Kerja
- Topi Pelindung (Safety Helmet) - Semua Pekerja BH 12.00 207,000.00 2,484,000.00
- Pelindung Mata (Goggles, Spectacles) - Pekerja Las/Mesin BH 4.00 103,500.00 414,000.00
- Pelindung Pernafasan dan Mulut (Masker) - Semua Pekerja BH 12.00 85,000.00 1,020,000.00
- Sarung Tangan (Safety Gloves) - Semua Pekerja PSG 12.00 34,500.00 414,000.00
- Sepatu Keselamatan (Safety Shoes) - Semua Pekerja PSG 12.00 207,000.00 2,484,000.00
- Rompi Keselamatan (Safety Vest) - Semua Pekerja BH 12.00 103,500.00 1,242,000.00
- Penahan Jatuh (Fall Arrester) - Pekerja Utama BH 4.00 345,000.00 1,380,000.00
- Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) SET 1.00 2,090,000.00 2,090,000.00

III PEKERJAAN PENGADAAN DAN PEMASANGAN FENDER 629,999,999.96


2 Pek. Pengadaan & Pemasangan Fender Type V H500 x L1000 BH 21.00 30,000,000.00 629,999,999.96

IV PEKERJAAN AKHIR & LAIN - LAIN 15,000,000.00


1 Dokumentasi dan Pelaporan Pelaksanaan LS 1.00 7,000,000.00 7,000,000.00
2 Asbuild Drawing LS 1.00 3,000,000.00 3,000,000.00
3 Pembersihan Akhir LS 1.00 5,000,000.00 5,000,000.00
ANALISA HARGA SATUAN

PEMBERSIHAN LAPANGAN & PERATAAN


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.10 158,000.00 15,800.00
2 Mandor OH 0.05 315,000.00 15,750.00
31,550.00

B BAHAN
JUMLAH HARGA BAHAN -

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 31,550.00
E OVERHEAD & PROFIT (15%) 4,732.50
F HARGA SATUAN PEKERJAAN 36,282.50

PEMBUATAN GUDANG SEMEN DAN PERALATAN


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 1.000 158,000.00 158,000.00
2 Tukang Kayu OH 2.000 236,000.00 472,000.00
3 Kepala Tukang OH 0.200 275,000.00 55,000.00
4 Mandor OH 0.050 315,000.00 15,750.00
JUMLAH HARGA TENAGA KERJA 700,750.00

B BAHAN
Dolken Kayu Dia. 8-10/400 cm BTG 1.700 21,735.00 36,949.50
Kayu M3 0.210 2,107,380.00 442,549.80
Paku Biasa KG 0.300 49,350.00 14,805.00
Semen Portland KG 10.500 3,619.00 37,999.50
Pasir Beton M3 0.030 771,000.00 23,130.00
Koral Beton M3 0.050 1,009,500.00 50,475.00
Seng Spandek M2 1.250 84,328.00 105,410.00
JUMLAH HARGA BAHAN 711,318.80

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 1,412,068.80
E OVERHEAD & PROFIT (15%) 211,810.32
F HARGA SATUAN PEKERJAAN 1,623,879.12

PENGUKURAN DAN PEMASANGAN 1 M BOUPLANK


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.100 158,000.00 15,800.00
2 Tukang Kayu OH 0.100 236,000.00 23,600.00
3 Kepala Tukang OH 0.010 275,000.00 2,750.00
4 Mandor OH 0.005 315,000.00 1,575.00
JUMLAH HARGA TENAGA KERJA 43,725.00

B BAHAN
Kayu Balok 5/7 M3 0.012 2,107,380.00 25,288.56
Paku Biasa 2 - 3' KG 0.020 49,350.00 987.00
Kayu Papan 3/20 M3 0.007 2,107,380.00 14,751.66
JUMLAH HARGA BAHAN 41,027.22

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 84,752.22
E OVERHEAD & PROFIT (15%) 12,712.83
F HARGA SATUAN PEKERJAAN 97,465.05
PEKERJAAN PELAMPUNG DRUM PLASTIK 1 UNIT UKURAN 3X3 M
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Tenaga Kerja OH 5.000 158,000.00 790,000.00
2 Mandor Oh 1.000 315,000.00 315,000.00
JUMLAH HARGA TENAGA KERJA 790,000.00

B BAHAN
Drum Plastik BH 4.000 605,225.00 2,420,900.00
Balok Kayu Kls. II 5/10 cm M3 0.480 4,096,310.00 1,966,228.80
Papan Kayu Kls. II Tb. 20 cm M3 0.180 4,096,310.00 737,335.80
Paku Kg 0.500 49,350.00 24,675.00
JUMLAH HARGA BAHAN 5,149,139.60

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 5,939,139.60
E OVERHEAD & PROFIT (15%) 890,870.94
F HARGA SATUAN PEKERJAAN 6,830,010.54

PEKERJAAN FENDER DERMAGA / 1 UNIT


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja O/H 3.500 158,000.00 553,000.00
Tukang O/H 2.000 315,000.00 630,000.00
JUMLAH HARGA TENAGA KERJA 1,183,000.00

B BAHAN
Angkur Dia. 25 mm Bh 8.000 61,825.07 494,600.57
Fender Karet Type V H200 x L2500 Bh 1.000 28,022,399.43 28,022,399.43
JUMLAH HARGA BAHAN 28,517,000.00

C PERALATAN
Sewa mesin las Hari 0.050 1,200,000.00 60,000.00
Sewa ponton transport Jam 0.200 1,200,000.00 240,000.00
JUMLAH HARGA ALAT 300,000.00

D JUMLAH A + B + C 30,000,000.00
F HARGA SATUAN PEKERJAAN 30,000,000.00