URAIAN PEKERJAAN
2
I. PEKERJAAN PERSIAPAN
Biaya perijinan bangunan
Pek. Pas bowplank
JUMLAH
PEKERJAAN TANAH DAN PASIR
Pek. Galian tanah pondasi
Urg. Kembali bekas galian tanah
Urg. Tanah peninggian lantai T.20 cm
Pek. Urg. Pasir alas lantai T.10
Pek. Urg. Pasir alas pondasi T.5 cm
JUMLAH
III. PEKERJAAN PASANGAN
Pas. Batu kosong (Aanstamping)
Pek. Pondasi batu belah 1Pc:5Ps (batu kali)
Pek. Lantai kerja (beton tumbuk) 1 Pc:3Ps:5Kr
Pas. Bata dinding 1 Pc: 5 Ps
Plesteran dinding + Acian 1 Pc:5Ps
JUMLAH
IV. PEKERJAAN BETON K. 175
Pek. Sloof 15/20
Pek. Kolom 15/20
Pek. Kolom 12/12
Pek. Balok 15/15
Pek. Ring balk 15/20
Pek. Balok konsol selasar 15/20
Pek. Balok sanwering 10/30
JUMLAH
V. PEKERJAAN LANTAI
Pas. Lantai keramik putih polos 30 x 30
JUMLAH
VI. PEKERJAAN KUSEN KAYU BORNEO
Pek. Kusen pintu, jendela, ventilasi 6/15
Pek. Daun jendela
Pek. Daun pintu panil multiplek
Pek. Jalusi 2/15
JUMLAH
VOLUME
ANALISA
126.00 M2
32.00 M'
Ls
A.4
HARGA SATUAN
UPAH
BAHAN
(Rp)
(Rp)
5
6
JUMLAH
(3x5)
7
JUMLAH
JUMLAH
(3x6)
8
JUMLAH
TOTAL
(7+8)
9
2,250.00
7,685.00
0.00
24,305.00
283,500.00
245,920.00
283,500.00
0.00
777,760.00
0.00
283,500.00
1,023,680.00
1,307,180.00
0.00
0.00
19,000.00
61,000.00
61,000.00
520,916.40
62,405.14
355,207.68
153,414.00
76,707.00
1,168,650.22
0.00
0.00
615,600.00
988,200.00
494,100.00
2,097,900.00
520,916.40
62,405.14
970,807.68
1,141,614.00
570,807.00
3,266,550.22
37.53
9.38
32.40
16.20
8.10
M3
M3
M3
M3
M3
B.1
B.9
B.4a
B.11
B.11
13,880.00
6,653.00
10,963.20
9,470.00
9,470.00
8.67
13.52
8.10
176.83
255.31
M3
M3
M3
M2
M2
C.14
C.6
G.1
D.4c
E.4d
42,588.00
75,225.00
64,385.00
14,755.00
19,025.00
127,000.00
369,237.96
241,470.00 1,017,042.00
287,400.00
521,518.50
26,067.00 2,609,126.65
6,020.00 4,857,272.75
9,374,197.86
1,101,090.00
3,264,674.40
2,327,940.00
4,609,427.61
1,536,966.20
12,840,098.21
1,470,327.96
4,281,716.40
2,849,458.50
7,218,554.26
6,394,238.95
22,214,296.07
667,099.46
853,345.05
774,313.08
774,313.08
667,099.46
708,121.93
671,535.56
### 1,621,051.69
### 1,672,556.30
###
116,146.96
###
271,009.58
### 1,140,740.08
###
332,817.31
###
362,629.20
5,516,951.11
4,342,225.44
4,278,504.58
307,482.39
717,458.92
3,055,640.13
872,848.29
970,814.73
14,544,974.48
5,963,277.13
5,951,060.88
423,629.36
988,468.50
4,196,380.20
1,205,665.60
1,333,443.93
20,061,925.59
M.47
24,883.60
34,347.50 4,031,143.20
4,031,143.20
5,564,295.00
5,564,295.00
9,595,438.20
9,595,438.20
F.4
F.11a
F.20b
F.17b
###
114,880.00
108,410.00
105,175.00
### 1,496,109.00
149,750.00
706,512.00
174,025.00
637,450.80
257,162.50
931,850.50
3,771,922.30
6,080,690.00
920,962.50
1,023,267.00
2,278,459.75
10,303,379.25
7,576,799.00
1,627,474.50
1,660,717.80
3,210,310.25
14,075,301.55
2.43
1.96
0.15
0.35
1.71
0.47
0.54
M3 G.4a+G.25a.1+G.29a
M3 G.4a+G.25a.6+G.29f
M3 G.4a+G.25a.5+G.29e
M3 G.4a+G.25a.5+G.29e
M3G.4a+G.25a.13+G.29m
M3 G.4a+G.25a.15+G.29o
M3 G.4a+G.25a.18+G.29r
162.00 M2
1.49
6.15
5.88
8.86
M3
M2
M2
M2
NO.
URAIAN PEKERJAAN
VOLUME
ANALISA
1
2
3
4
5
6
1
2
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
M3
M3
M2
M'
M2
M'
F.29
F.29
F.32
F.50a
H.1
H.4
M2
M2
HARGA SATUAN
UPAH
BAHAN
(Rp)
(Rp)
5
6
JUMLAH
(3x5)
7
JUMLAH
JUMLAH
(3x6)
8
JUMLAH
TOTAL
(7+8)
9
663,400.00
663,400.00
7,685.00
13,325.00
8,236.00
20,994.00
### 2,136,148.00
###
79,608.00
42,962.50 1,936,620.00
45,387.50
868,790.00
17,875.00 2,075,472.00
16,660.00
419,880.00
7,516,518.00
12,476,534.00
464,964.00
10,826,550.00
2,959,265.00
4,504,500.00
333,200.00
31,565,013.00
14,612,682.00
544,572.00
12,763,170.00
3,828,055.00
6,579,972.00
753,080.00
39,081,531.00
F.40
I.3a
19,150.00
4,085.50
42,575.00 3,929,580.00
11,527.50
838,344.60
4,767,924.60
8,736,390.00
2,365,443.00
11,101,833.00
12,665,970.00
3,203,787.60
15,869,757.60
Bh
Bh
Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
L.1
L.5
L.5a
L.11
L.11
L.8
L.17
Ls
Ls
Ls
20,985.00
7,162.60
4,773.50
4,985.00
4,985.00
7,162.60
7,162.60
0.00
0.00
0.00
61,000.00
24,162.60
11,000.00
9,250.00
9,250.00
9,500.00
56,000.00
10,000.00
10,000.00
4,500.00
41,970.00
85,951.20
152,752.00
19,940.00
79,760.00
229,203.20
70,408.36
0.00
0.00
0.00
679,984.76
122,000.00
289,951.20
352,000.00
37,000.00
148,000.00
304,000.00
550,480.00
80,000.00
40,000.00
288,000.00
2,211,431.20
163,970.00
375,902.40
504,752.00
56,940.00
227,760.00
533,203.20
620,888.36
80,000.00
40,000.00
288,000.00
2,891,415.96
M2
M2
M2
M2
M2
M2
N.11
N.16
N.8
N.8
N.8
N.10
3,521.00
3,896.00
6,597.50
6,597.50
6,597.50
3,282.00
8,120.00 1,336,501.18
8,410.00
799,459.20
23,005.00
328,027.70
23,005.00
114,004.80
23,005.00
210,064.40
4,062.50 1,220,542.98
4,008,600.26
3,082,189.60
1,725,732.00
1,143,808.60
397,526.40
732,479.20
1,510,803.13
8,592,538.93
4,418,690.78
2,525,191.20
1,471,836.30
511,531.20
942,543.60
2,731,346.11
12,601,139.19
140,964,535.37
MENGETAHUI/MENYETUJUI:
KOMITE SEKOLAH:
DRS. H. UMAEDI