1 2 3
JUMLAH 1,775,870,644.00
TOTAL 1,953,457,708.40
DIBULATKAN
TERBILANG :
1 2 3 4 5 6=3x5
I. PEKERJAAN PERSIAPAN
1. Papan nama proyek 1.00 bh 303,371.00 303,371.00
2. Pembersihan Lahan 270.00 m2 4,647.00 1,254,690.00
3. Penyediaan Direksikeet, Luas ± 18.00 m2 18.00 m2 376,051.00 6,768,918.00
4. Administrasi Proyek 1.00 ls 7,500,000.00 7,500,000.00
5. Pengadaan Listrik dan Air Kerja 6.00 bln 1,500,000.00 9,000,000.00
6. Penyambungan daya listrik baru 2,200.00 VA 1,604.00 3,528,800.00
7. Pas. Bouwplank 110.00 m1 34,530.00 3,798,300.00
32,154,079.00
1 2 3 4 5 6=3x5
b. Plesteran Beton, Kolom dan Balok ad 1 : 5 83.28 m2 55,824.00 4,649,022.72
c.Acian Dinding, kolom dan balok 818.01 m2 28,347.00 23,188,129.47
d.Rabat beton ad. 1:3:5 + bingkai bata merah 78.00 m2 57,828.00 4,510,584.00
e.Acian Openingan 5.40 m2 28,347.00 153,073.80
f.Acian Bawah Tangga 29.00 m2 28,347.00 822,063.00
112,579,522.02
- Pekerjaan kusen pintu, jendela dan kaca
a.Kusen Jendela alumunium Coated Black
- Type J.1 14.00 bh 2,290,553.00 32,067,742.00
- Type BV 1.00 bh 660,809.00 660,809.00
- Type BV1 6.00 bh 595,193.00 3,571,158.00
- Type BV2 2.00 bh 856,081.00 1,712,162.00
b.Kusen Pintu kayu kamper samarinda
- Type P.1 0.49 m3 12,313,032.00 6,033,385.68
c.Daun pintu panil kayu kamper samarinda (kualitas e 8.00 Unit 1,527,654.00 12,221,232.00
d.Daun jendela atas pintu + kaca 6.00 Unit 450,000.00 2,700,000.00
e.Kusen pintu PVC komplit 6.00 Unit 280,900.00 1,685,400.00
f.Glass Block 52.00 bh 24,518.24 1,274,948.48
61,926,837.16
- Pekerjaan kunci dan aksesoris pintu jendela
a.Engsel Pintu uk. 4 " Stainless Steel 24.00 bh 52,472.00 1,259,328.00
b.Engsel Pintu stainlis steel uk. 3 " Stainless Steel 12.00 bh 52,472.00 629,664.00
c Kunci double slaag 8.00 bh 303,572.00 2,428,576.00
4,317,568.00
- Pekerjaan plafond
a.Plafond Gyptile 9 mm + rangka Main Tee/Cross Tee 161.00 m2 195,000.00 31,395,000.00
b.Plafond GRC t =6 mm+ rangka Galvalum 0.35 mm G 96.00 m2 140,471.00 13,485,216.00
c.List Profil kayu 65.00 m1 71,746.00 4,663,490.00
49,543,706.00
- Pekerjaan pasangan keramik
a. Lantai keramik 40x40 cm, Kw1 232.00 m2 112,348.00 26,064,736.00
b. Lantai keramik KM/WC 20x25 KW 1 15.00 m2 125,776.00 1,886,640.00
c. Dinding keramik KM/WC20x25, t=150 cm KW 1 80.93 m2 125,776.00 10,179,051.68
d. Plin Lantai 10x40 cm 183.00 m1 52,747.00 9,652,701.00
e. Step noising tangga 27.30 m1 78,243.00 2,136,033.90
49,919,162.58
- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) 386.47 m2 66,425.00 25,671,269.75
b. Pengecatan Dindind cat minyak bawah kusen 112.00 m2 62,875.00 7,042,000.00
c. Pengecatan dinding Interior 353.94 m2 59,453.00 21,042,794.82
d. Pengecatan plafond setara ICI (3x) 96.00 m2 64,131.00 6,156,576.00
e. Pengecatan kayu 24.20 m2 64,694.00 1,565,594.80
61,478,235.37
3. PEKERJAAN MEKANIKAL
- Peralatan Utama
a.Pompa Air Jet Pump + Instalasi dan Pengeboran 1.00 unit 3,901,192.00 3,901,192.00
b.WLC elektrode + kabel NYM 3x2.5mm2 2.00 set 250,000.00 500,000.00
c.Roof reservoir kap. 1 M3 1.00 unit 1,500,000.00 1,500,000.00
d.Septictank + bak peresapan 1.00 unit 4,288,421.00 4,288,421.00
10,189,613.00
- Sanitasi
a. Pekerjaan Instalasi Air Bersih PVC1/2",3/4" 30.00 m1 43,856.00 1,315,680.00
b. Pekerjaan Instalasi Air Kotor PVC 4" 32.00 m1 91,435.00 2,925,920.00
c. Pekerjaan Instalasi Air Kotor PVC 3" 10.00 m1 80,576.00 805,760.00
d. Pas Closet Jongkok standard (Setara) 5.00 Unit 334,621.00 1,673,105.00
e. Pas Closet duduk standard (Setara) 1.00 unit 2,605,722.00 2,605,722.00
f. Pas Floor Drain Stainless Steel 7.00 Unit 174,948.00 1,224,636.00
g. Pas Kran Dinding 1/2" 8.00 Unit 36,395.00 291,160.00
NO. URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6=3x5
h. Pas. Kitchen Sink + Akesoris 1.00 Unit 312,751.00 312,751.00
i. Pas. Jet Spray 1.00 Unit 210,000.00 210,000.00
j. Pas Wastafel lengkap 2.00 Unit 1,562,751.00 3,125,502.00
k. Tower rangka siku 1.00 Unit 3,532,210.00 3,532,210.00
18,022,446.00
4 PEKERJAAN ELEKTRIKAL
- Pekerjaan instalasi penerangan dan armature
a.Instalasi titik lampu 30.00 ttk 109,435.00 3,283,050.00
b.Instalasi stop kontak 22.00 ttk 109,435.00 2,407,570.00
c.Pas. Saklar Tunggal 3.00 bh 46,831.00 140,493.00
d.Pas. Saklar Ganda 7.00 bh 52,031.00 364,217.00
e.Pas. Stop kontak 12.00 bh 47,631.00 571,572.00
f.Lampu TKI-031 TL. 2x18 watt + armatur lengkap 16.00 bh 129,701.00 2,075,216.00
g.Lampu Baret 18 watt teras 14.00 bh 152,264.00 2,131,696.00
h.Lam 3 8.00 bh 200,000.00 1,600,000.00
i.Grounding Panel-panel listrik lt.1 BC 35mm 1.00 Ls 500,000.00 500,000.00
j.Box Panel KWH Meter 20x30x40 1.00 bh 2,000,000.00 2,000,000.00
15,073,814.00
IV. PEKERJAAN LANTAI II
1. PEKERJAAN STRUKTUR
- Kolom beton struktur
a. Kolom beton 30/30 - K.225 ( K 2 ) 7.34 m3 5,087,449.00 37,341,875.66
b. Kolom beton 15/30 - K.225 ( K3 ) 0.77 m3 4,618,849.00 3,556,513.73
- Balok beton struktur
a. Balok beton praktis atas kusen - K.175 2.12 m3 4,253,806.00 9,018,068.72
- Ringbalk beton
a.Ringbalk beton 15/20 - K.225 ( RB2 ) 0.30 m3 5,429,197.00 1,628,759.10
b.Ringbalk beton 15/25- K.225 ( RB1 ) 4.35 m3 4,312,381.00 18,758,857.35
70,304,074.56
2. PEKERJAAN ARSITEKTUR
- Pekerjaan pasangan dinding + Rabat
a. Pas. Bata Hebel 10.20.60 Ad. 1:5 247.21 m2 122,537.00 30,292,371.77
b. Plesteran dinding ad 1 : 5 499.82 m2 49,888.00 24,935,020.16
c. Plesteran Beton, Kolom dan Balok ad 1 : 5 83.28 m2 75,000.00 6,246,000.00
d. Acian Dinding, kolom dan balok 583.10 m2 28,347.00 16,529,135.70
e. Acian Openingan Kusen 5.40 m2 28,347.00 153,073.80
f. Railing Selasar Hollow 27.00 m1 538,415.00 14,537,205.00
g. Railing tangga pipa galvanis dia. 2" 10.22 m1 127,865.00 1,306,780.30
93,999,586.73
- Pekerjaan kusen pintu, jendela dan kaca
a. Kusen alumunium Coated Black
- Type J.1 21.00 bh 2,290,553.00 48,101,613.00
b. Kusen Pintu kayu kamper samarinda
- Type P.1 0.32 m3 12,313,032.00 3,940,170.24
c. Daun pintu panil kayu kamper samarinda (kualitas 3.00 m2 1,527,654.00 4,582,962.00
d. Daun jendela atas pintu + kaca 3.00 Unit 450,000.00 1,350,000.00
57,974,745.24
- Pekerjaan kunci dan aksesoris pintu jendela
a.Engsel Pintu uk. 4 " Stainless Steel 24.00 bh 52,472.00 1,259,328.00
b.Engsel Pintu stainlis steel uk. 3 " Stainless Steel 12.00 bh 52,472.00 629,664.00
c.Kunci double slaag 3.00 bh 303,572.00 910,716.00
d.Hak Angin 3.00 bh 22,948.00 68,844.00
2,868,552.00
- Pekerjaan plafond
a. Plafond Gyptile 9 mm + rangka Main Tee/Cross Te 168.00 m2 195,000.00 32,760,000.00
b. Plafond GRC t =6 mm+ rangka Galvalum 0.35 mm G 172.00 m2 140,471.00 24,161,012.00
c. List Profil Gypsum 7 cm 45.00 m1 29,326.00 1,319,670.00
d. List Profil Kayu 5 cm 74.00 m1 71,746.00 5,309,204.00
NO. URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6=3x5
63,549,886.00
- Pekerjaan pasangan keramik
a. Lantai keramik 40x40 cm, Kw1 228.00 m2 112,348.00 25,615,344.00
b. Plin lantai 10x40 cm 183.00 m1 52,747.00 9,652,701.00
35,268,045.00
- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) 172.56 m2 66,425.00 11,462,298.00
b. Pengecatan Dinding cat minyak bawah kusen 112.00 m2 62,875.00 7,042,000.00
c. Pengecatan dinding Interior 353.94 m2 59,453.00 21,042,794.82
d. Pengecatan plafond setara ICI (3x) 172.00 m2 64,131.00 11,030,532.00
e. Pengecatan kayu setara 24.20 m2 64,694.00 1,565,594.80
f. Waterproofing sheet polister ( plat canopy ) 62.00 m2 55,617.00 3,448,254.00
55,591,473.62
- Pekerjaan Lain-Lain
a. Mobilisasi lantai 2 1.00 ls 7,500,000.00 7,500,000.00
7,500,000.00
3. PEKERJAAN ELEKTRIKAL
- Pekerjaan instalasi penerangan dan armature
a. Instalasi titik lampu 23.00 ttk 109,435.00 2,517,005.00
b. Instalasi stop kontak 9.00 ttk 109,435.00 984,915.00
c. Pas. Saklar Ganda 3.00 bh 52,031.00 156,093.00
d. Pas. Stop kontak 6.00 bh 47,631.00 285,786.00
e. Lampu TKI-031 TL. 2x18 watt 18.00 bh 129,701.00 2,334,618.00
f. Lampu Baret 5.00 bh 152,264.00 761,320.00
g. Pas. Penangkal petir + Grounding 2.00 ttk 1,598,762.00 3,197,524.00
h. Pas kabel tupur 4 x 16 15.00 m1 65,000.00 975,000.00
i. Grounding Panel-panel listrik lt.2 BC 35mm 1.00 Ls 500,000.00 500,000.00
11,712,261.00
V. PEKERJAAN ATAP
a. Kuda-kuda rangka Baja Ringan Zinc Alume ( Term 368.36 m2 225,000.00 82,881,000.00
b. Genteng Metal Berpasir tebal: 0,35 mm 368.36 m2 77,785.00 28,652,882.60
c. Nok Atap Metal Berpasir 49.00 m1 69,145.00 3,388,105.00
d. Alumunium Foil 368.36 m2 55,518.00 20,450,610.48
e. Listplank GRC t = 12 mm lebar 30 cm 80.00 m1 146,178.00 11,694,240.00
147,066,838.08
VI. PEKERJAAN LANSEKAP DAN SARANA LUAR
a. Saluran buis beton 1/2 dia. 20 cm 80.00 m1 119,819.00 9,585,520.00
b. Bak Kontrol 40x40 4.00 bh 225,000.00 900,000.00
c. Pek. Pintu Pagar ( Gerbang Entrane Utama ) 9.53 m2 789,671.00 7,525,564.63
d. Pek. Pagar Besi Hollow 26.00 m1 538,415.00 13,998,790.00
e. Pek pagar beton precast t=2.4 m 50.00 m1 541,460.00 27,073,000.00
f. Pekerjaan tiang bendera, (st. steel ) termasuk dudu 1.00 unit 7,500,000.00 7,500,000.00
g. Pek. Sumur Resapan 2.00 Unit 481,366.00 962,732.00
h. Pembersihan Akhir 1.00 ls 2,500,000.00 2,500,000.00
i. Urugan tanah merah taman 13.44 m3 200,206.00 2,690,768.64
j. Tanaman Rumput Gajah Mini 19.20 m2 22,874.00 439,180.80
k. Pucuk merah 8.00 bh 106,126.00 849,008.00
polib 10,123.00
l. Tanaman Sansivera 16.00 161,968.00
ag
74,186,532.07
1 2 3 4 5 6=3x5
ROSTA MANULLANG
Direktur
ANALISA TEKNIS
HARGA SATUAN PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN BETON
DIBULATKAN 11,715.00
BT13 1 m2 - Bekisting dengan papan + bongkaran dan penyiraman
Kayu Papan terentang 2/20-400 cm 0.0240 m3 2,299,000.00 55,176.00
Kayu Kaso terentang 5/7-400 cm 0.0280 m3 3,045,400.00 85,271.20
Paku 0.2500 kg 15,200.00 3,800.00
Pekerja 0.1650 hr 69,700.00 11,500.50
Tukang kayu 0.3940 hr 83,700.00 32,977.80
Mandor 0.0270 hr 116,200.00 3,137.40
JUMLAH 191,862.90
DIBULATKAN 191,862.00
BT14 1 m2 - Bekisting dengan triplex 9 mm + bongkaran dan penyiraman
Kayu Kaso terentang 5/7-400 cm 0.0280 m3 3,045,400.00 85,271.20
Multiplex 9 mm 0.3500 lbr 136,200.00 47,670.00
Paku 0.2500 kg 15,200.00 3,800.00
Pekerja 0.1650 bh 69,700.00 11,500.50
Tukang kayu 0.3940 hr 83,700.00 32,977.80
Mandor 0.0270 hr 116,200.00 3,137.40
JUMLAH 184,356.90
DIBULATKAN 184,356.00
BT14a 1 m3 - Bekisting sloof beton struktur
Kayu Kaso terentang 5/7-400 cm 0.1247 m3 3,045,400.00 379,761.38
Multiplex 9 mm 1.5667 lbr 136,200.00 213,384.54
Paku 1.1120 kg 15,200.00 16,902.40
Pekerja 0.7340 hr 69,700.00 51,159.80
Tukang kayu 1.7507 hr 83,700.00 146,533.59
Mandor 0.1200 hr 116,200.00 13,944.00
JUMLAH 821,685.71
DIBULATKAN 821,685.00
BT15 1 m3 - Bekisting kolom beton struktur
Kayu Kaso terentang 5/7-400 cm 0.2520 m3 3,045,400.00 767,440.80
Multiplex 9 mm 3.1500 lbr 136,200.00 429,030.00
Paku 2.2500 kg 15,200.00 34,200.00
Pekerja 1.4850 hr 69,700.00 103,504.50
Tukang kayu 3.5440 hr 83,700.00 296,632.80
Mandor 0.2430 hr 116,200.00 28,236.60
JUMLAH 1,659,044.70
DIBULATKAN 1,659,044.00
BT16 1 m3 - Bekisting balok beton struktur
Kayu Kaso terentang 5/7-400 cm 0.1870 m3 3,045,400.00 569,489.80
Multiplex 9 mm 2.3500 lbr 136,200.00 320,070.00
Paku 1.6680 kg 15,200.00 25,353.60
Pekerja 1.1010 hr 69,700.00 76,739.70
Tukang kayu 2.6260 hr 83,700.00 219,796.20
Mandor 0.1800 hr 116,200.00 20,916.00
JUMLAH 1,232,365.30
DIBULATKAN 1,232,365.00
BT17 1 m3 - Bekisting lantai beton
Kayu Kaso terentang 5/7-400 cm 0.2320 m3 3,045,400.00 706,532.80
Multiplex 9 mm 2.9050 lbr 136,200.00 395,661.00
Paku 2.0750 kg 15,200.00 31,540.00
Pekerja 1.3700 hr 69,700.00 95,489.00
Tukang kayu 3.2685 hr 83,700.00 273,573.45
Mandor 0.2245 hr 116,200.00 26,086.90
JUMLAH 1,528,883.15
DIBULATKAN 1,528,883.00
BT18 1 m2 - Perancah kayu / stoot werk - tinggi s/d 2 m
Kayu Kaso terentang 5/7-400 cm 0.0608 m3 3,045,400.00 185,160.32
Paku 0.3000 kg 15,200.00 4,560.00
Pekerja 0.6000 hr 69,700.00 41,820.00
Tukang kayu 0.4200 hr 83,700.00 35,154.00
Mandor 0.0300 hr 116,200.00 3,486.00
JUMLAH 270,180.32
DIBULATKAN 270,180.00
BT19 1 m2 - Perancah kayu / stoot werk - tinggi s/d 3 m
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
DIBULATKAN 4,715,614.00
BT29 1 m3 - Sloof beton 15/20 K.225
Adukan beton K.225 ( konvensional ) 1.0000 m3 1,374,549.00 1,374,549.00
Pembesian besi polos 187.1111 kg 11,715.00 2,192,006.67
Bekisting balok struktur 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,798,920.67
DIBULATKAN 4,798,920.00
BT30 1 m3 - Kolom beton 30/30 K-225
Adukan beton K-225 (ready-mix) 1.0000 m3 933,110.00 933,110.00
Pembesian 213.0000 kg 11,715.00 2,495,295.00
Bekisting Kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 5,087,449.00
DIBULATKAN 5,087,449.00
BT31 1 m3 - Kolom beton 25/35 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi polos 179.0000 kg 11,715.00 2,096,985.00
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 4,689,139.00
DIBULATKAN 4,689,139.00
BT32 1 m3 - Kolom beton 25/25 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi polos 155.0000 kg 11,715.00 1,815,825.00
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 4,407,979.00
DIBULATKAN 4,407,979.00
BT33 1 m3 - Kolom beton 25/25 K.250
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 260.0000 kg 11,715.00 3,045,900.00
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 5,638,054.00
DIBULATKAN 5,638,054.00
BT34 1 m3 - Kolom beton 20/20 K.225 ( K3)
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 170.0000 kg 11,715.00 1,991,550.00
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 4,583,704.00
DIBULATKAN 4,583,704.00
BT35 1 m3 - Kolom beton 15/30 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi polos 173.0000 kg 11,715.00 2,026,695.00
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 4,618,849.00
DIBULATKAN 4,618,849.00
BT36 1 m3 - Kolom beton 15/20 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi polos 187.1111 kg 11,715.00 2,192,006.54
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 4,784,160.54
DIBULATKAN 4,784,160.00
BT37 1 m3 - Kolom beton 15/40 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 180.0000 kg 11,715.00 2,108,700.00
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 4,700,854.00
DIBULATKAN 4,700,854.00
BT38 1 m3 - Kolom beton 12/30 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 170.0000 kg 11,715.00 1,991,550.00
Bekisting kolom 1.0000 m3 1,659,044.00 1,659,044.00
JUMLAH 4,583,704.00
DIBULATKAN 4,583,704.00
BT39 1 m3 - Kolom beton 12/30 K.250
Adukan beton K-225 (ready-mixl) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 170.0000 kg 11,715.00 1,991,550.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
JUMLAH 6,021,528.74
DIBULATKAN 6,021,528.00
BT49 1 m3 - Balok beton 25/60 K.250
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 150.0000 kg 11,715.00 1,757,250.00
Perancah kayu / stoot werk - tinggi s / d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,733,466.84
DIBULATKAN 4,733,466.00
BT50 1 m3 - Balok beton 25/65 K.250
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 230.0000 kg 11,715.00 2,694,450.00
Perancah kayu / stoot werk - tinggi s / d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,670,666.84
DIBULATKAN 5,670,666.00
BT51 1 m3 - Balok beton 20/50 K-225
Adukan beton K-225 (ready-mix) 1.0000 m3 933,110.00 933,110.00
Pembesian 175.1652 kg 11,715.00 2,052,060.32
Perancah kayu / stoot werk - tinggi s/d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,028,277.15
DIBULATKAN 5,028,277.00
BT52 1 m3 - Balok beton 20/40 K-225
Adukan beton K-225 (ready-mix) 1.0000 m3 933,110.00 933,110.00
Pembesian 205.6215 kg 11,715.00 2,408,855.87
Perancah kayu / stoot werk - tinggi s/d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,385,072.71
DIBULATKAN 5,385,072.00
BT53 1 m3 - Balok beton 20/35 K-225
Adukan beton K-225 (ready-mix) 1.0000 m3 933,110.00 933,110.00
Pembesian 180.0000 kg 11,715.00 2,108,700.00
Perancah kayu / stoot werk - tinggi s/d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting Balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,084,916.84
DIBULATKAN 5,084,916.00
BT54 1 m3 - Balok beton 20/30 K-225
Adukan beton K-225 (ready-mix) 1.0000 m3 933,110.00 933,110.00
Pembesian 180.2920 kg 11,715.00 2,112,120.78
Perancah kayu / stoot werk - tinggi s/d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting Balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,088,337.62
DIBULATKAN 5,088,337.00
BT55 1 m3 - Balok beton 15/25 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian 180.5556 kg 11,715.00 2,115,208.85
Perancah kayu / stoot werk - tinggi s / d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,091,425.69
DIBULATKAN 5,091,425.00
BT56 1 m3 - Balok beton 15/30 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian 196.2427 kg 11,715.00 2,298,982.84
Perancah kayu / stoot werk - tinggi s / d 4 m 1.6675 m2 486,202.00 810,741.84
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,275,199.68
DIBULATKAN 5,275,199.00
BT57 1 m3 - Balok beton 15/60 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian 120.0000 kg 11,715.00 1,405,800.00
Perancah kayu / stoot werk - tinggi s / d 4 m 1.6665 m2 486,202.00 810,255.63
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,381,530.63
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
DIBULATKAN 4,381,530.00
BT58 1 m3 - Balok beton 12/60 K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian 120.0000 kg 11,715.00 1,405,800.00
Perancah kayu / stoot werk - tinggi s / d 4 m 1.6665 m2 486,202.00 810,255.63
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,381,530.63
DIBULATKAN 4,381,530.00
BT59 1 m3 - Balok beton 12/60 K.250
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian 120.0000 kg 11,715.00 1,405,800.00
Perancah kayu / stoot werk - tinggi s / d 4 m 1.6665 m2 486,202.00 810,255.63
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,381,530.63
DIBULATKAN 4,381,530.00
BT60 1 m3 - Ring balok beton 13/20 - K. 175 (site mix)
Adukan beton K-225 (site-mix) 1.0000 m3 1,374,549.00 1,374,549.00
Pembesian 157.4200 kg 11,715.00 1,844,175.30
Bekisting Balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,451,089.30
DIBULATKAN 4,451,089.00
BT61 1 m3 - Ring balok beton 13/13 K-175 (site mix)
Adukan beton K-175 (site-mix) 1.0000 m3 1,205,616.00 1,205,616.00
Pembesian besi ulir 155.0000 kg 11,715.00 1,815,825.00
Bekisting Balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,253,806.00
DIBULATKAN 4,253,806.00
BT62 1 m3 - Ring balok beton 15/25 K-175 (site mix)
Adukan beton K-175 (site-mix) 1.0000 m3 1,205,616.00 1,205,616.00
Pembesian besi ulir 160.0000 kg 11,715.00 1,874,400.00
Bekisting Balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 4,312,381.00
DIBULATKAN 4,312,381.00
BT63 1 m3 - Ring balok beton 25/35 K-225 (ready mix)
Adukan beton K-225 (ready-mix) 1.0000 m3 933,110.00 933,110.00
Pembesian besi ulir 160.0000 kg 11,715.00 1,874,400.00
Perancah kayu / stoot werk - tinggi s / d 4 m 2.8575 m2 486,202.00 1,389,322.21
Bekisting Balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 5,429,197.22
DIBULATKAN 5,429,197.00
BT64 1 m3 - Plat lantai & tangga beton K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian 198.4100 kg 11,715.00 2,324,373.15
Perancah kayu / stoot werk - tinggi s / d 4 m 8.3333 m2 486,202.00 4,051,667.13
Bekisting plat lantai 1.0000 m3 1,528,883.00 1,528,883.00
JUMLAH 8,838,033.28
DIBULATKAN 8,838,033.00
BT65 1 m3 - Plat lantai & tangga beton K.250
Adukan beton K.250 ( ready - mix ) 1.0000 m3 948,810.00 948,810.00
Pembesian 198.4100 kg 11,715.00 2,324,373.15
Perancah kayu / stoot werk - tinggi s / d 4 m 8.3333 m2 486,202.00 4,051,667.13
Bekisting plat lantai 1.0000 m3 1,528,883.00 1,528,883.00
JUMLAH 8,853,733.28
DIBULATKAN 8,853,733.00
BT66 1 m3 - Plat listplank beton K.225
Adukan beton K.225 ( ready - mix ) 1.0000 m3 933,110.00 933,110.00
Pembesian 100.0000 kg 11,715.00 1,171,500.00
Perancah kayu / stoot werk - tinggi s / d 4 m 1.0000 m2 486,202.00 486,202.00
Bekisting balok 1.0000 m3 1,232,365.00 1,232,365.00
JUMLAH 3,823,177.00
DIBULATKAN 3,823,177.00
BT67 1 m3 - Plat listplank beton K.250
Adukan beton K.250 ( ready - mix ) 1.0000 m3 948,810.00 948,810.00
Pembesian 100.0000 kg 11,715.00 1,171,500.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
JUMLAH 29,144.00
DIBULATKAN 29,144.00
PA17 1 m2 - Alumunium foil + Roofmesh
Alumunium foil 1.0500 m2 19,100.00 20,055.00
Roofmesh 1.0500 m2 28,400.00 29,820.00
Pekerja 0.0330 hr 69,700.00 2,300.10
Tukang kayu 0.0330 hr 83,700.00 2,762.10
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 55,518.20
DIBULATKAN 55,518.00
PA18 1 m1 - Talang datar
Papan kayu meranti Oven 0.0096 m3 2,299,000.00 22,070.40
Plat seng 0.5000 m1 53,000.00 26,500.00
Paku 0.0150 kg 15,200.00 228.00
Pekerja 0.0500 hr 69,700.00 3,485.00
Tukang kayu 0.1200 hr 83,700.00 10,044.00
Mandor 0.0120 hr 116,200.00 1,394.40
JUMLAH 63,721.80
DIBULATKAN 63,721.00
PA19 1 m2 - Pasangan Atap Zincalume + Alumunium Foil + Roofmesh
Atap Zincalume 1.0000 m2 80,700.00 80,700.00
Alumunium Foil 1.0500 m2 19,100.00 20,055.00
Roofmesh 1.0500 m2 28,400.00 29,820.00
Paku Pengikat Atap metal/zincalume 0.1750 kg 15,200.00 2,660.00
Sealent 0.0650 tube 16,500.00 1,072.50
Pekerja 0.0695 hr 69,700.00 4,844.15
Tukang kayu 0.1225 hr 83,700.00 10,253.25
Mandor 0.0067 hr 116,200.00 778.54
JUMLAH 150,183.44
DIBULATKAN 150,183.00
PA20 1 m2 - Pasangan Atap Metal berpasir cutting + Alumunium Foil + Roofmesh
Atap Metal berpasir tebal 0,3 mm cutting 1.3000 lbr 121,500.00 157,950.00
Alumunium Foil 1.0500 m2 19,100.00 20,055.00
Roofmesh 1.0500 m2 28,400.00 29,820.00
Paku Pengikat Atap metal/zincalume 0.1200 kg 15,200.00 1,824.00
Pekerja 0.1400 hr 69,700.00 9,758.00
Tukang kayu 0.1000 hr 83,700.00 8,370.00
Kepala Tukang kayu 0.0080 hr 93,000.00 744.00
Mandor 0.0080 hr 116,200.00 929.60
JUMLAH 229,450.60
DIBULATKAN 229,450.00
PA21 1 m2 - Pasangan Atap Metal berpasir cutting
Atap Metal berpasir tebal 0,3 mm cutting 1.3000 lbr 43,200.00 56,160.00
Paku Pengikat Atap metal/zincalume 0.1200 kg 15,200.00 1,824.00
Pekerja 0.1400 hr 69,700.00 9,758.00
Tukang kayu 0.1000 hr 83,700.00 8,370.00
Kepala Tukang kayu 0.0080 hr 93,000.00 744.00
Mandor 0.0080 hr 116,200.00 929.60
JUMLAH 77,785.60
DIBULATKAN 77,785.00
PA23 1 m1 - Pasangan Nok Zincalume
Nok Zincalume 1.1000 lbr 43,200.00 47,520.00
Paku Pengikat Atap metal/zincalume 0.1200 kg 15,200.00 1,824.00
Pekerja 0.1400 hr 69,700.00 9,758.00
Tukang kayu 0.1000 hr 83,700.00 8,370.00
Kepala Tukang kayu 0.0080 hr 93,000.00 744.00
Mandor 0.0080 hr 116,200.00 929.60
JUMLAH 69,145.60
DIBULATKAN 69,145.00
PEKERJAAN KAYU
KY01 1 m3 - Kusen kayu kamper samarinda oven
Kayu balok kamper samarinda Oven 1.1000 m3 9,117,600.00 10,029,360.00
Paku 3.0000 kg 15,200.00 45,600.00
Angkur 10.5600 kg 12,500.00 132,000.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN PARTISI
JUMLAH 2,270,327.00
DIBULATKAN 2,270,327.00
ST04 1 bh - Wastafel
Wastafel + Accesoris 1.0000 bh 1,500,000.00 1,500,000.00
Pekerja 0.3000 hr 69,700.00 20,910.00
Tukang batu 0.2500 hr 83,700.00 20,925.00
Mandor 0.1800 hr 116,200.00 20,916.00
JUMLAH 1,562,751.00
DIBULATKAN 1,562,751.00
ST05 1 bh - Kitchen Zink
Kitchen Zink 1.0000 bh 250,000.00 250,000.00
Pekerja 0.3000 hr 69,700.00 20,910.00
Tukang batu 0.2500 hr 83,700.00 20,925.00
Mandor 0.1800 hr 116,200.00 20,916.00
JUMLAH 312,751.00
DIBULATKAN 312,751.00
ST07 1 bh - Floor drain
Floor drain stainless 1.0000 bh 165,300.00 165,300.00
Pekerja 0.0100 hr 69,700.00 697.00
Tukang batu 0.1000 hr 83,700.00 8,370.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 174,948.00
DIBULATKAN 174,948.00
ST08 1 bh - Shower
Shower 1.0000 bh 287,800.00 287,800.00
Pekerja 0.0100 hr 69,700.00 697.00
Tukang batu 0.1000 hr 83,700.00 8,370.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 297,448.00
DIBULATKAN 297,448.00
ST09 1 bh - Kran leher angsa 1/2"
Kran air leher angsa 1/2 1.0000 bh 273,700.00 273,700.00
Seal tape 0.0250 roll 2,400.00 60.00
Lem pipa PVC 0.1250 tube 13,500.00 1,687.50
Pekerja 0.0100 hr 69,700.00 697.00
Tukang batu 0.1000 hr 83,700.00 8,370.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 285,095.50
DIBULATKAN 285,095.00
ST10 1 bh - Kran air 1/2"
Kran air 1/2 1.0000 bh 25,000.00 25,000.00
Seal tape 0.0250 roll 2,400.00 60.00
Lem pipa PVC 0.1250 tube 13,500.00 1,687.50
Pekerja 0.0100 hr 69,700.00 697.00
Tukang batu 0.1000 hr 83,700.00 8,370.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 36,395.50
DIBULATKAN 36,395.00
ST11 1 unit - Pompa air jet pump + Instalasi dan pengeboran
Pompa air jet pump 1.0000 bh 1,891,600.00 1,891,600.00
Pipa PVC 1 " 40.0000 m1 8,800.00 352,000.00
Pipa PVC 4 " 16.0000 m1 10,312.00 164,992.00
Bocht LL-D 1" (lokal) 6.0000 bh 23,800.00 142,800.00
Water moer 2.0000 bh 57,400.00 114,800.00
Ongkos pengeboran 1.0000 ls 1,235,000.00 1,235,000.00
JUMLAH 3,901,192.00
DIBULATKAN 3,901,192.00
ST11 1 unit - Pompa air jet pump tanpa pengeboran
Pompa air jet pump 1.0000 bh 1,891,600.00 1,891,600.00
Ongkos pasang 1.0000 ls 75,000.00 75,000.00
JUMLAH 1,966,600.00
DIBULATKAN 1,966,600.00
ST12 1 unit - Water tower rangka besi siku
Konstruksi besi siku 210.0000 kg 13,500.00 2,835,000.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
JUMLAH 34,948.00
DIBULATKAN 34,948.00
AS03 1 bh - Pasang hak angin
Hak angin 1.0000 bh 13,300.00 13,300.00
Pekerja 0.0100 hr 69,700.00 697.00
Tukang kayu 0.1000 hr 83,700.00 8,370.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 22,948.00
DIBULATKAN 22,948.00
AS04 1 bh - Pasang slot jendela
Slot jendela 1.0000 bh 87,000.00 87,000.00
Pekerja 0.0100 hr 69,700.00 697.00
Tukang kayu 0.1000 hr 83,700.00 8,370.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 96,648.00
DIBULATKAN 96,648.00
AS05 1 bh - Pasang kunci double slaag (SOLID)
Kunci double slaag (SOLID) 1.0000 bh 278,000.00 278,000.00
Pekerja 0.0500 hr 69,700.00 3,485.00
Tukang kayu 0.2500 hr 83,700.00 20,925.00
Mandor 0.0100 hr 116,200.00 1,162.00
JUMLAH 303,572.00
DIBULATKAN 303,572.00
AS06 1 bh - Pasang Grendel pintu
Grendel Pintu 1.0000 bh 38,700.00 38,700.00
Pekerja 0.0100 hr 69,700.00 697.00
Tukang kayu 0.1000 hr 83,700.00 8,370.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 48,348.00
DIBULATKAN 48,348.00
PEKERJAAN SARANA LUAR
SL01 1 m1 - Saluran buis beton 1/2 dia. 20 cm tanpa tulangan
Buis beton 1/2 dia. 20 cm 1.0250 m1 65,300.00 66,932.50
Pasir urug 0.1200 m3 213,700.00 25,644.00
Pasir pasang 0.0540 m3 265,800.00 14,353.20
Semen PC ( 50 kg ) 0.0270 zak 75,000.00 2,025.00
Pekerja 0.0750 hr 69,700.00 5,227.50
Tukang batu 0.0500 hr 83,700.00 4,185.00
Mandor 0.0125 hr 116,200.00 1,452.50
JUMLAH 119,819.70
DIBULATKAN 119,819.00
SL02 1 m1 - Saluran tertutup buis beton dia. 30 cm tanpa tulangan
Buis beton dia. 30 cm 1.0250 m1 125,400.00 128,535.00
Pasir urug 0.1200 m3 213,700.00 25,644.00
Pasir pasang 0.0540 m3 265,800.00 14,353.20
Semen PC ( 50 kg ) 0.0270 zak 75,000.00 2,025.00
Pekerja 0.0750 hr 69,700.00 5,227.50
Tukang batu 0.0500 hr 83,700.00 4,185.00
Mandor 0.0125 hr 116,200.00 1,452.50
JUMLAH 181,422.20
DIBULATKAN 181,422.00
SL03 1 m2 - Paving block t = 6 cm
Paving block t = 6 cm K.250 1.0250 m2 74,800.00 76,670.00
Abu batu 0.0250 m3 265,800.00 6,645.00
Pekerja 0.1500 hr 69,700.00 10,455.00
Tukang batu 0.0500 hr 83,700.00 4,185.00
Mandor 0.0030 hr 116,200.00 348.60
JUMLAH 98,303.60
DIBULATKAN 98,303.00
SL04 1 m2 - Paving block t = 8 cm
Paving block t = 8 cm K.250 1.0250 m2 95,500.00 97,887.50
Abu batu 0.0250 m3 265,800.00 6,645.00
Pekerja 0.1500 hr 69,700.00 10,455.00
Tukang batu 0.0500 hr 83,700.00 4,185.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
PEKERJAAN TANAMAN
PT01 1 pohon - Eucaliptus
Eucaliptus Ø 4 - 7 cm, t = 1 - 3 m 1.0000 phn 99,200.00 99,200.00
Pekerja 0.0200 hr 69,700.00 1,394.00
Mandor 0.0020 hr 116,200.00 232.40
JUMLAH 100,826.40
DIBULATKAN 100,826.00
PT04 1 pohon - Pucuk Merah (tinggi 50 - 60 cm)
Pucuk Merah (tinggi 50 - 60 cm) 1.0000 phn 104,500.00 104,500.00
Pekerja 0.0200 hr 69,700.00 1,394.00
Mandor 0.0020 hr 116,200.00 232.40
JUMLAH 106,126.40
DIBULATKAN 106,126.00
PT04 1 pohon - Kiara Payung
Kiara Payung 1.0000 phn 133,000.00 133,000.00
Pekerja 0.0200 hr 69,700.00 1,394.00
Mandor 0.0020 hr 116,200.00 232.40
JUMLAH 134,626.40
DIBULATKAN 134,626.00
PT04 1 pohon - Pohon Glodogan Tiang T = 1.5m
Pohon Glodogan Tiang T = 1.5m 1.0000 phn 190,000.00 190,000.00
Pekerja 0.0200 hr 69,700.00 1,394.00
Mandor 0.0020 hr 116,200.00 232.40
JUMLAH 191,626.40
DIBULATKAN 191,626.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
ME02 1 m - Instalasi NYY (4X16) mm2 dari panel ke KWH meter PLN
Kabel NYY 4x16 mm 1.0000 m 118,900.00 118,900.00
Klem kabel 0.2500 dus 6,200.00 1,550.00
Pipa PVC AW 1/2" 2.0000 m 4,700.00 9,400.00
Pembantu Instalator 0.3715 hr 74,400.00 27,639.60
Instalator 0.1050 hr 93,000.00 9,765.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 167,835.60
DIBULATKAN 167,835.00
ME02 1 Titik - WLC elektrode + kabel NYM 3X2,5 mm2
Alat dan bahan 1.0000 ls 389,500.00 389,500.00
Pembantu Instalator 0.3715 hr 74,400.00 27,639.60
Instalator 0.1050 hr 93,000.00 9,765.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 427,485.60
DIBULATKAN 427,485.00
ME03 1 bh - Pasang Saklar Tunggal
Saklar tunggal 1.0000 bh 13,700.00 13,700.00
Pembantu Instalator 0.2500 hr 74,400.00 18,600.00
Instalator 0.1500 hr 93,000.00 13,950.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 46,831.00
DIBULATKAN 46,831.00
ME04 1 bh - Pasang Saklar Ganda
Saklar ganda 1.0000 bh 18,900.00 18,900.00
Pembantu Instalator 0.2500 hr 74,400.00 18,600.00
Instalator 0.1500 hr 93,000.00 13,950.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 52,031.00
DIBULATKAN 52,031.00
ME05 1 bh - Pasang Stop Kontak
Stop Kontak 1.0000 bh 14,500.00 14,500.00
Pembantu Instalator 0.2500 hr 74,400.00 18,600.00
Instalator 0.1500 hr 93,000.00 13,950.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 47,631.00
DIBULATKAN 47,631.00
ME06 1 bh - Pasang Stop Kontak
Stop Kontak 1.0000 bh 14,500.00 14,500.00
Pembantu Instalator 0.2500 hr 74,400.00 18,600.00
Instalator 0.1500 hr 93,000.00 13,950.00
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 47,631.00
DIBULATKAN 47,631.00
ME07 1 set - Panel PP-LP01, 40X60 cm2
Alat dan bahan 1.0000 ls 705,000.00 705,000.00
Pembantu Instalator 3.0000 hr 74,400.00 223,200.00
Instalator 2.0000 hr 93,000.00 186,000.00
Mandor 1.0000 hr 116,200.00 116,200.00
JUMLAH 1,230,400.00
DIBULATKAN 1,230,400.00
ME07 1 set - Pas.Box MCB 10 A
MCB 10 A 3.0000 bh 88,500.00 265,500.00
Box MCB 4 group 1.0000 bh 25,800.00 25,800.00
Pembantu Instalator 3.0000 hr 80,000.00 240,000.00
Instalator 2.0000 hr 100,000.00 200,000.00
Mandor 1.0000 hr 125,000.00 125,000.00
JUMLAH 856,300.00
DIBULATKAN 856,300.00
ME08 1 bh - Lampu TL 2 x 18 watt setara philips (inbouw) termasuk bahan komplit
Lampu TL 2 x 18 watt, armatur, komplit philips 1.0000 bh 96,100.00 96,100.00
Pembantu instalator 0.3132 hr 74,400.00 23,302.08
Instalator 0.1045 hr 93,000.00 9,718.50
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 129,701.58
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
DIBULATKAN 129,701.00
ME09 1 bh - Lampu SL 18 watt termasuk bahan komplit
Lampu SL 18 watt, komplit philips 1.0000 bh 30,600.00 30,600.00
Fitting keramik 1.0000 bh 15,100.00 15,100.00
Pembantu instalator 0.3132 hr 74,400.00 23,302.08
Instalator 0.1045 hr 93,000.00 9,718.50
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 79,301.58
DIBULATKAN 79,301.00
ME10 1 Bh - Lampu Baret Kotak 22 watt
Lampu baret kotat 22 watt, komplit philips 1.0000 bh 125,000.00 125,000.00
Instalator 0.1050 hr 93,000.00 9,765.00
Pembantu instalator 0.2274 hr 74,400.00 16,918.56
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 152,264.56
DIBULATKAN 152,264.00
ME11 1 Bh - Lampu downlight
Lampudownlight + Accecories 1.0000 bh 90,000.00 90,000.00
Pembantu instalator 0.2294 hr 74,400.00 17,067.36
Instalator 0.1045 hr 93,000.00 9,718.50
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 117,366.86
DIBULATKAN 117,366.00
ME12 1 Bh - Lampu PLC 13 watt
Lampu PLC 13 watt 1.0000 bh 61,100.00 61,100.00
Pembantu instalator 0.3132 hr 74,400.00 23,302.08
Instalator 0.1045 hr 93,000.00 9,718.50
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 94,701.58
DIBULATKAN 94,701.00
1 Bh - Lampu Pagar
Lampu pagar 1.0000 bh 174,700.00 174,700.00
Pekerja 0.3132 hr 69,700.00 21,830.04
Tukang listrik 0.1045 hr 93,000.00 9,718.50
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 206,829.54
DIBULATKAN 206,829.00
1 Bh - Lampu Sorot
Lampu sorot LED 50 watt 1.0000 bh 517,000.00 517,000.00
Pekerja 0.3132 hr 69,700.00 21,830.04
Tukang listrik 0.1045 hr 93,000.00 9,718.50
Mandor 0.0050 hr 116,200.00 581.00
JUMLAH 549,129.54
DIBULATKAN 549,129.00
ME17 1 Kwh - Penyambungan daya
Penyambungan daya 1.0000 ls 1,500.00 1,500.00
Instalator 0.0010 hr 93,000.00 93.00
Mandor 0.0001 hr 116,200.00 11.62
JUMLAH 1,604.62
DIBULATKAN 1,604.00
ME18 1 ttk - Penangkal petir kompensional
Splitzer uk.2 1.0000 bh 47,500.00 47,500.00
Kabel BC 75 mm2 1.0000 m 23,500.00 23,500.00
Klem Kabel 1.0000 bh 2,800.00 2,800.00
Pentanahan 1.0000 ls 882,000.00 882,000.00
Bak kontrol 600 x 600 x 400 1.0000 bh 113,200.00 113,200.00
Pembantu instalator 0.5000 hr 74,400.00 37,200.00
Instalator 0.8000 hr 93,000.00 74,400.00
Mandor 0.0100 hr 116,200.00 1,162.00
Box Test 1.0000 bh 417,000.00 417,000.00
JUMLAH 1,598,762.00
DIBULATKAN 1,598,762.00
PEKERJAAN PINTU DAN JENDELA
PJ01 1 m3 - Kusen kayu kamper samarinda
Kayu balok kamper samarinda Oven 1.1000 m3 9,117,600.00 10,029,360.00
Paku 3.0000 kg 15,200.00 45,600.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
JUMLAH 1,980,160.00
DIBULATKAN 1,980,160.00
1 unit - Pembuatan couter ruang pelayanan
Alat dan bahan 1.0000 ls 1,757,500.00 1,757,500.00
Pekerja 1.0000 hr 69,700.00 69,700.00
Tukang Besi 1.0000 hr 79,000.00 79,000.00
Mandor 0.0500 hr 116,200.00 5,810.00
JUMLAH 1,912,010.00
DIBULATKAN 1,912,010.00
PJ13 1 m2 - Pemasangan Almunium Komposit ( ACP )
Alumunium composite 1.2000 m2 114,900.00 137,880.00
Braket galvanis ACP 2.0000 bh 15,600.00 31,200.00
Rangka alumunium composite (Almn. 4 0 x 40 x 2 mm ) 4.5000 m 18,800.00 84,600.00
Skrup almunium 0.4000 kg 15,500.00 6,200.00
Sealent 1.5000 tube 16,500.00 24,750.00
Pekerja 0.3500 hr 69,700.00 24,395.00
Tukang besi 0.5500 hr 79,000.00 43,450.00
Mandor / pengawas 0.1200 hr 116,200.00 13,944.00
JUMLAH 366,419.00
DIBULATKAN 366,419.00
PEKERJAAN BONGKARAN
BK01 1 m3 - Bongkar struktur bangunan (manual)
Pekerja 2.3520 hr 69,700.00 163,934.40
Mandor 0.0388 hr 116,200.00 4,508.56
JUMLAH 168,442.96
DIBULATKAN 168,442.00
BK02 1 m3 - Bongkar struktur Bangunan ( dengan alat berat )
Pekerja 1.9600 hr 69,700.00 136,612.00
Mandor 0.0323 hr 116,200.00 3,753.26
Kompresor kap.400 - 6500 ltr/menit 0.1000 jam 69,000.00 6,900.00
Jack Hammer 0.1000 set 22,000.00 2,200.00
JUMLAH 149,465.26
DIBULATKAN 149,465.00
BK03 1 m2 - Bongkar dinding bata merah
Pekerja 0.1000 hr 69,700.00 6,970.00
Mandor 0.0250 hr 116,200.00 2,905.00
JUMLAH 9,875.00
DIBULATKAN 9,875.00
BK04 1 m2 - Bongkar lantai keramik
Pekerja 0.0800 hr 69,700.00 5,576.00
Mandor 0.0250 hr 116,200.00 2,905.00
JUMLAH 8,481.00
DIBULATKAN 8,481.00
BK05 1 m2 - Bongkar genteng
Pekerja 0.0400 hr 69,700.00 2,788.00
Mandor 0.0100 hr 116,200.00 1,162.00
JUMLAH 3,950.00
DIBULATKAN 3,950.00
BK06 1 m2 - Bongkar rangka atap
Pekerja 0.2000 hr 69,700.00 13,940.00
Tukang kayu 0.0550 hr 83,700.00 4,603.50
Mandor 0.0102 hr 116,200.00 1,185.24
JUMLAH 19,728.74
DIBULATKAN 19,728.00
BK07 1 m2 - Bongkar plafond
Pekerja 0.1250 hr 69,700.00 8,712.50
Tukang kayu 0.0600 hr 83,700.00 5,022.00
Mandor 0.0500 set 116,200.00 5,810.00
JUMLAH 19,544.50
DIBULATKAN 19,544.00
BK08 1 m2 - Bongkar Kusen
Pekerja 0.3300 hr 69,700.00 23,001.00
Mandor 0.0330 hr 116,200.00 3,834.60
Alat bantu 1.0000 set 1,000.00 1,000.00
NO. URAIAN KOEF. SAT. HARGA SATUAN JUMLAH
JUMLAH 27,835.60
DIBULATKAN 27,835.00
BK09 1 m2 - Pekerjaan kupasan dinding
Pekerja 0.0500 hr 69,700.00 3,485.00
Mandor 0.0250 hr 116,200.00 2,905.00
Alat bantu 1.0000 set 1,000.00 1,000.00
JUMLAH 7,390.00
DIBULATKAN 7,390.00
BK10 1 m2 - Bongkar pintu besi
Pekerja 0.3300 hr 69,700.00 23,001.00
Mandor 0.0330 hr 116,200.00 3,834.60
Alat bantu 2.0000 set 1,000.00 2,000.00
JUMLAH 28,835.60
DIBULATKAN 28,835.00
BK11 1 m1 - Bongkaran karpusan genteng morando glasur
Pekerja 0.0500 hr 69,700.00 3,485.00
Mandor 0.0225 hr 116,200.00 2,614.50
Alat bantu 1.0000 set 1,000.00 1,000.00
JUMLAH 7,099.50
DIBULATKAN 7,099.00
BK12 1 m1 - Bongkaran listplank 3 / 30 + 3 / 15 kayu kamper banjar
Pekerja 0.0840 hr 69,700.00 5,854.80
Tukang kayu 0.1680 hr 83,700.00 14,061.60
Mandor 0.0216 hr 116,200.00 2,509.92
JUMLAH 22,426.32
DIBULATKAN 22,426.00
BK13 1 kg - Bongkar konstruksi gording besi
Pekerja 0.0600 hr 69,700.00 4,182.00
Tukang besi 0.0045 hr 79,000.00 355.50
Mandor 0.0025 hr 116,200.00 290.50
Erection 1.0000 kg 40,000.00 40,000.00
JUMLAH 44,828.00
DIBULATKAN 44,828.00
1 2 3 4
I PASIR DAN BATU
Abu Batu/Screening 5 mm 251,000.00 m3
Batu Belah Pondasi 252,500.00 m3
Batu Pecah/Split ukr. 2 - 3 cm 264,300.00 m3
Batu Pecah/Split ukr. 3 - 4 cm 264,300.00 m3
Macadam/Steel Slag ukr. 5 - 7 cm 229,900.00 m3
Batu Tempel Hitam 141,000.00 m2
Koral Beton 235,500.00 m3
Pasir Beton 285,900.00 m3
Pasir pasang 265,800.00 m3
Pasir urug darat 213,700.00 m3
Sirtu 237,600.00 m3
Tanah Merah 137,700.00 m3
-
II PAVING BLOCK
Kastin Abu-abu ukr. 10.20.40 K 250 28,200.00 m1
Paving Block K 250 Tebal 6 Abu-abu 74,800.00 m2
Paving Block K 250 Tebal 8 Abu-abu 95,500.00 m2
Paving Block K 350 Tebal 6 Abu-abu 88,000.00 m2
Paving Block K 350 Tebal 8 Abu-abu 101,200.00 m2
Grass Blok tebal 6 (spek) 108,500.00 m2
-
III PAGAR PRECAST
pagar panel uk, 5x40x240, mutu beton K225 115,000.00 bh
Tiang pagar uk, 16x18x275, mutu beton K225 248,400.00 bh
Tiang pagar uk, 16x18x340, mutu beton K225 299,900.00 bh
-
IV SEMEN DAN KAPUR
Bata merah 400.00 bh
Bata Ringan / Hebel 8,700.00 bh
Rooster Beton 20 x 20 x 7 cm 7,800.00 bh
Glass block 22,100.00 bh
Semen Tiga Roda 50 kg 75,000.00 zak
Semen Warna 19,800.00 kg
Semen Instan (mortar) 110,500.00 zak
Compound Jaya (20 Kg) 66,600.00 zak
-
V KAYU & PLAFOND
Kaso kayu Meranti Jambi/Palembang - 400 cm 3,045,400.00 m3
Balok Kayu Meranti Jambi/palembang - 400 cm 3,598,500.00 m3
Papan Kayu Terentang - 400 cm 2,299,000.00 m3
Dolken Ø 8 - 10 cm ukr. 350 - 400 cm 26,300.00 btg
List Gypsum 7 cm 18,200.00 m1
List Gypsum 10 cm 22,000.00 m1
List profil kamper 5 Cm 57,400.00 m1
Balok Kayu Kamper Samarinda Oven : 6x15x400 cm 9,117,600.00 m3
Papan Kayu Kamper Samarinda Oven : 3x30x400 cm 10,005,800.00 m3
Daun Pintu Kayu Kamper Samarinda (Bukan Oven) 1,805,000.00 Unit
Daun Pintu Kayu Kamper Samarinda Kualitas Export (Oven) 2,308,500.00 Unit
Bahan plafond hardplex 5 mm 120x240 75,000.00 lbr
Formika ukr. 122 x 244 x 3 mm 115,500.00 lbr
Kusen dan Daun Pintu PVC ukuran standar 225,900.00 Unit
Multiplek ukr. 122 x 244 x 9 mm 136,200.00 lbr
Teakwood ukr. 122 x 244 x 4 mm 97,600.00 lbr
NO. NAMA BAHAN/MATERIAL HARGA SATUAN SATUAN
1 2 3 4
Triplek ukr. 122 x 244 x 4 mm 67,300.00 lbr
Gypsum Jaya 9 mm (122 mm x 244 mm) 71,100.00 lbr
GRC Board t = 4 mm 82,600.00 lbr
Kassa Gypsum / Textille 5,200.00 rol
Plafon Gyptile terpasang 117,000.00 m2
Bambu Ø 8 - 10 Cm Panjang = 5 - 6 M 19,000.00 btg
Galpanis 4x4 tbl = 1,6 mm 152,000.00 btg
Galpanis 5x5 tbl = 1,6 mm 180,500.00 btg
Besi galpanis Ø 2 inch 71,200.00 m1
Besi tempa 16 mm 142,500.00 btg
Zincromate 900.00 m2
-
VI READYMIX
Readymix beton K-225 tanpa pompa 855,000.00 m3
Readymix beton K-250 tanpa pompa 870,700.00 m3
Readymix beton K-300 tanpa pompa 914,300.00 m3
VII BETON
Buis Beton -
Buis Beton Ukuran .Ø 20 cm tanpa tulangan panjang 1,00 m Lokal 114,500.00 m1
Buis Beton Ukuran .Ø 30 cm tanpa tulangan panjang 1,00 m lokal 125,400.00 m1
Buis Beton Ukuran .1/2 Ø 20 cm tanpa tulangan panjang 1,00 m lokal 65,300.00 btg
Buis Beton Ukuran .1/2 Ø 30 cm tanpa tulangan panjang 1,00 m lokal 75,400.00 btg
-
VIII CAT
Amplas Kayu 3,000.00 lbr
Ampelas Besi 4,500.00 lbr
Cat minyak setara F Talit 53,100.00 kg
Cat tembok Dulux/ICI interior 41,300.00 kg
Cat tembok Dulux/ICI exterior 66,200.00 kg
Cat dasar setara Dulux/ICI 46,300.00 kg
Lem Putih 13,500.00 Kg
Dempul plitur 38,700.00 kg
Ijuk 6,800.00 ikat
Kwas 3" 12,300.00 bh
Melamik 53,800.00 kg
Meni setara Nippon 37,600.00 kg
Minyak Cat/Tinner 20,800.00 ltr
Pelamir Tembok 24,000.00 kg
Pelitur 47,600.00 kg
Rool cat tembok 23,300.00 bh
Vernis Bee Brand 66 (kayu/besi) 36,000.00 ltr
Aquaproof 44,600.00 kg
-
IX LANTAI
Ubin Keramik Ukr. 20x20 Standar KW 1 65,800.00 m2
Ubin Keramik Ukr. 20x25 Standar KW1 65,200.00 m2
Ubin Keramik Ukr. 30x30 Standar KW 1 55,300.00 m2
Ubin Keramik Ukr. 40x40 Standar KW 1 65,300.00 m2
Step noising Keramik 10 x 30 21,100.00 bh
-
X ALAT PENGUNCI
Engsel Pintu Nilon ukuran 3" 25,300.00 ps
Engsel Pintu Nilon ukuran 4" 38,000.00 ps
Engsel Jendela Casemen 16 " 95,000.00 set
Dyna Bolt 1,400.00 bh
Kunci KM / WC 33,200.00 bh
Kait Angin 27,700.00 bh
NO. NAMA BAHAN/MATERIAL HARGA SATUAN SATUAN
1 2 3 4
Hak Angin 13,300.00 bh
Grendel tanam pintu 87,000.00 bh
Kunci pintu setara Solid 278,000.00 bh
Kunci Gembok 47,500.00 bh
Grendel Ukuran 4" setara Solid 38,700.00 bh
Handel pintu 128,200.00 set
-
XI SANITASI AIR
Closet Duduk 2,465,900.00 bh
Closet Jongkok setara TOTO 224,500.00 bh
Urinoir 2,209,900.00 bh
Shower 287,800.00 bh
Kitchen zinck 252,100.00 bh
Kran leher angsa 273,700.00 bh
Kran Air TOTO 1/2" 208,200.00 bh
Floor Drain Stainless 165,300.00 bh
Roofdrain 111,800.00 bh
Sealtape 2,400.00 bh
Lem Pipa PVC 13,500.00 tube
Pompa jetpump 1,891,600.00 unit
Bocht LL-D 1" (lokal) 23,800.00 bh
Water moer 57,400.00 bh
Ongkos pengeboran 1,235,000.00 ls
Konstruksi besi siku 13,500.00 kg
Besi siku L.40.40.4 15,200.00 kg
Tangki air kapasitas 1 m3 1,641,300.00 bh
Pipa Galv Medium dia 1/2 inch ; P : 6 m (SNI ) 163,800.00 btg
Pipa Galv Medium dia 1/2 inch (SNI ) 27,200.00 m'
Pipa Galv Medium dia 3/4 inch ; P : 6 m (SNI/SII ) 181,400.00 btg
Pipa Galv Medium dia 3/4 inch (SNI/SII ) 30,200.00 m'
Pipa Galv Medium dia 1 inch P : 6 m (2,95 mm) (SNI) 287,100.00 btg
Pipa Galv Medium dia 1 inch (2,95 mm) (SNI) 47,700.00 m'
Pipa Galv Medium dia 1-1/4 inch P : 6 m (3,65 mm) (SNI) 365,500.00 btg
Pipa Galv Medium dia 1-1/4 inch (3,65 mm) (SNI) 60,800.00 m'
Pipa Galv Medium dia 1-1/2 inch P : 6 m (3 mm) (SNI) 391,600.00 btg
Pipa Galv Medium dia 1-1/2 inch (3 mm) (SNI) 65,200.00 m'
Pipa Galv Medium dia 2 inch P : 6 m (3,2 mm) (SNI) 473,800.00 btg
Pipa Galv Medium dia 2 inch (3,2 mm) (SNI) 78,900.00 m'
-
PIPA PVC Wavin Standard -
Pipa PVC dia. 1/2 inch type AW, tebal 22 mm, panjang 4 m 19,100.00 btg
Pipa PVC dia. 1/2 inch type AW, tebal 22 mm 4,700.00 m'
Pipa PVC dia. 3/4 inch type AW, tebal 26 mm, panjang 4 m 26,000.00 btg
Pipa PVC dia. 3/4 inch type AW, tebal 26 mm 6,500.00 m'
Pipa PVC dia. 1 inch type AW, panjang 4 m 35,200.00 btg
Pipa PVC dia. 1 inch type AW 8,800.00 m'
Pipa PVC dia. 2 inch type AW, panjang 4 m 72,800.00 btg
Pipa PVC dia. 2 inch type AW 18,200.00 m'
Pipa PVC dia. 3 inch type AW, panjang 4 m 141,000.00 btg
Pipa PVC dia. 3 inch type AW 35,200.00 m'
Pipa PVC dia. 4 inch type D, panjang 4 m 133,200.00 btg
Pipa PVC dia. 4 inch type D 33,300.00 m'
Knee 1/2" 2,200.00 Bh
Knee 3/4" 3,000.00 Bh
Knee 1" 6,400.00 Bh
Knee 2" 10,200.00 Bh
Knee 3" 14,400.00 Bh
Knee 4" 20,900.00 Bh
-
NO. NAMA BAHAN/MATERIAL HARGA SATUAN SATUAN
1 2 3 4
XII ATAP
Alumunium Foil 19,100.00 m2
Glasswool 22,800.00 roll
Roofmesh 28,400.00 m2
-
Fiber / Asbes semen gelombang 180x108x0,5 cm 58,400.00 lbr
Zinc Alume (Bahan) Gelombang Besar 80,700.00 m2
-
Genteng Metal Setara rainbow 121,500.00 Lembar
Nok 43,200.00 m1
-
Kusen Alumunium Natural Ukuran 3" x 1 1/2" 97,100.00 m1
Kusen Alumunium Natural Ukuran 4" x 1 3/4" 102,600.00 m1
Jalusi Alumunium Warna 52,800.00 m1
Frame daun Jendela Alumunium 168,900.00 m1
-
Seng gelombang 180 x 90 x 0,20 53,000.00 lbr
Sealent 16,500.00 tube
Karet List 5,200.00 m1
-
Perangkat Penangkal Petir - titik
Splitzer uk.2 47,500.00 bh
Kabel BC 75 mm2 23,500.00 m
Klem Kabel 2,800.00 bh
Pentanahan 882,000.00 ls
Bak kontrol 600 x 600 x 400 113,200.00 bh
Box Test 417,000.00 bh
-
RANGKA ATAP BAJA RINGAN -
Rangka atap baja ringan setara SMART TRUSS (terpasang) 166,900.00 m2
-
PLAFON -
Plafon Gyptile 60 x 60 (Material + Rangka Main Tee + Cross Tee + Terpasang) 118,200.00 m2
Plafon Acoustic Armstrong 60x60 (tebal 15 mm) + Rangka Main Tee + Cross Tee 188,500.00 m2
-
LIST PLANK -
List Plank GRC Uk.15 x 240 cm ; tebal 12 mm 33,600.00 m
List Plank GRC Uk.30 x 240 cm ; tebal 12 mm 36,000.00 m
-
XIII BAJA TULANGAN / PROFIL
Besi beton polos 8,500.00 kg
Besi beton ulir 8,500.00 kg
Baja IWF ex.DN SII 13,300.00 kg
Baja Canal C 28,900.00 kg
Besi Siku/Profil 40 x 40 x 4 15,200.00 kg
Besi Hollow 2 x 4 cm, rangka plafond 19,800.00 Batang
Besi Hollow 4 x 4 cm, rangka plafond 26,700.00 Batang
Besi Hollow 4 x 4 cm, rangka pagar 133,500.00 Batang
Besi Hollow 2 x 4 cm, rangka pagar 65,800.00 Batang
Besi Plat Strip 2 x 30 mm, (6 m) 11,000.00 kg
Besi Plat Strip 5 x 30 mm, (6 m) 13,300.00 kg
Sekrup Gypsum Merk Zolo 2 x 6" (isi 1.000 pieces) 79,900.00 dus
Besi Pipa stainless dia. 2" 78,900.00 m
Besi Pipa stainless dia. 1" 56,800.00 m
Alumunium composite 114,900.00 m2
Braket galvanis ACP 15,600.00 bh
Rangka alumunium composite (Almn. 4 0 x 40 x 2 mm ) 18,800.00 m
Skrup almunium 15,500.00 kg
-
NO. NAMA BAHAN/MATERIAL HARGA SATUAN SATUAN
1 2 3 4
XIV KAWAT
Kawat beton 17,200.00 kg
Paku segala ukuran (rata-rata) 15,200.00 kg
Wiremesh DM 8,dia.8x8,spasi 150x150mm,uk.5,4x2,1 m 604,700.00 lbr
Pagar BRC t = 1,20 m Ø 8 184,500.00 m1
Bondek 120,100.00 m2
-
XV KACA
Kaca bening 5 mm 105,900.00 m2
Kaca Es 5 mm 154,000.00 m2
Kaca Rayben 5 mm 135,000.00 m2
Kaca revlektif 491,400.00 m2
-
XVI LISTRIK
Kabel NYM 3x2.5 mm 12,100.00 m
Kabel NYY 4x35mm2 248,100.00 meter
Kabel NYY 4x16mm2 118,900.00 meter
Kabel NYY 4x10mm2 62,000.00 meter
Klem kabel 6,200.00 dus
Saklar tunggal 13,700.00 bh
Saklar double 18,900.00 bh
Saklar tukar 18,900.00 bh
Stop Kontak 14,500.00 bh
Lampu TL 2 x 18 watt, armatur, komplit philips 96,100.00 bh
Lampu SL 18 watt, komplit philips 30,600.00 bh
Lampu Halogen 50 Watt Merk : Philips/osram 470,000.00 buah
Lampu pagar 174,700.00 bh
Lampu Down Light + Isi SL 25 watt 86,400.00 bh
Fitting Keramik 15,100.00 bh
Panel PP-LP01, 40X60 cm2 705,000.00 bh
Panel PP-LP01, 60X80 cm2 893,000.00 unit
Penyambungan daya Listrik 1,400.00 watt
Lampu PLC 13 watt 61,100.00 bh
Lampu sorot LED 50 watt 517,000.00 bh
MCB 10 A 88,500.00 bh
Box MCB 4 group 25,800.00 bh
1 2 3 4
Huruf Stainles 20 cm 209,000.00 hrf
Huruf Stainles 15 cm 156,700.00 hrf
Tiang pancang 25x25 kelas C K-500 335,400.00 m'
Sambung TP kotak 25x25 kelas C 1,304,100.00 joint
Tiang pancang 25x25 214,200.00 m'
Tiang pancang 20x20 161,900.00 m'
Alat Pancang Hidraulic 80,700.00 m
Pengelasan/Penyambungan/Cutting Beton 76,000.00 ttk
roster beton 26,100.00 m3
Kusen pintu aluminium lengkap 1,306,200.00 unit
Pipa listrik panjang 4 m 9,900.00 btg
Stop kontak telpon 57,400.00 bh
Exhausfan 522,500.00 bh
Kitchen zinc 470,200.00 bh
Frameless tempered 12 mm 992,700.00 m2
Floor hings ex dexon 2,351,200.00 bh
Fitch fitting ex dexon 2,560,200.00 bh
Hendel stainless 470,200.00 bh
Pasang U aluminium 73,100.00 m1
RUMPUT -
Rumput Gajah Mini 20,900.00 m2
Rumput Manila ( Gebalan ) 15,600.00 m2
Eucaliptus Ø 4 - 7 cm, t = 1 - 3 m 99,200.00 phn
Tanaman Pucuk Merah 1 104,500.00 phn
Tanaman Krokol Three Colour 7,800.00 plbg
Tanaman Three Colour 7,800.00 plbg
Tanaman Sansivera 7,800.00 plbg
Tanaman Soka Jepang 26,100.00 plbg
Kiara Payung 133,000.00 phn
Pohon Glodogan Tiang T = 1.5m 190,000.00 phn
Papan kayu 3X10 cm 23,700.00 m1
List profil kayu 2X4 cm 11,400.00 m1
Plint kayu 1,5/10 21,300.00 m1
Besi Hollow 60 x 60 x 1,8 133,500.00 btg
Grendel besi + Kunci 128,200.00 set
Roda Besi 14,200.00 bh
Plat besi 6 mm untuk dudukan roda 11,000.00 kg
Besi Siku 40 x 40 x 4 untuk rel 15,200.00 kg
Pengelasan & Pengecatan hollow pagar 80,700.00 ls
Ongkos pasang Pagar Besi 166,200.00 ls
WLC elektrode 389,500.00 bh
Angkur 11,800.00 bh
Fisher 1,200.00 bh
ramp buncis 27,700.00 bh
Upah potong kaca 52,200.00 m2
Upah pasang + aksesories Jendela 166,200.00 unit
Pengelasan dengan argon 3,400.00 cm
Tangga Besi 1,900,000.00 bh
Meja Counter 1,757,500.00 bh
Angkur bout dia 19mm 130,600.00 bh
Baseplate tebal 10 mm 13,000.00 kg
XVIII UPAH
Pekerja / knek 69,700.00 hari
Tukang gali 79,000.00 hari
Kepala Tukang Batu 93,000.00 hari
Tukang Batu 83,700.00 hari
Kepala Tukang Kayu 93,000.00 hari
Tukang Kayu 83,700.00 hari
Kepala Tukang Besi 88,300.00 hari
NO. NAMA BAHAN/MATERIAL HARGA SATUAN SATUAN
1 2 3 4
Tukang Besi 79,000.00 hari
Kepala Tukang Cat 97,600.00 hari
Tukang Cat 83,700.00 hari
Mandor / pengawas 116,200.00 hari
Instalator / Tukang Listrik 93,000.00 hari
Pembantu Instalator 74,400.00 hari
Operator Alat Berat 97,600.00 hari
Pembantu Operator Alat Berat 74,400.00 hari
ROSTA MANULLANG
Direktur