1 hari
3 hari
20 hari
1 hari
Renumerasi
- Geodetic Engineer 1 Orang
- Surveyor 2 Orang
- Helper/Tenaga lokal 3 Orang
Quantity
1
25
25
Survey
Mob-Demob
Peralatan
ETS 1 Set
Handheld GPS 1 Unit
Auto Level 1 set
Flow meter
Water Quality Checker Multiparameter
Water & sediment sampler
Akomodasi
- Tempat tinggal & perlengkapan
- Transport Survei
- Konsumsi & Logistik Survei
Reporting
Biaya uji lab
Drawing & Report Producing
Unit
Bulan
Hari
Hari
2 Orang
1
1
1
1
1
1
LS
LS
LS
LS
LS
LS
1 Bln
25 Hari
25 Hari
0 LS
1 LS
Unit Price
7,000,000.00
800,000.00
360,000.00
Total
7,000,000.00
20,000,000.00
9,000,000.00
6,000,000.00
12,000,000.00
7,000,000.00
1,000,000.00
2,000,000.00
-
7,000,000.00
1,000,000.00
2,000,000.00
-
300,000.00
-
2,000,000.00
3,000,000.00
GRAND TOTAL
- Oleh Mucoindo
7,500,000.00
- Oleh Mucoindo
3,000,000.00
68,500,000.00