Anda di halaman 1dari 2

Mobilisasi

Orientasi medan & Pembuatan KD


Akusisi data
Demobilisasi

1 hari
3 hari
20 hari
1 hari

Renumerasi
- Geodetic Engineer 1 Orang
- Surveyor 2 Orang
- Helper/Tenaga lokal 3 Orang

Quantity
1
25
25

Survey
Mob-Demob
Peralatan
ETS 1 Set
Handheld GPS 1 Unit
Auto Level 1 set
Flow meter
Water Quality Checker Multiparameter
Water & sediment sampler
Akomodasi
- Tempat tinggal & perlengkapan
- Transport Survei
- Konsumsi & Logistik Survei
Reporting
Biaya uji lab
Drawing & Report Producing

Unit
Bulan
Hari
Hari

2 Orang
1
1
1
1
1
1

LS
LS
LS
LS
LS
LS

1 Bln
25 Hari
25 Hari

0 LS
1 LS

Unit Price
7,000,000.00
800,000.00
360,000.00

Total
7,000,000.00
20,000,000.00
9,000,000.00

6,000,000.00

12,000,000.00

7,000,000.00
1,000,000.00
2,000,000.00
-

7,000,000.00
1,000,000.00
2,000,000.00
-

300,000.00
-

2,000,000.00
3,000,000.00
GRAND TOTAL

- Oleh Mucoindo
7,500,000.00
- Oleh Mucoindo

3,000,000.00
68,500,000.00

Anda mungkin juga menyukai