ANALISA HARGA SATUAN S.N.

I
NO.

URAIAN

KOEF

A
I
ANALISA 001

SAT HARGA SAT matrial


D

HARGA SAT upah

JUMLAH matrial

JUMLAH upah

TOTAL harga

G=(CXE)

H = (C X F )

I=(G+H)

PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan

0.00

38,691.56

Dolken Kayu 8 - 10/400 cm


Semen Portland

1.250

btg

Rp

Rp

2.500

Kg

Rp

Rp

Pasir Beton

0.005

m3

Rp

Rp

Koral Beton
Kaso 5 / 7 ( albasiah )

0.009
0.072

m3
m3

Rp
Rp

Rp
Rp

Paku Biasa 2" - 5"

0.060

Kg

Rp

Rp

Residu

0.400

Lt

Rp

Rp

Tukang Kayu
Perkerja

0.200
0.400

Oh
Oh

Rp
Rp

65,734.00
55,798.00

Rp
Rp

13,146.80
22,319.20

Kepala Tukang

0.020

Oh

Rp

75,671.00

Rp

1,513.42

Mandor

0.020

Oh

Rp

85,607.00

Rp

1,712.14

38,691.56

Tenaga

ANALISA 002

1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m

0.00

38,691.56

38,691.56

Bahan

ANALISA 003

Dolken Kayu 8 - 10/400 cm


Semen Portland

1.250

btg

Rp

0.00

2.500

Kg

Rp

0.00

Pasir Beton
Koral Beton

1.200
0.009

m3
m3

Rp
Rp

0.00
0.00

Kaso 5 / 7 ( albasiah )

0.072

m3

Rp

0.00

Paku Biasa 2" - 5"

0.060

Kg

Rp

0.00

Meni Besi

0.450

Lt

Rp

0.00

Tenaga
Tukang Kayu

0.200

Oh

Rp

65,734.00

Rp

13,146.80

Perkerja

0.400

Oh

Rp

55,798.00

Rp

22,319.20

Kepala Tukang

0.020

Oh

Rp

75,671.00

Rp

1,513.42

Mandor

0.020

Oh

Rp

85,607.00

Rp

1,712.14

1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m

0.00

33,111.76

33,111.76

Bahan

ANALISA 004

Dolken Kayu 8 - 10/400 cm

1.000

btg

Rp

0.00

Semen Portland
Kawat Duri

2.000
25.000

Kg
Kg

Rp
Rp

0.00
0.00

Pasir Beton

0.005

m3

Rp

0.00

Koral Beton

0.009

m3

Rp

0.00

Paku Biasa 2" - 5"

0.060

Kg

Rp

0.00

Tenaga
Tukang Kayu

0.200

Oh

Rp

65,734.00

13,147

Perkerja

0.300

Oh

Rp

55,798.00

16,739

Kepala Tukang

0.020

Oh

Rp

75,671.00

1,513

Mandor

0.020

Oh

Rp

85,607.00

1,712
0.00

1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank


Bahan

13,337.95

Kayu Kaso 5 / 7 (borneo)

0.012

m3

Rp

0.00

Paku Biasa 2" - 5"


Kayu Papan 3 / 20 borneo

0.020
0.007

Kg
m3

Rp
Rp

0.00
0.00

Tukang Kayu

0.100

Oh

Rp

65,734.00

6,573

Perkerja

0.100

Oh

Rp

55,798.00

5,580

Kepala Tukang
Mandor

0.010
0.005

Oh
Oh

Rp
Rp

75,671.00
85,607.00

757
428

13,337.95

Tenaga

ANALISA 005

1 m Pek. Kantor Direksi Keet , dengan lantai plesteran

0.00

0.00

Bahan
Dolken Kayu 8 - 10/400 cm
Kayu Balok Borneo

1.250
0.180

btg
m3

Rp
Rp

0.00
0.00

Paku

0.850

Kg

Rp

0.00

Besi Strip

1.100

Kg

Rp

0.00

Semen Portland

35.000

Kg

Rp

0.00

Pasir Pasang
Pasir Beton

0.150
0.100

m3
m3

Rp
Rp

0.00
0.00

Koral Beton

0.150

m3

Rp

0.00

Bata merah kelas I

30.000

bh

Rp

0.00

Seng Plat
Jendela Nako

0.250
2.000

lbr
bh

Rp
Rp

0.00
0.00

Kaca Polos

0.080

m2

Rp

0.00

Kunci Tanam

0.150

bh

Rp

0.00

Plywood 4 mm

0.060

lbr

Rp

0.00

Tenaga
Tukang Kayu

2.000

Oh

Rp

0.00

ANALISA 006

ANALISA 007

Tukang Batu

1.000

Oh

Rp

Perkerja

2.000

Oh

Rp

Kepala Tukang

0.300

Oh

Rp

Mandor

0.050

Oh

Rp

0.00

1 m Pembuatan Gudang Semen dan Alat - alat


Bahan

0.00

Dolken Kayu 8 - 10/400 cm

1.700

btg

Rp

0.00

Kayu Balok Borneo


Paku

0.210
0.300

m3
Kg

Rp
Rp

0.00
0.00

Semen Portland

10.500

Kg

Rp

0.00

Pasir Beton

0.030

m3

Rp

0.00

Koral Beton

0.050

m3

Rp

0.00

Seng Gelombang BJLS 32


Tenaga

1.500

lbr

Rp

0.00

Tukang Kayu

2.000

Oh

Rp

Perkerja

1.000

Oh

Rp

Kepala Tukang

0.200

Oh

Rp

Mandor

0.050

Oh

Rp

0.00

1 m Pembuatan Rumah Jaga / Konstruksi Kayu


Bahan

0.00

Dolken Kayu 8 - 10/400 cm

3.000

btg

Rp

0.00

Kayu Balok Borneo


Paku

0.276
0.700

m3
Kg

Rp
Rp

0.00
0.00

Seng Gelombang BJLS 32

1.500

lbr

Rp

0.00

Tukang Kayu
Perkerja

1.500
1.000

Oh
Oh

Rp
Rp

Kepala Tukang

0.150

Oh

Rp

Mandor

0.050

Oh

Rp

0.00

0.00

Tenaga

ANALISA 008

ANALISA 009

ANALISA 010

Membersihkan Lapangan dan Perataan


Tenaga

0.00

#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A

1 m Pembuatan Bedeng Buruh


Bahan

#N/A

#N/A

Dolken Kayu 8 - 10/400 cm


Kayu Balok Borneo

1.250

btg

#N/A

#N/A

0.186

m3

49,500.00

9,207.00

Paku
Semen Portland

0.300
18.000

Kg
Kg

49,500.00
#N/A

14,850.00
#N/A

Pasir Beton

0.030

m3

49,500.00

1,485.00

Koral Beton

0.050

m3

#N/A

#N/A

Seng Gelombang BJLS 32

1.500

lbr

#N/A

#N/A

Plywood 4 mm
Tenaga

1.350

lbr

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Perkerja

1.000

Oh

#N/A

#N/A

Kepala Tukang

0.200

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A
#N/A

1 m Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm


Bahan

#N/A

Kayu Terentang

0.186

m3

#N/A

#N/A

Paku
Kayu Kaso 5 / 7 (borneo)

0.300
1.000

Kg
btg

49,500.00
49,500.00

14,850.00
49,500.00

Tukang Kayu

2.000

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

Tenaga

ANALISA 011

ANALISA 012

#N/A

1 m Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm


Bahan

#N/A

Bambu 6 - 8 / 600 cm

1.000

btg

#N/A

#N/A

Tali Ijuk
Tenaga

0.250

Kg

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Perkerja

1.000

Oh

#N/A

#N/A

Kepala Tukang

0.200

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A
#N/A

1 m Pembuatan Jalan Sementara


Bahan

#N/A

Batu Belah 5 / 20
Batu Belah 5 / 7

0.150
0.090

m3
m3

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.010

m3

49,500.00

495.00

Perkerja

1.000

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A

Tenaga

#N/A

#N/A

ANALISA 013

ANALISA 014

II
ANALISA 015

0.00

1 m Bongkaran Beton Bertulang


Tenaga

#N/A

Perkerja

6.667

Oh

#N/A

#N/A

Mandor

0.333

Oh

#N/A

#N/A
0.00

1 m Bongkaran Dinding Tembok Bata Merah


Tenaga

#N/A

Perkerja

6.667

Oh

#N/A

#N/A

Mandor

0.033

Oh

#N/A

#N/A

#N/A

#N/A

PEKERJAAN TANAH
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'

0.00

#N/A

#N/A

Tenaga
Perkerja
Tukang Gali

0.400

Kepala Tukang
Mandor
ANALISA 016

#N/A
#N/A

#N/A
#N/A

Oh

#N/A

#N/A

Oh

#N/A

#N/A

1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m'


Tenaga
Perkerja

0.00
0.525

#N/A

Oh

#N/A

#N/A

Tukang Gali

Oh

#N/A

#N/A

Kepala Tukang

Oh

#N/A

#N/A

Oh

#N/A

#N/A

Mandor
ANALISA 017

0.040

Oh
Oh

0.052

1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m'

0.00

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 018

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Oh

#N/A

#N/A

0.073

Oh

#N/A

#N/A

1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m'


Tenaga
Perkerja

0.00

#N/A

0.625

Oh

#N/A

#N/A

Tukang Gali

Oh

#N/A

#N/A

Kepala Tukang

Oh

#N/A

#N/A

0.062

Oh

#N/A

#N/A

Mandor
ANALISA 019

0.735
-

1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m'

0.00

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 020

#N/A
#N/A

Oh

#N/A

#N/A

0.125

Oh

#N/A

#N/A
0.00

#N/A

0.823

Oh

#N/A

#N/A

Oh

#N/A

#N/A

Kepala Tukang

Oh

#N/A

#N/A

0.083

Oh

#N/A

#N/A
0.00

1 m Pek. Stripping 1 m
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

#N/A

0.050

Oh

#N/A

#N/A

Oh
Oh

#N/A
#N/A

#N/A
#N/A

0.005

Oh

#N/A

#N/A

1 m Pembuangan Tanah sejauh 150 m


Tenaga
Perkerja

0.00

#N/A

0.192

Oh

#N/A

#N/A

Tukang Gali

Oh

#N/A

#N/A

Kepala Tukang

Oh

#N/A

#N/A

0.050

Oh

#N/A

#N/A

Mandor
ANALISA 023

#N/A
#N/A

Tukang Gali
Mandor

ANALISA 022

Oh
Oh

1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m'


Tenaga
Perkerja

ANALISA 021

1.250
-

1 m3 Urugan Tanah Kembali

0.00

#N/A

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 024

0.192

Oh

#N/A

#N/A

Oh
Oh

#N/A
#N/A

#N/A
#N/A

0.019

Oh

#N/A

#N/A

1 m3 Pemadatan tanah
Tenaga
Perkerja

0.00

#N/A

0.500

Oh

#N/A

#N/A

Tukang Gali

Oh

#N/A

#N/A

Kepala Tukang

Oh

#N/A

#N/A

0.050

Oh

#N/A

#N/A

Mandor

#N/A

ANALISA 025

1 m3 Pek. Urugan Pasir

#N/A

#N/A

#N/A

Bahan
Pasir Urug

1.200

m3

#N/A

#N/A

0.300
-

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Oh

#N/A

#N/A

0.010

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 026

1 m3 Pemasangan Lapisan ijuk

#N/A

#N/A

#N/A

Bahan
Ijuk

1.200

m3

#N/A

#N/A

0.150
-

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Oh

#N/A

#N/A

0.015

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
III
ANALISA 027

PEKERJAAN PONDASI
#N/A

1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang


Bahan

#N/A

Pasir Urug Darat

0.016

m3

#N/A

#N/A

Pasir Beton

0.080

m3

49,500.00

3,960.00

Koral Beton
Semen Portland

0.125
49.000

m3
Kg

#N/A
#N/A

#N/A
#N/A

Besi Beton

34.500

Kg

#N/A

#N/A

Kawat Beton

0.700

Kg

#N/A

#N/A

Kayu Kaso 5 / 7 (borneo)


Paku

0.270
0.120

m3
Kg

49,500.00
49,500.00

13,365.00
5,940.00

Minyak Bekisting

0.090

lt

#N/A

#N/A

Plamuur Tembok

0.200

Kg

#N/A

#N/A

Perkerja
Tukang Batu

0.800
0.500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.050

Oh

#N/A

#N/A

Mandor

0.040

Oh

#N/A

#N/A

#N/A

Tenaga

ANALISA 028

1 m3 Pasangan Batu kali 1 Pc : 3Ps


Bahan
Batu Belah 15 / 20

#N/A

1.100

m3

#N/A

392.000

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.314

m3

49,500.00

15,543.00

Perkerja

1.500

Oh

#N/A

#N/A

Tukang Batu

0.600

Oh

#N/A

#N/A

Kepala Tukang

0.060

Oh

#N/A

#N/A

Mandor

0.075

Oh

#N/A

#N/A

Semen Portland

ANALISA 029

#N/A

#N/A

#N/A

1 m3 Pasangan Batu kali 1 Pc : 5Ps

#N/A

#N/A

#N/A

Bahan
Batu Belah 15 / 20

1.100

m3

#N/A

#N/A

136.000
0.544

Kg
m3

#N/A
49,500.00

#N/A
26,928.00

Perkerja

1.500

Oh

#N/A

#N/A

Tukang Batu

0.600

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.060
0.075

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Semen Portland
Pasir Pasang
Tenaga

IV
ANALISA 030

ANALISA 031

PEKERJAAN DINDING
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan

#N/A

#N/A

Bata merah kelas I

140.000

bh

49,500.00

Semen Portland

32.950

Kg

#N/A

#N/A

Pasir Pasang

0.091

m3

49,500.00

4,504.50

Tenaga
Perkerja

0.650

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.030

Oh

#N/A

#N/A

#N/A

6,930,000.00

1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata

#N/A

#N/A

Bahan
Bata merah kelas I

140.000

bh

49,500.00

6,930,000.00

Semen Portland
Pasir Pasang

22.200
0.102

Kg
m3

#N/A
49,500.00

#N/A
5,049.00

Perkerja

0.650

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.020
0.030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

ANALISA 032

1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata

#N/A

#N/A

#N/A

Bahan
Bata merah kelas I

70.000

bh

49,500.00

3,465,000.00

Semen Portland
Pasir Pasang

14.370
0.040

Kg
m3

#N/A
49,500.00

#N/A
1,980.00

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.100
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.015

Oh

#N/A

#N/A

Tenaga

ANALISA 033

1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata

#N/A

#N/A

Bahan
Bata merah kelas I

70.000

bh

49,500.00

Semen Portland

9.680

Kg

#N/A

#N/A

Pasir Pasang

0.045

m3

49,500.00

2,227.50

Perkerja
Tukang Batu

0.320
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.015

Oh

#N/A

#N/A

#N/A

3,465,000.00

Tenaga

V
ANALISA 032

PEKERJAAN PELESTERAN
1 m2 Plesteran Dinding 1Pc : 3Ps

#N/A

#N/A

#N/A

Bahan

ANALISA 033

Semen Portland

6.480

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.019

m3

49,500.00

940.50

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.015

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

1 m2 Plesteran Dinding 1Pc : 5Ps

#N/A

#N/A

#N/A

Bahan

ANALISA 034

Semen Portland

4.320

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.022

m3

49,500.00

1,089.00

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.015
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm

#N/A

#N/A

#N/A

Bahan
Semen Portland
Kapur Padam

4.320
0.003

Kg
m3

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.013

m3

49,500.00

643.50

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.150
0.015

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.010

Oh

#N/A

#N/A

Tenaga

ANALISA 035

ANALISA 036

1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm

#N/A

#N/A

Bahan
Semen Portland

1.840

Kg

#N/A

Kapur Padam

0.006

m3

#N/A

#N/A

Pasir Pasang

0.014

m3

49,500.00

693.00

Tenaga
Perkerja

0.200

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.015

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

#N/A

#N/A

1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm

#N/A

#N/A

#N/A

Bahan

ANALISA 037

Semen Portland

3.000

Kg

#N/A

Kapur Padam

0.005

m3

#N/A

#N/A

Pasir Pasang
Tenaga

0.019

m3

49,500.00

940.50

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.015
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m2 Plesteran 1Kp : 1 Sm : 1Ps, tebal 15 mm

#N/A

#N/A

Bahan
Semen Merah
Kapur Padam

0.009
0.009

Kg
m3

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Pasir Pasang

0.009

m3

49,500.00

445.50

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.015
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

ANALISA 038

1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm

#N/A

#N/A

Bahan
Semen Merah

0.007

Kg

#N/A

Kapur Padam

0.007

m3

#N/A

#N/A

Pasir Pasang

0.015

m3

49,500.00

742.50

Perkerja
Tukang Batu

0.200
0.150

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.015

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

ANALISA 039

1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm


Bahan

#N/A

#N/A

Semen Portland

14.280

Kg

#N/A

#N/A

Pasir Pasang

0.023

m3

49,500.00

1,138.50

0.250
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Batu

ANALISA 040

1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm

#N/A

#N/A

#N/A

Bahan

ANALISA 041

Semen Portland

10.800

Kg

#N/A

#N/A

Pasir Pasang

0.026

m3

49,500.00

1,287.00

Tenaga
Perkerja

0.250

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm

#N/A

#N/A

#N/A

Bahan

ANALISA 042

Semen Portland

8.680

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.028

m3

49,500.00

1,386.00

Perkerja

0.250

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm

#N/A

#N/A

#N/A

Bahan
7.29

ANALISA 043

Semen Portland

7.290

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.028

m3

49,500.00

1,386.00

Perkerja

0.250

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Pasang

6.240
0.030

Kg
m3

#N/A
49,500.00

#N/A
1,485.00

Perkerja

0.250

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.020
0.0125

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

ANALISA 044

1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm

#N/A

#N/A

#N/A

Bahan
Semen Merah
Kapur Padam

0.009
0.009

Kg
m3

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

0.250
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Batu

ANALISA 045

1 m2 Plesteran 1Pc : 2Ps, tebal 25 mm


Bahan

#N/A

#N/A

#N/A

Semen Portland

15.500

Kg

#N/A

#N/A

Pasir Pasang

0.013

m3

49,500.00

643.50

Perkerja

0.300

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.200
0.020

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.013

Oh

#N/A

#N/A

Tenaga

ANALISA 046

1 m2 Plesteran 1Pc : 3Ps, tebal 25 mm


Bahan

#N/A

#N/A

Semen Portland

11.750

Kg

#N/A

#N/A

Pasir Pasang

0.035

m3

49,500.00

1,732.50

Perkerja
Tukang Batu

0.300
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.013

Oh

#N/A

#N/A

#N/A

Tenaga

ANALISA 047

1 m2 Plesteran 1Pc : 4Ps, tebal 25 mm


Bahan

#N/A

#N/A

Semen Portland

9.480

Kg

#N/A

#N/A

Pasir Pasang

0.038

m3

49,500.00

1,881.00

Perkerja
Tukang Batu

0.300
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.013

Oh

#N/A

#N/A

#N/A

Tenaga

ANALISA 048

1 m2 Plesteran 1Pc : 5Ps, tebal 25 mm

#N/A

#N/A

#N/A

Bahan

ANALISA 049

Semen Portland

7.940

Kg

#N/A

#N/A

Pasir Pasang

0.039

m3

49,500.00

1,930.50

Tenaga
Perkerja

0.300

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.013

Oh

#N/A

#N/A

1 m2 Plesteran 1Pc : 2Ps, tebal 30 mm

#N/A

#N/A

#N/A

Bahan

ANALISA 050

Semen Portland

18.650

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.035

m3

49,500.00

1,732.50

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.015

Oh

#N/A

#N/A

1 m2 Plesteran 1Pc : 3Ps, tebal 30 mm

#N/A

#N/A

#N/A

Bahan

ANALISA 051

Semen Portland

14.150

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.039

m3

49,500.00

1,930.50

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.015

Oh

#N/A

#N/A

1 m2 Plesteran 1Pc : 4Ps, tebal 30 mm

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Pasang

11.380
0.042

Kg
m3

#N/A
49,500.00

#N/A
2,079.00

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.025
0.015

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

ANALISA 052

1 m2 Plesteran 1Pc : 5Ps, tebal 30 mm

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Pasang

8.190
0.045

Kg
m3

#N/A
49,500.00

#N/A
2,227.50

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.250
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.015

Oh

#N/A

#N/A

Tenaga

ANALISA 053

1 m2 Berapen 1Pc : 3Ps, tebal 30 mm


Bahan
Semen Portland

#N/A
7.070

Kg

#N/A

#N/A

#N/A

#N/A

Pasir Pasang

0.021

m3

49,500.00

1,039.50

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Batu

0.070

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.007
0.008

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

ANALISA 054

1 m2 Berapen 1Pc : 5Ps, tebal 15 mm

#N/A

#N/A

Bahan
Semen Portland

5.670

Kg

#N/A

#N/A

Pasir Pasang

0.023

m3

49,500.00

1,138.50

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.070
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.008

Oh

#N/A

#N/A

#N/A

Tenaga

ANALISA 055

1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm

#N/A

#N/A

Bahan
Semen Portland

9.300

Kg

#N/A

#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

Perkerja

0.260

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.200
0.020

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.013

Oh

#N/A

#N/A

#N/A

Tenaga

ANALISA 056

1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm


Bahan

#N/A

#N/A

Semen Portland

7.070

Kg

#N/A

#N/A

Pasir Pasang

0.021

m3

49,500.00

1,039.50

Perkerja
Tukang Batu

0.260
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.013

Oh

#N/A

#N/A

#N/A

Tenaga

ANALISA 057

ANALISA 058

1 m2 Pelesteran Skoring 1Pc : 2Ps


Bahan

#N/A

#N/A

Semen Portland

0.500

Kg

#N/A

#N/A

Pasir Pasang

0.002

m3

49,500.00

99.00

Tenaga
Perkerja

0.057

Oh

#N/A

#N/A

Tukang Batu

0.038

Oh

#N/A

#N/A

Kepala Tukang

0.038

Oh

#N/A

#N/A

Mandor

0.002

Oh

#N/A

#N/A

1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm

#N/A

#N/A

#N/A

#N/A

Bahan

ANALISA 059

PC Warna

0.144

Kg

#N/A

#N/A

Batu Granito

15.000

Kg

#N/A

#N/A

Tenaga
Perkerja

0.050

Oh

#N/A

#N/A

Tukang Batu

0.020

Oh

#N/A

#N/A

Kepala Tukang

0.002

Oh

#N/A

#N/A

Mandor

0.005

Oh

#N/A

#N/A

1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm

#N/A

#N/A

#N/A

Bahan

ANALISA 060

PC Warna

0.440

Kg

#N/A

#N/A

Batu Teraso
Tenaga

11.500

Kg

#N/A

#N/A

Perkerja

0.450

Oh

#N/A

#N/A

Tukang Batu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.025

Oh

#N/A

#N/A

1 m2 Pelesteran Ciprat 1 Pc : 2 Ps

#N/A

#N/A

#N/A

Bahan

ANALISA 061

Semen Portland

4.320

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.016

m3

49,500.00

792.00

Perkerja

0.250

Oh

#N/A

#N/A

Tukang Batu

0.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.010
0.015

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m2 Pelesteran Siar Adukan 1 Pc : 2 Ps

#N/A

Bahan
Semen Portland
Pasir Pasang

4.320
0.016

Kg
m3

#N/A
49,500.00

#N/A
792.00

#N/A

#N/A

Tenaga

ANALISA 062

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Batu

0.070

Oh

#N/A

#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

1 m2 Pelesteran Waterfroof Batacote 3 lapis

#N/A

#N/A

#N/A

Bahan
Semen Portland
Batacote

0.500
2.900

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.006

m3

49,500.00

297.00

Perkerja

0.300

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.200
0.020

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.015

Oh

#N/A

#N/A

Tenaga

ANALISA 063

1 m2 Plesteran Dinding 1 : 3 + ACIAN

#N/A

#N/A

#N/A

#N/A

#N/A

0.00

#N/A
#N/A

#N/A
#N/A

0.00
0.00

#N/A

#N/A

0.00

#N/A

#N/A

Bahan
Semen Portland

8.0000

kg

49,500.00

396,000.00

Pasir Pasang

0.0260

m3

#N/A

#N/A

Perkerja

0.2250

org

Tukang Batu
Kepala Tukang

0.1525
0.0100

org
org

Mandor

0.0080

org

Tenaga

1 m2 Plesteran Dinding 1 : 5 + ACIAN


Bahan

#N/A

Semen Portland

5.4000

kg

#N/A

#N/A

Pasir Pasang

0.0280

m3

#N/A

#N/A

Perkerja
Tukang Batu

0.2250
0.1525

org
org

#N/A
#N/A

#N/A
#N/A

0.00
0.00

Kepala Tukang

0.0100

org

#N/A

#N/A

0.00

Mandor

0.0080

org

#N/A

#N/A

0.00

#N/A

#N/A

Tenaga

III

PEKERJAAN KAYU
#N/A

1m Pasang Kusen Pintu dan Jendela Kayu Jati


Bahan
Kayu Balok Jati

1.100

m3

Tenaga
Perkerja

#N/A

#N/A

6.000

Oh

#N/A

#N/A

Tukang Kayu

20.000

Oh

#N/A

#N/A

Kepala Tukang

2.000

Oh

#N/A

#N/A

Mandor

0.300

Oh

#N/A

#N/A
#N/A

1m Pasang Kusen Pintu dan Jendela Kayu Borneo


Bahan
Kayu Balok Borneo

#N/A

#N/A

1.200

m3

Perkerja
Tukang Kayu

6.000
18.000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

2.000

Oh

#N/A

#N/A

Mandor

0.300

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1m Pasang Kusen Pintu dan Jendela Kayu Damar Laut


Bahan
Kayu Balok Damar Laut

#N/A
#N/A

#N/A

1.200

m3

Perkerja
Tukang Kayu

6.000
18.000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

2.000

Oh

#N/A

#N/A

Mandor

0.300

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu Klamp Kayu Kamper


Bahan

#N/A

#N/A

Papan Kayu Kamper

0.036

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.050

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.350
1.050

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.105

Oh

#N/A

#N/A

Mandor

0.018

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1m Pasang Pintu Klamp Kayu Borneo


Bahan
Papan Kayu Borneo

0.036

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.050

Kg

#N/A

#N/A

Tenaga
Perkerja

0.350

Oh

#N/A

#N/A

#N/A

#N/A

Tukang Kayu

1.050

Oh

#N/A

#N/A

Kepala Tukang

0.105

Oh

#N/A

#N/A

Mandor

0.018

Oh

#N/A

#N/A

1m Pasang Pintu Panel Kayu Jati


Bahan
Papan Kayu Jati

#N/A
#N/A

#N/A

0.050

m3

Perkerja
Tukang Kayu

1.000
2.500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.250

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu Panel Kayu Kamper


Bahan
Papan Kayu Kamper

#N/A
#N/A

#N/A

0.040

m3

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

2.500
0.250

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.050

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu dan Jendela Kaca Kayu Jati


Bahan
Papan Kayu Jati

#N/A
#N/A

#N/A

0.035

m3

Perkerja

0.800

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

2.000
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.040

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu dan Jendela Kaca Kayu Kamper


Bahan
Papan Kayu Kamper

#N/A
#N/A

#N/A

0.035

m3

Perkerja

0.800

Oh

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.200
0.040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu dan Jendela Kaca Kayu Borneo


Bahan
Papan Kayu Borneo

#N/A
#N/A

#N/A

0.035

m3

Perkerja

0.800

Oh

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.200
0.040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu dan Jendela Jalusi Kayu Borneo

#N/A

#N/A

#N/A

Bahan
Papan Kayu Borneo
Tenaga

0.064

m3

#N/A

#N/A

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Kayu

3.000

Oh

#N/A

#N/A

Kepala Tukang

0.300

Oh

#N/A

#N/A

Mandor

0.300

Oh

#N/A

#N/A
#N/A

1m Pasang Pintu dan Jendela Jalusi Kayu Kamper


Bahan
#N/A

#N/A

Papan Kayu Borneo


Tenaga

0.064

m3

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Kayu

3.000

Oh

#N/A

#N/A

Kepala Tukang

0.300

Oh

#N/A

#N/A

Mandor

0.500

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1m Pasang Pintu Plywood rangkap, rangka kayu Jati


Bahan

#N/A

Papan Kayu Jati

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"


Lem Kayu

0.030
0.300

Kg
Lt

#N/A
#N/A

#N/A
#N/A

Plywood 4 mm

1.000

Lbr

49,500.00

49,500.00

Perkerja
Tukang Kayu

0.600
2.000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.200

Oh

#N/A

#N/A

Mandor

0.030

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu Plywood rangkap, rangka kayu Kamper


Bahan

#N/A

#N/A

#N/A

Papan Kayu Jati

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"


Lem Kayu

0.030

Kg

#N/A

#N/A

0.300

Lt

#N/A

#N/A

Plywood 4 mm

1.000

Lbr

49,500.00

49,500.00

Tenaga
Perkerja

0.600

Oh

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Kepala Tukang

0.200

Oh

#N/A

#N/A

Mandor

0.030

Oh

#N/A

#N/A
#N/A

1m Pasang Jalusi Mati Kusen Kayu Jati


Bahan

#N/A

Papan Kayu Jati

0.0600

m3

#N/A

#N/A

Paku Biasa " - 1"


Tenaga

0.150

Kg

#N/A

#N/A

Perkerja

0.500

Oh

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Kepala Tukang

0.200

Oh

#N/A

#N/A

Mandor

0.025

Oh

#N/A

#N/A
#N/A

1m Pasang Jalusi Mati Kusen Kayu Kamper


Bahan

#N/A

Papan Kayu Jati

0.0600

m3

#N/A

#N/A

Paku Biasa " - 1"


Tenaga

0.150

Kg

#N/A

#N/A

Perkerja

0.500

Oh

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.200
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1m Pasang Pintu Plywood Rangkap, rangka Kayu Borneo

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Papan Kayu Borneo
Paku Biasa " - 1"
Lem Kayu

0.0196
0.030

m3
Kg

#N/A
#N/A

#N/A
#N/A

0.300

Lt

#N/A

#N/A

1.000

lbr

49,500.00

49,500.00

Perkerja
Tukang Kayu

0.600
2.000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.200

Oh

#N/A

#N/A

Mandor

0.030

Oh

#N/A

#N/A

Plywood 4 mm
Tenaga

#N/A

1m Pasang Pintu Teakwood Rangkap, rangka Kayu Jati


Bahan

#N/A

Papan Kayu Jati

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"

0.300

Kg

#N/A

#N/A

Lem Kayu
Plywood 4 mm

0.300
1.000

Lt
lbr

#N/A
49,500.00

#N/A
49,500.00

Perkerja

0.600

Oh

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.200
0.030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

Tenaga

1m Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper

#N/A

#N/A

#N/A

Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu

0.0196
0.300

m3
Kg

#N/A
#N/A

#N/A
#N/A

0.300

Lt

#N/A

#N/A

Plywood 4 mm

1.000

lbr

49,500.00

49,500.00

Tenaga
Perkerja

0.600

Oh

#N/A

#N/A

Tukang Kayu

2.000

Oh

#N/A

#N/A

Kepala Tukang

0.200

Oh

#N/A

#N/A

Mandor

0.030

Oh

#N/A

#N/A
#N/A

1m Pasang Pintu Plywood & Formika, rangka Kayu Jati


Bahan

#N/A

Papan Kayu Jati

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"

0.300

Kg

#N/A

#N/A

Lem Kayu
Plywood 4 mm

0.800
1.000

Lt
lbr

#N/A
49,500.00

#N/A
49,500.00

Formika 4' x 3'

0.500

lbr

#N/A

#N/A

Perkerja
Tukang Kayu

0.800
2.500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.250

Oh

#N/A

#N/A

Mandor

0.040

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu Plywood & Formika, rangka Kayu Kamper


Bahan

#N/A

#N/A

#N/A

Papan Kayu Kamper

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"


Lem Kayu

0.300

Kg

#N/A

#N/A

0.800

Lt

#N/A

#N/A

Plywood 4 mm

1.000

lbr

49,500.00

49,500.00

Formika 4' x 3'


Tenaga

0.500

lbr

#N/A

#N/A

Perkerja

0.800

Oh

#N/A

#N/A

Tukang Kayu

2.500

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.250
0.040

Oh
Oh

#N/A
#N/A

#N/A
#N/A
#N/A

1m Pasang Pintu Teakwood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu

0.0196
0.300

m3
Kg

#N/A
#N/A

#N/A

#N/A

#N/A
#N/A

0.800

Lt

#N/A

#N/A

Plywood 4 mm

1.000

lbr

49,500.00

49,500.00

Formika 4' x 3'

0.500

lbr

49,500.00

24,750.00

Tenaga
Perkerja

0.800

Oh

#N/A

#N/A

Tukang Kayu

2.500

Oh

#N/A

#N/A

Kepala Tukang

0.250

Oh

#N/A

#N/A

Mandor

0.040

Oh

#N/A

#N/A
#N/A

1m Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis )


Bahan

#N/A

Papan Kayu Jati

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"


Lem Kayu

0.300
0.800

Kg
Lt

#N/A
#N/A

#N/A
#N/A

Plywood 4 mm

0.500

lbr

49,500.00

24,750.00

Formika 4' x 3'

0.500

lbr

49,500.00

24,750.00

Perkerja
Tukang Kayu

0.800
2.500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.250

Oh

#N/A

#N/A

Mandor

0.040

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu Formika Double, rangka Kayu Jati


Bahan

#N/A

#N/A

Papan Kayu Jati

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"

0.300

Kg

#N/A

#N/A

Lem Kayu
Plywood 4 mm

1.200
1.000

Lt
lbr

#N/A
49,500.00

#N/A
49,500.00

Formika 4' x 3'

1.000

lbr

49,500.00

49,500.00

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

2.600
0.260

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.050

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Pintu Formika Double, rangka Kayu Kamper


Bahan
Papan Kayu Kamper

#N/A

#N/A

0.0196

m3

#N/A

#N/A

Paku Biasa " - 1"


Lem Kayu

0.300

Kg

#N/A

#N/A

1.200

Lt

#N/A

#N/A

Plywood 4 mm

1.000

lbr

49,500.00

49,500.00

Formika 4' x 3'


Tenaga

1.000

lbr

49,500.00

49,500.00

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Kayu

2.600

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.260
0.050

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1m3 Pasang Konstruksi Kuda - kuda Kayu Jati

#N/A

#N/A

#N/A

#N/A

Bahan
Balok Kayu Jati
Besi Strip

1.100
15.000

m3

#N/A
#N/A

#N/A
#N/A

Paku Biasa 2" - 5"

0.800

Kg

#N/A

#N/A

Perkerja

4.000

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

12.000
1.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.200

Oh

#N/A

#N/A

Tenaga

1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper


Bahan

#N/A

Balok Kayu Kamper

1.100

m3

#N/A

#N/A

Besi Strip

15.000

Kg

#N/A

#N/A

Paku Biasa 2" - 5"

0.800

Kg

#N/A

#N/A

Tenaga
Perkerja

4.000

Oh

#N/A

#N/A

#N/A

#N/A

Tukang Kayu

12.000

Oh

#N/A

#N/A

Kepala Tukang

1.200

Oh

#N/A

#N/A

Mandor

0.200

Oh

#N/A

#N/A

1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo


Bahan

#N/A

#N/A

Balok Kayu Borneo

1.100

m3

#N/A

#N/A

Besi Strip

15.000

Kg

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.800

Kg

#N/A

#N/A

Perkerja

4.000

Oh

#N/A

#N/A

Tukang Kayu

12.000

Oh

#N/A

#N/A

Kepala Tukang

1.200

Oh

#N/A

#N/A

Mandor

0.200

Oh

#N/A

#N/A
#N/A

1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing


Bahan

#N/A

Balok Kayu Kruing

1.100

m3

#N/A

#N/A

Besi Strip
Paku Biasa 2" - 5"

15.000
0.800

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

4.000

Oh

#N/A

#N/A

Tukang Kayu

12.000

Oh

#N/A

#N/A

Kepala Tukang
Mandor

1.200
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1m Pasang Kaso + Reng Genteng Kodok Kayu Kamper

#N/A

#N/A

Bahan
Balok Kayu Kamper

0.012

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.100
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.005

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Kaso + Reng Genteng Kodok Kayu Borneo

#N/A

#N/A

Bahan
Balok Kayu Borneo

0.012

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.100
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.005

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Kaso + Reng Genteng Monier Kayu Jati


Bahan

#N/A

#N/A

Balok Kayu Jati

0.014

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.100
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.005

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Kaso + Reng Genteng Monier Kayu Kamper


Bahan

#N/A

#N/A

Balok Kayu Kamper

0.014

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Tenaga
Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.005

Oh

#N/A

#N/A
#N/A

1m Pasang Kaso + Reng Genteng Beton Kayu Borneo


Bahan

#N/A

Balok Kayu Borneo

0.014

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Tenaga
Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.005

Oh

#N/A

#N/A
#N/A

1m Pasang Kaso + Reng Atap Sirap Kayu Kamper


Bahan
Balok Kayu Kamper

0.165

m3

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.200

Kg

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Perkerja

0.120

Oh

#N/A

#N/A

Tukang Kayu

0.120

Oh

#N/A

#N/A

Kepala Tukang

0.012

Oh

#N/A

#N/A

Mandor

0.006

Oh

#N/A

#N/A
#N/A

1m Pasang Kaso + Reng Atap Sirap Kayu Borneo


Bahan

#N/A

Balok Kayu Kamper

0.165

m3

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.200

Kg

#N/A

#N/A

Perkerja

0.120

Oh

#N/A

#N/A

Tukang Kayu

0.120

Oh

#N/A

#N/A

Kepala Tukang

0.012

Oh

#N/A

#N/A

Mandor

0.006

Oh

#N/A

#N/A
#N/A

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati


Bahan

#N/A

Balok Kayu Jati

0.012

m3

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.100

Kg

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.075

Oh

#N/A

#N/A

1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Kayu Papan 3 / 20 borneo
Paku Biasa 2" - 5"

0.0072
0.050

m3
Kg

49,500.00
#N/A

356.40
#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.200

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.025
0.005

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper

#N/A

#N/A

#N/A

Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"

0.012
0.100

m3
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.250
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.075

Oh

#N/A

#N/A

Tenaga

1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo

#N/A

#N/A

Bahan
Balok Kayu Kamper

0.012

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.100

Kg

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.250
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.075

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati

#N/A

#N/A

Bahan
Balok Kayu Jati

0.023

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.200
0.300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.030

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper


Bahan

#N/A

#N/A

Balok Kayu Kamper

0.023

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.200
0.300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.030

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo


Bahan
Balok Kayu Borneo

0.023

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.150

Kg

#N/A

#N/A

Tenaga
Perkerja

0.200

Oh

#N/A

#N/A

#N/A

#N/A

Tukang Kayu

0.300

Oh

#N/A

#N/A

Kepala Tukang

0.030

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati


Bahan

#N/A

#N/A

Balok Kayu Jati

0.027

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.200

Kg

#N/A

#N/A

Tenaga
Perkerja

0.250

Oh

#N/A

#N/A

Tukang Kayu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A
#N/A

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper


Bahan

#N/A

Balok Kayu Kamper

0.027

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.200

Kg

#N/A

#N/A

Tenaga
Perkerja

0.250

Oh

#N/A

#N/A

Tukang Kayu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A
#N/A

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo


Bahan

#N/A

Balok Kayu Borneo

0.027

m3

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.200

Kg

#N/A

#N/A

Perkerja

0.250

Oh

#N/A

#N/A

Tukang Kayu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Papan Kayu Jati

0.0072

m3

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.050

Kg

#N/A

#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.200

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.025
0.005

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper

#N/A

#N/A

#N/A

Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"

0.0072
0.050

m3
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.200

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.025
0.005

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati

#N/A

#N/A

#N/A

Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"

0.0110
0.050

m3
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

0.110

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.220
0.022

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.005

Oh

#N/A

#N/A

Tenaga

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper

#N/A

#N/A

Bahan
Papan Kayu Kamper

0.0110

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.050

Kg

#N/A

#N/A

Perkerja

0.110

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.220
0.022

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.005

Oh

#N/A

#N/A

#N/A

Tenaga

1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper


Bahan

#N/A

Papan Kayu Kamper

0.0145

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.060

Kg

#N/A

#N/A

0.150
0.250

Oh
Oh

#N/A

Tenaga
Perkerja
Tukang Kayu

#N/A
#N/A

#N/A
#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.075

Oh

#N/A

#N/A

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper

#N/A

#N/A

Bahan
Papan Kayu Kamper

0.0086

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.060

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.100
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A

#N/A

Tenaga

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo


Bahan

#N/A

#N/A

Papan Kayu Borneo

0.0088

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.060

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.100
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.050

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Rangka Dinding Pemisah Kayu Kamper


Bahan

#N/A

#N/A

Balok Kayu Kamper

0.0195

m3

#N/A

#N/A

Papan Kayu Kamper

0.007

m3

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.100

Kg

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.450

Oh

#N/A

#N/A

Kepala Tukang

0.045

Oh

#N/A

#N/A

Mandor

0.075

Oh

#N/A

#N/A
#N/A

1m Pasang Rangka Dinding Pemisah Kayu Borneo


Bahan

#N/A

Balok Kayu Borneo

0.0195

m3

#N/A

#N/A

Papan Kayu Borneo


Paku Biasa 2" - 5"

0.007
0.100

m3
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.450
0.045

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.075

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1m Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper

#N/A

#N/A

Bahan
Balok Kayu Kamper

0.0195

m3

#N/A

#N/A

Papan Kayu Kamper

0.007

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.100

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.150
0.450

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.045

Oh

#N/A

#N/A

Mandor

0.075

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper


Bahan

#N/A

#N/A

Balok Kayu Kamper

0.0195

m3

#N/A

#N/A

Papan Kayu Kamper

0.007

m3

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.100

Kg

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.450

Oh

#N/A

#N/A

Kepala Tukang

0.045

Oh

#N/A

#N/A

Mandor

0.075

Oh

#N/A

#N/A
#N/A

1m Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper


Bahan

#N/A

Balok Kayu Kamper

0.0195

m3

#N/A

#N/A

Papan Kayu Kamper


Paku Biasa 2" - 5"

0.007
0.100

m3
Kg

#N/A
#N/A

#N/A
#N/A

Lem Kayu

0.560

lt

#N/A

#N/A

Plywood 4 mm

1.000

lbr

49,500.00

49,500.00

Tenaga
Perkerja

0.200

Oh

#N/A

#N/A

Tukang Kayu

0.600

Oh

#N/A

#N/A

Kepala Tukang

0.060

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

1m Pasang Dinding Lambriziring dari papan Kayu jati

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Papan Kayu Jati

0.007

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.100

Kg

#N/A

#N/A

Paku Skrup 3.5"

0.150

Kg

#N/A

#N/A

Tenaga
Perkerja

0.600

Oh

#N/A

#N/A

Tukang Kayu

1.800

Oh

#N/A

#N/A

Kepala Tukang

0.180

Oh

#N/A

#N/A

Mandor

0.030

Oh

#N/A

#N/A
#N/A

1m Pasang Plywood tebal 4mm, untuk dinding


Bahan

#N/A

Plywood 4 mm

0.400

lbr

49,500.00

19,800.00

Paku Biasa " - 1"


Tenaga

0.050

Kg

#N/A

#N/A

Perkerja

0.025

Oh

#N/A

#N/A

Tukang Kayu

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.0075

Oh

#N/A

#N/A

Mandor

0.0013

Oh

#N/A

#N/A
#N/A

1m Pasang List Plafond Kayu Profil


Bahan
#N/A

#N/A

Kayu Profil

1.050

m'

Tenaga
Perkerja

0.021

Oh

#N/A

#N/A

Tukang Kayu

0.021

Oh

#N/A

#N/A

Kepala Tukang

0.0020

Oh

#N/A

#N/A

Mandor

0.0010

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Beton

10.000
0.026

Kg
m3

#N/A
49,500.00

#N/A
1,287.00

Koral Beton

0.044

m3

#N/A

#N/A

Perkerja

1.150

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.020
0.002

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.006

Oh

#N/A

#N/A

Tenaga

1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 5 Kr


Bahan
Semen Portland

#N/A

#N/A

218.000

Kg

#N/A

#N/A

Pasir Beton

0.520

m3

49,500.00

25,740.00

Koral Beton

0.870

m3

#N/A

#N/A

Tenaga
Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.080

Oh

#N/A

#N/A
#N/A

1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr


Bahan
Semen Portland

#N/A

197.000

Kg

#N/A

#N/A

Pasir Beton

0.470

m3

49,500.00

23,265.00

Koral Beton
Tenaga

0.940

m3

#N/A

#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.025
0.080

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Beton

173.000
0.570

Kg
m3

#N/A
49,500.00

#N/A
28,215.00

0.870

m3

#N/A

#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.250
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.080

Oh

#N/A

#N/A

Koral Beton
Tenaga

#N/A

1 m Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland

232.000

Kg

#N/A

#N/A

Pasir Beton

0.520

m3

49,500.00

25,740.00

Koral Beton
Tenaga

0.780

m3

#N/A

#N/A

#N/A

#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.080

Oh

#N/A

#N/A
#N/A

1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr


Bahan
Semen Portland

#N/A

280.000

Kg

#N/A

#N/A

0.450
0.900

m3
m3

49,500.00
#N/A

22,275.00
#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.025
0.080

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Pasir Beton
Koral Beton

#N/A

Tenaga

1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Beton

352.000
0.560

Kg
m3

#N/A
49,500.00

#N/A
27,720.00

0.700

m3

#N/A

#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.250
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.080

Oh

#N/A

#N/A

Koral Beton
Tenaga

1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr


Bahan
Semen Portland

#N/A

#N/A

357.000

Kg

#N/A

#N/A

Pasir Beton

0.420

m3

49,500.00

20,790.00

Koral Beton

0.540

m3

#N/A

#N/A

Tenaga
Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.080

Oh

#N/A

#N/A
#N/A

1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr


Bahan
Semen Portland

#N/A

386.000

Kg

#N/A

#N/A

0.470
0.780

m3
m3

49,500.00
#N/A

23,265.00
#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.025
0.080

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Pasir Beton
Koral Beton

#N/A

#N/A

Tenaga

1 m Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Beton

479.000
0.370

Kg
m3

#N/A
49,500.00

#N/A
18,315.00

0.740

m3

#N/A

#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.250
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.080

Oh

#N/A

#N/A

Koral Beton
Tenaga

1 m Membuat Tiang Pancang Prestressed Beton


Bahan
Semen Portland

#N/A

#N/A

479.000

Kg

#N/A

#N/A

Pasir Beton

0.370

m3

49,500.00

18,315.00

Koral Beton

0.740

m3

#N/A

#N/A

Rapidrant
Tenaga

2.460

gln

#N/A

#N/A

Perkerja

1.650

Oh

#N/A

#N/A

Tukang Batu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.080

Oh

#N/A

#N/A
#N/A

1 m Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt


Bahan
Semen Portland
Pasir Beton

#N/A

336.000
0.540

Kg
m3

#N/A
49,500.00

#N/A
26,730.00

0.810

m3

#N/A

#N/A

Perkerja

2.000

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.350
0.035

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Koral Beton
Tenaga

#N/A

#N/A

Mandor

1.000

Oh

#N/A

1 m Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt

#N/A
#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Beton

291.000
0.470

Kg
m3

#N/A
49,500.00

#N/A
23,265.00

0.930

m3

#N/A

#N/A

Perkerja
Tukang Batu

2.000
0.350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

Mandor

1.000

Oh

#N/A

#N/A

Koral Beton
Tenaga

1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt


Bahan
Semen Portland

#N/A

#N/A

367.000

Kg

#N/A

#N/A

Pasir Beton

0.440

m3

49,500.00

21,780.00

Koral Beton

0.880

m3

#N/A

#N/A

Tenaga
Perkerja

2.000

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

Mandor

1.000

Oh

#N/A

#N/A
#N/A

1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt


Bahan
Semen Portland

#N/A

400.000

Kg

#N/A

#N/A

0.480
0.800

m3
m3

49,500.00
#N/A

23,760.00
#N/A

Perkerja

2.000

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.035
1.000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Pasir Beton
Koral Beton

#N/A

#N/A

Tenaga

1 m Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt

#N/A

#N/A

#N/A

Bahan
Semen Portland
Pasir Beton

615.000
0.520

Kg
m3

#N/A
49,500.00

#N/A
25,740.00

0.520

m3

#N/A

#N/A

Perkerja
Tukang Batu

2.000
0.350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

Mandor

1.000

Oh

#N/A

#N/A

Koral Beton
Tenaga

1 m Membuat Beton Kedap Air dengan Strorox - 100


Bahan
Semen Portland

#N/A

#N/A

400.000

Kg

#N/A

#N/A

Pasir Beton

0.480

m3

49,500.00

23,760.00

Koral Beton

0.800

m3

#N/A

#N/A

Strorox - 100
Tenaga

1.200

Kg

#N/A

#N/A

Perkerja

2.000

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

Mandor

1.000

Oh

#N/A

#N/A
#N/A

1 m' Memasang PVC Waterstop lebar 150 mm


Bahan
#N/A

#N/A

Waterstop lebar 150 mm


Tenaga

1.050

m'

Perkerja

0.050

Oh

#N/A

#N/A

Tukang Batu

0.030

Oh

#N/A

#N/A

Kepala Tukang

0.003

Oh

#N/A

#N/A

Mandor

0.002

Oh

#N/A

#N/A
#N/A

#N/A

#N/A

Waterstop lebar 200 mm

1.050

m'

Tenaga
Perkerja

0.050

Oh

#N/A

#N/A

Tukang Batu

0.030

Oh

#N/A

#N/A

Kepala Tukang

0.0035

Oh

#N/A

#N/A

Mandor

0.002

Oh

#N/A

#N/A
#N/A

1.050

m'

0.550

Oh

#N/A

#N/A

1 m' Memasang PVC Waterstop lebar 230 mm


Bahan
Tenaga
Perkerja

#N/A

#N/A

1 m' Memasang PVC Waterstop lebar 200 mm


Bahan

Waterstop lebar 230 mm

#N/A

#N/A

#N/A

#N/A
#N/A

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Mandor

0.003

Oh

#N/A

#N/A

1 m' Memasang PVC Waterstop lebar 250 mm


Bahan
Waterstop lebar 250 mm

#N/A
#N/A

#N/A

1.050

m'

Perkerja

0.550

Oh

#N/A

#N/A

Tukang Batu
Mandor

0.350
0.003

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

#N/A

1 m' Memasang PVC Waterstop lebar 300 mm


Bahan
#N/A

#N/A

Waterstop lebar 300 mm


Tenaga

1.050

m'

Perkerja

0.550

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Mandor

0.003

Oh

#N/A

#N/A

#N/A

#N/A

1 m' Memasang PVC Waterstop lebar 320 mm


Bahan
Waterstop lebar 320 mm

#N/A

#N/A

#N/A

1.050

m'

Perkerja
Tukang Batu

0.550
0.350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.003

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Kg Pembesian dengan Besi Polos atau Besi Ulir


Bahan

#N/A

#N/A

Besi Beton ( Polos / Ulir )

1.050

Kg

#N/A

#N/A

Kawat Beton

0.015

Kg

#N/A

#N/A

Perkerja
Tukang Besi

0.007
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0007

Oh

#N/A

#N/A

Mandor

0.0003

Oh

#N/A

#N/A

#N/A

Tenaga

1 Kg Kabel Presstressed Polos / Strands


Bahan

#N/A

#N/A

Besi Beton ( Polos / Ulir )

1.050

Kg

#N/A

#N/A

Kawat Beton

0.010

Kg

#N/A

#N/A

Tenaga
Perkerja

0.005

Oh

#N/A

#N/A

Tukang Besi

0.005

Oh

#N/A

#N/A

Kepala Tukang

0.0005

Oh

#N/A

#N/A

Mandor

0.0003

Oh

#N/A

#N/A

1 Kg Jaring Kawat Baja

#N/A

#N/A

#N/A

#N/A

Bahan
Besi Jaring Kawat Baja

1.020

Kg

#N/A

#N/A

Kawat Beton

0.805

Kg

#N/A

#N/A

Tenaga
Perkerja

0.025

Oh

#N/A

#N/A

Tukang Besi

0.025

Oh

#N/A

#N/A

Kepala Tukang

0.0025

Oh

#N/A

#N/A

Mandor

0.0015

Oh

#N/A

#N/A

1 m2 Pasang Bekisting

#N/A

#N/A

#N/A

Bahan
Kayu Terentang

0.040

m3

49,500.00

1,980.00

Paku Biasa 2" - 5"


Minyak Bekisting

0.400
0.200

Kg
Lt

#N/A
#N/A

#N/A
#N/A

Plywood 9 mm

0.350

lbr

49,500.00

17,325.00

Dolken Kayu Galam 8 - 10 / 4m

2.000

btg

#N/A

#N/A

Perkerja
Tukang Kayu

0.300
0.330

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0330

Oh

#N/A

#N/A

Mandor

0.0060

Oh

#N/A

#N/A

Tenaga

1 m2 Pasangan Stoot Werk


Bahan

29,115.90

#VALUE!

Kayu Kaso 5 / 7 (borneo)

0.0882

m3

49,500.00

4,365.90

Paku

0.5000

kg

49,500.00

24,750.00

Tenaga
Perkerja

0.1500

org

HARGA UPAH

#VALUE!

Tukang Kayu

0.2000

org

HARGA UPAH

#VALUE!

Kepala Tukang

0.2000

org

#N/A

#N/A

Mandor

0.0170

org

#N/A

#N/A

1 m2 Pasang Bekisting untuk Pondasi

#N/A

#N/A

#VALUE!

#N/A

Bahan
Kayu Terentang

0.040

m3

49,500.00

1,980.00

Paku Biasa 2" - 5"

0.300

Kg

#N/A

#N/A

Minyak Bekisting

0.100

Lt

#N/A

#N/A

Tenaga
Perkerja

0.300

Oh

#N/A

#N/A

Tukang Kayu

0.260

Oh

#N/A

#N/A

Kepala Tukang

0.0260

Oh

#N/A

#N/A

Mandor

0.0050

Oh

#N/A

#N/A

1 m2 Pasang Bekisting untuk Sloof

#N/A

#N/A

#N/A

Bahan
Kayu Terentang

0.040

m3

49,500.00

1,980.00

Paku Biasa 2" - 5"


Minyak Bekisting

0.300
0.100

Kg
Lt

#N/A
#N/A

#N/A
#N/A

Perkerja

0.300

Oh

#N/A

#N/A

Tukang Kayu

0.260

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0260
0.0050

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

1 m2 Pasang Bekisting untuk Kolom

#N/A

#N/A

#N/A

Bahan
Kayu Terentang
Paku Biasa 2" - 5"

0.040
0.400

m3
Kg

49,500.00
#N/A

1,980.00
#N/A

Minyak Bekisting
Balok Kayu Borneo

0.200

Lt

#N/A

#N/A

0.015

m3

#N/A

Plywood 9 mm

#N/A

0.350
2.000

lbr
btg

49,500.00
#N/A

17,325.00
#N/A

Perkerja

0.300

Oh

#N/A

#N/A

Tukang Kayu

0.330

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0330
0.0060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Dolken Kayu Galam 8 - 10 / 4m


Tenaga

1 m2 Pasang Bekisting untuk Balok

#N/A

#N/A

#N/A

Bahan
Kayu Terentang
Paku Biasa 2" - 5"

0.040
0.400

m3
Kg

49,500.00
#N/A

1,980.00
#N/A

Minyak Bekisting
Balok Kayu Borneo

0.200

Lt

#N/A

#N/A

0.018

m3

#N/A

Plywood 9 mm

#N/A

0.350
2.000

lbr
btg

49,500.00
#N/A

17,325.00
#N/A

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Kayu

0.330

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0330
0.0060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Dolken Kayu Galam 8 - 10 / 4m


Tenaga

1 m2 Pasang Bekisting untuk Lantai

#N/A

#N/A

#N/A

Bahan
Kayu Terentang
Paku Biasa 2" - 5"

0.040
0.400

m3
Kg

49,500.00
#N/A

1,980.00
#N/A

Minyak Bekisting
Balok Kayu Borneo

0.200

Lt

#N/A

#N/A

0.015

m3

#N/A

#N/A

Plywood 9 mm

0.350

lbr

49,500.00

17,325.00

Dolken Kayu Galam 8 - 10 / 4m


Tenaga

6.000

btg

#N/A

#N/A

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Batu

0.330

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.033
0.006

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m2 Pasang Bekisting untuk Dinding

#N/A

#N/A

#N/A

Bahan
Kayu Terentang
Paku Biasa 2" - 5"

0.040
0.400

m3
Kg

49,500.00
#N/A

1,980.00
#N/A

Minyak Bekisting
Balok Kayu Borneo

0.200

Lt

#N/A

#N/A

0.015

m3

#N/A

#N/A

Plywood 9 mm

0.350

lbr

49,500.00

17,325.00

Dolken Kayu Galam 8 - 10 / 4m


Formtie / penjaga jarak bekisting

6.000
4.000

btg
bh

#N/A
#N/A

#N/A
#N/A

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.330
0.033

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.006

Oh

#N/A

#N/A

Tenaga

1 m2 Pasang Bekisting untuk Tangga


Bahan
Kayu Terentang

#N/A
0.030

m3

49,500.00

1,485.00

#N/A

#N/A

Paku Biasa 2" - 5"

0.400

Kg

#N/A

#N/A

Minyak Bekisting

0.150

Lt

#N/A

#N/A

Balok Kayu Borneo

0.015

m3

#N/A

#N/A

Plywood 9 mm

0.350

lbr

49,500.00

17,325.00

Dolken Kayu Galam 8 - 10 / 4m


Tenaga

2.000

btg

#N/A

#N/A

Perkerja

0.320

Oh

#N/A

#N/A

Tukang Kayu

0.330

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.033
0.006

Oh
Oh

#N/A
#N/A

#N/A
#N/A
#N/A

1 m Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"

0.200
1.500

m3
Kg

49,500.00
#N/A

9,900.00
#N/A

#N/A

Minyak Bekisting

0.400

Lt

#N/A

#N/A

Besi Beton Polos

150.000

Kg

#N/A

#N/A

2.250

Kg

#N/A

#N/A

323.000
0.520

Kg
m3

#N/A
49,500.00

#N/A
25,740.00

0.780

m3

#N/A

#N/A

Perkerja

3.900

Oh

#N/A

#N/A

Tukang Batu
Tukang Kayu

0.350
1.040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tukang Besi

1.050

Oh

#N/A

#N/A

Kepala Tukang

0.245

Oh

#N/A

#N/A

Mandor

0.165

Oh

#N/A

#N/A

Kawat Beton
Semen Portland
Pasir Beton
Koral Beton

#N/A

Tenaga

#N/A

1 m Membuat Sloof Beton Bertulang ( 200 Kg + bekisting )


Bahan

#N/A

Kayu Terentang

0.270

m3

49,500.00

13,365.00

Paku Biasa 2" - 5"


Minyak Bekisting

2.000
0.600

Kg
Lt

#N/A
#N/A

#N/A
#N/A

Besi Beton Polos

200.000

Kg

#N/A

#N/A

3.000

Kg

#N/A

#N/A

323.000

Kg

#N/A

#N/A

0.520
0.780

m3
m3

49,500.00
#N/A

25,740.00
#N/A

Perkerja

4.850

Oh

#N/A

#N/A

Tukang Batu
Tukang Kayu

0.350
1.560

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tukang Besi

1.400

Oh

#N/A

#N/A

Kepala Tukang

0.331

Oh

#N/A

#N/A

Mandor

0.170

Oh

#N/A

#N/A

Kawat Beton
Semen Portland
Pasir Beton
Koral Beton

#N/A

Tenaga

#N/A

1 m Membuat Kolom Beton Bertulang ( 300 Kg + bekisting )


Bahan
Kayu Terentang

0.400

m3

49,500.00

19,800.00

Paku Biasa 2" - 5"

4.000

Kg

#N/A

#N/A

Minyak Bekisting
Besi Beton Polos

2.000
300.000

Lt
Kg

#N/A
#N/A

#N/A
#N/A
#N/A

Kawat Beton

4.500

Kg

#N/A

323.000

Kg

#N/A

#N/A

Pasir Beton

0.520

m3

49,500.00

25,740.00

Koral Beton
Kayu Balok Borneo

0.780
0.150

m3
m3

#N/A
#N/A

#N/A
#N/A

Semen Portland

#N/A

Plywood 9 mm

3.500

lbr

#N/A

#N/A

Dolken 8 / 4 m

20.000

btg

#N/A

#N/A

Tenaga
Perkerja

7.300

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Tukang Kayu

3.300

Oh

#N/A

#N/A

Tukang Besi

2.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.570
0.250

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m Membuat Balok Beton Bertulang ( 200 Kg + bekisting )

#N/A

Bahan
Kayu Terentang
Paku Biasa 2" - 5"

0.320
3.200

m3
Kg

49,500.00
#N/A

15,840.00
#N/A

Minyak Bekisting

1.600

Lt

#N/A

#N/A

Besi Beton Polos

200.000

Kg

#N/A

#N/A

Kawat Beton
Semen Portland

3.000
323.000

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Beton

0.520

m3

49,500.00

25,740.00

Koral Beton

0.780

m3

#N/A

#N/A

Kayu Balok Borneo

0.140

m3

#N/A

#N/A

Plywood 9 mm

2.800
16.000

lbr
btg

#N/A
#N/A

#N/A
#N/A

Dolken 8 / 4 m

#N/A

#N/A

#N/A

Tenaga
Perkerja

5.960

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Tukang Kayu

2.800

Oh

#N/A

#N/A

Tukang Besi
Kepala Tukang

1.400
0.455

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.208

Oh

#N/A

#N/A

1 m Membuat Balok Beton Bertulang ( 150 Kg + bekisting )


Bahan

#N/A

Kayu Terentang

0.320

m3

49,500.00

15,840.00

Paku Biasa 2" - 5"

3.200

Kg

#N/A

#N/A

Minyak Bekisting

1.600

Lt

#N/A

#N/A

Besi Beton Polos


Kawat Beton

150.000
2.250

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Semen Portland

#N/A

323.000

Kg

#N/A

#N/A

Pasir Beton

0.520

m3

49,500.00

25,740.00

Koral Beton

0.780

m3

#N/A

#N/A

Kayu Balok Borneo


Plywood 9 mm

0.120
2.800

m3
lbr

#N/A
#N/A

#N/A
#N/A

Dolken 8 / 4 m
Tenaga

32.000

btg

#N/A

#N/A

Perkerja

5.800

Oh

#N/A

#N/A

Tukang Batu
Tukang Kayu

0.350
2.800

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tukang Besi

1.050

Oh

#N/A

#N/A

Kepala Tukang

0.420

Oh

#N/A

#N/A

Mandor

0.185

Oh

#N/A

#N/A
#N/A

1 m Membuat Dinding Beton Bertulang ( 150 Kg + bekisting )


Bahan

#N/A

Kayu Terentang

0.240

m3

49,500.00

11,880.00

Paku Biasa 2" - 5"


Minyak Bekisting

3.200
1.600

Kg
Lt

#N/A
#N/A

#N/A
#N/A

Besi Beton Polos

150.000

Kg

#N/A

#N/A

2.250

Kg

#N/A

#N/A

323.000

Kg

#N/A

#N/A

Pasir Beton
Koral Beton

0.520
0.780

m3
m3

49,500.00
#N/A

25,740.00
#N/A

Kayu Balok Borneo

0.160

m3

#N/A

#N/A

Plywood 9 mm

2.800

lbr

#N/A

#N/A

Dolken 8 / 4 m
Tenaga

24.000

btg

#N/A

#N/A

Perkerja

5.600

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Tukang Kayu

2.640

Oh

#N/A

#N/A

Tukang Besi
Kepala Tukang

1.050
0.400

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.193

Oh

#N/A

#N/A

Kawat Beton
Semen Portland

1 m Membuat Tangga Beton Bertulang ( 200 Kg + bekisting )

#N/A

#N/A

Bahan
Kayu Terentang

0.250

m3

49,500.00

12,375.00

Paku Biasa 2" - 5"

3.000

Kg

#N/A

#N/A

Minyak Bekisting

1.200

Lt

#N/A

#N/A

Besi Beton Polos

200.000

Kg

#N/A

#N/A

Kawat Beton
Semen Portland

3.000
323.000

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Beton

0.520

m3

49,500.00

25,740.00

Koral Beton

0.780

m3

#N/A

#N/A

Kayu Balok Borneo


Plywood 9 mm

0.105
2.500

m3
lbr

#N/A
#N/A

#N/A
#N/A

Dolken 8 / 4 m
Tenaga

14.000

btg

#N/A

#N/A

Perkerja

5.600

Oh

#N/A

#N/A

Tukang Batu
Tukang Kayu

0.350
2.300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tukang Besi

1.400

Oh

#N/A

#N/A

Kepala Tukang

0.405

Oh

#N/A

#N/A

Mandor

0.202

Oh

#N/A

#N/A
#N/A

1 m Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Bahan
Kayu Terentang

0.002

m3

49,500.00

99.00

Paku Biasa 2" - 5"


Besi Beton Polos

0.010
3.000

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Kawat Beton

0.450

Kg

#N/A

#N/A

Semen Portland

4.000

Kg

#N/A

#N/A

Pasir Beton

0.006

m3

49,500.00

297.00

Koral Beton
Tenaga

0.009

m3

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Perkerja

0.060

Oh

#N/A

#N/A

Tukang Batu

0.020

Oh

#N/A

#N/A

Tukang Kayu

0.020

Oh

#N/A

#N/A

Tukang Besi

0.020

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.006
0.003

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m Membuat Ring Balok Beton Bertulang (10 x 15) cm

#N/A

#N/A

Bahan
Kayu Albasiah

0.003

m3

#N/A

#N/A

Paku Biasa 2" - 5"

0.200

Kg

#N/A

#N/A

Besi Beton Polos

3.600

Kg

#N/A

#N/A

Kawat Beton

0.050

Kg

#N/A

#N/A

Semen Portland
Pasir Beton

5.500
0.009

Kg
m3

#N/A
49,500.00

#N/A
445.50

Koral Beton

0.015

m3

#N/A

#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Batu
Tukang Kayu

0.330
0.033

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tukang Besi

0.033

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.005

Oh

#N/A

#N/A

#N/A

Tenaga

PEKERJAAN PENTUP ATAP


#N/A

1m Pasang Atap Genteng Palentong Kecil


Bahan
#N/A

#N/A

Genteng Palentong
Tenaga

25.000

bh

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.008

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1m Pasang Atap Genteng Kodok / Glazzur


Bahan
#N/A

#N/A

Genteng Kodok

25.000

bh

Tenaga
Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.008

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1m Pasang Atap Genteng Palentong Super / Besar


Bahan
#N/A

#N/A

Genteng Palentong Super

12.000

bh

Tenaga
Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.060

Oh

#N/A

#N/A

Kepala Tukang

0.006

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

#N/A

#N/A

1m' Pasang Genteng Bubung Palentong

#N/A

#N/A

#N/A

Bahan
Genteng Bubung Palentong

5.000

bh

#N/A

Semen Portland

8.000

Kg

#N/A

#N/A
#N/A

Pasir Pasang
Tenaga

0.032

m3

49,500.00

1,584.00

Perkerja

0.400

Oh

#N/A

#N/A

Tukang Kayu

0.200

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.020
0.002

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1m' Pasang Genteng Bubung Kodok Glazzur

#N/A

#N/A

#N/A

Bahan
Genteng Bubung Kodok
Semen Portland

5.000
8.000

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.032

m3

49,500.00

1,584.00

Perkerja

0.400

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.200
0.020

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.002

Oh

#N/A

#N/A

Tenaga

1m' Pasang Genteng Bubung Palentong Besar


Bahan

#N/A

Genteng Bubung Palentong

4.000

bh

#N/A

Semen Portland

8.000

Kg

#N/A

#N/A

Pasir Pasang

0.032

m3

49,500.00

1,584.00

Tenaga
Perkerja

0.400

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

Tukang Kayu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.002

Oh

#N/A

#N/A

1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm


Bahan

#N/A

#N/A

Roof Light Fiberglass

0.600

lbr

#N/A

#N/A

Paku

0.050

Kg

49,500.00

2,475.00

Tenaga
Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.067

Oh

#N/A

#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.007

Oh

#N/A

#N/A

1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm

#N/A

#N/A

#N/A

#N/A

Bahan
Asbes Gelombang

0.500

lbr

#N/A

#N/A

Paku Pancing 60 x 230

0.120

Kg

#N/A

#N/A

Tenaga
Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.008

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm

#N/A

#N/A

#N/A

Bahan
Asbes Gelombang

0.600

lbr

#N/A

#N/A

Paku Pancing 60 x 230


Tenaga

0.120

Kg

#N/A

#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.008

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm

#N/A

#N/A

#N/A

Bahan
Asbes Gelombang

0.600

lbr

#N/A

#N/A

Paku Pancing 60 x 230


Tenaga

0.120

Kg

#N/A

#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.070

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.007
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm

#N/A

#N/A

#N/A

Bahan
Asbes Gelombang
Paku Pancing 60 x 230

0.750
0.120

lbr
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.070

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.007
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

1m Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm

#N/A

#N/A

#N/A

Bahan
Asbes Gelombang
Paku Pancing 60 x 230

0.350
0.120

lbr
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.070
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.007

Oh

#N/A

#N/A

Tenaga

1m Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm

#N/A

#N/A

Bahan
Asbes Gelombang

0.420

lbr

#N/A

#N/A

Paku Pancing 60 x 230

0.120

Kg

#N/A

#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.070
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.007

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm


Bahan

#N/A

Asbes Gelombang

0.440

lbr

#N/A

#N/A

Paku Pancing 60 x 230

0.120

Kg

#N/A

#N/A

0.140
0.067

Oh
Oh

#N/A

Tenaga
Perkerja
Tukang Kayu

#N/A
#N/A

#N/A
#N/A

#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.007

Oh

#N/A

#N/A

1m Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm

#N/A

#N/A

Bahan
Asbes Gelombang

0.510

lbr

#N/A

#N/A

Paku Pancing 60 x 230

0.120

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.140
0.067

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.007

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm


Bahan

#N/A

#N/A

Asbes Gelombang

0.800

lbr

#N/A

#N/A

Paku Pancing 60 x 230

0.120

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.140
0.067

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.007

Oh

#N/A

#N/A

#N/A

Tenaga

1m Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm


Bahan

#N/A

#N/A

Asbes Gelombang

0.370

lbr

#N/A

#N/A

Paku Pancing 60 x 230

0.120

Kg

#N/A

#N/A

Tenaga
Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.067

Oh

#N/A

#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.007

Oh

#N/A

#N/A
#N/A

1m Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm


Bahan

#N/A

Asbes Gelombang

0.380

lbr

#N/A

#N/A

Paku Pancing 60 x 230

0.120

Kg

#N/A

#N/A

Tenaga
Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.067

Oh

#N/A

#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.007

Oh

#N/A

#N/A
#N/A

1m Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm


Bahan

#N/A

Asbes Gelombang

0.460

lbr

#N/A

#N/A

Paku Pancing 60 x 230


Tenaga

0.120

Kg

#N/A

#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.067

Oh

#N/A

#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.007

Oh

#N/A

#N/A
#N/A

1m Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm


Bahan

#N/A

Asbes Gelombang

0.490

lbr

#N/A

#N/A

Paku Pancing 60 x 230


Tenaga

0.120

Kg

#N/A

#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.067

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.007
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1m Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Asbes Gelombang
Paku Pancing 60 x 230

0.570
0.120

lbr
Kg

#N/A
#N/A

#N/A
#N/A

Perkerja

0.140

Oh

#N/A

#N/A

Tukang Kayu

0.067

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.007
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

1m' Pasang Bubung Stel Gelombang 0.92m

#N/A

#N/A

Bahan
Asbes Gelombang

2.400

lbr

#N/A

#N/A

Paku Pancing 60 x 230

6.000

Kg

#N/A

#N/A

Perkerja

0.084

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.125
0.013

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

Mandor

0.004

Oh

#N/A

1m' Pasang Nok Stel Gelombang 0.92m

#N/A
#N/A

#N/A

#N/A

Bahan
Asbes Gelombang
Paku Skrup 3.5"

2.400
6.000

lbr
bh

#N/A
49,500.00

#N/A
297,000.00

Perkerja

0.084

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.125
0.013

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.004

Oh

#N/A

#N/A

Tenaga

1m' Pasang Nok Stel Gelombang 1.05m

#N/A

#N/A

Bahan
Asbes Gelombang

2.100

lbr

#N/A

#N/A

Paku Skrup 3.5"

6.000

bh

49,500.00

297,000.00

Perkerja

0.084

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.125
0.013

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.004

Oh

#N/A

#N/A

#N/A

Tenaga

1m' Pasang Nok Stel Gelombang 1.08m

#N/A

#N/A

Bahan
Asbes Gelombang

2.050

lbr

#N/A

#N/A

Paku Skrup 3.5"

6.000

bh

49,500.00

297,000.00

Perkerja
Tukang Kayu

0.084
0.125

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.013

Oh

#N/A

#N/A

Mandor

0.004

Oh

#N/A

#N/A

#N/A

Tenaga

1m' Pasang Nok Paten 0.92m


Bahan

#N/A

#N/A

Nok Paten

1.200

lbr

#N/A

#N/A

Paku Skrup 3.5"

6.000

bh

49,500.00

297,000.00

Perkerja
Tukang Kayu

0.084
0.125

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.013

Oh

#N/A

#N/A

Mandor

0.004

Oh

#N/A

#N/A

#N/A

Tenaga

1m' Pasang Nok Paten 1.05m

#N/A

#N/A

#N/A

Bahan
Nok Paten

1.200

lbr

#N/A

#N/A

Paku Skrup 3.5"

6.000

bh

49,500.00

297,000.00

Tenaga
Perkerja

0.084

Oh

#N/A

#N/A

Tukang Kayu

0.125

Oh

#N/A

#N/A

Kepala Tukang

0.013

Oh

#N/A

#N/A

Mandor

0.004

Oh

#N/A

#N/A

1m' Pasang Nok Paten 1.08m

#N/A

#N/A

#N/A

Bahan
Nok Paten

1.200

lbr

#N/A

#N/A

Paku Skrup 3.5"

6.000

bh

49,500.00

297,000.00

Tenaga
Perkerja

0.084

Oh

#N/A

#N/A

Tukang Kayu

0.125

Oh

#N/A

#N/A

Kepala Tukang

0.013

Oh

#N/A

#N/A

Mandor

0.004

Oh

#N/A

#N/A

1m' Pasang Nok Stel rata 0.92m

#N/A

#N/A

#N/A

Bahan
Nok Stel rata

1.100

lbr

#N/A

#N/A

Paku Skrup 3.5"


Tenaga

6.000

bh

49,500.00

297,000.00

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.013

Oh

#N/A

#N/A

Mandor

0.004

Oh

#N/A

#N/A

1m' Pasang Nok Stel rata 1.05m

#N/A

#N/A

Bahan
Nok Stel rata
Paku Skrup 3.5"

1.100
6.000

lbr
bh

#N/A
49,500.00

#N/A
297,000.00

Perkerja

0.084

Oh

#N/A

#N/A

Tukang Kayu

0.125

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.013
0.004

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

#N/A

1m Pasang Atap Genteng Beton


Bahan

#N/A

Genteng Beton

11.000

lbr

#N/A

#N/A

Paku Biasa 2" - 5"


Tenaga

0.030

bh

#N/A

#N/A

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.010
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A
#N/A

1m Pasang Atap Genteng Aspal


Bahan

#N/A

Genteng Aspal
Plywood 4 mm

6.900
0.350

lbr
lbr

#N/A
49,500.00

#N/A
17,325.00

Paku Biasa 1/2" - 1"

0.030

Kg

#N/A

#N/A

Plastic Aerator

0.500

Bh

#N/A

#N/A

Perkerja
Tukang Kayu

0.200
0.300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.003

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1m Pasang Atap Genteng Metal


Bahan

#N/A

#N/A

Genteng Metal

1.020

lbr

#N/A

#N/A

Paku Biasa 2" - 5"

0.200

Kg

#N/A

#N/A

Tenaga
Perkerja

0.200

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.001

Oh

#N/A

#N/A
#N/A

1m Pasang Atap Sirap


Bahan

#N/A

Genteng Sirap

60.000

lbr

#N/A

#N/A

Paku Biasa " - 1"

0.200

Kg

#N/A

#N/A

Tenaga
Perkerja

0.166

Oh

#N/A

#N/A

Tukang Kayu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

1m' Pasang Nok Genteng Beton

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Genteng Beton

3.500

lbr

#N/A

#N/A

Paku Biasa 2" - 5"


Semen abu -abu

0.050
10.800

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.032

m3

49,500.00

1,584.00

Semen Warna

1.000

Kg

49,500.00

49,500.00

Perkerja
Tukang Kayu

0.400
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.020

Oh

#N/A

#N/A

Tenaga

1m' Pasang Nok Genteng Aspal


Bahan

#N/A

#N/A

Genteng Aspal

2.000

lbr

#N/A

#N/A

Paku Biasa " - 1"

0.050

Kg

#N/A

#N/A

Balok Kayu Borneo


Tenaga

0.0035

Kg

#N/A

#N/A

Perkerja

0.125

Oh

#N/A

#N/A

Tukang Kayu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.006

Oh

#N/A

#N/A

1m' Pasang Nok Genteng Metal

#N/A

#N/A

#N/A

#N/A

Bahan
Genteng Decra Bond

1.100

lbr

#N/A

#N/A

Paku Biasa " - 1"


Tenaga

0.050

Kg

#N/A

#N/A

Perkerja

0.250

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.015
0.013

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1m' Pasang Nok Genteng Metal

#N/A

Bahan
Genteng Decra Bond
Paku Biasa " - 1"

1.100
0.050

lbr
Kg

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga
Perkerja

0.250

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.015

Oh

#N/A

#N/A

Mandor

0.013

Oh

#N/A

#N/A

1m' Pasang Nok Sirap

#N/A

#N/A

#N/A

Bahan
Seng Plat 3" x 6" BJLS 28

Lbr
Kg

#N/A
#N/A

#N/A
#N/A

0.050

Kg

#N/A

#N/A

0.004

m3

#N/A

#N/A

Perkerja
Tukang Kayu

0.125
0.250

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

Mandor

0.006

Oh

#N/A

#N/A

Paku Biasa " - 1"


Paku Biasa 2" - 5"
Papan Kayu Borneo tebal 3cm

0.400
0.060

Tenaga

1m Pasang Atap Seng Gelombang


Bahan

#N/A

#N/A

Seng Gelombang 3" x 6" BJLS 28

0.700

Lbr

#N/A

#N/A

Paku Biasa " - 1"

0.020

Kg

#N/A

#N/A

Perkerja
Tukang Kayu

0.120
0.060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.006

Oh

#N/A

#N/A

Mandor

0.006

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1m Pasang Atap Nok Seng


Bahan
Seng Plat 3" x 6" BJLS 28

0.300

Lbr

#N/A

#N/A

Paku Biasa " - 1"

0.040

Kg

#N/A

#N/A

Tenaga
Perkerja

0.015

Oh

#N/A

#N/A

Tukang Kayu

0.070

Oh

#N/A

#N/A

Kepala Tukang

0.008

Oh

#N/A

#N/A

Mandor

0.006

Oh

#N/A

#N/A
#N/A

1m Pasang Atap Alluminium


Bahan

#N/A

Atap Alluminium Gelombang tebal 0.55

1.050

m2

#N/A

#N/A

Paku Hak Pnjang 15 cm


Tenaga

0.020

Kg

#N/A

#N/A

Perkerja

0.015

Oh

#N/A

#N/A

Tukang Kayu

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.008

Oh

#N/A

#N/A

Mandor

0.006

Oh

#N/A

#N/A
#N/A

1m Pasang Nok Alluminium


Bahan

#N/A

Nok standar 40 cm 18, swg 22

1.200

m2

#N/A

#N/A

Paku Hak Pnjang 15 cm


Tenaga

0.040

Kg

#N/A

#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

1.000

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.010

Oh

#N/A

#N/A
#N/A

1m Pasang Alluminium Foil / Sisalation


Bahan

VII

#N/A

#N/A

#N/A

Sisalation / Alluminium Foil


Tenaga

1.050

m2

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.050

Oh

#N/A

#N/A

Kepala Tukang

0.005

Oh

#N/A

#N/A

Mandor

0.008

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

PEKERJAAN LANGIT - LANGIT


1 m2 Pas. Rangka Plapond Kayu Kls I (Hanya Rangka)

11,929.50

#N/A

#N/A

Bahan
Kayu Balok Borneo
Paku

0.0210
0.2200

m3
kg

49,500.00
49,500.00

1,039.50
10,890.00

Perkerja

0.1875

org

#N/A

#N/A

0.00

Tukang Kayu
Kepala Tukang

0.2250
0.0375

org
org

#N/A
HARGA UPAH

#N/A
#VALUE!

0.00
0.00

Mandor

0.0105

org

#N/A

#N/A

0.00

#N/A

#N/A

Tenaga

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm


Bahan
Pelat Asbes tebal 5 mm

#N/A
1.100

lbr

#N/A

#N/A

Paku

0.010

Kg

49,500.00

495.00

Perkerja

0.030

Oh

#N/A

#N/A

Tukang Kayu

0.070

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.007
0.0015

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm

#N/A

#N/A

Bahan
Pelat Asbes tebal 4 mm

1.100

lbr

#N/A

#N/A

Paku

0.010

Kg

49,500.00

495.00

Perkerja

0.030

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.070
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0015

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm

#N/A

#N/A

Bahan
Pelat Asbes tebal 4 mm

1.100

lbr

#N/A

#N/A

Paku

0.010

Kg

49,500.00

495.00

Perkerja

0.030

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.070
0.007

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0015

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Langit - langit Akustik ( 30 x 30 )cm


Bahan

571,725.00

#N/A

Akustik 30 x 30 cm

11.500

lbr

49,500.00

569,250.00

Paku

0.050

Kg

49,500.00

2,475.00

0.060
0.120

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.012

Oh

#N/A

#N/A

Mandor

0.0030

Oh

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu

1 m Langit - langit Akustik ( 30 x 60 )cm


Bahan

289,575.00

#N/A

Akustik 30 x 60 cm

5.800

lbr

49,500.00

287,100.00

Paku

0.050

Kg

49,500.00

2,475.00

Tenaga
Perkerja

0.060

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.0030

Oh

#N/A

#N/A
#N/A

1 m Langit - langit Akustik ( 60 x 120 )cm


Bahan

#N/A

Akustik Arm Strong Ukuran 30 x 120 cm

1.500

lbr

#N/A

#N/A

Paku

0.050

Kg

49,500.00

2,475.00

Tenaga
Perkerja

0.060

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.0030

Oh

#N/A

#N/A
19,305.00

1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm


Bahan

#N/A

Plywood 4 mm

0.360

lbr

49,500.00

17,820.00

Paku
Tenaga

0.030

Kg

49,500.00

1,485.00

Perkerja

0.070

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.0035

Oh

#N/A

#N/A
19,305.00

1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm


Bahan

#N/A

Plywood 4 mm

0.360

lbr

49,500.00

17,820.00

Paku
Tenaga

0.030

Kg

49,500.00

1,485.00

Perkerja

0.070

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.010
0.0035

Oh
Oh

#N/A
#N/A

#N/A
#N/A
19,305.00

1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm


Bahan
Plywood 4 mm
Paku

0.360
0.030

lbr
Kg

49,500.00
49,500.00

17,820.00
1,485.00

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.070

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.0035

Oh

#N/A

#N/A
19,305.00

1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm


Bahan
Plywood 4 mm
Paku

49,500.00
49,500.00

#N/A

0.360
0.030

lbr
Kg

Perkerja

0.070

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.010
0.0035

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

17,820.00
1,485.00

Tenaga

1 m Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm

#N/A

#N/A

#N/A

Bahan
Teakwood 4' x 8' x 4mm
Paku

0.360
0.030

lbr
Kg

#N/A
49,500.00

#N/A
1,485.00

Perkerja

0.070

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.010
0.0035

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

1 m Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm

#N/A

#N/A

Bahan
Teakwood 4' x 8' x 4mm

0.360

lbr

#N/A

#N/A

Paku

0.030

Kg

49,500.00

1,485.00

Perkerja

0.070

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.100
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0035

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Langit - langit Gypsum

19,305.00

#N/A

Bahan
Gypsum

0.360

lbr

49,500.00

17,820.00

Paku

0.030

Kg

49,500.00

1,485.00

0.070
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.0035

Oh

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu

1 m Langit - langit Kayu Jati


Bahan

#N/A

#N/A

Papan Kayu Jati

0.024

m3

#N/A

#N/A

Paku

0.010

Kg

49,500.00

495.00

Paku Sekrup

0.050

Kg

#N/A

#N/A

Tenaga
Perkerja

0.200

Oh

#N/A

#N/A

Tukang Kayu

0.600

Oh

#N/A

#N/A

Kepala Tukang

0.060

Oh

#N/A

#N/A

Mandor

0.0100

Oh

#N/A

#N/A
#N/A

1 m Langit - langit Kayu Ramin


Bahan

#N/A

Papan Kayu Ramin

0.024

lbr

#N/A

#N/A

Paku
Paku Sekrup

0.010
0.050

Kg
Kg

49,500.00
#N/A

495.00
#N/A

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Kayu

0.600

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.060
0.0100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Langit - langit Kayu Kamper

#N/A

#N/A

#N/A

Bahan
Papan Kayu Kamper
Paku

0.024
0.010

lbr
Kg

#N/A
49,500.00

#N/A
495.00

Paku Sekrup

0.050

Kg

#N/A

#N/A

0.200
0.600

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.060

Oh

#N/A

#N/A

Mandor

0.0100

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu

1 m Langit - langit Softboard


Bahan

#N/A

#N/A

#N/A

Softboard 4' x 8' x 4mm

0.350

lbr

#N/A

#N/A

Paku

0.030

Kg

49,500.00

1,485.00

Perkerja

0.600

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.100
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0030

Oh

#N/A

#N/A

Tenaga

1 m Langit - langit Akustik 60 x 120 cm + rangka Alluminium


Bahan

#N/A

#N/A

Profil Alluminium " T "

3.600

m'

#N/A

#N/A

Kawat seng polos

0.150

Kg

#N/A

#N/A

Ramset / Dinabolt

1.000

bh

#N/A

#N/A

Akustik Armstrom 60 x 120cm


Tenaga

1.500

lbr

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.500

Oh

#N/A

#N/A

Kepala Tukang

0.050

Oh

#N/A

#N/A

Mandor

0.0075

Oh

#N/A

#N/A
#N/A

1 m List Langit - langit Kayu Profil


Bahan

#N/A

List Kayu Profil

1.100

m'

#N/A

#N/A

Paku
Tenaga

0.010

Kg

#N/A

#N/A

Perkerja

0.050

Oh

#N/A

#N/A

Tukang Kayu

0.050

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.005
0.0030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m Langit - langit Plywood 4 mm + RangkaKayu Borneo

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Balok Kayu Borneo
Paku

0.023
0.060

m3
Kg

#N/A
49,500.00

#N/A
2,970.00

Plywood 4 mm

0.390

lbr

49,500.00

19,305.00

Perkerja

0.270

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.400
0.040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0135

Oh

#N/A

#N/A

Tenaga

1 m Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan

#N/A

#N/A

Balok Kayu Borneo

0.012

m3

#N/A

#N/A

Paku

0.060

Kg

49,500.00

2,970.00

Asbes

1.100

lbr

#N/A

#N/A

Tenaga
Perkerja

0.180

Oh

#N/A

#N/A

Tukang Kayu

0.320

Oh

#N/A

#N/A

Kepala Tukang

0.032

Oh

#N/A

#N/A

Mandor

0.0090

Oh

#N/A

#N/A
#N/A

1 m Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo


Bahan

#N/A

Balok Kayu Borneo

0.023

m3

#N/A

#N/A

Paku

0.060

Kg

49,500.00

2,970.00

Akustik 30 x 60 cm
Tenaga

5.800

lbr

#N/A

#N/A

Perkerja

0.260

Oh

#N/A

#N/A

Tukang Kayu

0.400

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.040
0.0130

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo

#N/A

#N/A

#N/A

#N/A

#N/A

Bahan
Balok Kayu Borneo
Paku

0.027
0.060

m3
Kg

#N/A
49,500.00

#N/A
2,970.00

Akustik 30 x 30 cm

11.500

lbr

#N/A

#N/A

Perkerja

0.310

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.470
0.047

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0155

Oh

#N/A

#N/A

Tenaga

IX

PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok

#N/A

#N/A

Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Perkerja

1.000

bh

30% Dari bahan


3.300

Oh

#N/A

#N/A

#N/A

#N/A
#N/A

#N/A

#N/A

Tukang Batu

1.100

Oh

#N/A

#N/A

Kepala Tukang

0.001

Oh

#N/A

#N/A

Mandor

0.1600

Oh

#N/A

#N/A

Memasang 1 buah Kloset Jongkok Porselen


Bahan

#N/A

#N/A

Kloset Jongkok Porselen

1.000

bh

#N/A

Semen Portland

6.000

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.010

m3

49,500.00

495.00

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Batu

1.500

Oh

#N/A

#N/A

Kepala Tukang

1.500

Oh

#N/A

#N/A

Mandor

0.1600

Oh

#N/A

#N/A

#N/A

#N/A

Memasang 1 buah Kloset Jongkok Teraso

#N/A

#N/A

#N/A

Bahan
Kloset Jongkok Teraso

1.000

bh

#N/A

#N/A

Bata merah kelas I


Semen Portland

7.000
6.000

bh
Kg

49,500.00
#N/A

346,500.00
#N/A

Pasir Pasang

0.010

m3

49,500.00

495.00

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

1.500
0.300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.1100

Oh

#N/A

#N/A

Tenaga

Memasang 1 buah Urinoir


Bahan
Urinoir
Perlengkapan

#N/A
bh

#N/A

#N/A

30% Harga Urinoir

1.000

#N/A

#N/A

#N/A

Semen Portland

6.000

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.010

m3

49,500.00

495.00

Perkerja

1.000

Oh

#N/A

#N/A

Tukang Batu

1.000

Oh

#N/A

#N/A

Kepala Tukang

0.100

Oh

#N/A

#N/A

Mandor

0.1000

Oh

#N/A

#N/A

Memasang 1 buah Wastafel

#N/A

#N/A

#N/A

#N/A

Bahan
Urinoir
Perlengkapan

1.000
bh
12% Harga Urinoir

#N/A
#N/A

#N/A
#N/A

Semen Abu -abu

6.000

Kg

49,500.00

297,000.00

Pasir Pasang

0.010

m3

49,500.00

495.00

1.000
1.450

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.150

Oh

#N/A

#N/A

Mandor

0.1000

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Batu

Memasang 1 buah Bak Mandi Teraso, volume 0.30 m


Bahan

#N/A

#N/A

Bak Teraso

1.000

bh

#N/A

Semen Portland

6.000

Kg

#N/A

#N/A

Pasir Pasang

0.010

m3

49,500.00

495.00

Tenaga
Perkerja

2.100

Oh

#N/A

#N/A

Tukang Batu

0.750

Oh

#N/A

#N/A

Kepala Tukang

0.070

Oh

#N/A

#N/A

Mandor

0.1100

Oh

#N/A

#N/A

#N/A

58,410.00

Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m


Bahan
Bak Fiberglass
Perlengkapan
Tenaga

1.000

bh

49,500.00

49,500.00

18% Harga Bak

8,910.00

8,910.00

#N/A

Perkerja

1.800

Oh

#N/A

#N/A

Tukang Batu

2.700

Oh

#N/A

#N/A

Kepala Tukang

0.540

Oh

#N/A

#N/A

Mandor

0.1100

Oh

#N/A

#N/A
#N/A

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang

0.400
120.000

m3
Kg

49,500.00
#N/A

19,800.00
#N/A

0.300

m3

49,500.00

14,850.00

360.000

bh

#N/A

#N/A

Semen Nat

6.000

Kg

#N/A

#N/A

Tenaga
Perkerja

6.000

Oh

Porselen ( 11 x 11 ) cm

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Tukang Batu

3.000

Oh

#N/A

#N/A

Kepala Tukang

0.300

Oh

#N/A

#N/A

Mandor

0.3000

Oh

#N/A

#N/A

Memasang 1 buah Badkip Porselen


Bahan

#N/A

Badkip
Perlengkapan

bh

#N/A

#N/A

20% harga Badkip

1.000

#N/A

#N/A

Tenaga
Perkerja

#N/A

Oh

#N/A

#N/A

Tukang Batu

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.750

Oh

#N/A

#N/A

Mandor

0.2500

Oh

#N/A

#N/A

#N/A

Memasang 1 buah Bak Fiberglass volume 1 m air


Bahan
Bak Fiberglass
Perlengkapan
Tenaga

1.000

bh

#N/A

#N/A

#N/A

#N/A

#N/A

12% Harga Bak

#N/A

Perkerja

3.000

Oh

#N/A

#N/A

Tukang Batu

4.500

Oh

#N/A

#N/A

Kepala Tukang

0.900

Oh

#N/A

#N/A

Mandor

0.9000

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 15 cm


Bahan

#N/A

Pipa Tanah
Semen Portland

1.600
0.680

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.013

m3

49,500.00

643.50

Pasir Urug

0.011

m3

#N/A

#N/A

0.060
0.030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.003

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Batu

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 20 cm


Bahan

#N/A

#N/A

Pipa Tanah

1.600

bh

#N/A

Semen Portland

0.870

Kg

#N/A

#N/A

Pasir Pasang
Pasir Urug

0.014
0.014

m3
m3

49,500.00
#N/A

693.00
#N/A

Perkerja

0.080

Oh

#N/A

#N/A

Tukang Batu

0.040

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.004
0.0070

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

Memasang 1 m' Pipa Beton 5 cm - 20 cm

#N/A

#N/A

#N/A

Bahan
Pipa Beton
Bata merah kelas I

1.100
0.270

bh
m3

#N/A
49,500.00

#N/A
13,365.00

Semen Portland

3.920

Kg

#N/A

#N/A

Pasir Pasang

0.056

m3

49,500.00

2,772.00

Pasir Urug

0.024

m3

#N/A

#N/A

Tenaga
Perkerja

0.140

Oh

#N/A

#N/A

Tukang Batu

0.070

Oh

#N/A

#N/A

Kepala Tukang

0.007

Oh

#N/A

#N/A

Mandor

0.0070

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa Beton 30 cm - 100 cm


Bahan

#N/A

Pipa Beton

1.100

bh

#N/A

#N/A

Bata merah kelas I


Semen Portland

0.550
10.300

m3
Kg

49,500.00
#N/A

27,225.00
#N/A

Pasir Pasang

0.061

m3

49,500.00

3,019.50

Pasir Urug

0.069

m3

#N/A

#N/A

0.380
0.190

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.019

Oh

#N/A

#N/A

Mandor

0.0190

Oh

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Batu

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm

#N/A

Bahan
Bata merah kelas I

0.145

m3

49,500.00

Semen Portland

44.000

Kg

#N/A

7,177.50
#N/A

Pasir Pasang
Batu Kerikil

0.070
0.070

m3
m3

49,500.00
#N/A

3,465.00
#N/A

#N/A

#N/A

Besi Beton

1.600

Kg

#N/A

#N/A

Pasir Beton

0.060

m3

49,500.00

2,970.00

Perkerja

3.200

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

1.015
0.0015

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0160

Oh

#N/A

#N/A

Tenaga

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan

#N/A

#N/A

Bata merah kelas I

0.250

m3

49,500.00

Semen Portland

77.000

Kg

#N/A

#N/A

Pasir Pasang

0.130

m3

49,500.00

6,435.00

Batu Kerikil
Besi Beton

0.020
2.600

m3
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Beton

0.090

m3

49,500.00

4,455.00

Perkerja

1.420

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.473
0.0470

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0710

Oh

#N/A

#N/A

#N/A

12,375.00

Tenaga

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I

#N/A

#N/A

0.371

m3

49,500.00

114.000

Kg

#N/A

#N/A

Pasir Pasang

0.184

m3

49,500.00

9,108.00

Batu Koral
Besi Beton

0.033
4.850

m3
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Beton

0.120

m3

49,500.00

5,940.00

Perkerja

2.160

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.720
0.0720

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.1080

Oh

#N/A

#N/A

Tukang Gali

0.1000

Oh

#N/A

#N/A

Semen Portland

#N/A

18,364.50

Tenaga

Memasang 1 m' Pipa Galvanis "


Bahan
Pipa Galvanis
Perlengkapan

#N/A
m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.054

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0270

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa Galvanis "


Bahan
Pipa Galvanis
Perlengkapan

m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.054

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0270

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa Galvanis 1"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga

m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

Perkerja

0.054

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0270

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa Galvanis 1"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga

m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

Perkerja

0.108

Oh

#N/A

#N/A

Tukang Batu

0.180

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0180
0.0054

Oh
Oh

#N/A
#N/A

#N/A
#N/A
#N/A

Memasang 1 m' Pipa Galvanis 3"


Bahan
Pipa Galvanis
Perlengkapan

1.200
m'
35% Harga Pipa

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.108

Oh

#N/A

#N/A

Tukang Batu

0.180

Oh

#N/A

#N/A

Kepala Tukang

0.0180

Oh

#N/A

#N/A

Mandor

0.0054

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa Galvanis 4"


Bahan
Pipa Galvanis D 4"
Perlengkapan

1.200
m'
35% Harga Pipa

#N/A
#N/A

#N/A

#N/A

#N/A
#N/A

Tenaga
Perkerja

0.135

Oh

#N/A

#N/A

Tukang Batu

0.225

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0225
0.0068

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Memasang 1 m' Pipa PVC tipe AW "

#N/A

#N/A

#N/A

Bahan
Pipa PVC D 1/2"
Perlengkapan

1.200
m'
35% Harga Pipa

#N/A
#N/A

#N/A
#N/A

Tenaga
Perkerja

0.036

Oh

#N/A

#N/A

Tukang Batu

0.060

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0060
0.0018

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Memasang 1 m' Pipa PVC tipe AW "


Bahan
Pipa PVC tipe AW "
Perlengkapan

#N/A
m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.036

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.060
0.0060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0018

Oh

#N/A

#N/A

Memasang 1 m' Pipa PVC tipe AW 1"


Bahan
Pipa PVC tipe AW 1"
Perlengkapan

#N/A
m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Batu

0.036
0.060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0060

Oh

#N/A

#N/A

Mandor

0.0018

Oh

#N/A

#N/A

Memasang 1 m' Pipa PVC tipe AW 1"


Bahan
Pipa PVC tipe AW 1"
Perlengkapan

#N/A
m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Batu

0.036
0.060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0060

Oh

#N/A

#N/A

Mandor

0.0018

Oh

#N/A

#N/A

Memasang 1 m' Pipa PVC tipe AW 2"


Bahan
Pipa PVC tipe AW 2"
Perlengkapan

#N/A
m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.054

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0027

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa PVC tipe AW 2"


Bahan
Pipa PVC tipe AW 2"
Perlengkapan

m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.036

Oh

#N/A

#N/A

Tukang Batu

0.060

Oh

#N/A

#N/A

Kepala Tukang

0.0060

Oh

#N/A

#N/A

Mandor

0.0018

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa PVC tipe AW 3"


Bahan
Pipa PVC tipe AW 3"
Perlengkapan
Tenaga

m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Perkerja

0.081

Oh

#N/A

#N/A

Tukang Batu

0.135

Oh

#N/A

#N/A

Kepala Tukang

0.0135

Oh

#N/A

#N/A

Mandor

0.0041

Oh

#N/A

#N/A
#N/A

Memasang 1 m' Pipa PVC tipe AW 4"


Bahan
Pipa PVC tipe AW 4"
Perlengkapan
Tenaga

m'

#N/A

#N/A

35% Harga Pipa

1.200

#N/A

#N/A

#N/A

Perkerja

0.081

Oh

#N/A

#N/A

Tukang Batu

0.135

Oh

#N/A

#N/A

Kepala Tukang

0.0135

Oh

#N/A

#N/A

Mandor

0.0041

Oh

#N/A

#N/A

Memasang 1 bh Bak Cuci Piring Stainles Steel

#N/A

#N/A

#N/A

#N/A

Bahan
Bak cuci Stainless steel

1.000

bh

#N/A

#N/A

Water Drain + Asesories


Tenaga

1.000

set

49,500.00

49,500.00

Perkerja

0.030

Oh

#N/A

#N/A

Tukang Batu

0.300

Oh

#N/A

#N/A

Kepala Tukang

0.0300

Oh

#N/A

#N/A

Mandor

0.0015

Oh

#N/A

#N/A

Memasang 1 bh Bak Cuci Piring Teraso

#N/A

#N/A

#N/A

Bahan
Bak cuci Teraso
Water Drain + Asesories

1.000
1.000

bh
set

#N/A
#N/A

#N/A
#N/A

Semen Portland

20.000

Kg

#N/A

#N/A

Pasir Pasang

0.050

m3

49,500.00

2,475.00

Perkerja
Tukang Batu

0.050
0.500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0500

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A

Tenaga

Memasang 1 bh Kran " atau "


Bahan

#N/A

#N/A

Kran Air

1.000

bh

#N/A

#N/A

Seal tape

0.025

bh

#N/A

#N/A

Tenaga
Perkerja

0.010

Oh

#N/A

#N/A

Tukang Batu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.0100

Oh

#N/A

#N/A

Mandor

0.0050

Oh

#N/A

#N/A

Memasang 1 bh Floor Drain

#N/A

#N/A

#N/A

#N/A

Bahan
Kran Air

1.000

bh

#N/A

#N/A

Perkerja
Tukang Batu

0.010
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0100

Oh

#N/A

#N/A

Mandor

0.0050

Oh

#N/A

#N/A

Tenaga

VII

PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Pasang Rangka Atap Baja

#N/A

#N/A

#N/A

Bahan
Besi Profil WF

1.100

Kg

#N/A

#N/A

Meni Besi
Tenaga

0.080

Kg

#N/A

#N/A

Perkerja

0.006

Oh

#N/A

#N/A

Tukang Besi

0.060

Oh

#N/A

#N/A

Kepala Tukang

0.0060

Oh

#N/A

#N/A

Mandor

0.0003

Oh

#N/A

#N/A
#N/A

1 m Pasang Pintu Besi Baja


Bahan
#N/A

#N/A

Pintu Besi Baja

1.000

m2

Tenaga
Perkerja

0.650

Oh

#N/A

#N/A

Tukang Besi Konstruksi

0.650

Oh

#N/A

#N/A

Kepala Tukang

0.0650

Oh

#N/A

#N/A

Mandor

0.0320

Oh

#N/A

#N/A

#N/A

#N/A

1 m Pasang Jendela Besi


Bahan
Jendela Besi

1.000

m2

Tenaga
Perkerja

1.050

Oh

#N/A

#N/A

#N/A

#N/A
#N/A

#N/A

#N/A

Tukang Besi Konstruksi

1.050

Oh

#N/A

#N/A

Kepala Tukang

0.1050

Oh

#N/A

#N/A

Mandor

0.00525

Oh

#N/A

#N/A

1 m Pasang Jendela Besi Tahan Api


Bahan
Jendela Besi Tahan Api

#N/A
#N/A

#N/A

1.000

m2

Perkerja
Tukang Besi Konstruksi

1.022
1.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.1200

Oh

#N/A

#N/A

Mandor

0.0060

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Pintu gulung besi


Bahan
Pintu gulung besi

#N/A
#N/A

#N/A

1.000

m2

Perkerja

1.200

Oh

#N/A

#N/A

Tukang Besi Konstruksi


Kepala Tukang

1.200
0.1200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0060

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Pintu Lipat


Bahan
Pintu Lipat

#N/A
#N/A

#N/A

1.000

m2

Perkerja

1.050

Oh

#N/A

#N/A

Tukang Besi Konstruksi


Kepala Tukang

1.050
0.1050

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0052

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Pintu Suncreen Allumunium


Bahan
Suncreen Allumunium

#N/A
#N/A

#N/A

1.000

m2

Perkerja

0.080

Oh

#N/A

#N/A

Tukang Besi Konstruksi

0.800

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.080
0.004

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Rolling Door


Bahan
Rolling Door

#N/A
#N/A

#N/A

1.000

m2

Perkerja

1.050

Oh

#N/A

#N/A

Tukang Besi Konstruksi

1.500

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.105
0.0052

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Pintu Allumunium

#N/A

#N/A

#N/A

Bahan
Pintu Allumunium
Tenaga

1.000

m2

#N/A

#N/A

Perkerja

1.050

Oh

#N/A

#N/A

Tukang Besi Konstruksi

1.050

Oh

#N/A

#N/A

Kepala Tukang

0.105

Oh

#N/A

#N/A

Mandor

0.0052

Oh

#N/A

#N/A
#N/A

1 m Pasang Venetions Blinds


Bahan
Venetions Blinds
Tenaga

1.000

m2

Perkerja

0.350

Oh

#N/A

#N/A

Tukang Kayu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

0.00175

Oh

#N/A

#N/A

Mandor

#N/A

#N/A

#N/A

#N/A

1 m Pasang Vertikals Blinds


Bahan
#N/A

#N/A

Venetions Blinds

1.000

m2

Tenaga
Perkerja

0.350

Oh

#N/A

#N/A

Tukang Kayu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.035

Oh

#N/A

#N/A

0.00175

Oh

#N/A

#N/A

Mandor

#N/A
11.500

m'

Tenaga
Perkerja

1.200

Oh

#N/A

#N/A

1 m Pasang Terali Besi


Bahan
Terali Besi 2 x 3

#N/A

#N/A

#N/A

#N/A
#N/A

#N/A

#N/A

Tukang Las

1.200

Oh

#N/A

#N/A

Kepala Tukang

0.012

Oh

#N/A

#N/A

Mandor

0.0006

Oh

#N/A

#N/A

1 m Pasang Kawat Harmonika


Bahan

#N/A

#N/A

Kawat Harmonika

1.100

m2

#N/A

#N/A

Paku Biasa " - 1"

0.020

Kg

#N/A

#N/A

Papan Kayu Kamper


Tenaga

0.0018

m3

#N/A

#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.0005

Oh

#N/A

#N/A
#N/A

1 m Pasang Kawat Nyamuk


Bahan

#N/A

Kawat Nyamuk

1.100

m2

#N/A

#N/A

Paku Biasa " - 1"


Papan Kayu Kamper

0.020
0.0018

Kg
m3

#N/A
#N/A

#N/A
#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.010
0.0005

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Kawat Kassa


Bahan

#N/A

#N/A

Kawat Kassa

1.100

m2

#N/A

#N/A

Paku Biasa " - 1"

0.020

Kg

#N/A

#N/A

Papan Kayu Kamper

0.0018

m3

#N/A

#N/A

Tenaga
Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.0005

Oh

#N/A

#N/A
#N/A

1 m Pasang Kawat Burung


Bahan

#N/A

Kawat Burung

1.100

m2

#N/A

#N/A

Paku Biasa " - 1"


Papan Kayu Kamper

0.020
0.0018

Kg
m3

#N/A
#N/A

#N/A
#N/A

Perkerja

0.100

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.010
0.0005

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Jendela Nako & Tralis

#N/A

#N/A

#N/A

Bahan
Jendela Nako

1.100
0.020

m2
Kg

#N/A
#N/A

#N/A
#N/A

0.0250

m2

#N/A

#N/A

Perkerja

0.200

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.200
0.020

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0010

Oh

#N/A

#N/A

Paku Biasa " - 1" atau Sekrup


Besi Strip
Tenaga

1 m Pasang Talang Datar , Seng BJLS 28


Bahan

#N/A

#N/A

Seng Plat 3" x 6" BJLS 28

0.500

Lbr

49,500.00

24,750.00

Paku Biasa " - 1" atau Sekrup

0.015

Kg

#N/A

#N/A

Papan Kayu Borneo

0.0096

m3

#N/A

#N/A

Flincote / Meni Besi


Tenaga

0.2500

Kg

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.400

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

0.00125

Oh

#N/A

#N/A

Mandor

#N/A

1 m Pasang Talang Miring , Seng BJLS 28


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1" atau Sekrup
Papan Kayu Borneo

0.500
0.015

Lbr
Kg

49,500.00
#N/A

24,750.00
#N/A

0.0190

m3

#N/A

#N/A

Flincote / Meni Besi

0.3000

Kg

#N/A

#N/A

0.040
0.400

Oh
Oh

#N/A

Tenaga
Perkerja
Tukang Kayu

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Kepala Tukang
Mandor

0.025

Oh

#N/A

#N/A

0.00125

Oh

#N/A

#N/A

1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 28


Bahan
Seng Gelombang 3" x 6" BJLS 28

#N/A

#N/A

0.300

Lbr

49,500.00

14,850.00

0.100

Kg

#N/A

#N/A

0.0190

m3

#N/A

#N/A

Besi Strip
Tenaga

0.5000

Kg

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu

0.250

Oh

#N/A

#N/A

Kepala Tukang

0.025

Oh

#N/A

#N/A

0.00125

Oh

#N/A

#N/A

Paku Biasa " - 1" atau Sekrup


Papan Kayu Borneo

Mandor

#N/A

1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 24


Bahan

#N/A

Seng Plat 3 x 6 BJLS 24

0.300

Lbr

#N/A

#N/A

Paku Biasa " - 1" atau Sekrup


Papan Kayu Borneo

0.100
0.0190

Kg
m3

#N/A
#N/A

#N/A
#N/A

Besi Strip

0.5000

Kg

#N/A

#N/A

Perkerja

0.150

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.250
0.025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

0.00125

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

Mandor
VI

PEKERJAAN KUNCI DAN KACA


1 Buah Pasang Kunsi Tanam Antik

#N/A

#N/A

#N/A

Bahan
Kunsi Tanam Antik

1.000

Bh

#N/A

#N/A

Perkerja
Tukang Kayu

0.060
0.600

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.060

Oh

#N/A

#N/A

Mandor

0.003

Oh

#N/A

#N/A

Tenaga

1 Buah Pasang Kunsi Tanam Biasa


Bahan
Kunsi Tanam Biasa

#N/A
#N/A

#N/A

1.000

Bh

Perkerja
Tukang Kayu

0.010
0.500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.010

Oh

#N/A

#N/A

Mandor

0.005

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Kunsi Tanam Kamar Mandi


Bahan
Kunsi Tanam Kamar Mandi

#N/A
#N/A

#N/A

1.000

Bh

Perkerja

0.005

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.500
0.005

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0025

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Kunsi Silinder


Bahan
Kunsi Silinder

#N/A
#N/A

#N/A

1.000

Bh

Perkerja

0.005

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.500
0.005

Oh
Oh

#N/A
#N/A

#N/A
#N/A

0.00025

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

Mandor
1 Buah Pasang Engsel Pintu
Bahan
Engsel Pintu

#N/A
#N/A

#N/A

1.000

Bh

Perkerja

0.015

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

0.015
0.00075

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

Kepala Tukang
Mandor
1 Buah Pasang Engsel Jendela Kupu - kupu
Bahan
Engsel Jendela

#N/A
#N/A

#N/A

1.000

Bh

#N/A

Perkerja

0.010

Oh

#N/A

#N/A

Tukang Kayu

0.100

Oh

#N/A

#N/A

0.010
0.00050

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

Kepala Tukang
Mandor

#N/A

1 Buah Pasang Engsel Angin

#N/A

#N/A

#N/A

Bahan
Engsel Angin

1.000

Bh

Tenaga
Perkerja

0.020

Oh

#N/A

#N/A

Tukang Kayu

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

0.01000

Oh

#N/A

#N/A

Mandor

#N/A

#N/A

1 Buah Pasang Spring Knip

#N/A

#N/A

#N/A

Bahan
Spring Knip

1.000

Bh

Tenaga
Perkerja

0.015

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.015

Oh

#N/A

#N/A

0.00075

Oh

#N/A

#N/A

Mandor

#N/A

#N/A

1 Buah Pasang Kait angin

#N/A

#N/A

#N/A

Bahan
Kait Angin

1.000

Bh

#N/A

#N/A

0.015
0.150

Oh
Oh

#N/A
#N/A

#N/A
#N/A

0.015

Oh

#N/A

#N/A

0.00075

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Closer

#N/A

#N/A

#N/A

Bahan
Door Closer

1.000

Bh

#N/A

#N/A

0.050
0.500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

0.050

Oh

#N/A

#N/A

0.00250

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunci Selot
Bahan
Kunci Selot

#N/A
#N/A

#N/A

1.000

Bh

Perkerja
Tukang Kayu

0.020
0.200

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.020

Oh

#N/A

#N/A

Mandor

0.001

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Pegangan Pintu / Door Holder


Bahan
Door Holder

#N/A
#N/A

#N/A

1.000

Bh

Perkerja

0.050

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.500
0.050

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0025

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Door Stop


Bahan
Door Stop

#N/A
#N/A

#N/A

1.000

Bh

Perkerja

0.010

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.100
0.010

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0005

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Rel Pintu Dorong


Bahan
Rel Pintu Dorong

#N/A
#N/A

#N/A

1.000

Bh

Perkerja

0.060

Oh

#N/A

#N/A

Tukang Kayu

0.600

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.060
0.0030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Kunci Lemari


Bahan
Kunci Lemari

#N/A
#N/A

#N/A

1.000

Bh

#N/A

Perkerja

0.025

Oh

#N/A

#N/A

Tukang Kayu

0.250

Oh

#N/A

#N/A

0.025
0.00125

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

Kepala Tukang
Mandor

#N/A

1 Buah Pasang Kaca tebal 3 mm

#N/A

#N/A

#N/A

Bahan
Kaca Polos

1.100

m2

Tenaga
Perkerja

0.015

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.015

Oh

#N/A

#N/A

0.00075

Oh

#N/A

#N/A

Mandor

#N/A

#N/A

1 Buah Pasang Kaca tebal 5 mm

#N/A

#N/A

#N/A

Bahan
Kaca Polos

1.100

m2

Tenaga
Perkerja

0.015

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.015

Oh

#N/A

#N/A

0.00075

Oh

#N/A

#N/A

Mandor

#N/A

#N/A

1 Buah Pasang Kaca tebal 8 mm

#N/A

#N/A

#N/A

Bahan
Kaca Polos

1.100

m2

#N/A

#N/A

0.0165
0.165

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0165

Oh

#N/A

#N/A

Mandor

0.00080

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu

1 Buah Pasang Kaca Buram tebal 12 mm

#N/A

#N/A

#N/A

Bahan
Kaca Buram

1.100

m2

#N/A

#N/A

0.0250
0.250

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0250

Oh

#N/A

#N/A

Mandor

0.00125

Oh

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu

1 Buah Pasang Kaca Cermin tebal 5 mm


Bahan
Kaca Cermin

#N/A
#N/A

#N/A

1.100

m2

0.0150
0.150

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0150

Oh

#N/A

#N/A

Mandor

0.00075

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Kayu

1 Buah Pasang Kaca Cermin tebal 6 mm


Bahan
Kaca Cermin

#N/A
#N/A

#N/A

1.100

m2

Perkerja

0.0150

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.150
0.0150

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.00075

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Kaca Cermin tebal 8 mm


Bahan
Kaca Cermin

#N/A
#N/A

#N/A

1.100

m2

Perkerja

0.0165

Oh

#N/A

#N/A

Tukang Kayu
Kepala Tukang

0.165
0.0165

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.00080

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 Buah Pasang Kaca Wireglass tebal 5 mm


Bahan
Kaca Wireglass

#N/A
#N/A

#N/A

1.100

m2

Perkerja

0.0150

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

0.0150
0.00075

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

Kepala Tukang
Mandor
1 Buah Pasang Kaca Patri tebal 5 mm
Bahan
Kaca Patri

#N/A
#N/A

#N/A

1.100

m2

#N/A

Perkerja

0.0150

Oh

#N/A

#N/A

Tukang Kayu

0.150

Oh

#N/A

#N/A

0.0150
0.00075

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

Kepala Tukang
Mandor

#N/A

VI

PEKERJAAN PENUTUP LANTAI DAN DINDING


1 m Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm

#N/A

#N/A

#N/A

Bahan
Ubin Abu -abu 40 x40 cm
Semen Portland

6.630
9.800

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.0215

m3

49,500.00

1,064.25

Tenaga
Perkerja

0.2500

Oh

#N/A

#N/A

Tukang Batu

0.120

Oh

#N/A

#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A
#N/A

1 m Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm


Bahan

#N/A

Ubin Abu -abu 30 x 30 cm

11.870

bh

#N/A

Semen Portland

10.000

Kg

#N/A

#N/A

Pasir Pasang

0.0215

m3

49,500.00

1,064.25

Perkerja

0.2600

Oh

#N/A

#N/A

Tukang Batu

0.125

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0125
0.0130

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm

#N/A

#N/A

Bahan
Ubin Abu -abu 20 x 20 cm

26.500

bh

#N/A

Semen Portland

10.400

Kg

#N/A

#N/A

Pasir Pasang

0.0135

m3

49,500.00

668.25

Tenaga
Perkerja

0.2700

Oh

#N/A

#N/A

Tukang Batu

0.130

Oh

#N/A

#N/A

Kepala Tukang

0.0130

Oh

#N/A

#N/A

Mandor

0.0135

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1 m Pasang Lantai Ubin Warna ukuran 40 x 40 cm


Bahan

#N/A

Ubin Warna 40 x 40 cm

6.630

bh

#N/A

#N/A

Semen Portland
Pasir Pasang

8.160
0.0230

Kg
m3

#N/A
49,500.00

#N/A
1,138.50

Semen Warna

0.9000

Kg

49,500.00

44,550.00

Perkerja
Tukang Batu

0.2500
0.120

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Ubin Warna ukuran 30 x 30 cm


Bahan

#N/A

#N/A

Ubin Warna 30 x 30 cm

11.870

bh

#N/A

Semen Portland

8.360

Kg

#N/A

#N/A

Pasir Pasang

0.0230

m3

49,500.00

1,138.50

Semen Warna

0.9000

Kg

49,500.00

44,550.00

Perkerja

0.2500

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.120
0.0120

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0125

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Ubin Warna ukuran 20 x 20 cm

#N/A

#N/A

Bahan
Ubin Warna 20 x 20 cm

26.500

bh

#N/A

Semen Portland

8.760

Kg

#N/A

#N/A

Pasir Pasang

0.0230

m3

49,500.00

1,138.50

Semen Warna

0.9000

Kg

49,500.00

44,550.00

Perkerja

0.2700

Oh

#N/A

#N/A

Tukang Batu

0.130

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0130
0.0135

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Ubin Teraso ukuran 40 x 40 cm


Bahan
Ubin Teraso 40 x 40 cm
Semen Portland

6.250
8.800

bh
Kg

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Pasir Pasang

0.0215

m3

49,500.00

1,064.25

Semen Warna

0.9000

Kg

49,500.00

44,550.00

Perkerja
Tukang Batu

0.2500
0.120

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Ubin Teraso ukuran 30 x 30 cm


Bahan

#N/A

Ubin Teraso 30 x 30 cm

1.870

bh

#N/A

Semen Portland

10.000

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.0215
1.5400

m3
Kg

49,500.00
49,500.00

1,064.25
76,230.00

Perkerja

0.2600

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.125
0.0125

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0130

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Ubin Granito ukuran 40 x 40 cm

#N/A

#N/A

Bahan
Ubin Granito 40 x 40 cm

6.930

bh

#N/A

Semen Portland

9.800

Kg

#N/A

#N/A

Pasir Pasang

0.0215

m3

49,500.00

1,064.25

Semen Warna

1.3000

Kg

49,500.00

64,350.00

Perkerja

0.2500

Oh

#N/A

#N/A

Tukang Batu

0.120

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0125
0.0125

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Ubin Granito ukuran 30 x 30 cm

#N/A

#N/A

#N/A

Bahan
Ubin Granito 30 x 30 cm
Semen Portland

11.870
10.000

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.0215

m3

49,500.00

1,064.25

Semen Warna

1.5000

Kg

49,500.00

74,250.00

Perkerja

0.2600

Oh

#N/A

#N/A

Tukang Batu

0.125

Oh

#N/A

#N/A

Kepala Tukang

0.0125

Oh

#N/A

#N/A

Mandor

0.0130

Oh

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm


Bahan

#N/A

Ubin Teralux Kerang 40 x 40 cm

6.250

bh

#N/A

#N/A

Semen Portland
Pasir Pasang

8.800
0.0215

Kg
m3

#N/A
49,500.00

#N/A
1,064.25

Semen Warna

1.3000

Kg

49,500.00

64,350.00

Perkerja
Tukang Batu

0.2500
0.120

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm


Bahan

#N/A

Ubin Teralux Kerang 30 x 30 cm

11.807

bh

#N/A

Semen Portland

10.000

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.0215
1.1250

m3
Kg

49,500.00
49,500.00

1,064.25
55,687.50

Perkerja

0.2500

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.120
0.0120

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0125

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm


Bahan

#N/A

Ubin Teralux Marmer 60 x 60 cm

5.600

bh

#N/A

Semen Portland

8.190

Kg

#N/A

#N/A
#N/A

Pasir Pasang

0.0450

m3

49,500.00

2,227.50

Semen Warna

1.0000

Kg

49,500.00

49,500.00

#N/A

#N/A

Tenaga
Perkerja

0.2500

Oh

#N/A

#N/A

Tukang Batu

0.120

Oh

#N/A

#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0125

Oh

#N/A

#N/A
#N/A

1 m Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm


Bahan

#N/A

Ubin Teralux Marmer 40 x 40 cm


Semen Portland

6.250
8.800

bh
Kg

#N/A
#N/A

Pasir Pasang

0.0215

m3

49,500.00

1,064.25

Semen Warna

1.3000

Kg

49,500.00

64,350.00

Tenaga
Perkerja

0.6720

Oh

#N/A

#N/A

Tukang Batu

0.224

Oh

#N/A

#N/A

Kepala Tukang

0.0220

Oh

#N/A

#N/A

Mandor

0.0340

Oh

#N/A

#N/A

#N/A

#N/A
#N/A

#N/A

1 m Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm


Bahan

#N/A

Ubin Teralux Marmer 30 x 30 cm

11.870

bh

#N/A

Semen Portland

10.000

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.0215
1.5000

m3
Kg

49,500.00
49,500.00

1,064.25
74,250.00

Perkerja
Tukang Batu

0.7000
0.340

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0340

Oh

#N/A

#N/A

Mandor

0.0350

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm


Bahan

#N/A

#N/A

Plint Ubin PC Abu - abu 15 x 20 cm

5.300

bh

#N/A

Semen Portland

1.560

Kg

#N/A

#N/A

Pasir Pasang

0.0040

m3

49,500.00

198.00

Perkerja

0.0600

Oh

#N/A

#N/A

Tukang Batu

0.030

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0030
0.0030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm


Bahan

#N/A

Plint Ubin PC Abu -abu 10 x 30 cm


Semen Portland

3.530
1.560

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.0030

m3

49,500.00

148.50

Perkerja
Tukang Batu

0.0600
0.030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0030

Oh

#N/A

#N/A

Mandor

0.0030

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm


Bahan

#N/A

#N/A

Plint Ubin PC Abu - abu 10 x 40 cm

2.650

bh

#N/A

Semen Portland

1.560

Kg

#N/A

#N/A

Pasir Pasang

0.0030

m3

49,500.00

148.50

Perkerja

0.0600

Oh

#N/A

#N/A

Tukang Batu

0.030

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0030
0.0030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin PC Warna ukuran 10 x 20 cm

#N/A

#N/A

Bahan
Plint Ubin PC Warna 10 x 20 cm
Semen Portland

5.300
1.200

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.0030

m3

49,500.00

148.50

Semen Warna

0.1900

Kg

#N/A

#N/A

Perkerja

0.0600

Oh

#N/A

#N/A

Tukang Batu

0.030

Oh

#N/A

#N/A

Kepala Tukang

0.0030

Oh

#N/A

#N/A

Mandor

0.0030

Oh

#N/A

#N/A

Tenaga

#N/A

#N/A

1 m Pasang Plint Ubin PC Warna ukuran 10 x 30 cm


Bahan

#N/A

Plint Ubin PC Warna 10 x 30 cm

3.330

bh

#N/A

Semen Portland

1.650

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.0032
0.1000

m3
Kg

49,500.00
#N/A

158.40
#N/A

Perkerja
Tukang Batu

0.0600
0.030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0030

Oh

#N/A

#N/A

Mandor

0.0030

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin PC Warna ukuran 10 x 40 cm


Bahan

#N/A

#N/A

Plint Ubin PC Warna 10 x 40 cm

2.650

bh

#N/A

Semen Portland

1.200

Kg

#N/A

#N/A

Pasir Pasang

0.0030

m3

49,500.00

148.50

Semen Warna

0.1000

Kg

#N/A

#N/A

Perkerja

0.0800

Oh

#N/A

#N/A

Tukang Batu

0.040

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0040
0.0040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin Teraso ukuran 10 x 30 cm

#N/A

#N/A

Bahan
Plint Ubin Teraso 10 x 30 cm

3.530

bh

#N/A

Semen Portland

1.560

Kg

#N/A

#N/A

Pasir Pasang

0.0030

m3

49,500.00

148.50

Semen Warna

0.1900

Kg

#N/A

#N/A

Perkerja

0.0800

Oh

#N/A

#N/A

Tukang Batu

0.040

Oh

#N/A

#N/A

Kepala Tukang

0.0040

Oh

#N/A

#N/A

Mandor

0.0040

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Plint Ubin Teraso ukuran 10 x 40 cm


Bahan

#N/A

Plint Ubin Teraso 10 x 40 cm


Semen Portland

2.650
1.200

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.0030

m3

49,500.00

148.50

Semen Warna

0.1000

Kg

#N/A

#N/A

Tenaga
Perkerja

0.0800

Oh

#N/A

#N/A

Tukang Batu

0.040

Oh

#N/A

#N/A

Kepala Tukang

0.0040

Oh

#N/A

#N/A

Mandor

0.0040

Oh

#N/A

#N/A
#N/A

1 m Pasang Plint Ubin Granito ukuran 10 x 40 cm


Bahan

#N/A

Plint Ubin Granito 10 x 40 cm

2.650

bh

#N/A

Semen Portland

1.200

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.0030
0.1000

m3
Kg

49,500.00
#N/A

148.50
#N/A

Perkerja
Tukang Batu

0.0600
0.030

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0030

Oh

#N/A

#N/A

Mandor

0.0030

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin Granito ukuran 10 x 30 cm


Bahan

#N/A

#N/A

Plint Ubin Granito 10 x 30 cm

3.330

bh

#N/A

Semen Portland

1.650

Kg

#N/A

#N/A

Pasir Pasang

0.0032

m3

49,500.00

158.40

Semen Warna

0.1000

Kg

#N/A

#N/A

Perkerja

0.9000

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.090
0.0090

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0045

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm


Bahan
Plint Ubin Teralux Kerang 10 x 40 cm

#N/A
2.500

bh

#N/A

#N/A

#N/A

#N/A

Semen Portland

1.650

Kg

#N/A

#N/A

Pasir Pasang

0.0032

m3

49,500.00

158.40

Semen Warna

0.1000

Kg

#N/A

#N/A

Tenaga
Perkerja

0.9000

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0045

Oh

#N/A

#N/A
#N/A

1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm


Bahan

#N/A

Plint Ubin Teralux Kerang 10 x 30 cm

3.330

bh

#N/A

#N/A

Semen Portland
Pasir Pasang

1.650
0.0032

Kg
m3

#N/A
49,500.00

#N/A
158.40

Semen Warna

0.1000

Kg

#N/A

#N/A

Perkerja
Tukang Batu

0.9000
0.090

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0045

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm


Bahan

#N/A

#N/A

Plint Ubin Teralux Marmer 10 x 60 cm

1.700

bh

#N/A

Semen Portland

1.650

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.0032
0.1000

m3
Kg

49,500.00
#N/A

158.40
#N/A

Perkerja

0.9000

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.090
0.0090

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0045

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm

#N/A

#N/A

Bahan
Plint Ubin Teralux Marmer 10 x 40 cm

2.500

bh

#N/A

Semen Portland

1.650

Kg

#N/A

#N/A

Pasir Pasang

0.0032

m3

49,500.00

158.40

Semen Warna

0.1000

Kg

#N/A

#N/A

Perkerja

0.9000

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0090
0.0045

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm

#N/A

#N/A

#N/A

Bahan
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland

3.330
1.650

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.0032

m3

49,500.00

158.40

Semen Warna

0.1000

Kg

#N/A

#N/A

Tenaga
Perkerja

0.9000

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0045

Oh

#N/A

#N/A
#N/A

1 m Pasang Teraso Cor ditempat


Bahan
Bahan Teraso Cor

#N/A

#N/A

0.0036

m3

Perkerja

0.9000

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0045

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Teralux Cor ditempat, tebal 3 cm


Bahan
Bahan Teraso Cor

#N/A

#N/A

0.0036

m3

#N/A

Perkerja

0.9000

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0090
0.0045

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

#N/A

1 m Pasang Ubin Tahan Asam


Bahan

#N/A

Ubin Tahan Asam

1.0500

m2

#N/A

#N/A

Semen Tanam Asam


Pasir Pasang

14.1400
0.0400

Kg
m3

#N/A
49,500.00

#N/A
1,980.00

Perkerja
Tukang Batu

0.2700
0.150

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0150

Oh

#N/A

#N/A

Mandor

0.0135

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Keramik Artistik 10 x 20 cm


Bahan

#N/A

#N/A

Ubin Keramik Artistik 10 x 20 cm

5.0000

bh

#N/A

Semen Portland

11.3800

Kg

#N/A

#N/A

Pasir Pasang

0.0420

m3

49,500.00

2,079.00

Semen Warna

1.5000

Kg

49,500.00

74,250.00

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0350
0.0300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm

#N/A

#N/A

Bahan
Plint Keramik Artistik 10 x 20 cm

5.000

bh

#N/A

Semen Portland

1.650

Kg

#N/A

#N/A

Pasir Pasang

0.0032

m3

49,500.00

158.40

Semen Warna

0.1000

Kg

#N/A

#N/A

Perkerja

0.0900

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0045

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm

#N/A

#N/A

#N/A

Bahan
Plint Keramik Artistik 10 x 10 cm
Semen Portland

5.000
1.650

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.0032

m3

49,500.00

158.40

Semen Warna

0.1200

Kg

#N/A

#N/A

Tenaga
Perkerja

0.0900

Oh

#N/A

#N/A

Tukang Batu

0.090

Oh

#N/A

#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0045

Oh

#N/A

#N/A

1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm

#N/A

#N/A

#N/A

Bahan
Plint Keramik Artistik 5 x 20 cm

5.000

bh

#N/A

Semen Portland

0.850

Kg

#N/A

#N/A
#N/A

Pasir Pasang
Semen Warna

0.0022
0.0800

m3
Kg

49,500.00
#N/A

108.90
#N/A

Perkerja
Tukang Batu

0.0900
0.090

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0090

Oh

#N/A

#N/A

Mandor

0.0045

Oh

#N/A

#N/A

Tenaga

1 m' Pasang Plint Vinyl tanpa adukan

#N/A

#N/A

#N/A

Bahan
Lt. Vinyl Karet 30 x 30 kwl I

3.500

bh

#N/A

#N/A

Lem Vinyl

0.080

Kg

49,500.00

3,960.00

Perkerja

0.0800

Oh

#N/A

#N/A

Tukang Batu

0.080

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0080
0.0040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

1 m Pasang Lantai Keramik 10 x 20 cm


Bahan
Ubin Keramik 10 x 20 cm
Semen Portland

50.000
11.380

bh
Kg

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Pasir Pasang

0.042

m3

49,500.00

2,079.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja
Tukang Batu

0.6200
0.350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Keramik 15 x 15 cm


Bahan

#N/A

Ubin Keramik 15 x 15 cm

44.000

bh

#N/A

Semen Portland

11.380

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.042
1.500

m3
Kg

49,500.00
49,500.00

2,079.00
74,250.00

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.350
0.0350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Keramik 20 x 20 cm

#N/A

#N/A

Bahan
Ubin Keramik 20 x 20 cm

25.000

bh

#N/A

Semen Portland

11.380

Kg

#N/A

#N/A

Pasir Pasang

0.042

m3

49,500.00

2,079.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0350
0.0300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Keramik 25 x 25 cm

#N/A

#N/A

#N/A

Bahan
Ubin Keramik 25 x 25 cm
Semen Portland

16.000
11.380

bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.042

m3

49,500.00

2,079.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Keramik 15 x 20 cm


Bahan

#N/A

Ubin Keramik 15 x 20 cm

35.000

bh

#N/A

#N/A

Semen Portland
Pasir Pasang

11.380
0.042

Kg
m3

#N/A
49,500.00

#N/A
2,079.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja
Tukang Batu

0.6200
0.350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Keramik 33 x 33 cm


Bahan

#N/A

Ubin Keramik 33 x 33 cm

10.000

bh

#N/A

Semen Portland

11.380

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.042
1.500

m3
Kg

49,500.00
49,500.00

2,079.00
74,250.00

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.350
0.0350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Keramik 33 x 33 cm anti slip


Bahan

#N/A

Ubin Keramik 33 x 33 cm anti slip

10.000

bh

#N/A

Semen Portland

11.380

Kg

#N/A

#N/A
#N/A

Pasir Pasang

0.042

m3

49,500.00

2,079.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

#N/A

#N/A

Tenaga
Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A
#N/A

1 m Pasang Lantai Keramik 10 x 33 cm


Bahan

#N/A

Ubin Keramik 10 x 33 cm
Semen Portland

33.000
11.380

bh
Kg

#N/A
#N/A

Pasir Pasang

0.042

m3

49,500.00

2,079.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Tenaga
Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A
#N/A

#N/A

1 m Pasang Lantai Mozaik 30 x 30 cm, ex lokal


Bahan

#N/A

Mozaik 30 x 30 cm

12.000

bh

#N/A

Semen Portland

14.150

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.039
2.000

m3
Kg

49,500.00
49,500.00

1,930.50
99,000.00

Perkerja
Tukang Batu

0.6200
0.350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Marmer


Bahan

#N/A

#N/A

Marmer

1.052

M2

#N/A

Semen Portland

14.150

Kg

#N/A

#N/A

Pasir Pasang

0.039

m3

49,500.00

1,930.50

Semen Warna

2.000

Kg

49,500.00

99,000.00

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.350
0.0350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Karpet 100% Wool

#N/A

#N/A

Bahan
Feltex 100% Wool - T - 21

1.050

m2

#N/A

#N/A

Lem Vinyl

0.350

Kg

49,500.00

17,325.00

Perkerja
Tukang Batu

0.1700
0.170

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0170

Oh

#N/A

#N/A

Mandor

0.0085

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Lantai Karpet 100% Wool, 20% Nylon


Bahan

#N/A

#N/A

Carpet 80% Wool, 20% Nylon

1.050

m2

#N/A

#N/A

Lem Vinyl

0.350

Kg

49,500.00

17,325.00

Perkerja

0.1700

Oh

#N/A

#N/A

Tukang Batu

0.170

Oh

#N/A

#N/A

Kepala Tukang

0.0170

Oh

#N/A

#N/A

Mandor

0.0085

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Underlyer, tebal 6 mm


Bahan
Underlyer, tebal 6 mm / Rubber Corrugated

#N/A

#N/A

1.050

m2

Perkerja

0.1200

Oh

#N/A

#N/A

Tukang Batu

0.120

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0120
0.0060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Lantai Karpet


Bahan
Carpet
Lem Vinyl

1.050
0.350

m2
Kg

#N/A
49,500.00

#N/A
17,325.00

#N/A

#N/A

Tenaga
Perkerja

0.1700

Oh

#N/A

#N/A

Tukang Batu

0.170

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0170
0.0085

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m Pasang Lantai Parquet Jati

#N/A

#N/A

Bahan
Parquet Jati

1.050

m2

#N/A

#N/A

Lem Vinyl

0.600

Kg

49,500.00

29,700.00

Perkerja
Tukang Batu

0.6500
0.350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0325

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Dinding Porselen 11 x 11 cm, putih


Bahan

#N/A

Porselen 11 x 11 cm putih

83.000

Bh

#N/A

Semen Abu -abu

9.300

Kg

#N/A

#N/A

Pasir Pasang
Semen Warna

0.018
1.500

m3
Kg

49,500.00
49,500.00

891.00
74,250.00

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.500
0.0500

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Dinding Porselen 11 x 11 cm, warna

#N/A

#N/A

Bahan
Porselen 11 x 11 cm warna

83.000

Bh

#N/A

Semen Abu -abu

9.300

Kg

#N/A

#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Tenaga
Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.500

Oh

#N/A

#N/A

Kepala Tukang

0.0500

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1 m Pasang Dinding Porselen 15 x 15 cm, putih


Bahan

#N/A

Porselen 15 x 15 cm putih

45.000

Bh

#N/A

#N/A

Semen Abu -abu


Pasir Pasang

9.300
0.018

Kg
m3

#N/A
49,500.00

#N/A
891.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja

0.6000

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.450
0.0450

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Dinding Porselen 15 x 15 cm, warna

#N/A

#N/A

Bahan
Porselen 15 x 15 cm warna

45.000

Bh

#N/A

Semen Abu -abu

9.300

Kg

#N/A

#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

Semen Warna
Tenaga

1.500

Kg

49,500.00

74,250.00

Perkerja

0.6000

Oh

#N/A

#N/A

Tukang Batu

0.450

Oh

#N/A

#N/A

Kepala Tukang

0.0450

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1 m Pasang Dinding Porselen 10 x 20 cm, warna


Bahan

#N/A

Porselen 10 x 20 cm warna

50.000

Bh

#N/A

#N/A

Semen Abu -abu


Pasir Pasang

9.300
0.018

Kg
m3

#N/A
49,500.00

#N/A
891.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja
Tukang Batu

0.6000
0.450

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0450

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Dinding Porselen 20 x 20 cm, warna


Bahan

#N/A

#N/A

#N/A

Porselen 20 x 20 cm warna

25.000

Bh

#N/A

Semen Abu -abu

9.300

Kg

#N/A

#N/A
#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Tenaga
Perkerja

0.6000

Oh

#N/A

#N/A

Tukang Batu

0.450

Oh

#N/A

#N/A

Kepala Tukang

0.0450

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A
#N/A

1 m Pasang Dinding Keramik Artistik 10 x 20 cm, warna


Bahan
Keramik Artistik 10 x 20 cm

#N/A

100.000

Bh

#N/A

#N/A

Semen Abu -abu


Pasir Pasang

9.300
0.018

Kg
m3

#N/A
49,500.00

#N/A
891.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja

0.6000

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.450
0.0450

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Dinding Keramik Artistik 5 x 20 cm, warna


Bahan
Keramik Artistik 5 x 20 cm

#N/A

#N/A

100.000

Bh

#N/A

Semen Abu -abu

9.300

Kg

#N/A

#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

Semen Warna
Tenaga

1.500

Kg

49,500.00

74,250.00

Perkerja

0.6000

Oh

#N/A

#N/A

Tukang Batu

0.450

Oh

#N/A

#N/A

Kepala Tukang

0.0450

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1 m Pasang Dinding Keramik 10 x 20 cm


Bahan

#N/A

Keramik 10 x 20 cm

50.000

Bh

#N/A

#N/A

Semen Abu -abu


Pasir Pasang

9.300
0.018

Kg
m3

#N/A
49,500.00

#N/A
891.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja
Tukang Batu

0.6000
0.450

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0450

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Dinding Keramik 15 x 15 cm


Bahan

#N/A

#N/A

Keramik 15 x 15 cm

45.000

Bh

#N/A

Semen Abu -abu

9.300

Kg

#N/A

#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

Semen Warna
Tenaga

1.500

Kg

49,500.00

74,250.00

Perkerja

0.6000

Oh

#N/A

#N/A

Tukang Batu

0.450

Oh

#N/A

#N/A

Kepala Tukang

0.0450

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1 m Pasang Dinding Keramik 20 x 20 cm


Bahan

#N/A

Keramik 20 x 20 cm
Semen Abu -abu

25.000
9.300

Bh
Kg

#N/A
#N/A

Pasir Pasang

0.018

m3

49,500.00

891.00

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja
Tukang Batu

0.6000
0.100

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0450

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A
#N/A

Tenaga

1 m Pasang Dinding Keramik 10 x 20 cm


Bahan

#N/A

#N/A

Keramik 10 x 20 cm

50.000

Bh

#N/A

Semen Abu -abu

9.300

Kg

#N/A

#N/A
#N/A

Pasir Pasang
Semen Warna

0.018
1.500

m3
Kg

49,500.00
49,500.00

891.00
74,250.00

Perkerja

0.6000

Oh

#N/A

#N/A

Tukang Batu

0.125

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0125
0.0300

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

#N/A

1 m Pasang Dinding Marmer


Bahan

#N/A

Marmer

1.020

M2

#N/A

#N/A

Semen Abu -abu


Pasir Pasang

12.440
0.025

Kg
m3

#N/A
49,500.00

#N/A
1,237.50

Semen Warna

1.500

Kg

49,500.00

74,250.00

Perkerja
Tukang Batu

0.7200
0.650

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0650

Oh

#N/A

#N/A

Mandor

0.0350

Oh

#N/A

#N/A

#N/A

Tenaga

#N/A

1 m Pasang Dinding Bata Klinker 5 x 5 x 24 cm


Bahan

#N/A

Bata Pelapis Klinker

80.000

Bh

#N/A

Semen Abu -abu

12.440

Kg

#N/A

#N/A

Pasir Pasang
Tenaga

0.025

m3

49,500.00

1,237.50

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1 m Pasang Dinding Batu Paros


Bahan

#N/A

Batu Paros
Semen Abu -abu

1.050
11.750

Bh
Kg

#N/A
#N/A

#N/A
#N/A

Pasir Pasang

0.035

m3

49,500.00

1,732.50

Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu
Kepala Tukang

0.350
0.0350

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pasang Dinding Batu Tempel Hitam

#N/A

#N/A

Bahan
Batu Tempel Hitam

1.050

Bh

#N/A

Semen Abu -abu

11.750

Kg

#N/A

#N/A

Pasir Pasang

0.035

m3

49,500.00

1,732.50

Tenaga
Perkerja

0.6200

Oh

#N/A

#N/A

Tukang Batu

0.350

Oh

#N/A

#N/A

Kepala Tukang

0.0350

Oh

#N/A

#N/A

Mandor

0.0300

Oh

#N/A

#N/A

#N/A

#N/A

1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL I


Bahan

#N/A

Vinyl Karet 30 x 30 cm KL I

11.050

Bh

#N/A

#N/A

Lem Vinyl

0.350

Kg

#N/A

#N/A

Tenaga
Perkerja

0.1500

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.0150

Oh

#N/A

#N/A

Mandor

0.0075

Oh

#N/A

#N/A
#N/A

1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL II


Bahan

#N/A

Vinyl Karet 30 x 30 cm KL II

11.050

Bh

#N/A

#N/A

Lem Vinyl
Tenaga

0.350

Kg

#N/A

#N/A

Perkerja

0.1500

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.0150

Oh

#N/A

#N/A

Mandor

0.0075

Oh

#N/A

#N/A
#N/A

1 m Pasang Lantai Vinyl Asbes 30 x 30 cm


Bahan

#N/A

Vinyl Asbes 30 x 30 cm

11.050

Bh

#N/A

#N/A

Lem Vinyl
Tenaga

0.350

Kg

#N/A

#N/A

Perkerja

0.1500

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0150
0.0075

Oh
Oh

#N/A
#N/A

#N/A
#N/A
#N/A

1 m Pasang Lantai Vinyl Motif Kembang 30 x 30 cm


Bahan
Vinyl Motif Kembang ex DN
Lem Vinyl

11.050
0.350

Bh
Kg

#N/A
#N/A

#N/A

#N/A
#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Tenaga
Perkerja

0.1500

Oh

#N/A

#N/A

Tukang Batu

0.150

Oh

#N/A

#N/A

Kepala Tukang

0.0150

Oh

#N/A

#N/A

Mandor

0.0075

Oh

#N/A

#N/A
#N/A

1 m Pasang Wall Covering lebar 50 cm


Bahan
Vinyl Wall Covering lebar 50 cm
Lem

#N/A
#N/A

#N/A

1.100
0.250

m2
Kg

Perkerja

0.7500

Oh

#N/A

#N/A

Tukang Batu

0.170

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0170
0.0085

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A
#N/A

Tenaga

1 m Floor Hardener Ferrovax

#N/A

#N/A

#N/A

Bahan
Floor Hardener Ferrovax
Tenaga

3.000

Kg

#N/A

#N/A

Perkerja

0.1200

Oh

#N/A

#N/A

Tukang Batu

0.120

Oh

#N/A

#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0060

Oh

#N/A

#N/A
#N/A

1 m Floor Hardener Mastercron


Bahan
#N/A

Floor Hardener Ferrovax


Tenaga

5.000

Kg

Perkerja

0.1200

Oh

#N/A

#N/A

Tukang Batu

0.120

Oh

#N/A

#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0060

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

1 m Plint Kayu 2 x 10 cm
Bahan

VI

#N/A

#N/A

Papan Kayu Jati

0.002

m3

#N/A

#N/A

Paku Skrup 3.5"


Tenaga

0.050

Kg

49,500.00

2,475.00

Perkerja

0.1200

Oh

#N/A

#N/A

Tukang Kayu

0.120

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0120
0.0060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

PEKERJAAN PENGECATAN
1 m Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api

#N/A
#N/A

#N/A

0.050

Kg

0.1500

Oh

#N/A

#N/A

Oh

#N/A

#N/A

0.0025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mencuci Bidang Permukaan Tembok yang Pernah dicat

#N/A

#N/A

#N/A

Bahan
Sabun
Tenaga

0.050

Kg

Perkerja

0.1500

Oh

#N/A

#N/A

Oh

#N/A

#N/A

0.0025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tukang Cat
Kepala Tukang
Mandor

#N/A

#N/A

1 m Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual

#N/A

#N/A

#N/A

Bahan
Sabun
Tenaga

0.050

Kg

Perkerja

#N/A

#N/A

0.1500

Oh

#N/A

#N/A

Tukang Cat

Oh

#N/A

#N/A

Kepala Tukang

Oh

#N/A

#N/A

0.0025

Oh

#N/A

#N/A

Mandor

#N/A

1 m Menyabun Permukaan Tembok Lama


Bahan
Sabun
Tenaga

0.050

Kg

Perkerja

#N/A

#N/A

#N/A

0.1500

Oh

#N/A

#N/A

Tukang Cat

Oh

#N/A

#N/A

Kepala Tukang

Oh

#N/A

#N/A

0.0025

Oh

#N/A

#N/A

Mandor

#N/A

1 m Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2.
Bahan

#N/A

Pasir Silika

40.000

Kg

#N/A

#N/A

BBM

10.000

Ltr

#N/A

#N/A

Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle

#N/A

#N/A

sewa / Hr

Tenaga
Perkerja

1.6000

Oh

#N/A

#N/A

Tukang Cat
Kepala Tukang

1.600
0.8000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.5000

Oh

#N/A

#N/A

1 m Mendempul dan Menggosok Kayu

#N/A

#N/A

Bahan
Dempul Jadi

0.080

Kg

#N/A

#N/A

Minyak Cat

0.020

Kg

#N/A

#N/A

Batu Apung

0.010

Kg

#N/A

#N/A

Perkerja
Tukang Cat

0.0400
0.040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0040

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Mengecatan Bidang Kayu Lama


Bahan

#N/A

#N/A

Plamir

0.150

Kg

#N/A

#N/A

Cat Dasar

0.170

Kg

#N/A

#N/A

Cat Penutup
Tenaga

0.170

Kg

#N/A

#N/A

Perkerja

0.0700

Oh

#N/A

#N/A

Tukang Cat

0.075

Oh

#N/A

#N/A

Kepala Tukang

0.0075

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A
#N/A

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan

#N/A

Cat Meni

0.200

Kg

#N/A

#N/A

Plamir
Cat Dasar

0.150
0.170

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Cat Kayu glotek

0.260

Kg

49,500.00

12,870.00

Tenaga
Perkerja

0.0700

Oh

#N/A

#N/A

Tukang Cat

0.009

Oh

#N/A

#N/A

Kepala Tukang

0.0060

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A
#N/A

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan

#N/A

Cat Meni

0.200

Kg

#N/A

#N/A

Plamir

0.150

Kg

#N/A

#N/A

Cat Dasar
Cat Kayu glotek

0.170
0.350

Kg
Kg

#N/A
49,500.00

#N/A
17,325.00

Perkerja

0.0700

Oh

#N/A

#N/A

Tukang Cat
Kepala Tukang

0.105
0.0040

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0025

Oh

#N/A

#N/A

#N/A

#N/A

#N/A

Tenaga

1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan

#N/A

#N/A

Cat Meni

0.200

Kg

#N/A

#N/A

Plamir

0.150

Kg

#N/A

#N/A

Cat Dasar

0.170

Kg

#N/A

#N/A

Cat Kayu glotek

0.350

Kg

49,500.00

17,325.00

Perkerja

0.0700

Oh

#N/A

#N/A

Tukang Cat

0.105

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0040
0.0025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

Tenaga

1 m Pelaburan Bidang Kayu dengan Teak Oil


Bahan
Teak Oil

#N/A
#N/A

#N/A

0.360

Ltr

#N/A

Perkerja

0.0400

Oh

#N/A

#N/A

Tukang Cat

0.063

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0630
0.0025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

#N/A

1 m Pelaburan Bidang Kayu dengan Pelitur


Bahan

#N/A

Pelitur

0.150

Ltr

#N/A

#N/A

Pelitur Jadi
Ampelas

0.372
2.000

Ltr
Lbr

#N/A
#N/A

#N/A
#N/A

Perkerja

0.0400

Oh

#N/A

#N/A

Tukang Cat
Kepala Tukang

0.063
0.0630

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.0025

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pelaburan Bidang Kayu dengan Cat Residu dan Ter


Bahan
Residu atau Ter

#N/A
#N/A

#N/A

0.350

Ltr

0.1000

Oh

#N/A

#N/A

Oh

#N/A

#N/A

0.0060

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pelaburan Bidang Kayu dengan Vernis

#N/A

#N/A

#N/A

Bahan
Vernis
Dempul

0.150
0.050

Ltr
Kg

#N/A
#N/A

#N/A
#N/A

Ampelas

0.100

Lbr

#N/A

#N/A

Kuas

0.010

Bh

#N/A

#N/A

Tenaga
Perkerja

0.1600

Oh

#N/A

#N/A

Tukang Cat

0.160

Oh

#N/A

#N/A

Kepala Tukang

0.0160

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A
#N/A

1 m Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan

#N/A

Plamir

0.100

Kg

#N/A

Cat Dasar

0.100

Kg

#N/A

#N/A

Cat Tembok vinilex


Tenaga

0.260

Kg

49,500.00

12,870.00

Perkerja

0.0200

Oh

#N/A

#N/A

Tukang Cat

0.063

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0063
0.0025

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

#N/A

#N/A

1 m Melabur Tembok dengan Kapur Sirih


Bahan

#N/A

Ampelas
Alang - alang

0.100
0.250

Lbr
ikat

#N/A
#N/A

#N/A
#N/A

Perancah Kayu

0.002

m3

#N/A

#N/A

Kapur Sirih

0.150

Kg

#N/A

#N/A

Perkerja
Tukang Cat

0.1500
0.001

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Kepala Tukang

0.0001

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan )


Bahan

#N/A

#N/A

Perancah Kayu

0.002

m3

#N/A

#N/A

Kapur Sirih

0.300

Kg

#N/A

#N/A

Tenaga
Perkerja

0.0400

Oh

#N/A

#N/A

Tukang Cat

0.005

Oh

#N/A

#N/A

Kepala Tukang

0.0005

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A
#N/A

1 m Pemasangan Wall Paper


Bahan

#N/A

Wall Paper

1.200

m3

#N/A

#N/A

Perekat

0.200

Kg

#N/A

#N/A

Tenaga
Perkerja

0.0200

Oh

#N/A

#N/A

Tukang Cat

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.0020

Oh

#N/A

#N/A

Mandor

0.0025

Oh

#N/A

#N/A
#N/A

1 m Pengecatan Permukaan Baja dengan Meni Besi


Bahan
Meni Besi

0.100

Kg

#N/A

#N/A

Kuas
Tenaga

0.010

Bh

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Perkerja

0.0200

Oh

#N/A

#N/A

Tukang Cat

0.200

Oh

#N/A

#N/A

Kepala Tukang

0.0200

Oh

#N/A

#N/A

Mandor

0.0100

Oh

#N/A

#N/A
#N/A

1 m Pengecatan Permukaan Baja dengan Meni Besi dan Perancah


Bahan

#N/A

Meni Besi

0.100

Kg

#N/A

#N/A

Kuas
Perancah Kayu

0.010
0.002

Bh
m3

#N/A
#N/A

#N/A
#N/A

Perkerja

0.2500

Oh

#N/A

#N/A

Tukang Cat

0.225

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0225
0.0075

Oh
Oh

#N/A
#N/A

#N/A
#N/A

#N/A

Tenaga

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um

#N/A

#N/A

#N/A

Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B

0.100
0.100

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Alluminium C

0.040

Kg

#N/A

#N/A

Alluminium B

0.040

Kg

#N/A

#N/A

Pengencer

0.010

Ltr

#N/A

#N/A

Perancah Kayu
Tenaga

0.002

m3

#N/A

#N/A

Perkerja

0.0060

Oh

#N/A

#N/A

Tukang Cat

0.006

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.0225
0.0075

Oh
Oh

#N/A
#N/A

#N/A
#N/A

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um

14,850.00

#N/A

#N/A

Bahan
Meni Besi
Tenaga

0.300

Kg

49,500.00

14,850.00

Perkerja

0.0060

Oh

#N/A

#N/A

Tukang Cat

0.060

Oh

#N/A

#N/A

Kepala Tukang

0.0120

Oh

#N/A

#N/A

Mandor

0.0060

Oh

#N/A

#N/A

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um
Bahan

#N/A

#N/A

Cat Dasar
Cat Antara

0.110
0.170

Kg
Kg

#N/A
#N/A

#N/A
#N/A

Cat Penutup

0.080

Kg

#N/A

#N/A

Perkerja

0.5000

Oh

#N/A

#N/A

Tukang Cat
Kepala Tukang

0.800
0.3000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Mandor

0.2000

Oh

#N/A

#N/A

#N/A

Tenaga

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um

#N/A

Bahan
Cat Dasar

#N/A

#N/A

#N/A

0.300

Kg

Perkerja

0.4000

Oh

#N/A

#N/A

Tukang Cat

0.700

Oh

#N/A

#N/A

Kepala Tukang
Mandor

0.2000
0.2000

Oh
Oh

#N/A
#N/A

#N/A
#N/A

Tenaga

#N/A

NO

NO

JENIS UPAH

SPESIFIKASI

harga real

SATUAN

Pekerja / knek

Rp

55,798.00 Oh

Tukang gali

Rp

65,734.00 Oh

Kepala tukang batu


Tukang batu

Rp

75,671.00 Oh

Rp

65,734.00 Oh

Kepala tukang kayu


Tukang kayu

Rp

75,671.00 Oh

Rp

65,734.00 Oh

Kepala tukang besi

Rp

75,671.00 Oh

Tukang besi
Kepala tukang cat

Rp

65,718.00 Oh

Rp

75,671.00 Oh

Tukang Cat
Tukang aspalt

Rp

65,734.00 Oh

Rp

65,734.00 Oh

Mandor/ pengawas

Rp

85,607.00 Oh

Instalator
Pembantu instalator

Rp

75,671.00 Oh

Rp

65,718.00 Oh

Tukang babat rumput


Tukang taman
Kepala tukang pasang pipa
Tukang pasang pipa
Operator alat besar

Rp

55,798.00 Oh

Rp

65,734.00 Oh

Rp

65,734.00 Oh

Rp

55,798.00 Oh

Rp

85,607.00 Oh

Pembantu operator alat besar


Tukang las

Rp

65,734.00 Oh

Rp

65,734.00 Oh

JENIS BAHAN

Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik Arm Strong Ukuran 30 x 120 cm
Akustik Armstrom 60 x 120cm
Alang - alang
Alluminium B
Alluminium C
Ampelas
Asbes
Asbes Gelombang
Atap Alluminium Gelombang tebal 0.55
Badkip
Bahan Teraso Cor
Bak Teraso
Bak cuci Stainless steel
Bak cuci Teraso
Bak Fiberglass
Balok Kayu Borneo
Balok Kayu Jati

SPESIFIKASI

harga real

SATUAN

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Balok Kayu Kamper


Balok Kayu Kruing

Rp

#N/A

Rp

#N/A

Bambu 6 - 8 / 600 cm
Bata merah kelas I

Rp

#N/A

Rp

Bata Pelapis Klinker

Rp

#N/A

Batacote
Batu Apung

Rp

#N/A

Rp

#N/A

Batu Belah 15 / 20
Batu Belah 5 / 20

Rp

#N/A

Rp

#N/A

Batu Belah 5 / 7

Rp

#N/A

Batu Granito
Batu Kerikil

Rp

#N/A

Rp

#N/A

Batu Koral
Batu Paros

Rp

#N/A

Rp

#N/A

Batu Tempel Hitam

Rp

#N/A

Batu Teraso
BBM

Rp

#N/A

Rp

#N/A

Besi Beton
Besi Beton ( Polos / Ulir )

Rp

#N/A

Rp

#N/A

Besi Beton Polos


Besi Jaring Kawat Baja
Besi Profil WF

Rp

#N/A

Rp

#N/A

Rp

#N/A

Besi Strip
Carpet
Carpet 80% Wool, 20% Nylon
Cat Tembok vinilex
Cat Antara

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Cat Dasar
Cat Meni
Cat Penutup
Cat Kayu glotek
Dempul
Dempul Jadi
Dolken Kayu Galam 8 - 10 / 4m
Dolken Kayu 8 - 10/400 cm
Dolken 8 / 4 m
Door Closer
Door Holder
Door Stop
Engsel Angin
Engsel Jendela
Engsel Pintu
Feltex 100% Wool - T - 21
Flincote / Meni Besi
Floor Hardener Ferrovax
Formika 4' x 3'
Formtie / penjaga jarak bekisting
Genteng Aspal
Genteng Beton
Genteng Bubung Kodok
Genteng Bubung Palentong
Genteng Decra Bond

vinilex

Genteng Kodok
Genteng Metal

Rp

#N/A

Rp

#N/A

Genteng Palentong
Genteng Palentong Super

Rp

#N/A

Rp

#N/A

Genteng Sirap

Rp

Gypsum
Ijuk

Rp

Rp

#N/A

Jendela Besi
Jendela Besi Tahan Api

Rp

#N/A

Rp

#N/A

Jendela Nako

Rp

#N/A

Kaca Buram
Kaca Cermin

Rp

#N/A

Rp

#N/A

Kaca Patri
Kaca Polos

Rp

#N/A

Rp

#N/A

Kaca Wireglass

Rp

#N/A

Kait Angin
Kapur Padam

Rp

#N/A

Rp

#N/A

Kapur Sirih
Kaso 5 / 7 ( albasiah )

Rp

#N/A

Rp

#N/A

Kawat Beton
Kawat Burung
Kawat Duri

Rp

#N/A

Rp

#N/A

Rp

#N/A

Kawat Harmonika
Kawat Kassa
Kawat Nyamuk
Kawat seng polos
Kayu Albasiah

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Kayu Balok Borneo


Kayu Balok Damar Laut
Kayu Balok Jati
Kayu Kaso 5 / 7 (borneo)
Kayu Papan 3 / 20 borneo
Kayu Profil
Kayu Terentang
Keramik 10 x 20 cm
Keramik 15 x 15 cm
Keramik 20 x 20 cm
Keramik Artistik 10 x 20 cm
Keramik Artistik 5 x 20 cm
Kloset Duduk / Monoblok
Kloset Jongkok Porselen
Kloset Jongkok Teraso
Kompresor, Blasting Pot , Selang Dan Nozzle
Koral Beton
Kran Air
Kuas
Kunci Lemari
Kunci Selot
Kunci Tanam
Kunsi Silinder
Kunsi Tanam Antik
Kunsi Tanam Biasa

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

#N/A
lbr

hr

Kunsi Tanam Kamar Mandi


Lem

Rp

#N/A

Rp

#N/A

Lem Kayu
Lem Vinyl

Rp

#N/A

Rp

#N/A

List Kayu Profil

Rp

#N/A

Lt. Vinyl Karet 30 x 30 kwl I


Marmer

Rp

#N/A

Rp

#N/A

Meni ( Read Lead ) A


Meni ( Read Lead ) B

Rp

#N/A

Rp

#N/A

Meni Besi

Rp

#N/A

Minyak Bekisting
Minyak Cat

Rp

#N/A

Rp

#N/A

Mozaik 30 x 30 cm
Nok Paten

Rp

#N/A

Rp

#N/A

Nok standar 40 cm 18, swg 22

Rp

#N/A

Nok Stel rata


Paku

Rp

#N/A

Rp

#N/A

Paku Biasa " - 1"


Paku Biasa " - 1" atau Sekrup

Rp

#N/A

Rp

#N/A

Paku Biasa 1/2" - 1"


Paku Biasa 2" - 5"
Paku Hak Pnjang 15 cm

Rp

#N/A

Rp

#N/A

Rp

#N/A

Paku Hak Pnjang 15 cm


Paku Pancing 60 x 230
Paku Sekrup
Paku Skrup 3.5"
Papan Kayu Borneo

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Papan Kayu Borneo tebal 3cm


Papan Kayu Jati
Papan Kayu Kamper
Papan Kayu Ramin
Parquet Jati
Pasir Beton
Pasir Pasang
Pasir Silika
Pasir Urug
Pasir Urug Darat
PC Warna
Pelat Asbes tebal 4 mm
Pelat Asbes tebal 5 mm
Pelitur
Pelitur Jadi
Pengencer
Perancah Kayu
Perekat
Pintu Allumunium
Pintu Besi Baja
Pintu gulung besi
Pintu Lipat
Pipa Beton
Pipa Galvanis
Pipa Tanah

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

Rp

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Plamir
Plamuur Tembok

Rp

#N/A

Rp

#N/A

Plastic Aerator
Plint Keramik Artistik 10 x 10 cm

Rp

#N/A

Rp

#N/A

Plint Keramik Artistik 10 x 20 cm

Rp

#N/A

Plint Keramik Artistik 5 x 20 cm


Plint Ubin PC Abu - abu 10 x 40 cm

Rp

#N/A

Rp

#N/A

Plint Ubin Granito 10 x 30 cm


Plint Ubin Granito 10 x 40 cm

Rp

#N/A

Rp

#N/A

Plint Ubin PC Abu - abu 15 x 20 cm

Rp

#N/A

Plint Ubin PC Abu -abu 10 x 30 cm


Plint Ubin PC Warna 10 x 20 cm

Rp

#N/A

Rp

#N/A

Plint Ubin PC Warna 10 x 30 cm


Plint Ubin PC Warna 10 x 40 cm

Rp

#N/A

Rp

#N/A

Plint Ubin Teralux Kerang 10 x 30 cm

Rp

#N/A

Plint Ubin Teralux Kerang 10 x 40 cm


Plint Ubin Teralux Marmer 10 x 30 cm

Rp

#N/A

Rp

#N/A

Plint Ubin Teralux Marmer 10 x 40 cm


Plint Ubin Teralux Marmer 10 x 60 cm

Rp

#N/A

Rp

#N/A

Plint Ubin Teraso 10 x 30 cm


Plint Ubin Teraso 10 x 40 cm
Plywood 4 mm

Rp

#N/A

Rp

#N/A

Rp

#N/A

Plywood 9 mm
Porselen ( 11 x 11 ) cm
Porselen 10 x 20 cm warna
Porselen 11 x 11 cm putih
Porselen 11 x 11 cm warna

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Porselen 15 x 15 cm putih
Porselen 15 x 15 cm warna
Porselen 20 x 20 cm warna
Profil Alluminium " T "
Ramset / Dinabolt
Rapidrant
Rel Pintu Dorong
Residu
Residu atau Ter
Rolling Door
Roof Light Fiberglass
Sabun
Seal tape
Semen Abu -abu
Semen Merah
Semen Nat
Semen Portland
Semen Tanam Asam
Semen Warna
Seng Gelombang 3" x 6" BJLS 28
Seng Gelombang BJLS 32
Seng Plat
Seng Plat 3 x 6 BJLS 24
Seng Plat 3" x 6" BJLS 28
Sisalation / Alluminium Foil

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Soda Api
Softboard 4' x 8' x 4mm

Rp

#N/A

Rp

#N/A

Spring Knip
Strorox - 100

Rp

#N/A

Rp

#N/A

Suncreen Allumunium

Rp

#N/A

Tali Ijuk
Teak Oil

Rp

#N/A

Rp

#N/A

Teakwood 4' x 8' x 4mm


Terali Besi 2 x 3

Rp

#N/A

Rp

#N/A

Ubin Abu -abu 20 x 20 cm

Rp

#N/A

Ubin Abu -abu 30 x 30 cm


Ubin Abu -abu 40 x40 cm

Rp

#N/A

Rp

#N/A

Ubin Granito 30 x 30 cm
Ubin Granito 40 x 40 cm

Rp

#N/A

Rp

#N/A

Ubin Keramik 10 x 33 cm

Rp

#N/A

Ubin Keramik 15 x 15 cm
Ubin Keramik 15 x 20 cm

Rp

#N/A

Rp

#N/A

Ubin Keramik 20 x 20 cm
Ubin Keramik 25 x 25 cm

Rp

#N/A

Rp

#N/A

Ubin Keramik 33 x 33 cm
Ubin Keramik 33 x 33 cm anti slip
Ubin Keramik 10 x 20 cm

Rp

#N/A

Rp

#N/A

Rp

#N/A

Ubin Keramik Artistik 10 x 20 cm


Ubin Tahan Asam
Ubin Teralux Kerang 30 x 30 cm
Ubin Teralux Kerang 40 x 40 cm
Ubin Teralux Marmer 30 x 30 cm

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Ubin Teralux Marmer 40 x 40 cm


Ubin Teralux Marmer 60 x 60 cm
Ubin Teraso 30 x 30 cm
Ubin Teraso 40 x 40 cm
Ubin Warna 20 x 20 cm
Ubin Warna 30 x 30 cm
Ubin Warna 40 x 40 cm
Underlyer, tebal 6 mm / Rubber Corrugated
Urinoir
Venetions Blinds
Vernis
Vinyl Asbes 30 x 30 cm
Vinyl Karet 30 x 30 cm KL I
Vinyl Karet 30 x 30 cm KL II
Vinyl Motif Kembang ex DN
Vinyl Wall Covering lebar 50 cm
Wall Paper
Water Drain + Asesories
Waterstop lebar 150 mm
Waterstop lebar 200 mm
Waterstop lebar 230 mm
Waterstop lebar 250 mm
Waterstop lebar 300 mm
Waterstop lebar 320 mm
Pipa Galvanis D 4"

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

#N/A

Rp

Rp

Bh

Rp

Bh

Rp

Bh

Rp

Bh

Rp

m2

Rp

m3

Rp

set

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

Rp

m'

#N/A

Pipa PVC D 1/2"


Pipa PVC tipe AW "

Rp

m'

Rp

m'

Pipa PVC tipe AW 1"


Pipa PVC tipe AW 1"

Rp

m'

Rp

m'

Pipa PVC tipe AW 2"

Rp

m'

Pipa PVC tipe AW 2"


Pipa PVC tipe AW 3"

Rp

m'

Rp

m'

Pipa PVC tipe AW 4"

Rp

m'

1 PEKERJAAN ABUTMEN JEMBATAN


a.
Galian Tanah
b
Beton Tumbuk
c
Pondasi
d
Dinding Decker Jembatan
e
Pondasi Sumuran

M^3
M^3
M^3
M^3
M^3

90.09
2.76
183.94
5.20
18.84

2 PEKERJAAN BETON
a
Balok Induk/Gelagar Memanj M^3
b
Balok Induk/Gelagar MelintanM^3
c
Balok Anak/Diafragma
M^3
d
Bantalan Beton
M^3
e
Pelat Jembatan
M^3
f
Pelat Trotoar
M^3
g
Pion Jembatan
M^3

21.60
8.64
1.44
5.47
14.40
14.04
0.30

3 PEKERJAAN PERPIPAAN
a
Besi Sandaran

48

4 PEKERJAAN PEMBESIAN
a
Pembesian Balok induk/Gelagar Memanjang
Tul Pokok D 25
Btg
60.00
D 22
Btg
0.00
Peminggang D 12
Btg
6.00
Sengkang D 10
Btg
92.50
D8
Btg
0.00
b

Pembesian Balok induk/Gelagar Melintang


Tul Pokok D 25
Btg
24.00
D 22
Btg
0.00
Peminggang D 12
Btg
3.00
Sengkang D 10
Btg
37.80
D8
Btg
0.00
Pembesian Balok Anak/Diafragma
D 25
Btg
Tul Pokok D 22
Btg
Peminggang D 12
Btg
Sengkang D 10
Btg
D8
Btg

0.00
7.00
0.00
7.00
0.00

84.00

Pembesian Bantalan Beton


D 25
D 22
D 12
D 10
D8

Btg
Btg
Btg
Btg
Btg

0.00
0.00
46.00
0.00
0.00

Pembesian Plat Jembatan


D 25
D 22
D 12
D 10
D8

Btg
Btg
Btg
Btg
Btg

0.00
0.00
224.00
0.00
0.00

Pembesian Trotoar
D 25
D 22
D 12
D 10
D8

Btg
Btg
Btg
Btg
Btg

0.00
0.00
52.00
0.00
0.00

Pembesian Pion Jembatan


D 25
D 22
D 12
D 10
D8

Btg
Btg
Btg
Btg
Btg

0.00
0.00
0.00
6.00
0.00

No
BAHAN
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
19
20

ALAT
1
2
3
4
5
6
UPAH
1
2
3
4

Jenis

Harga
Standar
Satuan
Kabupat
en

Harga Survey
TPK

Timbunan pilihan
Sirtu
Batu gunung
Kerikil
Batu Pecah 2-3 cm
Pasir Pasang
Pasir urug
Kayu/Papan Kls III
Besi 10 sigma
Besi 12 sigma
Besi 14 sigma
Besi ulir 16 sigma
Besi ulir 19 sigma
Besi ulir sigma
Besi ulir sigma
Pipa galvanis ~ 6 m
Semen PCc 50 kg
Paku
Kawat Beton

m3
m3
m3
m3
m3
m3
m3
m3
batang
batang
batang
batang
batang
batang
batang
batang
zak
Kg
Kg

100,000
150,000
170,000
450,000
450,000
175,000
80,000
2,100,000
69,000
100,000
165,000
179,000
253,600
338,700
439,900
234,000
77,000
30,000
30,000

Concrete Mixer
Gerobak
Ember cor
Sekop
cangkul
sendok semen

LS
Buah
Buah
Buah
Buah
Buah

200,000
400,000
12,000
75,000
75,000
35,000

Pekerja
Tukang
Kepala Tukang
Mandor

OH
OH

50,000
90,000
100,000
100,000

DAFTAR BESI (BAJA) POLOS BETON


Diameter
Luas Tampang Berat DiameterLuas Tampang
(mm)
(cm2)
(kg/m')
(mm)
(cm2)
4.5
0.16
0.125
34
9.07
5
0.20
0.154
35
9.62
5.5
0.24
0.186
36
10.17
6
0.28
0.222
38
11.34
6.5
0.33
0.260
40
12.56
6.8
0.36
0.285
42
13.85
7
0.38
0.302
44
15.20
8
0.50
0.394
46
16.61
8.5
0.57
0.445
48
18.09
9
0.64
0.499
48.5
18.47
10
0.79
0.616
50
19.63
12
1.13
0.887
55
23.75
13
1.33
1.041
60
28.26
14
1.54
1.208
65
33.17
15
1.77
1.387
70
38.47
16
2.01
1.578
75
44.16
18
2.54
1.997
80
50.24
19
2.83
2.225
85
56.72
20
3.14
2.465
90
63.59
22
3.80
2.983
95
70.85
25
4.91
3.851
100
78.50
26
5.31
4.166
110
94.99
28
6.15
4.831
120
113.04
30
7.07
5.546
130
132.67
32
8.04
6.310
140
153.86

Berat
(kg/m')
7.124
7.549
7.986
8.898
9.860
10.870
11.930
13.039
14.198
14.495
15.406
18.641
22.184
26.036
30.195
34.663
39.438
44.522
49.914
55.614
61.623
74.563
88.736
104.142
120.780

7850

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

No

: Abutmen Jembatan Sub Pekerjaan Persiapan


:
:
:

Uraian Pekerjaan

(a)
(b)
1 Pekerjaan Persiapan
a
Bahan
Papan Nama Kegiatan
Administrasi Dan Dokumentasi

Ukuran/Dimensi

D
T

Volume Rell Galian =


Volume Reel Beton =

Volume
Total
(c)

Satuan
(d)

1.00 Ls
1.00 Ls

Kategori
Biaya
(e)

I-a
I-a

Harga Satuan
(f)

Rp
Rp

350,000.00
1,000,000.00
Jumlah

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

0.00
0.00
0.00
0.00

Oh
Oh
Oh
Oh

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

No

: Abutmen Jembatan Sub Pekerjaan Pondasi Sumuran


:
:
:

Uraian Pekerjaan

(a)
1. 1. Pek. Galian Tanah
a
Tenaga
Pekerja
Mandor

(b)

Volume
Total
(c)

Ukuran/Dimensi

Volume Rell Galian =


Volume Reel Beton =
Satuan
(d)

Kategori
Biaya
(e)

57.19 Oh
5.66 Oh

2. Pekerjaan Beton Tumbuk Dan Pondasi Sumuran 1 Pc : 3 Ps : 5 Kr


a
Bahan
Batu Belah/Koral Beton
18.79 M^3
Pasir
11.23 M^3
Semen 50 Kg
94.18 Zak
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

35.64
5.40
0.54
1.73

D
T

Oh
Oh
Oh
Oh

Harga Satuan
(f)

III-a
III-a

Rp
Rp

55,798.00
65,734.00
Jumlah

I-a
I-a
I-b

Rp
Rp
Rp

450,000.00
175,000.00
77,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 1a+2a+2b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA
No
1.

: Abutmen Jembatan Sub Pekerjaan Pondasi Batu Kali


:
:
:
: 2016
Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Pondasi 1 Pc : 3 Ps
a
Bahan
Batu Kali
Semen 50 Kg
Pasir
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

2. Pekerjaan Dinding Decker


Volume Reel
a
Bahan
Batu Kali
Semen 50 Kg
Pasir
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Volume
Total
(c)

Ukuran/Dimensi

Volume Reel

Satuan
(d)

202.33 M^3
1442.09 Zak
57.76 M^3

275.91
110.36
11.04
13.80

Oh
Oh
Oh
Oh

Kategori
Biaya
(e)

P
L
T
=

Harga Satuan
(f)

I-a
I-b
I-a

Rp
Rp
Rp

170,000.00
77,000.00
175,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

I-a
I-b
I-a

Rp
Rp
Rp

170,000.00
77,000.00
175,000.00
Jumlah

III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

5.20
5.72 M^3
40.77 Zak
1.63 M^3

7.80
3.12
0.31
0.39

Oh
Oh
Oh
Oh

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
22.87 M^3
Pasir Cor
14.71 kg
Semen Pc 50 Kg
249.78 Zak

No
1.

: Beton Bertulang Sub Pekerjaan Balok Induk / Gelagar


:
:
:
: 2016
Uraian Pekerjaan

Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor

49.90
0.85
8.32
2.51

Oh
Oh
Oh
Oh

Ukuran/Dimensi

Volume Reel

Kategori
Biaya
(e)

P
L
T
=

Harga Satuan
(f)

I-a
I-a
I-b

Rp
Rp
Rp

450,000.00
175,000.00
77,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
1.09 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
11.89 Zak

No
1.

: Beton Bertulang Sub Pekerjaan Balok Anak / Diafragma


:
:
:

Uraian Pekerjaan

Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor

2.38
0.04
0.40
0.12

Oh
Oh
Oh
Oh

Ukuran/Dimensi

Volume Reel

Kategori
Biaya
(e)

P
L
T
=

Harga Satuan
(f)

I-a
I-a
I-b

Rp
Rp
Rp

450,000.00
175,000.00
77,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

Ukuran/Dimensi

Volume Reel

Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
4.14 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
45.20 Zak

No
1.

Beton Bertulang Sub Pekerjaan Bantalan Beton


:
:
:

Uraian Pekerjaan

Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor

2.38
0.04
0.40
0.12

Oh
Oh
Oh
Oh

Kategori
Biaya
(e)

Harga Satuan
(f)

I-a
I-a
I-b

Rp
Rp
Rp

450,000.00
175,000.00
77,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

Ukuran/Dimensi

Volume Reel

Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
10.89 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
118.94 Zak

No
1.

Beton Bertulang Sub Pekerjaan Plat Jembatan


:
:
:

Uraian Pekerjaan

Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor

23.76
0.40
3.96
1.20

Oh
Oh
Oh
Oh

Kategori
Biaya
(e)

P
L
T
=

Harga Satuan
(f)

I-a
I-a
I-b

Rp
Rp
Rp

450,000.00
175,000.00
77,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

Ukuran/Dimensi

Jumlah
Volume Reel

Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
0.14 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
1.58 Zak

No
1.

Beton Bertulang Sub Pekerjaan Pion Jembatan


:
:
:

Uraian Pekerjaan

Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor

23.76
0.40
3.96
1.20

Oh
Oh
Oh
Oh

Kategori
Biaya
(e)

P
L
T
=
=

Harga Satuan
(f)

I-a
I-a
I-b

Rp
Rp
Rp

450,000.00
175,000.00
77,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

No
1.

Pipa Sandaran Jembatan


:
:
:

Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Pemasangan Pipa Galvanis 3 "
a
Bahan
Pipa Galvanis
Perlengkapan

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

Ukuran/Dimensi

Volume Reel

Harga Satuan
(f)

9.60 Btg
35% Harga Pipa

I-b

Rp
Rp

234,000.00
786,240.00
Jumlah

5.18
8.64
0.86
0.26

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Oh
Oh
Oh
Oh

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

No
1.

Pembesian Balok Induk/Gelar


:
:
:

Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 25 - 12
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton
b

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

Jenis Kegiatan

Berat Total

Harga Satuan
(f)

84.00
6.00
92.50
72.92

Btg
Btg
Btg
Kg

I-b
I-b
I-b
I-b

Rp
Rp
Rp
Rp

439,900.00
100,000.00
69,000.00
30,000.00
Jumlah

34.03
34.03
3.40
1.46

Oh
Oh
Oh
Oh

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

Pembesian Balok Anak/ Diafragma


:
:
:

No
1.

Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 22 - 12
Besi dia. 10 - 12
Kawat Beton

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

Jenis Kegiatan

Berat Total

Harga Satuan
(f)

7.00 Btg
7.00 Btg
4.76 Kg

I-b
I-b
I-b

Rp
Rp
Rp

338,700.00
69,000.00
30,000.00
Jumlah

2.22
2.22
0.22
0.10

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Oh
Oh
Oh
Oh

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui

Dibuat Oleh

Kepala Desa

Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

No
1.

Pembesian Bantalan Beton


:
:
:

Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Volume
Total
(c)

Satuan
(d)

46.00 Btg
0.00 Btg
7.71 Kg

3.60
3.60
0.36
0.15

Oh
Oh
Oh
Oh

Kategori
Biaya
(e)

Jenis Kegiatan

Berat Total

Harga Satuan
(f)

I-b
I-b
I-b

Rp
Rp
Rp

100,000.00
30,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016

Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

No
1.

Pembesian Plat Jembatan


:
:
:

Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin

Volume
Total
(c)

Satuan
(d)

224.00 Btg
0.00 Btg
37.57 Kg

17.53
17.53
1.75
0.75

Oh
Oh
Oh
Oh

Kategori
Biaya
(e)

Jenis Kegiatan

Berat Total

Harga Satuan
(f)

I-b
I-b
I-b

Rp
Rp
Rp

100,000.00
30,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

III-a Pembayaran tenaga kerja untuk konstruksi


III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

Pembesian Trotoar Jembatan


:
:
:

No
1.

Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a

Pembelian alat tangan

Volume
Total
(c)

Satuan
(d)

52.00 Btg
0.00 Btg
8.72 Kg

4.07
4.07
0.41
0.17

Oh
Oh
Oh
Oh

Kategori
Biaya
(e)

Jenis Kegiatan

Berat Total

Harga Satuan
(f)

I-b
I-b
I-b

Rp
Rp
Rp

100,000.00
30,000.00
Jumlah

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

II-b Pembelian / penyewaan alat mesin


III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

No
1.

Pembesian Pion Jembatan


:
:
:

Uraian Pekerjaan

(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

Jenis Kegiatan

Berat Total

Harga Satuan
(f)

0.00 Btg
6.00 Btg
0.70 Kg

I-b
I-b
I-b

Rp
Rp
Rp

69,000.00
30,000.00
Jumlah

0.33
0.33
0.03
0.01

III-a
III-a
III-a
III-a

Rp
Rp
Rp
Rp

50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Oh
Oh
Oh
Oh

II-a Pembelian alat tangan


II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa

Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)

0.00
0.00
0.00
0.00
Jumlah Harga
(g)

Rp
Rp

350,000.00
1,000,000.00

Rp

1,350,000.00

Rp
Rp
Rp
Rp
Rp
Rp

1,350,000.00

( ..)

1.00
2.00
108.93
21.60
Jumlah Harga
(g)

Rp
Rp
Rp

3,190,884.52
372,328.73
3,563,213.25

Rp
Rp
Rp
Rp

8,456,400.00
1,965,600.00
7,251,552.00
17,673,552.00

Rp
Rp
Rp
Rp
Rp
Rp

1,782,000.00
486,000.00
54,000.00
172,800.00
2,494,800.00
23,731,565.25

( ..)

6.80
4.60
4.80
183.94

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

34,396,780.00
111,040,899.20
10,107,503.00
155,545,182.20

Rp
Rp
Rp
Rp
Rp
Rp

13,795,500.00
9,932,760.00
1,103,640.00
1,379,550.00
26,211,450.00
181,756,632.20

Rp
Rp
Rp
Rp

972,400.00
3,139,136.00
285,740.00
4,397,276.00

Rp
Rp
Rp
Rp
Rp
Rp

390,000.00
280,800.00
31,200.00
39,000.00
741,000.00
5,138,276.00

( ..)

50.40
0.60
1.00
30.24

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

10,291,730.40
2,574,028.80
19,233,244.80
32,099,004.00

Rp
Rp
Rp
Rp
Rp
Rp

2,494,800.00
76,204.80
831,600.00
250,992.00
3,653,596.80
35,752,600.80

( ..)

9.60
0.30
0.50
1.44

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

490,082.40
122,572.80
915,868.80
1,528,524.00

Rp
Rp
Rp
Rp
Rp
Rp

118,800.00
3,628.80
39,600.00
11,952.00
173,980.80
1,702,504.80

( ..)

5.47

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

1,862,313.12
122,572.80
3,480,301.44
5,465,187.36

Rp
Rp
Rp
Rp
Rp
Rp

118,800.00
3,628.80
39,600.00
11,952.00
173,980.80
5,639,168.16

( ..)

12.00
4.80
0.25
14.40

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

4,900,824.00
122,572.80
9,158,688.00
14,182,084.80

Rp
Rp
Rp
Rp
Rp
Rp

1,188,000.00
36,288.00
396,000.00
119,520.00
1,739,808.00
15,921,892.80

( ..)

0.12
0.12
0.95
14
0.19
Jumlah Harga
(g)

Rp
Rp
Rp
Rp

65,180.96
122,572.80
121,810.55
309,564.31

Rp
Rp
Rp
Rp
Rp
Rp

1,188,000.00
36,288.00
396,000.00
119,520.00
1,739,808.00
2,049,372.31

( ..)

3"

48.00

Jumlah Harga
(g)

Rp
Rp
Rp

2,246,400.00
275,184.00
2,521,584.00

Rp
Rp
Rp
Rp
Rp
Rp

259,200.00
777,600.00
86,400.00
25,920.00
1,149,120.00
3,670,704.00

( ..)

Penulangan

4861.62

Jumlah Harga
(g)

Rp
Rp
Rp
Rp
Rp

36,951,600.00
600,000.00
6,382,500.00
2,187,730.50
46,121,830.50

Rp
Rp
Rp
Rp
Rp
Rp

1,701,568.17
3,062,822.70
340,313.63
145,848.70
5,250,553.20
51,372,383.70

( ..)

Penulangan

317.41

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

2,370,900.00
483,000.00
142,834.55
2,996,734.55

Rp
Rp
Rp
Rp
Rp
Rp

111,093.54
199,968.36
22,218.71
9,522.30
342,802.91
3,339,537.46

( ..)

Penulangan

514.32

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

4,600,000.00
231,442.28
4,831,442.28

Rp
Rp
Rp
Rp
Rp
Rp

180,010.66
324,019.19
36,002.13
15,429.49
555,461.47
5,386,903.75

( ..)

Penulangan

2504.50

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

22,400,000.00
1,127,023.27
23,527,023.27

Rp
Rp
Rp
Rp
Rp
Rp

876,573.65
1,577,832.58
175,314.73
75,134.88
2,704,855.85
26,231,879.12

( ..)

Penulangan

581.40

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

5,200,000.00
261,630.40
5,461,630.40

Rp
Rp
Rp
Rp
Rp
Rp

203,490.31
366,282.56
40,698.06
17,442.03
627,912.96
6,089,543.37

( ..)

Penulangan

46.59

Jumlah Harga
(g)

Rp
Rp
Rp
Rp

414,000.00
20,963.97
414,000.00

Rp
Rp
Rp
Rp
Rp
Rp

16,305.31
29,349.56
3,261.06
1,397.60
50,313.54
464,313.54

( ..)

REKAPITULASI ANGGARAN BIAYA


Pekerjaan
Kabupaten
Kecamatan
Desa
Tahun Anggaran

: Jembatan Desa
: Sinjai
: Sinjai Barat
:
: 2016

Dimensi : P = 12 M
L=4M

No

Jenis Pekerjaan

Harga (Rp)

(a)

(b)

(c)

Abutmen Jembatan Sub Pekerjaan Persiapan

Rp

1,350,000.00

Abutmen Jembatan Sub Pekerjaan Pondasi Sumuran

Rp

23,731,565.25

Abutmen Jembatan Sub Pekerjaan Pondasi Batu Kali

Rp

186,894,908.20

Beton Bertulang Sub Pekerjaan Balok Induk / Gelagar

Rp

35,752,600.80

Beton Bertulang Sub Pekerjaan Balok Anak / Diafragma

Rp

1,702,504.80

Beton Bertulang Sub Pekerjaan Bantalan Beton

Rp

5,639,168.16

Beton Bertulang Sub Pekerjaan Plat Jembatan

Rp

15,921,892.80

Beton Bertulang Sub Pekerjaan Pion Jembatan

Rp

2,049,372.31

Pipa Sandaran Jembatan

Rp

3,670,704.00

10

Pembesian Balok Induk/Gelar

Rp

51,372,383.70

11

Pembesian Balok Anak/ Diafragma

Rp

3,339,537.46

12

Pembesian Bantalan Beton

Rp

5,386,903.75

13

Pembesian Plat Jembatan

Rp

26,231,879.12

14

Pembesian Trotoar Jembatan

Rp

6,089,543.37

15

Pembesian Pion Jembatan

Rp

464,313.54

16

Oprit Jembatan

Rp

18,431,055.44

Jumlah

Rp

388,028,332.68

PPn 10%

Rp

38,802,833.27

Total Cost

Rp

426,831,165.95

Dibulatkan

Rp

426,831,100.00

Terbilang

Mengetahui
Kepala Desa

Sinjai . April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

( ..)