I
NO.
URAIAN
KOEF
A
I
ANALISA 001
JUMLAH matrial
JUMLAH upah
TOTAL harga
G=(CXE)
H = (C X F )
I=(G+H)
PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
0.00
38,691.56
1.250
btg
Rp
Rp
2.500
Kg
Rp
Rp
Pasir Beton
0.005
m3
Rp
Rp
Koral Beton
Kaso 5 / 7 ( albasiah )
0.009
0.072
m3
m3
Rp
Rp
Rp
Rp
0.060
Kg
Rp
Rp
Residu
0.400
Lt
Rp
Rp
Tukang Kayu
Perkerja
0.200
0.400
Oh
Oh
Rp
Rp
65,734.00
55,798.00
Rp
Rp
13,146.80
22,319.20
Kepala Tukang
0.020
Oh
Rp
75,671.00
Rp
1,513.42
Mandor
0.020
Oh
Rp
85,607.00
Rp
1,712.14
38,691.56
Tenaga
ANALISA 002
0.00
38,691.56
38,691.56
Bahan
ANALISA 003
1.250
btg
Rp
0.00
2.500
Kg
Rp
0.00
Pasir Beton
Koral Beton
1.200
0.009
m3
m3
Rp
Rp
0.00
0.00
Kaso 5 / 7 ( albasiah )
0.072
m3
Rp
0.00
0.060
Kg
Rp
0.00
Meni Besi
0.450
Lt
Rp
0.00
Tenaga
Tukang Kayu
0.200
Oh
Rp
65,734.00
Rp
13,146.80
Perkerja
0.400
Oh
Rp
55,798.00
Rp
22,319.20
Kepala Tukang
0.020
Oh
Rp
75,671.00
Rp
1,513.42
Mandor
0.020
Oh
Rp
85,607.00
Rp
1,712.14
0.00
33,111.76
33,111.76
Bahan
ANALISA 004
1.000
btg
Rp
0.00
Semen Portland
Kawat Duri
2.000
25.000
Kg
Kg
Rp
Rp
0.00
0.00
Pasir Beton
0.005
m3
Rp
0.00
Koral Beton
0.009
m3
Rp
0.00
0.060
Kg
Rp
0.00
Tenaga
Tukang Kayu
0.200
Oh
Rp
65,734.00
13,147
Perkerja
0.300
Oh
Rp
55,798.00
16,739
Kepala Tukang
0.020
Oh
Rp
75,671.00
1,513
Mandor
0.020
Oh
Rp
85,607.00
1,712
0.00
13,337.95
0.012
m3
Rp
0.00
0.020
0.007
Kg
m3
Rp
Rp
0.00
0.00
Tukang Kayu
0.100
Oh
Rp
65,734.00
6,573
Perkerja
0.100
Oh
Rp
55,798.00
5,580
Kepala Tukang
Mandor
0.010
0.005
Oh
Oh
Rp
Rp
75,671.00
85,607.00
757
428
13,337.95
Tenaga
ANALISA 005
0.00
0.00
Bahan
Dolken Kayu 8 - 10/400 cm
Kayu Balok Borneo
1.250
0.180
btg
m3
Rp
Rp
0.00
0.00
Paku
0.850
Kg
Rp
0.00
Besi Strip
1.100
Kg
Rp
0.00
Semen Portland
35.000
Kg
Rp
0.00
Pasir Pasang
Pasir Beton
0.150
0.100
m3
m3
Rp
Rp
0.00
0.00
Koral Beton
0.150
m3
Rp
0.00
30.000
bh
Rp
0.00
Seng Plat
Jendela Nako
0.250
2.000
lbr
bh
Rp
Rp
0.00
0.00
Kaca Polos
0.080
m2
Rp
0.00
Kunci Tanam
0.150
bh
Rp
0.00
Plywood 4 mm
0.060
lbr
Rp
0.00
Tenaga
Tukang Kayu
2.000
Oh
Rp
0.00
ANALISA 006
ANALISA 007
Tukang Batu
1.000
Oh
Rp
Perkerja
2.000
Oh
Rp
Kepala Tukang
0.300
Oh
Rp
Mandor
0.050
Oh
Rp
0.00
0.00
1.700
btg
Rp
0.00
0.210
0.300
m3
Kg
Rp
Rp
0.00
0.00
Semen Portland
10.500
Kg
Rp
0.00
Pasir Beton
0.030
m3
Rp
0.00
Koral Beton
0.050
m3
Rp
0.00
1.500
lbr
Rp
0.00
Tukang Kayu
2.000
Oh
Rp
Perkerja
1.000
Oh
Rp
Kepala Tukang
0.200
Oh
Rp
Mandor
0.050
Oh
Rp
0.00
0.00
3.000
btg
Rp
0.00
0.276
0.700
m3
Kg
Rp
Rp
0.00
0.00
1.500
lbr
Rp
0.00
Tukang Kayu
Perkerja
1.500
1.000
Oh
Oh
Rp
Rp
Kepala Tukang
0.150
Oh
Rp
Mandor
0.050
Oh
Rp
0.00
0.00
Tenaga
ANALISA 008
ANALISA 009
ANALISA 010
0.00
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
#N/A
1.250
btg
#N/A
#N/A
0.186
m3
49,500.00
9,207.00
Paku
Semen Portland
0.300
18.000
Kg
Kg
49,500.00
#N/A
14,850.00
#N/A
Pasir Beton
0.030
m3
49,500.00
1,485.00
Koral Beton
0.050
m3
#N/A
#N/A
1.500
lbr
#N/A
#N/A
Plywood 4 mm
Tenaga
1.350
lbr
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Perkerja
1.000
Oh
#N/A
#N/A
Kepala Tukang
0.200
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
#N/A
Kayu Terentang
0.186
m3
#N/A
#N/A
Paku
Kayu Kaso 5 / 7 (borneo)
0.300
1.000
Kg
btg
49,500.00
49,500.00
14,850.00
49,500.00
Tukang Kayu
2.000
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
ANALISA 011
ANALISA 012
#N/A
#N/A
Bambu 6 - 8 / 600 cm
1.000
btg
#N/A
#N/A
Tali Ijuk
Tenaga
0.250
Kg
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Perkerja
1.000
Oh
#N/A
#N/A
Kepala Tukang
0.200
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
#N/A
Batu Belah 5 / 20
Batu Belah 5 / 7
0.150
0.090
m3
m3
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.010
m3
49,500.00
495.00
Perkerja
1.000
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
ANALISA 013
ANALISA 014
II
ANALISA 015
0.00
#N/A
Perkerja
6.667
Oh
#N/A
#N/A
Mandor
0.333
Oh
#N/A
#N/A
0.00
#N/A
Perkerja
6.667
Oh
#N/A
#N/A
Mandor
0.033
Oh
#N/A
#N/A
#N/A
#N/A
PEKERJAAN TANAH
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'
0.00
#N/A
#N/A
Tenaga
Perkerja
Tukang Gali
0.400
Kepala Tukang
Mandor
ANALISA 016
#N/A
#N/A
#N/A
#N/A
Oh
#N/A
#N/A
Oh
#N/A
#N/A
0.00
0.525
#N/A
Oh
#N/A
#N/A
Tukang Gali
Oh
#N/A
#N/A
Kepala Tukang
Oh
#N/A
#N/A
Oh
#N/A
#N/A
Mandor
ANALISA 017
0.040
Oh
Oh
0.052
0.00
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 018
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Oh
#N/A
#N/A
0.073
Oh
#N/A
#N/A
0.00
#N/A
0.625
Oh
#N/A
#N/A
Tukang Gali
Oh
#N/A
#N/A
Kepala Tukang
Oh
#N/A
#N/A
0.062
Oh
#N/A
#N/A
Mandor
ANALISA 019
0.735
-
0.00
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 020
#N/A
#N/A
Oh
#N/A
#N/A
0.125
Oh
#N/A
#N/A
0.00
#N/A
0.823
Oh
#N/A
#N/A
Oh
#N/A
#N/A
Kepala Tukang
Oh
#N/A
#N/A
0.083
Oh
#N/A
#N/A
0.00
1 m Pek. Stripping 1 m
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
#N/A
0.050
Oh
#N/A
#N/A
Oh
Oh
#N/A
#N/A
#N/A
#N/A
0.005
Oh
#N/A
#N/A
0.00
#N/A
0.192
Oh
#N/A
#N/A
Tukang Gali
Oh
#N/A
#N/A
Kepala Tukang
Oh
#N/A
#N/A
0.050
Oh
#N/A
#N/A
Mandor
ANALISA 023
#N/A
#N/A
Tukang Gali
Mandor
ANALISA 022
Oh
Oh
ANALISA 021
1.250
-
0.00
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 024
0.192
Oh
#N/A
#N/A
Oh
Oh
#N/A
#N/A
#N/A
#N/A
0.019
Oh
#N/A
#N/A
1 m3 Pemadatan tanah
Tenaga
Perkerja
0.00
#N/A
0.500
Oh
#N/A
#N/A
Tukang Gali
Oh
#N/A
#N/A
Kepala Tukang
Oh
#N/A
#N/A
0.050
Oh
#N/A
#N/A
Mandor
#N/A
ANALISA 025
#N/A
#N/A
#N/A
Bahan
Pasir Urug
1.200
m3
#N/A
#N/A
0.300
-
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Oh
#N/A
#N/A
0.010
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 026
#N/A
#N/A
#N/A
Bahan
Ijuk
1.200
m3
#N/A
#N/A
0.150
-
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Oh
#N/A
#N/A
0.015
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
III
ANALISA 027
PEKERJAAN PONDASI
#N/A
#N/A
0.016
m3
#N/A
#N/A
Pasir Beton
0.080
m3
49,500.00
3,960.00
Koral Beton
Semen Portland
0.125
49.000
m3
Kg
#N/A
#N/A
#N/A
#N/A
Besi Beton
34.500
Kg
#N/A
#N/A
Kawat Beton
0.700
Kg
#N/A
#N/A
0.270
0.120
m3
Kg
49,500.00
49,500.00
13,365.00
5,940.00
Minyak Bekisting
0.090
lt
#N/A
#N/A
Plamuur Tembok
0.200
Kg
#N/A
#N/A
Perkerja
Tukang Batu
0.800
0.500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.050
Oh
#N/A
#N/A
Mandor
0.040
Oh
#N/A
#N/A
#N/A
Tenaga
ANALISA 028
#N/A
1.100
m3
#N/A
392.000
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.314
m3
49,500.00
15,543.00
Perkerja
1.500
Oh
#N/A
#N/A
Tukang Batu
0.600
Oh
#N/A
#N/A
Kepala Tukang
0.060
Oh
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
Semen Portland
ANALISA 029
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Batu Belah 15 / 20
1.100
m3
#N/A
#N/A
136.000
0.544
Kg
m3
#N/A
49,500.00
#N/A
26,928.00
Perkerja
1.500
Oh
#N/A
#N/A
Tukang Batu
0.600
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.060
0.075
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Semen Portland
Pasir Pasang
Tenaga
IV
ANALISA 030
ANALISA 031
PEKERJAAN DINDING
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan
#N/A
#N/A
140.000
bh
49,500.00
Semen Portland
32.950
Kg
#N/A
#N/A
Pasir Pasang
0.091
m3
49,500.00
4,504.50
Tenaga
Perkerja
0.650
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.030
Oh
#N/A
#N/A
#N/A
6,930,000.00
#N/A
#N/A
Bahan
Bata merah kelas I
140.000
bh
49,500.00
6,930,000.00
Semen Portland
Pasir Pasang
22.200
0.102
Kg
m3
#N/A
49,500.00
#N/A
5,049.00
Perkerja
0.650
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.020
0.030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
ANALISA 032
#N/A
#N/A
#N/A
Bahan
Bata merah kelas I
70.000
bh
49,500.00
3,465,000.00
Semen Portland
Pasir Pasang
14.370
0.040
Kg
m3
#N/A
49,500.00
#N/A
1,980.00
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.100
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.015
Oh
#N/A
#N/A
Tenaga
ANALISA 033
#N/A
#N/A
Bahan
Bata merah kelas I
70.000
bh
49,500.00
Semen Portland
9.680
Kg
#N/A
#N/A
Pasir Pasang
0.045
m3
49,500.00
2,227.50
Perkerja
Tukang Batu
0.320
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.015
Oh
#N/A
#N/A
#N/A
3,465,000.00
Tenaga
V
ANALISA 032
PEKERJAAN PELESTERAN
1 m2 Plesteran Dinding 1Pc : 3Ps
#N/A
#N/A
#N/A
Bahan
ANALISA 033
Semen Portland
6.480
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.019
m3
49,500.00
940.50
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.015
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
ANALISA 034
Semen Portland
4.320
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.022
m3
49,500.00
1,089.00
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.015
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Portland
Kapur Padam
4.320
0.003
Kg
m3
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.013
m3
49,500.00
643.50
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.150
0.015
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
Tenaga
ANALISA 035
ANALISA 036
#N/A
#N/A
Bahan
Semen Portland
1.840
Kg
#N/A
Kapur Padam
0.006
m3
#N/A
#N/A
Pasir Pasang
0.014
m3
49,500.00
693.00
Tenaga
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.015
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
ANALISA 037
Semen Portland
3.000
Kg
#N/A
Kapur Padam
0.005
m3
#N/A
#N/A
Pasir Pasang
Tenaga
0.019
m3
49,500.00
940.50
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.015
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Merah
Kapur Padam
0.009
0.009
Kg
m3
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.009
m3
49,500.00
445.50
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.015
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
ANALISA 038
#N/A
#N/A
Bahan
Semen Merah
0.007
Kg
#N/A
Kapur Padam
0.007
m3
#N/A
#N/A
Pasir Pasang
0.015
m3
49,500.00
742.50
Perkerja
Tukang Batu
0.200
0.150
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.015
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
ANALISA 039
#N/A
#N/A
Semen Portland
14.280
Kg
#N/A
#N/A
Pasir Pasang
0.023
m3
49,500.00
1,138.50
0.250
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Batu
ANALISA 040
#N/A
#N/A
#N/A
Bahan
ANALISA 041
Semen Portland
10.800
Kg
#N/A
#N/A
Pasir Pasang
0.026
m3
49,500.00
1,287.00
Tenaga
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
ANALISA 042
Semen Portland
8.680
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.028
m3
49,500.00
1,386.00
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
7.29
ANALISA 043
Semen Portland
7.290
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.028
m3
49,500.00
1,386.00
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Pasang
6.240
0.030
Kg
m3
#N/A
49,500.00
#N/A
1,485.00
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.020
0.0125
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
ANALISA 044
#N/A
#N/A
#N/A
Bahan
Semen Merah
Kapur Padam
0.009
0.009
Kg
m3
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
0.250
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Batu
ANALISA 045
#N/A
#N/A
#N/A
Semen Portland
15.500
Kg
#N/A
#N/A
Pasir Pasang
0.013
m3
49,500.00
643.50
Perkerja
0.300
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.200
0.020
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.013
Oh
#N/A
#N/A
Tenaga
ANALISA 046
#N/A
#N/A
Semen Portland
11.750
Kg
#N/A
#N/A
Pasir Pasang
0.035
m3
49,500.00
1,732.50
Perkerja
Tukang Batu
0.300
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.013
Oh
#N/A
#N/A
#N/A
Tenaga
ANALISA 047
#N/A
#N/A
Semen Portland
9.480
Kg
#N/A
#N/A
Pasir Pasang
0.038
m3
49,500.00
1,881.00
Perkerja
Tukang Batu
0.300
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.013
Oh
#N/A
#N/A
#N/A
Tenaga
ANALISA 048
#N/A
#N/A
#N/A
Bahan
ANALISA 049
Semen Portland
7.940
Kg
#N/A
#N/A
Pasir Pasang
0.039
m3
49,500.00
1,930.50
Tenaga
Perkerja
0.300
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.013
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
ANALISA 050
Semen Portland
18.650
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.035
m3
49,500.00
1,732.50
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.015
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
ANALISA 051
Semen Portland
14.150
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.039
m3
49,500.00
1,930.50
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.015
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Pasang
11.380
0.042
Kg
m3
#N/A
49,500.00
#N/A
2,079.00
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.025
0.015
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
ANALISA 052
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Pasang
8.190
0.045
Kg
m3
#N/A
49,500.00
#N/A
2,227.50
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.250
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.015
Oh
#N/A
#N/A
Tenaga
ANALISA 053
#N/A
7.070
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.021
m3
49,500.00
1,039.50
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Batu
0.070
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.007
0.008
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
ANALISA 054
#N/A
#N/A
Bahan
Semen Portland
5.670
Kg
#N/A
#N/A
Pasir Pasang
0.023
m3
49,500.00
1,138.50
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.070
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
Tenaga
ANALISA 055
#N/A
#N/A
Bahan
Semen Portland
9.300
Kg
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
Perkerja
0.260
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.200
0.020
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.013
Oh
#N/A
#N/A
#N/A
Tenaga
ANALISA 056
#N/A
#N/A
Semen Portland
7.070
Kg
#N/A
#N/A
Pasir Pasang
0.021
m3
49,500.00
1,039.50
Perkerja
Tukang Batu
0.260
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.013
Oh
#N/A
#N/A
#N/A
Tenaga
ANALISA 057
ANALISA 058
#N/A
#N/A
Semen Portland
0.500
Kg
#N/A
#N/A
Pasir Pasang
0.002
m3
49,500.00
99.00
Tenaga
Perkerja
0.057
Oh
#N/A
#N/A
Tukang Batu
0.038
Oh
#N/A
#N/A
Kepala Tukang
0.038
Oh
#N/A
#N/A
Mandor
0.002
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
ANALISA 059
PC Warna
0.144
Kg
#N/A
#N/A
Batu Granito
15.000
Kg
#N/A
#N/A
Tenaga
Perkerja
0.050
Oh
#N/A
#N/A
Tukang Batu
0.020
Oh
#N/A
#N/A
Kepala Tukang
0.002
Oh
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
ANALISA 060
PC Warna
0.440
Kg
#N/A
#N/A
Batu Teraso
Tenaga
11.500
Kg
#N/A
#N/A
Perkerja
0.450
Oh
#N/A
#N/A
Tukang Batu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.025
Oh
#N/A
#N/A
1 m2 Pelesteran Ciprat 1 Pc : 2 Ps
#N/A
#N/A
#N/A
Bahan
ANALISA 061
Semen Portland
4.320
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.016
m3
49,500.00
792.00
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Batu
0.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.010
0.015
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Pasang
4.320
0.016
Kg
m3
#N/A
49,500.00
#N/A
792.00
#N/A
#N/A
Tenaga
ANALISA 062
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Batu
0.070
Oh
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Portland
Batacote
0.500
2.900
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.006
m3
49,500.00
297.00
Perkerja
0.300
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.200
0.020
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.015
Oh
#N/A
#N/A
Tenaga
ANALISA 063
#N/A
#N/A
#N/A
#N/A
#N/A
0.00
#N/A
#N/A
#N/A
#N/A
0.00
0.00
#N/A
#N/A
0.00
#N/A
#N/A
Bahan
Semen Portland
8.0000
kg
49,500.00
396,000.00
Pasir Pasang
0.0260
m3
#N/A
#N/A
Perkerja
0.2250
org
Tukang Batu
Kepala Tukang
0.1525
0.0100
org
org
Mandor
0.0080
org
Tenaga
#N/A
Semen Portland
5.4000
kg
#N/A
#N/A
Pasir Pasang
0.0280
m3
#N/A
#N/A
Perkerja
Tukang Batu
0.2250
0.1525
org
org
#N/A
#N/A
#N/A
#N/A
0.00
0.00
Kepala Tukang
0.0100
org
#N/A
#N/A
0.00
Mandor
0.0080
org
#N/A
#N/A
0.00
#N/A
#N/A
Tenaga
III
PEKERJAAN KAYU
#N/A
1.100
m3
Tenaga
Perkerja
#N/A
#N/A
6.000
Oh
#N/A
#N/A
Tukang Kayu
20.000
Oh
#N/A
#N/A
Kepala Tukang
2.000
Oh
#N/A
#N/A
Mandor
0.300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
1.200
m3
Perkerja
Tukang Kayu
6.000
18.000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
2.000
Oh
#N/A
#N/A
Mandor
0.300
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.200
m3
Perkerja
Tukang Kayu
6.000
18.000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
2.000
Oh
#N/A
#N/A
Mandor
0.300
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.036
m3
#N/A
#N/A
0.050
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.350
1.050
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.105
Oh
#N/A
#N/A
Mandor
0.018
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
0.036
m3
#N/A
#N/A
0.050
Kg
#N/A
#N/A
Tenaga
Perkerja
0.350
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Kayu
1.050
Oh
#N/A
#N/A
Kepala Tukang
0.105
Oh
#N/A
#N/A
Mandor
0.018
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
0.050
m3
Perkerja
Tukang Kayu
1.000
2.500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.250
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.040
m3
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
2.500
0.250
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.035
m3
Perkerja
0.800
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
2.000
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.040
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.035
m3
Perkerja
0.800
Oh
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.200
0.040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.035
m3
Perkerja
0.800
Oh
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.200
0.040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Papan Kayu Borneo
Tenaga
0.064
m3
#N/A
#N/A
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Kayu
3.000
Oh
#N/A
#N/A
Kepala Tukang
0.300
Oh
#N/A
#N/A
Mandor
0.300
Oh
#N/A
#N/A
#N/A
#N/A
0.064
m3
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Kayu
3.000
Oh
#N/A
#N/A
Kepala Tukang
0.300
Oh
#N/A
#N/A
Mandor
0.500
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.030
0.300
Kg
Lt
#N/A
#N/A
#N/A
#N/A
Plywood 4 mm
1.000
Lbr
49,500.00
49,500.00
Perkerja
Tukang Kayu
0.600
2.000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.200
Oh
#N/A
#N/A
Mandor
0.030
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.030
Kg
#N/A
#N/A
0.300
Lt
#N/A
#N/A
Plywood 4 mm
1.000
Lbr
49,500.00
49,500.00
Tenaga
Perkerja
0.600
Oh
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Kepala Tukang
0.200
Oh
#N/A
#N/A
Mandor
0.030
Oh
#N/A
#N/A
#N/A
#N/A
0.0600
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Perkerja
0.500
Oh
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Kepala Tukang
0.200
Oh
#N/A
#N/A
Mandor
0.025
Oh
#N/A
#N/A
#N/A
#N/A
0.0600
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Perkerja
0.500
Oh
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.200
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Papan Kayu Borneo
Paku Biasa " - 1"
Lem Kayu
0.0196
0.030
m3
Kg
#N/A
#N/A
#N/A
#N/A
0.300
Lt
#N/A
#N/A
1.000
lbr
49,500.00
49,500.00
Perkerja
Tukang Kayu
0.600
2.000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.200
Oh
#N/A
#N/A
Mandor
0.030
Oh
#N/A
#N/A
Plywood 4 mm
Tenaga
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.300
Kg
#N/A
#N/A
Lem Kayu
Plywood 4 mm
0.300
1.000
Lt
lbr
#N/A
49,500.00
#N/A
49,500.00
Perkerja
0.600
Oh
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.200
0.030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
0.0196
0.300
m3
Kg
#N/A
#N/A
#N/A
#N/A
0.300
Lt
#N/A
#N/A
Plywood 4 mm
1.000
lbr
49,500.00
49,500.00
Tenaga
Perkerja
0.600
Oh
#N/A
#N/A
Tukang Kayu
2.000
Oh
#N/A
#N/A
Kepala Tukang
0.200
Oh
#N/A
#N/A
Mandor
0.030
Oh
#N/A
#N/A
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.300
Kg
#N/A
#N/A
Lem Kayu
Plywood 4 mm
0.800
1.000
Lt
lbr
#N/A
49,500.00
#N/A
49,500.00
0.500
lbr
#N/A
#N/A
Perkerja
Tukang Kayu
0.800
2.500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.250
Oh
#N/A
#N/A
Mandor
0.040
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.300
Kg
#N/A
#N/A
0.800
Lt
#N/A
#N/A
Plywood 4 mm
1.000
lbr
49,500.00
49,500.00
0.500
lbr
#N/A
#N/A
Perkerja
0.800
Oh
#N/A
#N/A
Tukang Kayu
2.500
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.250
0.040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
0.0196
0.300
m3
Kg
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.800
Lt
#N/A
#N/A
Plywood 4 mm
1.000
lbr
49,500.00
49,500.00
0.500
lbr
49,500.00
24,750.00
Tenaga
Perkerja
0.800
Oh
#N/A
#N/A
Tukang Kayu
2.500
Oh
#N/A
#N/A
Kepala Tukang
0.250
Oh
#N/A
#N/A
Mandor
0.040
Oh
#N/A
#N/A
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.300
0.800
Kg
Lt
#N/A
#N/A
#N/A
#N/A
Plywood 4 mm
0.500
lbr
49,500.00
24,750.00
0.500
lbr
49,500.00
24,750.00
Perkerja
Tukang Kayu
0.800
2.500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.250
Oh
#N/A
#N/A
Mandor
0.040
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.300
Kg
#N/A
#N/A
Lem Kayu
Plywood 4 mm
1.200
1.000
Lt
lbr
#N/A
49,500.00
#N/A
49,500.00
1.000
lbr
49,500.00
49,500.00
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
2.600
0.260
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.0196
m3
#N/A
#N/A
0.300
Kg
#N/A
#N/A
1.200
Lt
#N/A
#N/A
Plywood 4 mm
1.000
lbr
49,500.00
49,500.00
1.000
lbr
49,500.00
49,500.00
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Kayu
2.600
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.260
0.050
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Balok Kayu Jati
Besi Strip
1.100
15.000
m3
#N/A
#N/A
#N/A
#N/A
0.800
Kg
#N/A
#N/A
Perkerja
4.000
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
12.000
1.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.200
Oh
#N/A
#N/A
Tenaga
#N/A
1.100
m3
#N/A
#N/A
Besi Strip
15.000
Kg
#N/A
#N/A
0.800
Kg
#N/A
#N/A
Tenaga
Perkerja
4.000
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Kayu
12.000
Oh
#N/A
#N/A
Kepala Tukang
1.200
Oh
#N/A
#N/A
Mandor
0.200
Oh
#N/A
#N/A
#N/A
#N/A
1.100
m3
#N/A
#N/A
Besi Strip
15.000
Kg
#N/A
#N/A
0.800
Kg
#N/A
#N/A
Perkerja
4.000
Oh
#N/A
#N/A
Tukang Kayu
12.000
Oh
#N/A
#N/A
Kepala Tukang
1.200
Oh
#N/A
#N/A
Mandor
0.200
Oh
#N/A
#N/A
#N/A
#N/A
1.100
m3
#N/A
#N/A
Besi Strip
Paku Biasa 2" - 5"
15.000
0.800
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
4.000
Oh
#N/A
#N/A
Tukang Kayu
12.000
Oh
#N/A
#N/A
Kepala Tukang
Mandor
1.200
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Balok Kayu Kamper
0.012
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.100
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Balok Kayu Borneo
0.012
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.100
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.014
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.100
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.014
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Tenaga
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
#N/A
0.014
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Tenaga
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
0.165
m3
#N/A
#N/A
0.200
Kg
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Perkerja
0.120
Oh
#N/A
#N/A
Tukang Kayu
0.120
Oh
#N/A
#N/A
Kepala Tukang
0.012
Oh
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
#N/A
#N/A
0.165
m3
#N/A
#N/A
0.200
Kg
#N/A
#N/A
Perkerja
0.120
Oh
#N/A
#N/A
Tukang Kayu
0.120
Oh
#N/A
#N/A
Kepala Tukang
0.012
Oh
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
#N/A
#N/A
0.012
m3
#N/A
#N/A
0.100
Kg
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kayu Papan 3 / 20 borneo
Paku Biasa 2" - 5"
0.0072
0.050
m3
Kg
49,500.00
#N/A
356.40
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.200
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.025
0.005
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
0.012
0.100
m3
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.250
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Balok Kayu Kamper
0.012
m3
#N/A
#N/A
0.100
Kg
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.250
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Balok Kayu Jati
0.023
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.200
0.300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.030
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.023
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.200
0.300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.030
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
0.023
m3
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Tenaga
Perkerja
0.200
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Kayu
0.300
Oh
#N/A
#N/A
Kepala Tukang
0.030
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
#N/A
0.027
m3
#N/A
#N/A
0.200
Kg
#N/A
#N/A
Tenaga
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Kayu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
0.027
m3
#N/A
#N/A
0.200
Kg
#N/A
#N/A
Tenaga
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Kayu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
0.027
m3
#N/A
#N/A
0.200
Kg
#N/A
#N/A
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Kayu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Papan Kayu Jati
0.0072
m3
#N/A
#N/A
0.050
Kg
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.200
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.025
0.005
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
0.0072
0.050
m3
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.200
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.025
0.005
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
0.0110
0.050
m3
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
0.110
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.220
0.022
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Papan Kayu Kamper
0.0110
m3
#N/A
#N/A
0.050
Kg
#N/A
#N/A
Perkerja
0.110
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.220
0.022
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
0.0145
m3
#N/A
#N/A
0.060
Kg
#N/A
#N/A
0.150
0.250
Oh
Oh
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
#N/A
#N/A
Bahan
Papan Kayu Kamper
0.0086
m3
#N/A
#N/A
0.060
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.100
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.0088
m3
#N/A
#N/A
0.060
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.100
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.050
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.0195
m3
#N/A
#N/A
0.007
m3
#N/A
#N/A
0.100
Kg
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.450
Oh
#N/A
#N/A
Kepala Tukang
0.045
Oh
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
#N/A
#N/A
0.0195
m3
#N/A
#N/A
0.007
0.100
m3
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.450
0.045
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Balok Kayu Kamper
0.0195
m3
#N/A
#N/A
0.007
m3
#N/A
#N/A
0.100
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.150
0.450
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.045
Oh
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
0.0195
m3
#N/A
#N/A
0.007
m3
#N/A
#N/A
0.100
Kg
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.450
Oh
#N/A
#N/A
Kepala Tukang
0.045
Oh
#N/A
#N/A
Mandor
0.075
Oh
#N/A
#N/A
#N/A
#N/A
0.0195
m3
#N/A
#N/A
0.007
0.100
m3
Kg
#N/A
#N/A
#N/A
#N/A
Lem Kayu
0.560
lt
#N/A
#N/A
Plywood 4 mm
1.000
lbr
49,500.00
49,500.00
Tenaga
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Kayu
0.600
Oh
#N/A
#N/A
Kepala Tukang
0.060
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Papan Kayu Jati
0.007
m3
#N/A
#N/A
0.100
Kg
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Tenaga
Perkerja
0.600
Oh
#N/A
#N/A
Tukang Kayu
1.800
Oh
#N/A
#N/A
Kepala Tukang
0.180
Oh
#N/A
#N/A
Mandor
0.030
Oh
#N/A
#N/A
#N/A
#N/A
Plywood 4 mm
0.400
lbr
49,500.00
19,800.00
0.050
Kg
#N/A
#N/A
Perkerja
0.025
Oh
#N/A
#N/A
Tukang Kayu
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.0075
Oh
#N/A
#N/A
Mandor
0.0013
Oh
#N/A
#N/A
#N/A
#N/A
Kayu Profil
1.050
m'
Tenaga
Perkerja
0.021
Oh
#N/A
#N/A
Tukang Kayu
0.021
Oh
#N/A
#N/A
Kepala Tukang
0.0020
Oh
#N/A
#N/A
Mandor
0.0010
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Beton
10.000
0.026
Kg
m3
#N/A
49,500.00
#N/A
1,287.00
Koral Beton
0.044
m3
#N/A
#N/A
Perkerja
1.150
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.020
0.002
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
218.000
Kg
#N/A
#N/A
Pasir Beton
0.520
m3
49,500.00
25,740.00
Koral Beton
0.870
m3
#N/A
#N/A
Tenaga
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.080
Oh
#N/A
#N/A
#N/A
#N/A
197.000
Kg
#N/A
#N/A
Pasir Beton
0.470
m3
49,500.00
23,265.00
Koral Beton
Tenaga
0.940
m3
#N/A
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.025
0.080
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Beton
173.000
0.570
Kg
m3
#N/A
49,500.00
#N/A
28,215.00
0.870
m3
#N/A
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.250
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.080
Oh
#N/A
#N/A
Koral Beton
Tenaga
#N/A
1 m Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland
232.000
Kg
#N/A
#N/A
Pasir Beton
0.520
m3
49,500.00
25,740.00
Koral Beton
Tenaga
0.780
m3
#N/A
#N/A
#N/A
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.080
Oh
#N/A
#N/A
#N/A
#N/A
280.000
Kg
#N/A
#N/A
0.450
0.900
m3
m3
49,500.00
#N/A
22,275.00
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.025
0.080
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Pasir Beton
Koral Beton
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Beton
352.000
0.560
Kg
m3
#N/A
49,500.00
#N/A
27,720.00
0.700
m3
#N/A
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.250
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.080
Oh
#N/A
#N/A
Koral Beton
Tenaga
#N/A
#N/A
357.000
Kg
#N/A
#N/A
Pasir Beton
0.420
m3
49,500.00
20,790.00
Koral Beton
0.540
m3
#N/A
#N/A
Tenaga
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.080
Oh
#N/A
#N/A
#N/A
#N/A
386.000
Kg
#N/A
#N/A
0.470
0.780
m3
m3
49,500.00
#N/A
23,265.00
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.025
0.080
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Pasir Beton
Koral Beton
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Beton
479.000
0.370
Kg
m3
#N/A
49,500.00
#N/A
18,315.00
0.740
m3
#N/A
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.250
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.080
Oh
#N/A
#N/A
Koral Beton
Tenaga
#N/A
#N/A
479.000
Kg
#N/A
#N/A
Pasir Beton
0.370
m3
49,500.00
18,315.00
Koral Beton
0.740
m3
#N/A
#N/A
Rapidrant
Tenaga
2.460
gln
#N/A
#N/A
Perkerja
1.650
Oh
#N/A
#N/A
Tukang Batu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.080
Oh
#N/A
#N/A
#N/A
#N/A
336.000
0.540
Kg
m3
#N/A
49,500.00
#N/A
26,730.00
0.810
m3
#N/A
#N/A
Perkerja
2.000
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.350
0.035
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Koral Beton
Tenaga
#N/A
#N/A
Mandor
1.000
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Beton
291.000
0.470
Kg
m3
#N/A
49,500.00
#N/A
23,265.00
0.930
m3
#N/A
#N/A
Perkerja
Tukang Batu
2.000
0.350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
Mandor
1.000
Oh
#N/A
#N/A
Koral Beton
Tenaga
#N/A
#N/A
367.000
Kg
#N/A
#N/A
Pasir Beton
0.440
m3
49,500.00
21,780.00
Koral Beton
0.880
m3
#N/A
#N/A
Tenaga
Perkerja
2.000
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
Mandor
1.000
Oh
#N/A
#N/A
#N/A
#N/A
400.000
Kg
#N/A
#N/A
0.480
0.800
m3
m3
49,500.00
#N/A
23,760.00
#N/A
Perkerja
2.000
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.035
1.000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Pasir Beton
Koral Beton
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Semen Portland
Pasir Beton
615.000
0.520
Kg
m3
#N/A
49,500.00
#N/A
25,740.00
0.520
m3
#N/A
#N/A
Perkerja
Tukang Batu
2.000
0.350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
Mandor
1.000
Oh
#N/A
#N/A
Koral Beton
Tenaga
#N/A
#N/A
400.000
Kg
#N/A
#N/A
Pasir Beton
0.480
m3
49,500.00
23,760.00
Koral Beton
0.800
m3
#N/A
#N/A
Strorox - 100
Tenaga
1.200
Kg
#N/A
#N/A
Perkerja
2.000
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
Mandor
1.000
Oh
#N/A
#N/A
#N/A
#N/A
1.050
m'
Perkerja
0.050
Oh
#N/A
#N/A
Tukang Batu
0.030
Oh
#N/A
#N/A
Kepala Tukang
0.003
Oh
#N/A
#N/A
Mandor
0.002
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
1.050
m'
Tenaga
Perkerja
0.050
Oh
#N/A
#N/A
Tukang Batu
0.030
Oh
#N/A
#N/A
Kepala Tukang
0.0035
Oh
#N/A
#N/A
Mandor
0.002
Oh
#N/A
#N/A
#N/A
1.050
m'
0.550
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Mandor
0.003
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
1.050
m'
Perkerja
0.550
Oh
#N/A
#N/A
Tukang Batu
Mandor
0.350
0.003
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
1.050
m'
Perkerja
0.550
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Mandor
0.003
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1.050
m'
Perkerja
Tukang Batu
0.550
0.350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.003
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
1.050
Kg
#N/A
#N/A
Kawat Beton
0.015
Kg
#N/A
#N/A
Perkerja
Tukang Besi
0.007
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0007
Oh
#N/A
#N/A
Mandor
0.0003
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
1.050
Kg
#N/A
#N/A
Kawat Beton
0.010
Kg
#N/A
#N/A
Tenaga
Perkerja
0.005
Oh
#N/A
#N/A
Tukang Besi
0.005
Oh
#N/A
#N/A
Kepala Tukang
0.0005
Oh
#N/A
#N/A
Mandor
0.0003
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Besi Jaring Kawat Baja
1.020
Kg
#N/A
#N/A
Kawat Beton
0.805
Kg
#N/A
#N/A
Tenaga
Perkerja
0.025
Oh
#N/A
#N/A
Tukang Besi
0.025
Oh
#N/A
#N/A
Kepala Tukang
0.0025
Oh
#N/A
#N/A
Mandor
0.0015
Oh
#N/A
#N/A
1 m2 Pasang Bekisting
#N/A
#N/A
#N/A
Bahan
Kayu Terentang
0.040
m3
49,500.00
1,980.00
0.400
0.200
Kg
Lt
#N/A
#N/A
#N/A
#N/A
Plywood 9 mm
0.350
lbr
49,500.00
17,325.00
2.000
btg
#N/A
#N/A
Perkerja
Tukang Kayu
0.300
0.330
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0330
Oh
#N/A
#N/A
Mandor
0.0060
Oh
#N/A
#N/A
Tenaga
29,115.90
#VALUE!
0.0882
m3
49,500.00
4,365.90
Paku
0.5000
kg
49,500.00
24,750.00
Tenaga
Perkerja
0.1500
org
HARGA UPAH
#VALUE!
Tukang Kayu
0.2000
org
HARGA UPAH
#VALUE!
Kepala Tukang
0.2000
org
#N/A
#N/A
Mandor
0.0170
org
#N/A
#N/A
#N/A
#N/A
#VALUE!
#N/A
Bahan
Kayu Terentang
0.040
m3
49,500.00
1,980.00
0.300
Kg
#N/A
#N/A
Minyak Bekisting
0.100
Lt
#N/A
#N/A
Tenaga
Perkerja
0.300
Oh
#N/A
#N/A
Tukang Kayu
0.260
Oh
#N/A
#N/A
Kepala Tukang
0.0260
Oh
#N/A
#N/A
Mandor
0.0050
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kayu Terentang
0.040
m3
49,500.00
1,980.00
0.300
0.100
Kg
Lt
#N/A
#N/A
#N/A
#N/A
Perkerja
0.300
Oh
#N/A
#N/A
Tukang Kayu
0.260
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0260
0.0050
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
0.040
0.400
m3
Kg
49,500.00
#N/A
1,980.00
#N/A
Minyak Bekisting
Balok Kayu Borneo
0.200
Lt
#N/A
#N/A
0.015
m3
#N/A
Plywood 9 mm
#N/A
0.350
2.000
lbr
btg
49,500.00
#N/A
17,325.00
#N/A
Perkerja
0.300
Oh
#N/A
#N/A
Tukang Kayu
0.330
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0330
0.0060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
0.040
0.400
m3
Kg
49,500.00
#N/A
1,980.00
#N/A
Minyak Bekisting
Balok Kayu Borneo
0.200
Lt
#N/A
#N/A
0.018
m3
#N/A
Plywood 9 mm
#N/A
0.350
2.000
lbr
btg
49,500.00
#N/A
17,325.00
#N/A
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Kayu
0.330
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0330
0.0060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
0.040
0.400
m3
Kg
49,500.00
#N/A
1,980.00
#N/A
Minyak Bekisting
Balok Kayu Borneo
0.200
Lt
#N/A
#N/A
0.015
m3
#N/A
#N/A
Plywood 9 mm
0.350
lbr
49,500.00
17,325.00
6.000
btg
#N/A
#N/A
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Batu
0.330
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.033
0.006
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
0.040
0.400
m3
Kg
49,500.00
#N/A
1,980.00
#N/A
Minyak Bekisting
Balok Kayu Borneo
0.200
Lt
#N/A
#N/A
0.015
m3
#N/A
#N/A
Plywood 9 mm
0.350
lbr
49,500.00
17,325.00
6.000
4.000
btg
bh
#N/A
#N/A
#N/A
#N/A
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.330
0.033
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
Tenaga
#N/A
0.030
m3
49,500.00
1,485.00
#N/A
#N/A
0.400
Kg
#N/A
#N/A
Minyak Bekisting
0.150
Lt
#N/A
#N/A
0.015
m3
#N/A
#N/A
Plywood 9 mm
0.350
lbr
49,500.00
17,325.00
2.000
btg
#N/A
#N/A
Perkerja
0.320
Oh
#N/A
#N/A
Tukang Kayu
0.330
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.033
0.006
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
0.200
1.500
m3
Kg
49,500.00
#N/A
9,900.00
#N/A
#N/A
Minyak Bekisting
0.400
Lt
#N/A
#N/A
150.000
Kg
#N/A
#N/A
2.250
Kg
#N/A
#N/A
323.000
0.520
Kg
m3
#N/A
49,500.00
#N/A
25,740.00
0.780
m3
#N/A
#N/A
Perkerja
3.900
Oh
#N/A
#N/A
Tukang Batu
Tukang Kayu
0.350
1.040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Besi
1.050
Oh
#N/A
#N/A
Kepala Tukang
0.245
Oh
#N/A
#N/A
Mandor
0.165
Oh
#N/A
#N/A
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
#N/A
Tenaga
#N/A
#N/A
Kayu Terentang
0.270
m3
49,500.00
13,365.00
2.000
0.600
Kg
Lt
#N/A
#N/A
#N/A
#N/A
200.000
Kg
#N/A
#N/A
3.000
Kg
#N/A
#N/A
323.000
Kg
#N/A
#N/A
0.520
0.780
m3
m3
49,500.00
#N/A
25,740.00
#N/A
Perkerja
4.850
Oh
#N/A
#N/A
Tukang Batu
Tukang Kayu
0.350
1.560
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Besi
1.400
Oh
#N/A
#N/A
Kepala Tukang
0.331
Oh
#N/A
#N/A
Mandor
0.170
Oh
#N/A
#N/A
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
#N/A
Tenaga
#N/A
0.400
m3
49,500.00
19,800.00
4.000
Kg
#N/A
#N/A
Minyak Bekisting
Besi Beton Polos
2.000
300.000
Lt
Kg
#N/A
#N/A
#N/A
#N/A
#N/A
Kawat Beton
4.500
Kg
#N/A
323.000
Kg
#N/A
#N/A
Pasir Beton
0.520
m3
49,500.00
25,740.00
Koral Beton
Kayu Balok Borneo
0.780
0.150
m3
m3
#N/A
#N/A
#N/A
#N/A
Semen Portland
#N/A
Plywood 9 mm
3.500
lbr
#N/A
#N/A
Dolken 8 / 4 m
20.000
btg
#N/A
#N/A
Tenaga
Perkerja
7.300
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Tukang Kayu
3.300
Oh
#N/A
#N/A
Tukang Besi
2.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.570
0.250
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
0.320
3.200
m3
Kg
49,500.00
#N/A
15,840.00
#N/A
Minyak Bekisting
1.600
Lt
#N/A
#N/A
200.000
Kg
#N/A
#N/A
Kawat Beton
Semen Portland
3.000
323.000
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Beton
0.520
m3
49,500.00
25,740.00
Koral Beton
0.780
m3
#N/A
#N/A
0.140
m3
#N/A
#N/A
Plywood 9 mm
2.800
16.000
lbr
btg
#N/A
#N/A
#N/A
#N/A
Dolken 8 / 4 m
#N/A
#N/A
#N/A
Tenaga
Perkerja
5.960
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Tukang Kayu
2.800
Oh
#N/A
#N/A
Tukang Besi
Kepala Tukang
1.400
0.455
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.208
Oh
#N/A
#N/A
#N/A
Kayu Terentang
0.320
m3
49,500.00
15,840.00
3.200
Kg
#N/A
#N/A
Minyak Bekisting
1.600
Lt
#N/A
#N/A
150.000
2.250
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Semen Portland
#N/A
323.000
Kg
#N/A
#N/A
Pasir Beton
0.520
m3
49,500.00
25,740.00
Koral Beton
0.780
m3
#N/A
#N/A
0.120
2.800
m3
lbr
#N/A
#N/A
#N/A
#N/A
Dolken 8 / 4 m
Tenaga
32.000
btg
#N/A
#N/A
Perkerja
5.800
Oh
#N/A
#N/A
Tukang Batu
Tukang Kayu
0.350
2.800
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Besi
1.050
Oh
#N/A
#N/A
Kepala Tukang
0.420
Oh
#N/A
#N/A
Mandor
0.185
Oh
#N/A
#N/A
#N/A
#N/A
Kayu Terentang
0.240
m3
49,500.00
11,880.00
3.200
1.600
Kg
Lt
#N/A
#N/A
#N/A
#N/A
150.000
Kg
#N/A
#N/A
2.250
Kg
#N/A
#N/A
323.000
Kg
#N/A
#N/A
Pasir Beton
Koral Beton
0.520
0.780
m3
m3
49,500.00
#N/A
25,740.00
#N/A
0.160
m3
#N/A
#N/A
Plywood 9 mm
2.800
lbr
#N/A
#N/A
Dolken 8 / 4 m
Tenaga
24.000
btg
#N/A
#N/A
Perkerja
5.600
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Tukang Kayu
2.640
Oh
#N/A
#N/A
Tukang Besi
Kepala Tukang
1.050
0.400
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.193
Oh
#N/A
#N/A
Kawat Beton
Semen Portland
#N/A
#N/A
Bahan
Kayu Terentang
0.250
m3
49,500.00
12,375.00
3.000
Kg
#N/A
#N/A
Minyak Bekisting
1.200
Lt
#N/A
#N/A
200.000
Kg
#N/A
#N/A
Kawat Beton
Semen Portland
3.000
323.000
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Beton
0.520
m3
49,500.00
25,740.00
Koral Beton
0.780
m3
#N/A
#N/A
0.105
2.500
m3
lbr
#N/A
#N/A
#N/A
#N/A
Dolken 8 / 4 m
Tenaga
14.000
btg
#N/A
#N/A
Perkerja
5.600
Oh
#N/A
#N/A
Tukang Batu
Tukang Kayu
0.350
2.300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Besi
1.400
Oh
#N/A
#N/A
Kepala Tukang
0.405
Oh
#N/A
#N/A
Mandor
0.202
Oh
#N/A
#N/A
#N/A
0.002
m3
49,500.00
99.00
0.010
3.000
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Kawat Beton
0.450
Kg
#N/A
#N/A
Semen Portland
4.000
Kg
#N/A
#N/A
Pasir Beton
0.006
m3
49,500.00
297.00
Koral Beton
Tenaga
0.009
m3
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Perkerja
0.060
Oh
#N/A
#N/A
Tukang Batu
0.020
Oh
#N/A
#N/A
Tukang Kayu
0.020
Oh
#N/A
#N/A
Tukang Besi
0.020
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.006
0.003
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kayu Albasiah
0.003
m3
#N/A
#N/A
0.200
Kg
#N/A
#N/A
3.600
Kg
#N/A
#N/A
Kawat Beton
0.050
Kg
#N/A
#N/A
Semen Portland
Pasir Beton
5.500
0.009
Kg
m3
#N/A
49,500.00
#N/A
445.50
Koral Beton
0.015
m3
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Batu
Tukang Kayu
0.330
0.033
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Besi
0.033
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
Genteng Palentong
Tenaga
25.000
bh
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.008
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Genteng Kodok
25.000
bh
Tenaga
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.008
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
12.000
bh
Tenaga
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.060
Oh
#N/A
#N/A
Kepala Tukang
0.006
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Genteng Bubung Palentong
5.000
bh
#N/A
Semen Portland
8.000
Kg
#N/A
#N/A
#N/A
Pasir Pasang
Tenaga
0.032
m3
49,500.00
1,584.00
Perkerja
0.400
Oh
#N/A
#N/A
Tukang Kayu
0.200
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.020
0.002
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Genteng Bubung Kodok
Semen Portland
5.000
8.000
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.032
m3
49,500.00
1,584.00
Perkerja
0.400
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.200
0.020
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.002
Oh
#N/A
#N/A
Tenaga
#N/A
4.000
bh
#N/A
Semen Portland
8.000
Kg
#N/A
#N/A
Pasir Pasang
0.032
m3
49,500.00
1,584.00
Tenaga
Perkerja
0.400
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tukang Kayu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.002
Oh
#N/A
#N/A
#N/A
#N/A
0.600
lbr
#N/A
#N/A
Paku
0.050
Kg
49,500.00
2,475.00
Tenaga
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.067
Oh
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
0.500
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Tenaga
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.008
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
0.600
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.008
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
0.600
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.070
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.007
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
0.750
0.120
lbr
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.070
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.007
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
0.350
0.120
lbr
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.070
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Asbes Gelombang
0.420
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.070
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
Asbes Gelombang
0.440
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
0.140
0.067
Oh
Oh
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
0.510
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.140
0.067
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Asbes Gelombang
0.800
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.140
0.067
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Asbes Gelombang
0.370
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Tenaga
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.067
Oh
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
#N/A
Asbes Gelombang
0.380
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Tenaga
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.067
Oh
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
#N/A
Asbes Gelombang
0.460
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.067
Oh
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.007
Oh
#N/A
#N/A
#N/A
#N/A
Asbes Gelombang
0.490
lbr
#N/A
#N/A
0.120
Kg
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.067
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.007
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
0.570
0.120
lbr
Kg
#N/A
#N/A
#N/A
#N/A
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Kayu
0.067
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.007
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Asbes Gelombang
2.400
lbr
#N/A
#N/A
6.000
Kg
#N/A
#N/A
Perkerja
0.084
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.125
0.013
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
Mandor
0.004
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Asbes Gelombang
Paku Skrup 3.5"
2.400
6.000
lbr
bh
#N/A
49,500.00
#N/A
297,000.00
Perkerja
0.084
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.125
0.013
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.004
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Asbes Gelombang
2.100
lbr
#N/A
#N/A
6.000
bh
49,500.00
297,000.00
Perkerja
0.084
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.125
0.013
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.004
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Asbes Gelombang
2.050
lbr
#N/A
#N/A
6.000
bh
49,500.00
297,000.00
Perkerja
Tukang Kayu
0.084
0.125
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.013
Oh
#N/A
#N/A
Mandor
0.004
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Nok Paten
1.200
lbr
#N/A
#N/A
6.000
bh
49,500.00
297,000.00
Perkerja
Tukang Kayu
0.084
0.125
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.013
Oh
#N/A
#N/A
Mandor
0.004
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Nok Paten
1.200
lbr
#N/A
#N/A
6.000
bh
49,500.00
297,000.00
Tenaga
Perkerja
0.084
Oh
#N/A
#N/A
Tukang Kayu
0.125
Oh
#N/A
#N/A
Kepala Tukang
0.013
Oh
#N/A
#N/A
Mandor
0.004
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Nok Paten
1.200
lbr
#N/A
#N/A
6.000
bh
49,500.00
297,000.00
Tenaga
Perkerja
0.084
Oh
#N/A
#N/A
Tukang Kayu
0.125
Oh
#N/A
#N/A
Kepala Tukang
0.013
Oh
#N/A
#N/A
Mandor
0.004
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Nok Stel rata
1.100
lbr
#N/A
#N/A
6.000
bh
49,500.00
297,000.00
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.013
Oh
#N/A
#N/A
Mandor
0.004
Oh
#N/A
#N/A
#N/A
#N/A
Bahan
Nok Stel rata
Paku Skrup 3.5"
1.100
6.000
lbr
bh
#N/A
49,500.00
#N/A
297,000.00
Perkerja
0.084
Oh
#N/A
#N/A
Tukang Kayu
0.125
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.013
0.004
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Genteng Beton
11.000
lbr
#N/A
#N/A
0.030
bh
#N/A
#N/A
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.010
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Genteng Aspal
Plywood 4 mm
6.900
0.350
lbr
lbr
#N/A
49,500.00
#N/A
17,325.00
0.030
Kg
#N/A
#N/A
Plastic Aerator
0.500
Bh
#N/A
#N/A
Perkerja
Tukang Kayu
0.200
0.300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.003
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Genteng Metal
1.020
lbr
#N/A
#N/A
0.200
Kg
#N/A
#N/A
Tenaga
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.001
Oh
#N/A
#N/A
#N/A
#N/A
Genteng Sirap
60.000
lbr
#N/A
#N/A
0.200
Kg
#N/A
#N/A
Tenaga
Perkerja
0.166
Oh
#N/A
#N/A
Tukang Kayu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Genteng Beton
3.500
lbr
#N/A
#N/A
0.050
10.800
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.032
m3
49,500.00
1,584.00
Semen Warna
1.000
Kg
49,500.00
49,500.00
Perkerja
Tukang Kayu
0.400
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.020
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Genteng Aspal
2.000
lbr
#N/A
#N/A
0.050
Kg
#N/A
#N/A
0.0035
Kg
#N/A
#N/A
Perkerja
0.125
Oh
#N/A
#N/A
Tukang Kayu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Genteng Decra Bond
1.100
lbr
#N/A
#N/A
0.050
Kg
#N/A
#N/A
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.015
0.013
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Genteng Decra Bond
Paku Biasa " - 1"
1.100
0.050
lbr
Kg
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.250
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.015
Oh
#N/A
#N/A
Mandor
0.013
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Seng Plat 3" x 6" BJLS 28
Lbr
Kg
#N/A
#N/A
#N/A
#N/A
0.050
Kg
#N/A
#N/A
0.004
m3
#N/A
#N/A
Perkerja
Tukang Kayu
0.125
0.250
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
0.400
0.060
Tenaga
#N/A
#N/A
0.700
Lbr
#N/A
#N/A
0.020
Kg
#N/A
#N/A
Perkerja
Tukang Kayu
0.120
0.060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.006
Oh
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
0.300
Lbr
#N/A
#N/A
0.040
Kg
#N/A
#N/A
Tenaga
Perkerja
0.015
Oh
#N/A
#N/A
Tukang Kayu
0.070
Oh
#N/A
#N/A
Kepala Tukang
0.008
Oh
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
#N/A
#N/A
1.050
m2
#N/A
#N/A
0.020
Kg
#N/A
#N/A
Perkerja
0.015
Oh
#N/A
#N/A
Tukang Kayu
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.008
Oh
#N/A
#N/A
Mandor
0.006
Oh
#N/A
#N/A
#N/A
#N/A
1.200
m2
#N/A
#N/A
0.040
Kg
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
1.000
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.010
Oh
#N/A
#N/A
#N/A
VII
#N/A
#N/A
#N/A
1.050
m2
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.050
Oh
#N/A
#N/A
Kepala Tukang
0.005
Oh
#N/A
#N/A
Mandor
0.008
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
11,929.50
#N/A
#N/A
Bahan
Kayu Balok Borneo
Paku
0.0210
0.2200
m3
kg
49,500.00
49,500.00
1,039.50
10,890.00
Perkerja
0.1875
org
#N/A
#N/A
0.00
Tukang Kayu
Kepala Tukang
0.2250
0.0375
org
org
#N/A
HARGA UPAH
#N/A
#VALUE!
0.00
0.00
Mandor
0.0105
org
#N/A
#N/A
0.00
#N/A
#N/A
Tenaga
#N/A
1.100
lbr
#N/A
#N/A
Paku
0.010
Kg
49,500.00
495.00
Perkerja
0.030
Oh
#N/A
#N/A
Tukang Kayu
0.070
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.007
0.0015
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Pelat Asbes tebal 4 mm
1.100
lbr
#N/A
#N/A
Paku
0.010
Kg
49,500.00
495.00
Perkerja
0.030
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.070
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0015
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Pelat Asbes tebal 4 mm
1.100
lbr
#N/A
#N/A
Paku
0.010
Kg
49,500.00
495.00
Perkerja
0.030
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.070
0.007
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0015
Oh
#N/A
#N/A
#N/A
Tenaga
571,725.00
#N/A
Akustik 30 x 30 cm
11.500
lbr
49,500.00
569,250.00
Paku
0.050
Kg
49,500.00
2,475.00
0.060
0.120
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.012
Oh
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
289,575.00
#N/A
Akustik 30 x 60 cm
5.800
lbr
49,500.00
287,100.00
Paku
0.050
Kg
49,500.00
2,475.00
Tenaga
Perkerja
0.060
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
#N/A
#N/A
1.500
lbr
#N/A
#N/A
Paku
0.050
Kg
49,500.00
2,475.00
Tenaga
Perkerja
0.060
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
19,305.00
#N/A
Plywood 4 mm
0.360
lbr
49,500.00
17,820.00
Paku
Tenaga
0.030
Kg
49,500.00
1,485.00
Perkerja
0.070
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.0035
Oh
#N/A
#N/A
19,305.00
#N/A
Plywood 4 mm
0.360
lbr
49,500.00
17,820.00
Paku
Tenaga
0.030
Kg
49,500.00
1,485.00
Perkerja
0.070
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.010
0.0035
Oh
Oh
#N/A
#N/A
#N/A
#N/A
19,305.00
0.360
0.030
lbr
Kg
49,500.00
49,500.00
17,820.00
1,485.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.070
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.0035
Oh
#N/A
#N/A
19,305.00
49,500.00
49,500.00
#N/A
0.360
0.030
lbr
Kg
Perkerja
0.070
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.010
0.0035
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
17,820.00
1,485.00
Tenaga
#N/A
#N/A
#N/A
Bahan
Teakwood 4' x 8' x 4mm
Paku
0.360
0.030
lbr
Kg
#N/A
49,500.00
#N/A
1,485.00
Perkerja
0.070
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.010
0.0035
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Teakwood 4' x 8' x 4mm
0.360
lbr
#N/A
#N/A
Paku
0.030
Kg
49,500.00
1,485.00
Perkerja
0.070
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.100
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0035
Oh
#N/A
#N/A
#N/A
Tenaga
19,305.00
#N/A
Bahan
Gypsum
0.360
lbr
49,500.00
17,820.00
Paku
0.030
Kg
49,500.00
1,485.00
0.070
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.0035
Oh
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
0.024
m3
#N/A
#N/A
Paku
0.010
Kg
49,500.00
495.00
Paku Sekrup
0.050
Kg
#N/A
#N/A
Tenaga
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Kayu
0.600
Oh
#N/A
#N/A
Kepala Tukang
0.060
Oh
#N/A
#N/A
Mandor
0.0100
Oh
#N/A
#N/A
#N/A
#N/A
0.024
lbr
#N/A
#N/A
Paku
Paku Sekrup
0.010
0.050
Kg
Kg
49,500.00
#N/A
495.00
#N/A
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Kayu
0.600
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.060
0.0100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Papan Kayu Kamper
Paku
0.024
0.010
lbr
Kg
#N/A
49,500.00
#N/A
495.00
Paku Sekrup
0.050
Kg
#N/A
#N/A
0.200
0.600
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.060
Oh
#N/A
#N/A
Mandor
0.0100
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
#N/A
0.350
lbr
#N/A
#N/A
Paku
0.030
Kg
49,500.00
1,485.00
Perkerja
0.600
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.100
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
3.600
m'
#N/A
#N/A
0.150
Kg
#N/A
#N/A
Ramset / Dinabolt
1.000
bh
#N/A
#N/A
1.500
lbr
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.500
Oh
#N/A
#N/A
Kepala Tukang
0.050
Oh
#N/A
#N/A
Mandor
0.0075
Oh
#N/A
#N/A
#N/A
#N/A
1.100
m'
#N/A
#N/A
Paku
Tenaga
0.010
Kg
#N/A
#N/A
Perkerja
0.050
Oh
#N/A
#N/A
Tukang Kayu
0.050
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.005
0.0030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Balok Kayu Borneo
Paku
0.023
0.060
m3
Kg
#N/A
49,500.00
#N/A
2,970.00
Plywood 4 mm
0.390
lbr
49,500.00
19,305.00
Perkerja
0.270
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.400
0.040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0135
Oh
#N/A
#N/A
Tenaga
1 m Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
#N/A
#N/A
0.012
m3
#N/A
#N/A
Paku
0.060
Kg
49,500.00
2,970.00
Asbes
1.100
lbr
#N/A
#N/A
Tenaga
Perkerja
0.180
Oh
#N/A
#N/A
Tukang Kayu
0.320
Oh
#N/A
#N/A
Kepala Tukang
0.032
Oh
#N/A
#N/A
Mandor
0.0090
Oh
#N/A
#N/A
#N/A
#N/A
0.023
m3
#N/A
#N/A
Paku
0.060
Kg
49,500.00
2,970.00
Akustik 30 x 60 cm
Tenaga
5.800
lbr
#N/A
#N/A
Perkerja
0.260
Oh
#N/A
#N/A
Tukang Kayu
0.400
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.040
0.0130
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Balok Kayu Borneo
Paku
0.027
0.060
m3
Kg
#N/A
49,500.00
#N/A
2,970.00
Akustik 30 x 30 cm
11.500
lbr
#N/A
#N/A
Perkerja
0.310
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.470
0.047
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0155
Oh
#N/A
#N/A
Tenaga
IX
PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
#N/A
#N/A
Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Perkerja
1.000
bh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tukang Batu
1.100
Oh
#N/A
#N/A
Kepala Tukang
0.001
Oh
#N/A
#N/A
Mandor
0.1600
Oh
#N/A
#N/A
#N/A
#N/A
1.000
bh
#N/A
Semen Portland
6.000
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.010
m3
49,500.00
495.00
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Batu
1.500
Oh
#N/A
#N/A
Kepala Tukang
1.500
Oh
#N/A
#N/A
Mandor
0.1600
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kloset Jongkok Teraso
1.000
bh
#N/A
#N/A
7.000
6.000
bh
Kg
49,500.00
#N/A
346,500.00
#N/A
Pasir Pasang
0.010
m3
49,500.00
495.00
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
1.500
0.300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.1100
Oh
#N/A
#N/A
Tenaga
#N/A
bh
#N/A
#N/A
1.000
#N/A
#N/A
#N/A
Semen Portland
6.000
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.010
m3
49,500.00
495.00
Perkerja
1.000
Oh
#N/A
#N/A
Tukang Batu
1.000
Oh
#N/A
#N/A
Kepala Tukang
0.100
Oh
#N/A
#N/A
Mandor
0.1000
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Urinoir
Perlengkapan
1.000
bh
12% Harga Urinoir
#N/A
#N/A
#N/A
#N/A
6.000
Kg
49,500.00
297,000.00
Pasir Pasang
0.010
m3
49,500.00
495.00
1.000
1.450
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.150
Oh
#N/A
#N/A
Mandor
0.1000
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Batu
#N/A
#N/A
Bak Teraso
1.000
bh
#N/A
Semen Portland
6.000
Kg
#N/A
#N/A
Pasir Pasang
0.010
m3
49,500.00
495.00
Tenaga
Perkerja
2.100
Oh
#N/A
#N/A
Tukang Batu
0.750
Oh
#N/A
#N/A
Kepala Tukang
0.070
Oh
#N/A
#N/A
Mandor
0.1100
Oh
#N/A
#N/A
#N/A
58,410.00
1.000
bh
49,500.00
49,500.00
8,910.00
8,910.00
#N/A
Perkerja
1.800
Oh
#N/A
#N/A
Tukang Batu
2.700
Oh
#N/A
#N/A
Kepala Tukang
0.540
Oh
#N/A
#N/A
Mandor
0.1100
Oh
#N/A
#N/A
#N/A
0.400
120.000
m3
Kg
49,500.00
#N/A
19,800.00
#N/A
0.300
m3
49,500.00
14,850.00
360.000
bh
#N/A
#N/A
Semen Nat
6.000
Kg
#N/A
#N/A
Tenaga
Perkerja
6.000
Oh
Porselen ( 11 x 11 ) cm
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tukang Batu
3.000
Oh
#N/A
#N/A
Kepala Tukang
0.300
Oh
#N/A
#N/A
Mandor
0.3000
Oh
#N/A
#N/A
#N/A
Badkip
Perlengkapan
bh
#N/A
#N/A
1.000
#N/A
#N/A
Tenaga
Perkerja
#N/A
Oh
#N/A
#N/A
Tukang Batu
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.750
Oh
#N/A
#N/A
Mandor
0.2500
Oh
#N/A
#N/A
#N/A
1.000
bh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Perkerja
3.000
Oh
#N/A
#N/A
Tukang Batu
4.500
Oh
#N/A
#N/A
Kepala Tukang
0.900
Oh
#N/A
#N/A
Mandor
0.9000
Oh
#N/A
#N/A
#N/A
#N/A
Pipa Tanah
Semen Portland
1.600
0.680
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.013
m3
49,500.00
643.50
Pasir Urug
0.011
m3
#N/A
#N/A
0.060
0.030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.003
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Batu
#N/A
#N/A
Pipa Tanah
1.600
bh
#N/A
Semen Portland
0.870
Kg
#N/A
#N/A
Pasir Pasang
Pasir Urug
0.014
0.014
m3
m3
49,500.00
#N/A
693.00
#N/A
Perkerja
0.080
Oh
#N/A
#N/A
Tukang Batu
0.040
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.004
0.0070
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Pipa Beton
Bata merah kelas I
1.100
0.270
bh
m3
#N/A
49,500.00
#N/A
13,365.00
Semen Portland
3.920
Kg
#N/A
#N/A
Pasir Pasang
0.056
m3
49,500.00
2,772.00
Pasir Urug
0.024
m3
#N/A
#N/A
Tenaga
Perkerja
0.140
Oh
#N/A
#N/A
Tukang Batu
0.070
Oh
#N/A
#N/A
Kepala Tukang
0.007
Oh
#N/A
#N/A
Mandor
0.0070
Oh
#N/A
#N/A
#N/A
#N/A
Pipa Beton
1.100
bh
#N/A
#N/A
0.550
10.300
m3
Kg
49,500.00
#N/A
27,225.00
#N/A
Pasir Pasang
0.061
m3
49,500.00
3,019.50
Pasir Urug
0.069
m3
#N/A
#N/A
0.380
0.190
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.019
Oh
#N/A
#N/A
Mandor
0.0190
Oh
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Batu
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
#N/A
Bahan
Bata merah kelas I
0.145
m3
49,500.00
Semen Portland
44.000
Kg
#N/A
7,177.50
#N/A
Pasir Pasang
Batu Kerikil
0.070
0.070
m3
m3
49,500.00
#N/A
3,465.00
#N/A
#N/A
#N/A
Besi Beton
1.600
Kg
#N/A
#N/A
Pasir Beton
0.060
m3
49,500.00
2,970.00
Perkerja
3.200
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
1.015
0.0015
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0160
Oh
#N/A
#N/A
Tenaga
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
#N/A
#N/A
0.250
m3
49,500.00
Semen Portland
77.000
Kg
#N/A
#N/A
Pasir Pasang
0.130
m3
49,500.00
6,435.00
Batu Kerikil
Besi Beton
0.020
2.600
m3
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Beton
0.090
m3
49,500.00
4,455.00
Perkerja
1.420
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.473
0.0470
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0710
Oh
#N/A
#N/A
#N/A
12,375.00
Tenaga
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I
#N/A
#N/A
0.371
m3
49,500.00
114.000
Kg
#N/A
#N/A
Pasir Pasang
0.184
m3
49,500.00
9,108.00
Batu Koral
Besi Beton
0.033
4.850
m3
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Beton
0.120
m3
49,500.00
5,940.00
Perkerja
2.160
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.720
0.0720
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.1080
Oh
#N/A
#N/A
Tukang Gali
0.1000
Oh
#N/A
#N/A
Semen Portland
#N/A
18,364.50
Tenaga
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.054
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0270
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.054
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0270
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
Perkerja
0.054
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0270
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
Perkerja
0.108
Oh
#N/A
#N/A
Tukang Batu
0.180
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0180
0.0054
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
1.200
m'
35% Harga Pipa
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.108
Oh
#N/A
#N/A
Tukang Batu
0.180
Oh
#N/A
#N/A
Kepala Tukang
0.0180
Oh
#N/A
#N/A
Mandor
0.0054
Oh
#N/A
#N/A
#N/A
1.200
m'
35% Harga Pipa
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.135
Oh
#N/A
#N/A
Tukang Batu
0.225
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0225
0.0068
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Pipa PVC D 1/2"
Perlengkapan
1.200
m'
35% Harga Pipa
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.036
Oh
#N/A
#N/A
Tukang Batu
0.060
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0060
0.0018
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.036
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.060
0.0060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0018
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Batu
0.036
0.060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0060
Oh
#N/A
#N/A
Mandor
0.0018
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Batu
0.036
0.060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0060
Oh
#N/A
#N/A
Mandor
0.0018
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.054
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0027
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.036
Oh
#N/A
#N/A
Tukang Batu
0.060
Oh
#N/A
#N/A
Kepala Tukang
0.0060
Oh
#N/A
#N/A
Mandor
0.0018
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Perkerja
0.081
Oh
#N/A
#N/A
Tukang Batu
0.135
Oh
#N/A
#N/A
Kepala Tukang
0.0135
Oh
#N/A
#N/A
Mandor
0.0041
Oh
#N/A
#N/A
#N/A
m'
#N/A
#N/A
1.200
#N/A
#N/A
#N/A
Perkerja
0.081
Oh
#N/A
#N/A
Tukang Batu
0.135
Oh
#N/A
#N/A
Kepala Tukang
0.0135
Oh
#N/A
#N/A
Mandor
0.0041
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Bak cuci Stainless steel
1.000
bh
#N/A
#N/A
1.000
set
49,500.00
49,500.00
Perkerja
0.030
Oh
#N/A
#N/A
Tukang Batu
0.300
Oh
#N/A
#N/A
Kepala Tukang
0.0300
Oh
#N/A
#N/A
Mandor
0.0015
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Bak cuci Teraso
Water Drain + Asesories
1.000
1.000
bh
set
#N/A
#N/A
#N/A
#N/A
Semen Portland
20.000
Kg
#N/A
#N/A
Pasir Pasang
0.050
m3
49,500.00
2,475.00
Perkerja
Tukang Batu
0.050
0.500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0500
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Kran Air
1.000
bh
#N/A
#N/A
Seal tape
0.025
bh
#N/A
#N/A
Tenaga
Perkerja
0.010
Oh
#N/A
#N/A
Tukang Batu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.0100
Oh
#N/A
#N/A
Mandor
0.0050
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kran Air
1.000
bh
#N/A
#N/A
Perkerja
Tukang Batu
0.010
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0100
Oh
#N/A
#N/A
Mandor
0.0050
Oh
#N/A
#N/A
Tenaga
VII
#N/A
#N/A
#N/A
Bahan
Besi Profil WF
1.100
Kg
#N/A
#N/A
Meni Besi
Tenaga
0.080
Kg
#N/A
#N/A
Perkerja
0.006
Oh
#N/A
#N/A
Tukang Besi
0.060
Oh
#N/A
#N/A
Kepala Tukang
0.0060
Oh
#N/A
#N/A
Mandor
0.0003
Oh
#N/A
#N/A
#N/A
#N/A
1.000
m2
Tenaga
Perkerja
0.650
Oh
#N/A
#N/A
0.650
Oh
#N/A
#N/A
Kepala Tukang
0.0650
Oh
#N/A
#N/A
Mandor
0.0320
Oh
#N/A
#N/A
#N/A
#N/A
1.000
m2
Tenaga
Perkerja
1.050
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1.050
Oh
#N/A
#N/A
Kepala Tukang
0.1050
Oh
#N/A
#N/A
Mandor
0.00525
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
1.000
m2
Perkerja
Tukang Besi Konstruksi
1.022
1.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.1200
Oh
#N/A
#N/A
Mandor
0.0060
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
m2
Perkerja
1.200
Oh
#N/A
#N/A
1.200
0.1200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0060
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
m2
Perkerja
1.050
Oh
#N/A
#N/A
1.050
0.1050
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0052
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
m2
Perkerja
0.080
Oh
#N/A
#N/A
0.800
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.080
0.004
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
m2
Perkerja
1.050
Oh
#N/A
#N/A
1.500
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.105
0.0052
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Pintu Allumunium
Tenaga
1.000
m2
#N/A
#N/A
Perkerja
1.050
Oh
#N/A
#N/A
1.050
Oh
#N/A
#N/A
Kepala Tukang
0.105
Oh
#N/A
#N/A
Mandor
0.0052
Oh
#N/A
#N/A
#N/A
1.000
m2
Perkerja
0.350
Oh
#N/A
#N/A
Tukang Kayu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
0.00175
Oh
#N/A
#N/A
Mandor
#N/A
#N/A
#N/A
#N/A
#N/A
Venetions Blinds
1.000
m2
Tenaga
Perkerja
0.350
Oh
#N/A
#N/A
Tukang Kayu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.035
Oh
#N/A
#N/A
0.00175
Oh
#N/A
#N/A
Mandor
#N/A
11.500
m'
Tenaga
Perkerja
1.200
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tukang Las
1.200
Oh
#N/A
#N/A
Kepala Tukang
0.012
Oh
#N/A
#N/A
Mandor
0.0006
Oh
#N/A
#N/A
#N/A
#N/A
Kawat Harmonika
1.100
m2
#N/A
#N/A
0.020
Kg
#N/A
#N/A
0.0018
m3
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.0005
Oh
#N/A
#N/A
#N/A
#N/A
Kawat Nyamuk
1.100
m2
#N/A
#N/A
0.020
0.0018
Kg
m3
#N/A
#N/A
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.010
0.0005
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Kawat Kassa
1.100
m2
#N/A
#N/A
0.020
Kg
#N/A
#N/A
0.0018
m3
#N/A
#N/A
Tenaga
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.0005
Oh
#N/A
#N/A
#N/A
#N/A
Kawat Burung
1.100
m2
#N/A
#N/A
0.020
0.0018
Kg
m3
#N/A
#N/A
#N/A
#N/A
Perkerja
0.100
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.010
0.0005
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Jendela Nako
1.100
0.020
m2
Kg
#N/A
#N/A
#N/A
#N/A
0.0250
m2
#N/A
#N/A
Perkerja
0.200
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.200
0.020
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0010
Oh
#N/A
#N/A
#N/A
#N/A
0.500
Lbr
49,500.00
24,750.00
0.015
Kg
#N/A
#N/A
0.0096
m3
#N/A
#N/A
0.2500
Kg
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.400
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
0.00125
Oh
#N/A
#N/A
Mandor
#N/A
0.500
0.015
Lbr
Kg
49,500.00
#N/A
24,750.00
#N/A
0.0190
m3
#N/A
#N/A
0.3000
Kg
#N/A
#N/A
0.040
0.400
Oh
Oh
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
Mandor
0.025
Oh
#N/A
#N/A
0.00125
Oh
#N/A
#N/A
#N/A
#N/A
0.300
Lbr
49,500.00
14,850.00
0.100
Kg
#N/A
#N/A
0.0190
m3
#N/A
#N/A
Besi Strip
Tenaga
0.5000
Kg
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
0.250
Oh
#N/A
#N/A
Kepala Tukang
0.025
Oh
#N/A
#N/A
0.00125
Oh
#N/A
#N/A
Mandor
#N/A
#N/A
0.300
Lbr
#N/A
#N/A
0.100
0.0190
Kg
m3
#N/A
#N/A
#N/A
#N/A
Besi Strip
0.5000
Kg
#N/A
#N/A
Perkerja
0.150
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.250
0.025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
0.00125
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
Mandor
VI
#N/A
#N/A
#N/A
Bahan
Kunsi Tanam Antik
1.000
Bh
#N/A
#N/A
Perkerja
Tukang Kayu
0.060
0.600
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.060
Oh
#N/A
#N/A
Mandor
0.003
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
Tukang Kayu
0.010
0.500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.010
Oh
#N/A
#N/A
Mandor
0.005
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
0.005
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.500
0.005
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
0.005
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.500
0.005
Oh
Oh
#N/A
#N/A
#N/A
#N/A
0.00025
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
Mandor
1 Buah Pasang Engsel Pintu
Bahan
Engsel Pintu
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
0.015
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
0.015
0.00075
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Kepala Tukang
Mandor
1 Buah Pasang Engsel Jendela Kupu - kupu
Bahan
Engsel Jendela
#N/A
#N/A
#N/A
1.000
Bh
#N/A
Perkerja
0.010
Oh
#N/A
#N/A
Tukang Kayu
0.100
Oh
#N/A
#N/A
0.010
0.00050
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
Kepala Tukang
Mandor
#N/A
#N/A
#N/A
#N/A
Bahan
Engsel Angin
1.000
Bh
Tenaga
Perkerja
0.020
Oh
#N/A
#N/A
Tukang Kayu
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
0.01000
Oh
#N/A
#N/A
Mandor
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Spring Knip
1.000
Bh
Tenaga
Perkerja
0.015
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.015
Oh
#N/A
#N/A
0.00075
Oh
#N/A
#N/A
Mandor
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kait Angin
1.000
Bh
#N/A
#N/A
0.015
0.150
Oh
Oh
#N/A
#N/A
#N/A
#N/A
0.015
Oh
#N/A
#N/A
0.00075
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Closer
#N/A
#N/A
#N/A
Bahan
Door Closer
1.000
Bh
#N/A
#N/A
0.050
0.500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
0.050
Oh
#N/A
#N/A
0.00250
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunci Selot
Bahan
Kunci Selot
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
Tukang Kayu
0.020
0.200
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.020
Oh
#N/A
#N/A
Mandor
0.001
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
0.050
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.500
0.050
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
0.010
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.100
0.010
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0005
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
Bh
Perkerja
0.060
Oh
#N/A
#N/A
Tukang Kayu
0.600
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.060
0.0030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.000
Bh
#N/A
Perkerja
0.025
Oh
#N/A
#N/A
Tukang Kayu
0.250
Oh
#N/A
#N/A
0.025
0.00125
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
Kepala Tukang
Mandor
#N/A
#N/A
#N/A
#N/A
Bahan
Kaca Polos
1.100
m2
Tenaga
Perkerja
0.015
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.015
Oh
#N/A
#N/A
0.00075
Oh
#N/A
#N/A
Mandor
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kaca Polos
1.100
m2
Tenaga
Perkerja
0.015
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.015
Oh
#N/A
#N/A
0.00075
Oh
#N/A
#N/A
Mandor
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Kaca Polos
1.100
m2
#N/A
#N/A
0.0165
0.165
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0165
Oh
#N/A
#N/A
Mandor
0.00080
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
#N/A
Bahan
Kaca Buram
1.100
m2
#N/A
#N/A
0.0250
0.250
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0250
Oh
#N/A
#N/A
Mandor
0.00125
Oh
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
#N/A
1.100
m2
0.0150
0.150
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0150
Oh
#N/A
#N/A
Mandor
0.00075
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Kayu
#N/A
#N/A
#N/A
1.100
m2
Perkerja
0.0150
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.150
0.0150
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.00075
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.100
m2
Perkerja
0.0165
Oh
#N/A
#N/A
Tukang Kayu
Kepala Tukang
0.165
0.0165
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.00080
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.100
m2
Perkerja
0.0150
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
0.0150
0.00075
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Kepala Tukang
Mandor
1 Buah Pasang Kaca Patri tebal 5 mm
Bahan
Kaca Patri
#N/A
#N/A
#N/A
1.100
m2
#N/A
Perkerja
0.0150
Oh
#N/A
#N/A
Tukang Kayu
0.150
Oh
#N/A
#N/A
0.0150
0.00075
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
Kepala Tukang
Mandor
#N/A
VI
#N/A
#N/A
#N/A
Bahan
Ubin Abu -abu 40 x40 cm
Semen Portland
6.630
9.800
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0215
m3
49,500.00
1,064.25
Tenaga
Perkerja
0.2500
Oh
#N/A
#N/A
Tukang Batu
0.120
Oh
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
11.870
bh
#N/A
Semen Portland
10.000
Kg
#N/A
#N/A
Pasir Pasang
0.0215
m3
49,500.00
1,064.25
Perkerja
0.2600
Oh
#N/A
#N/A
Tukang Batu
0.125
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0125
0.0130
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Ubin Abu -abu 20 x 20 cm
26.500
bh
#N/A
Semen Portland
10.400
Kg
#N/A
#N/A
Pasir Pasang
0.0135
m3
49,500.00
668.25
Tenaga
Perkerja
0.2700
Oh
#N/A
#N/A
Tukang Batu
0.130
Oh
#N/A
#N/A
Kepala Tukang
0.0130
Oh
#N/A
#N/A
Mandor
0.0135
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Ubin Warna 40 x 40 cm
6.630
bh
#N/A
#N/A
Semen Portland
Pasir Pasang
8.160
0.0230
Kg
m3
#N/A
49,500.00
#N/A
1,138.50
Semen Warna
0.9000
Kg
49,500.00
44,550.00
Perkerja
Tukang Batu
0.2500
0.120
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Ubin Warna 30 x 30 cm
11.870
bh
#N/A
Semen Portland
8.360
Kg
#N/A
#N/A
Pasir Pasang
0.0230
m3
49,500.00
1,138.50
Semen Warna
0.9000
Kg
49,500.00
44,550.00
Perkerja
0.2500
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.120
0.0120
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Ubin Warna 20 x 20 cm
26.500
bh
#N/A
Semen Portland
8.760
Kg
#N/A
#N/A
Pasir Pasang
0.0230
m3
49,500.00
1,138.50
Semen Warna
0.9000
Kg
49,500.00
44,550.00
Perkerja
0.2700
Oh
#N/A
#N/A
Tukang Batu
0.130
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0130
0.0135
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
6.250
8.800
bh
Kg
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0215
m3
49,500.00
1,064.25
Semen Warna
0.9000
Kg
49,500.00
44,550.00
Perkerja
Tukang Batu
0.2500
0.120
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Ubin Teraso 30 x 30 cm
1.870
bh
#N/A
Semen Portland
10.000
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.0215
1.5400
m3
Kg
49,500.00
49,500.00
1,064.25
76,230.00
Perkerja
0.2600
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.125
0.0125
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0130
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Ubin Granito 40 x 40 cm
6.930
bh
#N/A
Semen Portland
9.800
Kg
#N/A
#N/A
Pasir Pasang
0.0215
m3
49,500.00
1,064.25
Semen Warna
1.3000
Kg
49,500.00
64,350.00
Perkerja
0.2500
Oh
#N/A
#N/A
Tukang Batu
0.120
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0125
0.0125
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Ubin Granito 30 x 30 cm
Semen Portland
11.870
10.000
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0215
m3
49,500.00
1,064.25
Semen Warna
1.5000
Kg
49,500.00
74,250.00
Perkerja
0.2600
Oh
#N/A
#N/A
Tukang Batu
0.125
Oh
#N/A
#N/A
Kepala Tukang
0.0125
Oh
#N/A
#N/A
Mandor
0.0130
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
6.250
bh
#N/A
#N/A
Semen Portland
Pasir Pasang
8.800
0.0215
Kg
m3
#N/A
49,500.00
#N/A
1,064.25
Semen Warna
1.3000
Kg
49,500.00
64,350.00
Perkerja
Tukang Batu
0.2500
0.120
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
11.807
bh
#N/A
Semen Portland
10.000
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.0215
1.1250
m3
Kg
49,500.00
49,500.00
1,064.25
55,687.50
Perkerja
0.2500
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.120
0.0120
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
5.600
bh
#N/A
Semen Portland
8.190
Kg
#N/A
#N/A
#N/A
Pasir Pasang
0.0450
m3
49,500.00
2,227.50
Semen Warna
1.0000
Kg
49,500.00
49,500.00
#N/A
#N/A
Tenaga
Perkerja
0.2500
Oh
#N/A
#N/A
Tukang Batu
0.120
Oh
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0125
Oh
#N/A
#N/A
#N/A
#N/A
6.250
8.800
bh
Kg
#N/A
#N/A
Pasir Pasang
0.0215
m3
49,500.00
1,064.25
Semen Warna
1.3000
Kg
49,500.00
64,350.00
Tenaga
Perkerja
0.6720
Oh
#N/A
#N/A
Tukang Batu
0.224
Oh
#N/A
#N/A
Kepala Tukang
0.0220
Oh
#N/A
#N/A
Mandor
0.0340
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
11.870
bh
#N/A
Semen Portland
10.000
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.0215
1.5000
m3
Kg
49,500.00
49,500.00
1,064.25
74,250.00
Perkerja
Tukang Batu
0.7000
0.340
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0340
Oh
#N/A
#N/A
Mandor
0.0350
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
5.300
bh
#N/A
Semen Portland
1.560
Kg
#N/A
#N/A
Pasir Pasang
0.0040
m3
49,500.00
198.00
Perkerja
0.0600
Oh
#N/A
#N/A
Tukang Batu
0.030
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0030
0.0030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
3.530
1.560
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0030
m3
49,500.00
148.50
Perkerja
Tukang Batu
0.0600
0.030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0030
Oh
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
2.650
bh
#N/A
Semen Portland
1.560
Kg
#N/A
#N/A
Pasir Pasang
0.0030
m3
49,500.00
148.50
Perkerja
0.0600
Oh
#N/A
#N/A
Tukang Batu
0.030
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0030
0.0030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Plint Ubin PC Warna 10 x 20 cm
Semen Portland
5.300
1.200
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0030
m3
49,500.00
148.50
Semen Warna
0.1900
Kg
#N/A
#N/A
Perkerja
0.0600
Oh
#N/A
#N/A
Tukang Batu
0.030
Oh
#N/A
#N/A
Kepala Tukang
0.0030
Oh
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
3.330
bh
#N/A
Semen Portland
1.650
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.0032
0.1000
m3
Kg
49,500.00
#N/A
158.40
#N/A
Perkerja
Tukang Batu
0.0600
0.030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0030
Oh
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
2.650
bh
#N/A
Semen Portland
1.200
Kg
#N/A
#N/A
Pasir Pasang
0.0030
m3
49,500.00
148.50
Semen Warna
0.1000
Kg
#N/A
#N/A
Perkerja
0.0800
Oh
#N/A
#N/A
Tukang Batu
0.040
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0040
0.0040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Plint Ubin Teraso 10 x 30 cm
3.530
bh
#N/A
Semen Portland
1.560
Kg
#N/A
#N/A
Pasir Pasang
0.0030
m3
49,500.00
148.50
Semen Warna
0.1900
Kg
#N/A
#N/A
Perkerja
0.0800
Oh
#N/A
#N/A
Tukang Batu
0.040
Oh
#N/A
#N/A
Kepala Tukang
0.0040
Oh
#N/A
#N/A
Mandor
0.0040
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
2.650
1.200
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0030
m3
49,500.00
148.50
Semen Warna
0.1000
Kg
#N/A
#N/A
Tenaga
Perkerja
0.0800
Oh
#N/A
#N/A
Tukang Batu
0.040
Oh
#N/A
#N/A
Kepala Tukang
0.0040
Oh
#N/A
#N/A
Mandor
0.0040
Oh
#N/A
#N/A
#N/A
#N/A
2.650
bh
#N/A
Semen Portland
1.200
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.0030
0.1000
m3
Kg
49,500.00
#N/A
148.50
#N/A
Perkerja
Tukang Batu
0.0600
0.030
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0030
Oh
#N/A
#N/A
Mandor
0.0030
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
3.330
bh
#N/A
Semen Portland
1.650
Kg
#N/A
#N/A
Pasir Pasang
0.0032
m3
49,500.00
158.40
Semen Warna
0.1000
Kg
#N/A
#N/A
Perkerja
0.9000
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.090
0.0090
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
2.500
bh
#N/A
#N/A
#N/A
#N/A
Semen Portland
1.650
Kg
#N/A
#N/A
Pasir Pasang
0.0032
m3
49,500.00
158.40
Semen Warna
0.1000
Kg
#N/A
#N/A
Tenaga
Perkerja
0.9000
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
#N/A
3.330
bh
#N/A
#N/A
Semen Portland
Pasir Pasang
1.650
0.0032
Kg
m3
#N/A
49,500.00
#N/A
158.40
Semen Warna
0.1000
Kg
#N/A
#N/A
Perkerja
Tukang Batu
0.9000
0.090
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
1.700
bh
#N/A
Semen Portland
1.650
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.0032
0.1000
m3
Kg
49,500.00
#N/A
158.40
#N/A
Perkerja
0.9000
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.090
0.0090
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Plint Ubin Teralux Marmer 10 x 40 cm
2.500
bh
#N/A
Semen Portland
1.650
Kg
#N/A
#N/A
Pasir Pasang
0.0032
m3
49,500.00
158.40
Semen Warna
0.1000
Kg
#N/A
#N/A
Perkerja
0.9000
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0090
0.0045
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland
3.330
1.650
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0032
m3
49,500.00
158.40
Semen Warna
0.1000
Kg
#N/A
#N/A
Tenaga
Perkerja
0.9000
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
0.0036
m3
Perkerja
0.9000
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.0036
m3
#N/A
Perkerja
0.9000
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0090
0.0045
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.0500
m2
#N/A
#N/A
14.1400
0.0400
Kg
m3
#N/A
49,500.00
#N/A
1,980.00
Perkerja
Tukang Batu
0.2700
0.150
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0150
Oh
#N/A
#N/A
Mandor
0.0135
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
5.0000
bh
#N/A
Semen Portland
11.3800
Kg
#N/A
#N/A
Pasir Pasang
0.0420
m3
49,500.00
2,079.00
Semen Warna
1.5000
Kg
49,500.00
74,250.00
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0350
0.0300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Plint Keramik Artistik 10 x 20 cm
5.000
bh
#N/A
Semen Portland
1.650
Kg
#N/A
#N/A
Pasir Pasang
0.0032
m3
49,500.00
158.40
Semen Warna
0.1000
Kg
#N/A
#N/A
Perkerja
0.0900
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Plint Keramik Artistik 10 x 10 cm
Semen Portland
5.000
1.650
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.0032
m3
49,500.00
158.40
Semen Warna
0.1200
Kg
#N/A
#N/A
Tenaga
Perkerja
0.0900
Oh
#N/A
#N/A
Tukang Batu
0.090
Oh
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Plint Keramik Artistik 5 x 20 cm
5.000
bh
#N/A
Semen Portland
0.850
Kg
#N/A
#N/A
#N/A
Pasir Pasang
Semen Warna
0.0022
0.0800
m3
Kg
49,500.00
#N/A
108.90
#N/A
Perkerja
Tukang Batu
0.0900
0.090
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0090
Oh
#N/A
#N/A
Mandor
0.0045
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Lt. Vinyl Karet 30 x 30 kwl I
3.500
bh
#N/A
#N/A
Lem Vinyl
0.080
Kg
49,500.00
3,960.00
Perkerja
0.0800
Oh
#N/A
#N/A
Tukang Batu
0.080
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0080
0.0040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
50.000
11.380
bh
Kg
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.042
m3
49,500.00
2,079.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
Tukang Batu
0.6200
0.350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Ubin Keramik 15 x 15 cm
44.000
bh
#N/A
Semen Portland
11.380
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.042
1.500
m3
Kg
49,500.00
49,500.00
2,079.00
74,250.00
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.350
0.0350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Ubin Keramik 20 x 20 cm
25.000
bh
#N/A
Semen Portland
11.380
Kg
#N/A
#N/A
Pasir Pasang
0.042
m3
49,500.00
2,079.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0350
0.0300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Ubin Keramik 25 x 25 cm
Semen Portland
16.000
11.380
bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.042
m3
49,500.00
2,079.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
Tenaga
#N/A
#N/A
Ubin Keramik 15 x 20 cm
35.000
bh
#N/A
#N/A
Semen Portland
Pasir Pasang
11.380
0.042
Kg
m3
#N/A
49,500.00
#N/A
2,079.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
Tukang Batu
0.6200
0.350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Ubin Keramik 33 x 33 cm
10.000
bh
#N/A
Semen Portland
11.380
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.042
1.500
m3
Kg
49,500.00
49,500.00
2,079.00
74,250.00
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.350
0.0350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
10.000
bh
#N/A
Semen Portland
11.380
Kg
#N/A
#N/A
#N/A
Pasir Pasang
0.042
m3
49,500.00
2,079.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
#N/A
#N/A
Tenaga
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
Ubin Keramik 10 x 33 cm
Semen Portland
33.000
11.380
bh
Kg
#N/A
#N/A
Pasir Pasang
0.042
m3
49,500.00
2,079.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Tenaga
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Mozaik 30 x 30 cm
12.000
bh
#N/A
Semen Portland
14.150
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.039
2.000
m3
Kg
49,500.00
49,500.00
1,930.50
99,000.00
Perkerja
Tukang Batu
0.6200
0.350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Marmer
1.052
M2
#N/A
Semen Portland
14.150
Kg
#N/A
#N/A
Pasir Pasang
0.039
m3
49,500.00
1,930.50
Semen Warna
2.000
Kg
49,500.00
99,000.00
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.350
0.0350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Feltex 100% Wool - T - 21
1.050
m2
#N/A
#N/A
Lem Vinyl
0.350
Kg
49,500.00
17,325.00
Perkerja
Tukang Batu
0.1700
0.170
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0170
Oh
#N/A
#N/A
Mandor
0.0085
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
1.050
m2
#N/A
#N/A
Lem Vinyl
0.350
Kg
49,500.00
17,325.00
Perkerja
0.1700
Oh
#N/A
#N/A
Tukang Batu
0.170
Oh
#N/A
#N/A
Kepala Tukang
0.0170
Oh
#N/A
#N/A
Mandor
0.0085
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
1.050
m2
Perkerja
0.1200
Oh
#N/A
#N/A
Tukang Batu
0.120
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0120
0.0060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
1.050
0.350
m2
Kg
#N/A
49,500.00
#N/A
17,325.00
#N/A
#N/A
Tenaga
Perkerja
0.1700
Oh
#N/A
#N/A
Tukang Batu
0.170
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0170
0.0085
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Parquet Jati
1.050
m2
#N/A
#N/A
Lem Vinyl
0.600
Kg
49,500.00
29,700.00
Perkerja
Tukang Batu
0.6500
0.350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0325
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Porselen 11 x 11 cm putih
83.000
Bh
#N/A
9.300
Kg
#N/A
#N/A
Pasir Pasang
Semen Warna
0.018
1.500
m3
Kg
49,500.00
49,500.00
891.00
74,250.00
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.500
0.0500
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Porselen 11 x 11 cm warna
83.000
Bh
#N/A
9.300
Kg
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Tenaga
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.500
Oh
#N/A
#N/A
Kepala Tukang
0.0500
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Porselen 15 x 15 cm putih
45.000
Bh
#N/A
#N/A
9.300
0.018
Kg
m3
#N/A
49,500.00
#N/A
891.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
0.6000
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.450
0.0450
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Porselen 15 x 15 cm warna
45.000
Bh
#N/A
9.300
Kg
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
Semen Warna
Tenaga
1.500
Kg
49,500.00
74,250.00
Perkerja
0.6000
Oh
#N/A
#N/A
Tukang Batu
0.450
Oh
#N/A
#N/A
Kepala Tukang
0.0450
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Porselen 10 x 20 cm warna
50.000
Bh
#N/A
#N/A
9.300
0.018
Kg
m3
#N/A
49,500.00
#N/A
891.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
Tukang Batu
0.6000
0.450
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0450
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Porselen 20 x 20 cm warna
25.000
Bh
#N/A
9.300
Kg
#N/A
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Tenaga
Perkerja
0.6000
Oh
#N/A
#N/A
Tukang Batu
0.450
Oh
#N/A
#N/A
Kepala Tukang
0.0450
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
100.000
Bh
#N/A
#N/A
9.300
0.018
Kg
m3
#N/A
49,500.00
#N/A
891.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
0.6000
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.450
0.0450
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
100.000
Bh
#N/A
9.300
Kg
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
Semen Warna
Tenaga
1.500
Kg
49,500.00
74,250.00
Perkerja
0.6000
Oh
#N/A
#N/A
Tukang Batu
0.450
Oh
#N/A
#N/A
Kepala Tukang
0.0450
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Keramik 10 x 20 cm
50.000
Bh
#N/A
#N/A
9.300
0.018
Kg
m3
#N/A
49,500.00
#N/A
891.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
Tukang Batu
0.6000
0.450
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0450
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Keramik 15 x 15 cm
45.000
Bh
#N/A
9.300
Kg
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
Semen Warna
Tenaga
1.500
Kg
49,500.00
74,250.00
Perkerja
0.6000
Oh
#N/A
#N/A
Tukang Batu
0.450
Oh
#N/A
#N/A
Kepala Tukang
0.0450
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Keramik 20 x 20 cm
Semen Abu -abu
25.000
9.300
Bh
Kg
#N/A
#N/A
Pasir Pasang
0.018
m3
49,500.00
891.00
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
Tukang Batu
0.6000
0.100
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0450
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Keramik 10 x 20 cm
50.000
Bh
#N/A
9.300
Kg
#N/A
#N/A
#N/A
Pasir Pasang
Semen Warna
0.018
1.500
m3
Kg
49,500.00
49,500.00
891.00
74,250.00
Perkerja
0.6000
Oh
#N/A
#N/A
Tukang Batu
0.125
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0125
0.0300
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Marmer
1.020
M2
#N/A
#N/A
12.440
0.025
Kg
m3
#N/A
49,500.00
#N/A
1,237.50
Semen Warna
1.500
Kg
49,500.00
74,250.00
Perkerja
Tukang Batu
0.7200
0.650
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0650
Oh
#N/A
#N/A
Mandor
0.0350
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
80.000
Bh
#N/A
12.440
Kg
#N/A
#N/A
Pasir Pasang
Tenaga
0.025
m3
49,500.00
1,237.50
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Batu Paros
Semen Abu -abu
1.050
11.750
Bh
Kg
#N/A
#N/A
#N/A
#N/A
Pasir Pasang
0.035
m3
49,500.00
1,732.50
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
Kepala Tukang
0.350
0.0350
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Bahan
Batu Tempel Hitam
1.050
Bh
#N/A
11.750
Kg
#N/A
#N/A
Pasir Pasang
0.035
m3
49,500.00
1,732.50
Tenaga
Perkerja
0.6200
Oh
#N/A
#N/A
Tukang Batu
0.350
Oh
#N/A
#N/A
Kepala Tukang
0.0350
Oh
#N/A
#N/A
Mandor
0.0300
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Vinyl Karet 30 x 30 cm KL I
11.050
Bh
#N/A
#N/A
Lem Vinyl
0.350
Kg
#N/A
#N/A
Tenaga
Perkerja
0.1500
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.0150
Oh
#N/A
#N/A
Mandor
0.0075
Oh
#N/A
#N/A
#N/A
#N/A
Vinyl Karet 30 x 30 cm KL II
11.050
Bh
#N/A
#N/A
Lem Vinyl
Tenaga
0.350
Kg
#N/A
#N/A
Perkerja
0.1500
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.0150
Oh
#N/A
#N/A
Mandor
0.0075
Oh
#N/A
#N/A
#N/A
#N/A
Vinyl Asbes 30 x 30 cm
11.050
Bh
#N/A
#N/A
Lem Vinyl
Tenaga
0.350
Kg
#N/A
#N/A
Perkerja
0.1500
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0150
0.0075
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
11.050
0.350
Bh
Kg
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
0.1500
Oh
#N/A
#N/A
Tukang Batu
0.150
Oh
#N/A
#N/A
Kepala Tukang
0.0150
Oh
#N/A
#N/A
Mandor
0.0075
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1.100
0.250
m2
Kg
Perkerja
0.7500
Oh
#N/A
#N/A
Tukang Batu
0.170
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0170
0.0085
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Bahan
Floor Hardener Ferrovax
Tenaga
3.000
Kg
#N/A
#N/A
Perkerja
0.1200
Oh
#N/A
#N/A
Tukang Batu
0.120
Oh
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0060
Oh
#N/A
#N/A
#N/A
5.000
Kg
Perkerja
0.1200
Oh
#N/A
#N/A
Tukang Batu
0.120
Oh
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0060
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
1 m Plint Kayu 2 x 10 cm
Bahan
VI
#N/A
#N/A
0.002
m3
#N/A
#N/A
0.050
Kg
49,500.00
2,475.00
Perkerja
0.1200
Oh
#N/A
#N/A
Tukang Kayu
0.120
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0120
0.0060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
PEKERJAAN PENGECATAN
1 m Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api
#N/A
#N/A
#N/A
0.050
Kg
0.1500
Oh
#N/A
#N/A
Oh
#N/A
#N/A
0.0025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mencuci Bidang Permukaan Tembok yang Pernah dicat
#N/A
#N/A
#N/A
Bahan
Sabun
Tenaga
0.050
Kg
Perkerja
0.1500
Oh
#N/A
#N/A
Oh
#N/A
#N/A
0.0025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tukang Cat
Kepala Tukang
Mandor
#N/A
#N/A
#N/A
#N/A
#N/A
Bahan
Sabun
Tenaga
0.050
Kg
Perkerja
#N/A
#N/A
0.1500
Oh
#N/A
#N/A
Tukang Cat
Oh
#N/A
#N/A
Kepala Tukang
Oh
#N/A
#N/A
0.0025
Oh
#N/A
#N/A
Mandor
#N/A
0.050
Kg
Perkerja
#N/A
#N/A
#N/A
0.1500
Oh
#N/A
#N/A
Tukang Cat
Oh
#N/A
#N/A
Kepala Tukang
Oh
#N/A
#N/A
0.0025
Oh
#N/A
#N/A
Mandor
#N/A
1 m Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2.
Bahan
#N/A
Pasir Silika
40.000
Kg
#N/A
#N/A
BBM
10.000
Ltr
#N/A
#N/A
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle
#N/A
#N/A
sewa / Hr
Tenaga
Perkerja
1.6000
Oh
#N/A
#N/A
Tukang Cat
Kepala Tukang
1.600
0.8000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.5000
Oh
#N/A
#N/A
#N/A
#N/A
Bahan
Dempul Jadi
0.080
Kg
#N/A
#N/A
Minyak Cat
0.020
Kg
#N/A
#N/A
Batu Apung
0.010
Kg
#N/A
#N/A
Perkerja
Tukang Cat
0.0400
0.040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0040
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Plamir
0.150
Kg
#N/A
#N/A
Cat Dasar
0.170
Kg
#N/A
#N/A
Cat Penutup
Tenaga
0.170
Kg
#N/A
#N/A
Perkerja
0.0700
Oh
#N/A
#N/A
Tukang Cat
0.075
Oh
#N/A
#N/A
Kepala Tukang
0.0075
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
#N/A
Cat Meni
0.200
Kg
#N/A
#N/A
Plamir
Cat Dasar
0.150
0.170
Kg
Kg
#N/A
#N/A
#N/A
#N/A
0.260
Kg
49,500.00
12,870.00
Tenaga
Perkerja
0.0700
Oh
#N/A
#N/A
Tukang Cat
0.009
Oh
#N/A
#N/A
Kepala Tukang
0.0060
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
#N/A
Cat Meni
0.200
Kg
#N/A
#N/A
Plamir
0.150
Kg
#N/A
#N/A
Cat Dasar
Cat Kayu glotek
0.170
0.350
Kg
Kg
#N/A
49,500.00
#N/A
17,325.00
Perkerja
0.0700
Oh
#N/A
#N/A
Tukang Cat
Kepala Tukang
0.105
0.0040
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
#N/A
#N/A
Cat Meni
0.200
Kg
#N/A
#N/A
Plamir
0.150
Kg
#N/A
#N/A
Cat Dasar
0.170
Kg
#N/A
#N/A
0.350
Kg
49,500.00
17,325.00
Perkerja
0.0700
Oh
#N/A
#N/A
Tukang Cat
0.105
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0040
0.0025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.360
Ltr
#N/A
Perkerja
0.0400
Oh
#N/A
#N/A
Tukang Cat
0.063
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0630
0.0025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
Pelitur
0.150
Ltr
#N/A
#N/A
Pelitur Jadi
Ampelas
0.372
2.000
Ltr
Lbr
#N/A
#N/A
#N/A
#N/A
Perkerja
0.0400
Oh
#N/A
#N/A
Tukang Cat
Kepala Tukang
0.063
0.0630
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
#N/A
0.350
Ltr
0.1000
Oh
#N/A
#N/A
Oh
#N/A
#N/A
0.0060
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pelaburan Bidang Kayu dengan Vernis
#N/A
#N/A
#N/A
Bahan
Vernis
Dempul
0.150
0.050
Ltr
Kg
#N/A
#N/A
#N/A
#N/A
Ampelas
0.100
Lbr
#N/A
#N/A
Kuas
0.010
Bh
#N/A
#N/A
Tenaga
Perkerja
0.1600
Oh
#N/A
#N/A
Tukang Cat
0.160
Oh
#N/A
#N/A
Kepala Tukang
0.0160
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
1 m Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
#N/A
Plamir
0.100
Kg
#N/A
Cat Dasar
0.100
Kg
#N/A
#N/A
0.260
Kg
49,500.00
12,870.00
Perkerja
0.0200
Oh
#N/A
#N/A
Tukang Cat
0.063
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0063
0.0025
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Ampelas
Alang - alang
0.100
0.250
Lbr
ikat
#N/A
#N/A
#N/A
#N/A
Perancah Kayu
0.002
m3
#N/A
#N/A
Kapur Sirih
0.150
Kg
#N/A
#N/A
Perkerja
Tukang Cat
0.1500
0.001
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Kepala Tukang
0.0001
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
Tenaga
#N/A
#N/A
Perancah Kayu
0.002
m3
#N/A
#N/A
Kapur Sirih
0.300
Kg
#N/A
#N/A
Tenaga
Perkerja
0.0400
Oh
#N/A
#N/A
Tukang Cat
0.005
Oh
#N/A
#N/A
Kepala Tukang
0.0005
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
#N/A
Wall Paper
1.200
m3
#N/A
#N/A
Perekat
0.200
Kg
#N/A
#N/A
Tenaga
Perkerja
0.0200
Oh
#N/A
#N/A
Tukang Cat
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.0020
Oh
#N/A
#N/A
Mandor
0.0025
Oh
#N/A
#N/A
#N/A
0.100
Kg
#N/A
#N/A
Kuas
Tenaga
0.010
Bh
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Perkerja
0.0200
Oh
#N/A
#N/A
Tukang Cat
0.200
Oh
#N/A
#N/A
Kepala Tukang
0.0200
Oh
#N/A
#N/A
Mandor
0.0100
Oh
#N/A
#N/A
#N/A
#N/A
Meni Besi
0.100
Kg
#N/A
#N/A
Kuas
Perancah Kayu
0.010
0.002
Bh
m3
#N/A
#N/A
#N/A
#N/A
Perkerja
0.2500
Oh
#N/A
#N/A
Tukang Cat
0.225
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0225
0.0075
Oh
Oh
#N/A
#N/A
#N/A
#N/A
#N/A
Tenaga
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um
#N/A
#N/A
#N/A
Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B
0.100
0.100
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Alluminium C
0.040
Kg
#N/A
#N/A
Alluminium B
0.040
Kg
#N/A
#N/A
Pengencer
0.010
Ltr
#N/A
#N/A
Perancah Kayu
Tenaga
0.002
m3
#N/A
#N/A
Perkerja
0.0060
Oh
#N/A
#N/A
Tukang Cat
0.006
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.0225
0.0075
Oh
Oh
#N/A
#N/A
#N/A
#N/A
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um
14,850.00
#N/A
#N/A
Bahan
Meni Besi
Tenaga
0.300
Kg
49,500.00
14,850.00
Perkerja
0.0060
Oh
#N/A
#N/A
Tukang Cat
0.060
Oh
#N/A
#N/A
Kepala Tukang
0.0120
Oh
#N/A
#N/A
Mandor
0.0060
Oh
#N/A
#N/A
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um
Bahan
#N/A
#N/A
Cat Dasar
Cat Antara
0.110
0.170
Kg
Kg
#N/A
#N/A
#N/A
#N/A
Cat Penutup
0.080
Kg
#N/A
#N/A
Perkerja
0.5000
Oh
#N/A
#N/A
Tukang Cat
Kepala Tukang
0.800
0.3000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Mandor
0.2000
Oh
#N/A
#N/A
#N/A
Tenaga
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um
#N/A
Bahan
Cat Dasar
#N/A
#N/A
#N/A
0.300
Kg
Perkerja
0.4000
Oh
#N/A
#N/A
Tukang Cat
0.700
Oh
#N/A
#N/A
Kepala Tukang
Mandor
0.2000
0.2000
Oh
Oh
#N/A
#N/A
#N/A
#N/A
Tenaga
#N/A
NO
NO
JENIS UPAH
SPESIFIKASI
harga real
SATUAN
Pekerja / knek
Rp
55,798.00 Oh
Tukang gali
Rp
65,734.00 Oh
Rp
75,671.00 Oh
Rp
65,734.00 Oh
Rp
75,671.00 Oh
Rp
65,734.00 Oh
Rp
75,671.00 Oh
Tukang besi
Kepala tukang cat
Rp
65,718.00 Oh
Rp
75,671.00 Oh
Tukang Cat
Tukang aspalt
Rp
65,734.00 Oh
Rp
65,734.00 Oh
Mandor/ pengawas
Rp
85,607.00 Oh
Instalator
Pembantu instalator
Rp
75,671.00 Oh
Rp
65,718.00 Oh
Rp
55,798.00 Oh
Rp
65,734.00 Oh
Rp
65,734.00 Oh
Rp
55,798.00 Oh
Rp
85,607.00 Oh
Rp
65,734.00 Oh
Rp
65,734.00 Oh
JENIS BAHAN
Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik Arm Strong Ukuran 30 x 120 cm
Akustik Armstrom 60 x 120cm
Alang - alang
Alluminium B
Alluminium C
Ampelas
Asbes
Asbes Gelombang
Atap Alluminium Gelombang tebal 0.55
Badkip
Bahan Teraso Cor
Bak Teraso
Bak cuci Stainless steel
Bak cuci Teraso
Bak Fiberglass
Balok Kayu Borneo
Balok Kayu Jati
SPESIFIKASI
harga real
SATUAN
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Bambu 6 - 8 / 600 cm
Bata merah kelas I
Rp
#N/A
Rp
Rp
#N/A
Batacote
Batu Apung
Rp
#N/A
Rp
#N/A
Batu Belah 15 / 20
Batu Belah 5 / 20
Rp
#N/A
Rp
#N/A
Batu Belah 5 / 7
Rp
#N/A
Batu Granito
Batu Kerikil
Rp
#N/A
Rp
#N/A
Batu Koral
Batu Paros
Rp
#N/A
Rp
#N/A
Rp
#N/A
Batu Teraso
BBM
Rp
#N/A
Rp
#N/A
Besi Beton
Besi Beton ( Polos / Ulir )
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Besi Strip
Carpet
Carpet 80% Wool, 20% Nylon
Cat Tembok vinilex
Cat Antara
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Cat Dasar
Cat Meni
Cat Penutup
Cat Kayu glotek
Dempul
Dempul Jadi
Dolken Kayu Galam 8 - 10 / 4m
Dolken Kayu 8 - 10/400 cm
Dolken 8 / 4 m
Door Closer
Door Holder
Door Stop
Engsel Angin
Engsel Jendela
Engsel Pintu
Feltex 100% Wool - T - 21
Flincote / Meni Besi
Floor Hardener Ferrovax
Formika 4' x 3'
Formtie / penjaga jarak bekisting
Genteng Aspal
Genteng Beton
Genteng Bubung Kodok
Genteng Bubung Palentong
Genteng Decra Bond
vinilex
Genteng Kodok
Genteng Metal
Rp
#N/A
Rp
#N/A
Genteng Palentong
Genteng Palentong Super
Rp
#N/A
Rp
#N/A
Genteng Sirap
Rp
Gypsum
Ijuk
Rp
Rp
#N/A
Jendela Besi
Jendela Besi Tahan Api
Rp
#N/A
Rp
#N/A
Jendela Nako
Rp
#N/A
Kaca Buram
Kaca Cermin
Rp
#N/A
Rp
#N/A
Kaca Patri
Kaca Polos
Rp
#N/A
Rp
#N/A
Kaca Wireglass
Rp
#N/A
Kait Angin
Kapur Padam
Rp
#N/A
Rp
#N/A
Kapur Sirih
Kaso 5 / 7 ( albasiah )
Rp
#N/A
Rp
#N/A
Kawat Beton
Kawat Burung
Kawat Duri
Rp
#N/A
Rp
#N/A
Rp
#N/A
Kawat Harmonika
Kawat Kassa
Kawat Nyamuk
Kawat seng polos
Kayu Albasiah
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
#N/A
lbr
hr
Rp
#N/A
Rp
#N/A
Lem Kayu
Lem Vinyl
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Meni Besi
Rp
#N/A
Minyak Bekisting
Minyak Cat
Rp
#N/A
Rp
#N/A
Mozaik 30 x 30 cm
Nok Paten
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
Rp
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Plamir
Plamuur Tembok
Rp
#N/A
Rp
#N/A
Plastic Aerator
Plint Keramik Artistik 10 x 10 cm
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Plywood 9 mm
Porselen ( 11 x 11 ) cm
Porselen 10 x 20 cm warna
Porselen 11 x 11 cm putih
Porselen 11 x 11 cm warna
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Porselen 15 x 15 cm putih
Porselen 15 x 15 cm warna
Porselen 20 x 20 cm warna
Profil Alluminium " T "
Ramset / Dinabolt
Rapidrant
Rel Pintu Dorong
Residu
Residu atau Ter
Rolling Door
Roof Light Fiberglass
Sabun
Seal tape
Semen Abu -abu
Semen Merah
Semen Nat
Semen Portland
Semen Tanam Asam
Semen Warna
Seng Gelombang 3" x 6" BJLS 28
Seng Gelombang BJLS 32
Seng Plat
Seng Plat 3 x 6 BJLS 24
Seng Plat 3" x 6" BJLS 28
Sisalation / Alluminium Foil
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Soda Api
Softboard 4' x 8' x 4mm
Rp
#N/A
Rp
#N/A
Spring Knip
Strorox - 100
Rp
#N/A
Rp
#N/A
Suncreen Allumunium
Rp
#N/A
Tali Ijuk
Teak Oil
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Ubin Granito 30 x 30 cm
Ubin Granito 40 x 40 cm
Rp
#N/A
Rp
#N/A
Ubin Keramik 10 x 33 cm
Rp
#N/A
Ubin Keramik 15 x 15 cm
Ubin Keramik 15 x 20 cm
Rp
#N/A
Rp
#N/A
Ubin Keramik 20 x 20 cm
Ubin Keramik 25 x 25 cm
Rp
#N/A
Rp
#N/A
Ubin Keramik 33 x 33 cm
Ubin Keramik 33 x 33 cm anti slip
Ubin Keramik 10 x 20 cm
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
#N/A
Rp
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
m2
Rp
m3
Rp
set
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
#N/A
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
M^3
M^3
M^3
M^3
M^3
90.09
2.76
183.94
5.20
18.84
2 PEKERJAAN BETON
a
Balok Induk/Gelagar Memanj M^3
b
Balok Induk/Gelagar MelintanM^3
c
Balok Anak/Diafragma
M^3
d
Bantalan Beton
M^3
e
Pelat Jembatan
M^3
f
Pelat Trotoar
M^3
g
Pion Jembatan
M^3
21.60
8.64
1.44
5.47
14.40
14.04
0.30
3 PEKERJAAN PERPIPAAN
a
Besi Sandaran
48
4 PEKERJAAN PEMBESIAN
a
Pembesian Balok induk/Gelagar Memanjang
Tul Pokok D 25
Btg
60.00
D 22
Btg
0.00
Peminggang D 12
Btg
6.00
Sengkang D 10
Btg
92.50
D8
Btg
0.00
b
0.00
7.00
0.00
7.00
0.00
84.00
Btg
Btg
Btg
Btg
Btg
0.00
0.00
46.00
0.00
0.00
Btg
Btg
Btg
Btg
Btg
0.00
0.00
224.00
0.00
0.00
Pembesian Trotoar
D 25
D 22
D 12
D 10
D8
Btg
Btg
Btg
Btg
Btg
0.00
0.00
52.00
0.00
0.00
Btg
Btg
Btg
Btg
Btg
0.00
0.00
0.00
6.00
0.00
No
BAHAN
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
19
20
ALAT
1
2
3
4
5
6
UPAH
1
2
3
4
Jenis
Harga
Standar
Satuan
Kabupat
en
Harga Survey
TPK
Timbunan pilihan
Sirtu
Batu gunung
Kerikil
Batu Pecah 2-3 cm
Pasir Pasang
Pasir urug
Kayu/Papan Kls III
Besi 10 sigma
Besi 12 sigma
Besi 14 sigma
Besi ulir 16 sigma
Besi ulir 19 sigma
Besi ulir sigma
Besi ulir sigma
Pipa galvanis ~ 6 m
Semen PCc 50 kg
Paku
Kawat Beton
m3
m3
m3
m3
m3
m3
m3
m3
batang
batang
batang
batang
batang
batang
batang
batang
zak
Kg
Kg
100,000
150,000
170,000
450,000
450,000
175,000
80,000
2,100,000
69,000
100,000
165,000
179,000
253,600
338,700
439,900
234,000
77,000
30,000
30,000
Concrete Mixer
Gerobak
Ember cor
Sekop
cangkul
sendok semen
LS
Buah
Buah
Buah
Buah
Buah
200,000
400,000
12,000
75,000
75,000
35,000
Pekerja
Tukang
Kepala Tukang
Mandor
OH
OH
50,000
90,000
100,000
100,000
Berat
(kg/m')
7.124
7.549
7.986
8.898
9.860
10.870
11.930
13.039
14.198
14.495
15.406
18.641
22.184
26.036
30.195
34.663
39.438
44.522
49.914
55.614
61.623
74.563
88.736
104.142
120.780
7850
No
Uraian Pekerjaan
(a)
(b)
1 Pekerjaan Persiapan
a
Bahan
Papan Nama Kegiatan
Administrasi Dan Dokumentasi
Ukuran/Dimensi
D
T
Volume
Total
(c)
Satuan
(d)
1.00 Ls
1.00 Ls
Kategori
Biaya
(e)
I-a
I-a
Harga Satuan
(f)
Rp
Rp
350,000.00
1,000,000.00
Jumlah
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
0.00
0.00
0.00
0.00
Oh
Oh
Oh
Oh
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
No
Uraian Pekerjaan
(a)
1. 1. Pek. Galian Tanah
a
Tenaga
Pekerja
Mandor
(b)
Volume
Total
(c)
Ukuran/Dimensi
Kategori
Biaya
(e)
57.19 Oh
5.66 Oh
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
35.64
5.40
0.54
1.73
D
T
Oh
Oh
Oh
Oh
Harga Satuan
(f)
III-a
III-a
Rp
Rp
55,798.00
65,734.00
Jumlah
I-a
I-a
I-b
Rp
Rp
Rp
450,000.00
175,000.00
77,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 1a+2a+2b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
(a)
(b)
1. Pekerjaan Pondasi 1 Pc : 3 Ps
a
Bahan
Batu Kali
Semen 50 Kg
Pasir
b
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Volume
Total
(c)
Ukuran/Dimensi
Volume Reel
Satuan
(d)
202.33 M^3
1442.09 Zak
57.76 M^3
275.91
110.36
11.04
13.80
Oh
Oh
Oh
Oh
Kategori
Biaya
(e)
P
L
T
=
Harga Satuan
(f)
I-a
I-b
I-a
Rp
Rp
Rp
170,000.00
77,000.00
175,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
I-a
I-b
I-a
Rp
Rp
Rp
170,000.00
77,000.00
175,000.00
Jumlah
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
5.20
5.72 M^3
40.77 Zak
1.63 M^3
7.80
3.12
0.31
0.39
Oh
Oh
Oh
Oh
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
22.87 M^3
Pasir Cor
14.71 kg
Semen Pc 50 Kg
249.78 Zak
No
1.
Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor
49.90
0.85
8.32
2.51
Oh
Oh
Oh
Oh
Ukuran/Dimensi
Volume Reel
Kategori
Biaya
(e)
P
L
T
=
Harga Satuan
(f)
I-a
I-a
I-b
Rp
Rp
Rp
450,000.00
175,000.00
77,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
1.09 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
11.89 Zak
No
1.
Uraian Pekerjaan
Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor
2.38
0.04
0.40
0.12
Oh
Oh
Oh
Oh
Ukuran/Dimensi
Volume Reel
Kategori
Biaya
(e)
P
L
T
=
Harga Satuan
(f)
I-a
I-a
I-b
Rp
Rp
Rp
450,000.00
175,000.00
77,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
Ukuran/Dimensi
Volume Reel
Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
4.14 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
45.20 Zak
No
1.
Uraian Pekerjaan
Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor
2.38
0.04
0.40
0.12
Oh
Oh
Oh
Oh
Kategori
Biaya
(e)
Harga Satuan
(f)
I-a
I-a
I-b
Rp
Rp
Rp
450,000.00
175,000.00
77,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
Ukuran/Dimensi
Volume Reel
Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
10.89 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
118.94 Zak
No
1.
Uraian Pekerjaan
Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor
23.76
0.40
3.96
1.20
Oh
Oh
Oh
Oh
Kategori
Biaya
(e)
P
L
T
=
Harga Satuan
(f)
I-a
I-a
I-b
Rp
Rp
Rp
450,000.00
175,000.00
77,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
Ukuran/Dimensi
Jumlah
Volume Reel
Volume
Satuan
Total
(a)
(b)
(c)
(d)
1. Pekerjaan Balok Beton Bertulang 1 Pc : 2 Ps : 3 Kr K300
a
Bahan
Batu Pecah 2-3 Cm
0.14 M^3
Pasir Cor
0.70 kg
Semen Pc 50 Kg
1.58 Zak
No
1.
Uraian Pekerjaan
Tenaga
Pekerja
Kepala Tukang
Tukang Batu
Mandor
23.76
0.40
3.96
1.20
Oh
Oh
Oh
Oh
Kategori
Biaya
(e)
P
L
T
=
=
Harga Satuan
(f)
I-a
I-a
I-b
Rp
Rp
Rp
450,000.00
175,000.00
77,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
No
1.
Uraian Pekerjaan
(a)
(b)
1. Pekerjaan Pemasangan Pipa Galvanis 3 "
a
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Volume
Total
(c)
Satuan
(d)
Kategori
Biaya
(e)
Ukuran/Dimensi
Volume Reel
Harga Satuan
(f)
9.60 Btg
35% Harga Pipa
I-b
Rp
Rp
234,000.00
786,240.00
Jumlah
5.18
8.64
0.86
0.26
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Oh
Oh
Oh
Oh
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
No
1.
Uraian Pekerjaan
(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 25 - 12
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton
b
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Volume
Total
(c)
Satuan
(d)
Kategori
Biaya
(e)
Jenis Kegiatan
Berat Total
Harga Satuan
(f)
84.00
6.00
92.50
72.92
Btg
Btg
Btg
Kg
I-b
I-b
I-b
I-b
Rp
Rp
Rp
Rp
439,900.00
100,000.00
69,000.00
30,000.00
Jumlah
34.03
34.03
3.40
1.46
Oh
Oh
Oh
Oh
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
No
1.
Uraian Pekerjaan
(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 22 - 12
Besi dia. 10 - 12
Kawat Beton
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Volume
Total
(c)
Satuan
(d)
Kategori
Biaya
(e)
Jenis Kegiatan
Berat Total
Harga Satuan
(f)
7.00 Btg
7.00 Btg
4.76 Kg
I-b
I-b
I-b
Rp
Rp
Rp
338,700.00
69,000.00
30,000.00
Jumlah
2.22
2.22
0.22
0.10
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Oh
Oh
Oh
Oh
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Dibuat Oleh
Kepala Desa
( ..)
( ..)
No
1.
Uraian Pekerjaan
(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Volume
Total
(c)
Satuan
(d)
46.00 Btg
0.00 Btg
7.71 Kg
3.60
3.60
0.36
0.15
Oh
Oh
Oh
Oh
Kategori
Biaya
(e)
Jenis Kegiatan
Berat Total
Harga Satuan
(f)
I-b
I-b
I-b
Rp
Rp
Rp
100,000.00
30,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
Sinjai April 2016
Mengetahui
Kepala Desa
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
No
1.
Uraian Pekerjaan
(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
Volume
Total
(c)
Satuan
(d)
224.00 Btg
0.00 Btg
37.57 Kg
17.53
17.53
1.75
0.75
Oh
Oh
Oh
Oh
Kategori
Biaya
(e)
Jenis Kegiatan
Berat Total
Harga Satuan
(f)
I-b
I-b
I-b
Rp
Rp
Rp
100,000.00
30,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
No
1.
Uraian Pekerjaan
(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a
Volume
Total
(c)
Satuan
(d)
52.00 Btg
0.00 Btg
8.72 Kg
4.07
4.07
0.41
0.17
Oh
Oh
Oh
Oh
Kategori
Biaya
(e)
Jenis Kegiatan
Berat Total
Harga Satuan
(f)
I-b
I-b
I-b
Rp
Rp
Rp
100,000.00
30,000.00
Jumlah
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
No
1.
Uraian Pekerjaan
(a)
(b)
1. Pekerjaan Penulangan
a
Bahan
Besi dia. 12 - 12
Besi dia. 10 - 12
Kawat Beton
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Catatan :
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
Volume
Total
(c)
Satuan
(d)
Kategori
Biaya
(e)
Jenis Kegiatan
Berat Total
Harga Satuan
(f)
0.00 Btg
6.00 Btg
0.70 Kg
I-b
I-b
I-b
Rp
Rp
Rp
69,000.00
30,000.00
Jumlah
0.33
0.33
0.03
0.01
III-a
III-a
III-a
III-a
Rp
Rp
Rp
Rp
50,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b
Oh
Oh
Oh
Oh
Dibuat Oleh
Tim Penyusun RKP
( ..)
( ..)
0.00
0.00
0.00
0.00
Jumlah Harga
(g)
Rp
Rp
350,000.00
1,000,000.00
Rp
1,350,000.00
Rp
Rp
Rp
Rp
Rp
Rp
1,350,000.00
( ..)
1.00
2.00
108.93
21.60
Jumlah Harga
(g)
Rp
Rp
Rp
3,190,884.52
372,328.73
3,563,213.25
Rp
Rp
Rp
Rp
8,456,400.00
1,965,600.00
7,251,552.00
17,673,552.00
Rp
Rp
Rp
Rp
Rp
Rp
1,782,000.00
486,000.00
54,000.00
172,800.00
2,494,800.00
23,731,565.25
( ..)
6.80
4.60
4.80
183.94
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
34,396,780.00
111,040,899.20
10,107,503.00
155,545,182.20
Rp
Rp
Rp
Rp
Rp
Rp
13,795,500.00
9,932,760.00
1,103,640.00
1,379,550.00
26,211,450.00
181,756,632.20
Rp
Rp
Rp
Rp
972,400.00
3,139,136.00
285,740.00
4,397,276.00
Rp
Rp
Rp
Rp
Rp
Rp
390,000.00
280,800.00
31,200.00
39,000.00
741,000.00
5,138,276.00
( ..)
50.40
0.60
1.00
30.24
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
10,291,730.40
2,574,028.80
19,233,244.80
32,099,004.00
Rp
Rp
Rp
Rp
Rp
Rp
2,494,800.00
76,204.80
831,600.00
250,992.00
3,653,596.80
35,752,600.80
( ..)
9.60
0.30
0.50
1.44
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
490,082.40
122,572.80
915,868.80
1,528,524.00
Rp
Rp
Rp
Rp
Rp
Rp
118,800.00
3,628.80
39,600.00
11,952.00
173,980.80
1,702,504.80
( ..)
5.47
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
1,862,313.12
122,572.80
3,480,301.44
5,465,187.36
Rp
Rp
Rp
Rp
Rp
Rp
118,800.00
3,628.80
39,600.00
11,952.00
173,980.80
5,639,168.16
( ..)
12.00
4.80
0.25
14.40
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
4,900,824.00
122,572.80
9,158,688.00
14,182,084.80
Rp
Rp
Rp
Rp
Rp
Rp
1,188,000.00
36,288.00
396,000.00
119,520.00
1,739,808.00
15,921,892.80
( ..)
0.12
0.12
0.95
14
0.19
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
65,180.96
122,572.80
121,810.55
309,564.31
Rp
Rp
Rp
Rp
Rp
Rp
1,188,000.00
36,288.00
396,000.00
119,520.00
1,739,808.00
2,049,372.31
( ..)
3"
48.00
Jumlah Harga
(g)
Rp
Rp
Rp
2,246,400.00
275,184.00
2,521,584.00
Rp
Rp
Rp
Rp
Rp
Rp
259,200.00
777,600.00
86,400.00
25,920.00
1,149,120.00
3,670,704.00
( ..)
Penulangan
4861.62
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
Rp
36,951,600.00
600,000.00
6,382,500.00
2,187,730.50
46,121,830.50
Rp
Rp
Rp
Rp
Rp
Rp
1,701,568.17
3,062,822.70
340,313.63
145,848.70
5,250,553.20
51,372,383.70
( ..)
Penulangan
317.41
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
2,370,900.00
483,000.00
142,834.55
2,996,734.55
Rp
Rp
Rp
Rp
Rp
Rp
111,093.54
199,968.36
22,218.71
9,522.30
342,802.91
3,339,537.46
( ..)
Penulangan
514.32
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
4,600,000.00
231,442.28
4,831,442.28
Rp
Rp
Rp
Rp
Rp
Rp
180,010.66
324,019.19
36,002.13
15,429.49
555,461.47
5,386,903.75
( ..)
Penulangan
2504.50
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
22,400,000.00
1,127,023.27
23,527,023.27
Rp
Rp
Rp
Rp
Rp
Rp
876,573.65
1,577,832.58
175,314.73
75,134.88
2,704,855.85
26,231,879.12
( ..)
Penulangan
581.40
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
5,200,000.00
261,630.40
5,461,630.40
Rp
Rp
Rp
Rp
Rp
Rp
203,490.31
366,282.56
40,698.06
17,442.03
627,912.96
6,089,543.37
( ..)
Penulangan
46.59
Jumlah Harga
(g)
Rp
Rp
Rp
Rp
414,000.00
20,963.97
414,000.00
Rp
Rp
Rp
Rp
Rp
Rp
16,305.31
29,349.56
3,261.06
1,397.60
50,313.54
464,313.54
( ..)
: Jembatan Desa
: Sinjai
: Sinjai Barat
:
: 2016
Dimensi : P = 12 M
L=4M
No
Jenis Pekerjaan
Harga (Rp)
(a)
(b)
(c)
Rp
1,350,000.00
Rp
23,731,565.25
Rp
186,894,908.20
Rp
35,752,600.80
Rp
1,702,504.80
Rp
5,639,168.16
Rp
15,921,892.80
Rp
2,049,372.31
Rp
3,670,704.00
10
Rp
51,372,383.70
11
Rp
3,339,537.46
12
Rp
5,386,903.75
13
Rp
26,231,879.12
14
Rp
6,089,543.37
15
Rp
464,313.54
16
Oprit Jembatan
Rp
18,431,055.44
Jumlah
Rp
388,028,332.68
PPn 10%
Rp
38,802,833.27
Total Cost
Rp
426,831,165.95
Dibulatkan
Rp
426,831,100.00
Terbilang
Mengetahui
Kepala Desa
( ..)
( ..)