Anda di halaman 1dari 77

PEMERINTAHAN PROVINSI RIA

DINAS CIPTA KARYA, TATA RUANG DAN SUMB

Jl. SM. Amin No. 92 Telp. (0761) 564550 - 564535 - 564541 Fax. (0761)

PEKANBARU

ENGINEERING ESTIMATE
(EE)

KEGIATAN :

DRAINASE KELURAHAN UKUI KABUPATEN PELAL

PEKERJAAN :

PERENCANAAN DRAINASE KELURAHAN UKUI KABUPATE

TAHUN ANGGARAN 2014

INTAHAN PROVINSI RIAU

A, TATA RUANG DAN SUMBER DAYA AIR

761) 564550 - 564535 - 564541 Fax. (0761) 564547 - 564407

PEKANBARU
KODE POS : 28115

GINEERING ESTIMATE
(EE)

KEGIATAN :

LURAHAN UKUI KABUPATEN PELALAWAN

PEKERJAAN :

ASE KELURAHAN UKUI KABUPATEN PELALAWAN

HUN ANGGARAN 2014

REKAPITULASI
RENCANA ANGGARAN BIAYA
KEGIATAN

: DRAINASE KELURAHAN KABUPATEN PELALAWAN

PEKERJAAN

: PEMBANGUNAN DRAINASE KELURAHAN UKUI KABUPATEN PELALAWAN

LOKASI

: KELURAHAN UKUI - KABUPATEN PELALAWAN

NO.

URIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

7,991,700.75

PEKERJAAN SALURAN DRAINASE SEPANJANG 95 M

PEKERJAAN AKHIR

120,295,728.48
1,713,000.00

JUMLAH
PPN 10%
JUMLAH + PPN 10%
PEMBULATAN
TERBILANG :
Seratus Empat Puluh Tiga Juta Rupiah

130,000,429.23
13,000,042.92
143,000,472.15
143,000,000.00

Pekanbaru, 7 November 2014


Penawar,
CV. L E G I N A

TARMIZI
Direktur

RENCANA ANGGARAN BIAYA (RAB)


KEGIATAN

: DRAINASE KELURAHAN KABUPATEN PELALAWAN

PEKERJAAN

: PEMBANGUNAN DRAINASE KELURAHAN UKUI KABUPATEN PELALAWAN

LOKASI

: KELURAHAN UKUI - KABUPATEN PELALAWAN

NO.

A.

URAIAN PEKERJAAN

SAT

PEKERJAAN PERSIAPAN
1. Pembersihan lokasi
2. Pengukuran dan pasang bowplank

JUMLAH A
PEKERJAAN SALURAN DRAINASE SEPANJANG 95 M
1. Galian tanah
2. Pek. Pancang Kayu Dia. Galam dia.8 - 10 cm
3. Pasir urug
4. Lantai kerja
5. Bekisting dinding dan balok saluran
6. Pembongkaran bek. Dinding secara biasa
7. Bekisting balok pengaku saluran
8. Pembongkaran bek. Balok secara biasa
9. Pembesian
10. Cor beton mutu K-175
11. Penimbunan kembali bekas galian
JUMLAH B
C.
PEKERJAAN AKHIR
Pekerjaan pembersihan akhir

VOLUME

M2
M1

79.20
99.00

M3
M1
M3
M3
M2
M2
M2
M2
KG
M3
M3

105.02
792.00
5.15
5.15
195.84
391.68
3.67
7.34
2,688.91
32.61
21.00

Ls

1.00

B.

JUMLAH C
GRAND TOTAL (A + B + C)

NA ANGGARAN BIAYA (RAB)

URAHAN UKUI KABUPATEN PELALAWAN

HARGA SATUAN
(Rp)

JUMLAH HARGA (Rp)

11,787.50
71,294.25

933,570.00
7,058,130.75
7,991,700.75

54,193.75
11,518.98
187,277.50
742,285.02
155,146.50
1,969.38
155,146.50
1,969.38
14,402.26
901,607.56
39,387.50

5,691,427.63
9,123,028.20
964,479.13
3,822,767.87
30,383,890.56
771,364.80
569,387.66
14,455.21
38,726,367.49
29,401,422.44
827,137.50
120,295,728.48

1,713,000.00

1,713,000.00

1,713,000.00
130,000,429.23

JADWAL WAKTU PELAKSANAAN


KEGIATAN

: DRAINASE DESA GABUNG MAKMUR KABUPATEN PELALAWAN

PEKERJAAN

: PERENCANAAN DRAINASE DESA GABUNG MAKMUR KABUPATEN PELALAWAN

LOKASI

: DESA GABUNG MAKMUR - KABUPATEN PELALAWAN

NO.

URAIAN PEKERJAAN

SAT

VOLUME

MINGGU KE -

BOBOT
1

A.

1. Pembersihan lokasi

M2

56.00

0.52%

0.52%

2. Pengukuran dan pasang bowplank

M1

70.00

3.91%

3.91%

4.43%

PEKERJAAN SALURAN DRAINASE


1. Galian tanah

M3

105.02

4.46%

4.46%

2. Pek. Pancang Kayu Dia. Galam dia.8 - 10 cm

M1

792.00

7.14%

3.57%

3. Pasir urug

M3

5.15

0.76%

0.76%

4. Lantai kerja

M3

5.15

2.99%

2.99%

5. Bekisting dinding dan balok saluran

M2

195.84

23.79%

11.90%

11.90%

6. Pembongkaran bek. Dinding secara biasa

M2

391.68

0.60%

0.20%

0.20%

7. Pembesian

KG

2,688.91

30.33%

15.16%

15.16%

8. Cor beton mutu K-175

M3

32.61

23.02%

7.67%

7.67%

9. Penimbunan kembali bekas galian

M3

21.00

0.65%

JUMLAH B
C.

PEKERJAAN PERSIAPAN

JUMLAH A
B.

PEKERJAAN AKHIR

94.20%

3.57%

0.32%

NO.

URAIAN PEKERJAAN

SAT

Pekerjaan pembersihan akhir

Ls

VOLUME
1.00

MINGGU KE -

BOBOT
1.17%

JUMLAH C

1.17%

GRAND TOTAL (A + B + C)

100%
0.00%

12.65%
12.65%

42.48%
55.13%

35.49%
90.62%

Pekanbaru, 7 Novembe
CV. L E G I N A

TARMIZI
Direktur

AKTU PELAKSANAAN

MINGGU KE -

KETERANGAN
4
100
%

75%

50%
0.20%

7.67%
0.32%

25%

MINGGU KE -

KETERANGAN
1.17%
9.38%
100%

Pekanbaru, 7 November 2014


CV. L E G I N A

0%

ANALISA HARGA SATUAN PEKERJAAN


PERMEN PU REPUBLIK INDONESIA NO. 11/PRT/M/2013
Ditetapkan di Jakarta tgl. 4 November 2013
A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan
NO
A

URAIAN
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

L.01
L.04

OH
OH

KOEF

0.1000
0.0500

15%

A.2.2.1.4. Pengukuran dan pemasangan 1 m' Bowplank


NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
BAHAN
Kayu balok 5/7
Paku biasa 2" - 3"
Kayu papan 3/20

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

KOEF

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.1000
0.1000
0.0100
0.0050

M3
KG
M3

0.0120
0.0200
0.0070

15%

A.2.3.1.1. Penggalian 1 M3 tanah biasa sedalam 1 m


NO
A

URAIAN
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

L.01
L.04

OH
OH

KOEF

0.7500
0.0250

15%

A.2.3.1.9. Pengurugan kembali 1 M3 galian tanah


Pengurugan kembali 1 M3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
NO
A

URAIAN
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

L.01
L.04

OH
OH

KOEF

0.5000
0.0500

15%

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


NO
A

URAIAN
TENAGA
Pekerja
Mandor
BAHAN
Pasir urug

KODE

SAT

KOEF

L.01
L.04

OH
OH

0.3000
0.0100

M3

1.2000

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

15%

Pekerjaan 1 m panjang cerucuk kayu/dolken diameter 8 cm 10 cm


NO
A

URAIAN
TENAGA
Pekerja
Mandor
Operator Tripod/Crane *)
BAHAN
Kayu Dia. Galam dia.8 - 10 cm

PERALATAN
Peralatan 30% dari bahan+upah

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

KOEF

L.01
L.04
L.05

OH
OH
OH

0.0300
0.0030
0.0050

M.31.b

M1

1.0500

15%

A.4.1.1.4. Membuat 1 M3 lantai kerja beton mutu fc' = 7.4 MPa (K-100), slump (3-6) cm, w/c = 0.87
NO
A

URAIAN
TENAGA
Pekerja
Tukang batu
Kepala tukang
Mandor
BAHAN
Semen portland
Pasir beton
Kerikil (Maks 30 MM)
Air

KODE

SAT

KOEF

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.200
0.200
0.020
0.060

KG
KG
KG
Liter

230
893
1,027
200

PERALATAN

D
Jumlah (A + B + C)
E
Overhead & profit
15%
F
Harga satuan pekerjaan (D+E)
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %

A.4.1.1.20. Pemasangan 1 M2 bekisting untuk pondasi


NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor

KODE

SAT

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.520
0.260
0.026
0.026

M3
KG
Ltr

0.040
0.300
0.100

BAHAN
Kayu kelas III
Paku 5 - 10 cm
Minyak bekisting

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KOEF

15%

B.21 1 m bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
NO
A

URAIAN
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
BAHAN
1. Multipleks 12 mm
2. Kaso 5/7 cm Kelas III
3. Paku 5 cm dan 7 cm
4. Minyak bekisting

KODE

SAT

KOEF

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.200
0.600
0.060
0.020

Lbr
M3
KG
Ltr

0.2450
0.0135
0.2500
0.2000

PERALATAN

D
Jumlah (A + B + C)
E
Overhead & profit
F
Harga satuan pekerjaan (D+E)
Catatan : Bekisting 2 x pakai

15%

B.35 Bongkar 1 m bekisting secara biasa


NO
A

URAIAN
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

L.01
L.04

OH
OH

KOEF

0.0250
0.0025

15%

A.4.1.1.17. Pembesian 10 kg dengan besi polos atau ulir


NO
A

URAIAN
TENAGA
Pekerja
Tukang besi
Kepala tukang
Mandor
BAHAN
Besi beton (polos/ulir)
Kawat beton

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

KOEF

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.070
0.070
0.007
0.004

KG
KG

10.500
0.150

15%

A.4.1.1.5. Membuat 1 M3 beton mutu fc' = 14.5 MPa (K-175), slump (12 2) cm, w/c = 0.66
NO
A

URAIAN
TENAGA
Pekerja
Tukang batu
Kepala tukang
Mandor
BAHAN
Semen portland
Pasir beton
Kerikil (Maks 30 MM)
Air

PERALATAN

D
E
F

Jumlah (A + B + C)
Overhead & profit
Harga satuan pekerjaan (D+E)

KODE

SAT

KOEF

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.650
0.275
0.028
0.083

KG
KG
KG
Liter

326
760
1,029
215

15%

A HARGA SATUAN PEKERJAAN


PUBLIK INDONESIA NO. 11/PRT/M/2013
an di Jakarta tgl. 4 November 2013
HARGA SATUAN
Rp.

60,000.00
85,000.00
JUMLAH (A)

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

6,000.00
4,250.00
10,250.00
-

10,250.00
1,537.50
11,787.50

JUMLAH HARGA
Rp.

60,000.00
72,000.00
76,000.00
85,000.00
JUMLAH (A)

6,000.00
7,200.00
760.00
425.00
14,385.00

2,400,000.00
13,000.00
2,650,000.00
JUMLAH (B)

28,800.00
260.00
18,550.00
47,610.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

61,995.00
9,299.25
71,294.25

HARGA SATUAN
Rp.

60,000.00
85,000.00
JUMLAH (A)

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

60,000.00
85,000.00
JUMLAH (A)

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

45,000.00
2,125.00
47,125.00
-

47,125.00
7,068.75
54,193.75

JUMLAH HARGA
Rp.

30,000.00
4,250.00
34,250.00
-

34,250.00
5,137.50
39,387.50

JUMLAH HARGA
Rp.

60,000.00
85,000.00
JUMLAH (A)

18,000.00
850.00
18,850.00

120,000.00

144,000.00

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

144,000.00

162,850.00
24,427.50
187,277.50

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
85,000.00
80,000.00
JUMLAH (A)

1,800.00
255.00
400.00
2,455.00

5,000.00

5,250.00
5,250.00

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

c' = 7.4 MPa (K-100), slump (3-6) cm, w/c = 0.87


HARGA SATUAN
Rp.

2,311.50
2,311.50
10,016.50
1,502.48
11,518.98

JUMLAH HARGA
Rp.

60,000.00
72,000.00
76,000.00
85,000.00
JUMLAH (A)

72,000.00
14,400.00
1,520.00
5,100.00
93,020.00

1,220.00
107.14
166.67
25.00
JUMLAH (B)

280,600.00
95,678.57
171,166.67
5,000.00
552,445.24

JUMLAH (C)
JUMLAH (D)
x Jumlah D

645,465.24
96,819.79
742,285.02

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
72,000.00
76,000.00
85,000.00
JUMLAH (A)

31,200.00
18,720.00
1,976.00
2,210.00
54,106.00

2,200,000.00
15,000.00
4,000.00
JUMLAH (B)

88,000.00
4,500.00
400.00
92,900.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

dengan multiflex 12 mm atau 18 mm (tanpa perancah)


HARGA SATUAN
Rp.

147,006.00
22,050.90
169,056.90

JUMLAH HARGA
Rp.

60,000.00
72,000.00
76,000.00
85,000.00
JUMLAH (A)

12,000.00
43,200.00
4,560.00
1,700.00
61,460.00

160,000.00
2,200,000.00
15,000.00
4,000.00
JUMLAH (B)

39,200.00
29,700.00
3,750.00
800.00
73,450.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

134,910.00
20,236.50
155,146.50

HARGA SATUAN
Rp.

60,000.00
85,000.00
JUMLAH (A)

JUMLAH (B)
JUMLAH (C)
JUMLAH (D)
x Jumlah D

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

1,500.00
212.50
1,712.50
-

1,712.50
256.88
1,969.38

JUMLAH HARGA
Rp.

60,000.00
72,000.00
76,000.00
85,000.00
JUMLAH (A)

4,200.00
5,040.00
532.00
340.00
10,112.00

10,750.00
15,000.00
JUMLAH (B)

112,875.00
2,250.00
115,125.00

JUMLAH (C)
JUMLAH (D)
x Jumlah D

125,237.00
18,785.55
144,022.55

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

60,000.00
72,000.00
76,000.00
85,000.00
JUMLAH (A)

99,000.00
19,800.00
2,128.00
7,055.00
127,983.00

1,220.00
107.14
166.67
25.00
JUMLAH (B)

397,720.00
81,428.57
171,500.00
5,375.00
656,023.57

JUMLAH (C)
JUMLAH (D)
x Jumlah D

784,006.57
117,600.99
901,607.56

DAFTAR HARGA SATUAN BAHAN DAN UPAH


LOKASI
TAHUN

:
:

PELALAWAN
2014

NO.

TENAGA DAN MATERIAL

SATUAN

(1)

(2)

(3)

A.

UPAH TENAGA :
1. Pekerja
2. Tukang gali
3. Tukang kayu
4. Tukang batu
5. Tukang besi
6. Tukang cat
7. Kepala tukang
8. Mandor
9. Mekanik
10. Operator

B.

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

BAHAN:

1. Kayu balok 5/7


2. Kayu papan 3/20
3. Kayu kelas III
4. Kayu Kelas II
5. Balok kayu kelas II
6. Papan kayu (4 x 30) cm
7. Plywood tebal 9 mm
8. Multipleks 12 mm
9. Kayu Dia. Galam dia.8 - 10 cm
10. Paku biasa 2" - 3"
11. Paku 5 - 10 cm
12. Paku 5 - 12 cm
13. Paku Beton
14. Besi beton (polos/ulir)
15. Kawat beton
16. Pasir urug
17. Tanah Urug
18. Pasir beton
19. Pasir Pasang
20. Kerikil (Maks 30 MM)
21. Semen portland @ 50 KG / zak
22. Minyak bekisting
23. Air

M3
M3
M3
M3
M3
M3
Lbr
Lbr
M'
KG
KG
KG
BH
KG
KG
M3
M3
KG
M3
KG
KG
Ltr
Liter

NO.

TENAGA DAN MATERIAL

SATUAN
Pekanbaru, 7 November 2014
CV. L E G I N A

TARMIZI
Direktur

RGA SATUAN BAHAN DAN UPAH

HARGA SATUAN
(Rp)
(4)

60,000.00
72,000.00
72,000.00
72,000.00
72,000.00
72,000.00
76,000.00
85,000.00
75,000.00
80,000.00

2,400,000.00
2,400,000.00
2,200,000.00
2,400,000.00
2,500,000.00
2,650,000.00
110,000.00
160,000.00
5,000.00
13,000.00
15,000.00
16,000.00
20,000.00
10,750.00
15,000.00
120,000.00
67,500.00
107.14
121,000.00
166.67
1,220.00
4,000.00
25.00

HARGA SATUAN
(Rp)
Pekanbaru, 7 November 2014

CALCULATION SHEET

PROPERTIES SALURAN
DIMENSI DRAINAGE :
B
=
H
=
T. DD
=
T. LT
=
Jarak pengaku
Cover beton =

0.6 M
0.9 M
0.12 M
0.12 M
3M
0.03 M

Pembesian Lt. :
Satu lapis
Dia.
=
Jarak
=

10 MM
150 MM

Pembesian Dd.
Satu lapis
Dia.
=
Jarak
=

10 MM
150 MM

Pembesian balok sepanjang saluran 4 bh :


b
=
0.15
h
=
0.15
Jumlah balok
0 Bh
Tul. Utama :
Dia.
=
10 MM
Jlh Tul
=
4 Bh
Tul. Skg :
Dia.
=
8 MM
Jarak
=
200 MM
Pembesian balok-kolom pengaku :
b
=
0
h
=
0
Jarak pengaku
3 M setiap jarak
Tul. Utama :
Dia.
=
0 MM
Jlh Tul
=
0 Bh
Tul. Skg :
Dia.
=
0 MM
Jarak
=
200 MM

PERHITUNGAN VOLUME BETON

Luas penampang saluran = luas penampang lantai + luas penampang dinding


Luas penampang lantai = (B + 2 x T.DD) x T.LT
Luas penampang lantai =

0.1008 M2

Luas penampang dinding = 2 x (H x T.DD)


Luas penampang dinding =

0.216 M2

Luas penampang saluran =

0.3168 M2

Volume penampang perjarak

3 M ===>

0.9504 M3

Volume balok pengaku = b x h x pjg balok


Volume balok pengaku =
Volume beton saluran perjarak

0 M3
3 M ===>

0.9504 M3

PERHITUNGAN BEKISTING
Untuk dinding saluran :
Luas bekisting per-m' = 2 x ((B + T.LT) + B)
Luas bekisting per-m' =

3.84 M2

Luas bekisting per-jarak

3 M ===>

11.52 M2

Untuk balok pengaku :


Luas bekisting = (2 x h + b) x B
Luas bekisting =

0 M2

PERHITUNGAN PEMBESIAN (perjarak 3 M pengaku saluran)


NO.

ITEM PEKERJAAN

DIA.
(MM)

Dinding, lantai dan balok saluran


1. Untuk tulangan bagi
0.05

10
0.05

0.96

0.96

0.78
2. Untuk tulangan memanjang (pd dinding dan lantai)
Jarak tulangan =
150 MM
3M

10

JUMLAH BERAT BESI PERJARAK PENGAKU =

PANJANG SALURAN TOTAL


JARAK PENGAKU
PENGALI VOLUME

=
=
=

95 M
3M
31.67

Volume galian = lebar galian x dalam galian x panjang galian


Volume pasir urug = lebar galian x tebal urug x panjang galian
Volume lantai kerja = lebar galian x tebal lt kerja x panjang galian
Tebal pasir urug
Tebal lantai kerja
Panjang saluran
Panjang cerucuk
Jarak cerucuk
Jumlah baris
Jumlah titik
Pjg cerucuk total

=
=
=
=
=
=
=
=

0.05 M
0.05 M

95 M
4 M/ Btg
0.5 M
2 Baris / penampang
380 Btg
1520 M

Galian tanah
Pek. Pancang Kayu Dia. Galam dia.8 - 10 cm
Pasir urug
Lantai kerja
Bekisting dinding dan balok saluran
Bekisting balok pengaku saluran
Pembesian
Cor beton mutu K-175
Penimbunan kembali bekas galian

=
=
=
=
=
=
=
=
=

100.776 M
1520 M
4.94 M
4.94 M
364.80 M2
- M2
2186.653 KG
30.10 M3
20.1552 M3

32.8035

1.0359

PANJANG JUMLAH
PANJANG BERAT
POTONG POTONG
BESI
BESI/M'
AN
AN
(M)
(Btg)
(M)
(KG/M')

BERAT
BESI
(KG)

2.8

20

56

0.6165

34.53

18.66667

56

0.6165

34.53

69.05

2.71

LEMBAR PERHITUNGAN VOLUME (CALCULATION SHEET)


1.
2.
3.

Pembersihan lokasi
Pengukuran dan pasang bowplank
Err:509
Err:509
Err:509

=
=

Ukuran pondasi :
b
=
h
=
t
=
Ukuran pedestal pondasi :
b
=
h
=
T
=

0.8
0.8
0.2
0.3
0.3
0.8

1 Galian tanah
=
3 Pasir urug
=
4 Lantai kerja
=
5 Bekisting dinding dan balok salur =
7 Pembesian
=
8 Cor beton mutu K-175
=

Err:509
a.

Sloof Type S1 (200x400)


Ukuran penampang sloof :
b
=
h
=
deking
=
Pembesian :
Tulangan utama
Dia.
Jumlah
Tulangan sengkang
Dia.
Jarak

0.2
0.4
0.04

=
=

12
6

=
=

8
200

Panjang sloof

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

68

=
=
=
=
=
=

5.44
1.36
1.36
54.4
493.70
5.44

Err:509
Ukuran penampang sloof :
b
=
h
=
d
=
Pembesian :
Tulangan utama
Dia.
Jumlah
Tulangan sengkang
Dia.
Jarak
Panjang sloof

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
c.

=
=

12
6

=
=

8
200

32

=
=
=
=
=
=

1.28
0.64
0.64
19.2
219.70
1.92

Err:509
Ukuran penampang sloof :
b
=
h
=
d
=
Pembesian :
Tulangan utama
Dia.

0.2
0.3
0.04

0.15
0.3
0.04

12

Err:509

Jumlah
Tulangan sengkang
Dia.
Jarak

=
=

8
150

Panjang sloof

4.54

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

=
=
=
=
=
=

0.1589
0.07945
0.07945
2.724
24.24
0.2043

Err:509
Err:509
Err:509
Err:509
Err:509

=
=
=
=

19.6302
4.90755
4.90755
8.96

Err:509
Err:509
Err:509
Err:509
Err:509

=
=
=
=

2.219
0.55475
0.55475
0.9552

Err:509
Err:509
Err:509
Err:509
Err:509

=
=
=

169.80
93.92
5.6352

BETON KOLOM K1
b
h
deking
Tinggi

=
=
=

0.2 M
0.3 M
0.04 M

84.26 M
9.66 M
93.92 M

BESI KOLOM K1
Tulangan utama :

Dia.
Jlh
Sengkang
Dia.
Jarak
Sengkang
Dia.
Jarak
b.

=
=
Tump:
=
=
Lap:
=
=

Err:509
Err:509
Err:509
Err:509

13 MM
8 Btg
8 MM
150 MM
8 MM
200 MM

=
=
=

BETON KOLOM K2
b
h
deking
Tinggi

=
=
=

0.3 M
0.3 M
0.04 M

7.66 M
0M
7.66 M

BESI KOLOM K2
Tulangan utama :
Dia.
=
Jlh
=
Sengkang Tump:
Dia.
=
Jarak
=
Sengkang Lap:
Dia.
=
Jarak
=
Err:509
Err:509
Err:509
Err:509
Err:509
BETON KOLOM
b
h
deking

80.78
9.192
0.6894

13 MM
8 Btg
8 MM
150 MM
8 MM
200 MM

=
=
=

=
=
=

68.8
602.44
5.16

0.2 M
0.3 M
0.04 M

Panjang

86 M

BESI BALOK
TUL. UTAMA
Dia.
=

13 MM

TUL. SENGKANG
Dia.
=
Jarak
=
Jarak
=

Err:509
Err:509
Err:509
Err:509
Luas dag
Tebal

8 MM
150 MM
200 MM

=
=
=
=
=

Pembesian :
Dia.
Jarak

128.635
1,586.17
12.8635

128.635 M2
0.1 M1

=
=

Err:509
Err:509
Err:509
Err:509
Err:509

10 MM
200 MM

=
=
=

BETON KOLOM
b
h
deking
Panjang

11.2
98.07
0.84

=
=
=

0.2 M
0.3 M
0.04 M

14 M

BESI BALOK
TUL. UTAMA
Dia.
=
TUL. SENGKANG
Dia.
=
Jarak
=
Jarak
=

13 MM

8 MM
150 MM
200 MM

Err:509
Err:509
Err:509
Err:509
Luas dag
Tebal

=
=
=
=
=

Pembesian :
Dia.
Jarak

16
197.29
1.6

16 M2
0.1 M1

=
=

10 MM
200 MM

Panjang dinding
Tinggi dinding
Luas brutto

=
=
=

62 M
4.7 M
291.4 M2

Luas Lubang kusen

58.321 M2

Luas netto

233.079 M2

Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PROYEK DRAINAGE
PANJANG SALURAN (TOTAL)
PEKERJAAN SALURAN DRAINASE SEPANJANG 55 M
Galian tanah
Pek. pancang cerucuk dia. 15-20cm, L=4M
Pasir urug
Lantai kerja
Bekisting dinding dan balok saluran
Bekisting balok pengaku saluran
Pembesian
Cor beton mutu K-175
Penimbunan kembali bekas galian
DIMENSI DRAINAGE :
B
=
H
=
T. DD
=
T. LT
=
Jarak pengaku
Pembesian Lt. :
Satu lapis
Dia.
=
Jarak
=
Pembesian Dd.
Satu lapis

0.6 M
0.9 M
0.12 M
0.12 M
3M

10 MM
200 MM

Dia.
Jarak

=
=

Pembesian balok :
b
=
h
=
Jumlah balok
Tul. Utama :
Dia.
=
Jlh Tul
=
Tul. Skg :
Dia.
=
Jarak
=
Pembesian balok kolom pengaku :
b
=
h
=
Jarak pengaku
Tul. Utama :
Dia.
=
Jlh Tul
=
Tul. Skg :
Dia.
=
Jarak
=
TOTAL BERAT BESI PER=
Panjang saluran
Panjang cerucuk
Jarak cerucuk
Jumlah baris
Jumlah titik
Pjg cerucuk total

=
=
=
=
=
=

10 MM
200 MM

0.15
0.15
4 Bh
10 MM
4 Bh
8 MM
200 MM

0.15
0.15
3 M setiap jarak
10 MM
4 Bh
8 MM
200 MM
3 M JARAK
100.04 kg/ per 3 m jarak
95 M
4 M/ Btg
0.5 M
2 Baris / penampang
380 Btg
1520 M

M2
M1

M
M
M
M
M
M

Jumlah pondasi Type P1 :


n
=
26

Bh

Dalam galian Type P1 :


D
=

1.1

Tebal pasir urug :


t
=

0.05

Tebal pasir urug :


t
=

0.05

28.6 M3
1.3 M3
1.3 M3
41.6 M2
866.72 KG
5.2 M3

M
M
M

Ukuran galian sloof :


b
=
dalam
=

tebal psr urug =


tebal lt. kerja =
MM
Btg
MM
MM

0.4 M
0.2 M

0.05 M
0.05 M

M3
M3
M3
M2
KG
M3

M
M
M

Ukuran galian sloof :


b
=
dalam
=

0.4 M
0.1 M

tebal psr urug =


tebal lt. kerja =

0.05 M
0.05 M

Ukuran galian sloof :


b
=
dalam
=

0.35 M
0.1 M

tebal psr urug =


tebal lt. kerja =

0.05 M
0.05 M

MM
Btg
MM
MM
M

M3
M3
M3
M2
KG
M3

M
M
M

MM

Btg
MM
MM
M

M3
M3
M3
M2
KG
M3

M3
M3
M3
M3

A
A
A
A

=
=
=
=

98.151 M2
98.151 M2
98.151 M2
112 M2

t
t
t
t

=
=
=
=

0.2 M
0.05 M
0.05 M
0.08 M

M3
M3
M3
M3

A
A
A
A

=
=
=
=

11.095 M2
11.095 M2
11.095 M2
11.94 M2

t
t
t
t

=
=
=
=

0.2 M
0.05 M
0.05 M
0.08 M

KG
M2
M3

22 bh
2 bh

3.83 M
4.83 M

KG
M2
M3

2 bh
bh

M2
KG
M3

3.83 M
M

M2
KG
M3

M2
KG
M3

M2
KG
M3

=
=

199.823 M2
466.158 M2

=
=
=
=
=
=
=
=
=
=
=

27.72 M2
27.72 M2
39.6 M1
27.72 M2
106.259 M2
108.96 M1
22 Unit
18 Unit
14.148 M2
16.1 M2
27.72 M2

=
=
=
=

63.43 M2
126.86 M2
2 Unit
2 Unit

0.7

39.6

0.786 M2
0.5

32.2

14 M

4.7 M

65.8

=
=

24 M2
24 M1

=
=
=
=

4.982 M2
2.096 M2
25.85 KG
0.752 M3

b=
p=

0.13
4.7

h=
l=

0.2
0.54

L=
t=

=
=
=
=

3.922 M2
1.696 M2
20.91 KG
0.592 M3

b=
p=

0.13
3.7

h=
l=

0.2
0.54

L=
t=

31.666667 M

=
=
=
=
=
=
=
=
=

Dalam
Lebar
Galian samping
1.02
0.84
0.2 =

100.776
1520
9.88
4.94
364.8
8.55
3168.0107
32.8035
20.1552

D=
B tot =

0.1
0.05
1.02

0.84
0.84
0.9

1.0608

0.2 =
0.2 =
=
0.45

Lantai =
Dinding=
Pengaku=

0.104
0.052
3.84
0.6

0.3024 M3
0.72 M3
0.0135 M3
1.0359 M3 / 3 M jarak

1.02 M
0.84 M

Dia
10
10

Dia

Pjg.pot
1.00
1.00

Jlh. Pot
5.00
5.00

Pjg besi
5.00
5.00

berat/m'
0.62
0.62

berat besi
3.08
3.08
6.17 kg / m2

Pjg.pot

Jlh. Pot

Pjg besi

berat/m'

berat besi

etiap jarak

per 3 m jarak

s / penampang

10
10

1.00
1.00

10
8

Pjg.pot
3.00
0.46

Dia

5.00
5.00

Jlh. Pot
4.00
15.00

Berat besi balok total

Dia
10
8

Pjg.pot
3.18
0.46

Berat besi pengaku

5.00
5.00

Pjg besi
12.00
6.90

0.62
0.62

berat/m'
0.62
0.39

3.08
3.08
6.17 kg / m2
berat besi
7.40
2.72
10.12 kg

40.48432 kg / 3 m' / 4 bh balok

Jlh. Pot
4.00
15.90

Pjg besi
12.72
7.31

berat/m'
0.62
0.39

berat besi
7.84
2.89
10.73 kg
10.73 kg / 3 m' / 1 bh balok

M2

2.37 M2

4.7
0.1

0.2444 M3
0.5076 M3

3.7
0.1

0.1924 M3
0.3996 M3

3.1824 M3

=
=
=
=

0.312 M3
0.156 M3
11.52 M2
0.27 M2
0.1008
0.216

0.1008
0.24

luas lantai perjarak =


2.52 m2
jadi berat besi lantai =
luas dinding perjarak -

(0.02)

3M

15.536746 kg
3M

5.4 m2

jadi berat besi dinding =

33.293028 kg
48.82977 kg

NO.

SKETS

DIA.
(MM)

1. PONDASI TAPAK DAN PEDESTALNYA


0.74
0.14

13
0.14

0.74
13

0.3
0.24

0.24

13

0.24

0.24

juMLAH =

26 bh
BERAT =

SLOOF TYPE S1

TULANGAN UTAMA

12

TULANGAN SENGKANG

8
BERAT =

SLOOF TYPE S2

TULANGAN UTAMA

12

TULANGAN SENGKANG

8
BERAT =

SLOOF TYPE S2

TULANGAN UTAMA

12

TULANGAN SENGKANG

8
BERAT =

KOLOM K1

TULANGAN UTAMA

13

TULANGAN SENGKANG

8
BERAT =

KOLOM K2

TULANGAN UTAMA

13

TULANGAN SENGKANG

8
BERAT =

1. Tulangan Pokok
Atas
Panjang tulangan pokok =

13

Bawah
Panjang tulangan pokok =

13

Pada Tumpuan
Atas

Panjang tul. Ekstra =

13

Pada lapangan
Panjang tulangan ekstra =

13

2. Tulangan Geser (Sengkang)

Pada tumpuan
Panjang pot. =

0.78 M

0.78 M

Pada lapangan
Panjang pot. =

JUMLAH
PLAT LANTAI
10
10
10
10

1. Tulangan Pokok
Atas
Panjang tulangan pokok =

13

Bawah
Panjang tulangan pokok =

13

Pada Tumpuan
Atas
Panjang tul. Ekstra =

13

Pada lapangan
Panjang tulangan ekstra =

13

2. Tulangan Geser (Sengkang)


b
h
jarak
jarak

=
=
=
=

0.2
0.3
150
200

Pada tumpuan
Panjang pot. =

0.78 M

0.78 M

Pada lapangan
Panjang pot. =

JUMLAH
PLAT LANTAI
10
10
10
10

10

PANJANG JUMLAH
TOTAL
POTONG POTONG
BERAT/M
PANJANG
AN
AN
(M)
(Btg)
(M)
KG/M1

TOTAL
BERAT
KG

1.86

8.00

14.88

1.04

15.50

1.30

8.00

10.40

1.04

10.84

1.06

6.33

6.71

1.04

6.99

866.72

68.00

6.00

408.00

0.89

362.23

0.98

340.00

333.20

0.39

131.48
493.70

32.00

6.00

192.00

0.89

170.46

0.78

160.00

124.80

0.39

49.24
219.70

4.54

4.00

18.16

0.89

16.12

0.68

30.27

20.58

0.39

8.12
24.24

0.55

8.00

4.44

1.04

4.62

0.78

536.69

418.61

0.39

165.18
169.80

7.66

8.00

61.28

1.04

63.85

0.98

43.77

42.90

0.39

16.93
80.78

86.00

2.00

172.00

1.04

179.22

86.00

2.00

172.00

1.04

179.22

43.00

1.00

43.00

1.04

44.80

43.00

1.00

43.00

1.04

44.80

0.78

286.67

223.60

0.39

88.23

0.78

215.00

167.70

0.39

66.17
602.44

1.00
1.00
1.00
1.00

5.00
5.00
5.00
5.00

5.00
5.00
5.00
5.00

0.62
0.62
0.62
0.62

3.08
3.08
3.08
3.08
12.33

14.00

2.00

28.00

1.04

29.17

14.00

2.00

28.00

1.04

29.17

7.00

1.00

7.00

1.04

7.29

7.00

1.00

7.00

1.04

7.29

0.78

46.67

36.40

0.39

14.36

0.78

35.00

27.30

0.39

10.77
98.07

1.00
1.00
1.00
1.00

5.00
5.00
5.00
5.00

5.00
5.00
5.00
5.00

0.62
0.62
0.62
0.62

3.08
3.08
3.08
3.08
12.33

Anda mungkin juga menyukai