Anda di halaman 1dari 1

REKAPITULASI RENCANA ANGGARAN BIAYA

PROGRAM PENYEDIAAN DAN PENGOLAHAN AIR BAKU


PERENCANAAN PEMBANGUNAN PRASARANA PENGAMBILAN DAN SALURAN PEMBAWA
PEKERJAAN PERENCANAAN PEMBANGUNAN IPA
KECAMATAN SUNGAI BAHAR - KABUPATEN MUARO JAMBI

JUMLAH BIAYA
NO. U RAIAN PE K E R JAAN KONSTRUKSI
(Rp)

I LOKASI UNIT I, II, & IV


1.1 PEKERJAAN INTAKE KAP. 50 lt/dt, JARINGAN PIPA & POMPA AIR BAKU 1,386,265,000.00
1.2 PEKERJAAN TAHAP I BANGUNAN IPA KAP. 30 lt/dt 3,368,026,000.00
1.3 PEKERJAAN TAHAP II BANGUNAN IPA KAP. 20 lt/dt 3,264,560,000.00
1.4 PEKERJAAN BANGUNAN RESERVOIR PRODUKSI KAP. 600 M3 1,181,935,000.00
1.5 PEKERJAAN BANGUNAN RUMAH GENSET 1,015,987,000.00
1.6 PEKERJAAN BANGUNAN RUMAH POMPA DISTRIBUSI 133,136,000.00
1.7 PEKERJAAN BANGUNAN RUMAH OPERATOR 185,438,000.00
1.8 PEKERJAAN BANGUNAN LABORATORIUM 99,715,000.00
1.9 PEKERJAAN BANGUNAN RUMAH JAGA 66,693,000.00
1.10 PEKERJAAN BANGUNAN WORK SHOP 51,760,000.00
1.11 PEKERJAAN BANGUNAN PENGOLAH LUMPUR 158,019,000.00
1.12 PEKERJAAN BANGUNAN TANKI BBM KAP. 3000 Lt 34,284,000.00
1.13 PEKERJAAN JARINGAN PIPA TRANSMISI AIR BAKU/AIR MINUM DAN DISTRIBUSI 20,249,763,000.00

TOTAL BIAYA PEKERJAAN 31,195,581,000.00

TERBILANG : Tiga Puluh Satu Milyar Seratus Sembilan Puluh Lima Juta Lima Ratus Delapan Puluh Satu Ribu Rupiah

JAMBI, OKTOBER 2012