No URAIAN PEKERJAAN
1 Pekerjaan Plambing
JUMLAH TOTAL
I
N BIAYA
JUMLAH
(Rp)
Rp 151,957,247.43
Rp 151,957,247.43
REKAPITULASI RENCANA ANGGARAN BIA
No URAIAN PEKERJAAN
PEKERJAAN PLAMBING
JUMLAH TOTAL
CANA ANGGARAN BIAYA
JUMLAH
(Rp)
Rp 151,957,247.43
Rp 151,957,247.43
Bill Of Quantity (BoQ)
No URAIAN PEKERJAAN
A B
PEKERJAAN PLAMBING
2 Panel Pompa
3 Header GIP 4"
4 Gate Valve dia. 2 1/2" (125 psi )
5 Stainer dia. 2 1/2" (125 psi )
6 Flexible Joint dia. 2 1/2" (125 psi )
7 Gate Valve dia. 2 " (125 psi )
8 Stainer dia. 2 1" (125 psi )
9 Flexible Joint dia. 2 " (125 psi )
10 Foot Valve
nb tanpa sapot
Bill Of Quantity (BoQ)
HARGA
RJAAN SAT VOL SATUAN
( Rp )
C D E
l End Suction
Pipe) Medium
m 135.00 109,854.00
m 145.00 82,689.50
m 80.00 82,689.50
m 210.00 70,342.00
18,000,000.00
5,000,000.00
2,000,000.00
1,600,000.00
4,800,000.00
2,450,000.00
1,400,000.00
4,800,000.00
1,800,000.00
1,300,000.00
14,830,290.00
11,989,976.85
6,615,159.64
14,771,820.94
8,000,000.00
9,000,000.00
16,000,000.00
3,000,000.00
1,600,000.00
16,000,000.00
6,000,000.00
1,000,000.00
Rp 151,957,247.43