Dokumen - Tips - Contoh Perhitungan Bbs
Dokumen - Tips - Contoh Perhitungan Bbs
Tul.
1. D 13 36 1,500 54 55,782 Pokok
.
Seng-
2. 8 27 1,296 35 13,755
kang.
4,772 Tul.
2. D 13 4 1,155 4,62 Tump
uan.
3 D 13 2 1,87 3.73 3,853 Tul.
Lapan
gan.
46,4 Tul.
4 D 13 2 23,23 28,799
5 Torsi.
Seng-
5 10 50 2,8 140 86,8
kang.
Kolom :
1 D13 = (150 x 12) x 3 kolom = 5400 cm = 54 m
2 D8 = (30 x 4) + (2x6d)
= 120 + (9.6)
= 129.6 cm x 27 buah
= 3499.2 cm = 34.99 m
Balok :
1 D10= (2x30)+ (2x50) + (2x6d)
= 280 cm x 50 buah
= 14000 cm = 140 m
Laboratorium konstruksi beton
D13 = 2 ((2x(5,3+21,33))+(2x534)+40)
= 2322,52 cm x 2 buah = 46,45 m
D13 = ((2x(5,3+21,33+12d))+(2xL)+40)
= ((2x(5,3+21,33+(12x1,3))+(2x534)+40)
= 1192,46 cm x10 buah = 11924,6 cm =119,25 m
4 D13 = 12d+(5,3+21,33)+1/8L+(5d)
= (12x1,3)+26,63+(534/8)+(5x1,3)
= 115,48 cm x4 = 461,92 cm
= 4,62 m
5 D13 = (2x5d)+(2x(1/8L))+40
= (2x(5x1,3))+(2x(534/8))+40
= 186,5 cm x 2= 373 cm
=3.73 m