DAFTAR HARGA SATUAN UPAH

HARGA UPAH
NO URAIAN SATUAN UPAH UPAH
ORANG/JAM ORANG/HARI

1 Mandor org/Hari/8 jam Rp 10,625.00 Rp 85,000.00


2 Kepala Tukang Batu org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
3 Kepala Tukang Kayu org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
4 KepalaTukang Besi/Alumunium org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
5 Kepala Tukang Cat/Pelitur org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
6 Kepala Tukang Listrik org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
7 Tukang Batu org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
8 Tukang Kayu org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
9 Tukang Besi/Baja org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
10 Tukang Alumunium org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
11 Tukang Cat org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
12 Tukang Listrik org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
13 Tukang Pipa org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
14 Tukang Plitur org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
15 Tukang Taman org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
16 Tukang org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
17 Pembantu Tukang org/Hari/8 jam Rp 8,375.00 Rp 67,000.00
18 Pekerja Biasa org/Hari/8 jam Rp 8,375.00 Rp 67,000.00
19 Penjaga Malam org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
20 Supir org/Hari/8 jam Rp 8,750.00 Rp 70,000.00
21 Operator org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
22 Mekanik org/Hari/8 jam Rp 10,000.00 Rp 80,000.00
23 Pembantu Supir org/Hari/8 jam Rp 8,375.00 Rp 67,000.00
24 Pembantu Operator org/Hari/8 jam Rp 8,375.00 Rp 67,000.00
25 Pembantu Mekanik org/Hari/8 jam Rp 8,375.00 Rp 67,000.00

Harga Sudah Termasuk Profit / Keuntungan


DAFTAR HARGA SATUAN BAHAN / MATERIAL

NO URAIAN SAT. HARGA

A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m3 181,230.00
2 Tanah Urug Pilihan m3 92,300.00
3 Sirtu m3 211,030.00
4 Pasir Teras m3 180,480.00
5 Pasir Pasang Kali m3 241,390.00
6 Pasir Beton m3 264,140.00
7 Abu Batu m3 267,800.00
8 Batu Gosok ( Apung ) kg 30,640.00
9 Batu Pecah Mesin 1/2 m3 231,240.00
10 Batu Pecah Mesin 2/3 m3 218,260.00
11 Batu Pecah Mesin 3/5 m3 211,970.00
12 Batu Pecah Mesin 5/7 m3 202,660.00
13 Batu Belah Pondasi m3 212,530.00
14 Batu Bronjol ( Untuk Bronjong ) m3 187,060.00
15 Batu Koral Beton Kali m3 178,600.00
16 Batu Tempel Hitam m3 100,110.00
17 Batu Pinggir Beton 10 x 20 x 35 bh 14,660.00
18 Batu Pinggir Beton 15 x 35 x 50 ( K-225 ) bh 76,230.00
19 Batu Telor m3 101,520.00
20 Batako Kecil 8 x 10 x 20 bh 2,500.00
21 Batako Besar 8 x 20 x 30 bh 2,700.00
22 Con Blok 8 x 20 x 40 bh 6,000.00
23 Bata Merah Bakar kelas I bh 850.00
24 Bata Merah Bakar kelas II bh 750.00
25 Bata Merah Oven ( Klingker ) bh 2,000.00
26 Roster Beton 20 x 20 bh 16,000.00
27 Roster Beton 30 x 30 bh 17,200.00
28 Grass Blok 20 x 20 bh 10,700.00
29 Grass Blok 30 x 30 m3 14,900.00
30 Paving Blok Natural 8 cm m3 89,300.00
31 Paving Blok Warna 8 cm m3 119,500.00
32 Paving Blok Natural 6 cm m3 83,600.00
33 Paving Blok Warna 6 cm m3 94,600.00
34 Canstin Paving Blok m1 38,400.00
35 Semen PC /50 kg zak 77,400.00
Semen PC kg 1,540.00
36 Semen Putih zak 102,000.00
37 Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm bh 64,800.00
38 Readymix Beton K500, Tanpa Pompa ( Selang ) m3 1,386,000.00
39 Readymix Beton K400, Tanpa Pompa ( Selang ) m3 1,248,000.00
40 Readymix Beton K350, Tanpa Pompa ( Selang ) m3 1,220,000.00
41 Readymix Beton K300, Tanpa Pompa ( Selang ) m3 1,219,000.00
42 Readymix Beton K225, Tanpa Pompa ( Selang ) m3 1,165,000.00
43 Readymix Beton K175, Tanpa Pompa ( Selang ) m3 1,062,000.00
44 Kapur Pasang / Kapur Tembok m3 388,700.00
45 Kapur Sirih kg 20,200.00
46 Semen Warna kg 15,000.00
47 Tanah liat m3 34,500.00
48 Air ltr 350.00
49 Formite/spacer bh 2,800.00
50 Hollow/Con Blok 8 x 20 x 40 bh 5,700.00
51 Hollow/Con Blok 8 x 15 x 40 bh 6,500.00
52 Hollow/Con Blok 8 x 10 x 40 bh 3,500.00
NO URAIAN SAT. HARGA

B LABURAN,PENGISI DAN ALATNYA


1 Plamir Tembok kg 27,500.00
2 Cat Tembok ICI Eksterior ( Beton ) lt 135,000.00
3 Cat Tembok ICI Interior ( Plafon Dan Dinding ) lt 82,500.00
4 Cat Tembok Vinilex kg 27,500.00
5 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 92,500.00
6 Cat Tembok Sanlek kg 22,500.00
7 Cat Dasar kg 35,000.00
8 Cat Tahan Asam lt 45,000.00
9 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) kg 100,000.00
10 Cat Marka / Spotlight kg 205,000.00
11 Water Profing Emulsion ml 80,000.00
12 Water Profing Membrance bh 68,000.00
13 Rool Cat Tembok bh 35,000.00
14 Kape Tembok bh 9,500.00
15 Kape Kayu 5 lt 10,500.00
16 Soligneum 1 Blek kg 26,000.00
17 Plincote kg 32,000.00
18 Penawetan Kayu m3 395,000.00
19 Pegopenan Kayu bh 390,000.00
20 Kwas 3" kg 16,500.00
21 Oker bks 23,500.00
22 Oyan bks 5,500.00
23 Oten ( Pewarna Plitur ) lt 6,000.00
24 Spirtus kg 17,500.00
25 Bahan Pelitur Kripik ( Sirlak India ) kg 115,000.00
26 Dempul Lilin kg 35,000.00
27 Dempul Plitur kg 40,000.00
28 Dempul Halus / Imfra ( Wood Filler ) lt 42,000.00
29 Dempul Jadi kg 40,000.00
30 Politur lt 55,000.00
31 Politur Jadi lt 125,000.00
32 Terpentin kg 21,000.00
33 Tiner A kg 26,300.00
34 Tiner B kg 23,700.00
35 Kumpon zak 34,000.00
36 Melamik kg 57,800.00
37 Dempul Plastik kg 43,200.00
38 Dempul Duco kg 40,000.00
39 Ampelas kg 5,500.00
40 Dempul Kayu Cap Kucing kg 26,900.00
41 Meni Kayu / Besi kg 33,500.00
42 Sincromat kg 45,000.00
43 Cat Kayu Glotex kg 45,900.00
43 Cat Kayu Pinotex kg 52,500.00
44 Cat Besi lt 48,400.00
45 Cat Besi Duco Danaglos / ICI kg 84,000.00
46 Cat Bron kg 74,500.00
47 Karet lis bh 3,700.00
48 Minyak cat kg 42,300.00
Steger werk Ls 1,000.00
49 Glass beet kg 55,500.00
50 Residu lt 9,000.00

C BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu 5 s.d 7 bt 19,500.00
2 Bambu 7 s.d 10 bt 27,500.00
NO URAIAN SAT. HARGA

3 Bambu Gombong bt 42,500.00


4 Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II ) m3 7,805,000.00
5 Kayu Balok Borneo Super m3 5,810,000.00
6 Kayu Papan Borneo Super m3 6,155,500.00
7 Kayu Balok Kamper Medan (Kruing ) m3 6,262,000.00
8 Kayu Papan Kamper Medan (Kruing ) m3 6,405,800.00
9 Kayu Balok Kamper Banjar m3 7,000,000.00
10 Kayu Papan Kamper Banjar m3 7,310,000.00
11 Kayu Balok Kamper Samarinda m3 9,500,000.00
12 Kayu Papan Kamper Samarinda m3 9,596,800.00
13 Kayu Balok Rasamala m3 2,923,800.00
14 Kayu Jati Jatim Tua dia. 40 cm m3 22,850,000.00
15 Kayu Jati Jateng Tua dia. 40 cm m3 24,410,000.00
16 Kayu Jati Jabar Tua dia. 40 cm m3 15,000,000.00
17 Kayu Jati Jabar Tua dia. 40 cm kebawah m3 14,010,000.00
18 Kayu Hutan Kelas I ( Segeng,Mahoni, Laban ) m3 2,276,800.00
19 Kayu Balok Albasia m3 2,058,000.00
20 Kayu Papan Albasia m3 2,279,000.00
21 Dolken 5 s/d 7 bt 24,900.00
22 Dolken 7 s/d 10 bt 30,800.00
23 List Profil Kamper 1 cm m1 9,800.00
24 List Profil Kamper 2 cm m1 10,500.00
25 List Profil Kamper 4 cm m1 15,000.00
26 List Profil Kamper 5 cm m1 19,000.00
27 List Profil Kamper 10 cm m1 32,400.00
28 Pegangan Tangga Profil Jati m1 176,500.00
29 Pegangan Tangga Profil Kamper m1 135,000.00
30 Kayu Kaso 4/6 m3 3,049,500.00
31 Kayu Kaso 5/7 m3 3,692,500.00
32 Kayu Reng 2/3 Borneo Super m1 2,700.00
33 Kayu Reng 2/3 Kamper Banjar m1 3,500.00
34 Kayu Reng 3/4 Kamper Banjar m3 4,300.00
35 Kayu Papan Terentang m3 2,950,000.00
36 Kayu Balok Terentang m3 2,705,000.00
37 Batang Kelapa bt 294,300.00
38 Tali Ijuk kg 25,800.00
39 Lapisan Ijuk tebal 10 cm m2 24,500.00
40 Venetion Blind m2 592,000.00
41 Vertikal Blind m2 386,500.00
42 List Kayu 1/4 kayu Borneo m1 3,000.00

D BAHAN PENUTUP RANGKA PLAFOND


1 Plafond Enternit 4 mm m2 18,500.00
2 Plafond hardpleks 5 mm 120 x 240 lbr 68,700.00
3 Plafond Asbes Semen 5 mm m2 25,000.00
4 Plafond Asbes Semen 3,5 mm m2 21,500.00
5 Gypsum 120 x 240 t= 9 mm ex DN lbr 87,800.00
6 Gypsum 120 x 240 t= 9 mm ex Luar lbr 92,200.00
7 Tepung Gypsum kg 13,800.00
8 Acustik Amstrong 60 x 120 lbr 146,500.00
9 Cotton Plester bh 16,500.00
10 GRC board ( 120 x 240 x 4 ) mm lbr 74,500.00
11 Cornice Coumpound zak 83,000.00
12 List gypsum m1 9,000.00
Kalsiplank uk. 3000x300x9 mm lbr 65,800.00

E BAHAN KAYU LAPIS


NO URAIAN SAT. HARGA

1 Triplek 3 mm 120 x 240 lbr 65,000.00


2 Triplek 4 mm 120 x 240 lbr 68,500.00
3 Triplek 4 mm ukuran Pintu lbr 60,500.00
4 Triplek 6 mm 120 x 240 lbr 98,500.00
5 Triplek 9 mm 120 x 240 lbr 183,500.00
6 Jabar Wood 4 mm lbr 132,500.00
7 Bilik Bambu ( tanpa kulit ) m2 22,500.00
8 Bilik Bambu ( dengan kulit ) m2 25,000.00
9 Bilik Bambu Hitam Variasi m2 37,700.00
10 Wall paper m2 61,500.00
11 Multiplek 9 mm 120 x 240 lbr 166,500.00
12 Multiplek 12 mm 120 x 240 lbr 215,000.00
13 Multiplek 18 mm 120 x 240 lbr 282,500.00
14 Playwood 18 mm 120 x 240 m3 357,500.00
15 Playwood 9 mm 120 x 240 lbr 260,000.00
16 Playwood 4 mm 120 x 240 lbr 145,000.00
17 Teakwood 3 mm 120 x 240 lbr 142,500.00
18 Teakwood 4 mm 120 x 240 lbr 145,000.00
19 Teakwood 3 mm 120 x 240 ukuran Pintu lbr 140,000.00
20 Teakwood ukuran Pintu 4 mm lbr 127,500.00
21 Tacon ( Tahan Bakar ) m2 142,500.00
22 Supercon m2 61,500.00
23 Melamin 4 mm 120 x 240 lbr 98,500.00
24 Melamin TOK 4 mm lbr 147,000.00
25 Formika 120 x 240 lbr 175,000.00
26 Formika ukuran Pintu lbr 147,500.00
27 Formika Warna 4" x 8" lbr 262,500.00
27 HPL lbr 175,000.00

F BAHAN LANTAI DAN PELAPIS DINDING


1 Tegel PC 20 x 20 bh 3,800.00
2 Plin Tegel PC 10 x 20 bh 2,700.00
3 Tegel PC 30 x 30 bh 3,800.00
4 Plin Tegel PC 15 x 30 bh 3,000.00
5 Tegel Warna 20 x 20 bh 4,000.00
6 Plin Tegel Warna 10 x 20 bh 3,600.00
7 Tegel Warna 30 x 30 bh 6,000.00
8 Plin Tegel Warna 15 x 30 bh 6,500.00
9 Tegel Wafel PC 20 x 20 bh 3,500.00
10 Tegel Wafel Warna 20 x 20 bh 2,700.00
11 Tegel Badak PC 30 x 30 bh 4,300.00
12 Poslin 11 x 11 Warna Standar DN m2 70,000.00
13 Poslin 11 x 11 Warna khusus DN m2 75,000.00
14 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia m2 60,000.00
15 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia m2 62,500.00
16 Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia m2 65,000.00
17 Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia m2 60,000.00
18 Keramik 20 x 25 Dinding KM KW I DN Corak Mulia m2 65,000.00
19 Keramik 30 x 30 KWI DN Putih Polos Mulia m2 55,500.00
20 Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 60,500.00
21 Keramik 40 x 40 KWI DN Putih Polos Mulia m2 67,500.00
22 Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 66,000.00
23 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman m2 65,500.00
24 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman m2 80,000.00
25 Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman m2 83,000.00
26 Keramik 20 x 20 (KM) KW I DN Putih Polos Roman m2 81,500.00
27 Keramik 20 x 25 Dinding KM KW I DN Corak Roman m2 81,500.00
NO URAIAN SAT. HARGA

27 Keramik 20 x 40 Dinding KM KW I DN Corak Roman m2 83,000.00


28 Keramik 20 x 25 KW I DN Putih Polos Roman m2 76,000.00
28 Keramik 30 x 30 KW I DN Polos Roman m2 76,000.00
29 Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman m2 80,000.00
30 Keramik 40 x 40 KW I DN Polos Roman m2 80,000.00
31 Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman m2 85,000.00
32 Vinyl Lantai Standar m2 65,500.00
33 Karpet Kelas Baik LN m2 1,128,500.00
34 Karpet Kelas Sedang LN m2 389,000.00
35 Parquet Jati m2 413,500.00
36 Stairnosing Keramik 10/20 bh 15,500.00
37 Stairnosing Fiber m 25,000.00
38 Taraso Kerang 30 x 30 m2 35,000.00
39 Plin Taraso 10 x 30 bh 15,000.00
40 Granit Alam LN Ukuran Besar m2 2,033,500.00
41 Granit Alam LN Ukuran Kecil m2 1,774,500.00
42 Granit Alam DN Ukuran Besar m2 1,464,500.00
43 Granit Alam DN Ukuran Kecil m2 1,429,500.00
44 Granito Tile Essenza Ukuran 40 x 40 Polis m2 380,000.00
45 Granito Tile Essenza Ukuran 30 x 30 m3 355,500.00
46 Granito Tile Essenza Ukuran 40 x 40 UnPolis m2 225,500.00
47 Marmer m2 605,000.00
48 Marmer Alam Lampung Ukuran Besar m2 605,500.00
49 Marmer Alam Lampung Ukuran kecil m2 380,500.00
50 Marmer Alam Citatah Ukuran Besar m2 375,000.00
51 Marmer Alam Citatah Ukuran Kecil m2 262,500.00
52 Marmer Sintetis m2 175,000.00
53 Granito Tile Essenza 60 x 60 Polis M2 395,000.00
54 Granito Tile Essenza 60 x 60 UnPolis M2 255,000.00
55 Batu Tempel Hitam m2 106,500.00
56 Bata Karawang bh 650.00
57 Campuran untuk Kedap Air ( AM ) ltr 41,500.00
58 Plint keramik 10 x 20 bh 3,500.00
59 Plint keramik 10 x 25 bh 4,000.00
60 Plint keramik 10 x 30 bh 4,000.00
61 Plint keramik 10 x 40 bh 4,500.00
62 Plint keramik 15 x 30 bh 5,000.00
63 Plint keramik 15 x 40 bh 5,500.00
64 Plint granito 10 x 30 bh 2,000.00
65 Plint granito 10 x 40 bh 2,200.00
66 Plint granito 15 x 30 bh 2,500.00
67 Plint granito 15 x 40 bh 3,000.00
Puzzdith - 100 XR ltr 0.00

G BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel U 20 cm' m1 48,000.00
2 Grafel U 30 cm' m1 60,000.00
3 Grafel U 40 cm' m1 79,000.00
4 Buis Beton 20 cm ( 1 M' ) m1 53,000.00
5 Buis Beton 30 cm ( 1 M' ) m1 68,000.00
6 Buis Beton 40 cm ( 1 M' ) m1 85,000.00
7 Buis Beton 50 cm ( 1 M' ) stk 98,000.00
8 Buis Beton 60 cm ( 1 M' ) stk 135,000.00
9 Buis Beton 100 cm ( 0.50 M' ) stk 310,000.00
10 Buis Beton 80 cm ( 0.50 M' ) stk 305,000.00
11 BuisTanah 10 cm ( 0.50 M' ) stk 10,000.00
12 BuisTanah 15 cm ( 0.50 M' ) stk 13,000.00
NO URAIAN SAT. HARGA

13 BuisTanah 20 cm ( 0.50 M' ) stk 17,000.00


14 BuisTanah 25 cm ( 0.50 M' ) stk 23,500.00
15 Injuk kg 18,000.00

H BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-rata kg 16,500.00
2 Besi Beton U-39 / U-32 Rata-rata kg 22,800.00
3 Pagar BRC lengkap tiang ( Tanpa Pondasi ) m2 188,500.00
4 Bondek m2 203,500.00
5 Besi WF Ex DN SII kg 26,400.00
6 Besi WF Ex Jepang kg 26,300.00
7 Besi Profil DN SII kg 20,200.00
8 Besi Profil Ex LN kg 23,800.00
9 Besi C Lip Chanel kg 21,200.00
10 Ongkos Galfanis Besi kg 11,700.00
11 Kawat Beton kg 30,500.00
12 Kawat Duri kg 70,000.00
13 Kawat Pengikat m1 1,100.00
14 Kawat Bronjong 4 mm kg 31,100.00
15 Kawat Tembaga kg 45,600.00
16 Ram Nyamuk Hijau m2 14,800.00
17 Ram Kawat 1 x 1 cm m2 16,000.00
18 Ram Ayam m2 15,500.00
19 Kawat Kasa 1 x 1 ( Putih ) m2 35,500.00
Kawat Harmonika 4 cm Lapis Plastik m2 80,000.00
20 Kawat Harmonika 4 cm m2 37,000.00
21 Kawat Harmonika 2 cm m2 31,500.00
22 Kawat Las Listrik kg 26,000.00
23 Wiremesh M8 m2 57,500.00
24 Wiremesh M6 m2 42,600.00
25 Timah kg 51,000.00
26 Timah Hitam kg 47,700.00
27 Ram nyamuk Alumunium m2 35,700.00
28 Plat Srip 2 x 30 mm ( 6 m1 ) bt 36,300.00
29 Plat Srip 3 x 30 mm ( 6 m1 ) bt 36,500.00
30 Plat Strip bt 20,100.00
31 Besi Strip kg 29,500.00
32 Plat Alumunium 0.2 mm m2 98,800.00
33 Plat Alumunium 0.3 mm m2 122,000.00
34 Plat Alumunium 0.4 mm m2 155,600.00
35 Plat Alumunium 0.5 mm m2 157,500.00
36 Plat Alumunium 0.6 mm m2 189,000.00
37 Plat Alumunium 0.1 mm m2 62,000.00
38 Kusen Alumunium Natural 1.3 mm t= 103 mm ( 4 " ) m1 166,500.00
39 Kusen Alumunium Warna 1.3 mm t= 103 mm ( 4 " ) m1 179,500.00
40 Kusen Alumunium Natural 1.3 mm t= 103 mm ( 3 " ) m1 89,100.00
41 Kusen Alumunium Warna 1.3 mm t= 103 mm ( 3 " ) m1 112,200.00
42 Daun Jendela Alumunium Natural ( tanpa kaca dan accessories ) m2 108,700.00
43 Daun Jendela Alumunium Warna ( tanpa kaca dan accessories ) m2 98,800.00
44 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m2 233,000.00
45 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m2 211,800.00
46 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 379,800.00
47 Kait Angin Alumunium ps 115,000.00
48 Karet Asisoris Kusen / Pintu Alumunium m1 8,300.00
49 Jalusi Alumunium m1 38,500.00
50 Sunscreen Almunium m2 418,300.00
51 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) roll 1,740,000.00
NO URAIAN SAT. HARGA

52 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) roll 228,500.00


53 Plat Besi Tipis 1 mm kg 18,500.00
54 Plat Besi Tipis 0.5 mm kg 19,500.00
55 Plat Besi 2 mm s/d 5 mm kg 15,600.00
56 Plat Besi 6 mms/d 10 mm kg 15,600.00
57 Plat Besi 10 mm keatas kg 16,200.00
58 Kabel presstressed polos kg 29,400.00
59 Jaring Kawat Baja kg 31,800.00
60 Lem Kuning ( Aibond ) kg 39,300.00
61 Lem Fox kg 26,300.00
62 Lem Vinyl kg 48,500.00
63 Besi Strip Kaca Nako kg 12,100.00
64 Profil alumunium "T" m1 13,500.00
65 Besi Hallow ( 2 x 4 x 4 cm ) btg 25,000.00
66 Besi Hallow ( 4 x 4 cm ) btg 32,200.00
67 Besi Rail Pengamanan kg 505,300.00
68 Jendela Besi m2 429,300.00
69 Jendela Besi tahan api m2 551,900.00
70 Pintu gulung besi m2 551,900.00
71 Pintu Roliing Door m2 337,300.00
72 Jendela nako kaca ryben + tralis 6 klip set 187,000.00
73 Jendela nako kaca ryben + tralis 7 klip set 220,000.00
74 Jendela nako kaca ryben + tralis 8 klip set 253,000.00
75 Jendela nako kaca ryben + tralis 10 klip set 319,000.00
76 Jendela nako kaca bening + tralis 4 klip set 132,000.00
77 Jendela nako kaca bening + tralis 5 klip set 154,000.00
78 Jendela nako kaca bening + tralis 6 klip set 187,000.00
79 Jendela nako kaca bening + tralis 7 klip set 231,000.00
80 Jendela nako kaca bening + tralis 8 klip set 253,000.00
81 Jendela nako kaca bening + tralis 10 klip set 330,000.00

I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 75,900.00
2 Kaca Polos 3 mm ( ASAHI ) m2 96,200.00
3 Kaca Polos 5 mm ( ASAHI ) m2 122,100.00
4 Kaca Polos 8 mm ( ASAHI ) m2 201,500.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 163,600.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 355,800.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 689,700.00
8 Kaca cermin 5 mm m2 165,600.00
9 Kaca cermin 6 mm m2 205,100.00
10 Kaca cermin 8 mm m2 257,800.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,783,300.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 3,768,300.00
13 Kaca 6 mm Gravver m2 1,390,300.00
14 Glass Block DN 20 x 20 ( Kedawung ) bh 24,200.00
15 Glass Block DN 20 x 20 Ex LN bh 138,300.00
16 Sealant kg 233,000.00
17 Jendela Nako bh 120,200.00

J BAHAN PAKU DAN MUR BAUT


1 Paku s/d 2 cm kg 24,000.00
2 Paku 2 cm s/d 5 cm kg 24,000.00
3 Paku 8 cm s/d 15 cm kg 18,400.00
4 Paku Beton 2 cm s/d 5 cm bh 1,700.00
5 Paku Kait Lengkap bh 1,000.00
6 Paku Cacing kg 63,000.00
NO URAIAN SAT. HARGA

7 Besi Beugel Kuda - Kuda kg 24,000.00


8 Duk Angker bh 8,300.00
9 Angker Mur Baut dia. 19 / Panjang 60 cm bh 79,000.00
10 Mur Baut HTB dia. 19 s/d 16 ( 5 cm ) bh 17,500.00
11 Mur Baut Biasa dia. 19 s/d 16 ( 5 cm ) bh 10,300.00
12 Piser dia.12 s/d 20 cm bh 5,500.00
13 Paku skrup 3" bh 850.00
14 Ramset / Dinabolt bh 8,000.00
15 Baut Besar bh 700.00
16 Baut Kecil bh 300.00
17 Paku GRC kg 38,500.00
18 Paku Gypsum kg 18,500.00
19 Sekrup fixer bh 300.00

K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt 183,500.00
2 Besi Pipa Untuk Hydrant BSP 1.25" bt 231,300.00
3 Besi Pipa Untuk Hydrant BSP 1.5" bt 327,800.00
4 Besi Pipa Untuk Hydrant BSP 2" bt 387,000.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 483,500.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 654,500.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 956,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,565,800.00
9 Besi Pipa Hitam 1" t = 2 mm bt 189,600.00
10 Besi Pipa Hitam 2" t = 2 mm bt 250,700.00
11 Besi Pipa Hitam 3" t = 2mm bt 402,500.00
12 Besi Pipa Hitam 4" t = 2 mm bt 630,500.00
13 Besi Pipa Hitam 6" t = 2 mm bt 850,000.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 120,500.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 175,500.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 199,700.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 285,500.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 308,600.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 359,100.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 514,200.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 739,500.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 934,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 950,000.00
24 Macam2 Sambungan GIP 1/2" bh 7,000.00
25 Macam2 Sambungan GIP 3/4" bh 9,500.00
26 Macam2 Sambungan GIP 1" bh 18,500.00
27 Macam2 Sambungan GIP 1 1/4" bh 21,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 23,000.00
29 Macam2 Sambungan GIP 1 3/4" bh 25,000.00
30 Macam2 Sambungan GIP 2" bh 56,500.00
31 Macam2 Sambungan GIP 2 1/2" bh 66,500.00
32 Macam2 Sambungan GIP 3" bh 83,500.00
33 Macam2 Sambungan GIP 4" bh 130,500.00
34 Pipa PVC RUCIKA type AW 1/2" bt 42,500.00
35 Pipa PVC RUCIKA type AW 3/4" bt 55,500.00
36 Pipa PVC RUCIKA type AW 1" bt 65,000.00
37 Pipa PVC RUCIKA type AW 1 1/4" bt 82,500.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 110,000.00
39 Pipa PVC RUCIKA type AW 2" bt 120,000.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 170,000.00
41 Pipa PVC RUCIKA type AW 3" bt 215,000.00
42 Pipa PVC RUCIKA type AW 4" bt 360,000.00
NO URAIAN SAT. HARGA

43 Pipa PVC RUCIKA type AW 6" bt 675,000.00


44 Pipa PVC RUCIKA type AW 8" bt 850,000.00
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 25,000.00
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 28,500.00
47 Pipa PVC MASPION ABU ( AW ) 1" bt 42,500.00
48 Pipa PVC MASPION ABU ( AW ) 1 1/4" bt 60,500.00
49 Pipa PVC MASPION ABU ( AW ) 1 1/2" bt 61,500.00
50 Pipa PVC MASPION ABU ( AW ) 2" bt 80,000.00
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt 130,500.00
52 Pipa PVC MASPION ABU ( AW ) 3" bt 155,000.00
53 Pipa PVC MASPION ABU ( AW ) 4" bt 265,000.00
54 Macam2 Sambungan Paralon 1/2" bh 4,700.00
55 Macam2 Sambungan Paralon 3/4" bh 5,000.00
56 Macam2 Sambungan Paralon 1" bh 5,500.00
57 Macam2 Sambungan Paralon 1 1/4" bh 8,000.00
58 Macam2 Sambungan Paralon 1 1/2" bh 10,500.00
59 Macam2 Sambungan Paralon 1 3/4" bh 15,000.00
60 Macam2 Sambungan Paralon 2" bh 17,500.00
61 Macam2 Sambungan Paralon 2 1/2" bh 29,500.00
62 Macam2 Sambungan Paralon 3" bh 33,000.00
63 Macam2 Sambungan Paralon 4" bh 38,000.00
64 Sambungan Pipa PVC Jenis AW 4" TY bh 99,000.00
65 Lem Paralon tb 10,500.00
66 Solatip Ledeng gl 4,500.00
67 Pipa PVC 4" Berlobang Jenis AW m1 40,500.00
68 PVC Waterstop lebar 150 m1 55,000.00
69 PVC Waterstop lebar 200 m1 60,000.00
70 PVC Waterstop lebar 230 m1 70,000.00
71 PVC Waterstop lebar 250 m1 76,000.00
72 PVC Waterstop lebar 300 m1 87,500.00
73 PVC Waterstop lebar 320 m1 95,000.00

L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 115,000.00
2 Stop Kran 1" KIT bh 137,500.00
3 Stop Kran 1 1/2" KIT bh 230,000.00
4 Stop Kran 2" KIT bh 295,000.00
5 Stop Kran 2 1/2" KIT bh 785,000.00
6 Stop Kran 3" KIT bh 915,000.00
7 Check Valve 1/2" bh 95,500.00
8 Double Neple 1/2" bh 36,000.00
9 Water Mur 1/2" bh 44,500.00
10 Gate walve 1/2" bh 61,500.00
11 Saringan Air Lt. KM Stainless Steel/Floor Drain bh 73,500.00
12 Apooer Bath Tube bh 295,000.00
13 Kran Stainless Lokal Kait bh 51,500.00
14 Shower Dengan Tiang bh 245,000.00
15 Shower Tanpa Tiang bh 150,000.00
16 Kran Tembok Sun Eui dia. 1/2" bh 55,000.00
17 Kran Tembok ITAP dia. 1/2" bh 45,000.00
18 Kran Bebek Sun Eui 1/2" bh 160,000.00
19 Kran Bebek ITAP 1/2" bh 57,500.00
20 Kran Panas Dingin San Eui Standard bh 252,000.00
21 Bath Cape Washteren unit 2,310,000.00
22 Tempat Sabun Poslin bh 51,500.00
23 Wastafel Lengkap TOTO LW 230 unit 1,115,000.00
24 Wastafel Lengkap INA unit 800,000.00
NO URAIAN SAT. HARGA

25 Closet Jongkok Poslin Warna TOTO unit 227,500.00


26 Closet Jongkok Standard Putih Poslin TOTO unit 207,500.00
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,236,500.00
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,897,500.00
29 Wastafel Bulat Warna Standard Lengkap unit 1,002,000.00
30 Closet Duduk Warna Standard INA Lengkap bh 1,399,500.00
31 Urinoir Lengkap TOTO Warna Standard Lengkap unit 1,952,500.00
32 Penyekat Poslin Urinoar TOTO lbr 545,500.00
33 Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) bh 438,500.00
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lubang ) bh 1,400,000.00
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) bh 1,815,500.00
36 Talang PVC U - 15 cm btg 66,000.00

M BAHAN PENUTUP ATAP


1 Atap Plastik Gelombang 80 x 180 lbr 36,500.00
2 Atap Fiber Glass Tipis 80 x 180 ( Gelombang ) lbr 52,000.00
3 Atap Fiber Glass Tebal 80 x 180 ( Gelombang ) lbr 110,000.00
4 Atap Alumunium Natural USR 26 ( JAINDO ) m2 155,000.00
5 Atap Alumunium Warna USR 26 ( JAINDO ) m2 182,500.00
6 Atap Asbes Gel. Kecil 80 x 180 x 4 mm lbr 85,000.00
7 Atap Asbes Gel. Besar 80 x 180 x 5 mm lbr 122,500.00
8 Atap Seng Gelombang 80 cm x 180 cm x 3 mm lbr 69,500.00
9 Atap Seng Gelombang 80 cm x 180 cm x 5 mm lbr 91,500.00
10 Atap Seng Gelombang 270 cm x 105 cm x 4mm lbr 81,000.00
11 Atap Seng Gelombang 240 cm x 105 cm x 4mm lbr 72,500.00
12 Atap Seng Gelombang 210 cm x 105 cm x 4mm lbr 65,500.00
13 Atap Seng Gelombang 150 cm x 105 cm x 4mm lbr 47,000.00
14 Atap Seng Gelombang 150 cm x 102 cm x 5mm lbr 86,500.00
15 Atap Seng Gelombang 180 cm x 102 cm x 5mm lbr 107,500.00
16 Atap Gelombang 300 cm x 105 cm x 4 mm lbr 88,000.00
17 Atap Tegola Kubota, lengkap m2 536,000.00
18 Atap Tegola Kwalitas Sedang m2 312,000.00
19 Alumunium Foile m2 20,000.00
20 Atap Genteng Plentong pres Bakar KW I bh 2,000.00
21 Atap Genteng Plentong pres Molen Oven KW I bh 3,000.00
22 Atap Genteng Flam pres Molen Oven Jatiwangi bh 2,500.00
23 Bubung Genteng pres Bulat Ex Jatiwangi bh 8,500.00
24 Genteng Bubungan Ex Jatiwangi Segi Tiga bh 5,000.00
25 Genteng Bubungan Beton bh 11,000.00
26 Genteng Metal ( Rainbow Roof ) m2 225,000.00
27 Genteng Metal Hana m2 190,000.00
28 Nok Atas Metal ( Rainbow Roof ) m2 152,500.00
29 Nok Atas Metal Hana lbr 89,000.00
30 Nok Pingir Metal ( Rainbow Roof ) lbr 115,900.00
31 Nok Pingir Metal Hana lbr 110,900.00
32 Wall Flasing ( Rainbow Roof ) lbr 92,300.00
33 Wall Flasing Hana lbr 97,600.00
34 Atap Genteng Beton Warna 14.5/m2 m2 106,500.00
35 Genteng Beton Natural m2 9,000.00
36 Sirap Kelas I ( 80 / m2 ) bh 27,500.00
37 Genteng Keramik Natural Intan 14.5 / m2 m2 115,000.00
38 Genteng Keramik Glasur Standard 14.5 /m2 m2 145,500.00
39 Genteng Keramik Glasur Special 14.5 /m2 m2 147,000.00
40 Genteng Keramik Glasur Premium 14.5 /m2 m2 150,000.00
41 Genteng Murando Natural 1m2 = 20 bh bh 3,000.00
42 Genteng Murando Glasur 1m2 = 20 bh bh 4,500.00
43 Bubung Murando Natural bh 8,500.00
NO URAIAN SAT. HARGA

44 Bubung Murando Glasur bh 12,000.00


45 Bubungan Genteng Keramik bh 11,000.00
46 Atap Genteng Kodok bh 3,500.00
47 Bubungan Genteng Kodok bh 5,000.00
48 Bubungan Genteng Plentong bh 6,500.00
49 Bubungan Stel Gelombang bh 8,000.00
50 Nok Stel Gelombang lbr 39,000.00
51 Nok Atap Seng lbr 41,500.00
52 Nok Standar 40 cm 18, SWG 22 m2 78,500.00
53 Pelat Asbes tebal 4 mm lbr 22,500.00
54 Pelat Asbes tebal 3.5 mm lbr 17,500.00
55 Trusses ZAM-75 t=0.8 Rangka Utama m1 38,500.00
56 Trusses ZAM-75 t=0.5 Rangka Utama m1 23,000.00
57 Reng 16-DB Roof Battens t=0.48 mm m1 11,500.00
58 Foot Plate t= 1.22 mm m1 8,000.00
59 PLD - Diafragma Plate bh 2,500.00
60 WIND Bracing m1 2,000.00
61 Tensioner ( Pengaku Tali angin ) bh 8,000.00
62 Nok Pinggir Morando Natural bh 4,000.00
62 Waterproofing membrance tb. 3 mm m2 100,000.00

N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) unit 78,536,500.00
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) unit 237,995,000.00
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) unit 650,812,000.00
4 Presure Tank kap. 500 liter lengkap unit 40,698,000.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 7,540,000.00
6 Fire House 1.5 x 30 m + nose unit 5,353,000.00
7 Exhose Fan H 360 W 60 x 60 cm unit 7,550,000.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 6,040,500.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,212,500.00
10 AC Split 3 PK Setara TOSHIBA unit 33,871,500.00
11 AC Split 2 PK Setara TOSHIBA unit 24,119,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,692,000.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU 5,000,000.00

O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL 105,000.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 155,000.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) m' 7,000.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) m' 5,000.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m' 11,500.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 6,500.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 16,000.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 21,500.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 12,500.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 14,500.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m' 20,500.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m' 19,500.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m' 132,500.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m' 27,500.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m' 31,500.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 13,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 21,500.00
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' ) m' 26,500.00
NO URAIAN SAT. HARGA

21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m' 15,000.00


22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m' 21,500.00
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m' 20,500.00
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' ) m' 22,500.00
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' ) m' 28,500.00
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' ) m' 39,500.00
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' ) m' 46,500.00
28 NSFB FUJI EA - 100 A bh 926,500.00
29 NSFB FUJI EA - 150 A bh 2,201,000.00
30 Rumah Panel 30 x 60 cm ( Kosong ) unt 169,500.00
31 Skring Kas 2 grop Biasa unt 225,500.00
32 Skring Kas 3 grop Biasa unt 245,000.00
33 Skring Kas 5 grop Biasa unt 516,000.00
34 MCB 1 PAS bh 61,500.00
35 MCB 3 PAS bh 117,500.00
36 Tahanan 50 A Merk Fuji bh 573,500.00
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh 26,500.00
38 Saklar Broko Seri Standard ( 1 Phase ) bh 29,000.00
39 Stop Kontak Broko Standard ( 1 Phase ) bh 26,500.00
40 Stop Kontak Broko 3 Phase (Out Bow) bh 96,500.00
41 Stop Kontak Broko 3 Phase ( In Bow) bh 160,000.00
42 Stop Kontak Handle 3 Phase bh 97,500.00
43 Instalas Titik Lampu / Stop Kontak (Upah dan Alat) ttk 198,000.00
44 Lampu pijar 25 Watt s/d 100 Watt bh 67,500.00
45 Lampu Neon Phillips 20 Watt bh 33,000.00
46 Lampu Neon Phillips 40 Watt bh 39,000.00
47 Trapo TL 20 W (Phillips) bh 46,000.00
48 Trapo TL 40 W (Phillips) bh 42,500.00
49 Trapo TL 20 W (Sinar) bh 45,000.00
50 Trapo TL 40 W (Sinar) bh 45,500.00
51 Stater Neon Phillips bh 9,500.00
52 Stater Neon Biasa bh 7,500.00
53 Rumah TL In Bow / Out Bow 2 x 20 W (kosongan) bh 158,500.00
54 Down Light + SL 25 W bh 125,000.00
55 Lampu SL Philip 25 W bh 50,000.00
56 Lampu Sirkel TL 20 W Lengkap bh 75,000.00
57 Lampu Mercuri 80 W bh 163,000.00
58 Lampu Taman + Tiang + Lampu 1 Buah bh 338,500.00
59 Lampu Baret 30 cm + Neon bh 245,000.00
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 812,000.00
61 Jarum Penangkal Petir 16 bh 112,000.00
62 Kawat BC ( Tembaga ) kg 72,500.00
63 Pentanahan Penangkal Petir ttk 466,500.00
64 Pentanahan Panel ttk 326,000.00

P BAHAN ALAT PENGANTUNG DAN KUNCI


1 Kunci Silinder ALFA untuk Pintu Alumunium bh 452,500.00
2 Tarikan Pintu Alumunium bh 450,000.00
3 Kunci 2 Slaag ROYAL bh 139,500.00
4 Rel Henderson Lengkap bh 951,000.00
5 Rel maraton I Pintu unt 212,500.00
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh 369,500.00
7 Kunci 2 Slaag Ancor Asli bh 182,500.00
8 Kunci 2 Slaag ISO bh 228,500.00
9 Kunci KM Bulat Kualitas Biasa bh 59,900.00
10 Kunci kM Bulat ALFA bh 113,100.00
11 Kunci 2 Slaag Silinder Utama Standard bh 645,300.00
NO URAIAN SAT. HARGA

12 Kunci Gembok Besar bh 93,800.00


13 Kunci 2 Slaag Kuda Terbang bh 104,000.00
14 Kunci Lemari bh 51,500.00
15 Espangolet ps 56,800.00
16 Grendel 15 cm bh 54,800.00
17 Grendel 5 cm bh 6,000.00
18 Hak Angin Kait Jendela Biasa ps 8,000.00
19 Hak Angin Jendela Antik ps 31,900.00
20 Hak Angin Sendok Stainless / Kuningan bh 35,500.00
21 Sloot Pintu Berikut Rantai bh 35,000.00
22 Sloot Jendela Tunggal bh 36,300.00
23 Engsel Pintu Unilon Standard ps 23,100.00
24 Engsel Jendela Unilon ps 16,500.00
25 Engsel Patrun ps 15,100.00
26 Engsel Harmonika m1 10,100.00
27 Door Closer Kelas Standard ( Kelas Sedang ) unt 462,000.00
28 Door Closer Kelas Standard ( Kelas Baik ) unt 657,300.00
29 Door Closer Kelas Rendah unt 220,000.00
30 Door Holder unt 226,000.00
31 Door Stoper unt 281,500.00
32 Tarikan Almari Rata-rata bh 21,500.00
33 Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) m1 48,000.00
34 Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) m1 59,000.00
35 Seng BJLS 30 / 3 x 0.3 mm lbr 96,500.00
36 Seng Plat 3' x 6' BJLS 30 lbr 55,500.00
37 Waterstop Lebar 200 mm m1 64,500.00
38 Waterstop Lebar 150 mm m1 57,000.00

Q BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


1 Hotmix jadi berikut alat dan bahan bakar ( T=5 cm => 9 m2 ) ton 1,483,500.00
2 Aspal (ESO) 1 Drum 155 kg kg 13,800.00
3 Aspal Curah kg 12,000.00
4 Aspal RC 70 ( Cilacap ) kg 12,000.00
5 Aspal Concrete / Laston ( AC - WC ) ton 1,483,500.00
6 Aspal Threated Base ( ATB ) ton 1,320,500.00
7 Lataston / Hot Rols Sheet ( HRS ) ton 1,833,600.00

R BAHAN PENGISAP AIR SUMUR DALAM


1 Pompa Kodok unit 189,900.00
2 Pompa Dragon Tegal unit 268,200.00
3 Pompa Dragon Asli unit 790,500.00
4 Mesin Pompa Air 100 W - Sanyo unit 1,210,500.00
5 Mesin Pompa Air 150 W - Sanyo unit 2,080,000.00
6 Pompa Zet Pump 250 W - Sanyo unit 5,458,000.00
7 Pompa Zet Pump 450 W - Sanyo unit 8,666,000.00
8 Pompa Submersible kap. 150 liter / menit 3 KW unit 29,866,000.00
9 Gear Pump Kap. 60 liter / menit unit 17,273,000.00
10 Deep Well dengan kelengkapannya kap. 150 liter / menit unit 189,258,000.00
11 Hand Oil Pump unit 5,715,000.00

S BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 1,290,000.00
2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,448,500.00
3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 2,150,000.00
4 Bak KM Fiber 60 x 60 bh 281,000.00
5 Bak Taraso WC 40 x 40 bh 130,500.00
6 Bak KM Taraso 60 x 60 bh 177,500.00
NO URAIAN SAT. HARGA

T ALAT TUKANG
1 Palu 0.5 kg bh 43,500.00
2 Cangkul bh 27,500.00
3 Singkup bh 46,000.00
4 Sekrop bh 55,500.00
5 Pengki bh 14,000.00
6 Linggis bh 46,000.00
7 Rool Meter 30 meter ( Bahan Plastik ) bh 111,100.00
8 Rool Meter 5 meter ( Bahan Besi ) bh 40,000.00
9 Selang Plastik untuk Water Pas dia. 0.5 cm m 1,700.00
10 Water Pas Alumunium 60 cm bh 92,500.00

U BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt 19,000.00
2 Kayu Bakar dari Kayu Karet m3 164,500.00
3 Bahan Bakar Residu lt 30,500.00
4 Minyak Solar lt 7,500.00
5 Bensin Premium lt 8,000.00
6 Plus Oil lt 3,500.00
7 Oil Mesran 40 SAE lt 57,500.00
8 Elpiji / botol 15 kg 112,500.00
9 Asitilin / Botol 15.1 kg btl 98,000.00
10 Angin ( O2 ) / botol btl 73,500.00
11 Karbit kg 21,500.00
12 Minyak Bekisting ltr 45,000.00
13 Rapidrant Gln 17,500.00
14 Soda Api kg 39,500.00
15 Sabun kg 2,500.00
16 Arang Kayu kg 11,500.00
17 Kawat Las bh 1,500.00

V BAHAN PAGAR
1 Panel Beton Pracetak lbr 200,900.00
2 Kolom Beton Pracetak btg 290,500.00

B BIDANG PERTAMANAN
1 Aglomena batang 55,000.00
2 Bambu krisik/jepang batang 55,000.00
3 Furadan kg 26,500.00
4 Kompos/pupuk kandang batang 27,500.00
5 Matoa (2 m) batang 42,500.00
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 110,500.00
7 Philo batang 83,000.00
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2 m batang 27,500.00
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 10,500.00
10 Rumput gajah mini m2 16,500.00

Keterangan :
Harga material diatas sudah termasuk profit / keuntungan
ANALISA HARGA SATUAN PEKERJAAN
HARGA SAT. JUMLAH
NO URAIAN SAT VOLUME
Rp. Rp.
1 2 3 4 5 6=4x5
A PEKERJAAN PERSIAPAN SNI 03-2835-2002
A-01 1 M Pagar Sementara dari Kayu Setinggi 2 Meter
Dolken Kayu 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 264,140.00 1,320.70
Koral Beton 2/3 M3 0.0090 218,260.00 1,964.34
Kayu balok terentang M3 0.0720 2,705,000.00 194,760.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Residu Lt 0.4000 9,000.00 3,600.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Pekerja Oh 0.4000 67,000.00 26,800.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0200 85,000.00 1,700.00
Jumlah 289,535.04
Dibulatkan 289,530.00
A-02 1 M Pagar Sementara dari Seng Gelombang Tinggi 2 Meter
Dolken Kayu 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Seng Gelombang BJLS-30 Lbr 1.2000 69,500.00 83,400.00
Pasir Beton M3 0.0050 264,140.00 1,320.70
Koral Beton 2/3 M3 0.0090 218,260.00 1,964.34
Kayu balok terentang M3 0.0720 2,705,000.00 194,760.00
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Meni besi Kg 0.4500 33,500.00 15,075.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Pekerja Oh 0.4000 67,000.00 26,800.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0200 85,000.00 1,700.00
Jumlah 384,410.04
Dibulatkan 384,410.00
A-03 1 M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter
Dolken Kayu 8-10/400 Cm Btg 1.0000 30,800.00 30,800.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 70,000.00 175,000.00
Pasir Beton M3 0.0050 264,140.00 1,320.70
Koral Beton M3 0.0090 218,260.00 1,964.34
Paku Biasa 2 " - 5 " Kg 0.0600 24,000.00 1,440.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Pekerja Oh 0.3000 67,000.00 20,100.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0200 85,000.00 1,700.00
Jumlah 251,005.04
Dibulatkan 251,000.00
A-04 1 M Pengukuran dan Pasang Bouwplank
Kayu kaso 5/7 Albasia M3 0.0120 2,279,000.00 27,348.00
Paku Biasa 2" - 5 " Kg 0.0200 24,000.00 480.00
Kayu Papan 3/20 Albasia M3 0.0070 2,279,000.00 15,953.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 58,706.00
Dibulatkan 58,700.00
1 M Pengukuran
Kayu kaso 5/7 Albasia M3 0.0040 2,058,000.00 8,232.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5 " Kg 0.0080 24,000.00 192.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 23,349.00
Dibulatkan 23,340.00
A-05 1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran
Dolken Kayu 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Kayu terentang M3 0.1800 2,705,000.00 486,900.00
Paku Biasa Kg 0.8500 24,000.00 20,400.00
Besi Strip Kg 1.1000 29,500.00 32,450.00
Semen Portland Kg 35.0000 1,540.00 53,900.00
Pasir Pasang M3 0.1500 241,390.00 36,208.50
Pasir Beton M3 0.1000 264,140.00 26,414.00
Koral Beton 2/3 M3 0.1500 218,260.00 32,739.00
Bata Merah Bh 30.0000 850.00 25,500.00
Seng Plat Lbr 0.2500 17,400.00 4,350.00
Kawat harmonika 4 cm Bh 2.0000 37,000.00 74,000.00
Kaca Polos M2 0.0800 96,200.00 7,696.00
Kunci Tanam Bh 0.1500 104,000.00 15,600.00
Plywood 120 x 240 x 0,4 cm Lbr 0.0600 145,000.00 8,700.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Tukang Batu Oh 1.0000 70,000.00 70,000.00
Pekerja Oh 2.0000 67,000.00 134,000.00
Kepala Tukang Oh 0.3000 80,000.00 24,000.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 1,235,607.50
Dibulatkan 1,235,600.00
A-06 1 M2 Pembuatan Gudang Semen dan alat - alat
Dolken Kayu 8-10/400 Cm Btg 1.7000 30,800.00 52,360.00
Kayu balok terentang M3 0.2100 2,705,000.00 568,050.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 10.5000 1,540.00 16,170.00
Pasir Beton M3 0.0300 264,140.00 7,924.20
Koral Beton 2/3 M3 0.0500 218,260.00 10,913.00
Seng Gelombang Bjls 30 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Pekerja Oh 1.0000 67,000.00 67,000.00
Kepala Tukang Oh 0.2000 80,000.00 16,000.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 994,117.20
Dibulatkan 994,110.00
A-07 1 M2 Pembuatan Bedeng Buruh
Dolken Kayu 8-10/400 Cm Btg 1.2500 30,800.00 38,500.00
Kayu balok terentang M3 0.1860 2,705,000.00 503,130.00
Paku Biasa Kg 0.3000 24,000.00 7,200.00
Semen Portland Kg 18.0000 1,540.00 27,720.00
Pasir Beton M3 0.0300 264,140.00 7,924.20
Koral Beton 2/3 M3 0.0500 218,260.00 10,913.00
Seng Gelombang Bjls 32 Lbr 1.5000 69,500.00 104,250.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Pekerja Oh 1.0000 67,000.00 67,000.00
Kepala Tukang Oh 0.2000 80,000.00 16,000.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 926,887.20
Dibulatkan 926,880.00
A-08 1 M2 Membersihkan Lapangan dan Perataan
Pekerja Oh 0.1000 67,000.00 6,700.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 10,950.00
Dibulatkan 10,950.00
A-09 1 M2 Pembuatan Jalan Sementara
Batu Belah 15/20 M3 0.1500 212,530.00 31,879.50
Batu Pecah 5/7 M3 0.0900 202,660.00 18,239.40
Pasir Pasang M3 0.0100 241,390.00 2,413.90
Pekerja Oh 1.0000 67,000.00 67,000.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 123,782.80
Dibulatkan 123,780.00
A-10 1 M3 Bongkaran Beton Bertulang
Pekerja Oh 6.6670 67,000.00 446,689.00
Mandor Oh 0.3330 85,000.00 28,305.00
Jumlah 474,994.00
Dibulatkan 474,990.00
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
Pekerja Oh 6.6670 67,000.00 446,689.00
Mandor Oh 0.0330 85,000.00 2,805.00
Jumlah 449,494.00
Dibulatkan 449,490.00
A-12 1 M Pagar Beton Pracetak (5x50x213) Cm
Panel Beton Pracetak Lbr 0.9860 200,900.00 198,087.40
Kolom Beton Pracetak Btg 0.5250 290,500.00 152,512.50
Pasir Beton M3 0.0740 264,140.00 19,546.36
Koral 2/3 M3 0.1460 218,260.00 31,865.96
Semen Portland Kg 45.0000 1,540.00 69,300.00
Tukang Batu Oh 0.1250 70,000.00 8,750.00
Pekerja Oh 0.3750 67,000.00 25,125.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0190 85,000.00 1,615.00
Jumlah 507,762.22
Dibulatkan 507,760.00
A-13 1 M Pagar kawat ayam tiang besi L 50.50.5, tinggi 1 m
Kawat ram ayam Lbr 0.4340 15,500.00 6,727.00
Besi siku L 50.50.5 Kg 6.7860 20,200.00 137,077.20
Besi pelat (1,2 x 3) mm Kg 0.0424 20,200.00 856.48
Baut Kg 4.0000 700.00 2,800.00
Semen Portland Kg 2.5000 1,540.00 3,850.00
Pasir Beton M3 0.0050 264,140.00 1,320.70
Koral 2/3 M3 0.0090 218,260.00 1,964.34
Pekerja Oh 0.3750 67,000.00 25,125.00
Tukang Batu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0190 85,000.00 1,615.00
Jumlah 191,045.72
Dibulatkan 191,040.00
A-14 1 M2 Pagar BRC lengkap dengan tiang
BRC lengkap dengan tiang Lbr 0.4340 188,500.00 81,809.00
Semen Portland Kg 2.0000 1,540.00 3,080.00
Kawat Duri Kg 2.5000 70,000.00 175,000.00
Pasir Beton M3 0.0050 264,140.00 1,320.70
Koral Beton 2/3 M3 0.0090 218,260.00 1,964.34
Pekerja Oh 0.3750 67,000.00 25,125.00
Tukang Batu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0190 85,000.00 1,615.00
Jumlah 299,624.04
Dibulatkan 299,620.00
1 2 3 4 5 6=4x5
A-15 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm
Bambu 6 -10/600 Cm Btg 1.0000 27,500.00 27,500.00
Tali Ijuk Kg 0.2500 25,800.00 6,450.00
Tukang Kayu Oh 0.0170 70,000.00 1,190.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Kepala Tukang Oh 0.0020 80,000.00 160.00
Mandor Oh 0.0130 85,000.00 1,105.00
Jumlah 49,805.00
Dibulatkan 49,800.00
A-16 1 M Cerucuk Bambu
Bambu 7 -10 ( 400 ) Cm Btg 1.2500 27,500.00 34,375.00
Pekerja Oh 0.5000 67,000.00 33,500.00
Mandor Oh 0.0250 85,000.00 2,125.00
Jumlah 70,000.00
Dibulatkan 70,000.00
17 1 M3 Bongkaran Kuda-kuda, Gording Balok
Pekerja Oh 2.5000 67,000.00 167,500.00
Tukang Kayu Oh 1.2000 70,000.00 84,000.00
Mandor Oh 0.1200 85,000.00 10,200.00
Jumlah 261,700.00
Dibulatkan 261,700.00
18 1 M3 Bongkaran Rangka Atap, Reng dan Kaso
Pekerja Oh 0.0700 67,000.00 4,690.00
Tukang Kayu Oh 0.0200 70,000.00 1,400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 6,515.00
Dibulatkan 6,510.00
19 1 M3 Bongkaran Genteng Lama
Pekerja Oh 0.0200 67,000.00 1,340.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 2,190.00
Dibulatkan 2,190.00

B PEKERJAAN TANAH SNI 03-2835-2002


B-01 Galian Tanah Biasa sedalam 1 Meter
Pekerja Oh 0.4000 67,000.00 26,800.00
Mandor Oh 0.0400 85,000.00 3,400.00
Jumlah 30,200.00
Dibulatkan 30,200.00
B-02 Galian Tanah Biasa sedalam 2 Meter
Pekerja Oh 0.5260 67,000.00 35,242.00
Mandor Oh 0.0526 85,000.00 4,471.00
Jumlah 39,713.00
Dibulatkan 39,710.00
B-03 Galian Tanah Biasa sedalam 3 Meter
Pekerja Oh 0.7350 67,000.00 49,245.00
Mandor Oh 0.0735 85,000.00 6,247.50
Jumlah 55,492.50
Dibulatkan 55,490.00
B-04 Galian Tanah Keras sedalam 1 Meter
Pekerja Oh 0.6250 67,000.00 41,875.00
Mandor Oh 0.0625 85,000.00 5,312.50
Jumlah 47,187.50
Dibulatkan 47,180.00
B-05 Galian Tanah Lumpur sedalam 1 Meter
Pekerja Oh 0.8230 67,000.00 55,141.00
Mandor Oh 0.0830 85,000.00 7,055.00
Jumlah 62,196.00
Dibulatkan 62,190.00
1 2 3 4 5 6=4x5
B-06 Pekerjaan Srtipping Setinggi 10 CM
Pekerja Oh 0.0500 67,000.00 3,350.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 3,775.00
Dibulatkan 3,770.00
B-07 1 M3 Pembuangan Tanah Sejauh 150 Meter
Pekerja Oh 0.0516 67,000.00 3,457.20
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 7,707.20
Dibulatkan 7,700.00
B-08 1 M3 Urugan Kembali
Pekerja Oh 0.1920 67,000.00 12,864.00
Mandor Oh 0.0190 85,000.00 1,615.00
Jumlah 14,479.00
Dibulatkan 14,470.00
B-09 1 M3 Pemadatan Tanah
Pekerja Oh 0.5000 67,000.00 33,500.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 37,750.00
Dibulatkan 37,750.00
B-10 1 M3 Urugan Pasir
Pasir Urug m3 1.2000 181,230.00 217,476.00
Pekerja Oh 0.3000 67,000.00 20,100.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 238,426.00
Dibulatkan 238,420.00
B-11 1 M Pemasangan Lapisan Ijuk tebal 10 cm
Ijuk m2 1.2000 24,500.00 29,400.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 40,725.00
Dibulatkan 40,720.00
B-12 1 M3 Pemasangan Urugan Sirtu
Sirtu m3 1.2000 211,030.00 253,236.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Mandor Oh 0.0250 85,000.00 2,125.00
Jumlah 272,111.00
Dibulatkan 272,110.00
B-13 1 M3 Urugan Tanah Pilihan
Tanah Urug Pilihan m3 1.2000 92,300.00 110,760.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Mandor Oh 0.0250 85,000.00 2,125.00
Jumlah 129,635.00
Dibulatkan 129,630.00
B-14 1 M2 Pembuatan Jalan Sementara, Tebal 25 Cm
Batu Belah m3 0.2750 212,530.00 58,445.75
Kerikil m3 0.0300 178,600.00 5,358.00
Pasir Urug m3 0.0500 181,230.00 9,061.50
Pekerja Oh 1.0000 67,000.00 67,000.00
Mandor Oh 0.1000 85,000.00 8,500.00
Jumlah 148,365.25
Dibulatkan 148,360.00
1 M3 Lapisan Pudel Camp. 1 Kp : 3 Ps : 7 TL
Pasir Urug m3 0.3300 181,230.00 59,805.90
Kapur Padam m3 0.1090 388,700.00 42,368.30
Tanah Liat m3 0.7630 34,500.00 26,323.50
Pekerja Oh 0.8330 67,000.00 55,811.00
Tukang Gali Oh 0.4160 70,000.00 29,120.00
Kepala Tukang Oh 0.0400 80,000.00 3,200.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0830 85,000.00 7,055.00
Jumlah 223,683.70
Dibulatkan 223,680.00
1 M3 Lapisan Pudel Camp. 1 Kp : 5 TL
Kapur Padam m3 0.2000 388,700.00 77,740.00
Tanah Liat m3 1.0000 34,500.00 34,500.00
Pekerja Oh 0.8330 67,000.00 55,811.00
Tukang Gali Oh 0.4160 70,000.00 29,120.00
Kepala Tukang Oh 0.0410 80,000.00 3,280.00
Mandor Oh 0.0810 85,000.00 6,885.00
Jumlah 207,336.00
Dibulatkan 207,330.00

C PEKERJAAN PONDASI SNI 03-2836-2002


C-01 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 3 Ps
Batu Belah 15 / 20 M3 1.1000 212,530.00 233,783.00
Semen Portland Kg 202.0000 1,540.00 311,080.00
Pasir Pasang M3 0.4850 241,390.00 117,074.15
Pekerja Oh 1.5000 67,000.00 100,500.00
Tukang Gali Oh 0.6000 70,000.00 42,000.00
Kepala Tukang Oh 0.0600 80,000.00 4,800.00
Mandor Oh 0.0750 85,000.00 6,375.00
Jumlah 815,612.15
Dibulatkan 815,610.00
C-02 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps
Batu Belah 15 / 20 M3 1.1000 212,530.00 233,783.00
Semen Portland Kg 163.0000 1,540.00 251,020.00
Pasir Pasang M3 0.5200 241,390.00 125,522.80
Pekerja Oh 1.5000 67,000.00 100,500.00
Tukang Gali Oh 0.6000 70,000.00 42,000.00
Kepala Tukang Oh 0.0600 80,000.00 4,800.00
Mandor Oh 0.0750 85,000.00 6,375.00
Jumlah 764,000.80
Dibulatkan 764,000.00
C-03 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps
Batu Belah 15 / 20 M3 1.1000 212,530.00 233,783.00
Semen Portland Kg 136.0000 1,540.00 209,440.00
Pasir Pasang M3 0.5440 241,390.00 131,316.16
Pekerja Oh 1.5000 67,000.00 100,500.00
Tukang Gali Oh 0.6000 70,000.00 42,000.00
Kepala Tukang Oh 0.0600 80,000.00 4,800.00
Mandor Oh 0.0750 85,000.00 6,375.00
Jumlah 728,214.16
Dibulatkan 728,210.00
C-04 1 M3 Pasangan Pondasi Batu Kosong (Aanstamping)
Batu Belah 15 / 20 M3 1.2000 212,530.00 255,036.00
Pasir Urug M3 0.3000 181,230.00 54,369.00
Pekerja Oh 0.7800 67,000.00 52,260.00
Tukang Batu Oh 0.3900 70,000.00 27,300.00
Kepala Tukang Oh 0.0390 80,000.00 3,120.00
Mandor Oh 0.0390 85,000.00 3,315.00
Jumlah 395,400.00
Dibulatkan 395,400.00
C-05 1 M3 Beton Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah dgn besi tulangan
Besi Beton Kg 75.0000 16,500.00 1,237,500.00
Semen Portland Kg 202.0000 1,540.00 311,080.00
Pasir Beton M3 0.3200 264,140.00 84,524.80
Koral Beton 2/3 M3 0.4900 218,260.00 106,947.40
Kawat Beton Kg 0.8000 30,500.00 24,400.00
1 2 3 4 5 6=4x5
Batu Belah M3 0.4500 212,530.00 95,638.50
Pekerja Oh 3.0000 67,000.00 201,000.00
Tukang Batu Oh 0.8500 70,000.00 59,500.00
Kepala Tukang Oh 0.0850 80,000.00 6,800.00
Mandor Oh 0.1500 85,000.00 12,750.00
Jumlah 2,140,140.70
Dibulatkan 2,140,140.00
C-06 1 M3 Pasang Pondasi Sumuran 1pc : 2 ps : 3 kr + 40 % Batu Belah (D= 1m)
Batu Belah Kg 0.4500 212,530.00 95,638.50
Semen Portland Kg 280.0000 1,540.00 431,200.00
Pasir Beton M3 0.4500 264,140.00 118,863.00
Koral Beton 2/3 M3 0.6700 218,260.00 146,234.20
Pekerja Oh 2.3800 67,000.00 159,460.00
Tukang Batu Oh 0.3000 70,000.00 21,000.00
Kepala Tukang Oh 0.0300 80,000.00 2,400.00
Mandor Oh 0.0800 85,000.00 6,800.00
Jumlah 981,595.70
Dibulatkan 981,590.00
C-07 1 M3 Pondasi Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah
Batu Belah Kg 0.4500 212,530.00 95,638.50
Semen Portland Kg 202.0000 1,540.00 311,080.00
Pasir Beton M3 0.3200 264,140.00 84,524.80
Koral Beton 2/3 M3 0.4900 218,260.00 106,947.40
Pekerja Oh 3.0000 67,000.00 201,000.00
Tukang Batu Oh 0.8500 70,000.00 59,500.00
Kepala Tukang Oh 0.0850 80,000.00 6,800.00
Mandor Oh 0.1500 85,000.00 12,750.00
Jumlah 878,240.70
Dibulatkan 878,240.00
C-08 1 M Pembuatan Tiang Pancang (40x40) Cm, Beton Bertulang
Pasir Urug Darat M3 0.0190 181,230.00 3,443.37
Pasir Beton M3 0.0940 264,140.00 24,829.16
Koral Beton M3 0.1500 218,260.00 32,739.00
Semen Portland Kg 60.5000 1,540.00 93,170.00
Besi Beton Kg 45.0000 16,500.00 742,500.00
Kawat Beton Kg 0.9000 30,500.00 27,450.00
Kayu balok terentang M3 0.0320 2,705,000.00 86,560.00
Paku Kg 0.1200 24,000.00 2,880.00
Minyak Bekisting Lt 0.0900 45,000.00 4,050.00
Plamuur Tembok Kg 0.2400 27,500.00 6,600.00
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Batu Oh 0.6700 70,000.00 46,900.00
Kepala Tukang Oh 0.0670 80,000.00 5,360.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 1,147,731.53
Dibulatkan 1,147,730.00
C-09 1 M Pembuatan Tiang Pancang (35x35) Cm, Beton Bertulang
Pasir Urug Darat M3 0.0160 181,230.00 2,899.68
Pasir Beton M3 0.0800 264,140.00 21,131.20
Koral Beton M3 0.1250 218,260.00 27,282.50
Semen Portland Kg 49.0000 1,540.00 75,460.00
Besi Beton Kg 34.5000 16,500.00 569,250.00
Kawat Beton Kg 0.7000 30,500.00 21,350.00
Kayu balok terentang M3 0.0270 2,705,000.00 73,035.00
Paku Kg 0.1200 24,000.00 2,880.00
Minyak Bekisting Lt 0.0900 45,000.00 4,050.00
Plamuur Tembok Kg 0.2000 27,500.00 5,500.00
Pekerja Oh 0.8000 67,000.00 53,600.00
Tukang Batu Oh 0.5000 70,000.00 35,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0500 80,000.00 4,000.00
Mandor Oh 0.0400 85,000.00 3,400.00
Jumlah 898,838.38
Dibulatkan 898,830.00
C-10 1 M Pembuatan Tiang Pancang 40 Cm, Beton Bertulang
Pasir Urug Darat M3 0.0149 181,230.00 2,700.33
Pasir Beton M3 0.0738 264,140.00 19,493.53
Koral Beton M3 0.1178 218,260.00 25,711.03
Semen Portland Kg 47.4925 1,540.00 73,138.45
Besi Beton Kg 45.0000 16,500.00 742,500.00
Kawat Beton Kg 0.9000 30,500.00 27,450.00
Kayu balok terentang M3 0.0320 2,705,000.00 86,560.00
Paku Kg 0.1200 24,000.00 2,880.00
Minyak Bekisting Lt 0.0900 45,000.00 4,050.00
Plamuur Tembok Kg 0.2400 27,500.00 6,600.00
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Batu Oh 0.6700 70,000.00 46,900.00
Kepala Tukang Oh 0.0670 80,000.00 5,360.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 1,114,593.34
Dibulatkan 1,114,590.00
C-11 1 M Memancang Tiang Pancang Beton Bertulang
Crawler crane lengkap jam 0.1170 1,078,750.00 126,213.75
Pekerja Oh 0.0400 67,000.00 2,680.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 129,063.75
Dibulatkan 129,060.00
C-12 1 Buah Memotong Tiang Pancang (40 x 40) Cm Beton Bertulang
Pekerja Oh 3.3200 67,000.00 222,440.00
Kepala Tukang Oh 0.0700 80,000.00 5,600.00
Mandor Oh 0.2000 85,000.00 17,000.00
Alat bantu lot 0.3500 245,040.00 85,764.00
Jumlah 330,804.00
Dibulatkan 330,800.00
C-13 1 M Menyambung Tiang Pancang Beton Bertulang
Besi pelat Kg 18.3700 15,600.00 286,572.00
Besi Beton Kg 6.0600 16,500.00 99,990.00
Kawat las Kg 2.2000 26,000.00 57,200.00
Tukang las Oh 1.0000 70,000.00 70,000.00
Pembantu tukang las Oh 2.0000 67,000.00 134,000.00
Mandor Oh 0.2000 85,000.00 17,000.00
Mesin Las jam 2.0000 26,325.00 52,650.00
Jumlah 717,412.00
Dibulatkan 717,410.00

D PEKERJAAN BETON
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm
Semen Portland Kg 10.0000 1,200.00 12,000.00
Pasir Beton M3 0.0260 120,000.00 3,120.00
Koral Beton M3 0.0440 218,260.00 9,603.44
Pekerja Oh 1.1500 67,000.00 77,050.00
Tukang Batu Oh 0.0200 70,000.00 1,400.00
Kepala Tukang Oh 0.0020 80,000.00 160.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 103,843.44
Dibulatkan 103,840.00
D-01 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr
Semen Portland Kg 218.0000 1,540.00 335,720.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
1 2 3 4 5 6=4x5
Koral Beton M3 0.8700 218,260.00 189,886.20
Pekerja Oh 1.6500 67,000.00 110,550.00
Tukang Batu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0800 85,000.00 6,800.00
Jumlah 799,809.00
Dibulatkan 799,800.00
D-02 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr
Semen Portland Kg 197.0000 1,540.00 303,380.00
Pasir Beton M3 0.4700 264,140.00 124,145.80
Koral Beton M3 0.9400 218,260.00 205,164.40
Pekerja Oh 1.6500 67,000.00 110,550.00
Tukang Batu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0800 85,000.00 6,800.00
Jumlah 769,540.20
Dibulatkan 769,540.00
D-03 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 264,140.00 142,635.60
Koral Beton M3 0.8100 218,260.00 176,790.60
Pekerja Oh 2.0000 67,000.00 134,000.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Kepala Tukang Oh 0.0350 80,000.00 2,800.00
Mandor Oh 1.0000 85,000.00 85,000.00
Jumlah 1,083,166.20
Dibulatkan 1,083,160.00
D-04 1 M3 Tiang Pancang Prestressed Beton
Semen Portland Kg 440.0000 1,540.00 677,600.00
Pasir Beton M3 0.5000 264,140.00 132,070.00
Koral Beton M3 0.8000 218,260.00 174,608.00
Rapidrant Gln 2.4600 17,500.00 43,050.00
Pekerja Oh 1.6500 67,000.00 110,550.00
Tukang Batu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0800 85,000.00 6,800.00
Jumlah 1,164,178.00
Dibulatkan 1,164,170.00
D-05 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr
Semen Portland Kg 291.0000 1,540.00 448,140.00
Pasir Beton M3 0.4700 264,140.00 124,145.80
Koral Beton M3 0.9300 218,260.00 202,981.80
Pekerja Oh 2.0000 67,000.00 134,000.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Kepala Tukang Oh 0.0350 80,000.00 2,800.00
Mandor Oh 1.0000 85,000.00 85,000.00
Jumlah 1,021,567.60
Dibulatkan 1,021,560.00
D-06 1 M' Memasang PVC Waterstop Lebar 200 mm
Waterstop Lebar 200 mm M1 1.0500 64,500.00 67,725.00
Pekerja Oh 0.0500 67,000.00 3,350.00
Tukang Batu Oh 0.0350 70,000.00 2,450.00
Kepala Tukang Oh 0.0035 80,000.00 280.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 73,975.00
Dibulatkan 73,970.00
1 M' Memasang PVC Waterstop Lebar 150 mm
Waterstop Lebar 150 mm M1 1.0500 57,000.00 59,850.00
Pekerja Oh 0.0500 67,000.00 3,350.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.0300 70,000.00 2,100.00
Kepala Tukang Oh 0.0030 80,000.00 240.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 65,710.00
Dibulatkan 65,710.00
D-07 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir
Besi Beton ( Polos/ Ulir ) Kg 1.0500 16,500.00 17,325.00
Kawat Beton Kg 0.0150 30,500.00 457.50
Pekerja Oh 0.0070 67,000.00 469.00
Tukang Besi Oh 0.0070 70,000.00 490.00
Kepala Tukang Oh 0.0007 80,000.00 56.00
Mandor Oh 0.0003 85,000.00 25.50
Jumlah 18,823.00
Dibulatkan 18,820.00
D-08 1 M2 Pasangan Bekisting untuk Pondasi
Kayu terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Kayu Oh 0.2600 70,000.00 18,200.00
Kepala Tukang Oh 0.0260 80,000.00 2,080.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 166,005.00
Dibulatkan 166,000.00
D-09 1 M2 Pasangan Bekisting untuk Sloof
Kayu Terentang M3 0.0450 2,950,000.00 132,750.00
Paku Biasa 2" - 5" Kg 0.3000 24,000.00 7,200.00
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Kayu Oh 0.2600 70,000.00 18,200.00
Kepala Tukang Oh 0.0260 80,000.00 2,080.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 180,755.00
Dibulatkan 180,750.00
D-10 1 M2 Pasangan Bekisting untuk Kolom
Kayu Terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Kayu balok terentang M3 0.0150 2,705,000.00 40,575.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam -8 Cm / 4m Btg 2.0000 30,800.00 61,600.00
Pekerja Oh 0.3300 67,000.00 22,110.00
Tukang Kayu Oh 0.3300 70,000.00 23,100.00
Kepala Tukang Oh 0.0330 80,000.00 2,640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 336,410.00
Dibulatkan 336,410.00
D-11 1 M2 Pasangan Bekisting untuk Balok
Kayu Terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Kayu balok terentang M3 0.0180 2,705,000.00 48,690.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam -8 Cm / 4m Btg 2.0000 30,800.00 61,600.00
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Kayu Oh 0.3300 70,000.00 23,100.00
Kepala Tukang Oh 0.0330 80,000.00 2,640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 342,515.00
Dibulatkan 342,510.00
D-12 1 M2 Pasangan Bekisting untuk Lantai
Kayu Terentang M3 0.0400 2,950,000.00 118,000.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
1 2 3 4 5 6=4x5
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0150 2,705,000.00 40,575.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam -8 Cm / 4m Btg 6.0000 30,800.00 184,800.00
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Kayu Oh 0.3300 70,000.00 23,100.00
Kepala Tukang Oh 0.0330 80,000.00 2,640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 466,600.00
Dibulatkan 466,600.00
D-13 1 M2 Pasang Bekisting untuk Tangga
Kayu Terentang M3 0.0300 2,950,000.00 88,500.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.1500 45,000.00 6,750.00
Kayu balok terentang M3 0.0150 2,705,000.00 40,575.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam -8 Cm / 4m Btg 2.0000 30,800.00 61,600.00
Pekerja Oh 0.3200 67,000.00 21,440.00
Tukang Kayu Oh 0.3300 70,000.00 23,100.00
Kepala Tukang Oh 0.0330 80,000.00 2,640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 312,990.00
Dibulatkan 312,990.00
D-14 1 M3 Membuat Beton Cor Mutu K225
Semen Portland Kg 388.0000 1,540.00 597,520.00
Pasir Beton M3 0.6500 264,140.00 171,691.00
Koral Beton M3 0.6500 218,260.00 141,869.00
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 6.0000 67,000.00 402,000.00
Tukang Batu Oh 1.0000 70,000.00 70,000.00
Kepala Tukang Oh 0.1000 80,000.00 8,000.00
Mandor Oh 0.3000 85,000.00 25,500.00
Jumlah 1,491,830.00
Dibulatkan 1,491,830.00
D-15 1 M3 Membuat Beton Cor Mutu K275
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4000 264,140.00 105,656.00
Koral Beton M3 0.8200 218,260.00 178,973.20
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 6.0000 67,000.00 402,000.00
Tukang Batu Oh 1.0000 70,000.00 70,000.00
Kepala Tukang Oh 0.1000 80,000.00 8,000.00
Mandor Oh 0.3000 85,000.00 25,500.00
Jumlah 1,481,379.20
Dibulatkan 1,481,370.00
D-16 1 KG Besi Beton Polos
Besi Beton Polos U 24 Kg 1.1000 16,500.00 18,150.00
Kawat Beton Kg 0.0188 30,500.00 573.40
Pekerja Oh 0.0080 67,000.00 536.00
Tukang Besi Oh 0.0100 70,000.00 700.00
Kepala Tukang Oh 0.0029 80,000.00 232.00
Mandor Oh 0.0010 85,000.00 85.00
Jumlah 20,276.40
Dibulatkan 20,270.00
D-16 1 KG Besi Beton Ulir
Besi Beton Ulir 32 / 39 Kg 1.1000 22,800.00 25,080.00
Kawat Beton Kg 0.0188 30,500.00 573.40
Pekerja Oh 0.0080 67,000.00 536.00
Tukang Besi Oh 0.0100 70,000.00 700.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0029 80,000.00 232.00
Mandor Oh 0.0010 85,000.00 85.00
Jumlah 27,206.40
Dibulatkan 27,200.00
D-16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2000 2,950,000.00 590,000.00
Paku Biasa 2" - 5" Kg 1.5000 24,000.00 36,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 3.9000 67,000.00 261,300.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.0400 70,000.00 72,800.00
Tukang Besi Oh 1.0500 70,000.00 73,500.00
Kepala Tukang Oh 0.2450 80,000.00 19,600.00
Mandor Oh 0.1650 85,000.00 14,025.00
Jumlah 4,440,365.60
Dibulatkan 4,440,360.00
D-17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 67,000.00 324,950.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.5600 70,000.00 109,200.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.3310 80,000.00 26,480.00
Mandor Oh 0.1700 85,000.00 14,450.00
Jumlah 5,638,595.60
Dibulatkan 5,638,590.00
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 67,000.00 324,950.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.5600 70,000.00 109,200.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.3310 80,000.00 26,480.00
Mandor Oh 0.1700 85,000.00 14,450.00
Jumlah 4,840,595.60
Dibulatkan 4,840,590.00
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
1 2 3 4 5 6=4x5
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 67,000.00 324,950.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.5600 70,000.00 109,200.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.3310 80,000.00 26,480.00
Mandor Oh 0.1700 85,000.00 14,450.00
Jumlah 5,308,595.60
Dibulatkan 5,308,590.00
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 67,000.00 324,950.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.5600 70,000.00 109,200.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.3310 80,000.00 26,480.00
Mandor Oh 0.1700 85,000.00 14,450.00
Jumlah 4,813,595.60
Dibulatkan 4,813,590.00
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 67,000.00 324,950.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.5600 70,000.00 109,200.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.3310 80,000.00 26,480.00
Mandor Oh 0.1700 85,000.00 14,450.00
Jumlah 5,638,595.60
Dibulatkan 5,638,590.00
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.2700 2,950,000.00 796,500.00
Paku Biasa 2" - 5" Kg 2.0000 24,000.00 48,000.00
Minyak Bekisting Ltr 0.6000 45,000.00 27,000.00
Besi Beton Polos Kg 240.0000 16,500.00 3,960,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Pekerja Oh 4.8500 67,000.00 324,950.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.5600 70,000.00 109,200.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.3310 80,000.00 26,480.00
Mandor Oh 0.1700 85,000.00 14,450.00
Jumlah 6,325,595.60
Dibulatkan 6,325,590.00
1 2 3 4 5 6=4x5
D-18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 120.0000 16,500.00 1,980,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 6,768,865.60
Dibulatkan 6,768,860.00
D-19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 140.0000 16,500.00 2,310,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 7,098,865.60
Dibulatkan 7,098,860.00
D-20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 7,263,865.60
1 2 3 4 5 6=4x5
Dibulatkan 7,263,860.00
D-21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 7,758,865.60
Dibulatkan 7,758,860.00
D-22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,088,865.60
Dibulatkan 8,088,860.00
D-23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 16,500.00 4,125,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
1 2 3 4 5 6=4x5
Jumlah 8,913,865.60
Dibulatkan 8,913,860.00
D-24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 300.0000 16,500.00 4,950,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 9,738,865.60
Dibulatkan 9,738,860.00
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 140.0000 16,500.00 2,310,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 7,008,865.60
Dibulatkan 7,008,860.00
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 7,668,865.60
1 2 3 4 5 6=4x5
Dibulatkan 7,668,860.00
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 16,500.00 3,465,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,163,865.60
Dibulatkan 8,163,860.00
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 230.0000 16,500.00 3,795,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,493,865.60
Dibulatkan 8,493,860.00
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 250.0000 16,500.00 4,125,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,913,865.60
Dibulatkan 8,913,860.00
1 2 3 4 5 6=4x5
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 16,500.00 2,887,500.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 7,586,365.60
Dibulatkan 7,586,360.00
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 210.0000 16,500.00 3,465,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,163,865.60
Dibulatkan 8,163,860.00
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Minyak Bekisting Ltr 2.0000 45,000.00 90,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,088,865.60
Dibulatkan 8,088,860.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting)
1 2 3 4 5 6=4x5
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 175.0000 16,500.00 2,887,500.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 6,597,865.60
Dibulatkan 6,597,860.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 260.0000 16,500.00 4,290,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,000,365.60
Dibulatkan 8,000,360.00
1 M3 Kolom Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 4.5000 30,500.00 137,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,081,215.60
Dibulatkan 8,081,210.00
1 M3 Kolom Beton Tulang (250 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 250.0000 16,500.00 4,125,000.00
Kawat Beton Kg 4.5000 30,500.00 137,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
1 2 3 4 5 6=4x5
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,906,215.60
Dibulatkan 8,906,210.00
1 M3 Kolom Beton Tulang (300 kg besi+bekisting)
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 16,500.00 4,950,000.00
Kawat Beton Kg 4.5000 30,500.00 137,250.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1500 2,705,000.00 405,750.00
Multiplek 9 mm 120 x 240 Lbr 3.5000 166,500.00 582,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 9,731,215.60
Dibulatkan 9,731,210.00
D-25 1 M3 Balok Beton Tulang (120 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 120.0000 16,500.00 1,980,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,042,315.60
Dibulatkan 6,042,310.00
D-26 1 M3 Balok Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3500 2,950,000.00 1,032,500.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
1 2 3 4 5 6=4x5
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,639,540.60
Dibulatkan 6,639,540.00
D-27 1 M3 Balok Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.3000 2,950,000.00 885,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 200.0000 1,540.00 308,000.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 1.5000 166,500.00 249,750.00
Dolken Kayu Galam -8 Cm / 4m Btg 12.0000 30,800.00 369,600.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,810,845.60
Dibulatkan 6,810,840.00
D-28 1 M3 Balok Beton Tulang (230 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 230.0000 16,500.00 3,795,000.00
Kawat Beton Kg 3.4500 30,500.00 105,225.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 7,907,640.60
Dibulatkan 7,907,640.00
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
1 2 3 4 5 6=4x5
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,551,040.60
Dibulatkan 6,551,040.00
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,974,040.60
Dibulatkan 6,974,040.00
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15
Kayu Terentang M3 0.4000 2,950,000.00 1,180,000.00
Paku Biasa 2" - 5" Kg 4.0000 24,000.00 96,000.00
Besi Beton Polos Kg 300.0000 16,500.00 4,950,000.00
Kawat Beton Kg 1.8000 30,500.00 54,900.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Dolken Kayu Galam -8 Cm / 4m Btg 20.0000 30,800.00 616,000.00
Pekerja Oh 7.3000 67,000.00 489,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 3.3000 70,000.00 231,000.00
Tukang Besi Oh 2.1000 70,000.00 147,000.00
Kepala Tukang Oh 0.5700 80,000.00 45,600.00
Mandor Oh 0.2500 85,000.00 21,250.00
Jumlah 8,660,365.60
Dibulatkan 8,660,360.00
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 180.0000 16,500.00 2,970,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
1 2 3 4 5 6=4x5
Dolken o - 8 Cm/ 4 m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,974,040.60
Dibulatkan 6,974,040.00
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 190.0000 16,500.00 3,135,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 7,139,040.60
Dibulatkan 7,139,040.00
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 7,326,915.60
Dibulatkan 7,326,910.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 7,326,915.60
Dibulatkan 7,326,910.00
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 175.0000 16,500.00 2,887,500.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,914,415.60
Dibulatkan 6,914,410.00
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 140.0000 16,500.00 2,310,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 6,336,915.60
Dibulatkan 6,336,910.00
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Besi Beton Polos Kg 110.0000 16,500.00 1,815,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1400 2,705,000.00 378,700.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 16.0000 30,800.00 492,800.00
Pekerja Oh 5.9600 67,000.00 399,320.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.8000 70,000.00 196,000.00
1 2 3 4 5 6=4x5
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4550 80,000.00 36,400.00
Mandor Oh 0.2080 85,000.00 17,680.00
Jumlah 5,841,915.60
Dibulatkan 5,841,910.00
D-29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 2,950,000.00 737,500.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1050 2,705,000.00 284,025.00
Multiplek 9 mm 120 x 240 Lbr 2.5000 166,500.00 416,250.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 30,800.00 431,200.00
Pekerja Oh 5.6000 67,000.00 375,200.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.3000 70,000.00 161,000.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.4050 80,000.00 32,400.00
Mandor Oh 0.2020 85,000.00 17,170.00
Jumlah 6,899,760.60
Dibulatkan 6,899,760.00
D-30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Pasang Bekisting untuk lantai M2 10.0000 466,600.00 4,666,000.00
Besi Beton Polos Kg 90.0000 18,820.00 1,693,800.00
Jumlah 7,442,960.00
Dibulatkan 7,442,960.00
D-30.1 1 M3 Plat Lantai 1 lapis Tb. 10 Cm Beton Bertulang (50 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Besi Beton Polos Kg 50.0000 18,820.00 941,000.00
Jumlah 2,024,160.00
Dibulatkan 2,024,160.00
D-31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Pasang Bekisting untuk lantai M2 8.3300 466,600.00 3,886,778.00
Besi Beton Polos Kg 110.0000 18,820.00 2,070,200.00
Jumlah 7,040,138.00
Dibulatkan 7,040,130.00
D-32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Pasang Bekisting untuk lantai M2 8.3300 466,600.00 3,886,778.00
Besi Beton Polos Kg 130.0000 18,820.00 2,446,600.00
Jumlah 7,416,538.00
Dibulatkan 7,416,530.00
D-33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Pasang Bekisting untuk lantai M2 6.6700 466,600.00 3,112,222.00
Besi Beton Polos Kg 90.0000 18,820.00 1,693,800.00
Jumlah 5,889,182.00
Dibulatkan 5,889,180.00
D-34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Pasang Bekisting untuk lantai M2 6.6700 466,600.00 3,112,222.00
Besi Beton Polos Kg 115.0000 18,820.00 2,164,300.00
Jumlah 6,359,682.00
1 2 3 4 5 6=4x5
Dibulatkan 6,359,680.00
1 M3 Listplang Beton Tulang T= 8 cm (77.5 kg besi+bekisting)
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Pasang Bekisting untuk lantai M2 8.3300 466,600.00 3,886,778.00
Besi Beton Polos Kg 77.5000 18,820.00 1,458,550.00
Jumlah 6,428,488.00
Dibulatkan 6,428,480.00
D-35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm
Kayu Terentang M3 0.0020 2,950,000.00 5,900.00
Paku Biasa 2" - 5" Kg 0.0100 24,000.00 240.00
Besi Beton Polos Kg 3.0000 16,500.00 49,500.00
Kawat Beton Kg 0.0450 30,500.00 1,372.50
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pasir Beton M3 0.0060 264,140.00 1,584.84
Koral Beton M3 0.0090 218,260.00 1,964.34
Pekerja Oh 0.0600 67,000.00 4,020.00
Tukang Batu Oh 0.0200 70,000.00 1,400.00
Tukang Kayu Oh 0.0200 70,000.00 1,400.00
Tukang Besi Oh 0.0200 70,000.00 1,400.00
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0030 85,000.00 255.00
Jumlah 75,676.68
Dibulatkan 75,670.00
D-36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm
Kayu Terentang M3 0.0030 2,950,000.00 8,850.00
Paku Biasa 2" - 5" Kg 0.0200 24,000.00 480.00
Besi Beton Polos Kg 3.6000 16,500.00 59,400.00
Kawat Beton Kg 0.0500 30,500.00 1,525.00
Semen Portland Kg 5.5000 1,540.00 8,470.00
Pasir Beton M3 0.0090 264,140.00 2,377.26
Koral Beton M3 0.0150 218,260.00 3,273.90
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Batu Oh 0.0330 70,000.00 2,310.00
Tukang Kayu Oh 0.0330 70,000.00 2,310.00
Tukang Besi Oh 0.0330 70,000.00 2,310.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 99,231.16
Dibulatkan 99,230.00
D-37 1 M2 Pasang Bekisting untuk Dinding
Kayu Terentang M3 0.0300 2,950,000.00 88,500.00
Paku Biasa 2" - 5" Kg 0.4000 24,000.00 9,600.00
Minyak Bekisting Ltr 0.2000 45,000.00 9,000.00
Kayu balok terentang M3 0.0200 2,705,000.00 54,100.00
Multiplek 9 mm 120 x 240 Lbr 0.3500 166,500.00 58,275.00
Dolken Kayu Galam -8 Cm / 4m Btg 3.0000 30,800.00 92,400.00
Formtie/ Penjaga jarak Bekisting/ Spacer Bh 4.0000 2,800.00 11,200.00
Pekerja Oh 0.3200 67,000.00 21,440.00
Tukang Kayu Oh 0.3300 70,000.00 23,100.00
Kepala Tukang Oh 0.0330 80,000.00 2,640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 370,765.00
Dibulatkan 370,760.00
D-38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.3200 2,950,000.00 944,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
1 2 3 4 5 6=4x5
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1200 2,705,000.00 324,600.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken Kayu Galam -8 Cm / 4m Btg 32.0000 30,800.00 985,600.00
Pekerja Oh 5.3000 67,000.00 355,100.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.3000 70,000.00 91,000.00
Tukang Besi Oh 1.0500 70,000.00 73,500.00
Kepala Tukang Oh 0.2650 80,000.00 21,200.00
Mandor Oh 0.2650 85,000.00 22,525.00
Jumlah 6,805,665.60
Dibulatkan 6,805,660.00
D-39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting)
Kayu Terentang M3 0.2400 2,950,000.00 708,000.00
Paku Biasa 2" - 5" Kg 3.2000 24,000.00 76,800.00
Minyak Bekisting Ltr 1.6000 45,000.00 72,000.00
Besi Beton Polos Kg 150.0000 16,500.00 2,475,000.00
Kawat Beton Kg 2.2500 30,500.00 68,625.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1600 2,705,000.00 432,800.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 24.0000 30,800.00 739,200.00
Pekerja Oh 5.6000 67,000.00 375,200.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 2.6400 70,000.00 184,800.00
Tukang Besi Oh 1.0500 70,000.00 73,500.00
Kepala Tukang Oh 0.4000 80,000.00 32,000.00
Mandor Oh 0.1930 85,000.00 16,405.00
Jumlah 6,550,045.60
Dibulatkan 6,550,040.00
D-40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting)
Kayu Terentang M3 0.2500 2,950,000.00 737,500.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Minyak Bekisting Ltr 1.2000 45,000.00 54,000.00
Besi Beton Polos Kg 200.0000 16,500.00 3,300,000.00
Kawat Beton Kg 3.0000 30,500.00 91,500.00
Semen Portland Kg 323.0000 1,540.00 497,420.00
Pasir Beton M3 0.5200 264,140.00 137,352.80
Koral Beton M3 0.7800 218,260.00 170,242.80
Kayu Balok Terentang M3 0.1050 2,705,000.00 284,025.00
Multiplek 9 mm 120 x 240 Lbr 2.8000 166,500.00 466,200.00
Dolken o - 8 Cm/ 4 m Btg 14.0000 30,800.00 431,200.00
Pekerja Oh 5.6000 67,000.00 375,200.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Tukang Kayu Oh 1.5600 70,000.00 109,200.00
Tukang Besi Oh 1.4000 70,000.00 98,000.00
Kepala Tukang Oh 0.3230 80,000.00 25,840.00
Mandor Oh 0.2830 85,000.00 24,055.00
Jumlah 6,898,235.60
Dibulatkan 6,898,230.00
D-41 1 M3 Membuat Beton Cor Mutu K300
Semen Portland Kg 413.0000 1,540.00 636,020.00
Pasir Beton M3 0.4256 264,140.00 112,417.98
Koral Beton M3 0.6807 218,260.00 148,569.58
Pekerja Oh 1.6500 67,000.00 110,550.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.2750 70,000.00 19,250.00
Kepala Tukang Oh 0.0280 80,000.00 2,240.00
Mandor Oh 0.0830 85,000.00 7,055.00
Jumlah 1,036,102.57
Dibulatkan 1,036,100.00
D-42 1 M3 Membuat Beton Cor Mutu K200
Semen Portland Kg 352.0000 1,540.00 542,080.00
Pasir Beton M3 0.4569 264,140.00 120,685.57
Koral Beton M3 0.6873 218,260.00 150,010.10
Pekerja Oh 1.6500 67,000.00 110,550.00
Tukang Batu Oh 0.2750 70,000.00 19,250.00
Kepala Tukang Oh 0.0280 80,000.00 2,240.00
Mandor Oh 0.0830 85,000.00 7,055.00
Jumlah 951,870.66
Dibulatkan 951,870.00
D-43 1 M3 Membuat Beton Cor Mutu K250
Semen Portland Kg 384.0000 1,540.00 591,360.00
Pasir Beton M3 0.4325 264,140.00 114,240.55
Koral Beton M3 0.6927 218,260.00 151,188.70
Pekerja Oh 1.6500 67,000.00 110,550.00
Tukang Batu Oh 0.2750 70,000.00 19,250.00
Kepala Tukang Oh 0.0280 80,000.00 2,240.00
Mandor Oh 0.0830 85,000.00 7,055.00
Jumlah 995,884.25
Dibulatkan 995,880.00
1 M3 Membuat Beton dengan Puzzdith - 100 XR
Semen Portland Kg 336.0000 1,540.00 517,440.00
Pasir Beton M3 0.5400 264,140.00 142,635.60
Koral Beton M3 0.8100 218,260.00 176,790.60
Puzzdith - 100 XR Ltr 1.0000 0.00 0.00
Pekerja Oh 1.6500 67,000.00 110,550.00
Tukang Batu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0800 85,000.00 6,800.00
Jumlah 973,716.20
Dibulatkan 973,710.00
1 M3 Membuat Beton Kedap Air dengan AM - 100
Semen Portland Kg 400.0000 1,540.00 616,000.00
Pasir Beton M3 0.4800 264,140.00 126,787.20
Koral Beton M3 0.8000 218,260.00 174,608.00
AM - 100 Ltr 1.2000 41,500.00 49,800.00
Pekerja Oh 2.0000 67,000.00 134,000.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Kepala Tukang Oh 0.0350 80,000.00 2,800.00
Mandor Oh 1.0000 85,000.00 85,000.00
Jumlah 1,213,495.20
Dibulatkan 1,213,490.00
1 Kg Kabel Presstressed Polos / Strands
Besi Presstressed Polos Kg 1.0500 16,500.00 17,325.00
Kawat Beton Kg 0.0100 30,500.00 305.00
Pekerja Oh 0.0050 67,000.00 335.00
Tukang Besi Oh 0.0050 70,000.00 350.00
Kepala Tukang Oh 0.0005 80,000.00 40.00
Mandor Oh 0.0003 85,000.00 25.50
Jumlah 18,380.50
Dibulatkan 18,380.00
1 Kg Jaring Kawat Baja
Besi Jaring Kawat Baja Kg 1.0200 31,800.00 32,436.00
Kawat Beton Kg 0.8050 30,500.00 24,552.50
1 2 3 4 5 6=4x5
Pekerja Oh 0.0250 67,000.00 1,675.00
Tukang Besi Oh 0.0250 70,000.00 1,750.00
Kepala Tukang Oh 0.0025 80,000.00 200.00
Mandor Oh 0.0015 85,000.00 127.50
Jumlah 60,741.00
Dibulatkan 60,740.00
1 M3 Membuat Beton Cor Mutu K175
Semen Portland Kg 326.0000 1,540.00 502,040.00
Pasir Beton M3 0.5429 264,140.00 143,401.61
Koral Beton M3 0.7622 218,260.00 166,357.77
Air Ltr 215.0000 350.00 75,250.00
Pekerja Oh 1.6500 67,000.00 110,550.00
Tukang Batu Oh 0.2750 70,000.00 19,250.00
Kepala Tukang Oh 0.0280 80,000.00 2,240.00
Mandor Oh 0.0830 85,000.00 7,055.00
Jumlah 1,026,144.38
Dibulatkan 1,026,140.00
1 M2 Pasangan Jembatan Cor
Kayu Albasia M3 0.0264 2,279,000.00 60,165.60
Paku Biasa 2" - 5" Kg 0.6000 24,000.00 14,400.00
Dolken Kayu Galam -8 Cm / 4m Btg 0.5000 30,800.00 15,400.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.0500 70,000.00 3,500.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 104,510.60
Dibulatkan 104,510.00
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting )
Beton bertulang ad. 1Pc : 2 Ps : 3 Kr M3 1.0000 1,083,160.00 1,083,160.00
Pasang Bekisting untuk lantai M2 8.3300 466,600.00 3,886,778.00
Besi Beton Polos Kg 77.5000 18,820.00 1,458,550.00
Jumlah 6,428,488.00
Dibulatkan 6,428,480.00

E PEKERJAAN DINDING
E-01 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 32.9500 1,540.00 50,743.00
Pasir Pasang M3 0.0910 241,390.00 21,966.49
Pekerja Oh 0.6500 67,000.00 43,550.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0300 85,000.00 2,550.00
Jumlah 253,409.49
Dibulatkan 253,400.00
E-02 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 26.5500 1,540.00 40,887.00
Pasir Pasang M3 0.0930 241,390.00 22,449.27
Pekerja Oh 0.6500 67,000.00 43,550.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0300 85,000.00 2,550.00
Jumlah 244,036.27
Dibulatkan 244,030.00
E-03 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps
Bata Merah Bh 140.0000 850.00 119,000.00
Semen Portland Kg 22.2000 1,540.00 34,188.00
Pasir Pasang M3 0.1020 241,390.00 24,621.78
1 2 3 4 5 6=4x5
Pekerja Oh 0.6500 67,000.00 43,550.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0300 85,000.00 2,550.00
Jumlah 239,509.78
Dibulatkan 239,500.00
E-04 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 14.3700 1,540.00 22,129.80
Pasir Pasang M3 0.0400 241,390.00 9,655.60
Pekerja Oh 0.3200 67,000.00 21,440.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 121,800.40
Dibulatkan 121,800.00
E-05 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 11.5000 1,540.00 17,710.00
Pasir Pasang M3 0.0430 241,390.00 10,379.77
Pekerja Oh 0.3200 67,000.00 21,440.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 118,104.77
Dibulatkan 118,100.00
E-06 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps
Bata Merah Bh 70.0000 850.00 59,500.00
Semen Portland Kg 9.6800 1,540.00 14,907.20
Pasir Pasang M3 0.0450 241,390.00 10,862.55
Pekerja Oh 0.3200 67,000.00 21,440.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 115,784.75
Dibulatkan 115,780.00
E-07 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps
Roster Terawang Bh 36.0000 16,000.00 576,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
Pasir Pasang M3 0.0350 241,390.00 8,448.65
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 633,335.65
Dibulatkan 633,330.00
E-08 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps
Roster Terawang Bh 36.0000 16,000.00 576,000.00
Semen Portland Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 241,390.00 8,448.65
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 630,563.65
Dibulatkan 630,560.00
E-09 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm
Roster Terawang Bh 36.0000 16,000.00 576,000.00
Semen Portland Kg 12.8000 1,540.00 19,712.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.0350 241,390.00 8,448.65
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 633,335.65
Dibulatkan 633,330.00
E-10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps
Batako Bh 13.0000 2,700.00 35,100.00
Semen Portland Kg 12.0000 1,540.00 18,480.00
Pasir Pasang M3 0.0380 241,390.00 9,172.82
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 91,927.82
Dibulatkan 91,920.00
E-11 1 M2 Pasang Dinding Hollowblock (HB-20)
HB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 13.5000 1,540.00 20,790.00
Pasir Pasang M3 0.0480 241,390.00 11,586.72
Besi angkur 8 mm Kg 1.9500 16,500.00 32,175.00
Pekerja Oh 0.3500 67,000.00 23,450.00
Tukang Batu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0170 85,000.00 1,445.00
Jumlah 172,396.72
Dibulatkan 172,390.00
E-12 1 M2 Pasang Dinding Hollowblock (HB-15)
HB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4500 1,540.00 16,093.00
Pasir Pasang M3 0.0380 241,390.00 9,172.82
Besi angkur 8 mm Kg 1.9500 16,500.00 32,175.00
Pekerja Oh 0.3200 67,000.00 21,440.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 170,765.82
Dibulatkan 170,760.00
E-13 1 M2 Pasang Dinding Hollowblock (HB-10)
HB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 7.5000 1,540.00 11,550.00
Pasir Pasang M3 0.0270 241,390.00 6,517.53
Besi angkur 8 mm Kg 1.9500 16,500.00 32,175.00
Pekerja Oh 0.3200 67,000.00 21,440.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 126,067.53
Dibulatkan 126,060.00
E-14 1 M2 Pasang Dinding Conblock (CB-20)
CB-20 Bh 12.5000 5,700.00 71,250.00
Semen Portland Kg 14.0500 1,540.00 21,637.00
Pasir Beton M3 0.0040 264,140.00 1,056.56
Pasir Pasang M3 0.0420 241,390.00 10,138.38
Besi angkur 8 mm Kg 3.8700 16,500.00 63,855.00
Paku Biasa 2" - 5" Kg 0.0060 24,000.00 144.00
Kayu Terentang M3 0.0010 2,950,000.00 2,950.00
Kawat Beton Kg 0.0300 30,500.00 915.00
1 2 3 4 5 6=4x5
Koral Beton M3 0.0050 218,260.00 1,091.30
Pekerja Oh 0.3700 67,000.00 24,790.00
Tukang Batu Oh 0.1570 70,000.00 10,990.00
Tukang Besi Oh 0.0070 70,000.00 490.00
Kepala Tukang Oh 0.0164 80,000.00 1,312.00
Mandor Oh 0.0185 85,000.00 1,572.50
Jumlah 212,191.74
Dibulatkan 212,190.00
E-15 1 M2 Pasang Dinding Conblock (CB-15)
CB-15 Bh 12.5000 6,500.00 81,250.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 264,140.00 792.42
Pasir Pasang M3 0.0320 241,390.00 7,724.48
Besi angkur 8 mm Kg 0.8700 16,500.00 14,355.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 2,950,000.00 2,950.00
Kawat Beton Kg 0.0200 30,500.00 610.00
Koral Beton M3 0.0040 218,260.00 873.04
Pekerja Oh 0.3400 67,000.00 22,780.00
Tukang Batu Oh 0.1300 70,000.00 9,100.00
Tukang Besi Oh 0.0070 70,000.00 490.00
Kepala Tukang Oh 0.0137 80,000.00 1,096.00
Mandor Oh 0.0170 85,000.00 1,445.00
Jumlah 159,670.34
Dibulatkan 159,670.00
E-16 1 M2 Pasang Dinding Conblock (CB-10)
CB-10 Bh 12.5000 3,500.00 43,750.00
Semen Portland Kg 10.4600 1,540.00 16,108.40
Pasir Beton M3 0.0030 264,140.00 792.42
Pasir Pasang M3 0.0320 241,390.00 7,724.48
Besi angkur 8 mm Kg 0.8700 16,500.00 14,355.00
Paku Biasa 2" - 5" Kg 0.0040 24,000.00 96.00
Kayu Terentang M3 0.0010 2,950,000.00 2,950.00
Kawat Beton Kg 0.0200 30,500.00 610.00
Koral Beton M3 0.0040 218,260.00 873.04
Pekerja Oh 0.3400 67,000.00 22,780.00
Tukang Batu Oh 0.1300 70,000.00 9,100.00
Tukang Besi Oh 0.0070 70,000.00 490.00
Kepala Tukang Oh 0.0137 80,000.00 1,096.00
Mandor Oh 0.0170 85,000.00 1,445.00
Jumlah 122,170.34
Dibulatkan 122,170.00
E-17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia
Keramik 10x20 Cm Corak m2 1.0000 62,500.00 62,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 123,370.52
Dibulatkan 123,370.00
E-18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia
Keramik 10x20 Cm Polos m2 1.0000 60,000.00 60,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 120,870.52
Dibulatkan 120,870.00
E-19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia
Keramik 20x20 Cm Corak m2 1.0000 65,000.00 65,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 125,870.52
Dibulatkan 125,870.00
E-20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia
Keramik 20x20 Cm polos m2 1.0000 60,000.00 60,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 120,870.52
Dibulatkan 120,870.00
E-21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 60,000.00 60,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 120,870.52
Dibulatkan 120,870.00
E-22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia
Keramik 20x25 Cm Corak m2 1.0000 65,000.00 65,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 125,870.52
Dibulatkan 125,870.00
E-23 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Mulia
Keramik 30x30 Cm polos m2 1.0000 55,500.00 55,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 116,370.52
1 2 3 4 5 6=4x5
Dibulatkan 116,370.00
E-24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia
Keramik 30x30 Cm corak m2 1.0000 60,500.00 60,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 121,370.52
Dibulatkan 121,370.00
E-25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia
Keramik 40x40 Cm polos m2 1.0000 67,500.00 67,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 128,370.52
Dibulatkan 128,370.00
E-26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia
Keramik 40x40 Cm corak m2 1.0000 66,000.00 66,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 126,870.52
Dibulatkan 126,870.00
1 M2 Pasang Dinding Granito uk. 60 x 60 set. Essenza polis
Granito 60 x 60 essenza polis M2 1.0500 395,000.00 414,750.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 10.4400 1,540.00 16,077.60
Pasir Pasang M3 0.0200 241,390.00 4,827.80
Semen Warna Kg 1.5000 15,000.00 22,500.00
Pekerja Oh 0.5000 67,000.00 33,500.00
Tukang Batu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0250 85,000.00 2,125.00
Jumlah 515,280.40
Dibulatkan 515,280.00
E-27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman
Keramik 10x20 Cm Corak m2 1.0000 80,000.00 80,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 140,870.52
Dibulatkan 140,870.00
E-28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman
Keramik 10x20 Cm Polos m2 1.0000 65,500.00 65,500.00
1 2 3 4 5 6=4x5
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 126,370.52
Dibulatkan 126,370.00
E-29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman
Keramik 20x20 Cm Corak m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 143,870.52
Dibulatkan 143,870.00
E-30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman
Keramik 20x20 Cm polos m2 1.0000 65,500.00 65,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 126,370.52
Dibulatkan 126,370.00
E-31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman
Keramik 20x25 Cm m2 1.0000 76,000.00 76,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 136,870.52
Dibulatkan 136,870.00
E-32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman
Keramik 20x25 Cm Corak m2 1.0000 81,500.00 81,500.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 142,370.52
Dibulatkan 142,370.00
E-33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman
Keramik 30x30 Cm polos m2 1.0000 76,000.00 76,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 136,870.52
Dibulatkan 136,870.00
E-34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman
Keramik 30x30 Cm corak m2 1.0000 80,000.00 80,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 140,870.52
Dibulatkan 140,870.00
E-35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman
Keramik 40x40 Cm polos m2 1.0000 80,000.00 80,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 140,870.52
Dibulatkan 140,870.00
E-36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman
Keramik 40x40 Cm corak m2 1.0000 85,000.00 85,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 145,870.52
Dibulatkan 145,870.00
E-36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman
Keramik 20x40 Cm corak m2 1.0000 83,000.00 83,000.00
Semen Abu - Abu Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 143,870.52
Dibulatkan 143,870.00
E-37 1 M2 Pasang Dinding Marmer
Marmer M2 1.0500 605,000.00 635,250.00
Paku Pancing 60x230 Bh 2.0000 1,000.00 2,000.00
Semen Abu - Abu Kg 12.4400 1,540.00 19,157.60
Pasir Pasang M3 0.0250 241,390.00 6,034.75
Semen Warna Kg 1.5000 15,000.00 22,500.00
Pekerja Oh 0.9000 67,000.00 60,300.00
Tukang Batu Oh 0.6500 70,000.00 45,500.00
Kepala Tukang Oh 0.0650 80,000.00 5,200.00
Mandor Oh 0.0350 85,000.00 2,975.00
1 2 3 4 5 6=4x5
Jumlah 798,917.35
Dibulatkan 798,910.00
E-38 1 M2 Pasang Dinding Batu Tempel Hitam
Batu Tempel Hitam M2 0.0500 100,110.00 5,005.50
Semen Abu - Abu Kg 11.7500 1,540.00 18,095.00
Pasir Pasang M3 0.0350 241,390.00 8,448.65
Pekerja Oh 0.6200 67,000.00 41,540.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Kepala Tukang Oh 0.0350 80,000.00 2,800.00
Mandor Oh 0.0300 85,000.00 2,550.00
Jumlah 102,939.15
Dibulatkan 102,930.00
E-39 1 M2 Pasang Dinding Poslin 11 x 11 Cm
Poslin m2 1.0000 70,000.00 70,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.1875 67,000.00 12,562.50
Tukang Batu Oh 0.3750 70,000.00 26,250.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0188 85,000.00 1,598.00
Jumlah 130,870.52
Dibulatkan 130,870.00
E-40 1 M2 Wall paper
Wall paper m2 1.0500 61,500.00 64,575.00
Lem Kg 0.2500 39,300.00 9,825.00
Pekerja Oh 0.3500 67,000.00 23,450.00
Tukang Batu Oh 0.1750 70,000.00 12,250.00
Kepala Tukang Oh 0.0170 80,000.00 1,360.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 111,630.00
Dibulatkan 111,630.00
E-41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,262,000.00 175,336.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 26,300.00 14,728.00
Teak Wood 4 mm 120 x 240 Lbr 0.8600 145,000.00 124,700.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.4500 70,000.00 31,500.00
Kepala Tukang Oh 0.0450 80,000.00 3,600.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 364,194.00
Dibulatkan 364,190.00
E-42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,262,000.00 175,336.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 26,300.00 14,728.00
Plywood 120 x 240 x 9 mm Lbr 0.8600 260,000.00 223,600.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Kayu Oh 0.6000 70,000.00 42,000.00
Kepala Tukang Oh 0.0600 80,000.00 4,800.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 478,314.00
Dibulatkan 478,310.00
E-43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan
Kayu Balok Kamper Medan M3 0.0280 6,262,000.00 175,336.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Lem Kayu Lt 0.5600 26,300.00 14,728.00
Triplek 120 x 240 x 4 mm Lbr 0.8600 68,500.00 58,910.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Kayu Oh 0.6000 70,000.00 42,000.00
Kepala Tukang Oh 0.0600 80,000.00 4,800.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 313,624.00
Dibulatkan 313,620.00
E-44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 32,200.00 13,363.00
Hollow 2/4 Zincromate Btg 0.1500 25,000.00 3,750.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
Paku GRC kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang besi Oh 0.0500 70,000.00 3,500.00
Kepala tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 103,054.00
Dibulatkan 103,050.00
E-45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.8300 32,200.00 26,726.00
Hollow 2/4 Zincromate Btg 0.3000 25,000.00 7,500.00
Gypsum Lbr 0.7280 87,800.00 63,918.40
Paku Gypsum kg 0.2200 38,500.00 8,470.00
Ramset / dina bolt Bh 8.0000 8,000.00 64,000.00
Cotton plaster Bh 0.1440 16,500.00 2,376.00
Compoun Zak 0.2500 83,000.00 20,750.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang besi Oh 0.1000 70,000.00 7,000.00
Kepala tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 215,790.40
Dibulatkan 215,790.00
E-46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 32,200.00 13,363.00
Hollow 2/4 Zincromate Btg 0.1500 25,000.00 3,750.00
Plywood 120 x 240 x 9 mm Lbr 0.3640 260,000.00 94,640.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang besi Oh 0.0500 70,000.00 3,500.00
Kepala tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 157,418.00
Dibulatkan 157,410.00
E-47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow
Hollow 4/4 Zincromate Btg 0.4150 32,200.00 13,363.00
Hollow 2/4 Zincromate Btg 0.1500 25,000.00 3,750.00
Teakwood (120 x 240 x 4) mm Lbr 0.3640 145,000.00 52,780.00
Paku kg 0.1100 24,000.00 2,640.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang besi Oh 0.0500 70,000.00 3,500.00
Kepala tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 115,558.00
Dibulatkan 115,550.00
E-48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps
1 2 3 4 5 6=4x5
Glass block 20 x 20 bh 36.0000 24,200.00 871,200.00
Semen Abu - Abu Kg 11.0000 1,540.00 16,940.00
Pasir Pasang M3 0.0350 241,390.00 8,448.65
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 925,763.65
Dibulatkan 925,760.00
E-49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu
Bilik bambu M2 1.5000 25,000.00 37,500.00
Kayu kaso 5/7 M3 0.0140 3,692,500.00 51,695.00
Paku Kg 0.0112 24,000.00 268.80
List kayu 2/4 M3 0.0030 5,810,000.00 17,430.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.0500 70,000.00 3,500.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 117,663.80
Dibulatkan 117,660.00

F PEKERJAAN PLESTERAN
F-01 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 8.5200 1,540.00 13,120.80
Pasir Pasang M3 0.0170 241,390.00 4,103.63
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Batu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 43,174.43
Dibulatkan 43,170.00
F-02 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 6.4800 1,540.00 9,979.20
Pasir Pasang M3 0.0190 241,390.00 4,586.41
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Batu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 40,515.61
Dibulatkan 40,510.00
F-03 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm
Semen Portland Kg 5.2000 1,540.00 8,008.00
Pasir Pasang M3 0.0200 241,390.00 4,827.80
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Batu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 38,785.80
Dibulatkan 38,780.00
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0220 241,390.00 5,310.58
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Batu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 37,913.38
Dibulatkan 37,910.00
F-04 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
1 2 3 4 5 6=4x5
Semen Portland Kg 10.8000 1,540.00 16,632.00
Pasir Pasang M3 0.0260 241,390.00 6,276.14
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 56,320.64
Dibulatkan 56,320.00
F-05 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm
Semen Portland Kg 8.6800 1,540.00 13,367.20
Pasir Pasang M3 0.0280 241,390.00 6,758.92
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 53,538.62
Dibulatkan 53,530.00
F-06 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm
Semen Portland Kg 7.2900 1,540.00 11,226.60
Pasir Pasang M3 0.0260 241,390.00 6,276.14
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 50,915.24
Dibulatkan 50,910.00
F-07 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm
Semen Portland Kg 5.6700 1,540.00 8,731.80
Pasir Pasang M3 0.0230 241,390.00 5,551.97
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Batu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 30,473.77
Dibulatkan 30,470.00
F-08 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm
Semen Portland Kg 9.3000 1,540.00 14,322.00
Pasir Pasang M3 0.0180 241,390.00 4,345.02
Pekerja Oh 0.2600 67,000.00 17,420.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0130 85,000.00 1,105.00
Jumlah 52,792.02
Dibulatkan 52,790.00
F-09 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm
Semen Portland Kg 7.0700 1,540.00 10,887.80
Pasir Pasang M3 0.0210 241,390.00 5,069.19
Pekerja Oh 0.2600 67,000.00 17,420.00
Tukang Batu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0130 85,000.00 1,105.00
Jumlah 50,081.99
Dibulatkan 50,080.00
F-10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm
Semen Portland Kg 0.5000 1,540.00 770.00
Pasir Pasang M3 0.0130 241,390.00 3,138.07
Pekerja Oh 0.0800 67,000.00 5,360.00
Tukang Batu Oh 0.4000 70,000.00 28,000.00
Kepala Tukang Oh 0.0400 80,000.00 3,200.00
1 2 3 4 5 6=4x5
Mandor Oh 0.0040 85,000.00 340.00
Jumlah 40,808.07
Dibulatkan 40,800.00
F-11 1 M2 Acian Plesteran
Semen Portland Kg 4.0000 1,540.00 6,160.00
Pekerja Oh 0.1430 67,000.00 9,581.00
Tukang Batu Oh 0.1070 70,000.00 7,490.00
Kepala Tukang Oh 0.0105 80,000.00 840.00
Mandor Oh 0.0105 85,000.00 892.50
Jumlah 24,963.50
Dibulatkan 24,960.00
F-12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah
Semen Portland Kg 6.3400 1,540.00 9,763.60
Pasir Pasang M3 0.0120 241,390.00 2,896.68
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Batu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 45,735.28
Dibulatkan 45,730.00
F-13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah
Semen Portland Kg 4.3200 1,540.00 6,652.80
Pasir Pasang M3 0.0160 241,390.00 3,862.24
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Batu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 26,705.04
Dibulatkan 26,700.00

G PEKERJAAN PENUTUP ATAP


G-01 1 M2 Pasang Atap Genteng Pelentong
Genteng Pelentong Bh 25.0000 2,000.00 50,000.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.0750 70,000.00 5,250.00
Kepala Tukang Oh 0.0080 80,000.00 640.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 66,620.00
Dibulatkan 66,620.00
1 M2 Pasang Atap Genteng Pelentong Existing (Lama)
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.0750 70,000.00 5,250.00
Kepala Tukang Oh 0.0080 80,000.00 640.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 16,620.00
Dibulatkan 16,620.00
G-02 1 M2 Pasang Genteng Bubungan Palentong
Genteng Bubungan Pelentong Bh 5.0000 6,500.00 32,500.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0320 241,390.00 7,724.48
Pekerja Oh 0.4000 67,000.00 26,800.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 95,114.48
Dibulatkan 95,110.00
G-03 1 M2 Pasang Roof Ligt Fiberglass ( 180 x 90 ) Cm
Roof Light Fiberglass Lbr 0.6000 110,000.00 66,000.00
Paku Biasa 1/2" - 1" Kg 0.0500 24,000.00 1,200.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.1400 67,000.00 9,380.00
Tukang Kayu Oh 0.0670 70,000.00 4,690.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 82,425.00
Dibulatkan 82,420.00
G-04 1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.3500 88,000.00 30,800.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 67,000.00 9,380.00
Tukang Kayu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 49,115.00
Dibulatkan 49,110.00
G-05 1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.4200 81,000.00 34,020.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 67,000.00 9,380.00
Tukang Kayu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 52,335.00
Dibulatkan 52,330.00
G-06 1 M2 Pasang Atap Asbes Gelombang ( 2.40 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.4400 72,500.00 31,900.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 67,000.00 9,380.00
Tukang Kayu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 50,215.00
Dibulatkan 50,210.00
G-07 1 M2 Pasang Atap Asbes Gelombang ( 2.10 x 1.05 m ) x 4 mm
Asbes Gelombang Lbr 0.5100 65,500.00 33,405.00
Paku seng Kg 0.1200 24,000.00 2,880.00
Pekerja Oh 0.1400 67,000.00 9,380.00
Tukang Kayu Oh 0.0670 70,000.00 4,690.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 51,510.00
Dibulatkan 51,510.00
G-08 1 M2 Pasang Atap Asbes Gelombang besar 80 x 180 x 5 mm
Asbes Gelombang Lbr 0.6900 122,500.00 84,525.00
Paku kait bh 4.0000 1,000.00 4,000.00
Pekerja Oh 0.1400 67,000.00 9,380.00
Tukang Kayu Oh 0.0670 70,000.00 4,690.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 103,750.00
Dibulatkan 103,750.00
G-09 1 M' Pasang Nok Stel Gelombang 1.05 m
Nok Stel Gelombang Lbr 2.1000 39,000.00 81,900.00
Paku Sekrup 3,5" Bh 6.0000 850.00 5,100.00
Pekerja Oh 0.0840 67,000.00 5,628.00
Tukang Kayu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0130 80,000.00 1,040.00
Mandor Oh 0.0040 85,000.00 340.00
Jumlah 102,758.00
1 2 3 4 5 6=4x5
Dibulatkan 102,750.00
G-10 1 M2 Pasang Atap Genteng Beton
Genteng Beton Bh 11.0000 9,000.00 99,000.00
Paku 2" - 5" Kg 0.0300 24,000.00 720.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0200 85,000.00 1,700.00
Jumlah 123,420.00
Dibulatkan 123,420.00
G-11 1 M2 Pasang Atap Genteng Morando Natural
Genteng Morando Bh 18.0000 3,000.00 54,000.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.0750 70,000.00 5,250.00
Kepala Tukang Oh 0.0080 80,000.00 640.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 70,620.00
Dibulatkan 70,620.00
G-12 1 M2 Pasang Atap Genteng Morando Glasur
Genteng Morando Glasur Bh 18.0000 4,500.00 81,000.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.0750 70,000.00 5,250.00
Kepala Tukang Oh 0.0080 80,000.00 640.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 97,620.00
Dibulatkan 97,620.00
G-13 1 M2 Pasang Atap Genteng Metal
Genteng Metal m2 1.0200 225,000.00 229,500.00
Paku 2" - 5" Kg 0.2000 24,000.00 4,800.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0010 85,000.00 85.00
Jumlah 255,585.00
Dibulatkan 255,580.00
G-14 1 M' Pasang Nok Genteng Beton
Nok Genteng Beton Bh 3.5000 11,000.00 38,500.00
Paku 2" x 5" Kg 0.0500 24,000.00 1,200.00
Semen Abu - abu Kg 10.8000 1,540.00 16,632.00
Pasir Pasang M3 0.0320 241,390.00 7,724.48
Semen warna Kg 1.0000 15,000.00 15,000.00
Pekerja Oh 0.4000 67,000.00 26,800.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0200 85,000.00 1,700.00
Jumlah 123,156.48
Dibulatkan 123,150.00
G-15 1 M' Pasang Nok Genteng Metal
Nok genteng metal m1 1.1000 152,500.00 167,750.00
Paku Biasa 1/2" - 1" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Kayu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0130 85,000.00 1,105.00
Jumlah 198,505.00
Dibulatkan 198,500.00
G-16 1 M2 Pasang Atap Seng Gelombang
Seng Gelombang 180X80, 5mm Lbr 0.7000 91,500.00 64,050.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.1200 67,000.00 8,040.00
Tukang Kayu Oh 0.0600 70,000.00 4,200.00
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 77,760.00
Dibulatkan 77,760.00
G-17 1 M2 Pasang Atap Nok Seng
Seng Plat 3"x 6" Bjls 30 Lbr 0.3000 55,500.00 16,650.00
Paku Biasa 1/2" - 1" Kg 0.0400 24,000.00 960.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0080 80,000.00 640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 33,710.00
Dibulatkan 33,710.00
G-18 1 M2 Pasang Alluminium Foil / Sisalation
Sisalation / Alluminium Foil M2 1.0500 20,000.00 21,000.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.0500 70,000.00 3,500.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 35,630.00
Dibulatkan 35,630.00
G-19 1 M2 Pasang Atap Alluminium Natural
Atap Alluminium Natural USR 26 M2 1.0500 155,000.00 162,750.00
Paku Hak Panjang 15 Cm Kg 0.0200 18,400.00 368.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.7500 70,000.00 52,500.00
Kepala Tukang Oh 0.0080 80,000.00 640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 226,818.00
Dibulatkan 226,810.00
G-20 1 M2 Pasang Atap Alluminium Warna
Atap Alluminium Natural USR 26 M2 1.0500 182,500.00 191,625.00
Paku Hak Panjang 15 Cm Kg 0.0200 18,400.00 368.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.7500 70,000.00 52,500.00
Kepala Tukang Oh 0.0080 80,000.00 640.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 255,693.00
Dibulatkan 255,690.00
G-21 1 M2 Pasang Nol Alluminium
Nok standar M2 1.2000 78,500.00 94,200.00
Paku Hak Panjang 15 Cm Kg 0.0400 18,400.00 736.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 1.0000 70,000.00 70,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 173,286.00
Dibulatkan 173,280.00
G-22 1 M' Pasang Listplang GRC lebar 30 Cm
GRC lbr 0.3300 74,500.00 24,585.00
Paku GRC Kg 0.0500 38,500.00 1,925.00
Pekerja Setengah Terampil Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Terampil Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Kayu Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 49,235.00
Dibulatkan 49,230.00
1 2 3 4 5 6=4x5
1 M' Pasang Listplang GRC lebar 30 Cm , tebal 9 mm
Kalsiplank uk. 3000x300x9 mm lbr 0.3400 65,800.00 22,372.00
Kaso 4/6 ky. Borneo m3 0.0030 3,049,500.00 9,148.50
Paku Biasa " - 1" Kg 0.3000 24,000.00 7,200.00
Paku Skrup bh 4.0000 850.00 3,400.00
Pekerja Setengah Terampil Oh 0.1100 67,000.00 7,370.00
Tukang Kayu Terampil Oh 0.2200 70,000.00 15,400.00
Kepala Tukang Kayu Oh 0.0220 80,000.00 1,760.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 67,075.50
Dibulatkan 67,070.00
G-23 1 M' Pasang Nok Pinggir Morando Natural
Nok pinggir genteng morando natural Bh 4.0000 4,000.00 16,000.00
Paku Biasa 8" - 15" cm Kg 0.0526 18,400.00 967.84
Pekerja Oh 0.0840 67,000.00 5,628.00
Tukang Kayu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0130 80,000.00 1,040.00
Mandor Oh 0.0040 85,000.00 340.00
Jumlah 32,725.84
Dibulatkan 32,720.00
1 M' Pasang Bubungan Stel Gelombang 0.92 m
Bubungan Stel Gelombang Lbr 2.4000 8,000.00 19,200.00
Paku Sekrup 3,5" Bh 6.0000 850.00 5,100.00
Pekerja Oh 0.0840 67,000.00 5,628.00
Tukang Kayu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0130 80,000.00 1,040.00
Mandor Oh 0.0040 85,000.00 340.00
Jumlah 40,058.00
Dibulatkan 40,050.00
1 M' Pasang Nok Sirap
Seng Plat 3"x 6" Bjls 28 Lbr 0.4000 55,500.00 22,200.00
Paku Biasa 1/2" - 1" Kg 0.0600 24,000.00 1,440.00
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Kayu Borneo, Papan Tebal 3 Cm M3 0.0040 6,155,500.00 24,622.00
Pekerja Oh 0.1250 67,000.00 8,375.00
Tukang Kayu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0500 80,000.00 4,000.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 79,847.00
Dibulatkan 79,840.00
1 M' Pasang Genteng Bubungan Morando Naatural
Genteng Bubungan Morando Bh 4.0000 8,500.00 34,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0320 241,390.00 7,724.48
Pekerja Oh 0.4000 67,000.00 26,800.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 96,614.48
Dibulatkan 96,610.00
1 M' Pasang Genteng Bubungan Morando Glazur
Genteng Bubungan Morando Bh 4.0000 12,000.00 48,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0320 241,390.00 7,724.48
Pekerja Oh 0.4000 67,000.00 26,800.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 110,614.48
1 2 3 4 5 6=4x5
Dibulatkan 110,610.00
1 M2 Pasang Water Proofing Membrance tb. 3 mm
Water proofing membrance tb. 3 mm M2 1.0000 100,000.00 100,000.00
Alat bantu dan alat pembakaran Ls 0.1500 119,675.00 17,951.25
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Batu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0150 85,000.00 1,275.00
Jumlah 137,626.25
Dibulatkan 137,620.00

H PEKERJAAN LANGIT - LANGIT


H-01 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 5 mm
Plafond Asbes Tebal 5 mm M2 1.1000 25,000.00 27,500.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0300 67,000.00 2,010.00
Tukang Kayu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0015 85,000.00 127.50
Jumlah 35,337.50
Dibulatkan 35,330.00
H-02 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 3.5 mm
Plafond Asbes Tebal 3.5 mm M2 1.1000 21,500.00 23,650.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0300 67,000.00 2,010.00
Tukang Kayu Oh 0.0700 70,000.00 4,900.00
Kepala Tukang Oh 0.0070 80,000.00 560.00
Mandor Oh 0.0015 85,000.00 127.50
Jumlah 31,487.50
Dibulatkan 31,480.00
H-03 1 M2 Langit - langit Akustik (60x120) Cm
Akustik Arm Strong ukuran 60x120 Cm Lbr 1.5000 146,500.00 219,750.00
Paku Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.0600 67,000.00 4,020.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0030 85,000.00 255.00
Jumlah 233,025.00
Dibulatkan 233,020.00
H-04 1 M2 Langit - langit Akustik 60x120 Cm dan Rangka alluminium
Profi Alluminium "T" M' 3.6000 13,500.00 48,600.00
Kawat Seng Polos Kg 0.1500 30,500.00 4,575.00
Ramset/ Dina Bolt Bh 1.0000 8,000.00 8,000.00
Akustik Arm Strong 60x120 Cm Lbr 1.5000 146,500.00 219,750.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0500 80,000.00 4,000.00
Mandor Oh 0.0075 85,000.00 637.50
Jumlah 330,612.50
Dibulatkan 330,610.00
H-05 1 M2 Langit - Langit Teakwood (60 x 120) cm, t = 4 mm + Rangka kayu Borneo Super
Kayu Balok Borneo Super M3 0.2300 5,810,000.00 1,336,300.00
Paku biasa 2" - 5" Kg 0.0600 24,000.00 1,440.00
Teakwood 120 cm x 240 cm x 0,4 cm Lbr 0.3900 145,000.00 56,550.00
Pekerja Oh 0.2700 67,000.00 18,090.00
Tukang kayu Oh 0.4000 70,000.00 28,000.00
Kepala tukang Oh 0.0400 80,000.00 3,200.00
Mandor Oh 0.0135 85,000.00 1,147.50
Jumlah 1,444,727.50
1 2 3 4 5 6=4x5
Dibulatkan 1,444,720.00
H-06 1 M2 Langit - Langit Teakwood 3 mm + Rangka kayu Borneo Super
Kayu Balok Borneo Super M3 0.2300 5,810,000.00 1,336,300.00
Paku biasa 2" - 5" Kg 0.0600 24,000.00 1,440.00
Teakwood 120 cm x 240 cm x 0,3 cm Lbr 0.3900 142,500.00 55,575.00
Pekerja Oh 0.2700 67,000.00 18,090.00
Tukang kayu Oh 0.4000 70,000.00 28,000.00
Kepala tukang Oh 0.0400 80,000.00 3,200.00
Mandor Oh 0.0135 85,000.00 1,147.50
Jumlah 1,443,752.50
Dibulatkan 1,443,750.00
H-07 1 M2 Langit - Langit Triplek 4 mm + Rangka kayu Borneo Super
Kayu Balok Borneo Super M3 0.2300 5,810,000.00 1,336,300.00
Paku biasa 2" - 5" Kg 0.0600 24,000.00 1,440.00
Triplek 120 cm x 240 cm x 0,4 cm Lbr 0.3900 68,500.00 26,715.00
Pekerja Oh 0.2700 67,000.00 18,090.00
Tukang kayu Oh 0.4000 70,000.00 28,000.00
Kepala tukang Oh 0.0400 80,000.00 3,200.00
Mandor Oh 0.0135 85,000.00 1,147.50
Jumlah 1,414,892.50
Dibulatkan 1,414,890.00
H-07 1 M2 Langit - Langit Triplek 4 mm
Paku biasa 2" - 5" Kg 0.0100 24,000.00 240.00
Triplek 120 cm x 240 cm x 0,4 cm Lbr 0.3750 68,500.00 25,687.50
Pekerja Oh 0.0800 67,000.00 5,360.00
Tukang kayu Oh 0.0800 70,000.00 5,600.00
Kepala tukang Oh 0.0800 80,000.00 6,400.00
Mandor Oh 0.0400 85,000.00 3,400.00
Jumlah 46,687.50
Dibulatkan 46,680.00
H-08 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 2/4
Hollow 4/4 Zincromate Btg 0.4150 32,200.00 13,363.00
Hollow 2/4 Zincromate Btg 0.1500 25,000.00 3,750.00
Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.3640 87,800.00 31,959.20
Paku gypsum Kg 0.1100 18,500.00 2,035.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang besi Oh 0.0500 70,000.00 3,500.00
Kepala tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 105,695.20
Dibulatkan 105,690.00
H-08 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 4/4
Hollow 4/4 Zincromate Btg 0.5650 32,200.00 18,193.00
Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.3640 87,800.00 31,959.20
Paku gypsum Kg 0.1100 18,500.00 2,035.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang besi Oh 0.0500 70,000.00 3,500.00
Kepala tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 106,775.20
Dibulatkan 106,770.00
H-09 1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 2/4
Hollow 4/4 Zincromate Btg 0.4150 32,200.00 13,363.00
1 2 3 4 5 6=4x5
Hollow 2/4 Zincromate Btg 0.1500 25,000.00 3,750.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
Paku GRC Kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang besi Oh 0.0500 70,000.00 3,500.00
Kepala tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 103,054.00
Dibulatkan 103,050.00
H-09 1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 4/4
Hollow 4/4 Zincromate Btg 0.5650 32,200.00 18,193.00
GRC ( 120 x 240 x 4 ) mm Lbr 0.3640 74,500.00 27,118.00
Paku GRC Kg 0.1100 38,500.00 4,235.00
Ramset / dina bolt Bh 4.0000 8,000.00 32,000.00
Cotton plaster Bh 0.0720 16,500.00 1,188.00
Compoun Zak 0.1250 83,000.00 10,375.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang besi Oh 0.0500 70,000.00 3,500.00
Kepala tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 104,134.00
Dibulatkan 104,130.00
H-10 1 M2 Langit - Langit Gypsum Board, tb. 9 mm
Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.3900 87,800.00 34,242.00
Paku sekrup Kg 0.1100 18,500.00 2,035.00
Pekerja Oh 0.1350 67,000.00 9,045.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 61,517.00
Dibulatkan 61,510.00
H-11 1 M2 Langit - Langit GRC, tb. 4 mm
GRC ( 120 x 240 x 4 ) mm Lbr 0.3900 74,500.00 29,055.00
Paku GRC Kg 0.1100 38,500.00 4,235.00
Pekerja Oh 0.1350 67,000.00 9,045.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0070 85,000.00 595.00
Jumlah 58,530.00
Dibulatkan 58,530.00
H-12 1 M1 List Langit - langit Kayu Profil 10 cm
List Kayu Profil M' 1.0500 32,400.00 34,020.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0500 67,000.00 3,350.00
Tukang Kayu Oh 0.0500 70,000.00 3,500.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0030 85,000.00 255.00
Jumlah 41,765.00
Dibulatkan 41,760.00
H-13 1 M1 List Langit - langit Gypsum 10 cm
List Gypsum M' 1.0500 9,000.00 9,450.00
Tepung gypsum Kg 0.1500 13,800.00 2,070.00
Pekerja Oh 0.0500 67,000.00 3,350.00
Tukang Kayu Oh 0.0500 70,000.00 3,500.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0030 85,000.00 255.00
1 2 3 4 5 6=4x5
Jumlah 19,025.00
Dibulatkan 19,020.00
H-14 1 M1 List Langit - langit kayu borneo 1/4 cm
List kayu 1/4 M' 1.0500 3,000.00 3,150.00
Paku Kg 0.0100 24,000.00 240.00
Pekerja Oh 0.0434 67,000.00 2,907.80
Tukang Kayu Oh 0.0500 70,000.00 3,500.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0030 85,000.00 255.00
Jumlah 10,452.80
Dibulatkan 10,450.00

I PEKERJAAN PENUTUP LANTAI


1 M2 Pasang Lantai Granito Tile Essenza Ukuran 60 x 60 Cm Polis
Granito Tile Essenza 60 x 60 Cm M2 1.0500 395,000.00 414,750.00
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Pasang M3 0.0450 241,390.00 10,862.55
Semen Warna Kg 1.0000 15,000.00 15,000.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0125 80,000.00 1,000.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 483,575.05
Dibulatkan 483,570.00
1 M2 Pasang Lantai Granito Tile Essenza Ukuran 60 x 60 Cm Un Polis
Granito Tile Essenza 60 x 60 Cm M2 1.0500 255,000.00 267,750.00
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Pasang M3 0.0450 241,390.00 10,862.55
Semen Warna Kg 1.0000 15,000.00 15,000.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0125 80,000.00 1,000.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 336,575.05
Dibulatkan 336,570.00
I-0 1 M2 Pasang Lantai Ubin Granito Ukuran 40x40 cm setara Essenza
Ubin Granito 40 x 40 Cm M2 1.0500 380,000.00 399,000.00
Semen Portland Kg 9.8000 1,540.00 15,092.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 1.3000 15,000.00 19,500.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 465,954.39
Dibulatkan 465,950.00
I-02 1 M2 Pasang Lantai Ubin Granito Ukuran 30x30 cm setara Essenza
Ubin Granito 30 x 30 Cm M2 1.0500 355,500.00 373,275.00
Semen Portland Kg 10.0000 1,540.00 15,400.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 1.5000 15,000.00 22,500.00
Pekerja Oh 0.2600 67,000.00 17,420.00
Tukang Batu Oh 0.1250 70,000.00 8,750.00
Kepala Tukang Oh 0.0125 80,000.00 1,000.00
Mandor Oh 0.0130 85,000.00 1,105.00
Jumlah 444,639.89
Dibulatkan 444,630.00
I-03 1 M' Pasang Plin Ubin Granito Ukuran 10x40 cm setara Essenza
Plin Ubin Granito 10 x 40 Cm Bh 2.6500 2,200.00 5,830.00
1 2 3 4 5 6=4x5
Semen Portland Kg 1.2000 1,540.00 1,848.00
Pasir Pasang M3 0.0030 241,390.00 724.17
Semen Warna Kg 0.1000 15,000.00 1,500.00
Pekerja Oh 0.0600 67,000.00 4,020.00
Tukang Batu Oh 0.0300 70,000.00 2,100.00
Kepala Tukang Oh 0.0030 80,000.00 240.00
Mandor Oh 0.0030 85,000.00 255.00
Jumlah 16,517.17
Dibulatkan 16,510.00
I-04 1 M' Pasang Plin Ubin Granito Ukuran 10x30 cm setara Essenza
Plin Ubin Granito 10 x 30 cm Bh 3.3300 2,000.00 6,660.00
Semen Portland Kg 1.6500 1,540.00 2,541.00
Pasir Pasang M3 0.0032 241,390.00 772.45
Semen Warna Kg 0.1000 15,000.00 1,500.00
Pekerja Oh 0.0900 67,000.00 6,030.00
Tukang Batu Oh 0.0900 70,000.00 6,300.00
Kepala Tukang Oh 0.0090 80,000.00 720.00
Mandor Oh 0.0045 85,000.00 382.50
Jumlah 24,905.95
Dibulatkan 24,900.00
I-05 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Mulia
Ubin Keramik 10x20 cm Corak m2 1.0000 62,500.00 62,500.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 107,377.39
Dibulatkan 107,370.00
I-06 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Mulia
Ubin Keramik 20x20 cm Corak m2 1.0000 65,000.00 65,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 109,877.39
Dibulatkan 109,870.00
I-07 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Mulia
Keramik 30x30 cm Polos m2 1.0000 55,500.00 55,500.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 100,377.39
Dibulatkan 100,370.00
I-08 1 M2 Pasang Lantai Keramik 30 x 30 cm Corak setara Mulia
Keramik 30x30 cm corak setara Mulia m2 1.0000 60,500.00 60,500.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
1 2 3 4 5 6=4x5
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 105,377.39
Dibulatkan 105,370.00
I-09 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Mulia
Keramik 40x40 cm polos set. Mulia m2 1.0000 67,500.00 67,500.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 112,377.39
Dibulatkan 112,370.00
I-10 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Mulia
Keramik 40x40 cm Corak/Warna set. Mulia m2 1.0000 66,000.00 66,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 110,877.39
Dibulatkan 110,870.00

I-11 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Roman


Ubin Keramik 10x20 cm Corak m2 1.0000 80,000.00 80,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 124,877.39
Dibulatkan 124,870.00
I-12 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Roman
Ubin Keramik 20x20 cm Corak m2 1.0000 83,000.00 83,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 127,877.39
Dibulatkan 127,870.00
I-13 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Roman
Keramik 30x30 cm Polos m2 1.0000 76,000.00 76,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
1 2 3 4 5 6=4x5
Jumlah 120,877.39
Dibulatkan 120,870.00
I-14 1 M2 Pasang Lantai Keramik 30 x 30 cm corak setara Roman
Keramik 30x30 cm corak m2 1.0000 80,000.00 80,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 124,877.39
Dibulatkan 124,870.00
I-15 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Roman
Keramik 40x40 cm m2 1.0000 80,000.00 80,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 124,877.39
Dibulatkan 124,870.00
I-16 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Roman
Keramik 40x40 cm Corak/Warna m2 1.0000 85,000.00 85,000.00
Semen Portland Kg 8.0000 1,540.00 12,320.00
Pasir Pasang M3 0.0215 241,390.00 5,189.89
Semen Warna Kg 0.0130 15,000.00 195.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0125 85,000.00 1,062.50
Jumlah 129,877.39
Dibulatkan 129,870.00

I-17 1 M2 Lantai Marmer


Marmer m2 1.0600 605,000.00 641,300.00
Semen Portland Kg 8.1900 1,540.00 12,612.60
Pasir Pasang M3 0.0450 241,390.00 10,862.55
Semen Warna Kg 0.6500 15,000.00 9,750.00
Pekerja Oh 0.7000 67,000.00 46,900.00
Tukang Batu Oh 0.3500 70,000.00 24,500.00
Kepala Tukang Oh 0.0350 80,000.00 2,800.00
Mandor Oh 0.0350 85,000.00 2,975.00
Jumlah 751,700.15
Dibulatkan 751,700.00
I-18 1 M2 Pasang Lantai Parguet Jati
Parguet Jati M2 1.0500 413,500.00 434,175.00
Lem Vinyil Kg 0.6000 48,500.00 29,100.00
Pekerja Oh 0.6500 67,000.00 43,550.00
Tukang Oh 0.3500 70,000.00 24,500.00
Kepala Tukang Oh 0.0350 80,000.00 2,800.00
Mandor Oh 0.0325 85,000.00 2,762.50
Jumlah 536,887.50
Dibulatkan 536,880.00
I-19 1 M Plint Keramik ukuran 10 x 40 cm
Plint keramik 10 x 40 cm Bh 2.6500 4,500.00 11,925.00
Semen Portland Kg 1.2000 1,540.00 1,848.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.0030 241,390.00 724.17
Semen Warna Kg 0.1000 15,000.00 1,500.00
Pekerja Oh 0.0600 67,000.00 4,020.00
Tukang Batu Oh 0.0300 70,000.00 2,100.00
Kepala Tukang Oh 0.0030 80,000.00 240.00
Mandor Oh 0.0030 85,000.00 255.00
Jumlah 22,612.17
Dibulatkan 22,610.00
I-20 1 M Plint Keramik ukuran 10 x 30 cm
Plint keramik 10 x 30 cm Bh 3.5000 4,000.00 14,000.00
Semen Portland Kg 1.6500 1,540.00 2,541.00
Pasir Pasang M3 0.0032 241,390.00 772.45
Semen Warna Kg 0.1000 15,000.00 1,500.00
Pekerja Oh 0.0900 67,000.00 6,030.00
Tukang Batu Oh 0.0900 70,000.00 6,300.00
Kepala Tukang Oh 0.0090 80,000.00 720.00
Mandor Oh 0.0045 85,000.00 382.50
Jumlah 32,245.95
Dibulatkan 32,240.00
I-21 1 M Plint kayu kamper Samarinda 2 x 10 cm
Papan kayu kamper samarinda m3 0.0024 9,596,800.00 23,032.32
Paku Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1200 67,000.00 8,040.00
Tukang Kayu Oh 0.1200 70,000.00 8,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 42,142.32
Dibulatkan 42,140.00
I-22 1 M Plint Keramik ukuran 10 x 20 cm
Plint keramik 10 x 20 cm Bh 5.3000 3,500.00 18,550.00
Semen Portland Kg 1.1400 1,540.00 1,755.60
Pasir Pasang M3 0.0032 241,390.00 772.45
Semen Warna Kg 0.0250 15,000.00 375.00
Pekerja Oh 0.0900 67,000.00 6,030.00
Tukang Batu Oh 0.0900 70,000.00 6,300.00
Kepala Tukang Oh 0.0090 80,000.00 720.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 34,928.05
Dibulatkan 34,920.00
I-23 1 M2 Lantai karpet
Karpet m2 1.0500 389,000.00 408,450.00
Lem Kg 0.3500 39,300.00 13,755.00
Pekerja Oh 0.1700 67,000.00 11,390.00
Tukang Kayu Oh 0.1700 70,000.00 11,900.00
Kepala Tukang Oh 0.0170 80,000.00 1,360.00
Mandor Oh 0.0085 85,000.00 722.50
Jumlah 447,577.50
Dibulatkan 447,570.00
I-24 1 M2 Paving Block Natural 8 cm
Paving Block natural M2 1.0500 89,300.00 93,765.00
Pasir Pasang M3 0.1000 241,390.00 24,139.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 171,866.50
Dibulatkan 171,860.00
I-25 1 M2 Paving Block Warna 8 cm
Paving Block warna M2 1.0500 119,500.00 125,475.00
1 2 3 4 5 6=4x5
Pasir Pasang M3 0.1000 241,390.00 24,139.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 203,576.50
Dibulatkan 203,570.00
I-26 1 M2 Paving Block Natural 6 cm
Paving Block natural M2 1.0500 83,600.00 87,780.00
Pasir Pasang M3 0.1000 241,390.00 24,139.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 165,881.50
Dibulatkan 165,880.00
I-27 1 M2 Paving Block Warna 6 cm
Paving Block warna M2 1.0500 94,600.00 99,330.00
Pasir Pasang M3 0.1000 241,390.00 24,139.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 177,431.50
Dibulatkan 177,430.00
I-28 1 M2 Grass Block 20 x 20
Grass Block Bh 26.2500 10,700.00 280,875.00
Pasir Pasang M3 0.1000 241,390.00 24,139.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 358,976.50
Dibulatkan 358,970.00
I-29 1 M2 Grass Block 30 x 30
Grass Block Bh 11.6700 14,900.00 173,883.00
Pasir Pasang M3 0.1000 241,390.00 24,139.00
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Batu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 251,984.50
Dibulatkan 251,980.00

J PEKERJAAN KAYU
J-01 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Samarinda
Kayu Balok Kamper Samarinda M3 1.2000 9,500,000.00 11,400,000.00
Pekerja Oh 6.0000 67,000.00 402,000.00
Tukang Kayu Oh 18.0000 70,000.00 1,260,000.00
Kepala Tukang Oh 2.0000 80,000.00 160,000.00
Mandor Oh 0.3000 85,000.00 25,500.00
Jumlah 13,247,500.00
Dibulatkan 13,247,500.00
J-02 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Medan/Kruing
Kayu Balok Kamper Medan M3 1.2000 6,262,000.00 7,514,400.00
Pekerja Oh 6.0000 67,000.00 402,000.00
Tukang Kayu Oh 18.0000 70,000.00 1,260,000.00
Kepala Tukang Oh 2.0000 80,000.00 160,000.00
Mandor Oh 0.3000 85,000.00 25,500.00
1 2 3 4 5 6=4x5
Jumlah 9,361,900.00
Dibulatkan 9,361,900.00
J-03 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Super
Kayu Balok Borneo Super M3 1.2000 5,810,000.00 6,972,000.00
Pekerja Oh 6.0000 67,000.00 402,000.00
Tukang Kayu Oh 18.0000 70,000.00 1,260,000.00
Kepala Tukang Oh 2.0000 80,000.00 160,000.00
Mandor Oh 0.3000 85,000.00 25,500.00
Jumlah 8,819,500.00
Dibulatkan 8,819,500.00
J-04 1 M2 Pasang Pintu Panel Kayu Kamper Samarinda
Kayu Papan Kamper Samarinda M3 0.0400 9,596,800.00 383,872.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Kayu Oh 2.5000 70,000.00 175,000.00
Kepala Tukang Oh 0.2500 80,000.00 20,000.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 651,322.00
Dibulatkan 651,320.00
J-05 1 M2 Pasang Pintu Panel Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0400 6,405,800.00 256,232.00
Paku biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Kayu Oh 2.5000 70,000.00 175,000.00
Kepala Tukang Oh 0.2500 80,000.00 20,000.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 523,682.00
Dibulatkan 523,680.00
J-06 1 M2 Pasang Daun Jendela Kaca Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0150 6,405,800.00 96,087.00
Pekerja Oh 0.8000 67,000.00 53,600.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Kepala Tukang Oh 0.2000 80,000.00 16,000.00
Mandor Oh 0.0400 85,000.00 3,400.00
Jumlah 309,087.00
Dibulatkan 309,080.00
J-07 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo
Kayu Papan Borneo Super M3 0.0350 6,155,500.00 215,442.50
Pekerja Oh 0.8000 67,000.00 53,600.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Kepala Tukang Oh 0.2000 80,000.00 16,000.00
Mandor Oh 0.0400 85,000.00 3,400.00
Jumlah 428,442.50
Dibulatkan 428,440.00
J-08 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0640 6,405,800.00 409,971.20
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Kayu Oh 3.0000 70,000.00 210,000.00
Kepala Tukang Oh 0.3000 80,000.00 24,000.00
Mandor Oh 0.5000 85,000.00 42,500.00
Jumlah 753,471.20
Dibulatkan 753,470.00
J-09 1 M2 Pasang Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 26,300.00 7,890.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 67,000.00 40,200.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.2000 80,000.00 16,000.00
Mandor Oh 0.0300 85,000.00 2,550.00
Jumlah 401,413.68
Dibulatkan 401,410.00
J-10 1 M2 Pasang Jalusi Mati Kusen kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0600 6,405,800.00 384,348.00
Paku Biasa 1/2" - 1" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.5000 67,000.00 33,500.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Kepala Tukang Oh 0.3000 80,000.00 24,000.00
Mandor Oh 0.0250 85,000.00 2,125.00
Jumlah 587,573.00
Dibulatkan 587,570.00
J-11 1 M2 Pasang Daun Pintu Triplek Rangkap, Rangka Kayu Kamper
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.0300 24,000.00 720.00
Lem Kayu Lt 0.3000 26,300.00 7,890.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
Pekerja Oh 0.6000 67,000.00 40,200.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Kepala Tukang Oh 0.2000 80,000.00 16,000.00
Mandor Oh 0.0300 85,000.00 2,550.00
Jumlah 401,413.68
Dibulatkan 401,410.00
J-12 1 M2 Pasang Daun Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Lt 0.3000 26,300.00 7,890.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Pekerja Oh 0.6000 67,000.00 40,200.00
Tukang Kayu Oh 2.0000 70,000.00 140,000.00
Kepala Tukang Oh 0.2000 80,000.00 16,000.00
Mandor Oh 0.0300 85,000.00 2,550.00
Jumlah 484,393.68
Dibulatkan 484,390.00
J-13 1 M2 Pasang Pintu dobel Plywood lapis HPL, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 26,300.00 21,040.00
Triplek 4 mm 120 x 240 Lbr 1.0000 68,500.00 68,500.00
HPL Lbr 0.5000 175,000.00 87,500.00
Pekerja Oh 0.8000 67,000.00 53,600.00
Tukang Kayu Oh 2.5000 70,000.00 175,000.00
Kepala Tukang Oh 0.2500 80,000.00 20,000.00
Mandor Oh 0.0400 85,000.00 3,400.00
Jumlah 561,793.68
Dibulatkan 561,790.00
J-14 1 M2 Pasang Pintu Teakwood lapis HPL , Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0196 6,405,800.00 125,553.68
Paku Biasa 1/2" - 1 " Kg 0.3000 24,000.00 7,200.00
Lem Kayu Ltr 0.8000 26,300.00 21,040.00
Teak Wood 4 mm 120 x 240 Lbr 1.0000 145,000.00 145,000.00
Politur Ltr 0.5000 55,000.00 27,500.00
Formika Warna 4" x 8" Lbr 0.5000 262,500.00 131,250.00
Pekerja Oh 0.8000 67,000.00 53,600.00
Tukang Kayu Oh 2.5000 70,000.00 175,000.00
Kepala Tukang Oh 0.2500 80,000.00 20,000.00
Mandor Oh 0.0400 85,000.00 3,400.00
Jumlah 709,543.68
1 2 3 4 5 6=4x5
Dibulatkan 709,540.00
J-15 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper Medan
Kayu Balok Kamper Medan M3 1.1000 6,262,000.00 6,888,200.00
Besi Strip Kg 15.0000 29,500.00 442,500.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 67,000.00 268,000.00
Tukang Kayu Oh 12.0000 70,000.00 840,000.00
Kepala Tukang Oh 1.2000 80,000.00 96,000.00
Mandor Oh 0.2000 85,000.00 17,000.00
Jumlah 8,570,900.00
Dibulatkan 8,570,900.00
J-16 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo
Kayu Balok Borneo Super M3 1.1000 5,810,000.00 6,391,000.00
Besi Strip Kg 15.0000 29,500.00 442,500.00
Paku Biasa 2" - 5" Kg 0.8000 24,000.00 19,200.00
Pekerja Oh 4.0000 67,000.00 268,000.00
Tukang Kayu Oh 12.0000 70,000.00 840,000.00
Kepala Tukang Oh 1.2000 80,000.00 96,000.00
Mandor Oh 0.2000 85,000.00 17,000.00
Jumlah 8,073,700.00
Dibulatkan 8,073,700.00
J-17 1 M2 Pasang Kaso dan Reng Genteng Plentong kayu Kamper Medan
Kayu Balok Kamper medan M3 0.0120 6,262,000.00 75,144.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 93,669.00
Dibulatkan 93,660.00
J-18 1 M2 Pasang Kaso dan Reng Genteng Beton kayu Kamper
Kayu Balok Kamper Medan M3 0.0140 6,262,000.00 87,668.00
Paku Biasa 2" - 5" Kg 0.1500 24,000.00 3,600.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 106,193.00
Dibulatkan 106,190.00
J-19 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0072 6,405,800.00 46,121.76
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 70,046.76
Dibulatkan 70,040.00
J-20 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper Medan
Kayu Papan Kamper Medan M3 0.0110 6,405,800.00 70,463.80
Paku Biasa 2" - 5" Kg 0.0500 24,000.00 1,200.00
Pekerja Oh 0.1100 67,000.00 7,370.00
Tukang Kayu Oh 0.2200 70,000.00 15,400.00
Kepala Tukang Oh 0.0220 80,000.00 1,760.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 96,618.80
Dibulatkan 96,610.00
J-21 1 M' Pasang List Plafon - Kayu Profil 10 cm
Kayu Profil M' 1.0500 32,400.00 34,020.00
1 2 3 4 5 6=4x5
Pekerja Oh 0.0210 67,000.00 1,407.00
Tukang Kayu Oh 0.0210 70,000.00 1,470.00
Kepala Tukang Oh 0.0020 80,000.00 160.00
Mandor Oh 0.0010 85,000.00 85.00
Jumlah 37,142.00
Dibulatkan 37,140.00
J-22 7,26 M2 Kusen Partisi Dobel Triplek
Kayu Balok Borneo Super M3 0.1050 5,810,000.00 610,050.00
Triplek 4 mm 120 x 240 Lbr 5.0000 68,500.00 342,500.00
Paku Biasa 1 s/d 3 cm Kg 2.0000 24,000.00 48,000.00
Ampelas Lbr 2.0000 5,500.00 11,000.00
Engsel Bh 4.0000 23,100.00 92,400.00
Slot Bh 4.0000 35,000.00 140,000.00
Pekerja Oh 0.3000 67,000.00 20,100.00
Tukang Kayu Oh 1.3000 70,000.00 91,000.00
Kepala Tukang Oh 0.1300 80,000.00 10,400.00
Mandor Oh 0.0130 85,000.00 1,105.00
Jumlah 1,366,555.00
1 M2 Pekerjaan partisi 188,230.72
Dibulatkan 188,230.00
J-23 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper
Kayu Balok Kamper M3 0.0120 6,262,000.00 75,144.00
Paku Biasa 5" - 7" Kg 0.1000 24,000.00 2,400.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0750 85,000.00 6,375.00
Jumlah 113,469.00
Dibulatkan 113,460.00
J-24 1 M2 Pasang Rangka Langit - langit (0.50 x 1.00) m, Kayu Borneo
Kayu Balok Borneo Super M3 0.0154 5,810,000.00 89,474.00
Paku Biasa 5" - 7" Kg 0.2000 24,000.00 4,800.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.3000 70,000.00 21,000.00
Kepala Tukang Oh 0.0300 80,000.00 2,400.00
Mandor Oh 0.0750 85,000.00 6,375.00
Jumlah 134,099.00
Dibulatkan 134,090.00
J-25 1 M1 Reuter Kayu Kamper Medan
Kayu Kamper Medan M3 0.0040 6,262,000.00 25,048.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 47,773.00
Dibulatkan 47,770.00
J-26 1 M3 Gording kayu kelas II
Balok kayu M3 1.1000 6,262,000.00 6,888,200.00
Besi Strip Kg 15.0000 29,500.00 442,500.00
Paku Biasa 2" - 5" Kg 3.0000 24,000.00 72,000.00
Pekerja Oh 2.4000 67,000.00 160,800.00
Tukang Kayu Oh 7.2000 70,000.00 504,000.00
Kepala Tukang Oh 0.7200 80,000.00 57,600.00
Mandor Oh 0.1200 85,000.00 10,200.00
Jumlah 8,135,300.00
Dibulatkan 8,135,300.00
J-27 1 M2 Dinding bilik, rangka kayu borneo
Bilik bambu m2 1.1000 25,000.00 27,500.00
Kaso 5/7 m3 0.0140 2,705,000.00 37,870.00
1 2 3 4 5 6=4x5
Paku Biasa 2" - 5" Kg 0.0120 24,000.00 288.00
List kayu 2/4 m3 0.0030 10,500.00 31.50
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.0500 70,000.00 3,500.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 76,714.50
Dibulatkan 76,710.00
1 M2 Pasang Pintu Panel Multiplek 9 mm rangka kayu Kamper Medan / Kruing
Kayu Papan Kamper Medan/Kruing M3 0.0230 6,405,800.00 147,333.40
Multiplek 9 mm lbr 0.2300 166,500.00 38,295.00
List kayu profil 1 cm m' 3.6000 9,800.00 35,280.00
Paku biasa " - 1" kg 0.3000 24,000.00 7,200.00
Lem putih FOX kg 0.1500 26,300.00 3,945.00
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Kayu Oh 2.5000 70,000.00 175,000.00
Kepala Tukang Oh 0.2500 80,000.00 20,000.00
Mandor Oh 0.0500 85,000.00 4,250.00
Jumlah 498,303.40
Dibulatkan 498,300.00

K PEKERJAAN PENUTUP BESI & ALLUMUNIUM


K-01 1 Kg Besi profil
Besi Profil WF Kg 1.1000 26,400.00 29,040.00
Meni Besi Kg 0.0800 33,500.00 2,680.00
Tukang Besi Oh 0.0060 70,000.00 420.00
Pekerja Oh 0.0600 67,000.00 4,020.00
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0003 85,000.00 25.50
Jumlah 36,665.50
Dibulatkan 36,660.00
K-02 1 Kg pekerjaan perakitan
Solar Ltr 0.0100 7,500.00 75.00
Minyak pelumas Ltr 0.0010 57,500.00 57.50
Sewa Alat Jam 0.0080 100,000.00 800.00
Pekerja Oh 0.0010 67,000.00 67.00
Tukang Besi Oh 0.00001 70,000.00 0.70
Kepala Tukang Oh 0.00001 80,000.00 0.80
Mandor Oh 0.00005 85,000.00 4.25
Jumlah 1,005.25
Dibulatkan 1,000.00
K-03 1 Cm Pengelasan dengan las listrik
Kawat las listrik Kg 0.0400 26,000.00 1,040.00
Solar Ltr 0.0300 7,500.00 225.00
Minyak pelumas Ltr 0.0040 57,500.00 230.00
Sewa Alat Jam 0.0170 100,000.00 1,700.00
Pekerja Oh 0.0040 67,000.00 268.00
Tukang Las Oh 0.0020 70,000.00 140.00
Kepala Tukang Oh 0.0002 80,000.00 16.00
Mandor Oh 0.0002 85,000.00 17.00
Jumlah 3,636.00
Dibulatkan 3,630.00
K-04 1 M2 Pasang Pintu Rolling Door
Rolling Door M2 1.0000 337,300.00 337,300.00
Tukang Besi Oh 1.0500 70,000.00 73,500.00
Pekerja Oh 1.5000 67,000.00 100,500.00
Kepala Tukang Oh 0.1050 80,000.00 8,400.00
Mandor Oh 0.0052 85,000.00 442.00
Jumlah 520,142.00
1 2 3 4 5 6=4x5
Dibulatkan 520,140.00
K-05 1 M2 Pasang Pintu Alluminium Natural
Pintu Alluminium Natural M2 1.0000 233,000.00 233,000.00
Tukang Besi Konstruksi Oh 1.0500 70,000.00 73,500.00
Pekerja Oh 1.0500 67,000.00 70,350.00
Kepala Tukang Oh 0.1050 80,000.00 8,400.00
Mandor Oh 0.0052 85,000.00 442.00
Jumlah 385,692.00
Dibulatkan 385,690.00
K-06 1 M2 Pasang Terali Besi
Besi Strip 2x3 M' 11.5000 6,050.00 69,575.00
Tukang Las Oh 1.2000 70,000.00 84,000.00
Pekerja Oh 1.2000 67,000.00 80,400.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0006 85,000.00 51.00
Jumlah 234,986.00
Dibulatkan 234,980.00
K-07 1 M2 Pasang Kawat Harmonika
Kawat Harmonika M2 1.0000 37,000.00 37,000.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Papan Kayu Kamper M3 0.0018 6,405,800.00 11,530.44
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0005 85,000.00 42.50
Jumlah 63,552.94
Dibulatkan 63,550.00
K-08 1 M' Pasang Talang Datar, Seng Bjls 28 lebar 90 cm
Seng Plat 3'x6' Bjls 30 m1 1.0500 22,885.00 24,029.25
Paku Biasa 1/2" - 1" Kg 0.0150 24,000.00 360.00
Kayu Borneo, Papan M3 0.0096 6,155,500.00 59,092.80
Flincote Kg 0.2500 32,000.00 8,000.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.4000 70,000.00 28,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0013 85,000.00 106.25
Jumlah 131,638.30
Dibulatkan 131,630.00
K-09 1 M' Pasang Talang Miring, Seng Bjls 28 lebar 90 cm
Seng Plat 3'x6' Bjls 30 m1 1.0500 22,885.00 24,029.25
Paku Biasa 1/2" - 1" Kg 0.0150 24,000.00 360.00
Kayu papan borneo M3 0.0190 6,155,500.00 116,954.50
Flincote / Meni Besi Kg 0.3000 32,000.00 9,600.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Kayu Oh 0.4000 70,000.00 28,000.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0013 85,000.00 106.25
Jumlah 194,450.00
Dibulatkan 194,450.00
K-10 1 M' Pasang Talang 1/2 Lingkaran D -15 cm, seng pelat BJLS 28 lebar 90 cm
Seng Plat 3'x6' Bjls 30 m1 1.0500 22,885.00 24,029.25
Paku Biasa 1/2" - 1" Kg 0.1000 24,000.00 2,400.00
Kayu Borneo, Papan M3 0.0190 6,155,500.00 116,954.50
Besi Strip Kg 0.5000 29,500.00 14,750.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.3000 70,000.00 21,000.00
Kepala Tukang Oh 0.0300 80,000.00 2,400.00
Mandor Oh 0.0080 85,000.00 680.00
Jumlah 192,263.75
1 2 3 4 5 6=4x5
Dibulatkan 192,260.00
K-11 1 M1 Pasang Kusen pintu/jendela allumunium natural 4"
Alumunium profil natural 4" m1 1.1000 166,500.00 183,150.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 8,300.00 8,300.00
Pekerja Oh 0.0430 67,000.00 2,881.00
Tukang Kayu Oh 0.0430 70,000.00 3,010.00
Kepala Tukang Oh 0.0043 80,000.00 344.00
Mandor Oh 0.0021 85,000.00 178.50
Jumlah 198,463.50
Dibulatkan 198,460.00
K-12 1 M1 Pasang Kusen pintu/jendela allumunium warna 4"
Alumunium profil warna 4" m1 1.1000 179,500.00 197,450.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 8,300.00 8,300.00
Pekerja Oh 0.0430 67,000.00 2,881.00
Tukang Kayu Oh 0.0430 70,000.00 3,010.00
Kepala Tukang Oh 0.0043 80,000.00 344.00
Mandor Oh 0.0021 85,000.00 178.50
Jumlah 212,763.50
Dibulatkan 212,760.00
K-13 1 M1 Pasang Kusen pintu/jendela allumunium natural 3"
Alumunium profil natural 3" m1 1.1000 89,100.00 98,010.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 8,300.00 8,300.00
Pekerja Oh 0.0430 67,000.00 2,881.00
Tukang Kayu Oh 0.0430 70,000.00 3,010.00
Kepala Tukang Oh 0.0043 80,000.00 344.00
Mandor Oh 0.0021 85,000.00 178.50
Jumlah 113,323.50
Dibulatkan 113,320.00
K-14 1 M1 Pasang Kusen pintu/jendela allumunium warna 3"
Alumunium profil warna 3" m1 1.1000 112,200.00 123,420.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant m1 1.0000 8,300.00 8,300.00
Pekerja Oh 0.0430 67,000.00 2,881.00
Tukang Kayu Oh 0.0430 70,000.00 3,010.00
Kepala Tukang Oh 0.0043 80,000.00 344.00
Mandor Oh 0.0021 85,000.00 178.50
Jumlah 138,733.50
Dibulatkan 138,730.00
K-15 1 M1 Pintu Allumunium strip lebar 8 cm
Alumunium profil 4" natural m1 4.4000 166,500.00 732,600.00
Alumunium strip 6 mm m2 1.0500 189,000.00 198,450.00
Pekerja Oh 0.0850 67,000.00 5,695.00
Tukang Kayu Oh 0.0850 70,000.00 5,950.00
Kepala Tukang Oh 0.0085 80,000.00 680.00
Mandor Oh 0.0042 85,000.00 357.00
Jumlah 943,732.00
Dibulatkan 943,730.00
K-16 1 M1 Pintu/jendela kaca rangka allumunium natural 4"
Alumunium profil natural 4" m1 4.4000 166,500.00 732,600.00
Profil allumunium T m1 4.5000 13,500.00 60,750.00
Sealant tube 0.2700 8,300.00 2,241.00
Pekerja Oh 0.0850 67,000.00 5,695.00
Tukang Kayu Oh 0.0850 70,000.00 5,950.00
Kepala Tukang Oh 0.0085 80,000.00 680.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 808,341.00
1 2 3 4 5 6=4x5
Dibulatkan 808,340.00
K-17 1 M1 Pintu/jendela kaca rangka allumunium warna 4"
Alumunium profil warna 4" m1 4.4000 179,500.00 789,800.00
Profil allumunium T m1 4.5000 13,500.00 60,750.00
Sealant tube 0.2700 8,300.00 2,241.00
Pekerja Oh 0.0850 67,000.00 5,695.00
Tukang Kayu Oh 0.0850 70,000.00 5,950.00
Kepala Tukang Oh 0.0085 80,000.00 680.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 865,541.00
Dibulatkan 865,540.00
K-18 1 M2 Jendela Nako & Teralis (10 klips)
Jendela Nako (rangka + kaca 5 mm) M2 1.1000 330,000.00 363,000.00
Paku Biasa 1/2" - 1" atau Skrup bh 10.0000 300.00 3,000.00
Besi Strip m1 7.0000 6,050.00 42,350.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Kayu Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0010 85,000.00 85.00
Jumlah 437,435.00
Dibulatkan 437,430.00
K-19 1 M2 Pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Besi siku L 30.30.3 Kg 15.0000 26,400.00 396,000.00
Besi plat baja Kg 32.8000 26,400.00 865,920.00
Kawat las Kg 0.0500 26,000.00 1,300.00
Pekerja Oh 0.2000 67,000.00 13,400.00
Tukang Las Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0010 85,000.00 85.00
Jumlah 1,292,305.00
Dibulatkan 1,292,300.00
K-20 1 m2 Rangka jendela besi scuare tube ( 5 x 5 ) cm
Besi scuare tube M 4.7600 0.00 0.00
Besi lis kaca 1 x 1 cm M 4.5220 26,400.00 119,380.80
Pengelasan Cm 20.0000 3,630.00 72,600.00
Pekerja Oh 0.6500 67,000.00 43,550.00
Tukang Las Oh 0.6500 70,000.00 45,500.00
Kepala Tukang Oh 0.0650 80,000.00 5,200.00
Mandor Oh 0.0320 85,000.00 2,720.00
Jumlah 288,950.80
Dibulatkan 288,950.00
K-21 1 M2 Pasang Pintu Lipat
Pintu Lipat M2 1.0000 551,900.00 551,900.00
Tukang Besi Oh 1.0500 70,000.00 73,500.00
Pekerja Oh 1.0500 67,000.00 70,350.00
Kepala Tukang Oh 0.1050 80,000.00 8,400.00
Mandor Oh 0.0052 85,000.00 442.00
Jumlah 704,592.00
Dibulatkan 704,590.00
K-22 1 M2 Tirai ( Venetions Blinds and vertical blinds)
Venetion Blinds M2 1.0000 592,000.00 592,000.00
Tukang Kayu Oh 0.3500 70,000.00 24,500.00
Pekerja Oh 0.3500 67,000.00 23,450.00
Kepala Tukang Oh 0.0350 80,000.00 2,800.00
Mandor Oh 0.0018 85,000.00 148.75
Jumlah 642,898.75
Dibulatkan 642,890.00
1 M2 Pasang Jendela Besi
Jendela Besi M2 1.0000 429,300.00 429,300.00
1 2 3 4 5 6=4x5
Tukang Besi Oh 1.0500 70,000.00 73,500.00
Pekerja Oh 1.0500 67,000.00 70,350.00
Kepala Tukang Oh 0.1050 80,000.00 8,400.00
Mandor Oh 0.0053 85,000.00 446.25
Jumlah 581,996.25
Dibulatkan 581,990.00
1 M2 Pasang Jendela Besi Tahan Api
Jendela Besi Tahan Api M2 1.0000 551,900.00 551,900.00
Tukang Besi Oh 1.2000 70,000.00 84,000.00
Pekerja Oh 1.0220 67,000.00 68,474.00
Kepala Tukang Oh 0.1200 80,000.00 9,600.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 714,484.00
Dibulatkan 714,480.00
1 M2 Pasang Pintu Gulung Besi
Pintu Gulung Besi M2 1.0000 551,900.00 551,900.00
Tukang Besi Oh 1.2000 70,000.00 84,000.00
Pekerja Oh 1.2000 67,000.00 80,400.00
Kepala Tukang Oh 0.1200 80,000.00 9,600.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 726,410.00
Dibulatkan 726,410.00
1 M2 Pasang Pintu Sunscreen Alluminium
Sunscreen Alluminium M2 1.0000 418,300.00 418,300.00
Tukang Besi Oh 0.8000 70,000.00 56,000.00
Pekerja Oh 0.0800 67,000.00 5,360.00
Kepala Tukang Oh 0.0800 80,000.00 6,400.00
Mandor Oh 0.0040 85,000.00 340.00
Jumlah 486,400.00
Dibulatkan 486,400.00
1 M2 Pasang Kawat Nyamuk
Kawat Nyamuk M2 1.1000 14,800.00 16,280.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0005 85,000.00 42.50
Jumlah 31,302.50
Dibulatkan 31,300.00
1 M2 Pasang Kawat Kassa
Kawat Kassa M2 1.1000 35,500.00 39,050.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Kayu Kamper, Papan M3 0.0018 9,596,800.00 17,274.24
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0005 85,000.00 42.50
Jumlah 71,346.74
Dibulatkan 71,340.00
1 M2 Pasang Kawat Burung
Kawat Burung M2 1.1000 15,500.00 17,050.00
Paku Biasa 1/2" - 1" Kg 0.0200 24,000.00 480.00
Kayu Kamper, Papan M3 0.0018 9,596,800.00 17,274.24
Pekerja Oh 0.1000 67,000.00 6,700.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0005 85,000.00 42.50
Jumlah 49,346.74
Dibulatkan 49,340.00
1 2 3 4 5 6=4x5
1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 24
Seng Plat 3'x6' Bjls 24 Lbr 0.3000 55,500.00 16,650.00
Paku Biasa 1/2" - 1" Kg 0.1000 24,000.00 2,400.00
Kayu Borneo, Papan M3 0.0190 6,155,500.00 116,954.50
Besi Strip Kg 0.5000 3,350.00 1,675.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Tukang Kayu Oh 0.2500 70,000.00 17,500.00
Kepala Tukang Oh 0.0250 80,000.00 2,000.00
Mandor Oh 0.0013 85,000.00 106.25
Jumlah 167,335.75
Dibulatkan 167,330.00
1 1 UNIT Pasang Partisi Alumunium, Daun Partisi Multiplek rangka kayu Kamper
Kusen Alumunium Natural Uk 4" + upah 20% m' 7.6200 199,800.00 1,522,476.00
Multiplek 9 mm lbr 1.3500 166,500.00 224,775.00
Kayu papan kamper medan m3 0.0300 6,405,800.00 192,174.00
List kayu profil 1 cm m' 11.7000 9,800.00 114,660.00
Paku biasa " - 1" kg 0.1000 24,000.00 2,400.00
Lem putih FOX kg 0.2500 26,300.00 6,575.00
Grendel jendela 2" bh 4.0000 6,000.00 24,000.00
Handle partisi bh 2.0000 36,300.00 72,600.00
Cat kayu m2 1.5400 45,900.00 70,686.00
Cat tembok m2 4.8600 35,000.00 170,100.00
Pekerja Terampil Oh 0.3000 67,000.00 20,100.00
Tukang kayu Terampil Oh 1.3000 70,000.00 91,000.00
Kepla Tukang Kayu Oh 0.1300 80,000.00 10,400.00
Mandor Oh 0.0130 85,000.00 1,105.00
Jumlah 2,523,051.00
Dibulatkan 2,523,050.00
2 1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 12.0000 199,800.00 2,397,600.00
Profil daun jendela alm. + upah 20% m' 5.4000 130,440.00 704,376.00
Kaca polos 5 mm m2 1.8100 122,100.00 221,001.00
Engsel jendela 3" ps 2.0000 16,500.00 33,000.00
Slot Handle jendela bh 2.0000 36,300.00 72,600.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Acesories ( 5 % ) ls 0.0000 166,148.85 166,148.85
Jumlah 3,610,725.85
Dibulatkan 3,610,720.00
3 1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Profil aluminium 4" natural + upah 20% m' 14.1000 199,800.00 2,817,180.00
Profil daun jendela alm. + upah 20% m' 2.7000 130,440.00 352,188.00
Kaca polos 5 mm m2 1.6500 122,100.00 201,465.00
Daun pintu panel Multiplek 9 mm m2 1.6800 498,300.00 837,144.00
rangka ky. Kamper Medan/Kruing
Engsel jendela 3" ps 1.0000 16,500.00 16,500.00
Slot Handle jendela bh 1.0000 36,300.00 36,300.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 168,541.65 168,541.65
Jumlah 4,625,468.65
Dibulatkan 4,625,460.00
4 1 UNIT Pek. Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
Profil aluminium 4" natural + upah 20% m' 7.0000 199,800.00 1,398,600.00
Kaca polos 5 mm m2 0.3700 122,100.00 45,177.00
Daun pintu panel Multiplek 9 mm m2 1.6800 498,300.00 837,144.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
1 2 3 4 5 6=4x5
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 72,188.85 72,188.85
Jumlah 2,533,259.85
Dibulatkan 2,533,250.00
5 1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 15.4500 199,800.00 3,086,910.00
Profil daun jendela alm. + upah 20% m' 5.4000 130,440.00 704,376.00
Kaca polos 5 mm m2 2.5500 122,100.00 311,355.00
Engsel jendela 3" ps 2.0000 16,500.00 33,000.00
Slot Handle jendela bh 2.0000 36,300.00 72,600.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Acesories ( 5 % ) ls 0.0000 205,132.05 205,132.05
Jumlah 4,429,373.05
Dibulatkan 4,429,370.00
6 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
Profil aluminium 4" natural + upah 20% m' 17.5500 199,800.00 3,506,490.00
Profil daun jendela alm. + upah 20% m' 5.4000 130,440.00 704,376.00
Kaca polos 5 mm m2 2.4000 122,100.00 293,040.00
Daun pintu panel Multiplek 9 mm m2 1.6800 498,300.00 837,144.00
rangka ky. Kamper Medan/Kruing
Engsel jendela 3" ps 2.0000 16,500.00 33,000.00
Slot Handle jendela bh 2.0000 36,300.00 72,600.00
Hak Kait angin jendela biasa bh 2.0000 8,000.00 16,000.00
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 225,195.30 225,195.30
Jumlah 5,867,995.30
Dibulatkan 5,867,990.00
7 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
Profil aluminium 4" natural + upah 20% m' 8.9000 199,800.00 1,778,220.00
Kaca polos 5 mm m2 0.6500 122,100.00 79,365.00
Daun pintu panel Multiplek 9 mm m2 2.7300 498,300.00 1,360,359.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
spagnolet tanam ps 1.0000 56,800.00 56,800.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 92,879.25 92,879.25
Jumlah 3,541,773.25
Dibulatkan 3,541,770.00
8 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Profil aluminium 4" natural + upah 20% m' 8.8000 199,800.00 1,758,240.00
Kaca polos 5 mm m2 0.7000 122,100.00 85,470.00
Daun pintu panel Multiplek 9 mm m2 2.9400 498,300.00 1,465,002.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
spagnolet tanam ps 1.0000 56,800.00 56,800.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 92,185.50 92,185.50
Jumlah 3,631,847.50
Dibulatkan 3,631,840.00
9 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
Profil aluminium 4" natural + upah 20% m' 10.7500 199,800.00 2,147,850.00
Kaca polos 5 mm m2 1.0700 122,100.00 130,647.00
Daun pintu panel Multiplek 9 mm m2 1.6800 498,300.00 837,144.00
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
spagnolet tanam ps 1.0000 56,800.00 56,800.00
1 2 3 4 5 6=4x5
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 113,924.85 113,924.85
Jumlah 3,460,515.85
Dibulatkan 3,460,510.00
10 1 UNIT Pek. Jalusi Alumunium Sofi-sofi
Profil aluminium 4" natural + upah 20% m' 5.1000 199,800.00 1,018,980.00
Jalusi Alm m2 8.0000 38,500.00 308,000.00
Acesories ( 5 % ) ls 0.0000 66,349.00 66,349.00
Jumlah 1,393,329.00
Dibulatkan 1,393,320.00
11 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 4.0000 199,800.00 799,200.00
Kaca polos 5 mm m2 0.2400 122,100.00 29,304.00
Acesories ( 5 % ) ls 0.0000 41,425.20 41,425.20
Jumlah 869,929.20
Dibulatkan 869,920.00
12 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 4.5000 199,800.00 899,100.00
Kaca polos 5 mm m2 0.4800 122,100.00 58,608.00
Acesories ( 5 % ) ls 0.0000 47,885.40 47,885.40
Jumlah 1,005,593.40
Dibulatkan 1,005,590.00
13 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 6.4000 199,800.00 1,278,720.00
Kaca polos 5 mm m2 0.7200 122,100.00 87,912.00
Acesories ( 5 % ) ls 0.0000 68,331.60 68,331.60
Jumlah 1,434,963.60
Dibulatkan 1,434,960.00
14 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m
Profil aluminium 4" natural + upah 20% m' 8.3000 199,800.00 1,658,340.00
Kaca polos 5 mm m2 0.9600 122,100.00 117,216.00
Acesories ( 5 % ) ls 0.0000 88,777.80 88,777.80
Jumlah 1,864,333.80
Dibulatkan 1,864,330.00
15 1 UNIT Pek. Kusen Jendela Alumunium uk. 1,35 X 1,60 M' ( 2 lubang ) dgn 1 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 8.8500 199,800.00 1,768,230.00
Profil daun jendela alm. + upah 20% m' 2.9000 130,440.00 378,276.00
Kaca polos 5 mm m2 1.5500 122,100.00 189,255.00
Engsel jendela 3" ps 1.0000 16,500.00 16,500.00
Slot Handle jendela bh 1.0000 36,300.00 36,300.00
Hak Kait angin jendela biasa bh 1.0000 8,000.00 8,000.00
Acesories ( 5 % ) ls 0.0000 116,788.05 116,788.05
Jumlah 2,513,349.05
Dibulatkan 2,513,340.00
16 1 UNIT Pek. Kusen Jendela Alumunium uk. 0,70 X 1,60 M' ( 1 lubang ) dgn 1 Daun Jendela
Profil aluminium 4" natural + upah 20% m' 5.3000 199,800.00 1,058,940.00
Profil daun jendela alm. + upah 20% m' 2.9000 130,440.00 378,276.00
Kaca polos 5 mm m2 0.3300 122,100.00 40,293.00
Engsel jendela 3" ps 1.0000 16,500.00 16,500.00
Slot Handle jendela bh 1.0000 36,300.00 36,300.00
Hak Kait angin jendela biasa bh 1.0000 8,000.00 8,000.00
Acesories ( 5 % ) ls 0.0000 73,875.45 73,875.45
Jumlah 1,612,184.45
Dibulatkan 1,612,180.00
17 1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,80 M' (KM/WC)
Profil aluminium 4" natural + upah 20% m' 7.0000 199,800.00 1,398,600.00
Kaca polos 5 mm m2 0.3700 122,100.00 45,177.00
Daun pintu Triplel lapis formika m2 1.6800 561,790.00 943,807.20
rangka ky. Kamper Medan/Kruing
1 2 3 4 5 6=4x5
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 72,188.85 72,188.85
Jumlah 2,639,923.05
Dibulatkan 2,639,920.00
18 1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,15 M' (KM/WC)
Profil aluminium 4" natural + upah 20% m' 5.2000 199,800.00 1,038,960.00
Daun pintu Triplel lapis formika m2 1.6800 561,790.00 943,807.20
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 51,948.00 51,948.00
Jumlah 2,214,865.20
Dibulatkan 2,214,860.00
19 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 2,40 X 2,80 M' ( 2 Daun Pintu ) Kantor
Profil aluminium 4" natural + upah 20% m' 16.1000 199,800.00 3,216,780.00
Daun Pintu Alumunium Natural + upah 20 % m2 2.9840 279,600.00 834,326.40
Tarikan Pintu Alumunium bh 2.0000 379,800.00 759,600.00
Kaca polos 5 mm m2 4.4900 122,100.00 548,229.00
Engsel pintu 4" ps 3.0000 23,100.00 69,300.00
Door Holder bh 2.0000 226,000.00 452,000.00
Kunci Silinder ALFA untuk pintu alumunium bh 1.0000 452,500.00 452,500.00
Acesories ( 5 % ) ls 0.0000 267,946.77 267,946.77
Jumlah 6,600,682.17
Dibulatkan 6,600,680.00
20 1 UNIT Pek. Kusen Pintu Alm. Doble Triplek Lapis Formika uk. 0,8 X 2,80 M'
Profil aluminium 4" natural + upah 20% m' 7.0000 199,800.00 1,398,600.00
Kaca polos 5 mm m2 0.3700 122,100.00 45,177.00
Daun pintu Duble Triplek Lapis Formika m2 1.6800 709,540.00 1,192,027.20
rangka ky. Kamper Medan/Kruing
Engsel pintu 4" ps 1.5000 23,100.00 34,650.00
Grendel pintu 2" bh 1.0000 6,000.00 6,000.00
Kunci tanam 2 slaagh (Royal) bh 1.0000 139,500.00 139,500.00
Acesories ( 5 % ) ls 0.0000 72,188.85 72,188.85
Jumlah 2,888,143.05
Dibulatkan 2,888,140.00

L PEKERJAAN KUNCI DAN KACA


L-01 1 Buah Pasang Kunci Tanam 2 slaag
Kunci Tanam Bh 1.0000 182,500.00 182,500.00
Pekerja Oh 0.0600 67,000.00 4,020.00
Tukang Kayu Oh 0.6000 70,000.00 42,000.00
Kepala Tukang Oh 0.0600 80,000.00 4,800.00
Mandor Oh 0.0030 85,000.00 255.00
Jumlah 233,575.00
Dibulatkan 233,570.00
L-02 1 Buah Pasang Kunci Tanam Biasa
Kunci Tanam Biasa Bh 1.0000 139,500.00 139,500.00
Pekerja Oh 0.0100 67,000.00 670.00
Tukang Kayu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 176,395.00
Dibulatkan 176,390.00
L-03 1 Buah Pasang Kunci Tanam Kamar Mandi
Kunci Tanam Kamar Mandi Bh 1.0000 104,000.00 104,000.00
Pekerja Oh 0.0050 67,000.00 335.00
1 2 3 4 5 6=4x5
Tukang Kayu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0050 80,000.00 400.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 139,947.50
Dibulatkan 139,940.00
L-04 1 Buah Pasang Engsel Pintu
Engsel Pintu Bh 1.0000 23,100.00 23,100.00
Pekerja Oh 0.0150 67,000.00 1,005.00
Tukang Kayu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0008 85,000.00 63.75
Jumlah 35,868.75
Dibulatkan 35,860.00
L-05 1 Buah Pasang Engsel Jendela Kupu - Kupu
Engsel Jendela Bh 1.0000 16,500.00 16,500.00
Pekerja Oh 0.0100 67,000.00 670.00
Tukang Kayu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0005 85,000.00 42.50
Jumlah 25,012.50
Dibulatkan 25,010.00
L-06 1 Buah Pasang Kait Angin
Kait Angin Bh 1.0000 8,000.00 8,000.00
Pekerja Oh 0.0150 67,000.00 1,005.00
Tukang Kayu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0008 85,000.00 63.75
Jumlah 20,768.75
Dibulatkan 20,760.00
L-07 1 Buah Pasang Door Closer
Door Closer Bh 1.0000 462,000.00 462,000.00
Pekerja Oh 0.0500 67,000.00 3,350.00
Tukang Kayu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0500 80,000.00 4,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 504,562.50
Dibulatkan 504,560.00
L-08 1 Buah Pasang Pegangan Pintu / Door Holder
Door Holder Bh 1.0000 226,000.00 226,000.00
Pekerja Oh 0.0500 67,000.00 3,350.00
Tukang Kayu Oh 0.5000 70,000.00 35,000.00
Kepala Tukang Oh 0.0500 80,000.00 4,000.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 268,562.50
Dibulatkan 268,560.00
L-09 1 M2 Pasang Kaca, Tebal 3 mm
Kaca 3 mm M2 1.1000 96,200.00 105,820.00
Pekerja Oh 0.0150 67,000.00 1,005.00
Tukang Kayu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0008 85,000.00 63.75
Jumlah 118,588.75
Dibulatkan 118,580.00
L-10 1 M2 Pasang Kaca, Tebal 5 mm
Kaca 5 mm M2 1.1000 122,100.00 134,310.00
Pekerja Oh 0.0150 67,000.00 1,005.00
Tukang Kayu Oh 0.1500 70,000.00 10,500.00
Kepala Tukang Oh 0.0150 80,000.00 1,200.00
Mandor Oh 0.0008 85,000.00 63.75
1 2 3 4 5 6=4x5
Jumlah 147,078.75
Dibulatkan 147,070.00

M PEKERJAAN SANITASI
M-01 1 Buah Closet Jongkok Proselen Standar
Kloset jongkok porselen Bh 1.0000 207,500.00 207,500.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 241,390.00 2,413.90
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Batu Oh 1.5000 70,000.00 105,000.00
Kepala Tukang Oh 0.1500 80,000.00 12,000.00
Mandor Oh 0.1600 85,000.00 13,600.00
Jumlah 416,753.90
Dibulatkan 416,750.00
M-02 1 Buah Urinoir
Urinoir Bh 1.0000 1,952,500.00 1,952,500.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 241,390.00 2,413.90
Pekerja Oh 1.0000 67,000.00 67,000.00
Tukang Batu Oh 1.0000 70,000.00 70,000.00
Kepala Tukang Oh 0.1000 80,000.00 8,000.00
Mandor Oh 0.0010 85,000.00 85.00
Perlengkapan 30 % Ls 0.3000 1,952,500.00 585,750.00
Jumlah 2,694,988.90
Dibulatkan 2,694,980.00
M-03 1 Buah Wastafel
Wastafel Bh 1.0000 800,000.00 800,000.00
Semen PC Kg 6.0000 1,540.00 9,240.00
Pasir Pasang M3 0.0100 241,390.00 2,413.90
Pekerja Oh 1.2000 67,000.00 80,400.00
Tukang Batu Oh 1.4500 70,000.00 101,500.00
Kepala Tukang Oh 0.1500 80,000.00 12,000.00
Mandor Oh 0.1000 85,000.00 8,500.00
Perlengkapan 12 % Ls 0.1200 800,000.00 96,000.00
Jumlah 1,110,053.90
Dibulatkan 1,110,050.00
M-04 1 Buah Bak Mandi Fibreflass volume 0,30 M3
Bak Fibreglass Bh 1.0000 281,000.00 281,000.00
Pekerja Oh 1.8000 67,000.00 120,600.00
Tukang Batu Oh 2.7000 70,000.00 189,000.00
Kepala Tukang Oh 0.5400 80,000.00 43,200.00
Mandor Oh 0.1100 85,000.00 9,350.00
Perlengkapan 18 % Ls 0.1800 281,000.00 50,580.00
Jumlah 693,730.00
Dibulatkan 693,730.00
M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Buis beton 30 cm bh 1.1000 68,000.00 74,800.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 10.3000 1,540.00 15,862.00
Pasir pasang m3 0.0610 241,390.00 14,724.79
Pasir urug m3 0.0690 181,230.00 12,504.87
Pekerja org 0.3800 67,000.00 25,460.00
Tukang batu org 0.1900 70,000.00 13,300.00
Kepala Tukang org 0.0190 80,000.00 1,520.00
Mandor org 0.0190 85,000.00 1,615.00
Jumlah 181,036.66
Dibulatkan 181,030.00
M-06 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm
Bata Merah bh 186.0000 850.00 158,100.00
1 2 3 4 5 6=4x5
Semen PC Kg 114.0000 1,540.00 175,560.00
Pasir Pasang M3 0.1840 241,390.00 44,415.76
Batu pecah 2/3 M3 0.0330 218,260.00 7,202.58
Besi Beton Kg 4.8500 16,500.00 80,025.00
Pasir Beton M3 0.1200 264,140.00 31,696.80
Pekerja Oh 2.1600 67,000.00 144,720.00
Tukang Batu Oh 0.7200 70,000.00 50,400.00
Kepala Tukang Oh 0.0720 80,000.00 5,760.00
Tukang Gali Oh 0.1000 67,000.00 6,700.00
Mandor Oh 0.1080 85,000.00 9,180.00
Jumlah 713,760.14
Dibulatkan 713,760.00
M-07 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm
Bata Merah bh 53.0000 850.00 45,050.00
Semen PC Kg 44.0000 1,540.00 67,760.00
Pasir Pasang M3 0.0700 241,390.00 16,897.30
Batu pecah 2/3 M3 0.0700 218,260.00 15,278.20
Besi Beton Kg 1.6000 16,500.00 26,400.00
Pasir Beton M3 0.0600 264,140.00 15,848.40
Pekerja Oh 3.2000 67,000.00 214,400.00
Tukang Batu Oh 1.0150 70,000.00 71,050.00
Kepala Tukang Oh 0.0015 80,000.00 120.00
Mandor Oh 0.0160 85,000.00 1,360.00
Jumlah 474,163.90
Dibulatkan 474,160.00
M-08 1 M Pipa PVC Type AW "
Pipa PVC M1 1.2000 10,625.00 12,750.00
Pekerja Oh 0.0360 67,000.00 2,412.00
Tukang Batu Oh 0.0600 70,000.00 4,200.00
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0018 85,000.00 153.00
Perlengkapan 35% Ls 0.3500 12,750.00 4,462.50
Jumlah 24,457.50
Dibulatkan 24,450.00
M-09 1 M Pipa PVC Type AW 1"
Pipa PVC M1 1.2000 16,250.00 19,500.00
Pekerja Oh 0.0360 67,000.00 2,412.00
Tukang Batu Oh 0.0600 70,000.00 4,200.00
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0018 85,000.00 153.00
Perlengkapan 35% Ls 0.3500 19,500.00 6,825.00
Jumlah 33,570.00
Dibulatkan 33,570.00
M-10 1 M Pipa PVC Type AW 1"
Pipa PVC M1 1.2000 27,500.00 33,000.00
Pekerja Oh 0.0360 67,000.00 2,412.00
Tukang Batu Oh 0.0600 70,000.00 4,200.00
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0018 85,000.00 153.00
Perlengkapan 35% Ls 0.3500 33,000.00 11,550.00
Jumlah 51,795.00
Dibulatkan 51,790.00
M-11 1 M Pipa PVC Type AW 2"
Pipa PVC M1 1.2000 30,000.00 36,000.00
Pekerja Oh 0.0360 67,000.00 2,412.00
Tukang Batu Oh 0.0600 70,000.00 4,200.00
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0018 85,000.00 153.00
Perlengkapan 35% Ls 0.3500 36,000.00 12,600.00
1 2 3 4 5 6=4x5
Jumlah 55,845.00
Dibulatkan 55,840.00
1 M Pipa PVC Type AW 2"
Pipa PVC M1 1.2000 42,500.00 51,000.00
Perlengkapan 35% Ls 1.0000 17,850.00 17,850.00
Pekerja Oh 0.0540 67,000.00 3,618.00
Tukang Batu Oh 0.0900 70,000.00 6,300.00
Kepala Tukang Oh 0.0090 80,000.00 720.00
Mandor Oh 0.0027 85,000.00 229.50
Jumlah 79,717.50
Dibulatkan 79,710.00
1 M Pipa PVC Type AW 3"
Pipa PVC M1 1.2000 53,750.00 64,500.00
Perlengkapan 35% Ls 1.0000 22,575.00 22,575.00
Pekerja Oh 0.0810 67,000.00 5,427.00
Tukang Batu Oh 0.1350 70,000.00 9,450.00
Kepala Tukang Oh 0.0135 80,000.00 1,080.00
Mandor Oh 0.0041 85,000.00 348.50
Jumlah 103,380.50
Dibulatkan 103,380.00
M-12 1 M Pipa PVC Type AW 4"
Pipa PVC M1 1.2000 90,000.00 108,000.00
Pekerja Oh 0.0810 67,000.00 5,427.00
Tukang Batu Oh 0.1350 70,000.00 9,450.00
Kepala Tukang Oh 0.0135 80,000.00 1,080.00
Mandor Oh 0.0041 85,000.00 348.50
Perlengkapan 35% Ls 0.3500 108,000.00 37,800.00
Jumlah 162,105.50
Dibulatkan 162,100.00
M-13 1 M Pipa PVC Type AW "
Pipa PVC M1 1.2000 13,875.00 16,650.00
Pekerja Oh 0.0810 67,000.00 5,427.00
Tukang Batu Oh 0.1350 70,000.00 9,450.00
Kepala Tukang Oh 0.0135 80,000.00 1,080.00
Mandor Oh 0.0041 85,000.00 348.50
Perlengkapan 35% Ls 0.3500 16,650.00 5,827.50
Jumlah 38,783.00
Dibulatkan 38,780.00
M-14 1 Buah Bak Cuci Piring Stainles Steel
Bak cuci stainles steel Bh 1.0000 438,500.00 438,500.00
Pekerja Oh 0.0300 67,000.00 2,010.00
Tukang Batu Oh 0.3000 70,000.00 21,000.00
Kepala Tukang Oh 0.0300 80,000.00 2,400.00
Mandor Oh 0.0015 85,000.00 127.50
Jumlah 464,037.50
Dibulatkan 464,030.00
M-15 1 Buah Kran " atau "
Kran Air Bh 1.0000 45,000.00 45,000.00
Seal Tape Bh 0.0250 4,500.00 112.50
Pekerja Oh 0.0100 67,000.00 670.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 54,007.50
Dibulatkan 54,000.00
M-16 1 Buah Floor Drain
Floor Drain Bh 1.0000 73,500.00 73,500.00
Pekerja Oh 0.0100 67,000.00 670.00
Tukang Batu Oh 0.1000 70,000.00 7,000.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.0050 85,000.00 425.00
Jumlah 82,395.00
Dibulatkan 82,390.00
M-17 1 M' Grafel beton U 20 cm -60 cm
Pipa beton U bh 1.1000 48,000.00 52,800.00
Bata merah bh 12.0000 850.00 10,200.00
P.C (50 gk) zak 0.1030 1,540.00 158.62
Pasir pasang m3 0.0305 241,390.00 7,362.40
Pasir urug m3 0.0345 181,230.00 6,252.44
Pekerja org 0.0100 67,000.00 670.00
Tukang batu org 0.1000 70,000.00 7,000.00
Kepala Tukang org 0.0100 80,000.00 800.00
Mandor org 0.0050 85,000.00 425.00
Jumlah 85,668.45
Dibulatkan 85,660.00
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC m' 1.0500 66,000.00 69,300.00
Perlengkapan 35 % harga talang lot 0.3500 69,300.00 24,255.00
Pekerja org 0.1500 67,000.00 10,050.00
Tukang batu org 0.4000 70,000.00 28,000.00
Kepala Tukang org 0.0250 80,000.00 2,000.00
Mandor org 0.0013 85,000.00 106.25
Jumlah 133,711.25
Dibulatkan 133,710.00
M-19 1 M' Saluran Air Limbah Buis beton 60 cm
Buis beton 60 cm bh 1.1000 135,000.00 148,500.00
Bata merah bh 25.0000 850.00 21,250.00
P.C (50 gk) Kg 0.2060 1,540.00 317.24
Pasir pasang m3 0.0610 241,390.00 14,724.79
Pasir urug m3 0.0690 181,230.00 12,504.87
Pekerja org 0.3800 67,000.00 25,460.00
Tukang batu org 0.1900 70,000.00 13,300.00
Kepala Tukang org 0.0190 80,000.00 1,520.00
Mandor org 0.0190 85,000.00 1,615.00
Jumlah 239,191.90
Dibulatkan 239,190.00
M-20 1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6" lbr 0.5000 17,400.00 8,700.00
Paku kg 0.0150 24,000.00 360.00
Kayu kelas II m3 0.0096 2,950,000.00 28,320.00
Meni besi kg 0.2500 33,500.00 8,375.00
Pekerja org 0.1500 67,000.00 10,050.00
Tukang batu org 0.4000 70,000.00 28,000.00
Kepala Tukang org 0.0250 80,000.00 2,000.00
Mandor org 0.0013 85,000.00 106.25
Jumlah 85,911.25
Dibulatkan 85,910.00
M-21 1 Buah Closet Duduk
Closet duduk Bh 1.0000 1,399,500.00 1,399,500.00
Pekerja Oh 3.3000 67,000.00 221,100.00
Tukang Batu Oh 1.1000 70,000.00 77,000.00
Kepala Tukang Oh 0.0100 80,000.00 800.00
Mandor Oh 0.1600 85,000.00 13,600.00
Perlengkapan 6 % Ls 0.0600 1,399,500.00 83,970.00
Jumlah 1,795,970.00
Dibulatkan 1,795,970.00
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3 bh 1.0000 1,448,500.00 1,448,500.00
1 2 3 4 5 6=4x5
Pekerja org 3.3000 67,000.00 221,100.00
Tukang batu org 1.1000 70,000.00 77,000.00
Kepala Tukang org 0.0010 80,000.00 80.00
Mandor org 0.1600 85,000.00 13,600.00
Perlengkapan 6 % harga bak lot 0.0600 1,448,500.00 86,910.00
Jumlah 1,847,190.00
Dibulatkan 1,847,190.00
M-23 1 Unit Septictank 2 x 1,50 x 1,50 M + Rembesannya
Galian tanah M3 4.5000 39,713.00 178,708.50
Pasir urug M3 0.2142 181,230.00 38,819.47
Lantai kerja M3 2.2500 799,800.00 1,799,550.00
Pas bata 1pc : 3ps M2 15.0000 253,400.00 3,801,000.00
Plesteran M2 15.0000 43,170.00 647,550.00
Plat beton penutup & balok M3 0.3000 7,442,960.00 2,232,888.00
Pipa PVC 4" jenis AW + sambungan M1 5.4000 66,250.00 357,750.00
Pipa GIP 1 1/2" M1 5.0000 51,433.33 257,166.67
Galian tanah untuk rembesan M3 3.3750 39,713.00 134,031.38
Pas. Injuk KG 5.4000 25,800.00 139,320.00
Urugan kerikil 3.5 cm M3 1.0500 211,970.00 222,568.50
Pipa PVC 4" berlobang jenis AW M1 9.0000 40,500.00 364,500.00
Urugan kembali perataan tanah M3 1.1250 52,229.00 58,757.63
Jumlah 10,232,610.13
Dibulatkan 10,232,610.00
M-24 1 Unit Septictank 1 x 1,50 x 1,50 M + Rembesannya
Galian tanah M3 2.2500 30,200.00 67,950.00
Pasir urug M3 0.1070 181,230.00 19,391.61
Lantai kerja M3 1.1250 799,800.00 899,775.00
Pas bata 1pc : 3ps M2 7.5000 253,400.00 1,900,500.00
Plesteran M2 7.5000 43,170.00 323,775.00
Plat beton penutup & balok M3 0.1500 7,442,960.00 1,116,444.00
Pipa PVC 4" jenis AW + sambungan M1 9.0000 66,250.00 596,250.00
Pipa GIP 1 1/2" M1 2.5000 9,250.00 23,125.00
Galian tanah untuk rembesan M3 1.6880 30,200.00 50,977.60
Pas. Injuk KG 2.7000 25,800.00 69,660.00
Urugan kerikil 3.5 cm M3 0.5250 211,970.00 111,284.25
Pipa PVC 4" berlobang jenis AW M1 9.0000 40,500.00 364,500.00
Urugan kembali perataan tanah M3 0.5630 52,229.00 29,404.93
Jumlah 5,573,037.39
Dibulatkan 5,573,030.00
1 M Pipa Galvanis "
Pipa Galvanis M1 1.2000 20,083.33 24,100.00
Perlengkapan 35% Ls 1.0000 8,435.00 8,435.00
Pekerja Oh 0.0540 67,000.00 3,618.00
Tukang Batu Oh 0.0900 70,000.00 6,300.00
Kepala Tukang Oh 0.0090 80,000.00 720.00
Mandor Oh 0.0270 85,000.00 2,295.00
Jumlah 45,468.00
Dibulatkan 45,460.00
1 M Pipa Galvanis "
Pipa Galvanis M1 1.2000 29,250.00 35,100.00
Perlengkapan 35% Ls 1.0000 12,285.00 12,285.00
Pekerja Oh 0.0540 67,000.00 3,618.00
Tukang Batu Oh 0.0900 70,000.00 6,300.00
Kepala Tukang Oh 0.0090 80,000.00 720.00
Mandor Oh 0.0270 85,000.00 2,295.00
Jumlah 60,318.00
Dibulatkan 60,310.00
1 M Pipa Galvanis 1"
Pipa Galvanis M1 1.2000 33,283.33 39,940.00
1 2 3 4 5 6=4x5
Perlengkapan 35% Ls 1.0000 13,979.00 13,979.00
Pekerja Oh 0.0540 67,000.00 3,618.00
Tukang Batu Oh 0.0900 70,000.00 6,300.00
Kepala Tukang Oh 0.0090 80,000.00 720.00
Mandor Oh 0.0270 85,000.00 2,295.00
Jumlah 66,852.00
Dibulatkan 66,850.00
1 M Pipa Galvanis 1"
Pipa Galvanis M1 1.2000 51,433.33 61,720.00
Perlengkapan 35% Ls 1.0000 21,602.00 21,602.00
Pekerja Oh 0.1080 67,000.00 7,236.00
Tukang Batu Oh 0.1800 70,000.00 12,600.00
Kepala Tukang Oh 0.0180 80,000.00 1,440.00
Mandor Oh 0.0054 85,000.00 459.00
Jumlah 105,057.00
Dibulatkan 105,050.00
1 M Pipa Galvanis 3"
Pipa Galvanis M1 1.2000 155,816.67 186,980.00
Perlengkapan 35% Ls 1.0000 65,443.00 65,443.00
Pekerja Oh 0.1080 67,000.00 7,236.00
Tukang Batu Oh 0.1800 70,000.00 12,600.00
Kepala Tukang Oh 0.0180 80,000.00 1,440.00
Mandor Oh 0.0054 85,000.00 459.00
Jumlah 274,158.00
Dibulatkan 274,150.00
1 M Pipa Galvanis 4"
Pipa Galvanis M1 1.2000 158,333.33 190,000.00
Perlengkapan 35% Ls 1.0000 66,500.00 66,500.00
Pekerja Oh 0.1350 67,000.00 9,045.00
Tukang Batu Oh 0.2250 70,000.00 15,750.00
Kepala Tukang Oh 0.0225 80,000.00 1,800.00
Mandor Oh 0.0068 85,000.00 578.00
Jumlah 283,673.00
Dibulatkan 283,670.00
1 Buah Bak kontrol Pas. Batu Bata (45 x 45) cm, Tinggi 50 cm
Batu Bata M2 0.2500 59,500.00 14,875.00
Semen PC Kg 77.0000 1,540.00 118,580.00
Pasir Pasang M3 0.1300 241,390.00 31,380.70
Batu Kerikil M3 0.0200 178,600.00 3,572.00
Besi Beton Kg 2.6000 16,500.00 42,900.00
Pasir Beton M3 0.0900 264,140.00 23,772.60
Pekerja Oh 1.4200 67,000.00 95,140.00
Tukang Batu Oh 0.4730 70,000.00 33,110.00
Kepala Tukang Oh 0.0470 80,000.00 3,760.00
Mandor Oh 0.0710 85,000.00 6,035.00
Jumlah 373,125.30
Dibulatkan 373,120.00
1 M' Saluran Air Hujan Lbr. 20 cm
Galian tanah M3 0.1000 30,200.00 3,020.00
Urugan pasir M3 0.0100 238,420.00 2,384.20
Pas. Bata merah ad. 1 : 5 M2 0.3500 115,780.00 40,523.00
Pas. Plesteran ad. 1 : 5 M2 0.4000 56,320.00 22,528.00
Pas. Beton tumbuk ad. 1 : 3 : 5 M3 0.0150 799,800.00 11,997.00
Perapihan 5% - 4,022.61 4,022.61
Jumlah 84,474.81
Dibulatkan 84,470.00
1 M' Perbaikan Saluran Air Hujan Lbr. 20 cm
Pas. Plesteran ad. 1 : 5 M2 0.4000 56,320.00 22,528.00
Pas. Beton tumbuk ad. 1 : 3 : 5 M3 0.0150 799,800.00 11,997.00
1 2 3 4 5 6=4x5
Perapihan 5% - 1,726.25 1,726.25
Jumlah 36,251.25
Dibulatkan 36,250.00

N PEKERJAAN PENGECATAN
N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
Soda Api Kg 0.0500 39,500.00 1,975.00
Pekerja Oh 0.1500 67,000.00 10,050.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 12,237.50
Dibulatkan 12,230.00
N-02 1 M2 Mendempul dan Menggosok Kayu
Dempul Jadi Kg 0.0800 40,000.00 3,200.00
Minyak Cat Kg 0.0200 42,300.00 846.00
Batu Apung Kg 0.0100 30,640.00 306.40
Pekerja Oh 0.0400 67,000.00 2,680.00
Tukang Cat Oh 0.0400 70,000.00 2,800.00
Kepala Tukang Oh 0.0040 80,000.00 320.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 10,364.90
Dibulatkan 10,360.00
N-03 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Glotex 2X Kg 0.1700 45,900.00 7,803.00
Pekerja Oh 0.0700 67,000.00 4,690.00
Tukang Cat Oh 0.0750 70,000.00 5,250.00
Kepala Tukang Oh 0.0075 80,000.00 600.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 28,630.50
Dibulatkan 28,630.00
N-03 1 M2 Pengecatan Bidang Kayu lama Setara Pinotex
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Pinotex 2X Kg 0.1700 52,500.00 8,925.00
Pekerja Oh 0.0700 67,000.00 4,690.00
Tukang Cat Oh 0.0750 70,000.00 5,250.00
Kepala Tukang Oh 0.0075 80,000.00 600.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 29,752.50
Dibulatkan 29,750.00
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan
Cat Meni Kg 0.2000 33,500.00 6,700.00
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Glotex 3X Kg 0.3500 45,900.00 16,065.00
Pekerja Oh 0.0700 67,000.00 4,690.00
Tukang Cat Oh 0.1050 70,000.00 7,350.00
Kepala Tukang Oh 0.0040 80,000.00 320.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 45,412.50
Dibulatkan 45,410.00
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan
Cat Meni Kg 0.2000 33,500.00 6,700.00
Plamir Kg 0.1500 27,500.00 4,125.00
Cat Dasar Kg 0.1700 35,000.00 5,950.00
Cat Penutup setara Sieve 2X Kg 0.2600 45,900.00 11,934.00
Pekerja Oh 0.0700 67,000.00 4,690.00
Tukang Cat Oh 0.0090 70,000.00 630.00
1 2 3 4 5 6=4x5
Kepala Tukang Oh 0.0060 80,000.00 480.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 34,721.50
Dibulatkan 34,720.00
N-05 1 M2 Pelaburan Bidang Kayu dengan Politur
Politur Ltr 0.1500 55,000.00 8,250.00
Politur Jadi Ltr 0.3720 125,000.00 46,500.00
Ampelas Lbr 2.0000 5,500.00 11,000.00
Tukang Cat Oh 0.0600 70,000.00 4,200.00
Kepala Tukang Oh 0.0160 80,000.00 1,280.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 71,442.50
Dibulatkan 71,440.00
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Residu atau Ter Ltr 0.3500 9,000.00 3,150.00
Pekerja Oh 0.1000 67,000.00 6,700.00
Mandor Oh 0.0060 85,000.00 510.00
Jumlah 10,360.00
Dibulatkan 10,360.00
N-07 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield)
Plamir Kg 0.1000 27,500.00 2,750.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara ICI Exterior 2X Kg 0.2600 135,000.00 35,100.00
Pekerja Oh 0.0200 67,000.00 1,340.00
Tukang Cat Oh 0.0630 70,000.00 4,410.00
Kepala Tukang Oh 0.0063 80,000.00 504.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 47,816.50
Dibulatkan 47,810.00
N-07 1 M2 Pengecatan Tembok Setara ICI Interior
Plamir Kg 0.1000 27,500.00 2,750.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara ICI Interior 2X Kg 0.2600 92,500.00 24,050.00
Pekerja Oh 0.0200 67,000.00 1,340.00
Tukang Cat Oh 0.0630 70,000.00 4,410.00
Kepala Tukang Oh 0.0063 80,000.00 504.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 36,766.50
Dibulatkan 36,760.00
N-08 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield
Cat Dasar Kg 0.1200 35,000.00 4,200.00
Cat Penutup setara ICI 2X Kg 0.1800 135,000.00 24,300.00
Pekerja Oh 0.0280 67,000.00 1,876.00
Tukang Cat Oh 0.0420 70,000.00 2,940.00
Kepala Tukang Oh 0.0042 80,000.00 336.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 33,864.50
Dibulatkan 33,860.00
N-09 1 M2 Pengecatan Plafond ( 3x ) setara ICI
Cat tembok setara ICI Kg 0.2000 92,500.00 18,500.00
Plamir tembok Kg 0.1600 27,500.00 4,400.00
Rol cat Bh 0.0100 35,000.00 350.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 5,500.00 2,750.00
Pekerja setengah trampil Oh 0.2000 67,000.00 13,400.00
Tukang cat Oh 0.3000 70,000.00 21,000.00
Kepala tukang Oh 0.0300 80,000.00 2,400.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 64,650.00
1 2 3 4 5 6=4x5
Dibulatkan 64,650.00
N-10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.2000 27,500.00 5,500.00
Plamir tembok Kg 0.1600 27,500.00 4,400.00
Rol cat Bh 0.0100 35,000.00 350.00
Steger werk Ls 1.0000 1,000.00 1,000.00
Ampelas Lbr 0.5000 5,500.00 2,750.00
Pekerja setengah trampil Oh 0.2000 67,000.00 13,400.00
Tukang cat Oh 0.3000 70,000.00 21,000.00
Kepala tukang Oh 0.0300 80,000.00 2,400.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 51,650.00
Dibulatkan 51,650.00
N-10r 1 M2 Pengecatan Plafond ( 2x ) setara Vinilex
Cat tembok setara Vinilex Kg 0.1300 27,500.00 3,575.00
Plamir tembok Kg 0.1100 27,500.00 3,025.00
Rol cat Bh 0.0100 35,000.00 350.00
Steger werk Ls 0.6700 1,000.00 670.00
Ampelas Lbr 0.3300 5,500.00 1,815.00
Pekerja setengah trampil Oh 0.1300 67,000.00 8,710.00
Tukang cat Oh 0.2000 70,000.00 14,000.00
Kepala tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 34,595.00
Dibulatkan 34,590.00
N-11 1 M2 Pemasangan Wall Paper
Wall Paper M3 1.2000 61,500.00 73,800.00
Perekat Kg 0.2500 39,300.00 9,825.00
Pekerja Oh 0.3500 67,000.00 23,450.00
Tukang Cat Oh 0.1750 70,000.00 12,250.00
Kepala Tukang Oh 0.0170 80,000.00 1,360.00
Mandor Oh 0.0017 85,000.00 144.50
Jumlah 120,829.50
Dibulatkan 120,820.00
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
Meni Besi Kg 0.1000 33,500.00 3,350.00
Kuas Bh 0.0100 16,500.00 165.00
Pekerja Oh 0.0200 67,000.00 1,340.00
Tukang Cat Oh 0.2000 70,000.00 14,000.00
Kepala Tukang Oh 0.0200 80,000.00 1,600.00
Mandor Oh 0.0100 85,000.00 850.00
Jumlah 21,305.00
Dibulatkan 21,300.00
N-13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
Meni Besi Kg 0.1000 33,500.00 3,350.00
Kuas Bh 0.0100 16,500.00 165.00
Perancah Kayu M3 0.0020 2,276,800.00 4,553.60
Pekerja Oh 0.2500 67,000.00 16,750.00
Tukang Cat Oh 0.2250 70,000.00 15,750.00
Kepala Tukang Oh 0.0225 80,000.00 1,800.00
Mandor Oh 0.0075 85,000.00 637.50
Jumlah 43,006.10
Dibulatkan 43,000.00
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
Cat besi setara ICI Kg 0.3000 74,500.00 22,350.00
Pekerja Oh 0.0060 67,000.00 402.00
Tukang Cat Oh 0.0600 70,000.00 4,200.00
Kepala Tukang Oh 0.0120 80,000.00 960.00
Mandor Oh 0.0060 85,000.00 510.00
1 2 3 4 5 6=4x5
Jumlah 28,422.00
Dibulatkan 28,420.00
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
Plamir Kg 0.1600 27,500.00 4,400.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara Vinilex 3X Kg 0.3900 27,500.00 10,725.00
Pekerja Oh 0.0300 67,000.00 2,010.00
Tukang Cat Oh 0.1890 70,000.00 13,230.00
Kepala Tukang Oh 0.0189 80,000.00 1,512.00
Mandor Oh 0.0019 85,000.00 160.65
Jumlah 35,537.65
Dibulatkan 35,530.00
N-15r 1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan)
Plamir Kg 0.1000 27,500.00 2,750.00
Cat Dasar Kg 0.1000 35,000.00 3,500.00
Cat Penutup setara Vinilex 2X Kg 0.3900 27,500.00 10,725.00
Pekerja Oh 0.0300 67,000.00 2,010.00
Tukang Cat Oh 0.0945 70,000.00 6,615.00
Kepala Tukang Oh 0.0095 80,000.00 760.00
Mandor Oh 0.0038 85,000.00 323.00
Jumlah 26,683.00
Dibulatkan 26,680.00
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
Cat Dasar Kg 0.1200 35,000.00 4,200.00
Cat Penutup setara Vinilex 2X Kg 0.1800 27,500.00 4,950.00
Pekerja Oh 0.0280 67,000.00 1,876.00
Tukang Cat Oh 0.0420 70,000.00 2,940.00
Kepala Tukang Oh 0.0042 80,000.00 336.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 14,514.50
Dibulatkan 14,510.00

O PEKERJAAN PENANAMAN POHON


O-01 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
Pupuk kandang Krg 0.0800 27,500.00 2,200.00
Furadan Kg 0.0010 26,500.00 26.50
Pohon pelindung btg 1.0000 27,500.00 27,500.00
Pekerja Oh 0.0250 67,000.00 1,675.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 31,614.00
Dibulatkan 31,610.00
O-02 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
Pupuk kandang Krg 0.0800 27,500.00 2,200.00
Furadan Kg 0.0010 26,500.00 26.50
Bambu krisik/jepang btg 1.0000 55,000.00 55,000.00
Pekerja Oh 0.0250 67,000.00 1,675.00
Mandor Oh 0.0025 85,000.00 212.50
Jumlah 59,114.00
Dibulatkan 59,110.00
O-03 1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
Pupuk kandang Krg 0.0400 27,500.00 1,100.00
Furadan Kg 0.0010 26,500.00 26.50
Pohon perdu btg 1.0000 10,500.00 10,500.00
Pekerja Oh 0.0200 67,000.00 1,340.00
Mandor Oh 0.0020 85,000.00 170.00
Jumlah 13,136.50
Dibulatkan 13,130.00
O-04 1 M2 Tanam rumput gajah (silang papan catur)
Pupuk kandang Krg 0.0400 27,500.00 1,100.00
1 2 3 4 5 6=4x5
Rumput gajah mini m2 0.5000 16,500.00 8,250.00
Pekerja Oh 0.0400 67,000.00 2,680.00
Mandor Oh 0.0040 85,000.00 340.00
Jumlah 12,370.00
Dibulatkan 12,370.00
DAFTAR HARGA SATUAN PEKERJAAN
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
A PEKERJAAN PERSIAPAN SNI 03-2835-2002
1 1 M Pagar Sementara dari Kayu Setinggi 2 Meter A-01 289,530.00
2 1 M Pagar Sementara dari Seng Gelombang Tinggi 2 Meter A-02 384,410.00
3 1 M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter A-03 251,000.00
4 1 M Pengukuran dan Pasang Bouwplank A-04 58,700.00
1 M Pengukuran 23,340.00
5 1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran A-05 1,235,600.00
6 1 M2 Pembuatan Gudang Semen dan alat - alat A-06 994,110.00
7 1 M2 Pembuatan Bedeng Buruh A-07 926,880.00
8 1 M2 Membersihkan Lapangan dan Perataan A-08 10,950.00
9 1 M2 Pembuatan Jalan Sementara A-09 123,780.00
10 1 M3 Bongkaran Beton Bertulang A-10 474,990.00
11 1 M3 Bongkaran Dinding Tembok Bata Merah A-11 449,490.00
12 1 M Pagar Beton Pracetak (5x50x213) Cm A-12 507,760.00
13 1 M Pagar kawat ayam tiang besi L 50.50.5, tinggi 1 m A-13 191,040.00
14 1 M2 Pagar BRC lengkap dengan tiang A-14 299,620.00
15 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm A-15 49,800.00
16 1 M Cerucuk Bambu A-16 70,000.00
1 M3 Bongkaran Kuda-kuda, Gording Balok 261,700.00
1 M3 Bongkaran Rangka Atap, Reng dan Kaso 6,510.00
1 M3 Bongkaran Genteng Lama 2,190.00

B PEKERJAAN TANAH SNI 03-2835-2002


1 Galian Tanah Biasa sedalam 1 Meter B-01 30,200.00
2 Galian Tanah Biasa sedalam 2 Meter B-02 39,710.00
3 Galian Tanah Biasa sedalam 3 Meter B-03 55,490.00
4 Galian Tanah Keras sedalam 1 Meter B-04 47,180.00
5 Galian Tanah Lumpur sedalam 1 Meter B-05 62,190.00
6 Pekerjaan Srtipping Setinggi 10 CM B-06 3,770.00
7 1 M3 Pembuangan Tanah Sejauh 150 Meter B-07 7,700.00
8 1 M3 Urugan Kembali B-08 14,470.00
9 1 M3 Pemadatan Tanah B-09 37,750.00
10 1 M3 Urugan Pasir B-10 238,420.00
11 1 M Pemasangan Lapisan Ijuk tebal 10 cm B-11 40,720.00
12 1 M3 Pemasangan Urugan Sirtu B-12 272,110.00
13 1 M3 Urugan Tanah Pilihan B-13 129,630.00
14 1 M2 Pembuatan Jalan Sementara, Tebal 25 Cm B-14 148,360.00
1 M3 Lapisan Pudel Camp. 1 Kp : 3 Ps : 7 TL 223,680.00
1 M3 Lapisan Pudel Camp. 1 Kp : 5 TL 207,330.00

C PEKERJAAN PONDASI SNI 03-2836-2002


1 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 3 Ps C-01 815,610.00
2 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps C-02 764,000.00
3 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps C-03 728,210.00
4 1 M3 Pasangan Pondasi Batu Kosong (Aanstamping) C-04 395,400.00
5 1 M3 Beton Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah dgn besi tulangan C-05 2,140,140.00
6 1 M3 Pasang Pondasi Sumuran 1pc : 2 ps : 3 kr + 40 % Batu Belah (D= 1m) C-06 981,590.00
7 1 M3 Pondasi Siklop 1pc : 2 ps : 3 kr + 40 % Batu Belah C-07 878,240.00
8 1 M Pembuatan Tiang Pancang (40x40) Cm, Beton Bertulang C-08 1,147,730.00
9 1 M Pembuatan Tiang Pancang (35x35) Cm, Beton Bertulang C-09 898,830.00
10 1 M Pembuatan Tiang Pancang 40 Cm, Beton Bertulang C-10 1,114,590.00
11 1 M Memancang Tiang Pancang Beton Bertulang C-11 129,060.00
12 1 Buah Memotong Tiang Pancang (40 x 40) Cm Beton Bertulang C-12 330,800.00
13 1 M Menyambung Tiang Pancang Beton Bertulang C-13 717,410.00

D PEKERJAAN BETON
1 M2 Lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr. tebal 5 cm 103,840.00
1 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr D-01 799,800.00
2 1 M3 Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr D-02 769,540.00
3 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 3 Kr D-03 1,083,160.00
4 1 M3 Tiang Pancang Prestressed Beton D-04 1,164,170.00
5 1 M3 Beton Tumbuk, 1 Pc : 2 Ps : 4 Kr D-05 1,021,560.00
6 1 M' Memasang PVC Waterstop Lebar 200 mm D-06 73,970.00
1 M' Memasang PVC Waterstop Lebar 150 mm 65,710.00
7 1 Kg Pembesian Dengan Besi Polos atau Besi Ulir D-07 18,820.00
8 1 M2 Pasangan Bekisting untuk Pondasi D-08 166,000.00
9 1 M2 Pasangan Bekisting untuk Sloof D-09 180,750.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
10 1 M2 Pasangan Bekisting untuk Kolom D-10 336,410.00
11 1 M2 Pasangan Bekisting untuk Balok D-11 342,510.00
12 1 M2 Pasangan Bekisting untuk Lantai D-12 466,600.00
13 1 M2 Pasang Bekisting untuk Tangga D-13 312,990.00
14 1 M3 Membuat Beton Cor Mutu K225 D-14 1,491,830.00
15 1 M3 Membuat Beton Cor Mutu K275 D-15 1,481,370.00
16 1 M3 Pondasi Beton Tulang (150 kg besi+bekisting) D-16 4,440,360.00
17 1 M3 Sloof Beton Tulang (200 kg besi+bekisting) D-17 5,638,590.00
1 M3 Sloof Beton Tulang 15/20 cm (150 kg besi+bekisting) 4,840,590.00
1 M3 Sloof Beton Tulang 15/20 cm (180 kg besi+bekisting) 4 dia. 12 ring 8-15 5,308,590.00
1 M3 Sloof Beton Tulang 20/30 cm (150 kg besi+bekisting) 4 dia. 16 ring 8-15 4,813,590.00
1 M3 Sloof Beton Tulang 20/30 cm (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15 5,638,590.00
1 M3 Sloof Beton Bertulang 20/40 cm (240 kg besi+bekisting) Struktur bertingkat 6,325,590.00
18 1 M3 Kolom Beton Tulang (120 kg besi+bekisting) D-18 6,768,860.00
19 1 M3 Kolom Beton Tulang (140 kg besi+bekisting) D-19 7,098,860.00
20 1 M3 Kolom Beton Tulang (150 kg besi+bekisting) D-20 7,263,860.00
21 1 M3 Kolom Beton Tulang (180 kg besi+bekisting) D-21 7,758,860.00
22 1 M3 Kolom Beton Tulang (200 kg besi+bekisting) D-22 8,088,860.00
23 1 M3 Kolom Beton Tulang (250 kg besi+bekisting) D-23 8,913,860.00
24 1 M3 Kolom Beton Tulang (300 kg besi+bekisting) D-24 9,738,860.00
1 M3 Kolom Beton Tulang 20/20 cm (140 kg besi+bekisting) 4 dia. 12, 8-15 7,008,860.00
1 M3 Kolom Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15 7,668,860.00
1 M3 Kolom Beton Tulang 20/20 cm (210 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15 8,163,860.00
1 M3 Kolom Beton Tulang 20/30cm (230 kg besi+bekisting) Struktur bertingkat 6 dia.16+2 dia.12, 8-15 8,493,860.00
1 M3 Kolom Beton Tulang 20/40 cm (250 kg besi+bekisting) Struktur bertingkat 8,913,860.00
1 M3 Kolom Beton Tulang 30/30 cm (175 kg besi+bekisting) Struktur bertingkat 8 dia. 16, 8-15 7,586,360.00
1 M3 Kolom Beton Tulang 30/30 cm (210 kg besi bekisting) Struktur bertingkat 10 dia. 16, 8-15 8,163,860.00
1 M3 Kolom Beton Tulang 30/40 cm (200 kg besi bekisting) Struktur bertingkat 8,088,860.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (175 kg besi+bekisting) 6,597,860.00
1 M3 Kolom Beton Tulang Praktis 12/12 cm (260 kg besi+bekisting) 4 dia. 10, 8-15 8,000,360.00
1 M3 Kolom Beton Tulang (200 kg besi+bekisting) 8,081,210.00
1 M3 Kolom Beton Tulang (250 kg besi+bekisting) 8,906,210.00
1 M3 Kolom Beton Tulang (300 kg besi+bekisting) 9,731,210.00
25 1 M3 Balok Beton Tulang (120 kg besi+bekisting) D-25 6,042,310.00
26 1 M3 Balok Beton Tulang (150 kg besi+bekisting) D-26 6,639,540.00
27 1 M3 Balok Beton Tulang (200 kg besi+bekisting) D-27 6,810,840.00
28 1 M3 Balok Beton Tulang (230 kg besi+bekisting) D-28 7,907,640.00
1 M3 Balok Beton Tulang 15/20 cm (150 kg besi+bekisting) 6,551,040.00
1 M3 Balok Beton Tulang 15/20 (180 kg besi+bekisting) 4 dia. 12, 8-15 6,974,040.00
1 M3 Balok Beton Lintel 11/11 (300 kg besi+bekisting) 4 dia. 10, 8-15 8,660,360.00
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk+balok portal (180 kg besi+bekisting) 4 dia.12, 8-15 6,974,040.00
1 M3 Balok Beton Tulang 15/30 (190 kg besi+bekisting) Struktur bertingkat 4 dia. 16, 8-15 7,139,040.00
1 M3 Balok Beton Tulang 20/40 (200 kg besi+bekisting) Struktur bertingkat 7 dia. 16+2 dia. 12, 8-15 7,326,910.00
1 M3 Balok Beton Tulang 20/30 (200 kg besi+bekisting) Struktur bertingkat 6 dia. 16, 8-15 7,326,910.00
1 M3 Balok Beton Tulang 20/30 (175 kg besi+bekisting) Struktur bertingkat 5 dia. 16, 8-15 6,914,410.00
1 M3 Balok Beton Tulang 25/55 (140 kg besi+bekisting) Struktur bertingkat 8 dia. 16+2 dia. 12, 8-15 6,336,910.00
1 M3 Balok Beton Tulang 30/60 (110 kg besi+ bekisting) Struktur bertingkat 9 dia. 19+2 dia. 12, 8-15 5,841,910.00
29 1 M3 Tangga Beton Tulang (200 kg besi+bekisting) D-29 6,899,760.00
30 1 M3 Plat Lantai Tb. 10 Cm Beton Bertulang (90 kg besi+bekisting) D-30 7,442,960.00
31 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (110 kg besi+bekisting) D-31 7,040,130.00
32 1 M3 Plat Lantai Tb. 12 Cm Beton Bertulang (130 kg besi+bekisting) D-32 7,416,530.00
33 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (90 kg besi+bekisting) D-33 5,889,180.00
34 1 M3 Plat Lantai Tb. 15 Cm Beton Bertulang (115 kg besi+bekisting) D-34 6,359,680.00
35 1 M' Kolom Praktis Beton Tulang ( 11 x 11 ) Cm D-35 75,670.00
36 1 M' Ring Balok Beton Tulang ( 10 x 15 ) Cm D-36 99,230.00
37 1 M2 Pasang Bekisting untuk Dinding D-37 370,760.00
38 1 M3 Pelat Beton Tulang (150 kg besi+bekisting) D-38 6,805,660.00
39 1 M3 Dinding Beton Tulang (150 kg besi+bekisting) D-39 6,550,040.00
40 1 M3 Dinding Beton Tulang (200 kg besi+bekisting) D-40 6,898,230.00
41 1 M3 Membuat Beton Cor Mutu K300 D-41 1,036,100.00
42 1 M3 Membuat Beton Cor Mutu K200 D-42 951,870.00
43 1 M3 Membuat Beton Cor Mutu K250 D-43 995,880.00
1 M3 Membuat Beton dengan Puzzdith - 100 XR 973,710.00
1 M3 Membuat Beton Kedap Air dengan AM - 100 1,213,490.00
1 Kg Kabel Presstressed Polos / Strands 18,380.00
1 Kg Jaring Kawat Baja 60,740.00
1 M3 Membuat Beton Cor Mutu K175 1,026,140.00
1 M2 Pasangan Jembatan Cor 104,510.00
1 M3 Listplank Beton Tulang T=8 cm ( 77,50 kg besi + bekisting ) 6,428,480.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN

E PEKERJAAN DINDING
1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps E-01 253,400.00
2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps E-02 244,030.00
3 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps E-03 239,500.00
4 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps E-04 121,800.00
5 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps E-05 118,100.00
6 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps E-06 115,780.00
7 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 3 ps E-07 633,330.00
8 1 M2 Pasang Dinding Roster Beton 20 x 20 ad.1pc : 4 ps E-08 630,560.00
9 1 M2 Pasang Dinding Roster/terawang (12 x 11 x 24) cm E-09 633,330.00
10 1 M2 Pasang Dinding Batako Besar Pres uk. 8 x 20 x 30 ad. 1pc : 4ps E-10 91,920.00
11 1 M2 Pasang Dinding Hollowblock (HB-20) E-11 172,390.00
12 1 M2 Pasang Dinding Hollowblock (HB-15) E-12 170,760.00
13 1 M2 Pasang Dinding Hollowblock (HB-10) E-13 126,060.00
14 1 M2 Pasang Dinding Conblock (CB-20) E-14 212,190.00
15 1 M2 Pasang Dinding Conblock (CB-15) E-15 159,670.00
16 1 M2 Pasang Dinding Conblock (CB-10) E-16 122,170.00
17 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Mulia E-17 123,370.00
18 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Mulia E-18 120,870.00
19 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Mulia E-19 125,870.00
20 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Mulia E-20 120,870.00
21 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Mulia E-21 120,870.00
22 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Mulia E-22 125,870.00
23 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-23 116,370.00
24 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Mulia E-24 121,370.00
25 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Mulia E-25 128,370.00
26 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Mulia E-26 126,870.00
27 1 M2 Pasang Dinding Keramik 10 x 20 Cm Corak setara Roman E-27 140,870.00
28 1 M2 Pasang Dinding Keramik 10 x 20 Cm Polos setara Roman E-28 126,370.00
29 1 M2 Pasang Dinding Keramik 20 x 20 Cm Corak setara Roman E-29 143,870.00
30 1 M2 Pasang Dinding Keramik 20 x 20 Cm polos setara Roman E-30 126,370.00
31 1 M2 Pasang Dinding Keramik 20 x 25 Cm polos setara Roman E-31 136,870.00
32 1 M2 Pasang Dinding Keramik 20 x 25 Cm Corak setara Roman E-32 142,370.00
33 1 M2 Pasang Dinding Keramik 30 x 30 Cm polos setara Roman E-33 136,870.00
34 1 M2 Pasang Dinding Keramik 30 x 30 Cm corak setara Roman E-34 140,870.00
35 1 M2 Pasang Dinding Keramik 40 x 40 Cm polos setara Roman E-35 140,870.00
36 1 M2 Pasang Dinding Keramik 40 x 40 Cm corak setara Roman E-36 145,870.00
36 1 M2 Pasang Dinding Keramik 20 x 40 Cm corak setara Roman E-36 143,870.00
37 1 M2 Pasang Dinding Marmer E-37 798,910.00
38 1 M2 Pasang Dinding Batu Tempel Hitam E-38 102,930.00
39 1 M2 Pasang Dinding Poslin 11 x 11 Cm E-39 130,870.00
40 1 M2 Wall paper E-40 111,630.00
41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan E-41 364,190.00
42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan E-42 478,310.00
43 1 M2 Dinding Pemisah Triplek Rangkap, Rangka Kayu Kamper Medan E-43 313,620.00
44 1 M2 Dinding Pemisah GRC tb. 4 mm + rangka besi hollow E-44 103,050.00
45 1 M2 Dinding Pemisah Gypsum dobel tb. 9 mm + rangka besi hollow E-45 215,790.00
46 1 M2 Dinding Plywood tb. 4 mm + rangka besi hollow E-46 157,410.00
47 1 M2 Dinding Teakwood tb. 4 mm + rangka besi hollow E-47 115,550.00
48 1 M2 Pasang Dinding Glass Block 20 x 20 ad. 1pc : 4 ps E-48 925,760.00
49 1 M2 Pasang Dinding Anyaman Bambu, rangka kayu E-49 117,660.00

F PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm F-01 43,170.00
2 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm F-02 40,510.00
3 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm F-03 38,780.00
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm + Acian 37,910.00
4 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm F-04 56,320.00
5 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm F-05 53,530.00
6 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm F-06 50,910.00
7 1 M2 Barapen 1 Pc : 5 Ps, Tebal 15 mm F-07 30,470.00
8 1 M2 Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm F-08 52,790.00
9 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm F-09 50,080.00
10 1 M2 Plesteran Skoning 1 Pc : 2 Ps, Tebal 10 mm F-10 40,800.00
11 1 M2 Acian Plesteran F-11 24,960.00
12 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps batu belah F-12 45,730.00
13 1 M2 Plesteran Siar Adukan 1 Pc : 2 Ps dinding bata merah F-13 26,700.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
G PEKERJAAN PENUTUP ATAP
1 1 M2 Pasang Atap Genteng Pelentong G-01 66,620.00
1 M2 Pasang Atap Genteng Pelentong Existing (Lama) 16,620.00
2 1 M2 Pasang Genteng Bubungan Palentong G-02 95,110.00
3 1 M2 Pasang Roof Ligt Fiberglass ( 180 x 90 ) Cm G-03 82,420.00
4 1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.05 m ) x 4 mm G-04 49,110.00
5 1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.05 m ) x 4 mm G-05 52,330.00
6 1 M2 Pasang Atap Asbes Gelombang ( 2.40 x 1.05 m ) x 4 mm G-06 50,210.00
7 1 M2 Pasang Atap Asbes Gelombang ( 2.10 x 1.05 m ) x 4 mm G-07 51,510.00
8 1 M2 Pasang Atap Asbes Gelombang besar 80 x 180 x 5 mm G-08 103,750.00
9 1 M' Pasang Nok Stel Gelombang 1.05 m G-09 102,750.00
10 1 M2 Pasang Atap Genteng Beton G-10 123,420.00
11 1 M2 Pasang Atap Genteng Morando Natural G-11 70,620.00
12 1 M2 Pasang Atap Genteng Morando Glasur G-12 97,620.00
13 1 M2 Pasang Atap Genteng Metal G-13 255,580.00
14 1 M' Pasang Nok Genteng Beton G-14 123,150.00
15 1 M' Pasang Nok Genteng Metal G-15 198,500.00
16 1 M2 Pasang Atap Seng Gelombang G-16 77,760.00
17 1 M2 Pasang Atap Nok Seng G-17 33,710.00
18 1 M2 Pasang Alluminium Foil / Sisalation G-18 35,630.00
19 1 M2 Pasang Atap Alluminium Natural G-19 226,810.00
20 1 M2 Pasang Atap Alluminium Warna G-20 255,690.00
21 1 M2 Pasang Nol Alluminium G-21 173,280.00
22 1 M' Pasang Listplang GRC lebar 30 Cm G-22 49,230.00
1 M' Pasang Listplang GRC lebar 30 Cm , tebal 9 mm 67,070.00
23 1 M' Pasang Nok Pinggir Morando Natural G-23 32,720.00
1 M' Pasang Bubungan Stel Gelombang 0.92 m 40,050.00
1 M' Pasang Nok Sirap 79,840.00
1 M' Pasang Genteng Bubungan Morando Naatural 96,610.00
1 M' Pasang Genteng Bubungan Morando Glazur 110,610.00
1 M2 Pasang Water Proofing Membrance tb. 3 mm 137,620.00

H PEKERJAAN LANGIT - LANGIT


1 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 5 mm H-01 35,330.00
2 1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 3.5 mm H-02 31,480.00
3 1 M2 Langit - langit Akustik (60x120) Cm H-03 233,020.00
4 1 M2 Langit - langit Akustik 60x120 Cm dan Rangka alluminium H-04 330,610.00
5 1 M2 Langit - Langit Teakwood (60 x 120) cm, t = 4 mm + Rangka kayu Borneo Super H-05 1,444,720.00
6 1 M2 Langit - Langit Teakwood 3 mm + Rangka kayu Borneo Super H-06 1,443,750.00
7 1 M2 Langit - Langit Triplek 4 mm + Rangka kayu Borneo Super H-07 1,414,890.00
8 1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 2/4 H-08 105,690.00
1 M2 Langit - Langit Gypsum Board, tb. 9 mm + Rangka Besi Hollow Galvalum 4/4, 4/4 H-08 106,770.00
9 1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 2/4 H-09 103,050.00
1 M2 Langit - Langit GRC, tb. 4 mm + Rangka Besi Hollow Galvalum 4/4, 4/4 H-09 104,130.00
1 M2 Langit - Langit Triplek 4 mm 46,680.00
10 1 M2 Langit - Langit Gypsum Board, tb. 9 mm H-10 61,510.00
11 1 M2 Langit - Langit GRC, tb. 4 mm H-11 58,530.00
12 1 M1 List Langit - langit Kayu Profil 10 cm H-12 41,760.00
13 1 M1 List Langit - langit Gypsum 10 cm H-13 19,020.00
14 1 M1 List Langit - langit kayu borneo 1/4 cm H-14 10,450.00

I PEKERJAAN PENUTUP LANTAI


1 M2 Pasang Lantai Granito Tile Essenza Ukuran 60 x 60 Cm Polis 483,570.00
1 1 M2 Pasang Lantai Ubin Granito Ukuran 40x40 cm setara Essenza I-01 465,950.00
2 1 M2 Pasang Lantai Ubin Granito Ukuran 30x30 cm setara Essenza I-02 444,630.00
3 1 M' Pasang Plin Ubin Granito Ukuran 10x40 cm setara Essenza I-03 16,510.00
4 1 M' Pasang Plin Ubin Granito Ukuran 10x30 cm setara Essenza I-04 24,900.00
5 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Mulia I-05 107,370.00
6 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Mulia I-06 109,870.00
7 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Mulia I-07 100,370.00
8 1 M2 Pasang Lantai Keramik 30 x 30 cm Corak setara Mulia I-08 105,370.00
9 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Mulia I-09 112,370.00
10 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Mulia I-10 110,870.00
11 1 M2 Pasang Lantai Keramik 10x20 cm Corak setara Roman I-11 124,870.00
12 1 M2 Pasang Lantai Keramik 20x20 cm Corak setara Roman I-12 127,870.00
13 1 M2 Pasang Lantai Keramik 30 x 30 cm Polos setara Roman I-13 120,870.00
14 1 M2 Pasang Lantai Keramik 30 x 30 cm corak setara Roman I-14 124,870.00
15 1 M2 Pasang Lantai Keramik 40x40 cm polos setara Roman I-15 124,870.00
16 1 M2 Pasang Lantai Keramik 40x40 cm Corak/Warna setara Roman I-16 129,870.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
17 1 M2 Lantai Marmer I-17 751,700.00
18 1 M2 Pasang Lantai Parguet Jati I-18 536,880.00
19 1 M Plint Keramik ukuran 10 x 40 cm I-19 22,610.00
20 1 M Plint Keramik ukuran 10 x 30 cm I-20 32,240.00
21 1 M Plint kayu kamper Samarinda 2 x 10 cm I-21 42,140.00
22 1 M Plint Keramik ukuran 10 x 20 cm I-22 34,920.00
23 1 M2 Lantai karpet I-23 447,570.00
24 1 M2 Paving Block Natural 8 cm I-24 171,860.00
25 1 M2 Paving Block Warna 8 cm I-25 203,570.00
26 1 M2 Paving Block Natural 6 cm I-26 165,880.00
27 1 M2 Paving Block Warna 6 cm I-27 177,430.00
28 1 M2 Grass Block 20 x 20 I-28 358,970.00
29 1 M2 Grass Block 30 x 30 I-29 251,980.00

J PEKERJAAN KAYU
1 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Samarinda J-01 13,247,500.00
2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kamper Medan/Kruing J-02 9,361,900.00
3 1 M3 Pasang Kusen Pintu dan Jendela Kayu Borneo Super J-03 8,819,500.00
4 1 M2 Pasang Pintu Panel Kayu Kamper Samarinda J-04 651,320.00
5 1 M2 Pasang Pintu Panel Kayu Kamper Medan/Kruing J-05 523,680.00
6 1 M2 Pasang Daun Jendela Kaca Kayu Kamper Medan J-06 309,080.00
7 1 M2 Pasang Pintu dan Jendela Kaca Kayu Borneo J-07 428,440.00
8 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan J-08 753,470.00
9 1 M2 Pasang Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan/Kruing J-09 401,410.00
10 1 M2 Pasang Jalusi Mati Kusen kayu Kamper Medan J-10 587,570.00
11 1 M2 Pasang Daun Pintu Triplek Rangkap, Rangka Kayu Kamper J-11 401,410.00
12 1 M2 Pasang Daun Pintu Teakwood Rangkap, Rangka Kayu Kamper Medan J-12 484,390.00
13 1 M2 Pasang Pintu dobel Plywood lapis HPL, Rangka Kayu Kamper Medan J-13 561,790.00
14 1 M2 Pasang Pintu Teakwood lapis HPL , Rangka Kayu Kamper Medan J-14 709,540.00
15 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Kamper Medan J-15 8,570,900.00
16 1 M3 Pasang Konstruksi Kuda - Kuda Kayu Borneo J-16 8,073,700.00
17 1 M2 Pasang Kaso dan Reng Genteng Plentong kayu Kamper Medan J-17 93,660.00
18 1 M2 Pasang Kaso dan Reng Genteng Beton kayu Kamper J-18 106,190.00
19 1 M' Pasang Lisplang (3x20) Cm, Kayu Kamper Medan J-19 70,040.00
20 1 M' Pasang Lisplang (3x30) Cm, Kayu Kamper Medan J-20 96,610.00
21 1 M' Pasang List Plafon - Kayu Profil 10 cm J-21 37,140.00
22 7,26 M2 Kusen Partisi Dobel Triplek J-22 188,230.00
23 1 M2 Pasang Rangka Langit - langit (1.00x1.00) m, Kayu Kamper J-23 113,460.00
24 1 M2 Pasang Rangka Langit - langit (0.50 x 1.00) m, Kayu Borneo J-24 134,090.00
25 1 M1 Reuter Kayu Kamper Medan J-25 47,770.00
26 1 M3 Gording kayu kelas II J-26 8,135,300.00
27 1 M2 Dinding bilik, rangka kayu borneo J-27 76,710.00
1 M2 Pasang Pintu Panel Multiplek 9 mm rangka kayu Kamper Medan / Kruing 498,300.00

K PEKERJAAN PENUTUP BESI & ALLUMUNIUM


1 1 Kg Besi profil K-01 36,660.00
2 1 Kg pekerjaan perakitan K-02 1,000.00
3 1 Cm Pengelasan dengan las listrik K-03 3,630.00
4 1 M2 Pasang Pintu Rolling Door K-04 520,140.00
5 1 M2 Pasang Pintu Alluminium Natural K-05 385,690.00
6 1 M2 Pasang Terali Besi K-06 234,980.00
7 1 M2 Pasang Kawat Harmonika K-07 63,550.00
8 1 M' Pasang Talang Datar, Seng Bjls 28 lebar 90 cm K-08 131,630.00
9 1 M' Pasang Talang Miring, Seng Bjls 28 lebar 90 cm K-09 194,450.00
10 1 M' Pasang Talang 1/2 Lingkaran D -15 cm, seng pelat BJLS 28 lebar 90 cm K-10 192,260.00
11 1 M1 Pasang Kusen pintu/jendela allumunium natural 4" K-11 198,460.00
12 1 M1 Pasang Kusen pintu/jendela allumunium warna 4" K-12 212,760.00
13 1 M1 Pasang Kusen pintu/jendela allumunium natural 3" K-13 113,320.00
14 1 M1 Pasang Kusen pintu/jendela allumunium warna 3" K-14 138,730.00
15 1 M1 Pintu Allumunium strip lebar 8 cm K-15 943,730.00
16 1 M1 Pintu/jendela kaca rangka allumunium natural 4" K-16 808,340.00
17 1 M1 Pintu/jendela kaca rangka allumunium warna 4" K-17 865,540.00
18 1 M2 Jendela Nako & Teralis (10 klips) K-18 437,430.00
19 1 M2 Pintu besi plat baja tebal 2 mm rangkap, rangka baja siku K-19 1,292,300.00
20 1 m2 Rangka jendela besi scuare tube ( 5 x 5 ) cm K-20 288,950.00
21 1 M2 Pasang Pintu Lipat K-21 704,590.00
22 1 M2 Tirai ( Venetions Blinds and vertical blinds) K-22 642,890.00
1 M2 Rangka atap baja ringan 196,000.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
1 M2 Pasang Jendela Besi 581,990.00
1 M2 Pasang Jendela Besi Tahan Api 714,480.00
1 M2 Pasang Pintu Gulung Besi 726,410.00
1 M2 Pasang Pintu Sunscreen Alluminium 486,400.00
1 M2 Pasang Kawat Nyamuk 31,300.00
1 M2 Pasang Kawat Kassa 71,340.00
1 M2 Pasang Kawat Burung 49,340.00
1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 24 167,330.00
1 UNIT Pasang Partisi Alumunium, Daun Partisi Multiplek rangka kayu Kamper 2,523,050.00
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela 3,610,720.00
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu ) 4,625,460.00
1 UNIT Pek. Kusen Pintu Alumunium uk. 0,8 X 2,70 M' 2,533,250.00
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela 4,429,370.00
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu ) 5,867,990.00
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu ) 3,541,770.00
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu ) 3,631,840.00
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu ) 3,460,510.00
1 UNIT Pek. Jalusi Alumunium Sofi-sofi 1,393,320.00
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m 869,920.00
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m 1,005,590.00
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m 1,434,960.00
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m 1,864,330.00
1 UNIT Pek. Kusen Jendela Alumunium uk. 1,35 X 1,60 M' ( 2 lubang ) dgn 1 Daun Jendela 2,513,340.00
1 UNIT Pek. Kusen Jendela Alumunium uk. 0,70 X 1,60 M' ( 1 lubang ) dgn 1 Daun Jendela 1,612,180.00
1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,80 M' (KM/WC) 2,639,920.00
1 UNIT Pek. Kusen Pintu Alumunium uk. 0,90 X 2,15 M' (KM/WC) 2,214,860.00
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 2,40 X 2,80 M' ( 2 Daun Pintu ) Kantor 6,600,680.00
1 UNIT Pek. Kusen Pintu Alm. Doble Triplek Lapis Formika uk. 0,8 X 2,80 M' 2,888,140.00

L PEKERJAAN KUNCI DAN KACA


1 1 Buah Pasang Kunci Tanam 2 slaag L-01 233,570.00
2 1 Buah Pasang Kunci Tanam Biasa L-02 176,390.00
3 1 Buah Pasang Kunci Tanam Kamar Mandi L-03 139,940.00
4 1 Buah Pasang Engsel Pintu L-04 35,860.00
5 1 Buah Pasang Engsel Jendela Kupu - Kupu L-05 25,010.00
6 1 Buah Pasang Engsel Jendela Kupu - Kupu L-06 20,760.00
7 1 Buah Pasang Door Closer L-07 504,560.00
8 1 Buah Pasang Pegangan Pintu / Door Holder L-08 268,560.00
9 1 M2 Pasang Kaca, Tebal 3 mm L-09 118,580.00
10 1 M2 Pasang Kaca, Tebal 5 mm L-10 147,070.00

M PEKERJAAN SANITASI
1 1 Buah Closet Jongkok Proselen Standar M-01 416,750.00
2 1 Buah Urinoir M-02 2,694,980.00
3 1 Buah Wastafel M-03 1,110,050.00
4 1 Buah Bak Mandi Fibreflass volume 0,30 M3 M-04 693,730.00
5 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm M-05 181,030.00
6 1 Buah Bak kontrol Pas. Bata Merah Uk (60 x 60) cm M-06 713,760.00
7 1 Buah Bak kontrol Pas. Bata Merah Uk (30 x 30) cm M-07 474,160.00
8 1 M Pipa PVC Type AW " M-08 24,450.00
9 1 M Pipa PVC Type AW 1" M-09 33,570.00
10 1 M Pipa PVC Type AW 1" M-10 51,790.00
11 1 M Pipa PVC Type AW 2" M-11 55,840.00
1 M Pipa PVC Type AW 2" 79,710.00
1 M Pipa PVC Type AW 3" 103,380.00
12 1 M Pipa PVC Type AW 4" M-12 162,100.00
13 1 M Pipa PVC Type AW " M-13 38,780.00
14 1 Buah Bak Cuci Piring Stainles Steel M-14 464,030.00
15 1 Buah Kran " atau " M-15 54,000.00
16 1 Buah Floor Drain M-16 82,390.00
17 1 M' Grafel beton U 20 cm -60 cm M-17 85,660.00
18 1 M' Pasang Talang Plastik PVC U 15 cm (AW) M-18 133,710.00
19 1 M' Saluran Air Limbah Buis beton 60 cm M-19 239,190.00
20 1 M' Pasang Talang Seng Datar M-20 85,910.00
21 1 Buah Closet Duduk M-21 1,795,970.00
22 1 Buah Tangki Air fibreglass Volume 1 m3 M-22 1,847,190.00
23 1 Unit Septictank 2 x 1,50 x 1,50 M + Rembesannya M-23 10,232,610.00
24 1 Unit Septictank 1 x 1,50 x 1,50 M + Rembesannya M-24 5,573,030.00
1 M Pipa Galvanis " 45,460.00
KODE HARGA
No. URAIAN SATUAN
ANAL SATUAN
1 M Pipa Galvanis " 60,310.00
1 M Pipa Galvanis 1" 66,850.00
1 M Pipa Galvanis 1" 105,050.00
1 M Pipa Galvanis 3" 274,150.00
1 M Pipa Galvanis 4" 283,670.00
1 Buah Bak kontrol Pas. Batu Bata (45 x 45) cm, Tinggi 50 cm 373,120.00
1 M' Saluran Air Hujan Lbr. 20 cm 84,470.00
1 M' Perbaikan Saluran Air Hujan Lbr. 20 cm 36,250.00

N PEKERJAAN PENGECATAN
1 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama N-01 12,230.00
2 1 M2 Mendempul dan Menggosok Kayu N-02 10,360.00
3 1 M2 Pengecatan Bidang Kayu dan Besi lama Setara Glotex N-03 28,630.00
1 M2 Pengecatan Bidang Kayu lama Setara Pinotex 29,750.00
4 1 M2 Pengecatan Bidang Kayu Baru Setara Glotex 3 X laburan N-04 45,410.00
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve 2 X laburan 34,720.00
5 1 M2 Pelaburan Bidang Kayu dengan Politur N-05 71,440.00
6 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter N-06 10,360.00
7 1 M2 Pengecatan Tembok Setara ICI Exterior (weather shield) N-07 47,810.00
8 1 M2 Pengecatan Tembok Lama Setara ICI Weather Shield N-08 33,860.00
9 1 M2 Pengecatan Plafond ( 3x ) setara ICI N-09 64,650.00
10 1 M2 Pengecatan Plafond ( 3x ) setara Vinilex N-10 51,650.00
1 M2 Pengecatan Plafond ( 2x ) setara Vinilex N-10r 34,590.00
11 1 M2 Pemasangan Wall Paper N-11 120,820.00
12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi N-12 21,300.00
13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah N-13 43,000.00
14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um N-14 28,420.00
15 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan) N-15 35,530.00
1 M2 Pengecatan Tembok Setara Vinilex (2 x laburan) N-15r 26,680.00
16 1 M2 Pengecatan Tembok Lama Setara Vinilex 16 14,510.00

O PEKERJAAN PENANAMAN POHON


1 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2 m O-01 31,610.00
2 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang O-02 59,110.00
3 1 Lubang (40x40x40) cm, tanam pohon perdu (polibag) O-03 13,130.00
4 1 M2 Tanam rumput gajah (silang papan catur) O-04 12,370.00
PERIHAL : BILL OF QUANTITY
PROYEK : pekerjaan timbunan sirtu
ALAMAT : TAMAN AIR

Upah dan
NO. ITEM PEKERJAAN VOLUME SAT. Bahan Upah Margin 40%
bahan
(Rp.) (Rp.)
PEKERJAAAN TIMBUNAAN DEPAN RESTO DENGAN KARAK DAN BATU GULI
I PEKERJAAN PERSIAPAN
Pembersihan lapangan 1.00 ls 200,000 200,000 280,000

II Pekerjaan Pembuatan km/wc


1 pengadaan batu guli 7.00 m3 250,000 - 250,000 287,500
2 Tanah Karak 7.00 m3 115,000 - 115,000 132,250
3 batu bata 450.00 buah 500 - 500 575
4 pasir 1.00 truck 250,000 - 250,000 287,500
5 semen 2.00 zak 50,000 - 50,000 57,500
6 Upah 1.00 lot - 740,000 740,000 851,000
- -
HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

200,000 200,000

Subtotal A 200,000

250,000 1,750,000
115,000 805,000
500 225,000
250,000 250,000
50,000 100,000
740,000 740,000
- -
Subtotal B 3,870,000
Grand Total 4,070,000