Analisa hasil perhitungan dengan SAP 2000

 Data pembebanan pada SAP2000 :


 Beban guna bangunan Gedung Sekolah = 250 kg/m2
 Beban atap miring akibat air hujan = 20 kg/m2
 Beban atap akibat pekerja = 100 kg/m2
 Beban pasangan dinding = 250 kg/m
 Beban spesi, keramik dan plafond = 105 kg/m2

 Spesifikasi bangunan
 Mutu beton = K-275 = fc’ 22,825 Mpa
 Mutu tulangan = U-24 = fy 240 Mpa; Fu 390 Mpa
= U-39 = fy 390 Mpa; Fu 550 Mpa
 Input Data SAP
 Baja
Modulus Elastisitas (E) = 200.000 Mpa
Angka Poison (µ) = 0,3
Koefisien Pemuaian (α) = 1,17 x 10-5/°C
Tegangan Leleh Baja (Fy) = 240 Mpa
Tegangan Putus Baja (Fu) = 370 Mpa
 Beton
Modulus Elastisitas (E) = 20.000 Mpa
Angka Poison (µ) = 0,2
Mutu Beton (Fc’) = 22,825 Mpa
 Concrete Frame Design Preferences
Design Code = ACI 318-99
Time History Design = Envelopes
Phi (Bending-Tension) = 0,8
Phi (Compression Tied) = 0,65
Phi (Compression Spiral) = 0,7
Phi (Shear) = 0,6
Pattern Live Load Factor = 0,75
Utilization Factor Limit = 0,95
Spesifikasi Beton Spesifikasi Tulangan Polos (BJTP U-24)

Spesifikasi Tulangan Ulir (BJTD U-39)


Gambar 3D

pembebanan pada plat dan balok


Hasil analisis dari SAP 2000
A. Perhitungan plat lantai

momen ultimit min dan max pada plat


dimensi plat = 2,75 x 2,25 m
tebal plat = 12 mm
Mutu beton = K-275 = fc’ 22,825 Mpa
Mutu tulangan Wiremesh = U-50 = fyw 500 Mpa

𝑙𝑦
= 𝑙𝑥 < 2 → (two way slab)

2,75
= 2,25 = 1,2222 < 2 → (two way slab)

Momen lapangan ultimit max (Mu Min) dari sap 2000 = 540 kgm
Momen tumpuan ultimit max (Mu max) dari sap 2000 = 1117 kgm

Diketahui spek plat bangunan menggunakan wiremesh = M8 – 150


untuk Wiremesh M8 – 150 dihitung luasan per m2
(As) = (¼ x π x d2) x 1000 / 150
= (¼ x π x 82) x 1000 / 150
= 334,93 mm2

Konversi wiremesh ke tulangan konvensional

𝑓𝑦𝑤
As butuh = As wiremesh x 𝑓𝑦𝑑
5000
= 334,93 x 4000
= 418,67 mm2
b = 1000 mm
d = 120 – 30 = 90 mm
As = ρ . b . d
418 mm2 = ρ . 1000 . 90
ρ = 0,004652

𝑓𝑐′
ρ = 𝑤 . 𝑓𝑦
𝑓𝑦
w = ρ . 𝑓𝑐′
240
w = 0,004652 . 22,825
w = 0,048915

1−2,353 .𝑅𝑛
w = 0,85 (1 − √ )
𝑓𝑐 ′

1−2,353 .𝑅𝑛
0,048915 = 0,85 (1 − √ )
22,825
Rn = 1,084328
𝑀𝑛 𝑥 106
Rn = 𝜙 𝑥 𝑏 𝑥 𝑑2
𝑀𝑛 𝑥 106
1,084328 = 0,8 𝑥 1000 𝑥 902
Mn = 7,026445 kNm = 702,6445 kgm

 Kontrol plat
Momen nominal > Momen ultimit
702,6445 kgm > 540 kgm .... OK

B. Perhitungan balok induk (B1)

momen lapangan ultimit max pada balok B1


Momen lapangan ultimit max (Mu lap max) dari sap 2000 = 7228,82 kgm

Dimensi balok induk = 30 x 40 cm


Mutu beton = K-275 = fc’ 22,825 Mpa
Mutu tulangan = U-24 = fy 240 Mpa
= U-39 = fy 390 Mpa

 Balok lapangan
As = ¼ x π x d2
= ¼ x π x 162
= 200,19 mm2

Tulangan atas = 4 – D16 = 803,84 mm2


Tulangan bawah = 6 – D16 = 1205,76 mm2

b = 300 mm
d = 400 – 50 = 350 mm
As =ρ.b.d
1205,76 mm2 = ρ . 300 . 350
ρ = 0,011483
𝑓𝑐′
ρ = 𝑤 . 𝑓𝑦
𝑓𝑦
w = ρ . 𝑓𝑐′
240
w = 0,011483 . 22,825
w = 0,120746
1−2,353 .𝑅𝑛
w = 0,85 (1 − √ )
𝑓𝑐 ′

1−2,353 .𝑅𝑛
0,120746 = 0,85 (1 − √ )
22,825

Rn = 2,560207

𝑀𝑛 𝑥 106
Rn = 𝜙 𝑥 𝑏 𝑥 𝑑2
𝑀𝑛 𝑥 106
2,560207 = 0,8 𝑥 300 𝑥 3502
Mn = 87,8151 kNm = 8781,51 kgm

 Kontrol balok bagian lapangan


Momen nominal > Momen ultimit
8781,51 kgm > 7228,82 kgm .... OK
 Balok tumpuan

Momen tumpuan ultimit max (Mu tum max) dari sap 2000 = 8191,21 kgm

Tulangan atas = 6 – D16 = 1205,76 mm2


Tulangan bawah = 4 – D16 = 803,84 mm2
b = 300 mm
d = 400 – 50 = 350 mm
As = ρ . b . d
1205,76 mm2 = ρ . 350 . 500
ρ = 0,0130857
𝑓𝑐′
ρ = 𝑤 . 𝑓𝑦
𝑓𝑦
w = ρ . 𝑓𝑐′
240
w = 0,011483 . 22,825
w = 0,120746
1−2,353 .𝑅𝑛
w = 0,85 (1 − √ )
𝑓𝑐 ′

1−2,353 .𝑅𝑛
0,120746 = 0,85 (1 − √ )
22,825

Rn = 2,56
𝑀𝑛 𝑥 106
Rn = 𝜙 𝑥 𝑏 𝑥 𝑑2
𝑀𝑛 𝑥 106
2,56 = 0,8 𝑥 300 𝑥 3502
Mn = 87,8151 kNm = 8781,51 kgm

 Kontrol balok bagian tumpuan


Momen nominal > Momen ultimit
8781,51 kgm > 8191,21 kgm .... OK
 Cek tulangan geser

Gaya geser dari Sap 2000 (Vu max) = 37,71 kN


Dimensi balok induk = 30 x 40 cm
Mutu beton = K-275 = fc’ 22,825 Mpa
Mutu tulangan = U-24 = fy 240 Mpa
= U-39 = fy 390 Mpa

Kuat geser yg disumbangkan beton balok induk


Vc = 1/6 x √𝑓𝑐′ x b x d
= 1/6 x √22,825 x 300 x 400
= 95551 N = 95,551 kN
Ø Vc = 0,6 x 95,551
= 57,33 kN
0,5 Ø Vc = 0,5 x 0,6 x 95,551
= 28,8653 KN

Vu > 0,5 Ø Vc → perlu tulangan geser


0,5 Ø Vc < Vu < Ø Vc → Digunakan Tulangan Minimum

Tulangan Sengkang Ø 10 = ¼ x π x 102


= 78,5 mm2 x 2
= 157 mm2
3 𝑥 𝐴𝑣 𝑥 𝑓𝑦
Smin = 𝑏
3 𝑥 157 𝑥 240
= 300
= 376,8 mm

Tulangan sengkang rencana Ø 10 -100 < Ø 10 – 375 . . . OK

C. Perhitungan balok anak B2

momen lapangan ultimit max pada balok B2


Momen lapangan ultimit max (Mu lap max) dari sap 2000 = 1853,18 kgm

Dimensi balok induk = 20 x 30 cm


Mutu beton = K-275 = fc’ 22,825 Mpa
Mutu tulangan = U-24 = fy 240 Mpa
= U-39 = fy 390 Mpa

 Balok lapangan
As = ¼ x π x d2
= ¼ x π x 162
= 200,19 mm2

Tulangan atas = 3 – D16 = 600,57 mm2


Tulangan bawah = 5 – D16 = 1000,95 mm2

b = 200 mm
d = 300 – 50 = 250 mm
As =ρ.b.d
1000,95 mm2 = ρ . 200 . 250
ρ = 0,020019
𝑓𝑐′
ρ = 𝑤 . 𝑓𝑦
𝑓𝑦
w = ρ . 𝑓𝑐′
240
w = 0,020019 .
22,825
w = 0,210496
1−2,353 .𝑅𝑛
w = 0,85 (1 − √ )
𝑓𝑐 ′

1−2,353 .𝑅𝑛
0,210496 = 0,85 (1 − √ )
22,825

Rn = 4,20955

𝑀𝑛 𝑥 106
Rn = 𝜙 𝑥 𝑏 𝑥 𝑑2
𝑀𝑛 𝑥 106
4,20955 = 0,8 𝑥 200 𝑥 2502
Mn = 73,667 kNm = 7366,712 kgm

 Kontrol balok bagian lapangan


Momen nominal > Momen ultimit
7366,712 kgm > 1853,83 kgm .... OK

 Balok tumpuan

Momen tumpuan ultimit max (Mu tum max) dari sap 2000 = 2135,53 kgm

Tulangan atas = 5 – D16 = 1000,95 mm2


Tulangan bawah = 3 – D16 = 600,57 mm2

b = 200 mm
d = 300 – 50 = 250 mm
As =ρ.b.d
1000,95 mm2 = ρ . 200 . 250
ρ = 0,020019
𝑓𝑐′
ρ = 𝑤 . 𝑓𝑦
𝑓𝑦
w = ρ . 𝑓𝑐′
240
w = 0,020019 . 22,825
w = 0,210496
1−2,353 .𝑅𝑛
w = 0,85 (1 − √ )
𝑓𝑐 ′

1−2,353 .𝑅𝑛
0,210496 = 0,85 (1 − √ )
22,825

Rn = 4,20955

𝑀𝑛 𝑥 106
Rn = 𝜙 𝑥 𝑏 𝑥 𝑑2
𝑀𝑛 𝑥 106
4,20955 = 0,8 𝑥 200 𝑥 2502

Mn = 73,667 kNm = 7366,712 kgm

 Kontrol balok bagian tumpuan


Momen nominal > Momen ultimit
7366,712 kgm > 2135,53 kgm .... OK

 Cek tulangan geser

Gaya geser dari Sap 2000 (Vu max) = 9,35 kN


Dimensi balok induk = 20 x 30 cm
Mutu beton = K-275 = fc’ 22,825 Mpa
Mutu tulangan = U-24 = fy 240 Mpa
= U-39 = fy 390 Mpa

Kuat geser yg disumbangkan beton balok induk


Vc = 1/6 x √𝑓𝑐′ x b x d
= 1/6 x √22,825 x 200 x 300
= 47775,5 N = 47,775 kN
Ø Vc = 0,6 x 47,775
= 28,665 kN
0,5 Ø Vc = 0,5 x 0,6 x 95,551
= 14,33 KN

Vu < 0,5 Ø Vc → Tidak perlu tulangan geser

Tulangan Sengkang Ø 10 = ¼ x π x 102


= 78,5 mm2 x 2
= 157 mm2
3 𝑥 𝐴𝑣 𝑥 𝑓𝑦
Smin = 𝑏
3 𝑥 157 𝑥 240
= 200
= 565,2 mm

Tulangan sengkang rencana Ø 10 -100 < Ø 10 – 565 . . . OK

D. Perhitungan kolom K1

Axial ultimit max pada kolom K1

Dimensi kolom K1 = 50 x 50 cm
Mutu beton = K-275 = fc’ 22,825 Mpa
Mutu tulangan = U-24 = fy 240 Mpa
= U-39 = fy 390 Mpa
Tegangan ultimit max kolom K1 dari sap 2000 = 128,95 Ton

Ag = 500 x 500 = 250000 mm2


Ast = 12 x ¼ x π x D16
= 12 x ¼ x π x 16
= 2413 mm2

 Kuat tekan rencana kolom


Pn = 0,8 φ (0,85 fc’ (Ag – Ast) + fy . Ast)
= 0,8 . 0,65 (0,85 x 22,825 x (250000 – 2413) + 390 x 2413)
= 2987,175 kN
= 298,7175 ton

 Kontrol kolom K1
tekan nominal > tekan ultimit
298,7175 ton > 128,95 ton .... OK

E. Perhitungan Pondasi

TABLE: Joint Reactions


Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
Text Text Text Kgf Kgf Kgf Kgf-m Kgf-m Kgf-m
1 1D+1L Combination 2368.99 2057.33 75998.17 1050 -5188.78 652.41
13 1D+1L Combination 1072.88 468.82 79255.34 -874.9 -836.58 474.25
25 1D+1L Combination 1117.6 3.77 76671.38 -8.77 -87.08 -50.94
37 1D+1L Combination 1298.84 196.72 80571.45 187.15 267 -51.33
49 1D+1L Combination 1142.07 -827.27 59111.59 -991.56 -1633.35 -54.53
109 1D+1L Combination 1686.78 1155.44 85395.16 127.41 -1112.4 -467.08
121 1D+1L Combination -244.43 38.29 90296.2 240.05 -517.91 -587.55
133 1D+1L Combination -326.83 -196.54 86993.58 434.27 -762.09 -50.01
145 1D+1L Combination 175.07 383.35 102187.74 -18.81 -99.45 -50.03
157 1D+1L Combination 310.86 -1629.48 97394.38 1338.24 233.52 -51.75
217 1D+1L Combination -1617.14 590.51 59650.46 1703.75 289.76 -52.73
229 1D+1L Combination -1810.71 -543.54 82039.89 632.54 -1652.38 -50.85
241 1D+1L Combination -1590.78 -369.18 77611.43 845.65 -1262.07 -50.74
253 1D+1L Combination -1999.41 84.21 89652.59 788.96 -1479.53 -49.58
265 1D+1L Combination -1583.78 -1412.42 67898.52 66.67 1072.2 -49.2

Diameter Strouss Pile Rencana = 40 cm


Kedalaman Strouss Rencana = 3,00 m
Nilai Konus Kedalaman 3,00 m = 50 kg/cm2
Ap = ¼ x π x D2
= ¼ x π x 402
= 1256 cm2

𝑄𝑐 𝑥 𝐴𝑝
Qall =
𝐹𝑎𝑐𝑡𝑜𝑟 𝑆𝑎𝑓𝑒𝑡𝑦
50 𝑥 1256
=
3
= 20933,33 kg/cm2

TABLE: Joint Reactions Daya Dukung Jumlah Strouss


Joint OutputCase F3 Tahanan Tanah Yang Diperlukan
Text Text Kgf Kgf/cm2 Buah Buah
1 1D+1L 75998.17 20933.33333 3.630486 4

13 1D+1L 79255.34 20933.33333 3.786083 4

25 1D+1L 76671.38 20933.33333 3.662646 4

37 1D+1L 80571.45 20933.33333 3.848955 4

49 1D+1L 59111.59 20933.33333 2.823802 3

109 1D+1L 85395.16 20933.33333 4.079387 5

121 1D+1L 90296.2 20933.33333 4.313513 5

133 1D+1L 86993.58 20933.33333 4.155744 5

145 1D+1L 102187.74 20933.33333 4.88158 5

157 1D+1L 97394.38 20933.33333 4.652598 5

217 1D+1L 59650.46 20933.33333 2.849544 3

229 1D+1L 82039.89 20933.33333 3.919103 4

241 1D+1L 77611.43 20933.33333 3.707552 4

253 1D+1L 89652.59 20933.33333 4.282767 5

265 1D+1L 67898.52 20933.33333 3.24356 4

Kesimpulan :
Jumlah Strouss yg dibutuhkan untuk 1
Pondasi adalah maksimal 5 buah pada
Kedalaman 3 meter karena 1 tiang
strouss mampu menahan 21 ton
sedangkan tanah keras terdapat pada
kedalaman 7,8 meter. Alternatif lain
adalah menggunakan tiang pancang
minipile.