RENCANA ANGGARAN BIAYA

KEGIATAN #REF!
PEKERJAAN : PEMBANGUNAN RUMAH DINAS BPP BLANGPIDIE
LOKASI #REF!
TAHUN ANGGARAN #REF!

JUMLAH
NO JENIS PEKERJAAN VOLUME/SAT ANALISA HARGA SATUAN
HARGA
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Pkt Taksir 850,000.00 850,000.00
2 Pemasangan Bowplank 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
3 Direksi Keet / Sewa Gudang 1.00 Unt Taksir 1,000,000.00 1,000,000.00
4 Administrasi & Dokumentasi 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
5 Papan Nama Kegiatan 1.00 Unt Taksir 650,000.00 650,000.00
Jumlah I 5,500,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 42.60 M³ A.1 31,425.00 1,338,705.00
2 Urugan Bekas Galian 14.20 M³ A.11 12,826.50 182,136.30
3 Urugan Tanah Bawah Lantai 35.81 M³ A.12 102,855.00 3,683,237.55
4 Urugan Pasir dibawah Lantai 13.79 M³ A.12a 90,570.00 1,248,675.00
Jumlah II 6,452,753.85

III PEKERJAAN PASANGAN DAN BETON


1 Aanstamping 9.80 M³ G.I.1 10,260.00 100,548.00
2 Pasangan Pondasi Batu Kali 20.83 M³ G.I.5 623,430.00 12,982,929.75
3 Lantai Kerja 1 : 3 : 5 0.54 M³ G.XIII.12 727,371.00 392,780.34
4 Pasangan Trasraam Bata 1 : 2 49.48 M² G.II.2 133,914.10 6,626,069.67
5 Pasangan Bata Pelapis Kolom 1 : 2 20.00 M² G.II.2 133,914.10 2,678,282.00
6 Pasangan Bata 1 : 4 257.10 M² G.II.4 116,624.10 29,984,540.33
7 Plesteran 1 : 2 108.98 M² G.X.2 37,480.50 4,084,624.89
8 Plesteran 1 : 4 514.21 M² G.X.4 33,105.50 17,023,123.01
Jumlah III 73,872,897.99

IV PEKERJAAN BETON BERTULANG


1 Kolom Utama 20 X 20 cm 2.24 M³ G.XIV.6 5,850,640.12 13,105,433.87
2 Kolom Praktis 13 x 13 cm 1.04 M³ G.XIV.2 6,641,389.54 6,907,045.12
3 Balok Sloof 20 x 25 cm 3.50 M³ G.XIV.3a 4,839,996.21 16,939,986.74
4 Ring Balok 13 x 15 1.71 M³ G.XIV.20 5,022,004.14 8,587,627.08
Jumlah IV 45,540,092.80

V PEKERJAAN LANTAI
1 Lantai Tumbuk 1 : 3 : 5 T= 5 cm 93.00 M² H. 2 65,512.00 6,092,616.00
2 Pas. Keramik 40 x40 cm (Dalam Ruangan) 78.00 M² H. 4 122,583.00 9,561,474.00
3 Pas. Keramik 40 x40 cm (Selasar) 15.00 M² H. 4 122,583.00 1,838,745.00
4 Pas. Keramik 30 x 30 cm (Tangga) 5.64 M² H. 5 113,683.00 641,172.12
5 Lantai Keramik 20 x 25 cm KM/WC 6.00 M² H. 9 113,683.00 682,098.00
6 Pas. Dinding Keramik 20 x 25 cm, t = 1.50 m 17.99 M² H. 8 136,911.00 2,463,028.89
7 Stop Nossing Keramik 44.70 M' Taksir 25,000.00 1,117,500.00
Jumlah V 22,396,634.01

VI PEKERJAAN KAYU DAN ATAP


1 Rangka Kayu Kuda - Kuda + Gording 3.02 M³ F14 5,991,300.00 18,093,726.00
2 Kosen Pintu,Jendela Dan Ventilasi 2.61 M³ F16 5,633,666.00 14,703,868.26
3 Daun Pintu Panel 8.00 Bh Taksir 650,000.00 5,200,000.00
4 Daun Pintu Panel 1/2 Lapis Seng 2.00 Bh Taksir 450,000.00 900,000.00
5 Daun Jendela + Kaca Terpasang 14.00 Bh Taksir 400,000.00 5,600,000.00
6 Ventilasi Kaca Untuk KM/WC 2.00 Bh Taksir 250,000.00 500,000.00
7 Ventilasi Moyet 12.00 Bh Taksir 115,000.00 1,380,000.00
8 Lysplank Papan 2.5/30 cm 22.36 M² F12 58,577.50 1,309,792.90
9 Papan Jalusi Terpasang 140.00 Bh Taksir 15,000.00 2,100,000.00
10 Plat Strip & Baut Untuk Kuda - Kuda 1.00 Pkt Taksir 450,000.00 450,000.00
Jumlah VI 50,237,387.16

VII PEKERJAAN PENGUNCI , PENUTUP DAN


PENGGANTUNG
1 Atap Seng Motief Genteng 167.99 M² J. 3 84,671.95 14,224,040.88
2 Rabung Seng Motief Genteng 14.00 M' J. 4 38,543.25 539,605.50
3 Plafon Tryplek 4 mm 126.84 M² F1 87,390.00 11,084,547.60
4 Engsel Pintu 20.00 Bh Taksir 17,000.00 340,000.00
5 Engsel Jendela 28.00 Bh Taksir 15,000.00 420,000.00
6 Kunci Pintu Tanam 2 Slag 10.00 Bh Taksir 115,000.00 1,150,000.00
7 Pacok Jendela 28.00 Bh Taksir 17,500.00 490,000.00
8 Kait Angin 28.00 Bh Taksir 12,500.00 350,000.00
Jumlah VII 28,598,193.98
1 2 3 4 5 6

VIII PEKERJAAN CAT


1 Cat Tembok Emulsion 623.19 M² I. 3 16,620.80 10,357,888.16
2 Cat Plafond Trypleks 126.84 M² Anl. G.53 18,812.50 2,386,177.50
3 Cat Kilat Kosen & Lysplank 96.35 M² Anl. K10+K23+K28 32,421.60 3,123,821.16
4 Residu Kuda - Kuda 61.54 M² I. 18 23,300.00 1,433,882.00
Jumlah VIII 17,301,768.82
IX PEKERJAAN INSTALASI LISTRIK
1 Pemasukan Arus Listrik, 6 amph 2.00 Pkt Taksir 3,500,000.00 7,000,000.00
2 Titik Api 14.00 Ttk Taksir 75,000.00 1,050,000.00
3 Jaringan Instalasi Listirk 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
4 Lampu TL 40 Watt (Philips) 4.00 Bh Taksir 106,950.00 427,800.00
5 Lampu HE 20 Watt (Philips) 10.00 Bh Taksir 51,150.00 511,500.00
6 Stop Kontak 8.00 Bh Taksir 15,500.00 124,000.00
7 Saklar Ganda 2.00 Bh Taksir 17,500.00 35,000.00
8 Saklar Tunggal 8.00 Bh Taksir 15,500.00 124,000.00
9 Panel Zakering 2.00 Bh Taksir 125,000.00 250,000.00
Jumlah IX 11,022,300.00
X PEKERJAAN SANITASI AIR
1 Pekerjaan Pipa Ketok Galvanis 1.00 Unt Taksir 5,000,000.00 5,000,000.00
2 Pengadaan Pompa Air Listrik 1.00 Bh Taksir 750,000.00 750,000.00
3 Instalasi Air Bersih 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
4 Instalasi Air Kotor 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
5 Klosed Jongkok 2.00 Bh Taksir 141,100.00 282,200.00
6 Floor Drain 2.00 Bh Taksir 17,600.00 35,200.00
7 Kran Air 2.00 Bh Taksir 29,400.00 58,800.00
8 Septictank + Bak Kontrol + Resepan 1.00 Unt Taksir 3,500,000.00 3,500,000.00
Jumlah X 12,126,200.00
XI PEKERJAAN LAIN - LAIN
1 Relief Bangunan 1.00 Pkt Taksir 3,000,000.00 3,000,000.00
2 Pemasukan Arus Gedung BPP Blangpidie, 6 amph 1.00 Pkt Taksir 3,500,000.00 3,500,000.00
3 Pembersihan Akhir 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
Jumlah XI 7,500,000.00
Sub Total 280,548,228.62
RENCANA ANGGARAN BIAYA
(RAB)

SATKER : KABUPATEN ACEH BARAT DAYA


PEKERJAAN : PEMBANGUNAN KAPAL PERIKANAN
LOKASI : KOTA PUSONG
TAHUN ANGGARAN : 2013
NILAI RAB : 640.000.000,00
TERBILANG : Enam Ratus Empat Puluh Juta Rupiah

Jumlah Harga
No Uraian Pekerjaan JENIS / TYPE Volume / Sat. Analisa Harga Sat.
( Rp )
( Rp)

Panjang Kapal = 14 m
Lebar Kapal = 3,2 m
Dalam Kapal = 1,10 m

I LAMBUNG KAPAL & ANJUNGAN


1 Kayu lunas (0,20x0,20x16m) Meranti/Seumantok 1.00 batang Taksir 1,600,000 1,600,000.00
2 Linggi haluan (0,20x0,30x6m) Mane/Halaban 1.00 batang Taksir 1,000,000 1,000,000.00
3 Linggi buritan (0,30x0,30x1,5m) Mane/Halaban 1.00 batang Taksir 600,000 600,000.00
4 Pisang-pisang (0,06x0,16x22m) Seumantok 4.00 batang Taksir 600,000 2,400,000.00
5 Naga-naga (0,06x0,18x22m) Seumantok 12.00 batang Taksir 600,000 7,200,000.00
6 Gading-gading sambung (0,12x0,14x2m) Mane/Halaban 1.00 shipset Taksir 6,800,000 6,800,000.00
7 Gading-gading dasar (0,12x0,14x2m) Mane/Halaban 1.00 shipset Taksir 8,400,000 8,400,000.00
8 Pengapit lunas (0,06x0,15x16m) Seumatok/Meranti 1.00 batang Taksir 240,000 240,000.00
9 Gading-gading serampak (0,12x0,14x1m) Mane/Halaban 1.00 shipset Taksir 200,000 200,000.00
10 Papan lambung/deck (0,030x0,20x14m) Meranti 90.00 lembar Taksir 120,000 10,800,000.00
11 Pintu nahkoda
- Pintu nahkoda kecil Meranti 2.00 buah Taksir 350,000 700,000.00
- Pintu nahkoda besar Meranti 2.00 buah Taksir 750,000 1,500,000.00
12 Balok/bantalan deck (0,10x0,12x4m) Seumantok 2.00 m3 Taksir 2,100,000 4,200,000.00
13 Tiang rumah
- Ukuran 0,10x0,10x5m Meranti 0.64 m3 Taksir 1,340,000 857,600.00
- Ukuran 0,05x0,10x5m Meranti 0.75 m3 Taksir 1,580,000 1,185,000.00
14 Reng kayu (0,5x10x5m) Mane/Halaban 30.00 batang Taksir 105,000 3,150,000.00
15 Papan punggung (0,05x0,40x5m) 1.00 batang Taksir 134,000 134,000.00
16 Balok pondasi mesin (0,25x0,25x4m) 2.00 batang Taksir 750,000 1,500,000.00
17 Baut dan mur linggi 22mm x 38cm 18.00 batang Taksir 25,000 450,000.00
18 Baut dan mur sambungan 150.00 batang Taksir 17,500 2,625,000.00
gading-gading 16mm x 25cm
19 Baut dan mur lunas/gading-gading 60.00 batang Taksir 32,000 1,920,000.00
16mm x 36cm
20 Baut dan mur pisang-pisang 16mm x 22cm 150.00 batang Taksir 16,000 2,400,000.00
21 Baut dan mur naga-naga 16mm x 26mm 300.00 batang Taksir 18,000 5,400,000.00
22 Baut dan mur palka 16mm x 26cm 150.00 batang Taksir 18,000 2,700,000.00
23 Baut dan mur tiang bangunan 16mm x 26cm 100.00 batang Taksir 18,000 1,800,000.00
24 Baut dan mur pondasi mesin 24mm x 42cm 30.00 batang Taksir 42,500 1,275,000.00
25 Baut dan mur galvanis 24mm x 25cm koker 6.00 batang Taksir 75,000 450,000.00
26 Paku galvanis 3 1/2" s/d 12cm 360.00 kg Taksir 17,000 6,120,000.00
27 Paku galvanis lapik seng 1 inchi 80.00 kg Taksir 17,000 1,360,000.00
28 Seng alumunium 1,0 mm (Lambung kapal) 50.00 lembar Taksir 140,000 7,000,000.00
29 Seng alumunium 0,5 mm (Dipakai atap) 20.00 lembar Taksir 95,000 1,900,000.00
30 Aspal 1.00 drum Taksir 1,200,000 1,200,000.00
31 Tali goni 50.00 kg Taksir 15,000 750,000.00
32 Damar 70.00 kg Taksir 7,500 525,000.00
33 Cat 70.00 kaleng Taksir 45,000 3,150,000.00
34 Tinner 10.00 kg Taksir 12,000 120,000.00
35 Minyak tanah 70.00 liter Taksir 4,500 315,000.00
36 Jendela kaca 1.00 shipset Taksir 300,000 300,000.00
37 karpet 5 mm 25.00 meter Taksir 15,000 375,000.00
38 Poly giling 1.00 unit Taksir 4,500,000 4,500,000.00
39 Poly tegak 1.00 unit Taksir 1,250,000 1,250,000.00
40 Poly tidur 1.00 unit Taksir 1,500,000 1,500,000.00
41 Gardan + Perlengkapan 1.00 unit Taksir 14,544,838.70 14,544,838.70
43 Hancuran (Buluh-buluh) 1.00 unit Taksir 650,000 650,000.00
44 Kayu dudukan poly 0.40 x 0.40 x 1.20m 1.00 shipset Taksir 1,800,000 1,800,000.00
45 Besi Pinggiran Kapal 4.00 batang Taksir 1,500,000 6,000,000.00
47 Kayu Balok Untuk Jangkar 0.20 x 0.30 x3m 1.00 batang Taksir 200,000 200,000.00
48 Kayu Balok Untuk Jensed 0.20 x 0.30 x 3m 2.00 batang Taksir 200,000 400,000.00
Jumlah 125,446,438.70

II MESIN DAN PERLENGKAPAN

1 Mesin induk 1.00 unit Taksir 110,000,000 110,000,000.00


2 Gear box 1.00 unit Taksir 24,800,000 24,800,000.00
3 Cooler dan perlengkapannya 1.00 shipset Taksir 8,500,000 8,500,000.00
Jumlah Harga
Harga Sat.
No Uraian Pekerjaan JENIS / TYPE Volume / Sat. Analisa
( Rp )
( Rp)

4 Cocer/sarung as kuningan 3 1/4" lengkap 1.00 shipset Taksir 5,100,000 5,100,000.00


5 As besi putih 3" panjang 2,8m lengkap 1.00 shipset Taksir 7,300,000 7,300,000.00
6 Selang kanvas 20.00 meter Taksir 22,500 450,000.00
7 Tali kipas 1.00 unit Taksir 125,000 125,000.00
8 Fanbelt 1.00 meter Taksir 200,000 200,000.00
9 Propeller 30-32 1.00 unit Taksir 1,800,000 1,800,000.00
10 Pompa keong 2.00 unit Taksir 500,000 1,000,000.00
11 Sambungan knalpot 1.00 unit Taksir 550,000 550,000.00
12 Gagang handle lengkap 1.00 shipset Taksir 1,125,000 1,125,000.00
13 Tali gas 6.00 meter Taksir 550,000 3,300,000.00
14 Letter U 1.00 shipset Taksir 700,000 700,000.00
15 Elbow 1.00 unit Taksir 125,000 125,000.00
16 Kemudi lengkap 1.00 shipset Taksir 325,000 325,000.00
17 Sarung kemudi 1.00 unit Taksir 400,000 400,000.00
18 Pipa gagang kemudi 1.00 unit Taksir 250,000 250,000.00
19 Plen poli 1.00 unit Taksir 350,000 350,000.00
20 As kiri kanan 2.00 unit Taksir 225,000 450,000.00
21 Baut kunus 2.00 unit Taksir 60,000 120,000.00
22 Baut stainles 2.00 unit Taksir 75,000 150,000.00
23 Spi kuningan 2.00 unit Taksir 75,000 150,000.00
24 Lobang spi kiri kanan 2.00 unit Taksir 75,000 150,000.00
25 Kelengkapan baut mesin 20.00 biji Taksir 800,000 16,000,000.00
26 Kepala As 1.00 unit Taksir 350,000 350,000.00
Jumlah 183,770,000.00

III PERLENGKAPAN LISTRIK

1 Mesin bantu 1.00 unit Taksir 9,800,000 9,800,000.00


2 Dinamo 10 KW 1.00 unit Taksir 5,500,000 5,500,000.00
3 Pompa keong 1.5" 1.00 unit Taksir 625,000 625,000.00
4 Corong kuningan (prom) 1.1/4" 1.00 buah Taksir 125,000 125,000.00
5 Kran kuningan 1.1/4 1.00 buah Taksir 80,000 80,000.00
6 Instalasi Listrik 1.00 shipset Taksir 600,000 600,000.00
7 Lampu sorot 1000 w 10.00 buah Taksir 1,500,000 15,000,000.00
8 Batterai 60 A 1.00 buah Taksir 750,000 750,000.00
9 Lampu navigasi 1.00 shipset Taksir 750,000 750,000.00
10 Lampu-lampu 1.00 shipset Taksir 400,000 400,000.00
Jumlah 33,630,000.00

IV PERLENGKAPAN NAVIGASI

1 GPS 1.00 unit Taksir 2,750,000 2,750,000.00


2 Fish Finders 1.00 unit Taksir 4,100,000 4,100,000.00
3 Kompas 1.00 unit Taksir 700,000 700,000.00
Jumlah 7,550,000.00

V PERLENGKAPAN TAMBAHAN

1 Jangkar 45 kg 1.00 buah Taksir 1,250,000 1,250,000.00


2 Tali Jangkar 20 mm 1.00 bal Taksir 1,275,000 1,275,000.00
3 Palkah Fiber (2,5 x 3 x 1,2m) 2.00 unit Taksir 4,125,000 8,250,000.00
4 Tangki BBM 2.00 buah Taksir 2,000,000 4,000,000.00
5 Jerigen Air Bersih/BBM 30.00 buah Taksir 40,000 1,200,000.00
Pipa besi 3.1/4
6 Pipa besi kapal
lambung 3.1/4 kiri
lambung kanan galvanis 2.00 batang Taksir 1,050,000 2,100,000.00
7 galvanis 1.00 batang Taksir 350,000 350,000.00
8 Life jacket (Plampung) 15.00 buah Taksir 130,000 1,950,000.00
9 Damprah ban bekas 4.00 buah Taksir 50,000 200,000.00
10 Surat /dokumen Kapal 1.00 berkas Taksir 2,500,000 2,500,000.00
11 Surat /dokumen Kapal 1.00 shipset Taksir 1,250,000 1,250,000.00
12 Bendera Nasional 1.00 buah Taksir 100,000 100,000.00
13 Perahu dayung 1.00 unit Taksir 1,800,000 1,800,000.00
Jumlah 26,225,000.00

VI JASA GALANGAN KAPAL


1 Jasa Galangan Kapal 1 Ls Taksir 30,000,000 30,000,000.00
Jumlah 30,000,000.00
Jumlah Harga
Harga Sat.
No Uraian Pekerjaan JENIS / TYPE Volume / Sat. Analisa
( Rp )
( Rp)

VII ALAT TANGKAP PURSE SEINE

1 Jaring nilon ukuran 1 inchi no.12 6.00 set Taksir 4,100,000 24,600,000.00
2 Jaring nilon ukuran 2 inchi no.12 10.00 set Taksir 3,400,000 34,000,000.00
3 Jaring nilon ukuran 3 inchi no.12 7.00 set Taksir 3,300,000 23,100,000.00
4 Jaring nilon ukuran 4 inchi no.12 4.00 set Taksir 3,200,000 12,800,000.00
5 Batu timah 500.00 Kg Taksir 30,000 15,000,000.00
6 Tali meudang no.24 15.00 set Taksir 350,000 5,250,000.00
7 Pelampung 1,400.00 biji Taksir 12,500 17,500,000.00
8 Tali kaja 8 mm 11.00 bal Taksir 281,700 3,098,700.00
Tali Kaja 10 mm 5.00 bal Taksir 344,300 1,721,500.00
9 Tali kaja batu 12 mm 5.00 bal Taksir 438,200 2,191,000.00
10 Cincin 6 inchi 50.00 biji Taksir 60,000 3,000,000.00
11 Tali ikat pukat 36mm 10.00 bal Taksir 260,000 2,600,000.00
12 Tali katrol
30 mm 2.00 bal Taksir 3,250,000 6,500,000.00
28 mm 3.00 bal Taksir 2,750,000 8,250,000.00
13 Biaya rakit/pasang 1.00 Ls Taksir 9,000,000 9,000,000.00
Jumlah 168,611,200.00

VIII SEA / FISHING TRIAL

1 BBM 500.00 liter Taksir 6,500 3,250,000.00


2 Logistik ABK untuk 3 hari 1.00 paket Taksir 4,500,000 4,500,000.00
3 Es batangan 60.00 batang Taksir 27,500 1,650,000.00
4 Air Minum 10.00 jerigen Taksir 5,000 50,000.00
5 Aqua Galon 10.00 galon Taksir 50,000 500,000.00
6 Lain-lain 1.00 paket Taksir 700,000 700,000.00
Jumlah 10,650,000.00

Kota Pusong, ............... 201


Kepala Dinas Kelautan dan Perikanan
Kota Pusong

...............
......................
REKAPITULASI
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE

SATKER : KABUPATEN ACEH BARAT DAYA


PEKERJAAN : PEMBANGUNAN KAPAL PERIKANAN
LOKASI : KOTA PUSONG
TAHUN ANGGARAN : 2013
NILAI RAB : 640.000.000,00
TERBILANG : Enam Ratus Empat Puluh Juta Rupiah

No. URAIAN PEKERJAAN JUMLAH HARGA

I LAMBUNG KAPAL & ANJUNGAN Rp. 125,446,438.70


II MESIN DAN PERLENGKAPAN Rp. 183,770,000.00
III PERLENGKAPAN LISTRIK Rp. 33,630,000.00
IV PERLENGKAPAN NAVIGASI Rp. 7,550,000.00
V PERLENGKAPAN TAMBAHAN Rp. 26,225,000.00
VI JASA GALANGAN KAPAL Rp. 30,000,000.00
VII ALAT TANGKAP PURSE SEINE Rp. 168,611,200.00
VIII SEA / FISHING TRIAL Rp. 10,650,000.00

Sub Total Rp. 585,882,638.70


PPn 10 % Rp. 58,588,263.87
Sub Total Rp. 644,470,902.57
Dibulatkan Rp. 640,000,000.00

Terbilang : Enam Ratus Empat Puluh Juta Rupiah.

Kota Pusong, ............... 201


Kepala Dinas Kelautan dan Perikanan
Kota Pusong

...............
......................
DAFTAR ANALISA HARGA SATUAN
I. PEKERJAAN PERSIAPAN
RSNI T-12-2002-B4
1 M' Pengukuran dan Pemasangan Bowplank
0.012 M3 Kayu Kasau 5/7 @Rp 3,000,000.00 Rp. 36,000.00
0.007 M3 Papang 3/20 @Rp 3,000,000.00 Rp. 21,000.00
0.020 Kg Paku 2" - 5" @Rp 15,000.00 Rp. 300.00
0.100 OH Pekerja @Rp 42,500.00 Rp. 4,250.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.005 OH Mandor @Rp 57,500.00 Rp. 287.50
Jumlah Rp. 67,687.50
Dibulatkan Rp. 67,687.00

RSNI T-12-2002-B8
1 M2 Membersihkan Lapangan dan Perataan
0.100 OH Pekerja @Rp 42,500.00 Rp. 4,250.00
0.050 OH Mandor @Rp 57,500.00 Rp. 2,875.00
Jumlah Rp. 7,125.00
Dibulatkan Rp. 7,125.00

RSNI T-12-2002-B12
1 M2 Pembuatan Jalan Sementara
0.150 M3 Batu Belah 15/20 @Rp 115,000.00 Rp. 17,250.00
0.090 M3 Batu Pecah 5/7 @Rp 130,000.00 Rp. 11,700.00
0.010 M3 Pasir Pasang @Rp 110,000.00 Rp. 1,100.00
1.000 OH Pekerja @Rp 42,500.00 Rp. 42,500.00
0.050 OH Mandor @Rp 57,500.00 Rp. 2,875.00
Jumlah Rp. 75,425.00
Dibulatkan Rp. 75,425.00

RSNI T-12-2002-B13
1 M3 Bongkaran Beton Bertulang
6.667 OH Pekerja @Rp 42,500.00 Rp. 283,347.50
0.333 OH Mandor @Rp 57,500.00 Rp. 19,147.50
Jumlah Rp. 302,495.00
Dibulatkan Rp. 302,495.00

RSNI T-12-2002-B14
1 M3 Bongkaran Dinding Tembok Bata Merah
6.667 OH Pekerja @Rp 42,500.00 Rp. 283,347.50
0.333 OH Mandor @Rp 57,500.00 Rp. 19,147.50
Jumlah Rp. 302,495.00
Dibulatkan Rp. 302,495.00

II. PEKERJAAN TANAH


SNI DT-91-0006-2007-6.1
1 M3 Galian tanah biasa sedalam 1 m
0.750 OH Pekerja @Rp 42,500.00 Rp. 31,875.00
0.025 OH Mandor @Rp 57,500.00 Rp. 1,437.50
Jumlah Rp. 33,312.50
Dibulatkan Rp. 33,312.00

SNI DT-91-0006-2007-6.2
1 M3 Galian tanah biasa sedalam 2 m
0.900 OH Pekerja @Rp 42,500.00 Rp. 38,250.00
0.045 OH Mandor @Rp 57,500.00 Rp. 2,587.50
Jumlah Rp. 40,837.50
Dibulatkan Rp. 40,837.00

SNI DT-91-0006-2007-6.3
1 M3 Galian tanah biasa sedalam 3 m
1.050 OH Pekerja @Rp 42,500.00 Rp. 44,625.00
0.067 OH Mandor @Rp 57,500.00 Rp. 3,852.50
Jumlah Rp. 48,477.50
Dibulatkan Rp. 48,477.00

SNI DT-91-0006-2007-6.9
1 M3 Urugan Tanah Kembali
0.250 OH Pekerja @Rp 42,500.00 Rp. 10,625.00
0.008 OH Mandor @Rp 57,500.00 Rp. 479.17
Jumlah Rp. 11,104.17
Dibulatkan Rp. 11,104.00
SNI DT-91-0006-2007-6.10
1 M3 Pemadatan Tanah
0.500 OH Pekerja @Rp 42,500.00 Rp. 21,250.00
0.050 OH Mandor @Rp 57,500.00 Rp. 2,875.00
Jumlah Rp. 24,125.00
Dibulatkan Rp. 24,125.00

SNI DT-91-0006-2007-6.11
1 M3 Mengurug Pasir Urug
1.200 M3 Pasir Urug @Rp 80,000.00 Rp. 96,000.00
0.300 OH Pekerja @Rp 42,500.00 Rp. 12,750.00
0.010 OH Mandor @Rp 57,500.00 Rp. 575.00
Jumlah Rp. 109,325.00
Dibulatkan Rp. 109,325.00

SNI DT-91-0006-2007-6.16
1 M3 Mengurug Tanah Timbun
1.200 M3 Tanah urug @Rp 60,000.00 Rp. 72,000.00
0.300 OH Pekerja @Rp 42,500.00 Rp. 12,750.00
0.010 OH Mandor @Rp 57,500.00 Rp. 575.00
Jumlah Rp. 85,325.00
Dibulatkan Rp. 85,325.00

III. PEKERJAAN PONDASI


SNI DT-91-0007-2007-6.9
1 M3 Pasangan Batu Kosong (aanstamping)
1.200 M3 Batu Kali @Rp 120,000.00 Rp. 144,000.00
0.432 M3 Pasir Urug @Rp 80,000.00 Rp. 34,560.00
0.780 OH Pekerja @Rp 42,500.00 Rp. 33,150.00
0.390 OH Tukang @Rp 52,500.00 Rp. 20,475.00
0.039 OH Kepala Tukang @Rp 60,000.00 Rp. 2,340.00
0.039 OH Mandor @Rp 57,500.00 Rp. 2,242.50
Jumlah Rp. 236,767.50
Dibulatkan Rp. 236,768.00

SNI DT-91-0007-2007-6.2
1 M3 Pasangan Batu Kali 1 PC : 4 PS
1.200 M3 Batu Kali @Rp 120,000.00 Rp. 144,000.00
0.520 M3 Pasir Pasang @Rp 110,000.00 Rp. 57,200.00
163.000 Kg Semen Portland @Rp 1,250.00 Rp. 203,750.00
1.500 Org Pekerja @Rp 42,500.00 Rp. 63,750.00
0.600 Org Tukang @Rp 52,500.00 Rp. 31,500.00
0.060 Org Kepala Tukang @Rp 60,000.00 Rp. 3,600.00
0.075 Org Mandor @Rp 57,500.00 Rp. 4,312.50
Jumlah Rp. 508,112.50
Dibulatkan Rp. 508,113.00

SNI DT-91-0007-2007-6.10
1 M3 Pondasi Beton Cyclopen 1 : 2 : 3 + 40% Batu Belah
0.312 M3 Pasir Beton @Rp 115,000.00 Rp. 35,880.00
0.480 M3 Batu Belah 15 cm/20 cm @Rp 115,000.00 Rp. 55,200.00
0.468 M3 Kerikil Beton @Rp 125,000.00 Rp. 58,500.00
194.000 Kg Semen Portland @Rp 1,250.00 Rp. 242,500.00
3.000 Org Pekerja @Rp 42,500.00 Rp. 127,500.00
0.850 Org Tukang @Rp 52,500.00 Rp. 44,625.00
0.085 Org Kepala Tukang @Rp 60,000.00 Rp. 5,100.00
0.150 Org Mandor @Rp 57,500.00 Rp. 8,625.00
Jumlah Rp. 577,930.00
Dibulatkan Rp. 577,930.00

SNI DT-91-0007-2007-6.11a
1 M3 Pondasi Sumuran diameter 100 cm
0.450 M3 Batu Belah 15 cm/20 cm @Rp 115,000.00 Rp. 51,750.00
0.312 M3 Pasir Beton @Rp 115,000.00 Rp. 35,880.00
0.468 M3 Kerikil Beton @Rp 125,000.00 Rp. 58,500.00
194.000 Kg Semen Portland @Rp 1,250.00 Rp. 242,500.00
2.380 Org Pekerja @Rp 42,500.00 Rp. 101,150.00
0.300 Org Tukang @Rp 52,500.00 Rp. 15,750.00
0.030 Org Kepala Tukang @Rp 60,000.00 Rp. 1,800.00
0.080 Org Mandor @Rp 57,500.00 Rp. 4,600.00
Jumlah Rp. 511,930.00
Dibulatkan Rp. 511,930.00

SNI DT-91-0007-2007-6.11b
1 M3 Pondasi Sumuran diameter 60 cm
0.27 M3 Batu Belah 15 cm/20 cm @Rp 115,000.00 Rp. 31,050.00
0.1872 M3 Pasir Beton @Rp 115,000.00 Rp. 21,528.00
0.2808 M3 Kerikil Beton @Rp 125,000.00 Rp. 35,100.00
116.4 Kg Semen Portland @Rp 1,250.00 Rp. 145,500.00
1.428 Org Pekerja @Rp 42,500.00 Rp. 60,690.00
0.18 Org Tukang @Rp 52,500.00 Rp. 9,450.00
0.018 Org Kepala Tukang @Rp 60,000.00 Rp. 1,080.00
0.048 Org Mandor @Rp 57,500.00 Rp. 2,760.00
Jumlah Rp. 307,158.00
Dibulatkan Rp. 307,158.00
IV. PEKERJAAN BETON
SNI DT-91-0008-2007-6.1
1 M3 Beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
869.000 Kg Pasir Beton @Rp 82.14 Rp. 71,382.14
999.000 Kg Kerikil Beton @Rp 92.59 Rp. 92,500.00
247.000 Kg Semen Portland @Rp 1,250.00 Rp. 308,750.00
215.000 Liter Air @Rp 75.00 Rp. 16,125.00
1.650 OH Pekerja @Rp 42,500.00 Rp. 70,125.00
0.275 OH Tukang @Rp 52,500.00 Rp. 14,437.50
0.028 OH Kepala Tukang @Rp 60,000.00 Rp. 1,680.00
0.083 OH Mandor @Rp 57,500.00 Rp. 4,772.50
Jumlah Rp. 579,772.14
Dibulatkan Rp. 579,772.00

SNI DT-91-0008-2007-6.5
1 M3 Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,68
760.000 Kg Pasir Beton @Rp 82.14 Rp. 62,428.57
1,029.000 Kg Kerikil Beton (Maximum 30 mm) @Rp 92.59 Rp. 95,277.78
326.000 Kg Semen Portland @Rp 1,250.00 Rp. 407,500.00
215.000 Liter Air @Rp 75.00 Rp. 16,125.00
1.650 OH Pekerja @Rp 42,500.00 Rp. 70,125.00
0.275 OH Tukang @Rp 52,500.00 Rp. 14,437.50
0.028 OH Kepala Tukang @Rp 60,000.00 Rp. 1,680.00
0.083 OH Mandor @Rp 57,500.00 Rp. 4,772.50
Jumlah Rp. 672,346.35
Dibulatkan Rp. 672,346.00

SNI DT-91-0008-2007-6.8
1 M3 Beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
692.000 Kg Pasir Beton @Rp 82.14 Rp. 56,842.86
1,039.000 Kg Kerikil Beton (Maximum 30 mm) @Rp 92.59 Rp. 96,203.70
384.000 Kg Semen Portland @Rp 1,250.00 Rp. 480,000.00
215.000 Liter Air @Rp 75.00 Rp. 16,125.00
1.650 OH Pekerja @Rp 42,500.00 Rp. 70,125.00
0.275 OH Tukang @Rp 52,500.00 Rp. 14,437.50
0.028 OH Kepala Tukang @Rp 60,000.00 Rp. 1,680.00
0.083 OH Mandor @Rp 57,500.00 Rp. 4,772.50
Jumlah Rp. 740,186.56
Dibulatkan Rp. 740,187.00

SNI DT-91-0008-2007-6.9
1 M3 Beton mutu f'c = 24 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
684.000 Kg Pasir Beton @Rp 82.14 Rp. 56,185.71
1,026.000 Kg Kerikil Beton (Maximum 30 mm) @Rp 92.59 Rp. 95,000.00
406.000 Kg Semen Portland @Rp 1,250.00 Rp. 507,500.00
215.000 Liter Air @Rp 75.00 Rp. 16,125.00
1.650 OH Pekerja @Rp 42,500.00 Rp. 70,125.00
0.275 OH Tukang @Rp 52,500.00 Rp. 14,437.50
0.028 OH Kepala Tukang @Rp 60,000.00 Rp. 1,680.00
0.083 OH Mandor @Rp 57,500.00 Rp. 4,772.50
Jumlah Rp. 765,825.71
Dibulatkan Rp. 765,826.00

SNI DT-91-0008-2007-6.17
1 Kg Besi Polos
1.050 Kg Besi beton Polos @Rp 11,500.00 Rp. 12,075.00
0.015 Kg Kawat beton @Rp 19,500.00 Rp. 282.75
0.007 OH Pekerja @Rp 42,500.00 Rp. 297.50
0.007 OH Tukang @Rp 52,500.00 Rp. 367.50
0.0007 OH Kepala Tukang @Rp 60,000.00 Rp. 42.00
0.0004 OH Mandor @Rp 57,500.00 Rp. 23.00
Jumlah Rp. 13,087.75
Dibulatkan Rp. 13,088.00

SNI DT-91-0008-2007-6.18
1 Kg Besi Ulir
1.050 Kg Besi beton Ulir @Rp 26,000.00 Rp. 27,300.00
0.015 Kg Kawat beton @Rp 19,500.00 Rp. 292.50
0.007 OH Pekerja @Rp 42,500.00 Rp. 297.50
0.007 OH Tukang @Rp 52,500.00 Rp. 367.50
0.0007 OH Kepala Tukang @Rp 60,000.00 Rp. 42.00
0.0004 OH Mandor @Rp 57,500.00 Rp. 23.00
Jumlah Rp. 28,322.50
Dibulatkan Rp. 28,323.00

SNI DT-91-0008-2007-6.20
1 M2 Bekisting untuk Pondasi
0.040 M3 Kayu Kelas III @Rp 3,000,000.00 Rp. 120,000.00
0.300 Kg Paku 5 cm - 10 cm @Rp 15,000.00 Rp. 4,500.00
0.100 Liter Minyak bekisting @Rp 17,500.00 Rp. 1,750.00
0.520 OH Pekerja @Rp 42,500.00 Rp. 22,100.00
0.260 OH Tukang @Rp 52,500.00 Rp. 13,650.00
0.026 OH Kepala Tukang @Rp 60,000.00 Rp. 1,560.00
0.026 OH Mandor @Rp 57,500.00 Rp. 1,495.00
Jumlah Rp. 165,055.00
Digunakan 2 kali Pakai Rp. 82,527.50
Dibulatkan Rp. 82,528.00
SNI DT-91-0008-2007-6.21
1 M2 Bekisting untuk Sloof
0.045 M3 Kayu Kelas III @Rp 3,000,000.00 Rp. 135,000.00
0.300 Kg Paku 5 cm - 10 cm @Rp 15,000.00 Rp. 4,500.00
0.100 Liter Minyak bekisting @Rp 17,500.00 Rp. 1,750.00
0.520 OH Pekerja @Rp 42,500.00 Rp. 22,100.00
0.260 OH Tukang @Rp 52,500.00 Rp. 13,650.00
0.026 OH Kepala Tukang @Rp 60,000.00 Rp. 1,560.00
0.026 OH Mandor @Rp 57,500.00 Rp. 1,495.00
Jumlah Rp. 180,055.00
Digunakan 2 Kali Pakai Rp. 90,027.50
Dibulatkan Rp. 90,028.00

SNI DT-91-0008-2007-6.22
1 M2 Bekisting untuk Kolom
0.040 M3 Kayu Kelas III @Rp 3,000,000.00 Rp. 120,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 15,000.00 Rp. 6,000.00
0.200 Liter Minyak bekisting @Rp 17,500.00 Rp. 3,500.00
0.015 M3 Balok Kayu Kelas II @Rp 3,500,000.00 Rp. 52,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 180,000.00 Rp. 63,000.00
2.000 Batang Dolken Kayu ø 8-10 panjang 4 m @Rp 4,500.00 Rp. 9,000.00
0.660 OH Pekerja @Rp 42,500.00 Rp. 28,050.00
0.330 OH Tukang @Rp 52,500.00 Rp. 17,325.00
0.033 OH Kepala Tukang @Rp 60,000.00 Rp. 1,980.00
0.033 OH Mandor @Rp 57,500.00 Rp. 1,897.50
Jumlah Rp. 303,252.50
Digunakan 2 x Rp. 151,626.25
Dibulatkan Rp. 151,626.00

SNI DT-91-0008-2007-6.23
Memasang M2 Bekisting untuk Balok
0.020 M3 Kayu Kelas III @Rp 3,000,000.00 Rp. 60,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 15,000.00 Rp. 6,000.00
0.200 Liter Minyak bekisting @Rp 17,500.00 Rp. 3,500.00
0.011 M3 Balok Kayu Kelas II @Rp 3,500,000.00 Rp. 38,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 180,000.00 Rp. 63,000.00
0.660 OH Pekerja @Rp 42,500.00 Rp. 28,050.00
0.330 OH Tukang @Rp 52,500.00 Rp. 17,325.00
0.033 OH Kepala Tukang @Rp 60,000.00 Rp. 1,980.00
0.033 OH Mandor @Rp 57,500.00 Rp. 1,897.50
Jumlah Rp. 220,252.50
Digunakan 2 x Rp. 110,126.25
Dibulatkan Rp. 110,126.00

SNI DT-91-0008-2007-6.24
Memasang 1 M2 Bekisting untuk Lantai
0.040 M3 Kayu Kelas III @Rp 3,000,000.00 Rp. 120,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 15,000.00 Rp. 6,000.00
0.200 Liter Minyak bekisting @Rp 17,500.00 Rp. 3,500.00
0.015 M3 Balok Kayu Kelas II @Rp 3,500,000.00 Rp. 52,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 180,000.00 Rp. 63,000.00
6.000 Batang Dolken Kayu ø 8-10 panjang 4 m @Rp 4,500.00 Rp. 27,000.00
0.660 OH Pekerja @Rp 42,500.00 Rp. 28,050.00
0.330 OH Tukang @Rp 52,500.00 Rp. 17,325.00
0.033 OH Kepala Tukang @Rp 60,000.00 Rp. 1,980.00
0.033 OH Mandor @Rp 57,500.00 Rp. 1,897.50
Jumlah Rp. 321,252.50
Dibulatkan Rp. 321,253.00

SNI DT-91-0008-2007-6.26
Memasang 1 M2 Bekisting untuk Tangga
0.030 M3 Kayu Kelas III @Rp 3,000,000.00 Rp. 90,000.00
0.400 Kg Paku 5 cm - 12 cm @Rp 15,000.00 Rp. 6,000.00
0.150 Liter Minyak bekisting @Rp 17,500.00 Rp. 2,625.00
0.015 M3 Balok Kayu Kelas II @Rp 3,500,000.00 Rp. 52,500.00
0.350 Lembar Plywood Tebal 9 mm @Rp 180,000.00 Rp. 63,000.00
2.000 Batang Dolken Kayu ø 8-10 panjang 4 m @Rp 4,500.00 Rp. 9,000.00
0.660 OH Pekerja @Rp 42,500.00 Rp. 28,050.00
0.330 OH Tukang @Rp 52,500.00 Rp. 17,325.00
0.033 OH Kepala Tukang @Rp 60,000.00 Rp. 1,980.00
0.033 OH Mandor @Rp 57,500.00 Rp. 1,897.50
Jumlah Rp. 272,377.50
Dibulatkan Rp. 272,378.00

Pekerjaan Lain-lain
1.0000 Ls Membongkar dan Menyiram Beton @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 42,500.00

REKAPITULASI PEKERJAAN BETON


Suplemen 1
Beton Bertulang Cincin Sumuran
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
58.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 759,104.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
10.500 M2 SNI DT-91-0008-2007-6.20 @Rp 82,528.00 Rp. 866,544.00
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 2,408,335.00
Dibulatkan Rp. 2,408,335.00
Suplemen 2
1 M3 Beton Bertulang Pondasi Tapak
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
105.190 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,376,720.18
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
2.800 M2 SNI DT-91-0008-2007-6.20 @Rp 82,528.00 Rp. 231,078.40
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 2,390,485.58
Dibulatkan Rp. 2,390,486.00

Suplemen 3
1 M3 Sloof Beton Bertulang Ukuran 20 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
145.375 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,902,668.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
6.667 M2 SNI DT-91-0008-2007-6.23 @Rp 90,028.00 Rp. 600,216.68
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,285,571.68
Dibulatkan Rp. 3,285,572.00

Suplemen 3a
1 M3 Sloof Beton Bertulang Ukuran 18 x 25 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
128.804 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,685,786.75
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
3.333 M2 SNI DT-91-0008-2007-6.23 @Rp 90,028.00 Rp. 300,090.33
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 2,768,564.08
Dibulatkan Rp. 2,768,564.00

Suplemen 3b
1 M3 Sloof Beton Bertulang Ukuran 18 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
129.826 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,699,162.69
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
5.554 M2 SNI DT-91-0008-2007-6.23 @Rp 90,028.00 Rp. 500,015.51
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 2,981,865.20
Dibulatkan Rp. 2,981,865.00

Suplemen 3b
1 M3 Sloof Beton Bertulang Ukuran 20 x 25 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
117.541 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,538,376.61
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
5.000 M2 SNI DT-91-0008-2007-6.23 @Rp 90,028.00 Rp. 450,140.00
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 2,771,203.61
Dibulatkan Rp. 2,771,204.00

Suplemen 3c
1 M3 Sloof Beton Bertulang Ukuran 30 x 30 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
117.496 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,537,792.01
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
10.000 M2 SNI DT-91-0008-2007-6.23 @Rp 90,028.00 Rp. 900,280.00
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,220,759.01
Dibulatkan Rp. 3,220,759.00

Suplemen 3d
1 M3 Sloof Beton Bertulang Ukuran 30 x 40 cm
3.200 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 2,368,598.40
65.692 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 859,773.62
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
6.875 M2 SNI DT-91-0008-2007-6.23 @Rp 90,028.00 Rp. 618,942.50
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,889,814.52
Dibulatkan Rp. 3,889,815.00

Suplemen 4
1 M3 Kolom Beton Bertulang Ukuran 13 x 13 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
190.556 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 2,493,996.93
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
6.154 M2 SNI DT-91-0008-2007-6.22 @Rp 151,626.00 Rp. 933,106.40
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 4,209,790.33
Dibulatkan Rp. 4,209,790.00

Suplemen 5
1 M3 Kolom Beton Bertulang Ukuran 18 x 25 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
104.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,361,152.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
6.300 M2 SNI DT-91-0008-2007-6.22 @Rp 151,626.00 Rp. 955,243.80
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,099,082.80
Dibulatkan Rp. 3,099,083.00
Suplemen 5a
1 M3 Kolom Beton Bertulang Ukuran 18 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
105.296 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,378,114.05
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
10.556 M2 SNI DT-91-0008-2007-6.22 @Rp 151,626.00 Rp. 1,600,488.24
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,761,289.29
Dibulatkan Rp. 3,761,289.00

Suplemen 6
1 M3 Kolom Beton Bertulang Ukuran 20 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
101.002 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,321,914.18
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
10.000 M2 SNI DT-91-0008-2007-6.22 @Rp 151,626.00 Rp. 1,516,260.00
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,620,861.18
Dibulatkan Rp. 3,620,861.00

Suplemen 6a
1 M3 Kolom Beton Bertulang Ukuran 20 x 25 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
150.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,963,200.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
6.000 M2 SNI DT-91-0008-2007-6.22 @Rp 151,626.00 Rp. 909,756.00
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,655,643.00
Dibulatkan Rp. 3,655,643.00

Suplemen 7
1 M3 Balok ukuran 13 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
120.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,570,560.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
8.460 M2 SNI DT-91-0008-2007-6.23 @Rp 110,126.00 Rp. 931,665.96
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,284,912.96
Dibulatkan Rp. 3,284,913.00

Suplemen 8
1 M3 Plat Lantai tebal 12 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
170.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 2,224,960.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
8.333 M2 SNI DT-91-0008-2007-6.24 @Rp 321,253.00 Rp. 2,677,097.62
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 5,684,744.62
Dibulatkan Rp. 5,684,745.00

Suplemen 9
1 M3 Ring Balok ukuran 15 x 15 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
152.174 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,991,653.31
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
6.675 M2 SNI DT-91-0008-2007-6.23 @Rp 110,126.00 Rp. 735,091.05
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,509,431.36
Dibulatkan Rp. 3,509,431.00

Suplemen 9a
1 M3 Ring Balok ukuran 18 x 20 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
148.924 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,949,117.31
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
5.555 M2 SNI DT-91-0008-2007-6.23 @Rp 110,126.00 Rp. 611,749.93
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,343,554.24
Dibulatkan Rp. 3,343,554.00

Suplemen 10
1 M3 Balok Latai ukuran 13 x 13 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
190.556 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 2,493,996.93
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
7.692 M2 SNI DT-91-0008-2007-6.23 @Rp 110,126.00 Rp. 847,089.19
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 4,123,773.12
Dibulatkan Rp. 4,123,773.00
Suplemen 10a
1 M3 Balok Latai ukuran 13 x 15 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
167.003 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 2,185,735.26
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
7.692 M2 SNI DT-91-0008-2007-6.23 @Rp 110,126.00 Rp. 847,089.19
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 3,815,511.46
Dibulatkan Rp. 3,815,511.00
Suplemen 11
1 M3 Meja Lab
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
140.000 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 1,832,320.00
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
10.000 M2 SNI DT-91-0008-2007-6.23 @Rp 321,253.00 Rp. 3,212,530.00
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 5,827,537.00
Dibulatkan Rp. 5,827,537.00

Suplemen 12
1 M3 Kolom Beton Bertulang Ukuran 13 x 15 cm
1.000 M3 SNI DT-91-0008-2007-6.8 @Rp 740,187.00 Rp. 740,187.00
182.940 Kg SNI DT-91-0008-2007-6.17 @Rp 13,088.00 Rp. 2,394,318.72
0.000 Kg SNI DT-91-0008-2007-6.18 @Rp 28,323.00 Rp. 0.00
9.613 M2 SNI DT-91-0008-2007-6.22 @Rp 151,626.00 Rp. 1,457,626.23
1.000 Ls Pekerjaan Lain-lain @Rp 42,500.00 Rp. 42,500.00
Jumlah Rp. 4,634,631.95
Dibulatkan Rp. 4,634,632.00

V. PEKERJAAN DINDING
SNI DT-91-0009-2007-6.3
1 M2 Pasangan bata merah tebal 1 bata adukan 1PC:4 PP
0.093 M3 Pasir Pasang @Rp 110,000.00 Rp. 10,230.00
140.000 Buah Batu Bata @Rp 500.00 Rp. 70,000.00
26.550 Kg Semen Portland @Rp 1,250.00 Rp. 33,187.50
0.600 OH Pekerja @Rp 42,500.00 Rp. 25,500.00
0.200 OH Tukang @Rp 52,500.00 Rp. 10,500.00
0.020 OH Kepala Tukang @Rp 60,000.00 Rp. 1,200.00
0.030 OH Mandor @Rp 57,500.00 Rp. 1,725.00
Jumlah Rp. 152,342.50
Dibulatkan Rp. 152,343.00

SNI DT-91-0009-2007-6.7
1 M2 Pasangan bata merah tebal 1/2 bata adukan 1PC : 2 PP
0.038 M3 Pasir Pasang @Rp 110,000.00 Rp. 4,180.00
70.000 Buah Batu Bata @Rp 500.00 Rp. 35,000.00
18.950 Kg Semen Portland @Rp 1,250.00 Rp. 23,687.50
0.300 OH Pekerja @Rp 42,500.00 Rp. 12,750.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.015 OH Mandor @Rp 57,500.00 Rp. 862.50
Jumlah 82,330.00
Dibulatkan 82,330.00

SNI DT-91-0009-2007-6.9
1 M2 Pasangan bata merah tebal 1/2 bata adukan 1PC : 4 PP
0.043 M3 Pasir Pasang @Rp 110,000.00 Rp. 4,730.00
70.000 Buah Batu Bata @Rp 500.00 Rp. 35,000.00
11.500 Kg Semen Portland @Rp 1,250.00 Rp. 14,375.00
0.300 OH Pekerja @Rp 42,500.00 Rp. 12,750.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.015 OH Mandor @Rp 57,500.00 Rp. 862.50
Jumlah Rp. 73,567.50
Dibulatkan Rp. 73,568.00

SNI DT-91-0009-2007-6.22
1 M2 Pasangan dinding roster/terawang campuran 1 PC : 3 PP
0.032 M3 Pasir Pasang @Rp 110,000.00 Rp. 3,520.00
25.000 Buah Roster/terawang @Rp 500.00 Rp. 12,500.00
14.000 Kg Semen Portland @Rp 1,250.00 Rp. 17,500.00
0.300 OH Pekerja @Rp 42,500.00 Rp. 12,750.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.015 OH Mandor @Rp 57,500.00 Rp. 862.50
Jumlah Rp. 52,982.50
Dibulatkan Rp. 52,983.00

VI. PEKERJAAN PLESTERAN


SNI DT-91-0010-2007-6.2
Memasang 1 M2 Plesteran 1 PC : 2 PP : tebal 15 mm
0.020 M3 Pasir Pasang @Rp 110,000.00 Rp. 2,200.00
10.224 Kg Semen Portland @Rp 1,250.00 Rp. 12,780.00
0.200 OH Pekerja @Rp 42,500.00 Rp. 8,500.00
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.010 OH Mandor @Rp 57,500.00 Rp. 575.00
Jumlah Rp. 32,830.00
Dibulatkan Rp. 32,830.00

SNI DT-91-0010-2007-6.3
Memasang 1 M2 Plesteran Beton 1 PC : 3 PP, tebal 15 mm
0.023 M3 Pasir Pasang @Rp 110,000.00 Rp. 2,530.00
7.776 Kg Semen Portland @Rp 1,250.00 Rp. 9,720.00
0.200 OH Pekerja @Rp 42,500.00 Rp. 8,500.00
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.010 OH Mandor @Rp 57,500.00 Rp. 575.00
Jumlah Rp. 30,100.00
Dibulatkan Rp. 30,100.00
SNI DT-91-0010-2007-6.4
Memasang 1 M2 Plesteran 1 PC : 4 PP : tebal 15 mm
0.024 M3 Pasir Pasang @Rp 110,000.00 Rp. 2,640.00
6.240 Kg Semen Portland @Rp 1,250.00 Rp. 7,800.00
0.200 OH Pekerja @Rp 42,500.00 Rp. 8,500.00
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.010 OH Mandor @Rp 57,500.00 Rp. 575.00
Jumlah Rp. 28,290.00
Dibulatkan Rp. 28,290.00

SNI DT-91-0010-2007-6.27
Memasang 1 M2 Acian
3.250 Kg Semen Portland @Rp 1,250.00 Rp. 4,062.50
0.150 OH Pekerja @Rp 42,500.00 Rp. 6,375.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.008 OH Mandor @Rp 57,500.00 Rp. 460.00
Jumlah Rp. 16,747.50
Dibulatkan Rp. 16,748.00

VII. PEKERJAAN KAYU


SNI DT-91-0011-2007-6.1
Membuat dan Memasang 1 M3 Kusen Pintu dan Jendela Kayu
1.100 M3 Balok Kayu Kelas I @Rp 4,950,000.00 Rp. 5,445,000.00
1.000 Kg Lem Kayu @Rp 27,000.00 Rp. 27,000.00
1.250 Kg Paku Biasa 10 Cm @Rp 15,000.00 Rp. 18,750.00
6.000 OH Pekerja @Rp 42,500.00 Rp. 255,000.00
20.000 OH Tukang @Rp 52,500.00 Rp. 1,050,000.00
2.000 OH Kepala Tukang @Rp 60,000.00 Rp. 120,000.00
0.300 OH Mandor @Rp 57,500.00 Rp. 17,250.00
Jumlah Rp. 6,933,000.00
Dibulatkan Rp. 6,933,000.00

SNI DT-91-0011-2007-6.5
Membuat dan Memasang 1 M2 Daun Pintu Panel kayu kelas I, atau II
0.040 M3 Papan Kayu @Rp 4,950,000.00 Rp. 198,000.00
0.500 Kg Lem Kayu @Rp 27,000.00 Rp. 13,500.00
1.000 OH Pekerja @Rp 42,500.00 Rp. 42,500.00
2.500 OH Tukang @Rp 52,500.00 Rp. 131,250.00
0.250 OH Kepala Tukang @Rp 60,000.00 Rp. 15,000.00
0.050 OH Mandor @Rp 57,500.00 Rp. 2,875.00
Jumlah Rp. 403,125.00
Dibulatkan Rp. 403,125.00

SNI DT-91-0011-2007-6.6
Membuat dan memasang 1 m 2 pintu dan jendela kaca, kayu kelas II
0.024 M3 Papan Kayu @Rp 4,950,000.00 Rp. 118,800.00
0.300 Kg Paku 5 cm - 7 cm @Rp 15,000.00 Rp. 4,500.00
0.800 OH Pekerja @Rp 42,500.00 Rp. 34,000.00
2.000 OH Tukang @Rp 52,500.00 Rp. 105,000.00
0.200 OH Kepala Tukang @Rp 60,000.00 Rp. 12,000.00
0.040 OH Mandor @Rp 57,500.00 Rp. 2,300.00
Jumlah Rp. 276,600.00
Dibulatkan Rp. 276,600.00

SNI DT-91-0011-2007-6.10
Memasang 1 M2 Jalusi Kusen Kayu
0.060 M3 Papan Kayu Kelas I @Rp 4,950,000.00 Rp. 297,000.00
0.150 Kg Paku Biasa 1 - 2,5 cm @Rp 15,000.00 Rp. 2,250.00
0.500 OH Pekerja @Rp 42,500.00 Rp. 21,250.00
2.000 OH Tukang @Rp 52,500.00 Rp. 105,000.00
0.200 OH Kepala Tukang @Rp 60,000.00 Rp. 12,000.00
0.025 OH Mandor @Rp 57,500.00 Rp. 1,437.50
Jumlah Rp. 438,937.50
Dibulatkan Rp. 438,938.00

SNI DT-91-0011-2007-6.19
Memasang 1 M3 Rangka langit-langit
0.011 M3 Kaso-kaso @Rp 3,750,000.00 Rp. 41,250.00
0.200 Kg Paku Biasa 7 - 10 Cm @Rp 15,000.00 Rp. 3,000.00
0.150 OH Pekerja @Rp 42,500.00 Rp. 6,375.00
0.250 OH Tukang @Rp 52,500.00 Rp. 13,125.00
0.025 OH Kepala Tukang @Rp 60,000.00 Rp. 1,500.00
0.075 OH Mandor @Rp 57,500.00 Rp. 4,312.50
Jumlah Rp. 69,562.50
Dibulatkan Rp. 69,563.00

SNI DT-91-0011-2007-6.22
Memasang 1 M' Lisplank ukuran 3 x 30 cm
0.011 M3 Papan Kayu Kelas I @Rp 4,950,000.00 Rp. 54,450.00
0.050 Kg Paku Biasa 5 dan 7 Cm @Rp 15,000.00 Rp. 750.00
0.100 OH Pekerja @Rp 42,500.00 Rp. 4,250.00
0.200 OH Tukang @Rp 52,500.00 Rp. 10,500.00
0.020 OH Kepala Tukang @Rp 60,000.00 Rp. 1,200.00
0.005 OH Mandor @Rp 57,500.00 Rp. 287.50
Jumlah Rp. 71,437.50
Dibulatkan Rp. 71,438.00
VIII. PEKERJAAN PENUTUP LANTAI DAN DINDING
SNI DT-91-0012-2007-6.36
Memasang 1 M2 Lantai Keramik Ukuran 20 x 20 cm unpolished
0.045 M3 Pasir Pasang @Rp 110,000.00 Rp. 4,950.00
25.000 Buah Keramik 20 x 20 cm unpolished @Rp 1,700.00 Rp. 42,500.00
10.400 Kg Semen Portland @Rp 1,250.00 Rp. 13,000.00
1.620 Kg Semen Warna @Rp 2,347.50 Rp. 3,802.95
0.620 OH Pekerja @Rp 42,500.00 Rp. 26,350.00
0.350 OH Tukang @Rp 52,500.00 Rp. 18,375.00
0.035 OH Kepala Tukang @Rp 60,000.00 Rp. 2,100.00
0.030 OH Mandor @Rp 57,500.00 Rp. 1,725.00
Jumlah Rp. 112,802.95
Dibulatkan Rp. 112,803.00

SNI DT-91-0012-2007-6.54
1 M2 Dinding Keramik 20 x 20 cm
0.018 M3 Pasir Pasang @Rp 110,000.00 Rp. 1,980.00
26.500 Buah keramik 20 x 20 cm @Rp 1,700.00 Rp. 45,050.00
9.300 kg Semen Portland @ 40 Kg @Rp 1,250.00 Rp. 11,625.00
1.940 kg Semen Warna @Rp 2,347.50 Rp. 4,554.15
0.600 OH Pekerja @Rp 42,500.00 Rp. 25,500.00
0.450 OH Tukang @Rp 52,500.00 Rp. 23,625.00
0.045 OH Kepala Tukang @Rp 60,000.00 Rp. 2,700.00
0.030 OH Mandor @Rp 57,500.00 Rp. 1,725.00
Jumlah Rp. 116,759.15
Dibulatkan Rp. 116,759.00

SNI DT-91-0012-2007-6.64
Memasang 1 M2 Lantai Keramik 40 x 40 cm polished
0.045 M3 Pasir Pasang @Rp 110,000.00 Rp. 4,950.00
6.250 Buah Keramik 40 x 40 cm polished @Rp 8,000.00 Rp. 50,000.00
10.000 Kg Semen Portland @Rp 1,250.00 Rp. 12,500.00
1.500 Kg Semen Warna @Rp 2,347.50 Rp. 3,521.25
0.620 OH Pekerja @Rp 42,500.00 Rp. 26,350.00
0.350 OH Tukang @Rp 52,500.00 Rp. 18,375.00
0.035 OH Kepala Tukang @Rp 60,000.00 Rp. 2,100.00
0.030 OH Mandor @Rp 57,500.00 Rp. 1,725.00
Jumlah Rp. 119,521.25
Dibulatkan Rp. 119,521.00

SNI DT-91-0012-2007-6.65
Memasang 1 M2 Lantai Keramik 40 x 40 cm unpolished
0.045 M3 Pasir Pasang @Rp 110,000.00 Rp. 4,950.00
6.250 Buah Keramik 40 x 40 cm unpolished @Rp 8,500.00 Rp. 53,125.00
10.000 Kg Semen Portland @Rp 1,250.00 Rp. 12,500.00
1.500 Kg Semen Warna @Rp 2,347.50 Rp. 3,521.25
0.620 OH Pekerja @Rp 42,500.00 Rp. 26,350.00
0.350 OH Tukang @Rp 52,500.00 Rp. 18,375.00
0.035 OH Kepala Tukang @Rp 60,000.00 Rp. 2,100.00
0.030 OH Mandor @Rp 57,500.00 Rp. 1,725.00
Jumlah Rp. 122,646.25
Dibulatkan Rp. 122,646.00

SNI DT-91-0012-2007-6.66
Memasang 1 M2 Dinding Keramik 20 x 25 cm
0.018 M3 Pasir Pasang @Rp 110,000.00 Rp. 1,980.00
20.000 Buah Keramik 20 x 25 cm @Rp 2,000.00 Rp. 40,000.00
9.300 Kg Semen Portland @ 40 Kg @Rp 1,250.00 Rp. 11,625.00
1.940 Kg Semen Warna @Rp 2,347.50 Rp. 4,554.15
0.600 OH Pekerja @Rp 42,500.00 Rp. 25,500.00
0.450 OH Tukang @Rp 52,500.00 Rp. 23,625.00
0.045 OH Kepala Tukang @Rp 60,000.00 Rp. 2,700.00
0.030 OH Mandor @Rp 57,500.00 Rp. 1,725.00
Jumlah Rp. 111,709.15
Dibulatkan Rp. 111,709.00

IX. PEKERJAAN LANGIT-LANGIT


SNI DT 91-0013-2007-6.1
Memasang 1 M2 Langit-langit Asbes semen tebal 4 mm
0.010 Kg Paku tripleks @Rp 15,000.00 Rp. 150.00
1.100 M2 Asbes Semen @Rp 15,000.00 Rp. 16,500.00
0.030 OH Pekerja @Rp 42,500.00 Rp. 1,275.00
0.070 OH Tukang @Rp 52,500.00 Rp. 3,675.00
0.007 OH Kepala Tukang @Rp 60,000.00 Rp. 420.00
0.002 OH Mandor @Rp 57,500.00 Rp. 115.00
Jumlah Rp. 22,135.00
Dibulatkan Rp. 22,135.00

SNI DT 91-0013-2007-6.6
Memasang 1 M2 Langit-langit Lambrizering kayu, tebal 9 mm
0.015 Kg Paku tripleks @Rp 15,000.00 Rp. 225.00
0.015 M3 Kayu Papan @Rp 3,750,000.00 Rp. 56,250.00
0.800 OH Pekerja @Rp 42,500.00 Rp. 34,000.00
0.800 OH Tukang @Rp 52,500.00 Rp. 42,000.00
0.080 OH Kepala Tukang @Rp 60,000.00 Rp. 4,800.00
0.030 OH Mandor @Rp 57,500.00 Rp. 1,725.00
Jumlah Rp. 139,000.00
Dibulatkan Rp. 139,000.00
X. PEKERJAAN BESI DAN ALUMINIUM
SNI DT 91-0014-2007-6.20
1 M2 Rangka Kuda-kuda Aluzing 55 % Aluminium untuk Metal
4.2600 M' Profil C 75.75 @Rp 13,000.00 Rp. 55,380.00
4.9300 M' Reng U 0.5 @Rp 9,250.00 Rp. 45,602.50
14.0000 Buah Baut Truss @Rp 4,250.00 Rp. 59,500.00
11.0000 Buah Baut Reng @Rp 4,250.00 Rp. 46,750.00
0.1400 OH Pekerja @Rp 42,500.00 Rp. 5,950.00
0.4000 OH Tukang @Rp 52,500.00 Rp. 21,000.00
0.0400 OH Kepala Tukang @Rp 60,000.00 Rp. 2,400.00
0.0700 OH Mandor @Rp 57,500.00 Rp. 4,025.00
Jumlah Rp. 240,607.50
Dibulatkan Rp. 240,608.00

XI. PEKERJAAN PENUTUP ATAP


SNI 03-3436-1994-6.1
1 M2 Atap Genteng Metal
1.020 Lbr Genteng Metal @Rp 58,000.00 Rp. 59,160.00
9.000 Buah Screw @Rp 300.00 Rp. 2,700.00
0.200 OH Pekerja @Rp 42,500.00 Rp. 8,500.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.001 OH Mandor @Rp 57,500.00 Rp. 57.50
Jumlah Rp. 76,267.50
Dibulatkan Rp. 76,268.00

SNI 03-3436-1994-6.2
1 M' Nok Genteng Metal
1.100 Lembar Rabung Genteng Metal @Rp 30,000.00 Rp. 33,000.00
9.000 Buah Screw @Rp 300.00 Rp. 2,700.00
0.250 OH Pekerja @Rp 42,500.00 Rp. 10,625.00
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.013 OH Mandor @Rp 57,500.00 Rp. 747.50
Jumlah Rp. 55,847.50
Dibulatkan Rp. 55,848.00

SNI 03-3436-1994-6.3
1 M2 Atap Seng Gelombang
0.700 Lembar Seng Gelombang 3" x 6 " BJLs 28 @Rp 58,000.00 Rp. 40,600.00
0.020 Kg Paku Seng @Rp 300.00 Rp. 6.00
0.120 OH Pekerja @Rp 42,500.00 Rp. 5,100.00
0.060 OH Tukang @Rp 52,500.00 Rp. 3,150.00
0.006 OH Kepala Tukang @Rp 60,000.00 Rp. 360.00
0.006 OH Mandor @Rp 57,500.00 Rp. 345.00
Jumlah Rp. 49,561.00
Dibulatkan Rp. 49,561.00

SNI 03-3436-1994-6.4
1 M' Nok Atap Seng
0.300 Lembar Seng Plat 3" x 6" BJLs 28 @Rp 30,000.00 Rp. 9,000.00
0.040 Kg Paku Seng @Rp 300.00 Rp. 12.00
0.015 OH Pekerja @Rp 42,500.00 Rp. 637.50
0.070 OH Tukang @Rp 52,500.00 Rp. 3,675.00
0.008 OH Kepala Tukang @Rp 60,000.00 Rp. 480.00
0.006 OH Mandor @Rp 57,500.00 Rp. 345.00
Jumlah Rp. 14,149.50
Dibulatkan Rp. 14,150.00

XII. PEKERJAAN SANITASI


RSNI T-15-2002-B.2
1 Buah Kloset Jongkok Porselen
1.000 Buah Kloset Jongkok Porselen @Rp 125,000.00 Rp. 125,000.00
0.010 M3 Pasir Pasang @Rp 110,000.00 Rp. 1,100.00
6.000 Kg Semen Portland @Rp 1,250.00 Rp. 7,500.00
1.000 OH Pekerja @Rp 42,500.00 Rp. 42,500.00
1.500 OH Tukang @Rp 52,500.00 Rp. 78,750.00
1.500 OH Kepala Tukang @Rp 60,000.00 Rp. 90,000.00
0.160 OH Mandor @Rp 57,500.00 Rp. 9,200.00
Jumlah Rp. 354,050.00
Dibulatkan Rp. 354,050.00

RSNI T-15-2002-B.4
Memasang 1 Buah Urinoir
1.000 Buah Urinoir @Rp 1,032,900.00 Rp. 1,032,900.00
25.000 % Perlengkapan dari harga kloset @Rp 258,225.00 Rp. 64,556.25
0.010 M3 Pasir Pasang @Rp 110,000.00 Rp. 1,100.00
6.000 Kg Semen Portland @Rp 1,250.00 Rp. 7,500.00
1.000 OH Pekerja @Rp 42,500.00 Rp. 42,500.00
1.000 OH Tukang @Rp 52,500.00 Rp. 52,500.00
0.100 OH Kepala Tukang @Rp 60,000.00 Rp. 6,000.00
0.100 OH Mandor @Rp 57,500.00 Rp. 5,750.00
Jumlah Rp. 1,212,806.25
Dibulatkan Rp. 1,212,806.00
RSNI T-15-2002-B.5
Memasang 1 Buah Wastafel
1.000 Buah Wastafel @Rp 704,250.00 Rp. 704,250.00
10.000 % Perlengkapan dari harga Wastafel @Rp 70,425.00 Rp. 7,042.50
0.010 M 3
Pasir Pasang @Rp 110,000.00 Rp. 1,100.00
6.000 Kg Semen Portland @Rp 1,250.00 Rp. 7,500.00
1.200 OH Pekerja @Rp 42,500.00 Rp. 51,000.00
1.450 OH Tukang @Rp 52,500.00 Rp. 76,125.00
0.150 OH Kepala Tukang @Rp 60,000.00 Rp. 9,000.00
0.100 OH Mandor @Rp 57,500.00 Rp. 5,750.00
Jumlah Rp. 861,767.50
Dibulatkan Rp. 861,768.00

RSNI T-15-2002-B.8
1 Buah Bak Mandi Batu Bata 0,3 M3 di Lapisi Keramik
200.000 Buah Batu Bata @Rp 500.00 Rp. 100,000.00
0.300 M3 Pasir Pasang @Rp 110,000.00 Rp. 33,000.00
120.000 Kg Semen Portland @Rp 1,250.00 Rp. 150,000.00
110.000 Buah Keramik uk. 20 x 20 cm' @Rp 1,700.00 Rp. 187,000.00
6.000 Kg Semen Warna @Rp 2,347.50 Rp. 14,085.00
6.000 OH Pekerja @Rp 42,500.00 Rp. 255,000.00
3.000 OH Tukang @Rp 52,500.00 Rp. 157,500.00
0.300 OH Kepala Tukang @Rp 60,000.00 Rp. 18,000.00
0.300 OH Mandor @Rp 57,500.00 Rp. 17,250.00
Jumlah Rp. 931,835.00
Dibulatkan Rp. 931,835.00

RSNI T-15-2002-B.18
Memasang 1 Buah Bak Kontrol Batu Bata ukuran 60 x 60 cm, t = 65 cm
108.000 Buah Batu Bata @Rp 500.00 Rp. 54,000.00
0.033 M3 Batu Koral @Rp 125,000.00 Rp. 4,125.00
4.850 Kg Besi Beton @Rp 13,088.00 Rp. 63,476.80
0.120 M3 Pasir Beton @Rp 110,000.00 Rp. 13,200.00
114.000 Kg Semen Portland @Rp 1,250.00 Rp. 142,500.00
2.160 OH Pekerja @Rp 42,500.00 Rp. 91,800.00
0.720 OH Tukang @Rp 52,500.00 Rp. 37,800.00
0.072 OH Kepala Tukang @Rp 60,000.00 Rp. 4,320.00
0.108 OH Mandor @Rp 57,500.00 Rp. 6,210.00
Jumlah Rp. 417,431.80
Dibulatkan Rp. 417,432.00

RSNI T-15-2002-6.19
Memasang 1 M' Pipa Galvanis Ø 1/2"
1.200 M' Pipa Galvanis Ø 1/2" @Rp 70,000.00 Rp. 84,000.00
35.000 % Harga pipa utk Perlengkapan @Rp 24,500.00 Rp. 8,575.00
0.054 OH Pekerja @Rp 42,500.00 Rp. 2,295.00
0.090 OH Tukang @Rp 52,500.00 Rp. 4,725.00
0.009 OH Kepala Tukang @Rp 60,000.00 Rp. 540.00
0.027 OH Mandor @Rp 57,500.00 Rp. 1,552.50
Jumlah Rp. 101,687.50
Dibulatkan Rp. 101,688.00

RSNI T-15-2002-6.25
Memasang 1 M' Pipa PVC tipe AW Ø 1/2"
1.200 M' Pipa PVC Ø 1/2" @Rp 5,833.33 Rp. 7,000.00
35.000 % Harga pipa utk Perlengkapan @Rp 2,041.67 Rp. 714.58
0.036 OH Pekerja @Rp 42,500.00 Rp. 1,530.00
0.060 OH Tukang @Rp 52,500.00 Rp. 3,150.00
0.006 OH Kepala Tukang @Rp 60,000.00 Rp. 360.00
0.0018 OH Mandor @Rp 57,500.00 Rp. 103.50
Jumlah Rp. 12,858.08
Dibulatkan Rp. 12,858.00

RSNI T-15-2002-B.26
Memasang 1 M' Pipa PVC tipe AW Ø 3/4"
1.100 M' Pipa PVC Ø 3/4" @Rp 4,166.67 Rp. 4,583.33
25.000 % Harga pipa utk Perlengkapan @Rp 1,041.67 Rp. 260.42
0.036 OH Pekerja @Rp 42,500.00 Rp. 1,530.00
0.060 OH Tukang @Rp 52,500.00 Rp. 3,150.00
0.006 OH Kepala Tukang @Rp 60,000.00 Rp. 360.00
0.0018 OH Mandor @Rp 57,500.00 Rp. 103.50
Jumlah Rp. 9,987.25
Dibulatkan Rp. 9,987.00

RSNI T-15-2002-6.28
Memasang 1 M' Pipa PVC tipe AW Ø 1½"
1.200 M' Pipa PVC 1½" @Rp 15,416.67 Rp. 18,500.00
35.000 % Harga pipa utk Perlengkapan @Rp 5,395.83 Rp. 1,888.54
0.036 OH Pekerja @Rp 42,500.00 Rp. 1,530.00
0.060 OH Tukang @Rp 52,500.00 Rp. 3,150.00
0.006 OH Kepala Tukang @Rp 60,000.00 Rp. 360.00
0.0018 OH Mandor @Rp 57,500.00 Rp. 103.50
Jumlah Rp. 25,532.04
Dibulatkan Rp. 25,532.00

RSNI T-15-2002-6.29
Memasang 1 M' Pipa Galvanis Ø 1½"
1.200 M' Pipa Galvanis Ø 1½" @Rp 35,000.00 Rp. 42,000.00
35.000 % Harga pipa utk Perlengkapan @Rp 12,250.00 Rp. 4,287.50
0.036 OH Pekerja @Rp 42,500.00 Rp. 1,530.00
0.060 OH Tukang @Rp 52,500.00 Rp. 3,150.00
0.006 OH Kepala Tukang @Rp 60,000.00 Rp. 360.00
0.0018 OH Mandor @Rp 57,500.00 Rp. 103.50
Jumlah Rp. 51,431.00
Dibulatkan Rp. 51,431.00
RSNI T-15-2002-B.31
Memasang 1 M' Pipa PVC tipe AW Ø 3"
1.200 M' Pipa PVC tipe AW Ø 3" @Rp 23,750.00 Rp. 28,500.00
30.000 % Harga pipa utk Perlengkapan @Rp 7,125.00 Rp. 2,137.50
0.081 OH Pekerja @Rp 42,500.00 Rp. 3,442.50
0.135 OH Tukang @Rp 52,500.00 Rp. 7,087.50
0.0135 OH Kepala Tukang @Rp 60,000.00 Rp. 810.00
0.0041 OH Mandor @Rp 57,500.00 Rp. 235.75
Jumlah Rp. 42,213.25
Dibulatkan Rp. 42,213.00

RSNI T-15-2002-B.32
Memasang 1 M' Pipa PVC tipe AW Ø 4"
1.200 M' Pipa PVC tipe AW Ø 4" @Rp 45,833.33 Rp. 55,000.00
35.000 % Harga pipa utk Perlengkapan @Rp 16,041.67 Rp. 5,614.58
0.081 OH Pekerja @Rp 42,500.00 Rp. 3,442.50
0.135 OH Tukang @Rp 52,500.00 Rp. 7,087.50
0.0135 OH Kepala Tukang @Rp 60,000.00 Rp. 810.00
0.0041 OH Mandor @Rp 57,500.00 Rp. 235.75
Jumlah Rp. 72,190.33
Dibulatkan Rp. 72,190.00

RSNI T-15-2002-B.35
Memasang 1 Buah Kran Ø ¾" atau Ø ½"
1.000 Buah Kran Air @Rp 18,000.00 Rp. 18,000.00
0.025 Buah Seal Tape @Rp 3,500.00 Rp. 87.50
0.010 OH Pekerja @Rp 42,500.00 Rp. 425.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.005 OH Mandor @Rp 57,500.00 Rp. 287.50
Jumlah Rp. 24,650.00
Dibulatkan Rp. 24,650.00

RSNI T-15-2002-B.36
Memasang 1 Buah Floor Drain
1.000 Buah Floor Drain @Rp 14,000.00 Rp. 14,000.00
0.010 OH Pekerja @Rp 42,500.00 Rp. 425.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.005 OH Mandor @Rp 57,500.00 Rp. 287.50
Jumlah Rp. 20,562.50
Dibulatkan Rp. 20,563.00

XIII. PEKERJAAN KUNCI DAN KACA


RSNI T-30-200-B.2
1 Buah Kunci Tanam Biasa
1.000 Buah Kunci Tanam Biasa @Rp 140,850.00 Rp. 140,850.00
0.010 OH Pekerja @Rp 42,500.00 Rp. 425.00
0.500 OH Tukang @Rp 52,500.00 Rp. 26,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.005 OH Mandor @Rp 57,500.00 Rp. 287.50
Jumlah Rp. 168,412.50
Dibulatkan Rp. 168,413.00

RSNI T-30-200-B.4
1 Buah Kunci Tanam Silinder
1.000 Buah Kunci Silinder @Rp 95,000.00 Rp. 95,000.00
0.005 OH Pekerja @Rp 42,500.00 Rp. 212.50
0.500 OH Tukang @Rp 52,500.00 Rp. 26,250.00
0.005 OH Kepala Tukang @Rp 60,000.00 Rp. 300.00
0.00025 OH Mandor @Rp 57,500.00 Rp. 14.38
Jumlah Rp. 121,776.88
Dibulatkan Rp. 121,777.00

RSNI T-30-200-B.5
1 Buah Engsel Pintu
1.000 Buah Engsel Pintu @Rp 17,000.00 Rp. 17,000.00
0.015 OH Pekerja @Rp 42,500.00 Rp. 637.50
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.00075 OH Mandor @Rp 57,500.00 Rp. 43.13
Jumlah Rp. 26,455.63
Dibulatkan Rp. 26,456.00

RSNI T-30-200-B.6
1 Buah Engsel Jendela Kupu - kupu
1.000 Buah Engsel Jendela @Rp 11,250.00 Rp. 11,250.00
0.010 OH Pekerja @Rp 42,500.00 Rp. 425.00
0.100 OH Tukang @Rp 52,500.00 Rp. 5,250.00
0.010 OH Kepala Tukang @Rp 60,000.00 Rp. 600.00
0.0005 OH Mandor @Rp 57,500.00 Rp. 28.75
Jumlah Rp. 17,553.75
Dibulatkan Rp. 17,554.00

RSNI T-30-200-B.9
1 Buah Kait Angin Jendela
1.000 Buah Kait Angin @Rp 18,000.00 Rp. 18,000.00
0.015 OH Pekerja @Rp 42,500.00 Rp. 637.50
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.00075 OH Mandor @Rp 57,500.00 Rp. 43.13
Jumlah Rp. 27,455.63
Dibulatkan Rp. 27,456.00
RSNI T-30-200-B.26
1 Buah Hak Tarikan Jendela
1.000 Buah Tarikan Jendela @Rp 17,250.00 Rp. 17,250.00
0.015 OH Pekerja @Rp 42,500.00 Rp. 637.50
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.00075 OH Mandor @Rp 57,500.00 Rp. 43.13
Jumlah Rp. 26,705.63
Dibulatkan Rp. 26,706.00

RSNI T-30-200-B.25
1 Buah Pacok Jendela
1.000 Buah Pacok Jendela @Rp 14,000.00 Rp. 14,000.00
0.020 OH Pekerja @Rp 42,500.00 Rp. 850.00
0.200 OH Tukang @Rp 52,500.00 Rp. 10,500.00
0.020 OH Kepala Tukang @Rp 60,000.00 Rp. 1,200.00
0.00075 OH Mandor @Rp 57,500.00 Rp. 43.13
Jumlah Rp. 26,593.13
Dibulatkan Rp. 26,593.00

RSNI T-30-200-B.12
1 Buah Pegangan pintu double
1.000 Buah Pegangan pintu/Door Holder @Rp 112,000.00 Rp. 112,000.00
0.050 OH Pekerja @Rp 42,500.00 Rp. 2,125.00
0.500 OH Tukang @Rp 52,500.00 Rp. 26,250.00
0.050 OH Kepala Tukang @Rp 60,000.00 Rp. 3,000.00
0.0025 OH Mandor @Rp 57,500.00 Rp. 143.75
Jumlah Rp. 143,518.75
Dibulatkan Rp. 143,519.00

RSNI T-30-200-B.11
1 Buah Slot pintu double
1.000 Buah Slot pintu double @Rp 101,500.00 Rp. 101,500.00
0.020 OH Pekerja @Rp 42,500.00 Rp. 850.00
0.200 OH Tukang @Rp 52,500.00 Rp. 10,500.00
0.020 OH Kepala Tukang @Rp 60,000.00 Rp. 1,200.00
0.001 OH Mandor @Rp 57,500.00 Rp. 57.50
Jumlah Rp. 114,107.50
Dibulatkan Rp. 114,108.00

RSNI T-30-200-B.17
1 M2 Pasang Kaca tebal 5 mm
1.100 M2 Kaca tebal 5 mm @Rp 100,000.00 Rp. 110,000.00
0.015 OH Pekerja @Rp 42,500.00 Rp. 637.50
0.150 OH Tukang @Rp 52,500.00 Rp. 7,875.00
0.015 OH Kepala Tukang @Rp 60,000.00 Rp. 900.00
0.00075 OH Mandor @Rp 57,500.00 Rp. 43.13
Jumlah Rp. 119,455.63
Dibulatkan Rp. 119,456.00

XIV. PEKERJAAN PENGECATAN


PT. T-38-2000-C-B8
1 M2 Pengecatan Bidang Kayu/Besi
0.200 Kg Cat Meni @Rp 22,500.00 Rp. 4,500.00
0.150 Kg Plamir @Rp 22,000.00 Rp. 3,300.00
0.170 Kg Cat Dasar @Rp 11,750.00 Rp. 1,997.50
0.260 Kg Cat Kayu/Besi @Rp 38,000.00 Rp. 9,880.00
0.070 OH Pekerja @Rp 42,500.00 Rp. 2,975.00
0.009 OH Tukang @Rp 52,500.00 Rp. 472.50
0.006 OH Kepala Tukang @Rp 60,000.00 Rp. 360.00
0.0025 OH Mandor @Rp 57,500.00 Rp. 143.75
Jumlah Rp. 23,628.75
Dibulatkan Rp. 23,629.00

PT. T-38-2000-C-B14
1 M2 Pengecatan Tembok Baru
0.100 Kg Plamir @Rp 22,000.00 Rp. 2,200.00
0.100 Kg Cat Dasar @Rp 11,750.00 Rp. 1,175.00
0.260 Kg Cat Tembok @Rp 15,500.00 Rp. 4,030.00
0.020 OH Pekerja @Rp 42,500.00 Rp. 850.00
0.063 OH Tukang @Rp 52,500.00 Rp. 3,307.50
0.0063 OH Kepala Tukang @Rp 60,000.00 Rp. 378.00
0.0025 OH Mandor @Rp 57,500.00 Rp. 143.75
Jumlah Rp. 12,084.25
Dibulatkan Rp. 12,084.00

PT. T-38-2000-C15
1 M2 Pengecatan Tembok Lama
0.120 Kg Cat Dasar @Rp 11,750.00 Rp. 1,410.00
0.180 Kg Cat Tembok @Rp 15,500.00 Rp. 2,790.00
0.028 OH Pekerja @Rp 42,500.00 Rp. 1,190.00
0.042 OH Tukang @Rp 52,500.00 Rp. 2,205.00
0.0042 OH Kepala Tukang @Rp 60,000.00 Rp. 252.00
0.0025 OH Mandor @Rp 57,500.00 Rp. 143.75
Jumlah Rp. 7,990.75
Dibulatkan Rp. 7,991.00

PT. T-38-2000-C16a
1M3 PEKERJAAN RANGKA KAYU
0.55 M3 Kayu Klas I @Rp 4,950,000.00 Rp. 2,722,500.00
9 OH Tukang Kayu @Rp 52,500.00 Rp. 472,500.00
0.9 OH Kepala Tukang @Rp 60,000.00 Rp. 54,000.00
3 OH Pekerja @Rp 42,500.00 Rp. 127,500.00
0.15 OH Mandor @Rp 57,500.00 Rp. 8,625.00
Jumlah Rp. 3,385,125.00
Dibulatkan Rp. 3,385,125.00
PT. T-38-2000-C17b
1M3 PEKERJAAN PAPAN LANTAI / DINDING
0.5500 M3 Kayu Klas II @Rp 3,750,000.00 Rp. 2,062,500.00
9.0000 OH Tukang Kayu @Rp 52,500.00 Rp. 472,500.00
0.9000 OH Kepala Tukang @Rp 60,000.00 Rp. 54,000.00
3.0000 OH Pekerja @Rp 42,500.00 Rp. 127,500.00
0.1500 OH Mandor @Rp 57,500.00 Rp. 8,625.00
Jumlah Rp. 2,725,125.00
Dibulatkan Rp. 2,725,125.00

#REF!
#REF!
#REF!

#REF!
#REF!
-
untuk diameter 100 cm untuk diameter 60 cm
0.450 0.27
0.312 0.1872
0.468 0.2808
194.000 116.4
2.380 1.428
0.300 0.18
0.030 0.018
0.080 0.048

untuk diameter 100 cm untuk diameter 60 cm


0.450 0.27
0.312 0.1872
0.468 0.2808
194.000 116.4
2.380 1.428
0.300 0.18
0.030 0.018
0.080 0.048
± Bobot Pasir 1400 kg/m3
Bobot Isi Kerikil 1350 kg/m3
Buckling factor pasir 20 %

93.57

10.5
0.145
0.07
0.07
0.007
0.004
K 250
Besi Polos
Besi Ulir
Bekisting pondasi
Luas Pjg
0.04 25 1.00
20 6.66666667

BES 18/20
0.036 27.7777778
111.12 6 117.12 0.888 104.00256
186.2 0.6 111.72 0.222 24.80184
CETAKAN 128.8044
11.112 3 3.704

BES 18/20
0.036 27.777777778
111.12 6 117.12 0.888 104.00256
186.2 0.6 111.72 0.222 24.80184
CETAKAN 128.8044
11.112 3 3.704

Luas Pjg
0.05 20 1.00
10 3.33333333

23.463 12.798
94.0333333 52.89375
11.1111111 6.25
0.05 0.09 0.16

beton 20/25 beton 30/30 beton 30/40


1.000 1 3.2
117.541 117.496333 65.69175
0.000 0 0
5.000 10 6.875
1.000 1 1
0.036
27.7777778
111.111111
114.311111
101.508267 0.4669
12.9694444

3.78707778

105.29534444

21.1111111111
10.555555556

Luas Pjg
0.05 20 1.00
18 6.000

Luas Pjg
0.0225 44.5 1.00
20.025 6.675

balok 18/20
27.7777778
BESI Luas Pjg
27.77 186.18518519 0.03 33.45 1.00
5 0.62 16.725 5.575
138.85 115.43481481
0.888 0.222 133.8 118.6806
123.2988 25.626528889 148.925329 111.48885 3.333 43.8151181
11.1111111 5.5555555556 162.495718

balok 13/13
59.1715976
BESI
62.27 395.47731755
4 0.42
249.08 166.10047337
0.617 0.222
153.68236 36.874305089 190.556665
15.3846154 7.6923076923
balok 13/13
51.2820513
BESI 26 8.66666667
62.27 342.88034188
4 0.42
249.08 144.00974359
0.617 0.222
153.68236 31.970163077 185.652523
15.3846154 7.6923076923
Luas Pjg
0.0195 51.5 1.00
28.84 9.61333333
0.0567

0.0075
1.1000 0.55
18.0000 9
1.8000 0.9
6.0000 3
0.3000 0.15
DAFTAR HARGA UPAH DAN BAHAN
A. UPAH
1 Pekerja Hari 42,500.00
2 Tukang Hari 52,500.00
3 Kepala Tukang Hari 60,000.00
4 Mandor Hari 57,500.00

B. BAHAN
1 Air Liter 75.00
2 Atap Seng Genteng Metal Lembar 58,000.00
3 Batu Kali/Batu Belah (Sungai/Gunung) M3 120,000.00
4 Batu Belah 15/20 M3 115,000.00
5 Batu Pecah 5/7 M3 130,000.00
6 Batu Bata Buah 500.00
7 Besi Beton Polos Kg 11,500.00
8 Besi Beton Ulir Kg 26,000.00
9 Baut Truss Buah 4,250.00
10 Baut Reng Buah 4,250.00
11 Box Zekering Buah 160,000.00
12 Besi Siku 40.40.4 (Terpasang) Bh 20,000.00
13 Bak Mandi Fiber Terpasang Bh 328,650.00
14 Bon-Bon Keramik M' 20,000.00
15 Cat Dasar Kg 11,750.00
16 Cat Menie Kg 22,500.00
17 Cat Kayu/Minyak Kg 38,000.00
18 Cat Dinding Acrylic Emultion Paint Kg 15,500.00
19 Dolken Kayu ø 8-10/4 m Batang 4,500.00
20 Daun penutup meja lab lengkap engsel + kunci terpasang Lbr 105,000.00
21 Asbes Quality 1 x 1 m Lembar 15,000.00
22 Engsel Pintu Buah 17,000.00
23 Engsel Jendela Buah 11,250.00
24 Floor Drain Buah 14,000.00
25 Ijuk Kg 12,000.00
26 Kerikil Beton M3 125,000.00
27 Koral Beton M3 125,000.00
28 Kayu Kelas I (Seumantok) M3 4,950,000.00
29 Kayu Kelas II M3 3,750,000.00
30 Kayu Balok M3 3,500,000.00
31 Kayu Kasau 5/7 untuk Bouwplank M3 3,000,000.00
32 Kawat Beton Kg 19,500.00
33 Keramik Sisi Kulit Jeruk 20 x 20 Buah 1,800.00
34 Keramik 20 x 20 cm' Buah 1,700.00
35 Keramik dinding 20 x 25 cm Buah 2,000.00
36 Keramik 40 x 40 Homogenius polished Buah 8,000.00
37 Keramik 40 x 40 Homogenius unpolished Buah 8,500.00
38 Kertas Amplas Lembar 3,700.00
39 Kunci Tanam Buah 140,850.00
40 Kunci Tanam Silinder Buah 95,000.00
41 Kait Angin Buah 18,000.00
42 Kaca Bening Tebal 5 mm M2 100,000.00
43 Kloset Jongkok Buah 125,000.00
44 Kloset Duduk Terpasang Buah 1,250,000.00
45 Kran diameter 3/4" atau 1/2" Buah 18,000.00
46 Kusen Alumenium Pintu M' 112,500.00
47 Kusen Alumenium Jendela M' 98,500.00
48 Kawat Duri M' 4,225.00
49 Lem Kayu Kg 27,000.00
50 Lampu Tanam 32 Watt Terpasang Buah 78,500.00
51 Lampu HE 18 wtt Buah 14,000.00
52 Lampu HE 23 wtt Buah 18,750.00
53 Lat lis Gybsum Btg 70,000.00
54 Minyak Bekisting Liter 17,500.00
55 Papan Kayu Bouwplank 3/20 M3 3,000,000.00
56 Papan kayu Meuranti 3/20 M3 3,750,000.00
57 Pasir Urug M3 80,000.00
58 Pasir Pasang M3 110,000.00
59 Pasir Beton M3 115,000.00
60 Plywood Garuda form 12 mm Lembar 195,000.00
61 Plywood Garuda form 9 mm Lembar 180,000.00
62 Paku Kayu 2" - 5" Kg 15,000.00
63 Paku 1/2" - 1" Kg 15,000.00
64 Profil C 75.75 M' 13,000.00
65 Plamir Kg 22,000.00
66 Pacok Jendela Buah 14,000.00
67 Pegangan pintu double Buah 112,000.00
68 Pipa PVC tipe AW Ø 1/2" Batang 35,000.00
69 Pipa PVC tipe AW Ø 3/4" Batang 25,000.00
70 Pipa PVC tipe AW Ø 1½" Batang 92,500.00
71 Pipa PVC tipe AW Ø 3" Batang 142,500.00
72 Pipa PVC tipe AW Ø 4" Batang 275,000.00
73 Pemasangan instalasi air bersih/kotor Titik 140,000.00
74 Pembentukan kolom selasar depan (bentuk sesuai gambar) Unit 1,250,000.00
75 Pemasangan titik api Titik 142,500.00
76 Instalasi Pipa Stainless 1/2" M' 70,000.00
77 Instalasi Pipa Stainless 2" M' 93,500.00
78 Pas.Pagar Kawat BRC Pnl 267,615.00
79 Penutup Pipa Besi 2" Bh 14,000.00
80 Roster batu kerawang Buah 9,200.00
81 Rabung Seng Genteng Metal Lembar 30,000.00
82 Reng U 0.5 M' 9,250.00
83 Resapan Lab. unit 980,000.00
84 Semen Andalas @ 40 Kg Zak 50,000.00
85 Semen Warna @ 50 Kg Zak 117,375.00
86 Screw Buah 300.00
87 Slot pintu double Buah 101,500.00
88 Septick tank + Peresapan Buah 2,800,000.00
89 Seal tape Buah 3,500.00
90 Saklar lampu Merk setara Broco 1 seri Buah 23,475.00
91 Saklar lampu Merk setara Broco 2 seri Buah 25,350.00
92 Stop kontak Buah 14,000.00
93 Stop kontak tanam Buah 20,500.00
94 Sklip BRC Bh 1,800.00
95 Tanah Urug M3 60,000.00
96 Talang Patahan Atap M' 35,000.00
97 Tarikan Jendela Buah 17,250.00
98 Tiang Pipa Pagar BRC Dia 2" Bh 93,900.00
99 Urinoir Buah 1,032,900.00
100 Wastafel Buah 704,250.00

Kota Pusong, ............... 201


Kepala Dinas Kelautan dan Perikanan
Kota Pusong

...............
......................
DAFTAR ANALISA HARGA SATUAN

Taksir 1 M² MEMBERSIH LAPANGAN


0.050 OH Pekerja @ Rp. 40,000.00 Rp. 2,000.00
0.005 OH Mandor @ Rp. 57,000.00 Rp. 267.90
Total Rp. 2,267.90
Dibulatkan Rp. 2,300.00

Taksir 1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK


0.004 M³ Kayu Kaso 5/7 @ Rp. 3,120,000.00 Rp. 10,920.00
0.004 M³ Papan Bowplank @ Rp. 3,800,000.00 Rp. 13,300.00
0.020 Kg Paku Kayu @ Rp. 16,500.00 Rp. 330.00

0.100 OH Pekerja @ Rp. 40,000.00 Rp. 4,000.00


0.005 OH Kepala Tukang Kayu @ Rp. 70,000.00 Rp. 350.00
0.005 OH Mandor @ Rp. 57,000.00 Rp. 285.00
0.050 OH Tukang Kayu @ Rp. 59,000.00 Rp. 2,950.00
Total Rp. 32,135.00
Dibulatkan Rp. 32,100.00

A.1 1 M³ GALIAN TANAH BIASA SEDALAM 1 M'


0.7500 OH Pekerja @ Rp. 40,000.00 Rp. 30,000.00
0.0250 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 31,425.00
Dibulatkan Rp. 31,400.00

A.1a 1 M³ GALIAN TANAH BIASA SEDALAM 2 M'


0.526 OH Pekerja @ Rp. 40,000.00 Rp. 21,040.00
0.052 OH Mandor @ Rp. 57,000.00 Rp. 2,964.00
Total Rp. 24,004.00
Dibulatkan Rp. 24,000.00

A.11 1 M³ URUGAN KEMBALI ( TANAH BIASA )


0.300 OH Pekerja @ Rp. 40,000.00 Rp. 12,000.00
0.015 OH Mandor @ Rp. 57,000.00 Rp. 826.50
Total Rp. 12,826.50
Dibulatkan Rp. 12,800.00

A.12 1 M³ TANAH URUG


1.200 M³ Tanah Urug @ Rp. 75,000.00 Rp. 90,000.00
0.300 OH Pekerja @ Rp. 40,000.00 Rp. 12,000.00
0.015 OH Mandor @ Rp. 57,000.00 Rp. 855.00
Total Rp. 102,855.00
Dibulatkan Rp. 102,900.00

A.12a 1 M³ URUGAN PASIR


1.2000 M³ Pasir Urug @ Rp. 65,000.00 Rp. 78,000.00
0.3000 OH Pekerja @ Rp. 40,000.00 Rp. 12,000.00
0.0100 OH Mandor @ Rp. 57,000.00 Rp. 570.00
Total Rp. 90,570.00
Dibulatkan Rp. 90,600.00

E. 3 1 M² MENGETAM KAYU
0.067 OH Tukang Kayu @ Rp. 59,000.00 Rp. 3,953.00
0.007 OH Kepala Tukang @ Rp. 70,000.00 Rp. 469.00
0.160 OH Pekerja @ Rp. 40,000.00 Rp. 6,400.00
0.008 OH Mandor @ Rp. 57,000.00 Rp. 456.00
Total Rp. 11,278.00
Dibulatkan Rp. 11,300.00

F1 1 M² MEMASANG PLAFOND TRYPLEK 4 MM


0.011 M³ Kayu Rangka Kls II @ Rp. 2,700,000.00 Rp. 29,700.00
0.347 Lbr Tryplek 4 mm @ Rp. 95,000.00 Rp. 32,965.00
0.200 Kg Paku Campur @ Rp. 16,500.00 Rp. 3,300.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 87,390.00
Dibulatkan Rp. 87,400.00
F12 1 M² MEMASANG LYSPLANK
1.100 M² Papan Lysplank 3/30 @ Rp. 23,500.00 Rp. 25,850.00
1.100 E. 3 @ Rp. 11,300.00 Rp. 12,430.00
0.020 Kg Paku @ Rp. 16,500.00 Rp. 330.00
0.520 OH Tukang Kayu @ Rp. 59,000.00 Rp. 30,680.00
0.052 OH Kepala Tukang @ Rp. 70,000.00 Rp. 3,640.00
0.190 OH Pekerja @ Rp. 40,000.00 Rp. 7,600.00
0.010 OH Mandor @ Rp. 57,000.00 Rp. 541.50
Total Rp. 81,071.50
Dibulatkan Rp. 81,100.00

F14 1 M³ PEKERJAAN KAYU KUDA KUDA


1.100 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 4,180,000.00
10.000 Kg Paku @ Rp. 95,000.00 Rp. 950,000.00
6.000 OH Tukang Kayu @ Rp. 59,000.00 Rp. 354,000.00
2.350 OH Kepala Tukang @ Rp. 70,000.00 Rp. 164,500.00
8.000 OH Pekerja @ Rp. 40,000.00 Rp. 320,000.00
0.400 OH Mandor @ Rp. 57,000.00 Rp. 22,800.00
Total Rp. 5,991,300.00
Dibulatkan Rp. 5,991,300.00

F14a 1 M³ PEKERJAAN KAYU KUDA KUDA KORIDOR


1.100 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 4,180,000.00
10.000 Kg Paku @ Rp. 95,000.00 Rp. 950,000.00
25.800 OH Tukang Kayu @ Rp. 59,000.00 Rp. 1,522,200.00
2.580 OH Kepala Tukang @ Rp. 70,000.00 Rp. 180,600.00
8.800 OH Pekerja @ Rp. 40,000.00 Rp. 352,000.00
0.440 OH Mandor @ Rp. 57,000.00 Rp. 25,080.00
Total Rp. 7,209,880.00
Dibulatkan Rp. 7,209,900.00

F16 1 M³ PEKERJAAN KAYU KOSEN PINTU DAN JENDELA


1.100 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 4,180,000.00
0.250 Kg Paku @ Rp. 95,000.00 Rp. 23,750.00
18.000 OH Tukang Kayu @ Rp. 59,000.00 Rp. 1,062,000.00
1.730 OH Kepala Tukang @ Rp. 70,000.00 Rp. 121,100.00
5.760 OH Pekerja @ Rp. 40,000.00 Rp. 230,400.00
0.288 OH Mandor @ Rp. 57,000.00 Rp. 16,416.00
Total Rp. 5,633,666.00
Dibulatkan Rp. 5,633,700.00

F. 21 1 M² PEKERJAAN PINTU / JENDELA PANEL


0.039 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 146,300.00
3.450 OH Tukang Kayu @ Rp. 59,000.00 Rp. 203,550.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.160 OH Pekerja @ Rp. 40,000.00 Rp. 46,400.00
0.534 OH Mandor @ Rp. 57,000.00 Rp. 30,415.20
Total Rp. 450,815.20
Dibulatkan Rp. 450,800.00

F. 21a 1 M² PEKERJAAN PINTU 1/2 LAPIS SENG


0.039 M³ Kayu Meuranti @ Rp. 2,700,000.00 Rp. 103,950.00
1.000 Lbr Seng Plat 0.30 mm @ Rp. 53,000.00 Rp. 53,000.00
0.050 Kg Lem Kayu @ Rp. 37,200.00 Rp. 1,860.00
0.270 Kg Paku @ Rp. 16,500.00 Rp. 4,455.00
3.450 OH Tukang Kayu @ Rp. 59,000.00 Rp. 203,550.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.160 OH Pekerja @ Rp. 40,000.00 Rp. 46,400.00
0.534 OH Mandor @ Rp. 57,000.00 Rp. 30,415.20
Total Rp. 467,780.20
Dibulatkan Rp. 467,780.00
F. 24 1 M² PEKERJAAN JENDELA KACA ALUMINIUM
1.100 M² Kaca 5 mm @ Rp. 141,100.00 Rp. 155,210.00
1.100 M² Karet Kaca @ Rp. 16,000.00 Rp. 17,600.00
0.010 Kg Lem Kaca @ Rp. 37,200.00 Rp. 372.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.000 OH Tukang Kaca @ Rp. 59,000.00 Rp. 59,000.00
0.920 OH Pekerja @ Rp. 40,000.00 Rp. 36,800.00
0.046 OH Mandor @ Rp. 57,000.00 Rp. 2,622.00
Total Rp. 295,754.00
Dibulatkan Rp. 295,800.00

F. 25 1 M² PEKERJAAN JENDELA KACA MATI BINGKAI ALUMINIUM


1.100 M² Kaca Rayben 5 mm @ Rp. 141,100.00 Rp. 155,210.00
1.100 M² Karet Kaca @ Rp. 16,000.00 Rp. 17,600.00
0.010 Kg Lem @ Rp. 37,200.00 Rp. 372.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.000 OH Tukang Kaca @ Rp. 59,000.00 Rp. 59,000.00
0.920 OH Pekerja @ Rp. 40,000.00 Rp. 36,800.00
0.046 OH Mandor @ Rp. 57,000.00 Rp. 2,622.00
Total Rp. 295,754.00
Dibulatkan Rp. 295,800.00

F. 26 1 M² PEKERJAAN PINTU/JENDELA KACA 3 CM


1.100 M² Kaca 5 mm @ Rp. 141,100.00 Rp. 155,210.00
0.025 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 93,632.00
2.760 OH Tukang Kayu @ Rp. 59,000.00 Rp. 162,840.00
0.276 OH Kepala Tukang @ Rp. 70,000.00 Rp. 19,320.00
0.920 OH Pekerja @ Rp. 40,000.00 Rp. 36,800.00
0.046 OH Mandor @ Rp. 57,000.00 Rp. 2,622.00
Total Rp. 470,424.00
Dibulatkan Rp. 470,400.00

F. 27b 1 M² MEMASANG PLAFOND PAPAN RIDER


0.015 M³ Kayu Rangka Plafond @ Rp. 2,700,000.00 Rp. 41,580.00
1.000 M² Papan Rider @ Rp. 58,800.00 Rp. 58,800.00
0.250 Kg Paku Campur @ Rp. 95,000.00 Rp. 23,750.00
0.800 OH Tukang Kayu @ Rp. 59,000.00 Rp. 47,200.00
0.080 OH Kepala Tukang @ Rp. 70,000.00 Rp. 5,600.00
0.280 OH Pekerja @ Rp. 40,000.00 Rp. 11,200.00
0.014 OH Mandor @ Rp. 57,000.00 Rp. 798.00
Total Rp. 188,928.00
Dibulatkan Rp. 188,900.00

G.I.1 1 M³ PASANGAN BATU KOSONG


1.100 M3 Batu Kali @ 125,000.00 Rp. 137,500.00
0.120 OH Kepala Tukang @ 70,000.00 Rp. 8,400.00
1.200 OH Tukang @ 59,000.00 Rp. 70,800.00
3.600 OH Pekerja @ 40,000.00 Rp. 144,000.00
0.180 OH Mandor @ 57,000.00 Rp. 10,260.00
Total Rp 370,960.00
Dibulatkan Rp 370,960.00

G.I.5 1 M³ PASANGAN BATU GUNUNG/BELAH/KALI 1:4


1.200 M³ Batu Belah/Gunung @ Rp. 125,000.00 Rp. 150,000.00
3.260 Zak Semen PC @ Rp. 60,000.00 Rp. 195,600.00
0.522 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 44,370.00
1.200 OH Tukang Batu @ Rp. 59,000.00 Rp. 70,800.00
0.120 OH Kepala Tukang @ Rp. 70,000.00 Rp. 8,400.00
3.600 OH Pekerja @ Rp. 40,000.00 Rp. 144,000.00
0.180 OH Mandor @ Rp. 57,000.00 Rp. 10,260.00
Total Rp. 623,430.00
Dibulatkan Rp. 623,400.00
G.II.2 1 M² PASANGAN BATA 1 : 2
80.000 Bh Batu Bata @ Rp. 600.00 Rp. 48,000.00
0.778 Zak Cemen PC @ Rp. 60,000.00 Rp. 46,680.00
0.061 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 5,185.00
0.175 OH Tukang Batu @ Rp. 59,000.00 Rp. 10,325.00
0.018 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,225.00
0.525 OH Pekerja @ Rp. 40,000.00 Rp. 21,000.00
0.026 OH Mandor @ Rp. 57,000.00 Rp. 1,499.10
Total Rp. 133,914.10
Dibulatkan Rp. 133,900.00

G.II.4 1 M² PASANGAN BATA 1 : 4


80.000 Bh Batu Bata @ Rp. 600.00 Rp. 48,000.00
0.470 Zak Cemen PC @ Rp. 60,000.00 Rp. 28,200.00
0.075 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 6,375.00
0.175 OH Tukang Batu @ Rp. 59,000.00 Rp. 10,325.00
0.018 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,225.00
0.525 OH Pekerja @ Rp. 40,000.00 Rp. 21,000.00
0.026 OH Mandor @ Rp. 57,000.00 Rp. 1,499.10
Total Rp. 116,624.10
Dibulatkan Rp. 116,600.00

G.II.3 1 M² PLESTERAN 1 : 3 TEBAL 15 MM


0.177 Zak Cemen PC @ Rp. 60,000.00 Rp. 10,620.00
0.021 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 1,785.00
0.132 OH Tukang Batu @ Rp. 59,000.00 Rp. 7,788.00
0.013 OH Kepala Tukang @ Rp. 70,000.00 Rp. 924.00
0.264 OH Pekerja @ Rp. 40,000.00 Rp. 10,560.00
0.013 OH Mandor @ Rp. 57,000.00 Rp. 752.40
Total Rp. 32,429.40
Dibulatkan Rp. 32,400.00

G.X.2 1 M² PLESTERAN DAN ACIAN 1 : 2 TEBAL 15 mm


0.310 Zak Cemen PC @ Rp. 60,000.00 Rp. 18,600.00
0.018 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 1,530.00
0.165 OH Tukang Batu @ Rp. 59,000.00 Rp. 9,735.00
0.017 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,155.00
0.138 OH Pekerja @ Rp. 40,000.00 Rp. 5,520.00
0.017 OH Mandor @ Rp. 57,000.00 Rp. 940.50
Total Rp. 37,480.50
Dibulatkan Rp. 37,500.00

G.X.4 1 M² PLESTERAN DAN ACIAN 1 : 4 TEBAL 15 mm


0.230 Zak Cemen PC @ Rp. 60,000.00 Rp. 13,800.00
0.023 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 1,955.00
0.165 OH Tukang Batu @ Rp. 59,000.00 Rp. 9,735.00
0.017 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,155.00
0.138 OH Pekerja @ Rp. 40,000.00 Rp. 5,520.00
0.017 OH Mandor @ Rp. 57,000.00 Rp. 940.50
Total Rp. 33,105.50
Dibulatkan Rp. 33,100.00

G.XIII.10 1 M³ BETON COOR 1 : 2 : 3


8.750 Zak Cemen PC @ Rp. 60,000.00 Rp. 525,000.00
0.680 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 57,800.00
0.940 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 94,000.00
0.700 OH Tukang Batu @ Rp. 59,000.00 Rp. 41,300.00
0.070 OH Kepala Tukang @ Rp. 70,000.00 Rp. 4,900.00
4.100 OH Pekerja @ Rp. 40,000.00 Rp. 164,000.00
0.203 OH Mandor @ Rp. 57,000.00 Rp. 11,571.00
Total Rp. 898,571.00
Dibulatkan Rp. 898,600.00
G.XIII.11 1 M³ BETON COOR 1 : 2 : 4
7.350 Zak Cemen PC @ Rp. 60,000.00 Rp. 441,000.00
0.590 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 50,150.00
1.080 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 108,000.00
0.700 OH Tukang Batu @ Rp. 59,000.00 Rp. 41,300.00
0.070 OH Kepala Tukang @ Rp. 70,000.00 Rp. 4,900.00
4.100 OH Pekerja @ Rp. 40,000.00 Rp. 164,000.00
0.203 OH Mandor @ Rp. 57,000.00 Rp. 11,571.00
Total Rp. 820,921.00
Dibulatkan Rp. 820,900.00

G.XIII.12 1 M³ BETON COOR 1 : 3 : 6 UNTUK LANTAI


5.730 Zak Cemen PC @ Rp. 60,000.00 Rp. 343,800.00
0.680 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 57,800.00
1.040 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 104,000.00
0.700 OH Tukang Batu @ Rp. 59,000.00 Rp. 41,300.00
0.070 OH Kepala Tukang @ Rp. 70,000.00 Rp. 4,900.00
4.100 OH Pekerja @ Rp. 40,000.00 Rp. 164,000.00
0.203 OH Mandor @ Rp. 57,000.00 Rp. 11,571.00
Total Rp. 727,371.00
Dibulatkan Rp. 727,400.00

G.XIV 1 M³ PEKERJAAN BETON BERTULANG


a. Mengerjakan 1 Kg Besi Beton Polos
0.049 OH Tukang Besi @ Rp. 59,000.00 Rp. 2,867.40
0.016 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,134.00
0.049 OH Pekerja @ Rp. 40,000.00 Rp. 1,944.00
1.250 Kg Besi Beton Polos @ Rp. 10,400.00 Rp. 13,000.00
0.023 Kg Kawat Beton @ Rp. 21,000.00 Rp. 483.00
Total Rp. 19,428.40
Dibulatkan Rp. 19,400.00

b. Mengerjakan 1 Kg Besi Beton Ulir


0.005 OH Tukang Besi @ Rp. 59,000.00 Rp. 286.74
0.016 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,134.00
0.049 OH Pekerja @ Rp. 40,000.00 Rp. 1,944.00
1.250 Kg Besi Beton Ulir @ Rp. 15,500.00 Rp. 19,375.00
0.023 Kg Kawat Beton @ Rp. 21,000.00 Rp. 483.00
Total Rp. 23,222.74
Dibulatkan Rp. 23,200.00

c. 1 M² Cetakan Beton / Bekisting Memakai Tryplek


0.380 Lbr Multiplek @ Rp. 95,000.00 Rp. 36,100.00
0.021 M³ Kasau ( Meranti ) @ Rp. 2,700,000.00 Rp. 56,160.00
0.250 Kg Paku @ Rp. 16,500.00 Rp. 4,125.00
0.220 OH Pekerja @ Rp. 40,000.00 Rp. 8,800.00
0.500 OH Tukang Kayu @ Rp. 59,000.00 Rp. 29,500.00
0.050 OH Kepala Tukang @ Rp. 70,000.00 Rp. 3,500.00
0.011 OH Mandor @ Rp. 57,000.00 Rp. 627.00
3.000 OH Pekerja Bkr/Siram @ Rp. 40,000.00 Rp. 120,000.00
Total Rp. 258,812.00
Dibulatkan Rp. 258,800.00

d. 1 M² Cetakan Beton / Bekisting Memakai Papan


0.048 M³ Papan Bekisting @ Rp. 2,000,000.00 Rp. 96,800.00
0.400 Kg Paku @ Rp. 95,000.00 Rp. 38,000.00
0.200 OH Pekerja @ Rp. 40,000.00 Rp. 8,000.00
0.500 OH Tukang Kayu @ Rp. 59,000.00 Rp. 29,500.00
0.050 OH Kepala Tukang @ Rp. 70,000.00 Rp. 3,500.00
0.010 OH Mandor @ Rp. 57,000.00 Rp. 570.00
4.000 OH Pekerja Bkr/Siram @ Rp. 40,000.00 Rp. 160,000.00
Total Rp. 336,370.00
Dibulatkan Rp. 336,400.00
d. 1 M³ Kayu Perancah / Stut Werk
0.420 M³ Papan Bekisting @ Rp. 2,000,000.00 Rp. 840,000.00
0.400 Kg Paku @ Rp. 95,000.00 Rp. 38,000.00
2.125 OH Pekerja @ Rp. 40,000.00 Rp. 85,000.00
5.875 OH Tukang Kayu @ Rp. 59,000.00 Rp. 346,625.00
0.788 OH Kepala Tukang @ Rp. 70,000.00 Rp. 55,160.00
0.131 OH Mandor @ Rp. 57,000.00 Rp. 7,467.00
Total Rp. 1,372,252.00
Dibulatkan Rp. 1,372,300.00

G.XIV.1 1 M³ PONDASI TAPAK


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
112.297 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,178,555.98
4.940 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,661,667.80
Total Rp. 4,738,823.78
Dibulatkan Rp. 4,738,800.00

G.XIV.2 1 M³ KOLOM 13/13


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
210.367 Kg Besi + Upah @ Rp. 19,400.00 Rp. 4,081,121.74
4.940 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,661,667.80
Total Rp. 6,641,389.54
Dibulatkan Rp. 6,641,400.00

G.XIV.4 1 M³ PONDASI TAPAK TYPE. D


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
115.846 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,247,421.71
3.940 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,325,297.80
Total Rp. 4,471,319.51
Dibulatkan Rp. 4,471,300.00

G.XIV.3 1 M³ BALOK SLOOF 25/40


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
135.143 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,621,774.20
2.030 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 682,831.10
Total Rp. 4,203,205.30
Dibulatkan Rp. 4,203,200.00

G.XIV.3a 1 M³ BALOK SLOOF 20/20


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
145.375 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,820,275.00
3.333 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,121,121.21
Total Rp. 4,839,996.21
Dibulatkan Rp. 4,840,000.00

G.XIV.4a 1 M³ BALOK 15/30


1.000 M³ Beton Coor G.XIII.11 @ Rp. 898,600.00 Rp. 898,600.00
185.692 Kg Besi + Upah @ Rp. 19,400.00 Rp. 3,602,432.56
5.558 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,869,376.28
0.200 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 274,460.00
Total Rp. 6,644,868.84
Dibulatkan Rp. 6,644,900.00

G.XIV.5 1 M³ KOLOM 20/25


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,571.00 Rp. 898,571.00
126.011 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,444,613.40
3.826 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,287,066.40
0.125 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 171,537.50
Total Rp. 4,801,788.30
Dibulatkan Rp. 4,801,800.00
G.XIV.6 1 M³ KOLOM 20/20
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
148.375 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,878,478.88
5.267 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,771,684.24
0.220 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 301,906.00
Total Rp. 5,850,640.12
Dibulatkan Rp. 5,850,600.00
G.XIV.7 1 M³ KOLOM 25/30
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
142.465 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,763,828.76
4.400 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,480,160.00
0.120 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 164,676.00
Total Rp. 5,307,235.76
Dibulatkan Rp. 5,307,200.00

G.XIV.8 1 M³ KOLOM PRAKTIS 13/13


1.000 M³ Beton Coor G.XIII. 11 @ Rp. 898,571.00 Rp. 898,571.00
182.318 Kg Besi + Upah @ Rp. 19,400.00 Rp. 3,536,973.08
4.130 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,389,332.00
Total Rp. 5,824,876.08
Dibulatkan Rp. 5,824,900.00
G.XIV.9 1 M³ RING BALK 13/13
1.000 M³ Beton Coor G.XIII. 11 @ Rp. 898,571.00 Rp. 898,571.00
182.318 Kg Besi + Upah @ Rp. 19,400.00 Rp. 3,536,973.08
5.478 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,417,706.40
Total Rp. 5,853,250.48
Dibulatkan Rp. 5,853,300.00

G.XIV.10 1 M³ BALOK LANTAI 25/40


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
135.143 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,621,774.20
5.833 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,509,658.04
0.270 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 370,521.00
Total Rp. 5,400,524.24
Dibulatkan Rp. 5,400,500.00

G.XIV.11 1 M³ PEMBAGI PLAT LANTAI 20/30


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
217.690 Kg Besi + Upah @ Rp. 19,400.00 Rp. 4,223,186.00
4.445 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,150,366.00
0.200 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 274,460.00
Total Rp. 6,546,583.00
Dibulatkan Rp. 6,546,600.00

G.XIV.12 1 M³ PLAT LANTAI


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
113.514 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,202,171.60
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,366,472.60
Dibulatkan Rp. 4,366,500.00

G.XIV.13 1 M³ COOR PLAT DAAG


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
116.015 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,250,682.46
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,414,983.46
Dibulatkan Rp. 4,415,000.00

G.XIV.14 1 M³ PLAT KUBAH


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
137.061 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,658,983.40
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,823,284.40
Dibulatkan Rp. 4,823,300.00
G.XIV.15 1 M³ BALOK PLAT DAG 25/35
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
116.015 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,250,682.46
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,414,983.46
Dibulatkan Rp. 4,415,000.00

G.XIV.16a 1 M³ KOLOM Ø 30
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
117.339 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,276,376.60
3.412 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 883,025.60
0.320 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 439,136.00
Total Rp. 4,497,109.20
Dibulatkan Rp. 4,497,100.00

G.XIV.17 1 M³ KOLOM 50/50


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
88.620 Kg Besi + Upah @ Rp. 19,400.00 Rp. 1,719,228.00
2.930 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 758,284.00
0.400 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 548,920.00
Total Rp. 3,925,003.00
Dibulatkan Rp. 3,925,000.00

G.XIV.17a 1 M³ RING BALOK 25/30


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
142.974 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,773,687.84
4.280 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,107,664.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 5,191,612.84
Dibulatkan Rp. 5,191,600.00

G.XIV.18 1 M³ PLAT TALANG


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
110.000 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,134,000.00
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,298,301.00
Dibulatkan Rp. 4,298,300.00

G.XIV.19 1 M³ PLAT TANGGA


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
143.000 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,774,200.00
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,938,501.00
Dibulatkan Rp. 4,938,500.00

H. 1 1 M³ PEREKAT 1 : 2
10.048 Zak Cemen PC @ Rp. 60,000.00 Rp. 602,880.00
0.950 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 80,750.00
Total Rp. 683,630.00
Dibulatkan Rp. 683,600.00

G.XIV.20 1 M³ BALOK 15/18


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
149.532 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,900,922.74
3.133 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 810,820.40
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 5,022,004.14
Dibulatkan Rp. 5,022,000.00
G.XIV.20a 1 M³ RING BALOK 15/15
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
152.174 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,952,167.84
4.280 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,107,664.00
0.350 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 480,305.00
Total Rp. 5,438,707.84
Dibulatkan Rp. 5,438,700.00

H. 2 1 M² COOR LANTAI TUMBUK TEBAL 7 CM


0.437 Zak Cemen PC @ Rp. 60,000.00 Rp. 26,220.00
0.044 M³ Pasir Beton @ Rp. 85,000.00 Rp. 3,740.00
0.070 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 7,000.00
0.095 OH Tukang Batu @ Rp. 59,000.00 Rp. 5,605.00
0.010 OH Kepala Tukang @ Rp. 70,000.00 Rp. 665.00
0.520 OH Pekerja @ Rp. 40,000.00 Rp. 20,800.00
0.026 OH Mandor @ Rp. 57,000.00 Rp. 1,482.00
Total Rp. 65,512.00
Dibulatkan Rp. 65,500.00

H. 3 1 M² LANTAI KERAMIK 60X60 CM


1.000 M² Keramik @ Rp. 159,300.00 Rp. 159,300.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 211,783.00
Dibulatkan Rp. 211,800.00

H. 11 1 M² LANTAI MARMER
1.052 Bh Marmer @ Rp. 255,750.00 Rp. 269,049.00
14.150 Kg Semen Portland @ Rp. 1,500.00 Rp. 21,225.00
0.039 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 3,315.00
2.000 Kg Semen Warna @ Rp. 4,650.00 Rp. 9,300.00
0.350 OH Tukang Batu @ Rp. 59,000.00 Rp. 20,650.00
0.035 OH Kepala Tukang @ Rp. 70,000.00 Rp. 2,450.00
0.620 OH Pekerja @ Rp. 40,000.00 Rp. 24,800.00
0.030 OH Mandor @ Rp. 57,000.00 Rp. 1,710.00
Total Rp. 352,499.00
Dibulatkan Rp. 352,500.00
H. 4 1 M² LANTAI KERAMIK 40X40 CM
1.000 M² Keramik @ Rp. 70,100.00 Rp. 70,100.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 122,583.00
Dibulatkan Rp. 122,600.00
H. 5 1 M² LANTAI KERAMIK 30X30 CM
1.000 M² Keramik @ Rp. 61,200.00 Rp. 61,200.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 113,683.00
Dibulatkan Rp. 113,700.00
H. 7 1 M² DINDING KERAMIK 30X30 CM
1.000 M² Keramik @ Rp. 61,200.00 Rp. 61,200.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.030 Zak Cemen Putih @ Rp. 129,400.00 Rp. 3,882.00
1.000 OH Tukang Batu @ Rp. 59,000.00 Rp. 59,000.00
0.100 OH Kepala Tukang @ Rp. 70,000.00 Rp. 7,000.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.075 OH Mandor @ Rp. 75,000.00 Rp. 5,625.00
Total Rp. 166,961.00
Dibulatkan Rp. 167,000.00

H. 8 1 M² DINDING KERAMIK 20X25 CM ( KM/WC)


1.000 M² Keramik @ Rp. 70,100.00 Rp. 70,100.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.030 Zak Cemen Putih @ Rp. 129,400.00 Rp. 3,882.00
0.500 OH Tukang Batu @ Rp. 59,000.00 Rp. 29,500.00
0.025 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,750.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 136,911.00
Dibulatkan Rp. 136,900.00
H. 9 1 M² LANTAI KERAMIK 25X25 CM
1.000 M² Keramik @ Rp. 61,200.00 Rp. 61,200.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 113,683.00
Dibulatkan Rp. 113,700.00

I. 3 1 M² MENGECAT DINDING / TEMBOK 3 X SAPU DAN MEMPLAMOUR


0.200 Kg Cat Tembok @ Rp. 8,500.00 Rp. 1,700.00
0.050 Lbr Kertas Amplas @ Rp. 5,300.00 Rp. 265.00
0.100 OH Tukang Cat @ Rp. 59,000.00 Rp. 5,900.00
0.010 OH Kepala Tukang @ Rp. 70,000.00 Rp. 700.00
0.188 OH Pekerja @ Rp. 40,000.00 Rp. 7,520.00
0.009 OH Mandor @ Rp. 57,000.00 Rp. 535.80
Total Rp. 16,620.80
Dibulatkan Rp. 16,600.00
I. 18 1 M² RESIDU
0.350 Ltr Residu @ Rp. 47,000.00 Rp. 16,450.00
0.100 OH Pekerja @ Rp. 40,000.00 Rp. 4,000.00
0.050 OH Mandor @ Rp. 57,000.00 Rp. 2,850.00
Total Rp. 23,300.00
Dibulatkan Rp. 23,300.00

J. 3 1 M² MEMASANG ATAP SENG MOTIF GENTENG


1.000 Lbr Genteng Jumbo Metal @ Rp. 70,000.00 Rp. 70,000.00
0.053 Kg Paku Seng @ Rp. 29,400.00 Rp. 1,558.20
0.150 OH Tukang Kayu @ Rp. 59,000.00 Rp. 8,850.00
0.015 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,050.00
0.075 OH Pekerja @ Rp. 40,000.00 Rp. 3,000.00
0.004 OH Mandor @ Rp. 57,000.00 Rp. 213.75
Total Rp. 84,671.95
Dibulatkan Rp. 84,700.00

J. 4 1 M² MEMASANG RABUNG SENG MOTIF GENTENG


0.700 Lbr Rabung Seng Multi Roof @ Rp. 51,150.00 Rp. 35,805.00
0.030 Kg Paku Seng @ Rp. 29,400.00 Rp. 882.00
0.019 OH Tukang Kayu @ Rp. 59,000.00 Rp. 1,106.25
0.019 OH Pekerja @ Rp. 40,000.00 Rp. 750.00
Total Rp. 38,543.25
Dibulatkan Rp. 38,500.00
J. 8 1 M² MEMASANG TALANG ATAP
0.040 Lbr Seng Plat 0.30 @ Rp. 53,000.00 Rp. 2,120.00
0.500 M¹ Plat Strip 2 Cm @ Rp. 6,950.00 Rp. 3,475.00
0.750 OH Tukang Kayu @ Rp. 59,000.00 Rp. 44,250.00
0.075 OH Kepala Tukang @ Rp. 70,000.00 Rp. 5,250.00
0.150 OH Pekerja @ Rp. 40,000.00 Rp. 6,000.00
0.023 OH Mandor @ Rp. 57,000.00 Rp. 1,282.50
Total Rp. 62,377.50
Dibulatkan Rp. 62,400.00

J. 9 1 M¹ MEMASANG PIPA PVC ø 4 " UNTUK PEMBUANGAN AIR HUJAN


0.173 Btg Pipa PVC @ Rp. 75,000.00 Rp. 12,975.00
0.020 Kg Lem Pipa @ Rp. 93,200.00 Rp. 1,864.00
0.117 OH Tukang Kayu @ Rp. 59,000.00 Rp. 6,903.00
0.012 OH Kepala Tukang @ Rp. 70,000.00 Rp. 819.00
0.070 OH Pekerja @ Rp. 40,000.00 Rp. 2,792.00
0.003 OH Mandor @ Rp. 57,000.00 Rp. 198.93
Total Rp. 25,551.93
Dibulatkan Rp. 25,600.00
Anl. G.53 10 M² MENGECAT TEMBOK DAN PLAFOND
1.000 Org Tukang @ Rp. 59,000.00 Rp. 59,000.00
3.000 Org Pekerja @ Rp. 40,000.00 Rp. 120,000.00
0.100 Org Kepala Tukang @ Rp. 70,000.00 Rp. 7,000.00
0.250 Kg Cat Tembok @ Rp. 8,500.00 Rp. 2,125.00
Jumlah Rp. 188,125.00
Untuk 1 M2 Luas Cat Tembok = 1/10 x … @ Rp. 188,125.00 Rp. 18,812.50

Anl. K10+K23+K28 10 M2 MENGECAT KOSEN PINTU JENDELA DAN LYSPLANK


0.075 Org Tukang @ Rp. 59,000.00 Rp. 4,425.00
0.025 Org Mandor @ Rp. 57,000.00 Rp. 1,425.00
0.500 Org Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.075 Org Kepala Tukang @ Rp. 70,000.00 Rp. 5,250.00
6.430 Kg Cat Minyak @ Rp. 41,200.00 Rp. 264,916.00
1.000 Kg Dempul @ Rp. 17,600.00 Rp. 17,600.00
2.000 Lbr Amplas @ Rp. 5,300.00 Rp. 10,600.00
Jumlah Rp. 324,216.00
Untuk 1 M2 Luas Cat Tembok = 1/10 x … @ Rp. 324,216.00 Rp. 32,421.60

Anl. G. 67. a 1 M² PASANGAN PAVING BLOK


46.000 Bh Paving Blok @ Rp. 4,100.00 Rp. 188,600.00
0.011 M3 Pasir Pasang @ Rp. 85,000.00 Rp. 969.00

0.250 Org Kepala Tukang @ Rp. 70,000.00 Rp. 17,500.00


0.013 Org Tukang @ Rp. 59,000.00 Rp. 784.11
0.125 Org Pekerja @ Rp. 40,000.00 Rp. 5,018.00
0.013 Org Mandor @ Rp. 57,000.00 Rp. 763.80
Jumlah Rp. 213,634.91

#REF!
#REF!
#REF!

#REF!
#REF!
HARGA SATUAN UPAH

HARGA SATUAN
NO BAHAN MATERIAL SATUAN (RP)
1 2 3 4
1 Tukang OH 59,000.00
2 Kepala Tukang OH 70,000.00
3 Pekerja OH 40,000.00
4 Mandor OH 57,000.00

HARGA SATUAN / BAHAN MATERIAL


HARGA SATUAN
NO BAHAN MATERIAL SATUAN (RP)
1 2 3 4
1 Ampelas Lbr 5,300.00
2 Asbes rata 1 x 1 Lbr 21,200.00
3 Alat - alat bantu Set 110,000.00
4 Batu Gunung m3 120,000.00
5 Batu Kali m3 125,000.00
6 Batu Bata Bh 600.00
7 Besi Beton Polos Kg 10,400.00
8 Besi Beton Ulir Kg 15,500.00
9 Bonbon Keramik m' 19,100.00
10 Baja Ringan Audie Trus CT - 100 (Zincalum) m2 225,000.00
11 Besi Pagar BRC, Uk. 90 x 240 Kw 1 Pnl 175,000.00
12 Bunga Besi Pengaman Atas Pagar Bh 7,500.00
13 Kerikil m3 90,000.00
14 Cat Tembok Kg 8,500.00
15 Cat Minyak Kg 41,200.00
16 Cat Kayu Dasar Kg 23,500.00
17 Cat Menie Kg 29,400.00
18 Cat Kayu Kilat Kg 41,200.00
19 Cat Kayu Kg 41,200.00
20 Cat Menie Kayu Kg 29,400.00
21 Dempul Kayu Kg 17,600.00
22 Engsel Pintu Bh 8,200.00
23 Engsel Jendela Bh 5,900.00
24 Floor Drain Bh 17,600.00
25 Genteng Jumbo Multi Roof m2 135,100.00
26 Genteng Jumbo Metal m2 70,000.00
27 Kaca Rayband 3 mm m2 94,100.00
28 Kaca Rayband 5 mm m2 141,100.00
29 Kaca Block Ktk 35,300.00
30 Klosek Jongkok Bh 141,100.00
31 Klosek Duduk Bh 141,100.00
32 Kran Air dia 1/2" Bh 23,500.00
33 Kran Air dia 3/4" Bh 29,400.00
34 Kayu Kaso 3/5 m3 3,120,000.00
35 Kayu Perancah m3 2,160,000.00
1 2 3 4
36 Kayu / Papan Bekisting M³ 2,000,000.00
37 Kayu Bahan Pintu M³ 3,800,000.00
38 Kayu Klas I (Semantok,dll) M³ 3,800,000.00
39 Kayu Klas II (Merante, Krueng dll) M³ 2,700,000.00
40 Kayu Klas III (Borneo,dll) M³ 1,850,000.00
41 Kayu Lat Btg 9,400.00
42 Kapur Kg 29,400.00
43 Kawat Beton Kg 21,000.00
44 Kawat Duri m' 7,500.00
45 Keramik 20 x 20 (Setera Ikat) m2 60,500.00
46 Keramik 20 x 25 (Setera Ikat) m2 70,100.00
47 Keramik 25 x 25 (Setera Ikat) m2 70,100.00
48 Keramik 30 x 30 (setera Ikat) m2 61,200.00
49 Keramik 40 x 40 (Setera Ikat) m2 70,100.00
50 Keramik 60 x 60 (Setera Ikat) m2 159,300.00
51 Koral / Kerikil Bersih m3 100,000.00
52 Kran Air 1/2" Bh 27,000.00
53 Kran Air 3/4" Bh 35,300.00
54 Kunci Tanam 2 Slag Bh 88,200.00
55 Kunci Pacok Bh 9,400.00
56 Kerandel Jendela Bh 9,400.00
57 Lem Kayu Kg 37,200.00
58 Lem Pipa Kg 93,200.00
59 Lampu TL 40 Watt (Philips) Bh 106,950.00
60 Lampu HE 20 Watt (Philips) Bh 51,150.00
61 Mosaik 30 x 30 Bh 41,850.00
62 Marmer Bh 255,750.00
63 Plat Strip Bh 6,950.00
64 Plamir Kg 23,500.00
65 Pipa PVC tipe AW 2½" Btg 88,350.00
66 Pipa PVC tipe AW ¾" m' 69,750.00
67 Pipa Galpanis ½ m' 209,250.00
68 Paku Plywood Kg 12,550.00
69 Pasir Pasang m3 85,000.00
70 Pasir Urug m3 65,000.00
71 Pasir Beton m3 85,000.00
72 Paku Biasa ½" - 1" Kg 16,500.00
73 Paku Kayu (biasa) Kg 16,500.00
74 Paku Seng Kg 29,400.00
75 Papan Bekisting Lbr 47,000.00
76 Papan Kayu Klas I (Semantok,dll) m3 3,800,000.00
77 Papan Kayu Klas II (Krueng / Merante) m3 2,700,000.00
78 Papan Kayu Klas III (Borneo, dll) m3 1,850,000.00
79 Papan Lysplank Klas I 1,3 x 30 cm m' 23,500.00
80 Papan Rider Lbr 58,800.00
81 Penutup Pipa Besi BRC Dia. 2" Bh 20,000.00
82 Plamor Tembok Kg 23,500.00
83 Pipa Pagar BRC Dia 2" Bh 135,000.00
84 Rabung Genteng Metal Lbr 51,150.00
1 2 3 4

79 Semen Warna Kg 4,650.00


80 Sirtu M³ 90,000.00
81 Semen PC @ 40 KG Zak 60,000.00
82 Semen Putih Zak 129,400.00
83 Seng Plat 0.30 m' 53,000.00
84 Sekring 1 Group Bh 58,550.00
85 Sekring 2 Group Bh 99,500.00
86 Sklip BRC Bh 2,500.00
87 Stop Kontak Bh 5,900.00
88 Sakelar Seri Bh 5,900.00
89 Tanah Timbun m3 75,000.00
90 Tear Residu Ltr 47,000.00
91 Plafond Jaya Board Gibsum Standar + Rangka m2 165,500.00
92 Paving Blok Bh 4,100.00
93 Tryplek 3 mm Lbr 95,000.00
94 Genteng Tanah Bh 11,600.00
95 Rabung Genteng m' 11,600.00

#REF!
#REF!
#REF!

#REF!
#REF!
RENCANA ANGGARAN BIAYA

KEGIATAN : PENINGKATAN SARANA & PRASARANA IBADAH


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PASANTREN JABBAL NUR JADID
LOKASI : KECAMATAN MANGGENG
TAHUN ANGGARAN : 2009

JUMLAH
NO JENIS PEKERJAAN VOLUME/SAT ANALISA HARGA SATUAN
HARGA
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Pkt Taksir 500,000.00 500,000.00
2 Pemasangan Bowplank 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
3 Direksi Keet / Sewa Gudang 1.00 Unt Taksir 1,000,000.00 1,000,000.00
4 Administrasi & Dokumentasi 1.00 Pkt Taksir 800,000.00 800,000.00
5 Papan Nama Kegiatan 1.00 Unt Taksir 550,000.00 550,000.00
Jumlah I 3,850,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 61.34 M³ A.1 31,400.00 1,926,076.00
2 Urugan Bekas Galian 20.45 M³ A.11 12,826.50 262,259.17
3 Urugan Tanah Bawah Lantai 92.44 M³ A.12 102,855.00 9,507,659.06
4 Urugan Pasir dibawah Lantai & Pondasi 12.33 M³ A.12a 90,570.00 1,116,275.25
Jumlah II 12,812,269.48

III PEKERJAAN PASANGAN DAN BETON


1 Aanstamping 6.56 M³ G.I.1 10,260.00 67,305.60
2 Pasangan Pondasi Batu Kali 23.20 M³ G.I.5 623,430.00 14,463,576.00
3 Pondasi Telapak 5.58 M³ G.XIV.1 4,738,823.78 26,442,636.69
4 Pasangan Trasraam Bata 1 : 2 + Kolom 98.71 M² G.II.2 133,914.10 13,218,660.81
5 Pasangan Bata 1 : 4 387.96 M² G.II.4 116,624.10 45,245,485.84
6 Plesteran 1 : 2 197.42 M² G.X.2 37,480.50 7,399,400.31
7 Plesteran 1 : 4 775.92 M² G.X.4 33,105.50 25,687,219.56
Jumlah III 132,524,284.81

IV PEKERJAAN BETON BERTULANG


1 Balok Sloof 25 x 40 cm 6.80 M³ G.XIV.3 4,203,205.30 28,581,796.04
2 Kolom Utama 25 X 25 cm Lt. I & Lt. II 8.12 M³ G.XIV.5 4,801,788.30 38,990,521.00
3 Kolom Praktis 13 x 13 cm Lt. I & Lt. II 1.56 M³ G.XIV.2 6,641,389.54 10,368,537.35
4 Balok Lantai II 25 x 40 cm 7.60 M³ G.XIV.10 5,400,524.24 41,043,984.22
5 Ring Balok 25 x 30 5.70 M³ G.XIV.17a 5,191,612.84 29,592,193.19
6 Balok 13 x 13 cm 0.81 M³ G.XIV.9 5,824,876.08 4,718,149.62
7 Pengecoran Plat Lantai 10.85 M³ G.XIV.12 4,366,472.60 47,376,227.71
8 Pengecoran Tangga 2.18 M³ G.XIV.19 4,938,501.00 10,765,932.18
9 Balok Tangga 15 x 18 cm 0.53 M³ G.XIV.20 5,022,004.14 2,661,662.19
Jumlah IV 214,099,003.51

V PEKERJAAN LANTAI
1 Lantai Tumbuk 1 : 3 : 5 T= 5 cm 108.50 M² H. 2 65,512.00 7,108,052.00
2 Pas. Lantai Keramik 40 x 40 cm Lt. I & Lt. II 203.20 M² H. 4 122,583.00 24,908,865.60
3 Pas. Keramik 25 x 25 cm Anti Slip Lt I & Lt. II 4.80 M² H. 9 113,683.00 545,678.40
4 Pas. Keramik 30 x 30 cm (Tangga)+ Border 22.50 M² H. 5 113,683.00 2,557,867.50
5 Pas. Dinding Keramik 20 x 25 cm Lt. I & Lt. II 42.70 M² H. 8 136,911.00 5,846,099.70
6 Stop Nossing Keramik 56.85 M' Taksir 25,000.00 1,421,250.00
Jumlah V 42,387,813.20

VI PEKERJAAN KAYU DAN ATAP


1 Rangka Atap Baja Ringan C Truess 75/100 229.41 M² Taksir 245,000.00 56,205,450.00
2 Kosen Pintu,Jendela Dan Ventilasi 1.12 M³ F16 5,633,666.00 6,309,705.92
3 Daun Pintu Double Panel 3.00 Bh Taksir 750,000.00 2,250,000.00
4 Daun Pintu Panel 6.00 Bh Taksir 650,000.00 3,900,000.00
5 Daun Pintu Panel 1/2 Lapis Seng 2.00 Bh Taksir 550,000.00 1,100,000.00
6 Daun Jendela + Kaca Terpasang Type A 14.00 Bh Taksir 385,000.00 5,390,000.00
7 Daun Jendela + Kaca Terpasang Type B 12.00 Bh Taksir 315,000.00 3,780,000.00
8 Ventilasi Kaca Untuk KM/WC 4.00 Bh Taksir 225,000.00 900,000.00
9 Papan Jalusi Terpasang 132.00 Bh Taksir 12,000.00 1,584,000.00
10 Lysplank Papan 2.5/30 cm 27.48 M² F12 81,071.50 2,227,844.82
Jumlah VI 83,647,000.74

VII PEKERJAAN PENGUNCI , PENUTUP DAN


PENGGANTUNG
1 Atap Seng Motief Genteng 229.41 M² J. 3 84,671.95 19,424,592.05
2 Rabung Seng Motief Genteng 22.25 M' J. 4 38,543.25 857,587.31
3 Talang Patahan Atap 14.48 M' J. 8 62,377.50 903,226.20
4 Plafon Tryplek 4 mm 148.27 M² F1 87,390.00 12,957,315.30
5 Engsel Pintu 22.00 Bh Taksir 17,000.00 374,000.00
6 Engsel Jendela 52.00 Bh Taksir 15,000.00 780,000.00
7 Kunci Pintu Tanam 2 Slag 11.00 Bh Taksir 115,000.00 1,265,000.00
8 Pacok Jendela 52.00 Bh Taksir 17,500.00 910,000.00
9 Kait Angin 52.00 Bh Taksir 12,500.00 650,000.00
Jumlah VII 38,121,720.86
1 2 3 4 5 6

VIII PEKERJAAN CAT


1 Cat Tembok Emulsion 3 Lapis 973.34 M² I. 3 16,620.80 16,177,689.47
2 Cat Plafond Trypleks 148.27 M² Anl. G.53 18,812.50 2,789,329.38
3 Cat Kilat Kosen & Lysplank 52.05 M² Anl. K10+K23+ 32,421.60 1,687,544.28
Jumlah VIII 20,654,563.13
IX PEKERJAAN INSTALASI LISTRIK
1 Pemasukan Arus Listrik 1.00 Pkt Taksir 2,500,000.00 2,500,000.00
2 Titik Api 22.00 Ttk Taksir 75,000.00 1,650,000.00
3 Jaringan Instalasi Listirk 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
4 Lampu TL 20 Watt (Philips) 14.00 Bh Taksir 106,950.00 1,497,300.00
5 Lampu HE 20 Watt (Philips) 8.00 Bh Taksir 51,150.00 409,200.00
6 Stop Kontak 17.00 Bh Taksir 15,500.00 263,500.00
7 Saklar Ganda 12.00 Bh Taksir 17,500.00 210,000.00
8 Saklar Tunggal 8.00 Bh Taksir 15,500.00 124,000.00
9 Panel Zakering 1.00 Bh Taksir 175,000.00 175,000.00
Jumlah IX 8,329,000.00
X PEKERJAAN SANITASI AIR
1 Pekerjaan Sumur Pipa 1.00 Unt Taksir 5,000,000.00 5,000,000.00
2 Pengadaan Pompa Air Listrik 1.00 Bh Taksir 750,000.00 750,000.00
3 Instalasi Air Bersih 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
4 Instalasi Air Kotor 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
5 Klosed Jongkok 2.00 Bh Taksir 141,100.00 282,200.00
6 Floor Drain 2.00 Bh Taksir 17,600.00 35,200.00
7 Kran Air 2.00 Bh Taksir 29,400.00 58,800.00
8 Septictank + Bak Kontrol + Resepan 1.00 Unt Taksir 3,500,000.00 3,500,000.00
Jumlah X 12,126,200.00
XI PEKERJAAN LAIN - LAIN
1 Relief Bangunan 1.00 Pkt Taksir 5,000,000.00 5,000,000.00
2 Pipa Pengaman Galvanis Dia 2" 16.00 M' Taksir 125,000.00 2,000,000.00
3 Papan Ukir Tolak Angin Terpasang 3.00 Unt Taksir 1,750,000.00 5,250,000.00
4 Ukiran Papan Untuk Pagar Teras Atas Terpasang 16.00 Unt Taksir 250,000.00 4,000,000.00
5 Pengaman Tangga dan Void 1.00 Pkt Taksir 3,500,000.00 3,500,000.00
6 Pembersihan Akhir 1.00 Pkt Taksir 500,000.00 500,000.00
Jumlah XI 20,250,000.00

Sub Total 588,801,855.73


6 3 3 3 3 2 2 2 2
1 2 2 2 2 3 3 3 3
6 12 12 12 12 18 18 18 18
1 2 2 2 2 3 3 3 3
6 12 12 12 12 18 18 18 18
1 2 2 2 2
6 12 12 12 12
1
6
1
6
1
6
3 3 3 3 3 3 3 3 3
39 39 39 39 39 39 39 39 39

6 3 3 3 3 2 2 2 2
1 2 2 2 2 3 3 3 3
6 12 12 12 12 18 18 18 18
1 2 2 2 2 0,75 0,75 0,75 0,75
6 12 12 12 12 12 12 12 12
1 0,5 0,5 0,5 0,5
6 6 6 6 6
1
6
1
6
1

3 3 3 3 3 3 3 3 3
33 33 33 33 33 33 33 33 33
4 4 4 4
24 24 24 24
0,5 0,5 0,5 0,5
12 12 12 12

3 3 3 3
39 39 39 39

4 4 4 4
24 24 24 24
0,25 0,25 0,25 0,25
6 6 6 6

3 3 3 3
33 33 33 33
rumus perhutungan gt kapal
v1 lwl d l 0.7
14 3.2 1.1 34.496
v2 p l t
5 2.8 1.2 16.8
v3 p l t
2 3 1.1 6.6

GT v1 v2 v3 0.25
34.496 16.8 6.6 956.2291

nt GT 0.3
956.2291 286.8687