BAB III
PERENCANAAN GORDING
P SIN a
P P COS a
1. Beban Mati ( D )
a Berat Penutup Atap = Berat Penutup Atap
= 1.39 kg/m
= 0.0139 KN/m
2. Beban Hidup ( L )
a q Air Hujan = 40 0,8.
= 40 0,8.31
= 15,2 kg/m2
B. ANALISIS STRUKTUR
SHEAR 2-2
MOMEN 3-3
1. Kontrol Lendutan
L
δ = x 2 y 2 ≤
200
= 0,000225 m ≤ 2800
200
= 0,225 mm ≤ 14 mm memenuhi syarat !
Sx = 1 bh 2
6
= 1 80 120 2
6
= 192000 mm3
Sy = 1 b2h
6
1
= 80 2 120
6
= 128000 mm3
Fx = Mx
Sx
= 803009
192000
= 4,182 N/mm2
My
Fy =
Sy
482555
=
128000
= 3,77 N/mm2
Fvx = 3 Vx
2 A
= 3 925,97
2 9600
= 0,145 N/mm2
Fvy = 3 Vy
2 A
= 3 1540,89
2 9600
= 0,241 N/mm2