DATA PROYEK PEMERINTAHDINAS PENJLN. BAU BAHARUDDIN NO.

86 TELP (0485) 21301


PROGRAM : PENGEMBANGAN DAN PENYEDIAAN PRASARANA DAN SARANA PERTANIAN
KEGIATAN : PENINGKATAN IRIGASI SEMI TEKNIS
PEKERJAA : PENGGALIAN SUNGAI LAPIO
KLP TANI : MAMMINASAE II
LOKASI : DESA BALIELO MATTOMBONG
KECAMATA : BOLA KABUPATEN WAJO
SUMBER D : APBD TAHUN ANGGARAN 2018
PANJANG : 130 M
PANJANG REALISASI 90 M
NILAI KEGI : 55,000,000

NILAI SWA : ###

WAKTU PE: 5 APRIL 2015


26 MEI 2015

KETUA KELOMPOK : AGUS ANGGOTA 1 RIDWAN


2 ISKANDAR
NOMOR REKENING :

BENDAHARA RIDWAN N

PPK : BURHANUDDIN, SP
JABATAN : PPK KEC. MATTIRO SOMPE
NIP : 1964817198711 1003

TANGGAL PENCAIRAN
Pinrang , 15 Januari 2014 termyn 70 %
Pinrang , 2015 termyn 70 %
Pinrang , 2015 termyn 100 %
DATA KONSULTAN PENGAWAS

NAMA CV. DASYA TRI KARSA ENG. CONS

NAMA PEKERJAAN PENGAWASAN JITUT DAN PERLUASAN SAWAH


NO KONTRAK : 11111
TGL KONTRAK : 11111
KEGIATAN PENGEMBANGAN DAN PERLUASAN AREAL PERTANIAN

ALAMAT KANTOR JLN JEND. GATOT SUBROTO NO. 8 TELP (0421) 921304

PEJABAT PEMBUAT KOMITMEN


PPK ANDI ASBAR AZIS , S.Sos, Msi TIM TEKNIS
NIP NIP : 19720210200701.1.025

KUASA PENGGUNA ANGGARAN


KADIS Ir. DARWIN JABIR, M.Si
NIP NIP : 19641231 200003 1 035
KEPALA DINAS PENGELOLAAN SUMBER DAYA AIR

#REF!
P

KONSULTAN PERENCANA
NAMA CV CV. C97 CONSULTANT CV. C97 CONSULTANT
PT ASHABIB KARYA KONSULINDO
PNAMA TENAGA DAN POSISI
NAMA SURIADI, ST SURIADI, ST
POSISI DIREKTUR IRFAN RACHMAN, ST

BULAN RE 2015
DATA KONSULTAN PENGAWAS
NAMA CV CV. C97 CONSULTANT

PNAMA TENAGA DAN POSISI


NAMA BUYUNG TIRTO
POSISI INSPECTOR Pengawas Lapangan
DATA RUUK

NOMOR SPK : 697/SPK/PSP- JARINGAN- MAMMINASAE II /VI/Distanak, Tanggal : 8 Juni 2015


No. Rekening : 1700000736326
JUNI 2015
KWITANSI
Sudah Terima Dari : BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA

Jumlah Uang : Rp 42,000,000


Terbilang : Empat Puluh Dua Juta Rupiah
Untuk Pembayaran : Dana Kegiatan

MATTOMBONG 31 Maret 2017

Setuju Di Bayar Koordinator UPKK Di Bayar Oleh Yang Menerima


Bendahara
Ketua Kelompok

AGUS RIDWAN RIDWAN RIDWAN


N N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

FOTO COPY PENARIKAN


KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Biaya Pengukuran

MATTOMBONG 31 Maret 2017

Setuju Di Bayar Di Bayar OlehDi Bayar Oleh


Koordinator UPKK Yang Menerima
Ketua Kelompok Bendahara Bendahara

AGUS RIDWAN RIDWAN N RIDWAN N -

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari : BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA

Jumlah Uang : Rp 11,000,000


Terbilang : Sebelas Juta Rupiah
Untuk Pembayaran : Bayar Semen 200 sak @ Rp55000

MATTOMBONG 01 April 2017

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN NRIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 8,650,000
Terbilang : Delapan Juta Enam Ratus Lima Puluh Ribu Rupiah
Untuk Pembayaran : Bayar Batu 50 m3 @ Rp173000

MATTOMBONG 01 April 2017

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 3,888,000
Terbilang : Tiga Juta Delapan Ratus Delapan Puluh Delapan Ribu Rupiah
Untuk Pembayaran : Bayar Pasir 40 m3 @ Rp97200

MATTOMBONG 01 April 2017

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN NRIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Administrasi

MATTOMBONG 02 April 2017

Koordinator UPKK Di Bayar Oleh


Setuju Di Bayar Di Bayar Oleh Bendahara Yang Menerima
Ketua Kelompok Bendahara

AGUS RIDWANRIDWAN N RIDWAN N AGUS

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Dana Kegiatan

MATTOMBONG -

Setuju Di Bayar Di Bayar OlehDi Bayar Oleh


Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWANRIDWAN N RIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

FOTO COPY PENCAIRAN


KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Dana Kegiatan

MATTOMBONG -

Setuju Di Bayar Di Bayar Oleh Yang Menerima


Ketua Kelompok Bendahara

AGUS RIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

FOTO COPY PENCAIRAN


KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Err:509
Terbilang : Err:509
Untuk Pembayaran : Err:509

MATTOMBONG Err:509

Setuju Di Bayar Di Bayar Oleh Yang Menerima


Ketua Kelompok Bendahara

AGUS RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari : BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA

Jumlah Uang : Err:509


Terbilang : Err:509
Untuk Pembayaran : Err:509

MATTOMBONG Err:509

Setuju Di Bayar Di Bayar Oleh Yang Menerima


Ketua Kelompok Bendahara

AGUS RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 1,071,600
Terbilang : Satu Juta Tujuh Puluh Satu Ribu Enam Ratus Rupiah
Untuk Pembayaran : Bayar Kerikil 6 m3 @ Rp178600

MATTOMBONG 03 April 2017

Setuju Di Bayar Koordinator Di Bayar Oleh Di Bayar Oleh


UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN
RIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Pembelian Pasir 0 m3 @ Rp97200

MATTOMBONG -

Setuju Di Bayar Di Bayar OlehDi Bayar Oleh


Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWANRIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 3,300,000
Terbilang : Tiga Juta Tiga Ratus Ribu Rupiah
Untuk Pembayaran : Bayar Semen 60 sak @ Rp55000

MATTOMBONG 03 April 2017

Setuju Di Bayar Koordinator UPKK Di Bayar Oleh


Di Bayar Oleh Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN NRIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 6,920,000
Terbilang : Enam Juta Sembilan Ratus Dua Puluh Ribu Rupiah
Untuk Pembayaran : Bayar Batu 40 m3 @ Rp173000

MATTOMBONG 03 April 2017

Setuju Di Bayar Koordinator Bayar Oleh Di Bayar Oleh


DiUPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN
RIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari : BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA

Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Administrasi

MATTOMBONG -

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN NRIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 18,000,000
Terbilang : Delapan Belas Juta Rupiah
Untuk Pembayaran : Dana Kegiatan

MATTOMBONG 03 April 2017

Koordinator UPKK Di Bayar Oleh


Setuju Di Bayar Di Bayar OlehBendahara Yang Menerima
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN NRIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

FOTO COPY PENARIKAN


KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 50,600
Terbilang : Lima Puluh Ribu Enam Ratus Rupiah
Untuk Pembayaran : Bayar Pasir 0,5 m3 @ Rp97200

MATTOMBONG 04 April 2017

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN NRIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 825,000
Terbilang : Delapan Ratus Dua Puluh Lima Ribu Rupiah
Untuk Pembayaran : Bayar Semen 15 sak @ Rp55000

MATTOMBONG 09 April 2017

Setuju Di Bayar Di Bayar OlehDi Bayar Oleh


Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWANRIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp 692,000
Terbilang : Tiga Ratus Dua Puluh Satu Ribu Enam Ratus Rupiah
Untuk Pembayaran : Bayar Batu 2 m3 @ Rp173000

MATTOMBONG 09 April 2017

Setuju Di Bayar Di Bayar OlehDi Bayar Oleh


Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWANRIDWAN N RIDWAN N

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Upah Kerja Minggu Ke 1 , Sampai Dengan Minggu Ke 6
Dengan Rincian Tukang = Rp -
Buruh = Rp -
Mandor = Rp -
MATTOMBONG 23 April 2017

Setuju Di Bayar Di Bayar OlehDi Bayar Oleh


Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWANRIDWAN N RIDWAN N Mustapa

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Biaya Lansiran

MATTOMBONG -

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN N
RIDWAN RIDWAN N -

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Biaya Pemasangan + Prasast

MATTOMBONG -

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWAN RIDWAN NRIDWAN N AGUS

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
KWITANSI
Sudah Terima Dari :
BENDAHARA KELOMPOK TANI MAMMINASAE II DESA BALIELO KECAMATAN BOLA
Jumlah Uang : Rp -
Terbilang : Rupiah
Untuk Pembayaran : Administrasi

MATTOMBONG -

Setuju Di Bayar Di Bayar Oleh


Di Bayar Oleh
Koordinator UPKK Yang Menerima
Bendahara
Ketua Kelompok Bendahara

AGUS RIDWANRIDWANRIDWAN
N N AGUS

Mengetahui :
Pejabat Pembuat Komitmen Koordinator Lapang

ANDI TJALO KERRANG, SP.,M.Si BURHANUDDIN, SP


Nip. : 19690812 199903 1 010 NIP : 1964817198711 1003

NOTA
DOKUMENTASI
MAMMINASAE II

NAMA BARANG BANYAKNYA SATUAN HARGA SATUAN JUMLAH

FOTO COPY 0 LBR 250 -


JILID BIASA RNGKP
MATERAI 0 BH 8000 -
PULPEN 1 BH 1800 1,800
LEM 0 BH 2200 -
KERTAS 0 RIM 45000 -

PRINT FOTO
JUMLAH 1,800.0

NAMA BARANG BANYAKNYA SATUAN HARGA SATUAN JUMLAH

FOTO COPY 18 LBR 250 4,500


JILID BIASA RNGKP
MATERAI 6 LBR 8000 48,000
PULPEN 1 BH 0 0
LEM 1 BH 1300 1,300
MAP PLASTIK BH 0 0
KERTAS 0 RIM 45000 0
KERTAS 0 LBR 150 0
PRINT FOTO
JUMLAH 53,800

NAMA BARANG BANYAKNYA SATUAN HARGA SATUAN JUMLAH

FOTO COPY 0 LBR 250 0


JILID BIASA 2 RNKP 3500 7000
MATERAI 3 LBR 8000 24000
PULPEN 1 BH 1900 1900
LEM BH 5400 0
KERTAS 1 RIM 45000 45000
KERTAS 0 LBR 150 0

BUKU TULIS 0 BH 2600 0


PRINT FOTO 11 LBR 1500 16500
JUMLAH 94,400
DAFTAR KEBUTUHAN UPAH KERJA DAN MATERIAL
BAHAN SATUAN JUMLAH HARGA TOTAL HARGA
SEMEN ZAK ± 200 Rp 59,400 Rp 11,880,000
PASIR M3 ± 40 Rp 97,200 Rp 3,888,000
BATU GUNUNG/ BATU KALI M3 ± 50 Rp 173,000 Rp 8,650,000

ADMINISTRASI Rp - Rp -

UPAH KERJA
TUKANG HOK Rp - Rp -
BURUH HOK Rp - Rp -

TOTAL KEBUTUHAN UPAH KERJA DAN MATERIAL Rp 24,418,000


DI BULATKAN Rp 24,400,000
PEMERINTAH KABUPATEN WAJO
DINAS PENGELOLAAN SUMBER DAYA AIR
JLN. BAU BAHARUDDIN NO. 86 TELP (0485) 21301 SENGKANG

REKAPITULASI
ESTIMATE ENGINEER (EE)

PEKERJAAN : PENGGALIAN SUNGAI TOLAWA


LOKASI : DESA BALIELO KECAMATAN BOLA KAB. WAJO
SUMBER DANA : APBD
TAHUN ANGGARAN : 2018

TOTAL BIAYA
No URAIAN BOBOT (%)
(Rp)
I PEKERJAAN PERSIAPAN 6,300,000.00 3.08
II PEKERJAAN GALIAN 198,248,996.77 96.92

(A) Jumlah Harga Pekerjaan (Termasuk Biaya Umum dan Keuntungan) 204,548,996.77 100.00
(B) Pajak Pertambahan Nilai (PPN) = 10 % x (A) 20,454,899.68
(C) JUMLAH TOTAL PEKERJAAN = (A) + (B) 225,003,896.45
(D) DIBULATKAN 225,000,000.00

TERBILANG : Dua Ratus Dua Puluh Lima Juta Rupiah

Di Periksa /Di Setujui


PEJABAT Oleh,KOMITMEN
PEMBUAT Di Periksa Di Buat oleh
KONSULTAN PERENCANA
PEJABAT PEMBUAT
DINAS KOMITMEN
PENGELOLAAN SUMBER DAYA AIR KONTRAKTOR
KONSULTAN SUPERVISI CV. C97 CONSULTANT PELAKSANA
DINAS PEKERJAAN UMUM PT. ASHABIB KARYA KONSULINDO PT. MITRA AIYANGGA NUSANTA
KAB. PINRANG

ANDI ASBAR AZIS , S.Sos, Msi SURIADI, ST


NIP : 19720210200701.1.025 DIREKTUR
IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md
MENGETAHUI
Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR
KEPALA DINAS PENGELOLAAN SUMBER DAYA AIR
KUASA PENGGUNA ANGGARAN

Ir. DARWIN JABIR, M.Si


NIP : 19641231 200003 1 035
PEMERINTAH KABUPATEN PINRANG
DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : PENGGALIAN SUNGAI TOLAWA


LOKASI : DESA BALIELO KECAMATAN BOLA KAB. WAJO
MASA PELAKSANAAN : APBD
NILAI KONTRAK : 2018 Nomor Laporan :
02 ( Dua)
Status :
25 JUNII 2013
TOTAL BIAYA (Rupiah)
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu ###
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu #REF!
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG
IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md
Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR

PEMERINTAH KABUPATEN PINRANG


DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : 0.00
KLP TANI : 0.00
KEL / DESA : 0.00
KECAMATAN : 0.00 Nomor Laporan :
03 ( TIGA)
Status :
TOTAL BIAYAJULI
25 2013
(Rupiah)
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu #REF!
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu #REF!
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG

IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md


Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR
PEMERINTAH KABUPATEN PINRANG
DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : 0.00
KLP TANI : 0.00
KEL / DESA : 0.00
KECAMATAN : 0.00 Nomor Laporan :
04 ( EMPAT)
Status :
TOTAL BIAYAAGUSTUS
25 (Rupiah) 2013
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu #REF!
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu 0.00
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG

IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md


Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR

PEMERINTAH KABUPATEN PINRANG


DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : 0.00
KLP TANI : 0.00
KEL / DESA : 0.00
KECAMATAN : 0.00 Nomor Laporan : 05
( LIMA)
Status : 25
TOTAL BIAYA (Rupiah)2013
SEPTEMBER
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu #REF!
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu 0.00
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG

IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md


Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR
Pagu Anggaran Sungai Lapio = 483,000,000

225000000
Tolawa =
708,000,000

Nomor Laporan : 03 ( Tiga)


225,000,000.00 Status : 26 Oktober
462,300,000.00 2017
687,300,000.00
(20,700,000.00)

78,150,000 #DIV/0!
276,853,225.97 #DIV/0!

160,000,000.00 -65,000,000

94,500,000.00 23,625,000 70,875,000.00


225,000,000.00 0

59.00 ENAM PULUH JUTA EMPAT PULUH DUA RIBU TIGA PULUH LIMA RUPIAH.
50.00

225,003,000.00 0 Rp 225,000,000.00 Sembilan


2 11 Dua Ratus Dua
2 0 Dua Puluh Dua
5 Lima Lima
Juta
0 Sembilan
0 Sembilan
0 Sembilan

0 Sembilan
0 Sembilan
0 Sembilan
Dua Ratus Dua Puluh LRupiah
DI PERIKSA DI PERIKSA
PENGAWAS PU KONSULTAN SUPERVISI DI
DI KETAHUI PT.ASHABIB KARYA KONTRAKT
PPTK KONSULINDO PT. MITR
NUS

AFENDY. JARSAM
MONIR BA'SI Nip : 19800526 201212 2 002 SURIADI, ST
Nip : 19820317200801 1 SITE ENGINEER MUH. MASN
005 DIREKT

DI SETUJUI OLEH
PENGGUNA ANGGARAN DI SETUJUI OLEH
DINAS PEKERJAAN UMUM DAN PEJABAT PEMBUAT KOMITMEN
PERUMAHAN RAKYAT
KAB. PINRANG

IRWAN ISMAIL, ST,M.Eng


Ir. ARSYAD. B. M.Si Nip : 19750423 200312 1 004
DI SETUJUI OLEH
PENGGUNA ANGGARAN DI SETUJUI OLEH
DINAS PEKERJAAN UMUM DAN PEJABAT PEMBUAT KOMITMEN
PERUMAHAN RAKYAT
KAB. PINRANG

IRWAN ISMAIL, ST,M.Eng


Ir. ARSYAD. B. M.Si Nip : 19750423 200312 1 004
Nip : 10581110 199203 1 005

mor Laporan :
Dua)
us :
UNII 2013

78,150,000 #DIV/0!

276,853,225.97 #DIV/0!
2,587,000,000.00 #REF!
2,600,000,000.00 PAGU
#VALUE!

2,352,321,080.29

#REF!

#REF!

13,000,000.00

59.00 ENAM PULUH JUTA EMPAT PULUH DUA RIBU TIGA PULUH LIMA RUPIAH.
50.00

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah

mor Laporan :
TIGA)
us :
ULI 2013

#REF!

#REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah
mor Laporan :
EMPAT)
us :
AGUSTUS 2013

#REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah
Laporan : 05
)
: 25
MBER 2013

#REF!

#REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah
DI BUAT
KONTRAKTOR PELAKSANA
PT. MITRA AIYANGGA
NUSANTARA

MUH. MASNUR ASRY A.Md.


DIREKTUR UTAMA

DI SETUJUI OLEH
PEJABAT PEMBUAT KOMITMEN

IRWAN ISMAIL, ST,M.Eng


Nip : 19750423 200312 1 004
DI SETUJUI OLEH
PEJABAT PEMBUAT KOMITMEN

IRWAN ISMAIL, ST,M.Eng


Nip : 19750423 200312 1 004
PEMERINTAH KABUPATEN WAJO
DINAS PENGELOLAAN SUMBER DAYA AIR
JLN. BAU BAHARUDDIN NO. 86 TELP (0485) 21301 SENGKANG

REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)

PEKERJAAN : PENGGALIAN SUNGAI TOLAWA


LOKASI : DESA BALIELO KECAMATAN BOLA KAB. WAJO
SUMBER DANA : APBD
TAHUN ANGGARAN : 2018

TOTAL BIAYA
No URAIAN BOBOT (%)
(Rp)
I PEKERJAAN PERSIAPAN 6,300,000.00 3.08
II PEKERJAAN GALIAN 198,248,996.77 96.92

(A) Jumlah Harga Pekerjaan (Termasuk Biaya Umum dan Keuntungan) 204,548,996.77 100.00
(B) Pajak Pertambahan Nilai (PPN) = 10 % x (A) 20,454,899.68
(C) JUMLAH TOTAL PEKERJAAN = (A) + (B) 225,003,896.45
(D) DIBULATKAN 225,000,000.00

TERBILANG : Dua Ratus Dua Puluh Lima Juta Rupiah

Di Periksa /Di Setujui Oleh, Di Periksa SENGKANG, 2018 Di Buat oleh


PEJABAT PEMBUAT KOMITMEN PEJABAT PEMBUAT KOMITMEN PELAKSANA
KONSULTAN SUPERVISI KONTRAKTOR
DINAS PEKERJAAN UMUM PT. ASHABIB KARYA KONSULINDO
DINAS PENGELOLAANPT.SUMBER
MITRA AIYANGGA
DAYA AIR NUSANTA
KAB. PINRANG

ANDI ASBAR AZIS , S.Sos, Msi


IRWAN ISMAIL, S.T.,M.Eng. SURIADI,NIP
ST : 19720210200701.1.025
MUH. MASNUR ASRY A.Md
Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR
PEMERINTAH KABUPATEN PINRANG
DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : PENGGALIAN SUNGAI TOLAWA


LOKASI : DESA BALIELO KECAMATAN BOLA KAB. WAJO
MASA PELAKSANAAN : APBD
NILAI KONTRAK : 2018 Nomor Laporan :
02 ( Dua)
Status :
25 JUNII 2013
TOTAL BIAYA (Rupiah)
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu ###
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu #REF!
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG
IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md
Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR

PEMERINTAH KABUPATEN PINRANG


DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : 0.00
KLP TANI : 0.00
KEL / DESA : 0.00
KECAMATAN : 0.00 Nomor Laporan :
03 ( TIGA)
Status :
TOTAL BIAYAJULI
25 2013
(Rupiah)
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu #REF!
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu #REF!
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG

IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md


Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR
PEMERINTAH KABUPATEN PINRANG
DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : 0.00
KLP TANI : 0.00
KEL / DESA : 0.00
KECAMATAN : 0.00 Nomor Laporan :
04 ( EMPAT)
Status :
TOTAL BIAYAAGUSTUS
25 (Rupiah) 2013
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu #REF!
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu 0.00
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG

IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md


Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR

PEMERINTAH KABUPATEN PINRANG


DINAS PERTANIAN DAN PETERNAKAN
REKAPITULASI
LAPORAN BULANAN

PEKERJAAN : 0.00
KLP TANI : 0.00
KEL / DESA : 0.00
KECAMATAN : 0.00 Nomor Laporan : 05
( LIMA)
Status : 25
TOTAL BIAYA (Rupiah)2013
SEPTEMBER
No URAIAN
KONTRAK BOBOT (%)
I PEKERJAAN PERSIAPAN ### #REF!
II PEKERJAAN REHAB BENDUNG - #REF!
III PEKERJAAN GALIAN ### #REF!
A Jumlah Harga Pekerjaan yang Selesai s /d kini ###
B PPN = 10 % x (A)
C Total (A) + (B) ###
#REF!
D Dibulatkan ###
E Material On Site -
F Total Pembayaran = (D) + (E)
PEMOTONGAN :
1 Komulatf Pembayaran s/d bulanlalu #REF!
2 Koreksi Pembayaran Bulan Lalu
3 Jaminan Pemeliharaan ( 5 % )
4 Pengembalian Uang Muka (20 % )
5 Jumlah Potongan
Total Pembayaran Sertifikat Bulan Ini (F - 5)
s/d bulan lalu 0.00
Persentase Kemajuan Pekerjaan ( % ) Bulan ini #REF!
s/d bulan ini #REF!

TERBILANG : #REF!

Di Setujui Oleh, Di Periksa Di Buat oleh


KEPALA DINAS KONSULTAN SUPERVISI Konsultan Supervisi
PERTANIAN DAN PETERNAKAN
KAB. PINRANG

IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST MUH. MASNUR ASRY A.Md


Nip : 19761007 200212 2 008 SITE ENGINEER DIREKTUR
Pagu Anggaran Sungai Lapio = 483,000,000

225000000
Tolawa =
708,000,000

Nomor Laporan : 03 ( Tiga)


225,000,000.00 Status : 26 Oktober
462,300,000.00 2017
687,300,000.00
(20,700,000.00)

78,150,000 #DIV/0!
276,853,225.97 #DIV/0!

160,000,000.00 -65,000,000

94,500,000.00 23,625,000 70,875,000.00


225,000,000.00 0

59.00 ENAM PULUH JUTA EMPAT PULUH DUA RIBU TIGA PULUH LIMA RUPIAH.
50.00

225,003,000.00 0 Rp 225,000,000.00 Sembilan


2 11 Dua Ratus Dua
2 0 Dua Puluh Dua
5 Lima Lima
KONSULTAN PERENCANA
CV. C97 CONSULTANT Juta
0 Sembilan
0 Sembilan
0 Sembilan

SURIADI, ST 0 Sembilan
DIREKTUR 0 Sembilan
0 Sembilan
Dua Ratus Dua Puluh LRupiah
DI PERIKSA DI PERIKSA
PENGAWAS PU KONSULTAN SUPERVISI DI
DI KETAHUI PT.ASHABIB KARYA KONTRAKT
PPTK KONSULINDO PT. MITR
NUS

AFENDY. JARSAM
MONIR BA'SI Nip : 19800526 201212 2 002 SURIADI, ST
Nip : 19820317200801 1 SITE ENGINEER MUH. MASN
005 DIREKT

KUASA PENGGUNA ANGGARAN


DINAS PENGELOLAAN SUMBER DAYA AIR

DI SETUJUI OLEH
PENGGUNA ANGGARAN DI SETUJUI OLEH
Ir. DARWIN JABIR,
DINAS M.Si
PEKERJAAN UMUM DAN PEJABAT PEMBUAT KOMITMEN
PERUMAHAN
NIP : 19641231 200003 1 RAKYAT
035 KAB. PINRANG

IRWAN ISMAIL, ST,M.Eng


Ir. ARSYAD. B. M.Si Nip : 19750423 200312 1 004
DI SETUJUI OLEH
PENGGUNA ANGGARAN DI SETUJUI OLEH
DINAS PEKERJAAN UMUM DAN PEJABAT PEMBUAT KOMITMEN
PERUMAHAN
NIP : 19641231 200003 1 RAKYAT
035 KAB. PINRANG

IRWAN ISMAIL, ST,M.Eng


Ir. ARSYAD. B. M.Si Nip : 19750423 200312 1 004
Nip : 10581110 199203 1 005

mor Laporan :
Dua)
us :
UNII 2013

78,150,000 #DIV/0!

276,853,225.97 #DIV/0!
2,587,000,000.00 #REF!
2,600,000,000.00 PAGU
#VALUE!

2,352,321,080.29

#REF!

#REF!

13,000,000.00

59.00 ENAM PULUH JUTA EMPAT PULUH DUA RIBU TIGA PULUH LIMA RUPIAH.
50.00

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah

mor Laporan :
TIGA)
us :
ULI 2013

#REF!

#REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah
mor Laporan :
EMPAT)
us :
AGUSTUS 2013

#REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah
Laporan : 05
)
: 25
MBER 2013

#REF!

#REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! 0 #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! Rupiah
DI BUAT
KONTRAKTOR PELAKSANA
PT. MITRA AIYANGGA
NUSANTARA

MUH. MASNUR ASRY A.Md.


DIREKTUR UTAMA

DI SETUJUI OLEH
PEJABAT PEMBUAT KOMITMEN

IRWAN ISMAIL, ST,M.Eng


Nip : 19750423 200312 1 004
DI SETUJUI OLEH
PEJABAT PEMBUAT KOMITMEN

IRWAN ISMAIL, ST,M.Eng


Nip : 19750423 200312 1 004
RINCIANA ANGGARAN BIAYA

PEKERJAAN : PENGGALIAN SUNGAI TOLAWA


LOKASI : DESA BALIELO KECAMATAN BOLA KAB. WAJO
SUMBER DANA : APBD
TAHUN ANGGARAN : 2018 PANJANG RENCANA GALIAN

SATUAN KUANTITAS HARGA SATUAN


NO URAIAN (Rp)

I PEKERJAAN PERSIAPAN
1 Papan Proyek Bh 1 300,000
2 Direksi Keet ( disewa ) Unit 1 2,000,000
3 Mobilisasi Alat LS 1 4,000,000
JUMLAH HARGA PEKERJAAN PERSIAPAN

II PEKERJAAN GALIAN
1 Galian Tanah Mekanis M3 14767.00 13,425.14
JUMLAH HARGA PEKERJAAN GALIAN

REAL COST

Diperiksa DI PERIKSA
PEJABAT PEMBUAT KOMIT
Pengawas PU Kab Pinrang
DINAS PENGELOLAAN SUMBER

EFENDY. JARSAM
Nip : : 19800526 201212 2 002 ANDI ASBAR AZIS , S.Sos, M
NIP : 19720210200701.1.02
REKAPITULASI
A

= 1800 Meter 1800


13,140.0

JUMLAH HARGA BOBOT (%)


(Rp)
225003896.445783 7
225,000,000 3.65 2 7.3
300,000 0.15
2,000,000 0.98
4,000,000 1.96
6,300,000.00

198,248,996.77 96.92 225000000 DI KETAHUI DI PERIKSA


PPTK PENGAWAS PU
198,248,996.77 235,000,000 0.0500
204,548,996.77 100.00

DI PERIKSA MONIR BA'SI AFENDY. JARSAM


PEJABAT PEMBUAT KOMITMEN Nip : 19820317200801 1 Nip : 19800526 201212 2 0
INAS PENGELOLAAN SUMBER DAYA AIR 005

DI SETUJUI OLEH
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT
ANDI ASBAR AZIS , S.Sos, Msi KAB. PINRANG
NIP : 19720210200701.1.025

Ir. ARSYAD. B. M.Si


Nip : 10581110 199203 1 005
REKA
DI PERIKSA DI PERIKSA DI BUAT
PENGAWAS PU KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
PT.ASHABIB KARYA PT. MITRA AIYANGGA
0.2500 NUSANTARA
KONSULINDO

AFENDY. JARSAM
19800526 201212 2 002 SURIADI, ST MUH. MASNUR ASRY A.Md.
SITE ENGINEER DIREKTUR UTAMA

UJUI OLEH
NA ANGGARAN
JAAN UMUM DAN DI SETUJUI OLEH
AHAN RAKYAT PEJABAT PEMBUAT KOMITMEN
PINRANG

YAD. B. M.Si IRWAN ISMAIL, ST,M.Eng


110 199203 1 005 Nip : 19750423 200312 1 004
BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.878.000.00

SKETSA PERHITUN

II PEKERJAAN REHAB BENDUNG Volume Bongkaran Sayap


1 Bongkaran Pasangan Lama V1 = ( La + Lb/2 x t) x P
V2 = (L x T x P)
V1 = 0.66
= 8.075
V2 = 0.8
= 2.654
Volume Bongkaran Lantai
V1 = (L x t x P )
= 2.85
= 14.96

2 Galian Tanah V = 2.654


= 31.03
Volume Pas. Batu Sayap
3 Pasangan Batu V1 = ( La + Lb/2 x t) x P
V2 = (L x T x P)
V1 = 0.66
= 8.075
V2 = 0.8
= 2.654
Volume Pas. Batu Lantai
Lantai Terjun
Lantai Depan
Volume Mercu

4 Plasteran Volume Plasteran Lantai


Volume Plasteran Mercu

II PEKERJAAN GALIAN Arah Pinrang


1 Galian Tanah Mekanis V = P
= 9
IV PEKERJAAN PENINGKATAN SALURAN = 109.9
1 Beton mutu sedang fc’=30 MPa lantai jembatan
2 Beton mutu sedang fc’= 20 MPa Arah Enrekang
3 Beton mutu rendah fc’= 10 Mpa K125 V = P
Err:509 Err:509 = 9
Err:509 Err:509 = 110

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.878.000.00

GAMBAR PERHITUN

3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter Arah Pinrang


V = P
= 9
= 81.76

Arah Enrekang

4255

700
V = P
4255 = 9
= 80.25
700

5150

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN
3.2.(1a) Timbunan Biasa dari galian Arah Pinrang
V = P
= 7
P = 49
T
T Timbunan
Arah Enrekang
V = P
4255 = 7
= 44.1
700

5150

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO
DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN
3.2.(2a) Timbunan Pilihan dari Sumber Galian

5.2.(1) Lapis Permukaan Agregat Tanpa Penutup Aspal

DIVISI 7. STRUKTUR
7.1 (5) a Beton mutu sedang fc’=30 MPa lantai jembatan

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN
7.1 (7) a Beton mutu sedang fc’= 20 MPa I = 4 x
150 180
= 25.2
II = 0.5 x
2200 150470 950
Abutmen 100
50 200
900
200
470 = 2.2275
200
350 XI IX X 200
200
III = 0.5 x
200
50
745 VIII 945 = 2.2275
1245
VII 500 IV = 0.7 x
500 V VI 500 = 21.735
700
600
V = 0.5 x
2155
2655
= 1.575
IV VI = 0.5 x
800 = 1.35
II III 300

700 I 700 VII = 0.5 x


100
1650 700 1650
= 9.00

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.878.000.00

GAMBAR PERHITUN
IX = 0.2 x
150
2200 150470
180
950 = 1.08
100
50 200
200
X = 0.47 x
900 470
= 1.269
200
350 200
200 XI = 0.20 x
I 945
II 745
1295
III 500

500 IV 500
700
600
2200 150470 950
100
50 200
200
900 470
200
350 200
200
I
II 745 945 = 0.3
1295
Volume Total Abutmen
III 500

500 IV 500
Wing Wall 700
600

I = 2.1 x
2155 V
2655 = 0.315
II = 2.1 x
VII
800 VI
VIII 300
= 0.168
700
III = 2.1 x
= 2.52
1650 700 1650

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN

IV = 0.5 x
= 0.0525
V = 0.7 x
= 0.4536
VI = 0.5 x
= 0.138
VII = 0.5 x
= 0.2475
VIII = 0.5 x
= 0.07425

Volume Total Wing Wall


DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN

7.1 (10) Beton mutu rendah fc’= 10 Mpa K125

Lantai Kerja
Tebal Lantai Kerja = 10 Cm
9,20
9.2 x

4,20

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

EFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA
PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA
LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN

'7.3 (1) Baja Tulangan U 24 Polos


7.3 (3) Baja Tulangan U 32 Ulir

7.4 (3) c Pengadaan Struktur Jembatan Rangka Baja Panjang 60 , Lebar 7 m lihat Lampiran

7.5 (1) Pemasangan jembatan Rangka Baja


7.5 (2) Pengangkutan Bahan Jembatan

7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 500 mm Arah pinrang
Arah Enrekang

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

AFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN
7.6 (18) b Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 500 mm Arah pinrang
Arah Enrekang
0.3

3
I
0.3

7.9.(1) Pasangan Batu VI = P

3 = 7
I

= 13.65
V II = P
1 = 7
II 1
= 9.10
1.3

7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis


7.11.(6) Expansion Joint Tipe Baja Bersudut
7.16.(3).a Pipa Drainase PVC diameter 75 mm

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

AFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN
7.9.(1) Pasangan Batu
L1 L2
Arah Pinrang Sebelah Kanan
Ta

VI = ((L2 x (Ta + Tb/2) x T2))/


T2

V2
T
T1

V1 = 3
= 5.85
V3
T
T3

Tb V2 = L1 x (Ta + Tb Rata2 /2) x


= 7
= 13.65
V3 = L1 + L2 x T3 x Tb Rata2
= 10
= 12.00
VI = 1 / 2 L2 x T2
VII = L1 x (T1 + T2/2)
VIII = L1 + l2 x T3

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

AFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN

L1 L2
Arah Pinrang Sebelah Kiri
Ta

VI = ((L2 x (Ta + Tb/2) x T2))/


= 3.1
T2

V2
T
T1

V1
= 6.51
V3
T
T3

Tb V2 = L1 x (Ta + Tb Rata2 /2) x


= 6
= 10.58
V3 = L1 + L2 x T3 x Tb Rata2
= 9.1
= 11.47

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

AFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

AFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN

L1 L2
Arah Enrekang Sebelah Kiri
Ta

VI = ((L2 x (Ta + Tb/2) x T2))/


= 3.15

T2
V2

T
T1

V1
= 7.69
V3

T
T3

Tb V2 = L1 x (Ta + Tb Rata2 /2) x


= 2.4
= 5.81
V3 = L1 + L2 x T3 x Tb Rata2
= 5.55
= 6.99

DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

AFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER

BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.879.000.00

GAMBAR PERHITUN
GAMBAR PERHITUN

L1 L2
Arah Enrekang Sebelah Kanan
Ta

VI = ((L2 x (Ta + Tb/2) x T2))/


= 2.4

T2
V2

T
T1

V1
= 4.65
V2 = L1 x (Ta + Tb Rata2 /2) x
V3

T
T3
Tb = 2.3
= 3.80
V3 = L1 + L2 x T3 x Tb Rata2
= 4.7
100 200 = 5.92

7.10.(3) a. Bronjong dengan kawat yang V = p x l x t x Jumlah Bronjo


= 2

50
dilapisi galvanis
= 1
= 10.00
DI PERIKSA
DI PERIKSA KONSULTAN SUPERVISI
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO

AFENDY. JARSAM SURIADI, ST


Nip : 19800526 201212 2 002 SITE ENGINEER
CKUP DATA

G KEC. PATAMPANUA PEKERJAAN


LOKASI
MASA PELAKSANAAN
NILAI KONTRAK

PERHITUNGAN VOLUME

e Bongkaran Sayap 25.69 m3


( La + Lb/2 x t) x P
(L x T x P)
+ 1.06 / 2 x 3 x 3.13

x 1.06 x 3.13

e Bongkaran Lantai
(L x t x P )
x 0.6 x 8.75

+ 7.481 + 21 31 m3

e Pas. Batu Sayap


( La + Lb/2 x t) x P 79.37 m3
(L x T x P)
+ 1.06 / 2 x 3 x 3.13

x 1.06 x 3.13

e Pas. Batu Lantai


= 16.06
= 25.980
= 36.4 - 9.8 = 26.6

e Plasteran Lantai = 21 100.07 m2


= 41.9
e Plasteran Mercu = 37

x L x T 219.86 m3
x 6.6 x 1.85
m3

x L x T
x 6.605 x 1.85
m3

DI S
PERIKSA DI LAPORKAN DI
TAN SUPERVISI KONTRAKTOR PELAKSANA PEJABAT PEM
ARYA KONSULINDO PT. MITRA AIYANGGA NUSANTARA

IRWAN ISM
RIADI, ST MUH. MASNUR ASRY A.Md. Nip : 197610
ENGINEER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME

x L x T 162.01 m3
x 6.6 x 1.38
m3
x L x T
x 6.605 x 1.35
m3

A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME

x L x Tinggi Rata2 93.10 m3


x 7 x 1
m3

x L x Tinggi Rata2
x 7 x 0.9
m3

RIKSA DI LAPORKAN
N SUPERVISI KONTRAKTOR PELAKSANA
YA KONSULINDO PT. MITRA AIYANGGA NUSANTARA
RIKSA DI LAPORKAN
N SUPERVISI KONTRAKTOR PELAKSANA
YA KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ADI, ST MUH. MASNUR ASRY A.Md.


GINEER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME

A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA
PERHITUNGAN VOLUME
0.7 x 9 131.928 m3

1.65 x 0.3 x 9

1.65 x 0.3 x 9

3.45 x 9

0.7 x 0.5 x 9

0.6 x 0.5 x 9

2 x 9

A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME
0.6 x 9

0.5 x 0.6 x 9

0.6 x 2.5
me Total Abutmen = 65.96 139.8657

0.3 x 0.5 7.9377 m3

0.2 x 0.4

4 x 0.3

ERIKSA DI LAPORKAN
AN SUPERVISI KONTRAKTOR PELAKSANA
RYA KONSULINDO PT. MITRA AIYANGGA NUSANTARA

IADI, ST MUH. MASNUR ASRY A.Md.


NGINEER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME

0.7 x 0.5 x 0.3

2.16 x 0.3

1.15 x 0.8 x 0.3

1.65 x 0.3

1.65 x 0.3 x 0.3

me Total Wing Wall = 3.96885


A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME

7.728

4.2 x 0.1 = 3.864

A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA
G KEC. PATAMPANUA

PERHITUNGAN VOLUME

3735 Kg
15759 Kg

131115 Kg

6555.75 Kg
131115 Kg

19 x 10 = 190 390 m
20 x 10 = 200

A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME
19 x 10 = 190 390 m
20 x 10 = 200
x LA + LB x T 22.75 m3
2
x 0.65 x 3
m3
x L x T
x 1.3 x 1
m 3

A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME
82.56 m3
g Sebelah Kanan 28.58

((L2 x (Ta + Tb/2) x T2))/2

x 0.65 x 3
m3 /2 = 2.93 m3
L1 x (Ta + Tb Rata2 /2) x( T1+T2/2)
x 0.75 x 2.6
m 3

L1 + L2 x T3 x Tb Rata2
x 1 x 1.2
m3
1 / 2 L2 x T2
L1 x (T1 + T2/2)
L1 + l2 x T3

A DI LAPORKAN
PERVISI KONTRAKTOR PELAKSANA
KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ST MUH. MASNUR ASRY A.Md.


EER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME
m
g Sebelah Kiri 25.30

((L2 x (Ta + Tb/2) x T2))/2


x 0.75 x 2.8
m3 /2 = 3.26 m3

L1 x (Ta + Tb Rata2 /2) x( T1+T2/2)


x 0.75 x 2.35
m3
L1 + L2 x T3 x Tb Rata2
x 1.05 x 1.2
m 3

RIKSA DI LAPORKAN
N SUPERVISI KONTRAKTOR PELAKSANA
YA KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ADI, ST MUH. MASNUR ASRY A.Md.


GINEER DIREKTUR UTAMA
N SUPERVISI KONTRAKTOR PELAKSANA
YA KONSULINDO PT. MITRA AIYANGGA NUSANTARA

ADI, ST MUH. MASNUR ASRY A.Md.


GINEER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME
m
ng Sebelah Kiri 16.64

((L2 x (Ta + Tb/2) x T2))/2


x 0.74 x 3.3
m 3
/2 = 3.85 m3

L1 x (Ta + Tb Rata2 /2) x( T1+T2/2)


x 0.75 x 3.23
m3
L1 + L2 x T3 x Tb Rata2
x 1.05 x 1.2
m3

IKSA DI LAPORKAN
SUPERVISI KONTRAKTOR PELAKSANA
A KONSULINDO PT. MITRA AIYANGGA NUSANTARA

DI, ST MUH. MASNUR ASRY A.Md.


GINEER DIREKTUR UTAMA

CKUP DATA

G KEC. PATAMPANUA

PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
m
ng Sebelah Kanan 12.04

((L2 x (Ta + Tb/2) x T2))/2


x 0.775 x 2.5
m 3
/2 = 2.33 m3
L1 x (Ta + Tb Rata2 /2) x( T1+T2/2)
x 0.75 x 2.2
m3
L1 + L2 x T3 x Tb Rata2
x 1.05 x 1.2
m 3

p x l x t x Jumlah Bronjong 10.00 m3


x 1 x 0.5
x 10
M3
KSA DI LAPORKAN
SUPERVISI KONTRAKTOR PELAKSANA
A KONSULINDO PT. MITRA AIYANGGA NUSANTARA

DI, ST MUH. MASNUR ASRY A.Md.


INEER DIREKTUR UTAMA
BACKUP DATA

PEKERJAAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA


LOKASI : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
MASA PELAKSANAAN : 125 HARI KALENDER
NILAI KONTRAK : Rp. 5.511.878.000.00
PERHITUNGAN
GAMBAR
(m)

V = P x
= x

= 0 m3

DI SETUJUI DI LAPORKAN
DI SETUJUI KONSULTAN SUPERVISI
PEJABAT PEMBUAT KOMITMEN PT.ASHABIB KARYA KONSULINDO

IRWAN ISMAIL, S.T.,M.Eng. SURIADI, ST


Nip : 19761007 200212 2 008 SITE ENGINEER
PERHITUNGAN VOLUME
(m) (m3)

L x T
x 0 m3

DI LAPORKAN
KONTRAKTOR PELAKSANA
PT. MITRA AIYANGGA NUSANTARA

MUH. MASNUR ASRY A.Md.


DIREKTUR UTAMA
DAFTAR TARIF SEWA PERALATAN KAB. WAJO
UNTUK ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2017

NO. URAIAN KODE HP

1 ASPHALT MIXING PLANT E01 290


2 ASPHALT FINISHER E02 50
3 ASPHALT SPRAYER E03 15
4 BULLDOZER E04 140
5 AIR COMPRESSOR E05 80
6 CONCRETE MIXER E06 10
7 CRANE MAKS 80 TON E07 150
8 DUMP TRUCK ( K ) E08 50
9 DUMP TRUCK E09 100
10 EXCAVATOR E10 100
11 FLAT BED TRUCK E11 125
12 GENERATOR SET E12 120
13 MOTOR GRADER E13 125
14 TRACK LOADER E14 95
15 WHEEL LOADER E15 95
16 THREE WHEEL ROLLER E16 50
17 TANDEM ROLLER E17 50
18 PNEUMATIC TYRE ROLLER E18 60
19 VIBRATORY ROLLER E19 50
20 CONCRETE VIBRATOR E20 3
21 STONE CRUSHER E21 220
22 WATER PUMP E22 6
23 WATER TANK TRUCK E23 125
24 VIBRATORY COMPACTOR E24 3
25 STAMPER E25 5
26 JACK HAMMER E26 3
27 FULVI MIXER E27 75
28 CONCRETE PUMP E28 120
29 TRAILER 20 TON E29 175
30 PILE DRIVER + DIESEL HAMMER E30 25
31 CRANE ON TRACK (35 Ton) E31 125
32 WELDING SET E32 40
33 PEDESTRIAN ROLLER E33 11
34 ASPHALT LIQUID MIXER E34 5
35 MESIN LIER E35 80
36 FLAT BED TRUCK + CRANE E36 125
37 SCREENING PLANT E37 150
38 DROP HAMMER / PANC. KAYU E40 75
39 HAND COMPACTOR E41 10
40 CONRETTE PAVING MACHINE (SLIP FORM PAVER) E42 105
41 VIBRATING SCREED E43 18
42 CONCRETE CUTTER E45 23
43 PONTON ANGKUT E46 50
44 PONTON PANCANG E47 100
45 BORE PILE MACHINE E48 150
46 BATCHING PLANT E49 150
47 TRONTON E52 220
48 COLD MILLING MACHINE E53 248
49 ROCK DRILL BREAKER E54 30
50 COLD RECYCLER E55 900
51 HOT RECYCLER E56 900
52 AGGREGAT (CHIP) SPREADER E57 135
53 ASPHALT DISTRIBUTOR E58 135
54 CONCRETE PAN MIXER E60 125
55 CONCRETE BREAKER E61 290
56 ASPAHLT TANKER E62 190
57 CEMENT TANKER E63 190
58 CONCRETE MIXER (350) E64 20
59 VIBRATING RAMMER E65 4.2
60 TRUCK MIXER (AGITATOR) E66 220
61 CRANE ON TRACK 75-100 TON E68 200
62 BLENDING EQUIPMENT E69 50
63 CHAIN SAW E71 10

Catatan :
- Harga tersebut belum termasuk PPn, Biaya Umum dan Keuntungan.
- Sudah termasuk Upah Operator dan Pembantu Operator
PERALATAN KAB. WAJO
GA SATUAN PEKERJAAN
GGARAN 2017
BIAYA SEWA
KAPASITAS KET.
ALAT/JAM
60.0 Ton/Jam 6,647,600
10 Ton/Jam 472,700
850 Liter 92,400
140 HP 656,400
400 M2/Jam 219,400
250 Liter 58,200
80 Ton 656,700
6 Ton 219,100
10 Ton 425,800
0.5 M3 522,400
10 Ton 389,600
100 KVA 500,600
125 HP 583,500
1.5 M3 473,300
1.5 M3 510,200
8 Ton 388,100
8 Ton 388,100
10 Ton 400,200
8 Ton 424,700
3 HP 41,300
100 Ton/Jam 1,176,900
10 M3/Jam 39,600
4 M3 353,400
3 HP 41,300
0.2 Ton 46,100
3 HP 55,900
75 HP 264,300
60 M3 325,400
20 Ton 633,100
2.5 Ton 115,700
35 Ton 499,600
250 Amp 158,400
1 Ton 91,600
1000 Liter 39,300
10 Ton 212,200
15 Ton 461,600
20 T/Jam 396,600
1 Ton 293,900
0,1 Ton 73,300
2,5 M 555,500
20,0 HP 75,600
25 HP 85,900
50,0 Ton 166,200
100 Ton 284,800
2000 Meter 1,521,905
800Liter 797,400
15 Ton 707,300
1000 Meter 1,761,700
30 HP 378,100
2,2 M 7,347,100
3M 9,438,500
3,5 M 642,500
4000 Liter 463,100
500 Liter 575,300
20 M3/Jam 905,900
4000 Liter 560,400
4000 Liter 560,500
350 Liter 82,700
80 Kg 44,100
5 M3 595,700
75 Ton 699,600
30 Ton 261,200
10 HP 55,500

Sengkang, Januari 2017


Kepala Dinas Bina Marga, Cipta Karya
Jasa Konstruksi dan Penataan Ruang
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

1. Jenis Peralatan EXCAVATOR 80-140 HP E10


2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 0.50 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,050,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa A= 10 % x B C 105,000,000 Rupiah

2. Faktor Angsuran Modai x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembali( B - C ) x D E 140,954.10 Rupiah
W

b. Asuransi 0.002 x B F 1,050.00 Rupiah


W

Biaya Pasti per Jam ( E + F ) G 142,004.10 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 101,414.82 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 143,000.00 Rupiah

Biaya beng(6.25% dan 8.75%) x B J 45,938 Rupiah


W

3. Perawatan(12,5 % - 17,5 %) x B K 65,625.00 Rupiah


perb W

4. Operator = ( 1 Orang / Jam ) x U1 L 13,500.00 Rupiah


5. Pembantu = ( 1 Orang / Jam ) x U2 M 11,000.00 Rupiah

Biaya Operasi per (H+I+K+L+M)


Jam P 380,477.32 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G S 522,400.00 Rupiah 478,300


(44,100)

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 13,500.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 11,000.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 8,451.24 Liter
6. Minyak Pelumas Mp 52,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ANALISIS HARGA SATUAN DASAR PEKERJAAN
E.28 Excavator
Pekerjaan Galian Tanah Biasa (Mekanis)
Produksi kerja di lapangan menggunakan alat berat yaitu Excavator
Type Alat : EXCAVATOR PC130F-7

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI DAN URUTAN KERJA


Asumsi :
1. Menggunakan alat berat (cara mekanik)
2. Kondisi lokasi pekerjaan : sedang/baik
3. Jam kerja efektif Pekerja per-hari Tk 7.00 Jam

Uraian Kerja :
1. Tanah yang digali umumnya berada diareal
persawahan dan saluran irigasi
2. Penggalian dengan menggunakan Excavator
3. Selanjutnya Excavator menuangkan material
hasil galian dibantaran tanggul kemudian
dirapihkan

II. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
EXCAVATOR
Kapasitas Bucket V 0.55 M3
Faktor Bucket Fb 1.10 -
Faktor Efisiensi alat/kerja Fa 0.83 -
Faktor Kembang (swell) Fk 0.90 -

Waktu siklus Ts
Menggali dan mengisi bucket 8.00 detik
Mengangkat dan swing 10.00 detik
Menuang hasil galian 5.00 detik
Perapihan hasil galian 10.00 detik
Swing kembali 5.00 detik
Waktu tetap, percepatan 5.00 detik
43.00 detik
Waktu Siklus Ts
0.72 menit

V x Fb x Fa x 60 Q 46.71 m3/jam
Kapasitas =
Ts x Fs

Koefisie = 1 : Q E.28 0.0214 Jam

3. TENAGA
Produksi : EXCAVATOR Q 46.71 m3/jam
Produksi G = Tk x Q Qt 326.98 m3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerj = (Tk x P) : Qt (L.01) 0.0642 Jam
- Mandor= (Tk x M) : Qt (L.15) 0.0214 Jam
Sumber :
* Analisa Harga Satuan Pekerjaan 2012 (AHSP 2012)
* UT-Komatsu Hydrolic Excavator J11096 PC130F-7"
N

KETERANGAN

SAE*
Sedang
sedang/baik
sedang/baik
BACK UP DATA
NAMA KLP MAMMINASAE II
Pekerjaan Pasangan Batu
KECAMATAN :BOLA

SKETSA TINGGI (M) LEBAR (M) Luas


Luas Luas
Luas 1 Luas 2 Rata- Rata
NO. STATION
(m2) (m2)
3
Rata L1 L2
(m2)
(m2) (m2
T T1 T2 L B B1/B2 L1 L2

0+0 0.79 0.10 0.10 1.57 1.27 0.40 0.25 0.25 0.51 0.13 0.16
0.51 0.13
0 + 10 0.77 0.10 0.10 1.58 1.28 0.40 0.25 0.25 0.50 0.13 0.16
0.50 0.13
0 + 20 0.77 0.10 0.10 1.60 1.30 0.40 0.25 0.25 0.50 0.13 0.16
0.50 0.13
25 L 25 0 + 30 0.76 0.10 0.10 1.59 1.29 0.40 0.25 0.25 0.49 0.13 0.16
0.52 0.13
0 + 40 0.83 0.10 0.10 1.57 1.27 0.40 0.25 0.25 0.54 0.13 0.16
0.54 0.13
T 0 + 50 0.83 0.10 0.10 1.57 1.27 0.40 0.25 0.25 0.54 0.13 0.16
0.54 0.13
0 + 60 0.83 0.10 0.10 1.57 1.27 0.40 0.25 0.25 0.54 0.13 0.16
T1
T2 0.54 0.13
0 + 70 0.84 0.10 0.10 1.63 1.33 0.40 0.25 0.25 0.55 0.13 0.16
B2 B B1 0.54 0.13
0 + 80 0.81 0.10 0.10 1.58 1.28 0.40 0.25 0.25 0.53 0.13 0.16
0.53 0.13
0 + 90 0.81 0.10 0.10 1.55 1.25 0.40 0.25 0.25 0.53 0.13 0.16
0.49 0.12
0 + 100 0.69 0.10 0.10 1.47 1.17 0.40 0.25 0.25 0.45 0.12 0.16
0.46 0.12
0 + 110 0.73 0.10 0.10 1.48 1.18 0.40 0.25 0.25 0.47 0.12 0.16
Jumlah :

Jumlah Segmn Lalu

Jumlah Total :

DI PERIKSA KELOMPOK TANI Dibu


TIM TEKNIS MAMMINASAE II PENGAWA

ANDI ASBAR AZIS , S.Sos, Msi AGUS BUYUN


NIP : 19720210200701.1.025 KETUA
BACK UP DATA
NAMA KLP MAMMINASAE II

Pekerjaan Pasangan Batu


KECAMATAN :BOLA

SKETSA TINGGI (M) LEBAR (M) Luas


Luas Luas
Luas 1 Luas 2 Rata- Rata
NO. STATION 3
(m2) (m2) Rata L1 L2
(m2)
(m2) (m2
T T1 T2 L B B1/B2 L1 L2

0 + 110 0.73 0.10 0.10 1.48 1.18 0.40 0.25 0.25 0.47 0.12 0.16
0.48 0.12
0 + 120 0.76 0.10 0.10 1.54 1.24 0.40 0.25 0.25 0.49 0.12 0.16
0.50 0.13
0 + 130 0.77 0.10 0.10 1.56 1.26 0.40 0.25 0.25 0.50 0.13 0.16
25 L 25
0.50 0.13
0 + 140 0.77 0.10 0.10 1.56 1.26 0.40 0.25 0.25 0.50 0.13 0.16
0.50 0.13
T 0 + 150 0.77 0.10 0.10 1.59 1.29 0.40 0.25 0.25 0.50 0.13 0.16
0.50 0.12
0 + 160 0.76 0.10 0.10 1.36 1.06 0.40 0.25 0.25 0.49 0.11 0.16
T1 0.49 0.11
T2
0 + 170 0.76 0.10 0.10 1.36 1.06 0.40 0.25 0.25 0.49 0.11 0.16
B2 B B1 0.50 0.10
0 + 180 0.79 0.10 0.10 1.32 1.02 0.40 0.25 0.25 0.51 0.10 0.16
Jumlah :

Jumlah Segmn Lalu

Jumlah Total :

DI PERIKSA KELOMPOK TANI Dibu


TIM TEKNIS MAMMINASAE II PENGAWA

ANDI ASBAR AZIS , S.Sos, Msi AGUS BUYUN


NIP : 19720210200701.1.025 KETUA
P DATA

Pekerjaan Pasangan Batu

Luas Luas
Rata2 Rata- Jarak VOLUM
L2 Rata L3 (m) E (m3)
KET.
(m2) (m2)

0.13 0.16 10.00 7.95

0.13 0.16 10.00 7.90

0.13 0.16 10.00 7.87

0.13 0.16 10.00 8.05

0.13 0.16 10.00 8.27

0.13 0.16 10.00 8.27

0.13 0.16 10.00 8.33

0.13 0.16 10.00 8.27

0.13 0.16 10.00 8.13

0.12 0.16 10.00 7.69

0.12 0.16 10.00 7.39


### 88.09

0.00

### 88.09

Dibuat oleh
PENGAWAS LAPANGAN

BUYUNG TIRTO
P DATA

Pekerjaan Pasangan Batu

Luas Luas
Rata2 Rata- Jarak VOLUM
L2 Rata L3 (m) E (m3) KET.
(m2) (m2)

0.12 0.16 10.00 7.65

0.13 0.16 10.00 7.82

0.13 0.16 10.00 7.87

0.13 0.16 10.00 7.88

0.12 0.16 10.00 7.75

0.11 0.16 10.00 7.60

0.10 0.16 10.00 7.68


70.00 54.25

### 88.09

180.0 142.33

Dibuat oleh
PENGAWAS LAPANGAN

BUYUNG TIRTO
DAFTAR HARGA SATUAN UPAH
PROVINSI : SULAWESI SELATAN
KABUPATEN : WAJO
TAHUN ANGGARAN : 2017

HARGA SATUAN HARGA SATUAN


NO. URAIAN KODE
(Rp/Jam) (Rp/Hari)

1 Pekerja L.01 11,400 79,800

2 Tukang L.02. 13,500 94,500

3 Mandor L.03 13,500 94,500

4 Operator Terampil L.04 14,200 99,400

5 Pembantu Operator L.05 11,700 81,900

6 Sopir Terampil L.06 13,500 94,500

7 Pembantu Sopir L.07 11,400 79,800

8 Mekanik Terampil L.08 14,200 99,400

9 Pembantu Mekanik L.09 11,700 81,900


10 Kepala Tukang L.10 14,200 99,400
11 Buruh Tak Terampil L.01.1 11,400 79,800

12 Buruh Semi Terampil L.01.2 11,600 81,200

13 Buruh Terampil L.01.3 11,700 81,900

14 Tukang Batu L.02.1 13,500 94,500

15 Tukang Cat L.02.2 13,500 94,500

16 Tukang Kayu L.02.3 13,500 94,500


17 Tukang Besi L.02.4 13,500 94,500

18 Operator Semi Terampil L.04.1 13,500 94,500

19 Sopir Pribadi L.06.1 13,500 94,500

Catatan :
Harga tersebut belum termasuk PPn, Biaya Umum dan Keuntungan
Kepala Dinas Bina Marga, Cipta Karya
Jasa Konstruksi dan Penataan Ruang
0

NIP.19620713 199303 1 005


0

15
11,900.0 10,700 Upah Minimum Sul-Sel
749 UP 7%

11,400 2017 (UP 7%) 11,449


2016

55,000 24,800
10700
70,000 94,800
12800
70,000 94,800
12800
75,000 99,800 13500
57,500 82,300
11000
70,000 94,800 12800
55,000 79,800
10700
75,000 99,800
13500
57,500 82,300
11000
75,000 99,800 13500
45,000 69,800
10700
50,000 74,800
10900
57,500 82,300
11000
70,000 94,800
12800
70,000 94,800
12800
70,000 94,800 12800
70,000 94,800 12800
70,000 94,800
12800
70,000 94,800 12800
PEMERINTAH KABUPATEN WAJO
DINAS PENGELOLAAN SUMBER DAYA AIR
JLN. BAU BAHARUDDIN NO. 86 TELP (0485) 21301 SENGKANG

DAFTAR ANALISA
PEKERJAAN : PENGGALIAN SUNGAI TOLAWA
LOKASI : DESA BALIELO KECAMATAN BOLA KAB. WAJO
SUMBER DANA : APBD
TAHUN ANGGARAN : 2018
T.07 a) 1 m³ Galian tanah biasa
NO. Uraian Kode Satuan Koefisien

A. TENAGA
1. Tukang gali L.01 OH 0.563
2. Mandor L.03 OH 0.019
JUMLAH HARGA TENAGA KERJA
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN

JUMLAH HARGA PERALATAN


D. Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E. Overhead & profit 15% x D
F. Harga satuan pekerjaan (D+E)

T.15 a) 1 m³ Timbunan tanah dengan bahan yg tersedia di lokasi

NO. Uraian Kode Satuan Koefisien


A. TENAGA
1. Pekerja L.01 OH 0.330
2. Mandor L.03 OH 0.012
JUMLAH HARGA TENAGA KERJA
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN

JUMLAH HARGA PERALATAN


D. Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E. Overhead & profit 15% x D
F. Harga satuan pekerjaan (D+E)
P.01 1 m³ Pasangan batu dengan mortar jenis PC-PP
Mortar tpe N (untuk mutu PP tertentu setara dengan campuran 1 PC : 4 PP)

NO. Uraian Kode Satuan Koefisien


A. TENAGA
1. Pekerja L.01 OH 2.703
2. Tukang batu L.02.1 OH 0.900
3. Kepala tukang L.10 OH 0.090
4. Mandor L.03 OH 0.135
JUMLAH HARGA TENAGA KERJA
B. BAHAN
1. Batu gunung M. 010 m³ 1.200
2. Pasir pasangan M. 040 m³ 0.520
3. Semen PC (Bosowa 50 kg) M.217 kg 163
JUMLAH HARGA BAHAN
C. PERALATAN
1. Molen E.09 unit/hari 0.167
JUMLAH HARGA PERALATAN
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E. Overhead & profit 15% x D
F. Harga satuan pekerjaan (D+E)

P.03 1 m² Plesteran dengan mortar jenis PC-PP


Plesteran tebal 1,5 cm mortar tpe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
NO. Uraian Kode Satuan Koefisien
A. TENAGA
1. Pekerja L.01 OH 0.384
2. Tukang batu L.02.1 OH 0.190
3. Kepala tukang L.10 OH 0.019
4. Mandor L.03 OH 0.019
JUMLAH HARGA TENAGA KERJA
B. BAHAN
1. Pasir pasangan M.08 m³ 0.023
2. Semen PC (Bosowa 50 kg) M.18 kg 7.776
JUMLAH HARGA BAHAN
C. PERALATAN

JUMLAH HARGA PERALATAN


D. Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E. Overhead & profit 15% x D
F. Harga satuan pekerjaan (D+E)
1 m³ Bongkaran pas. Batu gunung yang lama
NO. Uraian Kode Satuan Koefisien
A. TENAGA
1. Pekerja L.01 OH 4.000
2. Mandor L.03 OH 0.400
JUMLAH HARGA TENAGA KERJA
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN

JUMLAH HARGA PERALATAN


D. Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E. Overhead & profit 15% x D
F. Harga satuan pekerjaan (D+E)

E28 Galian Tanah Biasa (Mekanis)

NO. Uraian Kode Satuan Koefisien


A. TENAGA
1. Pekerja L.01 OH 0.0642
4. Mandor L.03 OH 0.0214
JUMLAH HARGA TENAGA KERJA
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
Excavator E.28 Jam 0.02141
JUMLAH HARGA PERALATAN
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E. Overhead & profit 10% x D
F. Harga satuan pekerjaan (D+E)

KUASA PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN


DINAS PENGELOLAAN SUMBER DAYA AIR DINAS PENGELOLAAN SUMBER DAYA AIR

Ir. DARWIN JABIR, M.Si ANDI ASBAR AZIS , S.Sos, Msi


NIP : 19641231 200003 1 NIP : 19720210200701.1.025
035
NIP : 19641231 200003 1 NIP : 19720210200701.1.025
035

Pinrang, 2014
Mengetahui :
Kepala Dinas PSDA Pejabat Pembuat Komitmen,
Kabupaten Pinrang,

Ir. Arsyad. B, M.Si H. Muh. Jenal, S.ST, MT


Pangkat : Pembina Utama Muda NIP. 19650519 199603 1 002
NIP. 19581110 199203 1 005
PATEN WAJO
MBER DAYA AIR
485) 21301 SENGKANG

ATAN BOLA KAB. WAJO

Harga Jumlah
Satuan (Rp) Harga (Rp)

79,800.00 44,927.40
94,500.00 1,795.50
MLAH HARGA TENAGA KERJA 46,722.90

JUMLAH HARGA BAHAN -

JUMLAH HARGA PERALATAN -


46,722.90
7,008.44
53,731.34

Harga Jumlah
Satuan (Rp) Harga (Rp)

79,800.00 26,334.00
94,500.00 1,134.00
MLAH HARGA TENAGA KERJA 27,468.00

JUMLAH HARGA BAHAN -

JUMLAH HARGA PERALATAN -


27,468.00
4,120.20
31,588.20
n 1 PC : 4 PP)
Harga Jumlah
Satuan (Rp) Harga (Rp)

79,800.00 215,699.40
94,500.00 85,050.00
99,400.00 8,946.00
94,500.00 12,757.50
MLAH HARGA TENAGA KERJA 322,452.90

423,500.00 508,200.00
142,710.00 74,209.20
1,301.00 212,063.00
JUMLAH HARGA BAHAN 794,472.20

- -
JUMLAH HARGA PERALATAN -
1,116,925.10
167,538.77
1,284,463.87

tara dengan campuran 1 PC : 3 PP)


Harga Jumlah
Satuan (Rp) Harga (Rp)

79,800.00 30,643.20
94,500.00 17,955.00
99,400.00 1,888.60
94,500.00 1,795.50
MLAH HARGA TENAGA KERJA 52,282.30

97,200.00 2,235.60
1,144.00 8,895.74
JUMLAH HARGA BAHAN 11,131.34

JUMLAH HARGA PERALATAN -


63,413.64
9,512.05
72,925.69
Harga Jumlah
Satuan (Rp) Harga (Rp)

79,800.00 319,200.00
94,500.00 37,800.00
MLAH HARGA TENAGA KERJA 357,000.00

-
JUMLAH HARGA BAHAN -

JUMLAH HARGA PERALATAN -


357,000.00
53,550.00
410,550.00

Harga Jumlah
Satuan (Rp) Harga (Rp)

11,400.00 732.15
13,500.00 289.01
MLAH HARGA TENAGA KERJA 1,021.16

- -
- -
JUMLAH HARGA BAHAN -

522,400.00 11,183.51
JUMLAH HARGA PERALATAN 11,183.51
12,204.67
1,220.47
13,425.14

PEJABAT PEMBUAT KOMITMEN


DINAS PENGELOLAAN SUMBER DAYA AIR

ANDI ASBAR AZIS , S.Sos, Msi


NIP : 19720210200701.1.025
NIP : 19720210200701.1.025

Pinrang, 2014

Pejabat Pembuat Komitmen,

H. Muh. Jenal, S.ST, MT


NIP. 19650519 199603 1 002
L.01
DAFTAR HARGA SATUAN BAHAN JALAN DAN JEMBAT
KABUPATEN WAJO
TAHUN ANGGARAN 2017
NO NAMA BARANG SATUAN KODE
1 Batu Gunung M3 M. 010
2 Batu Kali M3 M. 013
3 Tanah Timbunan M3 M. 015
4 Kerikil Ayak Beton M3 M. 016
5 Batu Belah 10 - 15 Cm M3 M. 020
6 Batu Belah 7 - 10 Cm M3 M. 021
7 Batu Pecah 5 - 7 Cm M3 M. 022
8 Batu Pecah 3 - 5 Cm (Crusher) M3 M. 023
9 Batu Pecah 2 - 3 Cm (Crusher) M3 M. 024
10 Batu Pecah 1 - 2 Cm (Crusher) M3 M. 025
11 Batu Pecah 0,5 - 1 Cm (Crusher) M3 M. 026
12 Abu Batu (Filler) Kg M. 027
13 Gorong-gorong Beton Dia 60 Cm (Bertulang) M' M. 031
14 Gorong-gorong Beton Dia 80 Cm (Bertulang) M' M. 032
15 Gorong-gorong Beton Dia 100 Cm (Bertulang) M' M. 033
16 Gorong-gorong Beton Dia 60 Cm M' M. 034
17 Gorong-gorong Beton Dia 80 Cm M' M. 035
18 Gorong-gorong Beton Dia 100 Cm M' M. 036
19 Pasir Urug M3 M. 039
20 Pasir Pasangan M3 M. 040
21 Pasir Beton M3 M. 041
22 Sirtu / Kerikil Sungai M3 M. 042
23 Material Timbunan Pilihan M3 M. 051
24 Aspal Bitumen (Drum) Kg M. 061
25 Aspal Bitumen (Curah) Kg M. 062
26 Minyak Flux Liter M. 063
27 Minyak Tanah (Industri) Liter M. 065
28 Kayu Bakar M3 M. 070
29 Kawat Bronjong (Pabrikasi Uk. 2x1x0,5 M') bh M. 162
30 Baut + Mour (Dia. 14 mm, P=15 cm) bh M. 163 a
31 Baut + Mour (Dia. 17 mm, P=15 cm) bh M. 163 b
32 Baut + Mour (Dia. 19 mm, P=30 cm) bh M. 163 c
33 Besi Tulangan (Polos) Kg M. 167
34 Besi Tulangan (Ulir) Kg M. 167
35 Alat-alat Bantu @ 3 Set Set M. 170
36 Kayu Untuk Perancah (Kapok, Kemiri, Piawing) M3 M. 180
37 Kayu Kelas I (Bayam) M3 M. 181 A
38 Kayu Kelas I (Kumia, Kalapi) M3 M. 181 B
39 Kayu Kelas II ( Baramming, Batau,Nato) M3 M. 181 C
40 Kayu Kelas III (Lapi Lapi) M3 M. 181 D
41 Minyak Diesel / Solar Liter M. 183 a
42 Solar (Industri) Liter M. 183 b
43 Bensin / Premium Liter M. 184
44 Minyak Pelumas Liter M. 185
45 Kuku Macan Dia. 1.5" Bh M. 200
46 Kuku Macan Dia. 1.0" Bh M. 201
47 Kuku Macan Dia. 0.5" Bh M. 202
48 Kabel / Tali Sling Baja Dia 36 mm M' M. 203
49 Kabel / Tali Sling Baja Dia 28 mm M' M. 204
50 Kabel / Tali Sling Baja Dia 24 mm M' M. 205
51 Kabel Pengaku Dia 16 mm M' M. 207
52 Jarum Keras 1.5" Bh M. 208
53 Jarum Keras 1.0" Bh M. 209
54 Beugel Plat Baja M' M. 210
55 Sadle Kabel Bh M. 211
55 Besi UNP 10 (P = 6 m') Btg M. 212
56 Besi UNP 8 (P = 6 m') Btg M. 213
57 Besi UNP 6 (P = 6 m') Btg M. 214
58 Besi Siku ( P = 6 m , T = 3 mm ) Btg M. 215
59 Besi Siku (P = 6 m , T = 5 mm) Btg M. 216
60 Semen 50 Kg Kg M.217
61 Plastik Alas M2 M. 218
Catatan : a. Harga tersebut belum termasuk ; PPn serta biaya umum dan keuntungan penyedia jasa.
b. Khusus batu pecah, merupakan harga maksimal untuk pekerjaan beton dengan volume k
untuk pekerjaan beton dan jalan (jalan beton, campuran hotmix / lapen) dengan volume b
sebagai produksi sendiri.
Sengkang, Januari 2017
Kepala Dinas Bina Marga, Cipta Karya
Jasa Konstruksi dan Penataan Ruang

Drs. HAIRIL AMRI WAWO


NIP.19620713 199303 1 005
AN DAN JEMBATAN
7
HARGA (Rp)
2016 % KENAIKAN
423,500 (14,000) 409,500 100 (3.42)
169,600 214,100 383,700 100 55.80
79,930 70 80,000 100 0.09
178,840 156,560 335,400 100 46.68
427,270 (14,170) 413,100 100 (3.43)
449,425 (7,025) 442,400 100 (1.59)
471,580 20 471,600 100 0.00
891,080 (412,980) 478,100 100 (86.38)
953,080 (365,680) 587,400 100 (62.25)
584,080 28,320 612,400 100 4.62
584,080 28,320 612,400 100 4.62
1,000 (100) 900 100 (11.11)
360,000 0 360,000 100 -
530,000 0 530,000 100 -
740,000 0 740,000 100 -
170,000 0 170,000 100 -
250,000 0 250,000 100 -
330,000 0 330,000 100 -
142,710 (24,910) 117,800 100 (21.15)
142,710 112,590 255,300 100 44.10
174,160 141,040 315,200 100 44.75
169,160 145,040 314,200 100 46.16
123,180 102,820 226,000 100 45.50
10,000 6,000 16,000 100 37.50
9,000 6,000 15,000 100 40.00
3,800 0 3,800 100 -
15,100 0 15,100 100 -
188,200 0 188,200 100 -
483,800 0 483,800 100 -
4,300 0 4,300 100 -
5,400 0 5,400 100 -
10,800 0 10,800 100 -
17,200 0 17,200 100 -
19,200 0 19,200 100 -
275,000 0 275,000 100 -
1,944,500 0 1,944,500 100 -
12,644,500 0 12,644,500 100 -
7,644,500 0 7,644,500 100 -
4,144,500 0 4,144,500 100 -
3,644,500 0 3,644,500 100 -
6,000 0 6,000 100 -
8,900 0 8,900 100 -
7,000 0 7,000 100 -
52,100 0 52,100 100 -
46,300 0 46,300 100 -
22,100 0 22,100 100 -
15,100 0 15,100 100 -
181,700 0 181,700 100 -
85,000 0 85,000 100 -
67,200 0 67,200 100 -
48,600 0 48,600 100 -
1,494,300 0 1,494,300 100 -
662,200 0 662,200 100 -
88,200 0 88,200 100 -
881,500 0 881,500 100 -
450,000 0 450,000.00 100 -
350,000 0 350,000.00 100 -
325,000 0 325,000.00 100 -
90,000 0 90,000.00 100 -
200,000 0 200,000.00 100 -
1,301
3,000 0 3,000.00 100 -
keuntungan penyedia jasa.
aan beton dengan volume kecil, sedangkan
ix / lapen) dengan volume besar dianalisa

Januari 2017
a Marga, Cipta Karya
dan Penataan Ruang

L AMRI WAWO
13 199303 1 005
101,780 56.0
59,050 69
47,060 70
27,600 57
100
100
100
100
100

100
INPUT NOMOR
KECAMATA 0

NO KECAMATAN MUAT BONGKAR JARAK

1 TEMPE 0.0 0 0 1

2 TANASITOLO 60.0 70 12 3

3 PAMMANA 60.0 70 18 4 71,710.00

4 SABBANGPARU 60.0 70 11 2 242.00

5 B O LA 60.0 70 35 7

6 PENRANG 60.0 70 44 10

7 TAKKALALLA 60.0 70 45 11

8 PITUMPANUA 60.0 70 78 14

9 K E E R A 60.0 70 63 13

10 GILIRENG 50.0 70 36 8

11 MANIANGPAJO 60.0 70 21 5

12 MAJAULENG 60.0 70 28 6

13 BELAWA 60.0 70 36 9

14 SAJOANGING 60.0 70 54 12

Dump Truck 221,100.00 219,100.00

Buruh Tak Trampil 83,300.00 389,600.00


0 0.00250 400.00
0 0.00397 251.00
0 0.00563 177.00
0 0.00810 123.00
0 0.01210 82.00
0 0.01563 64.00
0 0.02560 39.00
0.079 15 3/4
47.25

0.00026 3,906.00
0.00056 1,795.00
0.00099 1,007.00
0.00250 400.00
0.00 251.00
0.01 123.00
0.01 82.00
0.03 39.00
0.04 25.00

0.02 41.99
1.00 0.03 36.58
0.05 20.58
0.09 10.93
6 0.15 6.51
6 0.24 4.17

215 8 pokok perubahan


110,000 88,000.00 Rp 102,000.00
146,800 131,500.00 Rp 131,700.00
280,000 274,500.00 Rp 274,800.00
410,760 410,000.00 Rp 410,400.00

-
-
-
-
-
DAFTAR HARGA SATUAN BAH

NO

A. BAHAN DASAR
1
2
3
B. BAHAN BESI
1
2
3
4
5

C. BAHAN LANTAI DAN DINDING


1
2
3
4
5

D. BAHAN ATAP
1
2
3
4
5
6
7
8
9
12
13

E. BAHAN KACA
1
2
3
4
6
7
F. BAHAN KUNCI DAN PENGGANTUNG
1
2
3
4
5
6
7
8
9

G. BAHAN CAT
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18

H. BAHAN SANITASI
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

I. BAHAN LISTRIK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

J. BAHAN LANGIT - LANGIT


1
2
3
4
5
6
7
9
10
11
12
13
16
17

K. PAVING BLOK
1

L. PIPA

-
-
-
-
-
-
-
2

Rp 256,250.00 -
Rp 337,500.00 -
Rp 460,000.00 -
Rp 615,000.00 -
Rp 790,000.00 -

3
Rp 40,000.00 -
Rp 60,000.00 -
Rp 70,000.00 -
Rp 86,500.00 -
Rp 110,000.00 -
Rp 190,000.00 -
Rp 360,000.00 -
Rp 698,800.00 -
Rp -
4
-
-
-
-

41.00 5
36.00 -
20.00 -
10.00 -
6.00 -
4.00 -

6
-
-
-
-

7
-
-
-
-
-

8
-
-
-
-
-

9
-
-
-
-
-

10
-
-
-
-
-

11
-
-
-
-
-

12
-
-
-
-

13
-
-
-
-
-

14
-
-
-
-
-

15
-
-
-
-
-

16
-
-
-
-
-

17
-
-
-
-
-
-
-
-
-

18
-
-
-
-
-
-
-
-
-

19
-
-
-
-

20
21 -
22 -
23 -
24
-
-

25
-
-

26
-
-
-
-
-

27
-
-
-
-
-

28
-
-
-
-
-

29
-
-
-
-
30
-
-
-
-
-

31
-
-
-
-
-

32
-
-
-
-

33
-
-
-
-

34
-
-
-
-
-
-
35
-
-

36
-
-
-
-

37
-
-
-
-

38

-
-
-
-

39
-
-
-
-

40
-
-
-
-
-
41 -
42 -
43 -
44 -
45 -
46 -
B. BAHAN BESI
6
7
8
9
10
11
12
13
14
15
16
17
18
19

D. BAHAN ATAP
10
11
14
E. BAHAN KACA
5
F. BAHAN KUNCI DAN PENGGANTUNG
10
11
12
G. BAHAN CAT
13
H. BAHAN SANITASI
1
18
19
I. BAHAN LISTRIK

J. BAHAN LANGIT - LANGIT


1
2
8
14
15
DAFTAR HARGA SATUAN BAHAN / MATERIAL
PROPINSI : SULAWESI SELATAN
KABUPATEN : WAJO
TAHUN ANGGARAN : 2017
BIDANG : CIPTA KARYA
KABUPATEN : WAJO

BAHAN / MATERIAL SAT HARGA BAHAN 2017

A. BAHAN DASAR
Semen PC 50 Kg Zak Rp 65,050.00
Semen Warna (lemkra) Kg Rp 25,310.00
Batu bata Merah Bh Rp 890.00
B. BAHAN BESI
Kawat Ikat Beton Kg Rp 19,500.00
Paku Biasa 5-10 Cm Kg Rp 17,810.00
Paku Biasa 2,5 - 4 Cm Kg Rp 18,310.00
Paku Seng Kg Rp 29,560.00
Paku beton Persegi 5 - 10 Cm Kg Rp 20,310.00

C. BAHAN LANTAI DAN DINDING


Tegel Keramik 30 x 30 Polos Doz Rp 60,960.00
Tegel Keramik 40 x 40 Polos Doz Rp 62,980.00
Tegel Keramik 20 x 25 Polos Doz Rp 64,720.00
Tegel Keramik 20 x 20 Polos Doz Rp 67,300.00
Tegel Granit Warna 60 x 60 cm Doz Rp 169,710.00

D. BAHAN ATAP
Atap Spandek Zincalium 0,35 mm silver M' Rp 48,360.00
Nok Spandek 45 cm, 0,30 M' Rp 25,940.00
Genteng Metal (sakura roof) 2 x 4 (0,77 x 0,80) t = 0,35 cm Lbr Rp 35,150.00
Nok Genteng Metal Bh Rp 36,300.00
Seng Gelombang BWG 33" BjLs 0,3 KK Rp 9,910.00
Seng Plat BjLs 0,30 Lbr Rp 57,170.00
Kanal metal C 75/75 Setara "TASO" M' Rp 81,050.00
Reng 0,45 Panjang 6 M Setara "TASO" M' Rp 52,790.00
D y n a b o l t 10 x 5 mm Bh Rp 2,470.00
Karet Pelapis L 55 mm M' Rp 74,430.00
Talang Air Plastik P = 4 M Bh Rp 78,860.00

E. BAHAN KACA
Kaca Bening 3 mm M2 Rp 119,620.00
Kaca Bening 5 mm M2 Rp 129,620.00
Kaca Ryben 3 mm M2 Rp 139,620.00
Kaca Ryben 5 mm M2 Rp 139,620.00
Ce rmin M2 Rp 88,470.00
Silicone Sealant Ultraglaze ex GE tube Rp 15,310.00
F. BAHAN KUNCI DAN PENGGANTUNG
Kunci Tanam "SES" setara Bh Rp 110,940.00
Kunci Tanam Biasa 2 Slag Bh Rp 180,940.00
Kunci Lemari Mutu Baik Bh Rp 15,940.00
Handle Pintu Bh Rp 200,380.00
Engsel Pintu Biasa Bh Rp 20,070.00
Engsel Jendela Bh Rp 12,570.00
Grendel Pintu Bh Rp 16,320.00
Grendel Jendela Bh Rp 25,380.00
Hak Angin / Kait - kait Bh Rp 15,380.00

G. BAHAN CAT
Meni 1 Kg "PERAHU" Klg Rp 48,610.00
Cat Kayu "AVIAN" (1 Kg) Klg Rp 55,730.00
Minyak Cat "AVIAN" Klg Rp 47,140.00
Plamur Tembok Alcaplast 20 kg Klg Rp 199,430.00
Plamur Kayu Kucing Kg Rp 35,730.00
Cat Tembok Setara "METROLITE" (3 Ltr) Klg Rp 95,730.00
Cat Tembok Setara "MOWILEX" (2,5 Ltr) Luar Klg Rp 250,730.00
Cat Tembok Setara "MOWILEX" (2,5 Ltr) Dalam Klg Rp 250,730.00
Cat Seng/Genteng 4 Kg Klg Rp 107,490.00
Bahan Anti Rayap 10 Kg Klg Rp 190,730.00
Lem Kayu 800 gr Klg Rp 15,730.00
Cat Water Proofing Merk " Dulux watershield" 2,5 Ltr Klg Rp 275,730.00
Ter Residu 1 Kg Klg Rp 25,730.00
Kertas Gosok (Amplas) M' Rp 10,190.00
Kuas 1" Bh Rp 5,310.00
Kuas 2,5" Bh Rp 10,310.00
Kuas 3" Bh Rp 12,310.00

H. BAHAN SANITASI
Floor Drain "Plastik" Bh Rp 15,190.00
Kloset Jongkok "TOTO" Bh Rp 427,150.00
Kloset Duduk "TOTO" Bh Rp 3,023,570.00
Wastafel set Rp 531,430.00
Wastafel Lengkap set Rp 2,047,150.00
Urinoir 1 Set Lengkap set Rp 3,047,150.00
Stop Kran 1/2 " Biasa Bh Rp 10,310.00
Stop Kran 3/4 " Biasa Bh Rp 11,640.00
Kran Air Double + Shower Bh Rp 500,790.00
Kran Air Shower Bh Rp 100,250.00
Kran Air 1/2" "ONDA" Bh Rp 60,790.00
Kran Air 3/4" "ONDA" Bh Rp 30,790.00
Jet Washer "TOTO" Bh Rp 251,890.00
Seal Tape Bh Rp 4,190.00
Bak Penampungan Air Kap. 1 M3 Bh Rp 1,394,290.00
Bak Penampungan Air Kap. 2 M3 Bh Rp 3,188,580.00

I. BAHAN LISTRIK
Skring Box 1 lubang Bh Rp 50,130.00
Panel MCB Bh Rp 30,130.00
MCB 6A - 10A Bh Rp 60,130.00
Stop Kontak "PANASONIC" setara Bh Rp 17,130.00
Saklar Ganda "PANASONIC" setara Bh Rp 25,130.00
Saklar Tunggal "PANASONIC" setara Bh Rp 17,130.00
Lampu CPL Kapsul 8 Watt "PHILIPS Bh Rp 30,310.00
Lampu CPL Kapsul 15 Watt "PHILIPS Bh Rp 40,310.00
Lampu CPL Kapsul 18 Watt "PHILIPS Bh Rp 35,310.00
Lampu CPL Kapsul 23 Watt "PHILIPS Bh Rp 40,310.00
Kap Industri HDK 55 cm + Lampu HPLN 80 watt Bh Rp 85,470.00
Kap Industri HDK 55 cm + Lampu HPLN 150 watt Bh Rp 50,470.00
Lampu Down Light Plafond Bh Rp 50,310.00
Fitting Lampu Bh Rp 10,130.00
Stand Lampu Tanam Bh Rp 50,470.00
Lampu TL 20 Watt Bh Rp 20,630.00
Pipa PVC diameter 5/8" - 4 M M' Rp 10,260.00
Kabel NYY 2 x 2,5 mm M' Rp 10,090.00
Kabel NYY 2 x 1,5 mm M' Rp 7,590.00
Panel Box Bh Rp 500,130.00
Inbuw Duz Bh Rp 3,130.00
Sekring 16 A Bh Rp 50,130.00

J. BAHAN LANGIT - LANGIT


Gypsum Board 122 x 244 x 0,9 mm Lbr Rp 90,690.00
Calsiboard 35 mm 122 x 244 x 0,35 mm Lbr Rp 111,300.00
List Profil Kayu 0,03 x 0,03 x 4 M Bh Rp 15,630.00
Sekrup Gypsum Bh Rp 50,190.00
Plaster Gypsum M' Rp 10,190.00
Besi Hollow 40 x 40 mm Bh Rp 36,890.00
Besi Hollow 20 x 40 mm Bh Rp 26,890.00
Lem Gypsum 20 Kg (Comice Aplus) Kg Rp 89,430.00
Paku Gypsum Kg Rp 28,810.00
Tripleks 122 x 244 x 0,3 mm Lbr Rp 67,820.00
Tripleks 122 x 244 x 0,4 mm Lbr Rp 80,920.00
Tripleks 122 x 244 x 0,6 mm Lbr Rp 91,450.00
Multipleks 122 x 244 x 0,8 mm Lbr Rp 150,210.00
Teakwood 122 x 244 x 0,3 mm Lbr Rp 154,710.00

K. PAVING BLOK
Paving Blok (Kotak) K. 225 T = 8 Cm (44 buah / M2) M2 Rp 78,000.00

Paving Blok (Kotak) K. 300 T = 8 Cm (44 buah / M2) M2 Rp 85,000.00

Paving Blok (Kotak) K. 400 T = 8 Cm (44 buah / M2) M2 Rp 95,000.00

L. PIPA

Pipa GIP ( 6 meter )


(Sekelas Med.A)
Dia 50 mm (1 1/2") tebal 2 mm Btg Rp 457,031.00
Dia 63 mm (2") tebal 2 mm Btg Rp 570,312.00
Dia 75 mm (2 1/2") tebal 2 mm Btg Rp 757,812.00
Dia 90 mm (3") tebal 2,9 mm Btg Rp 900,000.00
Dia 110 mm (4") tebal 2,9 mm Btg Rp 1,289,062.00
Dia 125 mm (5") tebal 2,9 mm Btg Rp 1,353,980.00
Dia 160 mm (6") tebal 2,9 mm Btg Rp 1,653,800.00
Pipa GIP ( 6 meter )
(Sekelas Med.B)
Dia 50 mm (1 1/2") tebal 1,5 mm Btg Rp 256,250.00
Dia 63 mm (2") tebal 1,5 mm Btg Rp 337,500.00
Dia 75 mm (2 1/2") tebal 2,0 mm Btg Rp 460,000.00
Dia 90 mm (3") tebal 2,0 mm Btg Rp 615,000.00
Dia 110 mm (4") tebal 2,0 mm Btg Rp 790,000.00

Pipa PVC
Dia 1/2" - 4,00 M Btg Rp 40,000.00
Dia 3/4" - 4,00 M Btg Rp 60,000.00
Dia 1" - 4,00 M - AW Btg Rp 70,000.00
Dia 1 1/2" - 4,00 M - AW Btg Rp 86,500.00
Dia 2" - 4,00 M - AW Btg Rp 110,000.00
Dia 3" - 4,00 M - AW Btg Rp 190,000.00
Dia 4" - 4,00 M - AW Btg Rp 360,000.00
Dia 6" - 4,00 M - AW Btg Rp 698,800.00

PIPA PVC SNI T.12,5 bar - S.10 (Join Pipa Dengan Soket Pemyambungan Lem)
Dia 63 mm (2") - 6 M Btg Rp 175,000.00
Dia 90 mm (3") - 6 M Btg Rp 330,000.00
Dia 110 mm (4") - 6 M Btg Rp 480,000.00
Dia 160 mm (6") - 6 M Btg Rp 998,800.00

PIPA PVC SNI T.12,5 bar - S.10 (Join Pipa Dengan Soket Pemyambungan Ring karet)
Dia 63 mm (2") - 6 M Btg Rp 180,000.00
Dia 90 mm (3") - 6 M Btg Rp 335,800.00
Dia 110 mm (4") - 6 M Btg Rp 501,260.00
Dia 160 mm (6") - 6 M Btg Rp 1,028,800.00
Dia 200 mm (8") - 6 M Btg Rp 1,656,180.00

PIPA PVC SNI T.10 bar - S.12,5 (Join Pipa Dengan Soket Pemyambungan Lem)
Dia 50 mm (1 1/2") - 6 M Btg Rp 110,000.00
Dia 63 mm (2") - 6 M Btg Rp 146,800.00
Dia 90 mm (3") - 6 M Btg Rp 280,000.00
Dia 110 mm (4") - 6 M Btg Rp 410,760.00

PIPA PVC SNI T.10 bar - S.12,5 (Join Pipa Dengan Soket Pemyambungan Ring karet)
Dia 63 mm (2") - 6 M Btg Rp 160,000.00
Dia 90 mm (3") - 6 M Btg Rp 308,400.00
Dia 110 mm (4") - 6 M Btg Rp 455,700.00
Dia 160 mm (6") - 6 M Btg Rp 971,700.00
Dia 200 mm (8") - 6 M Btg Rp 1,499,400.00

FLANGE GIP/STEEL (sist. Las)


Flange Gip/Steel f 2" Bh Rp 49,875.00
Flange Gip/Steel f 3" Bh Rp 66,000.00
Flange Gip/Steel f 4" Bh Rp 82,500.00
Flange Gip/Steel f 6" Bh Rp 115,500.00
Flange Gip/Steel f 8" Bh Rp 203,500.00

TEE GIP/STEEL (sist. Las)


Tee Gip/Steel f 2" Bh Rp 41,250.00
Tee Gip/Steel f 3" Bh Rp 96,337.50
Tee Gip/Steel f 4" Bh Rp 169,312.50
Tee Gip/Steel f 6" Bh Rp 346,500.00
Tee Gip/Steel f 8" Bh Rp 605,000.00

BEND GIP/STEEL (sist. Las)


Bend Gip/Steel 90o f 2" Bh Rp 26,250.00
Bend Gip/Steel 90o f 3" Bh Rp 68,250.00
Bend Gip/Steel 90o f 4" Bh Rp 118,125.00
Bend Gip/Steel 90o f 6" Bh Rp 236,250.00
Bend Gip/Steel 90o f 8" Bh Rp 495,000.00

BEND GIP/STEEL (sist. Las)


Bend Gip/Steel 45o f 2" Bh Rp 26,250.00
Bend Gip/Steel 45o f 3" Bh Rp 72,187.50
Bend Gip/Steel 45o f 4" Bh Rp 121,537.50
Bend Gip/Steel 45o f 6" Bh Rp 170,500.00
Bend Gip/Steel 45o f 8" Bh Rp 352,000.00

FLANGE TEE GIP


Flange Tee GIP f 4" x 4" Bh Rp 302,500.00
Flange Tee GIP f 6" x 6" Bh Rp 357,500.00
Flange Tee GIP f 8" x 8" Bh Rp 715,000.00
Flange Tee GIP f 10" x 10" Bh Rp 1,017,500.00

Flange Bend GIP


Flange Bend Gip/Steel 90o f 2" Bh Rp 192,500.00
Flange Bend Gip/Steel 90o f 3" Bh Rp 269,500.00
Flange Bend Gip/Steel 90o f 4" Bh Rp 385,000.00
Flange Bend Gip/Steel 90o f 6" Bh Rp 577,500.00
Flange Bend Gip/Steel 90o f 8" Bh Rp 852,500.00

Flange Bend GIP


Flange Bend Gip/Steel 45o f 2" Bh Rp 159,500.00
Flange Bend Gip/Steel 45o f 3" Bh Rp 236,500.00
Flange Bend Gip/Steel 45o f 4" Bh Rp 319,000.00
Flange Bend Gip/Steel 45o f 6" Bh Rp 412,500.00
Flange Bend Gip/Steel 45o f 8" Bh Rp 715,000.00

Stub End / Stub Flange PE 100


Stub End / Stub Flange PE 100 f 63 mm (2") Bh Rp 115,500.00
Stub End / Stub Flange PE 100 f 90 mm (3") Bh Rp 231,000.00
Stub End / Stub Flange PE 100 f 110 mm (4") Bh Rp 280,500.00
Stub End / Stub Flange PE 100 f 160 mm (6") Bh Rp 445,500.00
Stub End / Stub Flange PE 100 f 200 mm (8") Bh Rp 836,000.00

Flange Spigot
Flange Spigot Ǿ 2" Bh Rp 104,500.00
Flange Spigot Ǿ 3" Bh Rp 203,500.00
Flange Spigot Ǿ 4" Bh Rp 264,000.00
Flange Spigot Ǿ 6" Bh Rp 412,500.00
Flange Spigot Ǿ 8" Bh Rp 1,155,000.00

Flange Socket (Soket Penyambung lem & Ring Karet)


Flange Socket Ǿ 2" (63 mm SC) Bh Rp 121,000.00
Flange Socket Ǿ 3" (90 mm SC) Bh Rp 247,500.00
Flange Socket Ǿ 4" (110 mm SC) Bh Rp 302,500.00
Flange Socket Ǿ 6" (160 mm SC) Bh Rp 467,500.00
Flange Socket Ǿ 2" (63 mm RR) Bh Rp 126,500.00
Flange Socket Ǿ 3" (90 mm RR) Bh Rp 258,500.00
Flange Socket Ǿ 4" (110 mm RR) Bh Rp 313,500.00
Flange Socket Ǿ 6" (160 mm RR) Bh Rp 522,500.00
Flange Socket Ǿ 8" (200 mm RR) Bh Rp 1,265,000.00

TEE PVC SNI - 3 x Socket Rubber Ring


Tee PVC Ø 2" x 2" Bh Rp 104,500.00
Tee PVC Ø 3" x 3" Bh Rp 198,000.00
Tee PVC Ø 3" x 2" Bh Rp 181,500.00
Tee PVC Ø 4" x 4" Bh Rp 302,500.00
Tee PVC Ø 4" x 3" Bh Rp 286,000.00
Tee PVC Ø 4" x 2" Bh Rp 291,500.00
Tee PVC Ø 6" x 6" Bh Rp 715,000.00
Tee PVC Ø 6" x 4" Bh Rp 687,500.00
Tee PVC Ø 8" x 8" Bh Rp 1,072,500.00

TEE PVC SNI - Socket


Tee PVC Socket Ø 8" x 8" Bh Rp 819,500.00
Tee PVC Socket Ø 8" x 6" Bh Rp 786,500.00
Tee PVC Socket Ø 8" x 4" Bh Rp 786,500.00
Tee PVC Socket Ø 8" x 3" Bh Rp 786,500.00

Bend HDPE PE 100 45 o Ø 2" Bh Rp 121,000.00


Bend HDPE PE 100 90 o Ø 2" Bh Rp 134,200.00
Bend Segmented 45 o Ø 2" Bh Rp 82,500.00
Bend Segmented 90 o Ø 2" Bh Rp 101,750.00
LONG BEND DOUBLE SOCKET (solvent cament}
Ø 2" (63 mm) x 45º Bh Rp 49,500.00
Ø 2" (63 mm) x 90º Bh Rp 85,250.00

LONG BEND DOUBLE SOCKET (rubber ring}


Ø 2" (63 mm) x 45º Bh Rp 79,200.00
Ø 3" (63 mm) x 90º Bh Rp 126,500.00

LONG BEND SOCKET / SPIGOT (rubber ring}


Ø 2" (63 mm) x 45º Bh Rp 82,500.00
Ø 3" (63 mm) x 45º Bh Rp 115,500.00
Ø 4" (63 mm) x 45º Bh Rp 181,500.00
Ø 6" (63 mm) x 45º Bh Rp 506,000.00
Ø 8" (63 mm) x 45º Bh Rp 742,500.00

LONG BEND SOCKET / SPIGOT (rubber ring}


Ø 2" (63 mm) x 90º Bh Rp 93,500.00
Ø 3" (63 mm) x 90º Bh Rp 126,500.00
Ø 4" (63 mm) x 90º Bh Rp 214,500.00
Ø 6" (63 mm) x 90º Bh Rp 544,500.00
Ø 8" (63 mm) x 90º Bh Rp 852,500.00

REDUCER PE 100
Reducer PE 100 Ø 3" x 2" Bh Rp 148,500.00
Reducer PE 100 Ø 4" x 2" Bh Rp 192,500.00
Reducer PE 100 Ø 4" x 3" Bh Rp 209,000.00
Reducer PE 100 Ø 6" x 3" Bh Rp 374,000.00
Reducer PE 100 Ø 6" x 4" Bh Rp 401,500.00

REDUCER PVC SNI - Socket Solvent Cement


Reducer PVC Ø 3" x 1 1/2" Bh Rp 30,250.00
Reducer PVC Ø 3" x 2" Bh Rp 71,500.00
Reducer PVC Ø 4" x 2" Bh Rp 82,500.00
Reducer PVC Ø 4" x 3" Bh Rp 85,250.00
REDUCER PVC SNI - Rubber Ring
Reducer PVC Ø 4" x 3" Bh Rp 149,600.00
Reducer PVC Ø 6" x 4" Bh Rp 291,500.00
Reducer PVC Ø 8" x 6" Bh Rp 467,500.00
Reducer PVC Ø 10" x 6" Bh Rp 803,000.00
Reducer PVC Ø 10" x 8" Bh Rp 819,500.00

DOP PE 100
Dop PE Ø 2" Bh Rp 52,250.00
Dop PE Ø 3" Bh Rp 82,500.00
Dop PE Ø 4" Bh Rp 115,500.00
Dop PE Ø 6" Bh Rp 181,500.00
Dop PE Ø 8" Bh Rp 797,500.00

DOP/CAP PVC SNI (Slovent Cement)


Dop PVC Ø 2" Bh Rp 24,750.00
Dop PVC Ø 3" Bh Rp 33,000.00
Dop PVC Ø 4" Bh Rp 44,000.00
Dop PVC Ø 6" Bh Rp 104,500.00

DOP/CAP PVC SNI (Rubber Ring)


Dop PVC Ø 2" Bh Rp 44,000.00
Dop PVC Ø 3" Bh Rp 88,000.00
Dop PVC Ø 4" Bh Rp 60,500.00
Dop PVC Ø 6" Bh Rp 115,500.00

CLAMP SADDLE GIP/STELL


Clamp Saddle Ø 2" x 3/4" Bh Rp 27,500.00
Clamp Saddle Ø 2" x 1 1/2" Bh Rp 33,000.00
Clamp Saddle Ø 3" x 3/4" Bh Rp 33,000.00
Clamp Saddle Ø 4" x 3/4" Bh Rp 41,250.00
Clamp Saddle Ø 6" x 3/4" Bh Rp 79,750.00
Clamp Saddle Ø 6" x 1 1/2" Bh Rp 104,500.00
STOP KRAN KUNINGAN
Stop Kran Ǿ 2" Bh Rp 280,500.00
Stop Kran Ǿ 3" Bh Rp 825,000.00

Air Valve
Air Valve Ǿ 2" Bh Rp 264,000.00
Air Valve Ǿ 3" Bh Rp 302,500.00
Air Valve Ǿ 4" Bh Rp 357,500.00
Air Valve Ǿ 6" Bh Rp 495,000.00

Gate Valve
> Gate Valve Ǿ 2" Bh Rp 999,900.00
> Gate Valve Ǿ 3" Bh Rp 1,200,100.00
> Gate Valve Ǿ 4" Bh Rp 1,412,400.00
> Gate Valve Ǿ 6" Bh Rp 1,980,000.00

Check Valve
> Check Valve Ǿ 1 1/2"
> Check Valve Ǿ 2" Bh Rp 381,150.00
> Check Valve Ǿ 3" Bh Rp 828,850.00
> Check Valve Ǿ 4" Bh Rp 1,633,500.00
> Check Valve Ǿ 6" Bh Rp 1,375,000.00

Gibeoul Joint
Gibeoul Joint Cast Iron PN 10 Ǿ 3" Bh Rp 148,500.00
Gibeoul Joint Cast Iron PN 10 Ǿ 4" Bh Rp 170,500.00
Gibeoul Joint Cast Iron PN 10 Ǿ 6" Bh Rp 324,500.00
Gibeoul Joint Cast Iron PN 10 Ǿ 8" Bh Rp 467,500.00

Karet Packing
Karet Packing Ǿ 2" Bh Rp 8,250.00
Karet Packing Ǿ 3" Bh Rp 11,000.00
Karet Packing Ǿ 4' Bh Rp 16,500.00
Karet Packing Ǿ 6" Bh Rp 22,000.00
Karet Packing Ǿ 8" Bh Rp 27,500.00
Bout/Moer 5/8 x 3" Bh Rp 5,500.00
Bout/Moer 3/8 x 3" Bh Rp 4,400.00
Water Meter Ǿ 15 MM Bh Rp 291,500.00
Box Meter Fiber Glass Bh Rp 46,750.00
Lem Pipa Kg Rp 82,500.00
Teplon/Solatip Ledeng Bh Rp 2,750.00

Sengkang, Januari 2017


Kepala Dinas Bina Marga, Cipta Karya
Jasa Konstruksi dan Penataan Ruang

Drs. HAIRIL AMRI WAWO


Nip 19620713 199303 1 005

Drs. HAIRIL AMRI WAWO


Nip 19620713 199303 1 005
B. BAHAN BESI
Besi Siku L 50 x 50 x 5 Btg #REF!
Besi Siku L 70 x 70 x 7 Btg #REF!
Besi Strip 2 x 30 mm Btg #REF!
Rolling Door M2 #REF!
Sekrup Fixer Bh #REF!
Baut dan Mur Bh #REF!
Kusen Aluminium 4 Inch M' #REF!
Kusen Aluminium 3 Inch M' #REF!
Jendela Aluminium M' #REF!
Profil kaca Aluminium Pintu, Fin, Coating Poeder, Ex, YKK M' #REF!
Bracket Steel Galvanized Bh #REF!
Stiffener Bh #REF!
Wiremesh M8 M2 #REF!
Floordecking M2 #REF!

D. BAHAN ATAP
Selt Drilling Screw Bh #REF!
Baut Dinabolt Bh #REF!
List plank GRC M' #REF!
E. BAHAN KACA
Kaca Bening T = 10 mm M2 #REF!
F. BAHAN KUNCI DAN PENGGANTUNG
Handle Jendela Bh #REF!
Pintu WC PVC Bh #REF!
Engsel Tanam (Setara Dekson) Bh #REF!
G. BAHAN CAT
Cairan Water Proofing Merk " Dulux watershield" 2,5 Ltr Klg #REF!
H. BAHAN SANITASI
Floor Drain "Aluminium" Bh #REF!
Pompa Air Unit #REF!
Pengadaan Sumur Bor dia 4" ls #REF!
I. BAHAN LISTRIK

J. BAHAN LANGIT - LANGIT


GRC Board 122 x 244 x 0,35 mm Lbr #REF!
List Profil Gypsum Lbr #REF!
Kawat Penggantung Lbr #REF!
HPL Lbr #REF!
Aluminium Composite Panel (PVDF) Alutile Lbr #REF!
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0

11 Rp 5,541.82 2 - - - 1 1
6 Rp 10,496.67 2 - - - 1 1
20 Rp 3,236.00 2 - - - 1 1
25 Rp 2,692.00 2 - - - 1 1
3 Rp 56,570.00 2 - - - 1 1

1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0

1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0

1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0

1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0

1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0

1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0
1 - - - 1 0

- - - - - 0

- - - - - 0

- - - - - 0

2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
- - - - - 0
- - - - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0

- - - - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
- - - - - 0
- - - - - 0
- - - - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
2 1 1 - - 0
2 1 1 - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
2 1 1 - - 0
1 1 - - - 0
2 1 1 - - 0
2 1 1 - - 0
2 1 1 - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
2 1 1 - - 0
2 1 1 - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
1 1 - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0

- - - - - 0
- - - - - 0
- - - - - 0

- - - - - 0

- - - - - 0
- - - - - 0
- - - - - 0

- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0

- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
- - - - - 0
Sewa Dasar Truck 0 (A) = Rp 71,031

Kapaitas Bak (B) = 3

Upah Buruh (D) = Rp 26,250


Upah Buruh (D) = Rp 26,250
KECAMATAN
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
#REF! ### / Truk (Kapasitas Bak)

1568.18181818

1568.18181818

1568.18181818

#REF! #REF!
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
Kapasitas Bak = 100 zak
/ Jam

M3

/ Hari
/ Hari
Menit
TOKO SURVEY : RINI BANGUNAN
KECAMATAN TEMPE
PEMERINTAH KABUPATEN
DINAS PEKERJAAN UM
LAPORAN HARIAN KEG

Kegiatan : PENGEMBANGAN SARANA DAN PRASARANA PERTANIAN


Pekerjaan : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG K
PATAMPANUA

Pelaksana : PT. MITRA AIYANGGA NUSANTARA


Konsultan Pengawas : CV. C 97 CONSULTANT

A. PEKERJAAN B.TIBA/MUTASI:PERALATAN DAN BA

No. JENIS PEKERJAAN VOLUME LOKASI No. JENIS

1 - - - 1 -

C. PEMAKAIAN PERALATAN
NO JENIS PERALATAN

1 -
D. PERSONIL PROYEK E. CUACA / BENCANA ALAM / KEJAD

No. TUGAS / JABATAN CACAH LOKASI NO. JENIS

1 - - - 1 -

F. USULAN / PENGAJUAN / SARAN /INSTRUKSI /KESEPAKATAN / PELAPORAN


NO. URAIAN / SARAN / INSTRUKSI
PENYEDIA JASA
KONSULTAN PENGAWAS
PENGAWAS LAPANGAN
ABUPATEN PINRANG
KERJAAN UMUM
ARIAN KEGIATAN

ARANA PERTANIAN
RUNG BAROMBONG KEC. Hari : Jumat

Tanggal : 01 September 2017

ASI:PERALATAN DAN BAHAN POKOK

VOLUME LOKASI ASAL LOKASI TUJUAN

- - -

AN PERALATAN
S PERALATAN CACAH/AKTIF LOKASI IDLE/RUSAK

- - -
BENCANA ALAM / KEJADIAN PENGHAMBAT PEKERJAAN

T.JAWAB Pelaksana
JAM LOKASI AKIBAT
YA/TIDAK

- - - -

NAMA TANDA TANGAN


SAJAD MAWARDI
SURIADI, ST
2.47
78,150,000
276,853,225.97 3.23
121,435,542.73 2.72

Batu Kali (M02) M3 1


Semen (PC) (M12) Kg 176
Pasir (M01) M3 0

114,173,262.75
TIDAK ADA KEGIATAN
N
TIME SCHEDULE

PEKERJAAN : PENGGALIAN SUNGAI TOLAWA


LOKASI : DESA BALIELO KECAMATAN BOLA KAB. WAJO
SUMBER DANA : APBD
TAHUN ANGGARAN : 2018

JADWAL WAKTU PELAKSANAAN 125 HARI KALEN


No. MATA AGUSTUS SEPTEMBER OKTOBER
PERKIRAAN BOBOT
PEMBAYAR URAIAN SA TU AN Satuan KUANTITAS (%)
AN 1 2 3 4 5 6 7 8 9 10
25-31 1-7 8-14 15-21 22-28 29-5 6-12 13-19 20-26 27-2
1 Mobilisasi Alat LS 1.00 1.96 0.65 0.65
2 Bongkaran Pasangan Lama LS M3 0.00 - - - -
3 Galian Tanah M3 0.00 - - - -
4 Pasangan Batu M3 0.00 - - - -
5 Plasteran M2 0.00 - - - -
6 0 0 0.00 - - - -
7 Galian Tanah Mekanis M3 14767.00 96.92
8 Beton mutu sedang fc’=30 MPa lantai jembatan M3 0.00 -
9 Beton mutu sedang fc’= 20 MPa M3 0.00 -
10 Beton mutu rendah fc’= 10 Mpa K125 M3 0.00 - -
11 Err:509 Err:509 Err:509 Err:509 Err:509 ### Err:509
12 Err:509 Err:509 Err:509 Err:509 Err:509 ### Err:509
13
Err:509 Err:509 Err:509 Err:509 Err:509 ### Err:509
14 Err:509 Err:509 Err:509 Err:509
15 Err:509 Err:509 Err:509 Err:509
16 Err:509
Err:509 Err:509 Err:509 Err:509 ### ### ###
17 Err:509
Err:509 Err:509 Err:509 Err:509 ### Err:509
18 Err:509 ls/ha Err:509 Err:509 Err:509 Err:509 ### Err:509 ###
19 Err:509 Err:509 Err:509 Err:509
20 Err:509 Err:509 Err:509 Err:509
21 Err:509 Err:509 Err:509 Err:509

MINGGU INI Err:509 0.65 Err:509 ### ### ### Err:509 ### Err:509 ### Err:509
RENCANA
S/D MINGGU INI 0 0.65 Err:509 ### ### ### Err:509 ### Err:509 ### Err:509
MINGGU INI #DIV/0! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI
S/D MINGGU INI 0 #DIV/0! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
MINGGU INI #DIV/0! Err:509 ### ### ### Err:509 ### Err:509 ### Err:509
DEVIASI
S/D MINGGU INI #DIV/0! Err:509 ### ### ### Err:509 ### Err:509 ### Err:509
DIKETAHUI OLEH
Disetujui Oleh,
PENGGUNA ANGGARAN Diperiksa Oleh
DINAS PEKERJAAN UMUM DAN
Dinas Kelautan Dan Perikanan DI SETUJUI OLEH TENAGA TEKNIS DINAS PUPR
Konsultan Supervisi KONSULTAN S
PERUMAHAN RAKYAT PEJABAT PEMBUAT KOMITMEN PPTK PENGAWAS PU PT.ASHABIB KARYA
PEJABAT PEMBUAT KOMITMEN
KAB. PINRANG CV. C 97 CONSULTANT

Ir. ARSYAD. B. M.Si IRWAN ISMAIL, ST,M.Eng MONIR BA'SI AFENDY. JARSAM SURIAD
Nip : 10581110 199203 1 005 Nip : 19750423 200312 1 004 Nip : 19820317200801 1 005SURIADI,Nip : 19800526 201212 2 002 SITE ENG
UMMIANI, SP.M.Si ST
NIP : 19710626 200003 2 006 Site Engineer
DULE

JADWAL WAKTU PELAKSANAAN 125 HARI KALENDER


NOVEMBER DESEMBER KETERANGAN

11 12 13 14 15 16 17 18
3-9 10-16 17-23 24-30 1-7 8-14 15-21 22-27
0.65

48.46 48.46
-
- - - -

### ###
### ### Err:509 ### Err:509

### ### Err:509 ### Err:509


### Err:509 Err:509 ###
### Err:509 ###
Err:509 Err:509
###
Err:509

### ### Err:509 ### Err:509 Err:509 ### Err:509


### ### Err:509 ### Err:509 Err:509 ### Err:509 RENCANA
#REF! #REF! #REF!
#REF! #REF! #REF! REALISASI
### ### Err:509
### ### Err:509

Dilaporkan Oleh,
TENAGA TEKNIS DINAS PUPR KONSULTAN SUPERVISI
Konsultan Supervisi KONTRAKTOR PELAKSANA
PENGAWAS PU PT.ASHABIB KARYA KONSULINDO PT. MITRA AIYANGGA NUSANTARA
DIREKTORAT ZENI

AFENDY. JARSAM SURIADI, ST MUH. MASNUR ASRY A.Md.


Nip : 19800526 201212 2 002 SITE ENGINEERSURIADI, ST DIREKTUR UTAMA
Site Engineer
DATA CUACA
NAMA KEGIATAN : PEMBANGUNAN JEMBATAN RANGKA BAJA URUNG BAROMBONG KEC. PATAMPANUA
KONTRAKTOR PELAKSANA : PT. MITRA AIYANGGA NUSANTARA
KONSULTAN PENGAWAS : PT. ASHABIB KARYA KONSULINDO
LOKASI PROYEK : DUSUN URUNG DESA SIPATUO KEC. PATAMPANUA
BULAN KE - : PERTAMA
PERIODE TANGGAL : 25 AGUSTUS 2017 s/d 31 AGUSTUS 2017

Tanggal 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Dibuat Oleh,


Jam Konsultan Pengawas
00.00.00 - 01.00.00
01.00.00 - 02.00.00
02.00.00 - 03.00.00
03.00.00 - 04.00.00 Suriadi, S.T.
04.00.00 - 05.00.00 Site Engineer
05.00.00 06.00.00 Disetujui Oleh,
06.00.00 07.00.00 Kontraktor Pelaksana
07.00.00 08.00.00
08.00.00 09.00.00
09.00.00 10.00.00
10.00.00 11.00.00 Muh. Masnur Asri, A.Md
11.00.00 12.00.00 Direktur Utama
12.00.00 13.00.00 Mengetahui,
13.00.00 14.00.00 PPK
14.00.00 15.00.00
15.00.00 16.00.00
16.00.00 17.00.00
17.00.00 18.00.00 Ir. Arsyad B, M.Si.
18.00.00 19.00.00 NIP. 19581110 199203 1 005
19.00.00 20.00.00
20.00.00 21.00.00
21.00.00 22.00.00
22.00.00 23.00.00
23.00.00 24.00.00
24.00.00 01.00.00
KETERANGAN : Pinrang, 2017
CC Cuaca Cerah HS Hujan Sedang

CM Cuaca Mendung HL Hujan Lebat

HG Hujan Gerimis JK Jam Kerja


TA CUACA

Dibuat Oleh,
Konsultan Pengawas

Suriadi, S.T.
Site Engineer
Disetujui Oleh,
Kontraktor Pelaksana

Muh. Masnur Asri, A.Md.


Direktur Utama
Mengetahui,
PPK

Ir. Arsyad B, M.Si.


NIP. 19581110 199203 1 005
Pinrang, 2017