LAPORAN
PERHITUNGAN STRUKTUR
PROYEK
MARUNDA BLOK A NO 6/7
MARUNDA CENTER
LOKASI
JAKARTA UTARA
DESEMBER, 2012
DAFTAR ISI
COVER
DAFTAR ISI
BAB I DATA PERENCANAAN
A. PERATURAN PERENCANAAN
B. DATA MATERIAL STRUKTUR
C. DATA PEMBEBANAN
D. KOMBINASI PEMBEBANAN
E. KRITERIA DESAIN
BAB II PERHITUNGAN STRUKTUR
A. GORDING
B. RAFTER
C. KOLOM
D. PEDESTAL
E. PONDASI
BAB III PENUTUP
BAB I. DATA PERENCANAAN
PERATURAN PERENCANAAN
PERHITUNGAN MENGACU PADA :
1. SNI 03‐1729‐2002 TATA CARA PERENCANAAN STRUKTUR BAJA UNTUK BANGUNAN GEDUNG.
2. SNI 03‐2847‐2002 TATA CARA PERENCANAAN STRUKTUR BETON UNTUK BANGUNAN GEDUNG.
3. SNI ‐1726‐2002 STANDART PERENCANAAN KETAHANAN GEMPA UNTUK STRUKTUR BANGUNAN GEDUNG.
DATA MATERIAL STRUKTUR
JENIS DAN MUTU MATERIAL
PROFIL BAJA (fy) 2,400.00 2
: KG/CM
TULANGAN φ <13 mm (fy) : 2,400.00 KG/CM2
TULANGAN φ >13 mm (fy) : 3,600.00 KG/CM2
BETON K‐300 DENGAN (fc) : 249.00 KG/CM2
DATA PEMBEBANAN
PEMBEBANAN MENGACU PADA PERATURAN MUATAN INDONESIA (PMI) TAHUN 1983, DENGAN DEFINISI :
BEBAN MATI (D)
BEBAN HIDUP (L)
BEBAN ANGIN (W)
BEBAN AIR HUJAN (H)
BEBAN GEMPA (E), DENGAN ASUMSI AWAL BEKERJA SEBESAR SAMA SEPERTI BERAT MATERIAL TERPASANG.
KOMBINASI PEMBEBANAN
KOMBINASI PEMBEBANAN STRUKTUR BAJA MENGACU PADA SNI 03‐1729‐2002, DENGAN RINCIAN :
KOMB 1 = 1.4D
KOMB 2 = 1.2D + 1.6L + 0.5H
KOMB 3 = 1.2D + 1.6H + 0.5L
KOMB 4 = 1.2D + 1.6H + 0.8W
KOMB 5 = 1.2D + 1.3 W + 0.5L + 0.5H
KOMB 6 = 1.2D ‐ 1.3 W + 0.5L + 0.5H
KOMB 7 = 1.2D + 1.0E + 0.5L
KOMB 8 = 1.2D ‐ 1.0E + 0.5L
1.2D 1.0E + 0.5L
KOMB 9 = 0.9D + 1.3W
KOMB 10 = 0.9D ‐ 1.3W
KOMB 11 = 0.9D + 1.0E
KOMB 12 = 0.9D ‐ 1.0E
KOMBINASI PEMBEBANAN STRUKTUR BETON MENGACU PADA SNI 03‐2847‐2002, DENGAN RINCIAN :
KOMB 1 = 1.4D
KOMB 2 = 1.2D + 1.6L + 0.5H
KOMB 3 = 1.2D + 1.0L + 1.6W + 0.5H
KOMB 4 = 1.2D + 1.0L ‐ 1.6W + 0.5H
KOMB 5 = 0.9D + 1.6 W
KOMB 6 = 0.9D ‐ 1.6 W
KOMB 7 = 1.2D + 1.0L + 1.0E
KOMB 8 = 1.2D + 1.0L ‐ 1.0E
KOMB 9 = 0.9D + 1.0E
KOMB 10 = 0.9D ‐ 1.0E
KRITERIA DESAIN
STRESS RATIO ANTARA BEBAN KERJA DAN KAPASITAS STRUKTUR ≤ 1 (SATU).
DEFLEKSI MAKSIMUM BALOK ADALAH L (PANJANG BALOK TERPASANG)/360.
DISPLACEMENTS MAKSIMUM KOLOM UNTUK ADALAH H (TINGGI KOLOM TERPASANG)/500.
SAFETY FAKTOR PONDASI ADALAH 3 UNTUK DAYA DUKUNG, DAN 1.5 UNTUK GESER DAN GULING.
BAB II. PERHITUNGAN STRUKTUR
GORDING CNP 150x65x20x3.2
GORDING C150.65.20.2,3
PLAT 8MM
BAUT 2Ø12MM SAGROD Ø12MM
PEMBEBANAN SESUAI PMI TH.1983
URAIAN DETAIL BERAT LOAD SAT
B. MATI ATAP 11.00 124.26 KG
B. HIDUP 100.00 100.00 KG
B. HUJAN 20.00 144.00 KG
B. ANGIN 25.00 180.00 KG
B. GEMPA 7.51 45.06 KG
KOMBINASI 1‐6
KOMB 1 KOMB 2 KOMB 3 KOMB 4 KOMB 5 KOMB 6
173.96 381.11 429.51 523.51 505.11 37.11
KOMBINASI 7‐12
KOMB 7 KOMB 8 KOMB 9 KOMB 10 KOMB 11 KOMB 12
244.17 154.05 345.83 122.17 156.89 66.77
MATERIAL CNP 150x65x20x3.2
PANJANG JARAK AREA GIRASI Zx Zy ARAH Y
6.00 1.20 9.57 5.89 44.20 12.20 0.15
GAYA BATANG
GAYA BATANG CATATAN λc ≤ 0.25 maka Ψ = 1
λc ≤ 0 25 maka Ψ = 1
λc = (1/π)*(Lk/r)*√(fy/E) 1.38 0.25 < λc < 1.20 maka Ψ = 1.43/(1.60‐0.67*λc)
Ψ 2.37 λc ≥ 1.20 maka Ψ = 1.25*λc2
SAMBUNGAN
MATERIAL KAPASITAS G. TARIK K. BAUT
PLAT 6MM
2,714.34 4,089.94 2BH
BAUT 12MM
SAGROD
MATERIAL KAPASITAS G. TARIK K. SGRD
SAGROD 12MM 2,714.34 4,089.94 2BH/BTG
REFERENSI PMI (Peraturan Muatan Indonesia Tahun 1983)
SNI 03‐1729‐2002 Tata Cara Perencanaan Struktur Baja untuk Bangunan Gedung
PENGAKU RAFTER UTAMA WF 250x125x6x9
PLAT 12MM
PENGAKU RAFTER W250.125.6.9
BAUT 2Ø19MM BAUT 2Ø19MM
PEMBEBANAN SESUAI PMI TH.1983
URAIAN DETAIL BERAT LOAD SAT
B. MATI ATAP 11.00
GORDING 0.00 244.80 KG
B. HIDUP 100.00 100.00 KG
B. HUJAN 20.00 120.00 KG
B. ANGIN 25.00 150.00 KG
B. GEMPA 29.80 178.80 KG
KOMBINASI 1‐6
KOMB 1 KOMB 2 KOMB 3 KOMB 4 KOMB 5 KOMB 6
342.72 513.76 535.76 605.76 598.76 208.76
KOMBINASI 7‐12
KOMB 7 KOMB 8 KOMB 9 KOMB 10 KOMB 11 KOMB 12
522.56 164.96 415.32 25.32 399.12 41.52
MATERIAL WF 250x125x6x9
PANJANG JARAK AREA GIRASI Zx Zy ARAH Y
6.00 1.00 37.66 10.40 324.00 47.00 0.25
SAMBUNGAN
MATERIAL KAPASITAS G. TARIK K. BAUT
PLAT 12MM
6,804.69 2,988.95 1BH
BAUT 19MM
REFERENSI PMI (Peraturan Muatan Indonesia Tahun 1983)
SNI 03‐1729‐2002 Tata Cara Perencanaan Struktur Baja untuk Bangunan Gedung
RAFTER UTAMA WF 250x125x6x9
PLAT 12MM
RAFTER UTAMA W250.125.6.11
BAUT 3Ø19MM BAUT 3Ø19MM
PEMBEBANAN SESUAI PMI TH.1983
URAIAN DETAIL BERAT LOAD SAT
B. MATI ATAP 11.00
GORDING 7.51
PENGAKU 29.80 697.18 KG
B. HIDUP 100.00 100.00 KG
B. HUJAN 20.00 480.00 KG
B. ANGIN 25.00 600.00 KG
B. GEMPA 29.80 119.20 KG
KOMBINASI 1‐6
KOMB 1 KOMB 2 KOMB 3 KOMB 4 KOMB 5 KOMB 6
976.05 1,236.62 1,654.62 2,084.62 1,906.62 346.62
KOMBINASI 7‐12
KOMB 7 KOMB 8 KOMB 9 KOMB 10 KOMB 11 KOMB 12
1,005.82 767.42 1,407.46 152.54 746.66 508.26
MATERIAL WF 250x125x6x9
PANJANG JARAK AREA GIRASI Zx Zy ARAH Y
4.00 6.00 37.66 10.40 324.00 47.00 0.25
SAMBUNGAN
MATERIAL KAPASITAS G. TARIK K. BAUT
PLAT 20MM
9,123.19 5,922.20 3BH
BAUT 22MM
WINDBRACING
MATERIAL KAPASITAS G. TARIK BRACING
BRACING 19MM 6,804.69 1,142.88 1BH/BTG
REFERENSI PMI (Peraturan Muatan Indonesia Tahun 1983)
SNI 03‐1729‐2002 Tata Cara Perencanaan Struktur Baja untuk Bangunan Gedung
KOLOM UTAMA TEPI WF 250x125x6x9
KOLOM
W250.125.6.11
PLAT 12MM ANCHOR 2Ø19MM
PEMBEBANAN SESUAI PMI TH.1983
URAIAN DETAIL BERAT LOAD SAT
B. MATI ATAP 11.00
GORDING 7.51
PENGAKU 29.80
RAFTER 29.80
T.RAFTER 0.00 17,378.60 KG
B. HIDUP 1,500.00 1,500.00 KG
B. HUJAN 20.00 480.00 KG
B. ANGIN 25.00 600.00 KG
B. GEMPA 29.80 119.20 KG
KOMBINASI 1‐6
KOMB 1 KOMB 2 KOMB 3 KOMB 4 KOMB 5 KOMB 6
24,330.04 23,494.32 22,372.32 22,102.32 22,624.32 21,064.32
KOMBINASI 7‐12
KOMB 7 KOMB 8 KOMB 9 KOMB 10 KOMB 11 KOMB 12
21,723.52 21,485.12 16,420.74 14,860.74 15,759.94 15,521.54
MATERIAL WF 250x125x6x9
TINGGI JARAK X JARAK Y AREA GIRASI Zx Zy
4.00 6.00 6.00 37.66 10.40 324.00 47.00
SAMBUNGAN
MATERIAL KAPASITAS G. TARIK K. BAUT
PLAT 12MM
4,825.49 31,103.74 7BH
ANCHOR 16MM
REFERENSI PMI (Peraturan Muatan Indonesia Tahun 1983)
SNI 03‐1729‐2002 Tata Cara Perencanaan Struktur Baja untuk Bangunan Gedung
PEDESTAL WF 250x125x6x9
PEMBEBANAN
GAYA AKSIAL 243.30 kN
MOMEN 39.81 kNm
DIMENSI MATERIAL TERPASANG KOLOM 350X350 MM
PROFIL BAJA KOLOM WF 250x125x6x9
DIMENSI KOLOM ARAH X 350.00 mm
DIMENSI KOLOM ARAH Y 350.00 mm
2
LUAS PENAMPANG (Ag) 122,500.00 mm
LUAS TULANGAN POKOK KOLOM (1% Ag) 1,225.00 mm2
2
LUAS TULANGAN SENGKANG 48.61 mm
MUTU BAHAN
MUTU BAJA (fy) 360.00 N/mm2
MUTU BETON K‐250 (f'c) 20.75 N/mm2
KAPASITAS KOLOM
DAYA DUKUNG 229.32 kN
KAPASITAS MOMEN 53.51 kNm
PENULANGAN
DIAMETER TULANGAN POKOK TERPASANG 16.00 mm
JUMLAH 8.00 btg
DIAMETER SENGKANG TERPASANG 10.00 mm
JARAK TULANGAN SENGKANG TERPASANG 150.00 mm
REFERENSI PMI (Peraturan Muatan Indonesia Tahun 1983)
SNI 03‐2847‐2002 Tata cara perencanaan struktur beton untuk bangunan gedung
PONDASI WF 250x125x6x9
BEARING CAPACITY
MENGGUNAKAN RUMUS TERZAGHI :
Qu = 1.3xcxNc + ϒxDxNq + 0.4xϒxBxNϒ
DIMANA :
2
c (kohesi of soil) : 13.00 kN/m
3
ϒ (soil density) : 17.00 kN/m (PMI'83)
D (depht of foundation) : 0.50 m
B (wide of foundation) : 0.50 m
Nc (bearing capacity factor, from g: 20.00
Nq (bearing capacity factor, from g: 12.00
Nϒ (bearing capacity factor, from g: 3.00
φ geser : 25.00 ⁰
SF (Safety Factor) : 3.00
2
Qu : 150.07 kN/m
TINGGI KOLOM : 4.00 m
DIMENSI PONDASI
ARAH X : 0.50 m
ARAH Y : 0.50 m
TEBAL PONDASI : 0.50 m
BERAT MATERIAL
3
BETON : 24.00 kN/m
3
TANAH : 17.00 kN/m (PMI'83)
2
ANGIN : 0.40 kN/m
STABILITAS TERHADAP GESER
∑ Rh 75.03
∑ Pa 25.00
Fshear 3.00 > 1.50 OK!!!
STABILITAS TERHADAP GULING
∑ MW 61.58
∑ Mroll 50.00
Froll 1.23 < 1.50 NOT OK!!!
STABILITAS TERHADAP PEMBEBANAN
Xe 0.05
e 0.20 > 0.08 m
B' 0.09 m
use formula qmax=2V/(3*B')
qu 150.07 kN/m2
2
q' 1,746.97 kN/m
Fresistance 0.09 < 1.00 NOT OK!!!
Dalam perhitungan diatas pondasi belum cukup mampu untuk menahan :
Gaya guling 50.00 kN
Gaya vertikal 246.30 kN
Digunakan pondasi tiang, dimana tiang dianggap sebagai tiang pendek, bila Lmax ≤ 20xdiameter
tiang, sedangkan gaya horizontal ultimit didapat dihitung dengan :
Panjang tiang (L) 42.00 M
Diameter tiang (d) 0.25 M
Jumlah tiang 1.00 Ttk
L/d 168.00 (termasuk tiang panjang)
Hu 1,217.53 kN
L = (3d/2) + f + g sehinggga didapat :
3d/2 0.38
sehingga (f + g) = 41.63 g = 41.625 ‐ f (persamaan 1)
dengan menganggap My = 0 maka didapat persamaan :
2
My = (9/4).c.d.g ‐ 9.c.d.f x ((3d/2) + (f/2))
(9/4).c.d 7.31
9.c.d 29.25
= (7) g2 ‐ (29) f x (0.375 + f/2), dimana g = 41.625 ‐ f, sehingga menjadi :
= (7) x (41.625 ‐ f)^2 ‐ (29) f x (0.375 + f/2), atau :
= 21f^2 ‐ 619 f + 1732
sehingga nilai f = 0.83 0.00
dan nilai g = 40.79
Sehingga My = 12,150.23 kNM
sehingga Hu = 30,751.10 kNm (Hu terpakai)
STABILITAS TERHADAP GULING
∑ MW 1,384.58
∑ Mroll 50.00
Froll 27.69 > 1.50 OK!!!
Stabilitas terhadap Daya Dukung
qu 962.13 kN/M
q' 309.30 kN/M
Fdayadukung 3.11 > 3.00 OK!!!
PERHITUNGAN PENULANGAN
Xe 3.73
e (3.48) < 0.08
B' 7.46
use formula qmax=(V/A)x(1+(6e/B))
qmax 61,302.24 kN/m2
DIMENSI KOLOM : 0.35 m
2
for (x1) 0.08 : 9,195.34 kN/m
2
for (x2) 0.43 : 52,106.91 kN/m
TULANGAN GESER
JARAK ANTAR TULANGAN TERPASANG 150.00 mm
MUTU BAHAN
MUTU TULANGAN (fy) : 360.00 N/mm2
MUTU BETON K‐250 (f'c) : 20.75 N/mm2
Vc Vsminimal ϕVn Vu Av
379.60 166.67 327.76 1,952.93 1,437.64
379.60 166.67 327.76 ,
1,947.89 ,
1,433.44
TULANGAN GESER TERPASANG D 13 ‐ 200
TULANGAN POKOK
JARAK ANTAR TULANGAN TERPASANG 150.00 mm
Mu As Control a As STATUS ρ
1646.96 1,944.44 ‐1,982,038.82 8.77 13.00 OK
12372.33 1,944.44 ‐15,337,382.30 14.74 13.00 OK
TULANGAN POKOK TERPASANG D 13 ‐ 200
REFERENSI PMI (Peraturan Muatan Indonesia Tahun 1983)
SNI 03‐2847‐2002 Tata cara perencanaan struktur beton untuk bangunan gedung