PEKERJAAN :
PEMBUATAN JEMBATAN
LOKASI :
SKP KELAS I SUMBAWA BESAR
PEKERJAAN :
LOKASI :
SKP KELAS I SUMBAWA BESAR
NOMOR
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
IV PEK. ATAP
1 Pekerjaan Rangka Atap Baja CNP A.4.2.1.1. Kg 1,583.59
I PEKERJAAN PERSIAPAN
II PEK. TANAH dan PONDASI
VI PEK. BETON BERTULANG
VII PEK. ATAP
IX PEK. PENGECATAN
JUMLAH BIAYA : (a)
PPn 10% : (b) = 10% x (a)
PPH ( 1,5 % ) : (c) =1,5% x (a)
TOTAL BIAYA : (c) = (a) + (b) + (c)
DI BULATKAN
TERBILANG : Seratus Tujuh Puluh Dua Juta Tiga Ratus Ribu rupiah
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp.)
1,004,000.00
525,000.00 525,000.00
79,000.00 79,000.00
200,000.00 200,000.00
200,000.00 200,000.00
10,747,358.50
48,750.00 2,018,250.00
157,500.00 252,000.00
537,960.00 8,140,733.50
32,500.00 336,375.00
124,278,685.47
7,089,597.50 11,804,179.84
6,705,799.54 50,997,605.52
8,730,699.35 26,165,905.94
5,553,789.58 35,310,994.17
58,884,052.16
24,940.00 39,494,625.86
75,220.69 18,414,024.30
54,189.00 975,402.00
2,190,258.63
23,845.00 2,190,258.63
KAB SUMBAWA
JUMLAH HARGA
( Rp. )
1,004,000.00
10,747,358.50
124,278,685.47
58,884,052.16
2,190,258.63
197,104,354.76
19,710,435.48
2,956,565.32
219,771,355.56
219,771,000.00
PEMERINTAH KABUPATEN SUMBAWA
DINAS PEKERJAAN UMUM
Jln. Garuda No. 81 Telp. (0371- 21087) Sumbawa Besar
NOMOR
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Tembok Lama A.4.7.1.11 M² 102.40
2 Pek. Pengecatan Kayu Tampak A.4.7.1.4. M² -
3 Pek. Pengecatan Lis plafond A.4.7.1.5. M² 21.08
4 Pek. Pengecatan Plapond A.4.7.1.10. M² 74.98
V PEKERJAAN FURNITURE
1 Pek. Rak Teakblock Ukuran P= 2,4 M Ls Unit 1.00
2 Pek. Rak Teakblock Ukuran P=1,4 M Ls Unit 1.00
Sumbawa Besar,
Mengesahkan :
Kepala Dinas Kesehatan Kepala Dinas Pek
Kabupaten Sumbawa Kabupaten
Drs. Didi Darsani, Apt
Nip. 19610414 199103 1 008 NIP. 19601213
SUMBAWA
N UMUM
1,000,000.00
325,000.00 -
500,000.00 500,000.00
500,000.00 500,000.00
8,465,959.67
448,639.50 7,837,732.07
366,100.00 628,227.60
2,410,650.00
39,290.00 1,375,150.00
15,775.00 315,500.00
67,040.00 -
225,000.00 720,000.00
3,750,443.16
12,140.00 1,243,136.00
28,037.00 -
51,119.00 1,077,588.52
19,068.00 1,429,718.64
3,400,000.00
1,900,000.00 1,900,000.00
1,500,000.00 1,500,000.00
3,786,343.27
319,550.00 319,550.00
3,203,800.00 3,203,800.00
285,335.00 262,993.27
SUMBAWA
R IWES
JUMLAH HARGA
( Rp. )
1,000,000.00
3,400,000.00
8,465,959.67
2,410,650.00
3,750,443.16
3,786,343.27
22,813,396.09
2,281,339.61
25,094,735.70
25,000,000.00
Dibuat Oleh,
CV. DHIR KONSULINDO Konsultan
Team Leaders
Sahabudin, ST.
Mengetahui :
Kepala Dinas Pekerjaan Umum
Kabupaten Sumbawa
Ir. A. Rahim
NIP. 19601213 199203 1 004
REKAP PAJAK GEDUNG SERBA GUNA
PAJAK GALIAN C
pasir beton (RP 5,500) 11.27 M3 1,352,806.08 62,004
Pasir urug (Rp 3,500) 0.84 M3 98,028.00 2,940
Kerikil (Rp 6,200) 16.48 M3 4,730,843.71 102,199
1,987,153 1,679,883 - -
TOTAL PEMBAYARAN PAJAK
REKAP PAJAK REHAB GEDUNG TK
PAJAK GALIAN C
Pasir Pasang (beton) (RP 5,500) 1.93 M3 1,352,806.08 10,638
Pasir urug (Rp 3,500) 0.48 M3 98,028.00 1,663
Kerikil (Rp 6,200) 0.52 M3 4,730,843.71 3,253
Real Cost -
168,008 (138,461) - -
PPN
(10%)
-
11,199,217
11,199,217
14,866,252
AK PENGHASILAN DAN
PPN
(10%)
-
(923,074)
(923,074)
(893,528)
PERHITUNGAN VOLUME
PROGRAM : DANA DESA
PEKERJAAN : PEMBANGUNAN WC UMUM
LOKASI : DESA STOWE BRANG
TAHUN ANGGARAN : 2018
NO URAIAN PERHITUNGAN
P L T JML
1 Penggalian 1 m3 tanah biasa sedalam 1 m 2 x 1.5 x 0.7 x 1
0.8 x 1.5 x 0.4 x 1
0 x 0.9 x 0.7 x 1
0 x 0.9 x 0.4 x 2
15 Acian 18 x 1
0 x 0.08 x x 26
0 x 0.08 x x 26
24 Engsel pintu
25 Engsel jendela
26 Kunci slot
27 - Haag Angin Besar
28 Pemasangan 1 buah kunci tanam biasa
29 Pekerjaan Sanitasi
Pipa PVC 1/2 "
Kran Air
Pipa PVC 3 "
Avoir Plastik
Septitank
bak air
closet jongkok
30 PENGECATAN 1.8 x 3 x 2
1.8 x 3 x 2
AN VOLUME SATUAN
= 2.1
= 0.48
= 0
= 0
2.58 m3
= 0.645 m3
= 1.377 m3
= 0.324
= 0.072
= 0
= 0
0.396 m3
= 0.36
=
= 0
= 0
0.36 m3
= 0.37386
= 0.37386
= 0
= 0
0.74772 m3
= 0.216
= 0
0.216 m3
= 0
= 0
0 m3
= 0.225 m3
= 0.04356
0.04356 m3
= 0
= 0
0 m3
= 9
= 9
18 m2
= 18 m2
= 18 m2
= 0.21 m3
= 3.36
= 0
3.36 m3
0.0117
0.0117 m3
1.4
1.76
3.16 m2
0
0
0 m2
1.664 m2
0
0
0 m3
0.021 m3
7.84
0.5
8.34 m2
2 bh
0 bh
0 bh
6 bh
1 bh
12 btg
1 bh
2 btg
1 Ls
1 Ls
1 bh
1 bh
10.8 m2
10.8
21.6
RENCANA ANGGARAN BIAYA
PROGRAM : DANA DESA
KEGIATAN : PEMBANGUNAN DESA
PEKERJAAN : PEMBANGUNAN WC UMUM
VOLUME : 1 UNIT
LOKASI : DESA BOAK
TAHUN ANGGARAN : 2018
NOMOR
NO. URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
NOMOR
NO. URAIAN PEKERJAAN SAT VOLUME
ANALISA
I PEKERJAAN PERSIAPAN
II PEK. TANAH dan PONDASI
III PEK. LANTAI
II PEK. PASANGAN dan PLESTERAN
III PEK. KUSEN PINTU / JENDELA
IV PEK. BETON BERTULANG
V PEK. ATAP
VI PEK. PENGUNCI dan PENGGANTUNG
VII PEK. PENGECATAN
VIII PEK. SANITASI
DI BULATKAN
TERBILANG :
Stow
(……………………) ……………………
……………………………
GARAN BIAYA
300,000.00
150,000.00 150,000.00 150,000.00
150,000.00 150,000.00 150,000.00
836,439.03
48,750.00 125,775.00
157,500.00 62,370.00
255,480.00 91,972.80
537,960.00 402,243.45
32,500.00 20,962.50
96,670.50 133,115.28
837,383.75
870,581.65 182,822.15
194,810.00 654,561.60
3,265,240.48
103,577.93 1,864,402.65
48,221.07 867,979.33
29,603.25 532,858.50
1,985,402.90
6,393,000.00 74,798.10
-
366,100.00
494,000.00 1,561,040.00
210,075.00 349,564.80
3,600,409.35
7,542,968.40 1,629,281.17
7,203,846.19 1,620,865.39
8,040,927.14 350,262.79
7,871,161.53 -
776,640.43
75,220.69 627,340.53
7,109,518.75 149,299.89
67,040.00 -
356,967.25
27,289.63 54,579.25
155,375.25 155,375.25
24,502.13 147,012.75
-
19,878.00 429,364.80
3,751,445.00
28,710.00 344,520.00
54,275.00 54,275.00
75,000.00 150,000.00
35,000.00 35,000.00
319,550.00 319,550.00
848,100.00 848,100.00
2,000,000.00 2,000,000.00
16,139,293
16,139,251
TULASI
GARAN BIAYA
JUMLAH HARGA
JUMLAH HARGA BAHAN UPAH PKTD TOTAL
300,000.00 300,000.00
836,439.03 836,439.03
837,383.75 837,383.75
3,265,240.48 3,265,240.48
1,985,402.90 1,985,402.90
3,600,409.35 3,600,409.35
776,640.43 776,640.43
356,967.25 356,967.25
429,364.80 429,364.80
3,751,445.00 3,751,445.00
16,139,293
16,139,200
Dibuat Oleh,
Kader Teknik
………………………
DAFTAR ANALISA HARGA SATUAN
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Kayu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.020 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Dolken kayu φ 8-10/400 cm Batang 1.25 24,300.00
2 Semen portland Kg 5 1,400.00
3 Pasir beton m3 0.005 120,000.00
4 Koral beton m3 0.009 287,000.00
5 Kayu 5/7 m3 0.072 3,675,000.00
6 Paku biasa 2” – 5” Kg 0.060 14,000.00
7 Residu Liter 0.400 12,200.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang Kayu L.02 OH 0.400 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.020 0.00
JUMLAH TENAGA
B BAHAN KERJA
1 Dolken kayu φ 8-10/400 cm Batang 1.250 24,300.00
2 Semen portland Kg 2.50 1,400.00
3 Seng gelombang Lbr 1.20 104,500.00
4 Pasir beton m3 0.005 120,000.00
5 Koral beton m3 0.09 287,000.00
6 Kayu 5/7 m3 0.072 3,675,000.00
7 Paku biasa 2” – 5” Kg 0.06 14,000.00
8 Meni besi Liter 0.45 45,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang Kayu L.02 OH 0.300 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.020 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Dolken kayu φ 8-10/400 cm Batang 1.000 24,300.00
2 Semen portland Kg 2.000 1,400.00
3 Kawat duri M’ 25.000 65,000.00
4 Pasir beton m3 0.005 120,000.00
5 Koral beton m3 0.009 287,000.00
6 Paku biasa 2” – 5” Kg 0.060 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 65,000.00
2 Tukang Kayu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu balok 5/7 m3 0.12 3,675,000.00
2 Paku 2”-3” Kg 0.02 14,000.00
3 Kayu papan 3/20 m3 0.007 3,800,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 2.000 65,000.00
2 Tukang Kayu L.02 OH 2.000 90,000.00
3 Tukang batu L.02 OH 1.000 90,000.00
4 Kepala Tukang L.03 OH 0.300 0.00
5 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Dolken kayu diameter 8-10/400 cm Batang 1.250 24,300.00
2 Kayu m3 0.180 3,675,000.00
3 Paku biasa Kg 0.080 14,000.00
4 Besi strip Kg 11.000 11,200.00
5 Semen Portland Kg 35.000 1,340.00
6 Pasir pasang m3 0.150 115,000.00
7 Pasir beton m3 0.100 120,000.00
8 Koral beton m3 0.150 287,000.00
9 Bata merah Bh 30.000 650.00
10 Seng plat Lbr 0.250 104,500.00
11 Jendela naco Bh 0.200 141,000.00
12 Kaca polos m2 0.080 176,000.00
13 Kunci tanam Bh 0.150 93,700.00
14 Plywood 4mm Lbr 0.060 62,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang Kayu L.02 OH 1.500 90,000.00
3 Kepala tukang L.03 OH 0.150 0.00
4 Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
1 Dolken kayu φ 8-10/400 cm Batang 3.000 24,300.00
2 Kayu m3 0.276 3,675,000.00
3 Paku biasa Kg 0.700 14,000.00
4 Seng gelombang Kg 1.500 104,500.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang Kayu L.02 OH 2.000 90,000.00
3 Kepala Tukang L.03 OH 0.200 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Dolken kayu diameter 8-10/400 cm Batang 1.700 24,300.00
2 Kayu m3 0.210 3,675,000.00
3 Paku biasa Kg 0.300 14,000.00
4 Semen Portland Kg 10.500 1,400.00
5 Pasir beton m3 0.030 120,000.00
6 Koral beton m3 0.050 287,000.00
7 Seng gelombang Lbr 1.500 104,500.00
8 Seng plat Lbr 0.250 104,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang Kayu L.02 OH 2.000 90,000.00
3 Kepala Tukang L.03 OH 0.200 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Dolken kayu diameter 8-10/400 cm Batang 1.250 24,300.00
2 Kayu m3 0.186 3,675,000.00
3 Paku biasa Kg 0.300 14,000.00
4 Semen Portland Kg 18.000 1,400.00
5 Pasir beton m3 0.030 120,000.00
6 Koral beton m3 0.050 287,000.00
7 Seng gelombang Lbr 1.500 104,500.00
8 Plywood 4mm Lbr 1.350 62,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 65,000.00
2 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang Kayu L.02 OH 2.000 90,000.00
3 Kepala Tukang L.03 OH 0.200 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bambu diameter 6-8/600 cm Batang 1.2500 12,800.00
2 Tali ijuk m3 0.1860 12,700.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Tukang Kayu L.02 OH 0.300 90,000.00
2 Kepala Tukang L.03 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu papan kelas III m3 0.0360 5,500,000.00
2 Kayu balok 5/7 kelas III m3 5,350,000.00
3 Paku biasa kg 0.0800 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.12. Pembuatan 1 m2 jalan sementara
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.0000 65,000.00
2 Mandor L.04 OH 0.0050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 0.1500 100,000.00
2 Batu pecah m3 0.0900 265,000.00
3 Pasir pasang m3 0.0100 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 13.3340 65,000.00
2 Mandor L.04 OH 0.6660 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 6.6670 65,000.00
2 Mandor L.04 OH 0.3330 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0420 65,000.00
2 Tukang L.02 OH 0.0040 90,000.00
3 Kepala Tukang L.03 OH 0.0020 0.00
4 Mandor L.04 OH 0.0420 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kawat jaring Lbr 0.1434 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.750 65,000.00
2 Mandor L.04 OH 0.025 0.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.900 65,000.00
2 Mandor L.04 OH 0.045 0.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.050 65,000.00
2 Mandor L.04 OH 0.067 0.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Mandor L.04 OH 0.032 0.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Mandor L.04 OH 0.060 0.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.200 65,000.00
2 Mandor L.04 OH 0.045 0.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0500 65,000.00
2 Mandor L.04 OH 0.0050 0.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.500 65,000.00
2 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.500 65,000.00
2 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Mandor L.04 OH 0.010 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pasir urug 1.200 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Mandor L.04 OH 0.010 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Tanah urug pilihan m3 1.200 56,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Tukang Batu L.02 OH 0.750 90,000.00
3 Kepala Tukang L.03 OH 0.075 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Semen Portlan Kg 202.000 1,400.00
3 Pasir Pasang m3 0.485 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.5000 65,000.00
2 Tukang Batu L.02 OH 0.7500 90,000.00
3 Kepala Tukang L.03 OH 0.0750 0.00
4 Mandor L.04 OH 0.0750 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Semen Portlan Kg 163.000 1,400.00
3 Pasir Pasang m3 0.520 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Tukang Batu L.02 OH 0.750 90,000.00
3 Kepala Tukang L.03 OH 0.075 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Semen Portlan Kg 136.000 1,400.00
3 Pasir Pasang m3 0.544 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Tukang Batu L.02 OH 0.750 90,000.00
3 Kepala Tukang L.03 OH 0.075 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Semen Portlan Kg 117.000 1,400.00
3 Pasir Pasang m3 0.561 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Tukang Batu L.02 OH 0.750 90,000.00
3 Kepala Tukang L.03 OH 0.075 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Semen Portlan Kg 91.000 1,400.00
3 Pasir Pasang m3 0.584 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Tukang Batu L.02 OH 0.750 90,000.00
3 Kepala Tukang L.03 OH 0.075 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Kapur m3 0.170 342,000.00
3 Semen Portlan Kg 0.170 1,400.00
4 Pasir Pasang m3 0.340 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Tukang Batu L.02 OH 0.750 90,000.00
3 Kepala Tukang L.03 OH 0.075 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Semen Portlan Kg 61.000 1,400.00
3 Kapur m3 0.147 342,000.00
4 Pasir Pasang m3 0.492 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 65,000.00
2 Tukang Batu L.02 OH 0.750 90,000.00
3 Kepala Tukang L.03 OH 0.075 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.200 100,000.00
2 Semen Portlan Kg 41.000 1,400.00
3 Kapur m3 0.131 342,000.00
4 Pasir Pasang m3 0.523 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.780 65,000.00
2 Tukang Batu L.02 OH 0.390 90,000.00
3 Kepala Tukang L.03 OH 0.039 0.00
4 Mandor L.04 OH 0.039 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 1.2000 100,000.00
2 Pasir urug m3 0.4320 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40%
batu belah
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 3.400 65,000.00
2 Tukang Batu L.02 OH 0.850 90,000.00
3 Kepala Tukang L.03 OH 0.085 0.00
4 Mandor L.04 OH 0.170 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 0.480 100,000.00
2 Semen Portlan Kg 194.000 1,400.00
3 Pasir Beton m3 0.312 120,000.00
4 Kerikil m3 0.468 287,000.00
5 Besi beton Kg 126.000 12,000.00
6 Kawat beton Kg 1.800 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 2.400 65,000.00
2 Tukang Batu L.02 OH 0.800 90,000.00
3 Kepala Tukang L.03 OH 0.080 0.00
4 Mandor L.04 OH 0.119 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu belah m3 0.450 100,000.00
2 Semen Portlan Kg 194.000 1,400.00
3 Pasir Beton m3 0.312 120,000.00
4 Kerikil m3 0.468 287,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.6500 65,000.00
2 Tukang Batu L.02 OH 0.2750 90,000.00
3 Kepala Tukang L.03 OH 0.0280 0.00
4 Mandor L.04 OH 0.0830 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 247.000 1,400.00
2 Pasir Beton m3 0.621 120,000.00
3 Kerikil (Maks 30mm) m3 0.740 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
c c cc
A.4.1.1.2 Membuat 1 m3 beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.6500 65,000.00
2 Tukang Batu L.02 OH 0.2750 90,000.00
3 Kepala Tukang L.03 OH 0.0280 0.00
4 Mandor L.04 OH 0.0830 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 276.000 1,400.00
2 Pasir Beton kg 0.828 120,000.00
3 Kerikil(Maks 30mm) kg 1.012 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.3 Membuat 1 m3 beton mutu f’ = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.650 65,000.00
2 Tukang Batu L.02 OH 0.275 90,000.00
3 Kepala Tukang L.03 OH 0.028 0.00
4 Mandor L.04 OH 0.083 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 299.000 1,400.00
2 Pasir Beton kg 0.990 120,000.00
3 Kerikil(Maks 30mm) kg 1.017 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.200 65,000.00
2 Tukang Batu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.060 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 230.000 1,400.00
2 Pasir Beton kg 0.893 120,000.00
3 Kerikil (Maks 30mm) kg 1.027 287,000.00
4 Air Liter 200.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.650 65,000.00
2 Tukang Batu L.02 OH 0.275 90,000.00
3 Kepala Tukang L.03 OH 0.028 0.00
4 Mandor L.04 OH 0.083 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 371.000 1,400.00
2 Pasir Beton m3 0.492 120,000.00
3 Kerikil (Maks 30mm) m3 0.776 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. A.4.1.1.6 Membuat 1 m3 beton mutu f’ = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.6500 65,000.00
2 Tukang Batu L.02 OH 0.2750 90,000.00
3 Kepala Tukang L.03 OH 0.0280 0.00
4 Mandor L.04 OH 0.0830 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 352.000 1,400.00
2 Pasir Beton kg 0.731 120,000.00
3 Kerikil (Maks 30mm) kg 1.031 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c
c
= 0,66
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.5000 65,000.00
2 Tukang Batu L.02 OH 0.2750 90,000.00
3 Kepala Tukang L.03 OH 0.0280 0.00
4 Mandor L.04 OH 0.0830 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 326.000 1,400.00
2 Pasir Beton m3 0.543 120,000.00
3 Kerikil (Maks 30mm) m3 0.762 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.8. Membuat 1 m3 beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/cc= 0,56
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.6500 65,000.00
2 Tukang Batu L.02 OH 0.2750 90,000.00
3 Kepala Tukang L.03 OH 0.0280 0.00
4 Mandor L.04 OH 0.0830 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 384.00 1,400.00
2 Pasir Beton kg 0.692 120,000.00
3 Kerikil (Maksimum 30mm) kg 1.04 287,000.00
4 Air Liter 215.00 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.650 65,000.00
2 Tukang Batu L.02 OH 0.275 90,000.00
3 Kepala Tukang L.03 OH 0.028 0.00
4 Mandor L.04 OH 0.083 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 406.000 1,400.00
2 Pasir Beton kg 0.684 120,000.00
3 Kerikil (Maks 30mm) kg 1.026 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.6500 65,000.00
2 Tukang Batu L.02 OH 0.2750 90,000.00
3 Kepala Tukang L.03 OH 0.0280 0.00
4 Mandor L.04 OH 0.0830 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 413.000 1,400.00
2 Pasir Beton kg 0.681 120,000.00
3 Kerikil (Maks 30mm) kg 1.021 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 2.100 65,000.00
2 Tukang Batu L.02 OH 0.350 90,000.00
3 Kepala Tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.105 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 439.000 1,400.00
2 Pasir Beton m3 0.670 120,000.00
3 Kerikil (Maks 30mm) m3 1.006 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 2.1000 65,000.00
2 Tukang Batu L.02 OH 0.3500 90,000.00
3 Kepala Tukang L.03 OH 0.0350 0.00
4 Mandor L.04 OH 0.1050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portland kg 448.000 1,400.00
2 Pasir Beton kg 0.667 120,000.00
3 Kerikil (Maks 30mm) kg 1.000 287,000.00
4 Air Liter 215.000 75.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0700 65,000.00
2 Tukang Besi L.02 OH 0.0700 90,000.00
3 Kepala Tukang L.03 OH 0.0070 0.00
4 Mandor L.04 OH 0.0040 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Besi beton (polos/ulir) kg 10.500 12,000.00
2 Kawat beton kg 0.150 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan 1 Kg Besi polos atau besi ulir (D/10)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0500 65,000.00
2 Tukang Besi L.02 OH 0.0500 90,000.00
3 Kepala Tukang L.03 OH 0.0050 0.00
4 Mandor L.04 OH 0.0030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Besi beton (polos/ulir) kg 10.500 12,000.00
2 Kawat beton kg 0.100 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.5200 65,000.00
2 Tukang Kayu L.02 OH 0.2600 90,000.00
3 Kepala Tukang L.03 OH 0.0260 0.00
4 Mandor L.04 OH 0.0260 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.0400 3,000,000.00
2 Paku 5 – 10 cm kg 0.3000 14,000.00
3 Minyak bekisting Liter 0.1000 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.5200 65,000.00
2 Tukang Kayu L.02 OH 0.2600 90,000.00
3 Kepala Tukang L.03 OH 0.0260 0.00
4 Mandor L.04 OH 0.0260 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.0450 3,000,000.00
2 Paku 5 cm – 10 cm kg 0.3000 14,000.00
3 Minyak bekisting Liter 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.6600 65,000.00
2 Tukang Kayu L.02 OH 0.3300 90,000.00
3 Kepala Tukang L.03 OH 0.0330 0.00
4 Mandor L.04 OH 0.0330 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 3,000,000.00
2 Paku 5 cm – 12 cm kg 0.4000 14,000.00
3 Minyak bekisting Liter 25,000.00
4 Balok kayu kelas II m3 0.0150 3,675,000.00
5 Plywood tebal 9 mm Lbr 0.3500 115,000.00
6 Dolken kayu φ 8-10cm –panj 4 m Batang 2.0000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok Ring
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.6600 65,000.00
2 Tukang Kayu L.02 OH 0.3300 90,000.00
3 Kepala Tukang L.03 OH 0.0330 0.00
4 Mandor L.04 OH 0.0330 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.0400 3,000,000.00
2 Paku 5 cm – 12 cm kg 0.4000 14,000.00
3 Minyak bekisting Liter 25,000.00
4 Balok kayu kelas II m3 0.0180 3,675,000.00
5 Plywood tebal 9 mm Lbr 115,000.00
6 Dolken kayu g φ 8–0)cm panj4 m Batang 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.6600 65,000.00
2 Tukang Kayu L.02 OH 0.3300 90,000.00
3 Kepala Tukang L.03 OH 0.0330 0.00
4 Mandor L.04 OH 0.0330 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.040 3,000,000.00
2 Paku 5 cm – 12 cm kg 0.400 14,000.00
3 Minyak bekisting Liter 0.200 25,000.00
4 Balok kayu kelas II m3 0.015 3,675,000.00
5 Plywood tebal 9 mm Lbr 0.350 115,000.00
6 Dolken kayu galam, 8–10 cm panj4 m Batang 6.000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
No
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.660 65,000.00
2 Tukang Kayu L.02 OH 0.330 90,000.00
3 Kepala Tukang L.03 OH 0.033 0.00
4 Mandor L.04 OH 0.033 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.030 3,000,000.00
2 Paku 5 cm – 12 cm kg 0.400 14,000.00
3 Minyak bekisting Liter 0.150 25,000.00
4 Balok kayu kelas II m3 0.015 3,675,000.00
5 Plywood tebal 9 mm Lbr 0.350 115,000.00
6 Dolken kayu, φ 8–10 cm,panj4 m Batang 2.000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Kayu L.02 OH 0.050 90,000.00
3 Kepala Tukang L.03 OH 0.005 0.00
4 Mandor L.04 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III (papan) m3 0.026 3,000,000.00
2 Paku 5 cm – 12 cm kg 0.600 14,000.00
3 Dolken kayu , φ 8–10 panj 4m Batang 0.500 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 5.300 65,000.00
2 Tukang batu L.02 OH 0.275 90,000.00
3 Tukang kayu L.02 OH 1.300 90,000.00
4 Tukang besi L.02 OH 1.050 90,000.00
5 Kepala tukang L.03 OH 0.262 0.00
6 Mandor L.04 OH 0.265 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.200 3,000,000.00
2 Paku 5 cm – 12 cm kg 1.500 14,000.00
3 Minyak bekisting Liter 0.400 25,000.00
4 Besi beton polos kg 157.500 12,000.00
5 Kawat beton kg 2.250 20,000.00
6 Semen Portland kg 336.000 1,400.00
7 Pasir Beton m3 0.540 120,000.00
8 Kerikil m3 0.810 287,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 5.650 65,000.00
2 Tukang batu L.02 OH 0.275 90,000.00
3 Tukang kayu L.02 OH 1.560 90,000.00
4 Tukang besi L.02 OH 1.400 90,000.00
5 Kepala tukang L.03 OH 0.323 0.00
6 Mandor L.04 OH 0.283 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.270 3,000,000.00
2 Paku 5 cm – 12 cm kg 2.000 14,000.00
3 Minyak bekisting Liter 0.600 25,000.00
4 Besi beton polos kg 210.000 12,000.00
5 Kawat beton kg 3.000 20,000.00
6 Semen Portland kg 336.000 1,400.00
7 Pasir Beton m3 0.540 120,000.00
8 Kerikil m3 0.810 287,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1 Pekerja L.01 OH 7.050 65,000.00
2 Tukang batu L.02 OH 0.275 90,000.00
3 Tukang kayu L.02 OH 1.650 90,000.00
4 Tukang besi L.02 OH 2.100 90,000.00
5 Kepala tukang L.03 OH 0.403 0.00
6 Mandor L.04 OH 0.353 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.400 3,000,000.00
2 Paku 5 cm – 12cm kg 4.000 14,000.00
3 Minyak bekisting Liter 2.000 25,000.00
4 Besi beton polos kg 315.000 12,000.00
5 Kawat beton kg 4.500 20,000.00
6 Semen Portland kg 336.000 1,400.00
7 Pasir Beton m3 0.540 120,000.00
8 Kerikil m3 0.810 287,000.00
9 Kayu kelas II balok M3 0.150 3,675,000.00
10 Plywood 9 mm Lbr 3.500 115,000.00
11 Dolken kayu φ (8-10)cm, panj4 m Batang 20.000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 6.350 65,000.00
2 Tukang batu L.02 OH 0.275 90,000.00
3 Tukang kayu L.02 OH 1.650 90,000.00
4 Tukang besi L.02 OH 1.400 90,000.00
5 Kepala tukang L.03 OH 0.333 0.00
6 Mandor L.04 OH 0.318 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.320 3,000,000.00
2 Paku 5 cm – 12 cm kg 3.200 14,000.00
3 Minyak bekisting Liter 1.600 25,000.00
4 Besi beton polos kg 210.000 12,000.00
5 Kawat beton kg 3.000 20,000.00
6 Semen Portland kg 336.000 1,400.00
7 Pasir Beton m3 0.540 120,000.00
8 Kerikil m3 0.810 287,000.00
9 Kayu kelas II balok m3 0.140 3,675,000.00
10 Plywood 9 mm Lembar 2.800 115,000.00
11 Dolken kayu φ (8-10)cm, panj 4 m Batang 16.000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 5.300 65,000.00
2 Tukang batu L.02 OH 0.275 90,000.00
3 Tukang kayu L.02 OH 1.300 90,000.00
4 Tukang besi L.02 OH 1.050 90,000.00
5 Kepala tukang L.03 OH 0.265 0.00
6 Mandor L.04 OH 0.265 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.320 3,000,000.00
2 Paku 5 cm – 12 cm kg 3.200 14,000.00
3 Minyak bekisting Liter 1.600 25,000.00
4 Besi beton polos kg 157.500 12,000.00
5 Kawat beton kg 2.250 20,000.00
6 Semen Portland kg 336.000 1,400.00
7 Pasir Beton m3 0.540 120,000.00
8 Kerikil m3 0.810 287,000.00
9 Kayu kelas II balok m3 0.120 3,675,000.00
10 Plywood 9 mm Lembar 2.800 115,000.00
11 Dolken kayu φ (8-10)cm, panjang 4 m Batang 32.000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 5.300 65,000.00
2 Tukang batu L.02 OH 0.275 90,000.00
3 Tukang kayu L.02 OH 1.300 90,000.00
4 Tukang besi L.02 OH 1.050 90,000.00
5 Kepala tukang L.03 OH 0.262 0.00
6 Mandor L.04 OH 0.265 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.240 3,000,000.00
2 Paku 5 cm – 12 cm kg 3.200 14,000.00
3 Minyak bekisting Liter 1.600 25,000.00
4 Besi beton polos kg 157.500 12,000.00
5 Kawat beton kg 2.250 20,000.00
6 Semen Portland kg 336.000 1,400.00
7 Pasir Beton m3 0.540 120,000.00
8 Kerikil m3 0.810 287,000.00
9 Kayu kelas II balok m3 0.160 3,675,000.00
10 Plywood 9 mm Lembar 2.800 115,000.00
11 Dolken kayu φ (8-10)cm, panjang 4 m Batang 24.000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 5.650 65,000.00
2 Tukang batu L.02 OH 0.275 90,000.00
3 Tukang kayu L.02 OH 1.560 90,000.00
4 Tukang besi L.02 OH 1.400 90,000.00
5 Kepala tukang L.03 OH 0.323 0.00
6 Mandor L.04 OH 0.283 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.250 3,000,000.00
2 Paku 5 cm – 12 cm kg 3.000 14,000.00
3 Minyak bekisting Liter 1.200 25,000.00
4 Besi beton polos kg 210.000 12,000.00
5 Kawat beton kg 3.000 20,000.00
6 Semen Portland kg 336.000 1,400.00
7 Pasir Beton m3 0.540 120,000.00
8 Kerikil m3 0.810 287,000.00
9 Kayu kelas II balok m3 0.105 3,675,000.00
10 Plywood 9 mm Lembar 2.500 115,000.00
11 Dolken kayu φ (8-10)cm, panj 4 m Batang 14.000 24,300.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.180 65,000.00
2 Tukang batu L.02 OH 0.020 90,000.00
3 Tukang kayu L.02 OH 0.020 90,000.00
4 Tukang besi L.02 OH 0.020 90,000.00
5 Kepala tukang L.03 OH 0.006 0.00
6 Mandor L.04 OH 0.009 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.002 3,000,000.00
2 Paku 5 cm – 12 cm kg 0.010 14,000.00
3 Minyak bekisting Liter 25,000.00
4 Besi beton polos kg 3.000 12,000.00
5 Kawat beton kg 0.450 20,000.00
6 Semen Portland kg 4.000 1,400.00
7 Pasir Beton m3 0.006 120,000.00
8 Kerikil m3 0.009 287,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.297 65,000.00
2 Tukang batu L.02 OH 0.033 90,000.00
3 Tukang kayu L.02 OH 0.033 90,000.00
4 Tukang besi L.02 OH 0.033 90,000.00
5 Kepala tukang L.03 OH 0.010 0.00
6 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m3 0.003 3,000,000.00
2 Paku 5 cm – 12 cm kg 0.020 14,000.00
3 Minyak bekisting Liter 25,000.00
4 Besi beton polos kg 3.600 12,000.00
5 Kawat beton kg 0.050 20,000.00
6 Semen Portland kg 5.500 1,400.00
7 Pasir Beton m3 0.009 120,000.00
8 Kerikil m3 0.015 287,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.37 1 m3 Beton bertulang untuk pondasi plat :
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 135.0000 30,067.75
3 Begisting A.4.1.1.20 M2 2.8000 183,900.00
D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 171.1572 30,067.75
3 Begisting A.4.1.1.21 M2 2.9165 219,084.20
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 130.3401 30,067.75
3 Begisting A.4.1.1.21 M2 10.0000 219,084.20
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 175.3000 30,067.75
3 Begisting A.4.1.1.22 M2 3.8480 247,725.13
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.41 1 m3 Kolom beton bertulang 15/15cm :
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 178.1000 30,067.75
3 Begisting A.4.1.1.22 M2 13.3300 247,725.13
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 157.8667 30,067.75
3 Begisting A.4.1.1.22 M2 23.3333 247,725.13
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 144.2920 30,067.75
3 Begisting A.4.1.1.22 M2 20.0000 247,725.13
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 204.2347 30,067.75
3 Begisting A.4.1.1.22 M2 16.0000 247,725.13
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.45 1 m3 Kolom beton bertulang 30/30cm :
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 178.3926 30,067.75
3 Begisting A.4.1.1.22 M2 13.3333 247,725.13
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 96.2803 30,067.75
3 Begisting A.4.1.1.22 M2 11.4286 247,725.13
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 214.4286 30,067.75
3 Begisting A.4.1.1.23 M2 2.0825 294,750.25
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.48 1 m3 balok beton bertulang 13/15cm :
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 179.3200 30,067.75
3 Begisting A.4.1.1.23 M2 5.0880 294,750.25
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 174.1846 30,067.75
3 Begisting A.4.1.1.23 M2 15.3846 294,750.25
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 183.0267 30,067.75
3 Begisting A.4.1.1.23 M2 18.3333 294,750.25
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 131.7468 30,067.75
3 Begisting A.4.1.1.23 M2 12.8571 294,750.25
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.52 1 m3 balok beton bertulang 20x30 cm :
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 168.4816 30,067.75
3 Begisting A.4.1.1.23 M2 13.3333 294,750.25
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 86.6170 30,067.75
3 Begisting A.4.1.1.26 M2 12.5000 315,925.00
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A BAHAN
1 Beton cor A.4.1.1.7. M3 1.0000 979,723.33
2 Pembesian beton A.4.1.1.17 Kg 123.4000 30,067.75
3 Begisting A.4.1.1.24 M2 10.0000 444,375.00
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.053 65,000.00
2 Tukang kayu OH 0.018 90,000.00
3 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.089 65,000.00
2 Tukang kayu OH 0.030 90,000.00
3 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.071 65,000.00
2 Tukang kayu OH 0.024 90,000.00
3 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.064 65,000.00
2 Tukang batu L.02 OH 0.244 90,000.00
3 Tukang vibrator L.02 OH 0.128 90,000.00
4 Kepala Tukang L.03 OH 0.034 0.00
5 Mandor L.04 OH 0.073 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.069 65,000.00
2 Tukang batu L.02 OH 0.242 90,000.00
3 Tukang vibrator L.02 OH 0.138 90,000.00
4 Kepala Tukang L.03 OH 0.037 0.00
5 Mandor L.04 OH 0.073 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.061 65,000.00
2 Tukang batu L.02 OH 0.213 90,000.00
3 Tukang vibrator L.02 OH 0.122 90,000.00
4 Kepala Tukang L.03 OH 0.033 0.00
5 Mandor L.04 OH 0.073 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Tukang batu L.02 OH 0.367 90,000.00
2 Kepal tukang L.03 OH 0.074 0.00
3 Mandor L.04 OH 0.037 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja 0.147 65,000.00
2 Tukang kayu L.02 OH 0.147 90,000.00
3 Kepala tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kaso 5/7 m3 0.012 3,675,000.00
2 Papan cor m3 0.004 3,000,000.00
3 Paku 5-7cm Kg 0.264 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.220 65,000.00
2 Tukang kayu L.02 OH 0.220 90,000.00
3 Tukang besi L.02 OH 0.220 0.00
4 Mandor L.04 OH 0.011 0.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.060 65,000.00
2 Tukang Las Konstruksi 0.060 90,000.00
3 Kepala tukang L.03 OH 0.006 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Besi Baja IWF Kg 1.150 13,600.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0430 65,000.00
2 Tukang Khusus Alumunium L.03 OH 0.0430 90,000.00
3 Kepala tukang L.03 OH 0.0043 0.00
4 Mandor L.04 OH 0.0021 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Profil alluminium m 1.100 224,300.00
2 Skrup fixer buah 2.000 75,000.00
3 Sealant Tube 0.060 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.085 65,000.00
2 Tukang Allumunium/Kaca L.03 OH 0.085 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pintu alluminium m 4.400 224,300.00
2 Profil kaca m 4.500 2,000.00
3 Sealant Tube 0.270 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
Uraian Kode Satuan Koefisien Satuan
No
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang L.03 OH 0.200 90,000.00
3 Kepala tukang L.03 OH 0.020 0.00
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang L.03 OH 0.200 90,000.00
3 Kepala tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.001 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Seng plat m 1.050 44,900.00
2 Paku 1 cm - 2,5 cm kg 0.015 18,000.00
3 Papan kayu kelas II atau III m3 0.019 3,800,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang L.03 OH 0.300 90,000.00
3 Kepala tukang L.03 OH 0.030 0.00
4 Mandor L.04 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Seng plat m 1.050 44,900.00
2 Paku 1 cm – 2,5 cm kg 0.010 18,000.00
3 Besi strip kg 0.500 11,200.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 65,000.00
2 Tukang Besi L.02 OH 0.250 90,000.00
3 Kepala Tukang L.03 OH 0.025 0.00
4 Mandor L.04 OH 0.013 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Rangka metal hollow 40.40.2 mm M1 3.500 125,000.00
2 Assesoris (perkuatan, las dll) Ls 3.500 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.350 65,000.00
2 Tukang Besi L.02 OH 0.350 90,000.00
3 Kepala Tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.018 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Rangka metal hollow 40.40.2 mm M1 4.000 125,000.00
2 Assesoris (perkuatan, las dll) Ls 4.000 15,000.00
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 65,000.00
2 Tukang Batu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 140.000 650.00
2 Semen Portlan Kg 43.500 1,400.00
3 Pasir Pasang m3 0.080 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP :
3PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 65,000.00
2 Tukang Batu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 140.000 650.00
2 Semen Portlan Kg 32.950 1,400.00
3 Pasir Pasang m3 0.091 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 65,000.00
2 Tukang Batu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 140.000 650.00
2 Semen Portlan Kg 26.550 1,400.00
3 Pasir Pasang m3 0.093 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 65,000.00
2 Tukang Batu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 140.000 650.00
2 Semen Portlan Kg 22.200 1,400.00
3 Pasir Pasang m3 0.102 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 65,000.00
2 Tukang Batu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 140.000 650.00
2 Semen Portlan Kg 18.500 1,400.00
3 Pasir Pasang m3 0.122 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 65,000.00
2 Tukang Batu L.02 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 140.0000 650.00
2 Semen Portlan Kg 10.0800 1,400.00
3 Kapur Padam m3 0.0275 342,000.00
4 Pasir Pasang m3 0.0925 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.3000 65,000.00
2 Tukang Batu L.02 OH 0.1000 90,000.00
3 Kepala Tukang L.03 OH 0.0100 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Portlan Kg 18.950 1,400.00
3 Pasir Pasang m3 0.038 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.3000 65,000.00
2 Tukang Batu L.02 OH 0.1000 90,000.00
3 Kepala Tukang L.03 OH 0.0100 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Portlan Kg 14.370 1,400.00
3 Pasir Pasang m3 0.040 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Portlan Kg 11.500 1,400.00
3 Pasir Pasang m3 0.043 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Portlan Kg 9.800 1,400.00
3 Pasir Pasang m3 0.045 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.3000 65,000.00
2 Tukang Batu L.02 OH 0.1000 90,000.00
3 Kepala Tukang L.03 OH 0.0100 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Portland Kg 8.320 1,400.00
3 Pasir Pasang m3 0.049 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Portland Kg 6.500 1,400.00
3 Pasir Pasang m3 0.050 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Portlan Kg 4.500 1,400.00
3 Kapur Padam m3 0.015 342,000.00
4 Pasir Pasang m3 0.050 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Merah Kg 0.018 1,400.00
3 Kapur Padam m3 0.018 342,000.00
4 Pasir Pasang m3 0.018 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah m3 70.000 650.00
2 Semen Merah Kg 0.014 1,400.00
3 Kapur Padam m3 0.014 342,000.00
4 Pasir Pasang m3 0.028 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata rooster m2 30.000 10,000.00
2 Semen Portland Kg 11.000 1,400.00
3 Pasir Pasang m3 0.035 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata berongga m2 30.000 10,000.00
2 Semen Portland Kg 11.000 1,400.00
3 Pasir Pasang m3 0.035 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.02 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata rooster m2 70.000 10,000.00
2 Semen Portland Kg 14.000 1,400.00
3 Pasir Pasang m3 0.032 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 15.504 1,400.00
2 Pasir pasang m3 0.016 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 10.224 1,400.00
2 Pasir pasang m3 0.020 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 7.776 1,400.00
2 Pasir pasang m3 0.023 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 6.240 1,400.00
2 Pasir pasang m3 0.024 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 5.184 1,400.00
2 Pasir pasang m3 0.026 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 4.416 1,400.00
2 Pasir pasang m3 0.027 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 3.936 1,400.00
2 Pasir pasang m3 0.028 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 3.456 1,400.00
2 Pasir pasang m3 0.029 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.3600 65,000.00
2 Tukang Batu L.03 OH 0.1200 90,000.00
3 Kepala Tukang L.03 OH 0.0120 0.00
4 Mandor L.04 OH 0.0180 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 5.760 1,400.00
2 Kapur Pasang m3 0.003 342,000.00
3 Pasir pasang m3 0.013 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.3600 65,000.00
2 Tukang Batu L.03 OH 0.1200 90,000.00
3 Kepala Tukang L.03 OH 0.0120 0.00
4 Mandor L.04 OH 0.0180 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 3.000 1,400.00
2 Kapur Pasang m3 0.005 342,000.00
3 Pasir pasang m3 0.020 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.3600 65,000.00
2 Tukang Batu L.03 OH 0.1200 90,000.00
3 Kepala Tukang L.03 OH 0.0120 0.00
4 Mandor L.04 OH 0.0180 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC m3 0.009 1,400.00
2 Kapur Pasang m3 0.009 342,000.00
3 Pasir pasang m3 0.009 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.360 65,000.00
2 Tukang Batu L.03 OH 0.120 90,000.00
3 Kepala Tukang L.03 OH 0.012 0.00
4 Mandor L.04 OH 0.018 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC m3 0.007 1,400.00
2 Kapur Pasang m3 0.007 342,000.00
3 Pasir pasang m3 0.015 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Batu L.03 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.022 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 13.632 1,400.00
2 Pasir pasang m3 0.027 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.2600 65,000.00
2 Tukang Batu L.03 OH 0.2000 90,000.00
3 Kepala Tukang L.03 OH 0.0200 0.00
4 Mandor L.04 OH 0.0130 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 10.3680 1,400.00
2 Pasir pasang m3 0.0310 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Batu L.03 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.022 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 8.3200 1,400.00
2 Pasir pasang m3 0.0320 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Batu L.03 OH 0.200 90,000.00
3 Kepala Tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.022 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 6.9120 1,400.00
2 Pasir pasang m3 0.0350 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.4000 65,000.00
2 Tukang Batu L.03 OH 0.2000 90,000.00
3 Kepala Tukang L.03 OH 0.0200 0.00
4 Mandor L.04 OH 0.0220 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 5.8880 1,400.00
2 Pasir pasang m3 0.0360 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.4400 65,000.00
2 Tukang Batu L.03 OH 0.2200 90,000.00
3 Kepala Tukang L.03 OH 0.0220 0.00
4 Mandor L.04 OH 0.0220 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC m3 0.009 1,400.00
2 Kapur Pasang m3 0.009 342,000.00
3 Pasir pasang m3 0.018 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Batu L.03 OH 0.075 90,000.00
3 Kepala Tukang L.03 OH 0.008 0.00
4 Mandor L.04 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 5.184 1,400.00
2 Pasir pasang m3 0.026 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.080 65,000.00
2 Tukang Batu L.03 OH 0.400 90,000.00
3 Kepala Tukang L.03 OH 0.040 0.00
4 Mandor L.04 OH 0.004 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 0.500 1,400.00
2 Pasir pasang m3 0.013 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.3000 65,000.00
2 Tukang Batu L.03 OH 0.1000 90,000.00
3 Kepala Tukang L.03 OH 0.0100 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 4.3200 1,400.00
2 Pasir pasang Kg 0.0060 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Batu L.03 OH 0.075 90,000.00
3 Kepala Tukang L.03 OH 0.008 0.00
4 Mandor L.04 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 3.108 1,400.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 65,000.00
2 Tukang Batu L.03 OH 0.035 90,000.00
3 Kepala Tukang L.03 OH 0.004 0.00
4 Mandor L.04 OH 0.004 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 1.600 1,400.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang Batu L.03 OH 0.150 90,000.00
3 Kepala Tukang L.03 OH 0.015 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 6.3400 1,400.00
2 Pasir pasang m3 0.0120 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang Batu L.03 OH 0.100 90,000.00
3 Kepala Tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.010 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 3.2500 1,400.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 65,000.00
2 Tukang Batu L.02 OH 0.125 90,000.00
3 Kepala tukang L.03 OH 0.013 0.00
4 Mandor L.04 OH 0.013 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin teraso Bh 6.630 3,883.33
2 Semen Portlan kg 9.800 1,400.00
3 Semen warna Kg 1.300 15,000.00
4 Pasir pasang M3 0.045 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 65,000.00
2 Tukang Batu L.02 OH 0.125 90,000.00
3 Kepala tukang L.03 OH 0.013 0.00
4 Mandor L.04 OH 0.013 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin granit Bh 6.630 41,666.67
2 Semen Portlan kg 9.800 1,400.00
3 Semen warna Kg 1.300 15,000.00
4 Pasir pasang M3 0.045 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.260 65,000.00
2 Tukang Batu L.02 OH 0.130 90,000.00
3 Kepala tukang L.03 OH 0.013 0.00
4 Mandor L.04 OH 0.013 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin granit Bh 11.870 22,727.27
2 Semen Portlan kg 10.000 1,400.00
3 Semen warna Kg 1.500 15,000.00
4 Pasir pasang M3 0.045 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint ubin teraso Bh 3.530 3,883.33
2 Semen Portlan kg 1.140 1,400.00
3 Semen warna Kg 0.100 15,000.00
4 Pasir pasang M3 0.003 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint ubin teraso Bh 2.650 3,883.33
2 Semen Portlan kg 1.140 1,400.00
3 Semen warna Kg 0.100 15,000.00
4 Pasir pasang M3 0.003 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint ubin granit Bh 2.650 22,727.27
2 Semen Portlan kg 1.140 1,400.00
3 Semen warna Kg 0.100 15,000.00
4 Pasir pasang M3 0.003 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint ubin granit Bh 3.530 22,727.27
2 Semen Portlan kg 1.140 1,400.00
3 Semen warna Kg 0.100 15,000.00
4 Pasir pasang M3 0.003 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint teralux marmer Bh 1.700 12,348.00
2 Semen Portlan kg 1.140 1,400.00
3 Semen warna Kg 0.100 15,000.00
4 Pasir pasang M3 0.003 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint teralux marmer Bh 2.6500 12,348.00
2 Semen Portland kg 1.1400 1,400.00
3 Semen warna Kg 0.1000 15,000.00
4 Pasir pasang M3 0.0030 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.30.Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint teralux marmer Bh 3.530 12,348.00
2 Semen Portlan kg 1.140 1,400.00
3 Semen warna Kg 0.100 15,000.00
4 Pasir pasang M3 0.003 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 65,000.00
2 Tukang Batu L.02 OH 0.350 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.035 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin keramik Bh 53.000 6,200.00
2 Semen Portlan Kg 8.190 1,400.00
3 Pasir pasang M3 0.045 115,000.00
4 Semen warna Kg 2.750 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.33.Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.7000 65,000.00
2 Tukang Batu L.02 OH 0.3500 90,000.00
3 Kepala tukang L.03 OH 0.0350 0.00
4 Mandor L.04 OH 0.0350 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin keramik Bh 106.000 6,200.00
2 Semen Portlan Kg 8.190 1,400.00
3 Pasir pasang M3 0.045 115,000.00
4 Semen warna Kg 3.200 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 65,000.00
2 Tukang Batu L.02 OH 0.350 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.035 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik kw 1 40 x 40 cm Bh 6.250 12,500.00
2 Semen Portland Kg 8.190 1,400.00
3 Pasir pasang M3 0.045 115,000.00
4 Semen warna Kg 1.620 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 65,000.00
2 Tukang Batu L.02 OH 0.350 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.035 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin keramik Bh 11.870 6,200.00
2 Semen Portland Kg 10.000 1,400.00
3 Pasir pasang M3 0.045 115,000.00
4 Semen warna Kg 1.500 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 65,000.00
2 Tukang Batu L.02 OH 0.350 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.035 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin keramik Bh 26.500 6,200.00
2 Semen Portlan Kg 10.400 1,400.00
3 Pasir pasang M3 0.045 115,000.00
4 Semen warna Kg 1.620 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.050 65,000.00
2 Tukang Batu L.02 OH 0.525 90,000.00
3 Kepala tukang L.03 OH 0.053 0.00
4 Mandor L.04 OH 0.053 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin keramik Bh 33.000 6,200.00
2 Semen Portlan Kg 9.800 1,400.00
3 Pasir pasang M3 0.045 115,000.00
4 Semen warna Kg 4.370 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 65,000.00
2 Tukang Batu L.02 OH 0.350 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.035 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Ubin keramik Bh 11.870 6,200.00
2 Semen Portlan Kg 14.150 1,400.00
3 Pasir pasang M3 0.039 115,000.00
4 Semen warna Kg 2.000 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint keramik Bh 5.300 6,200.00
2 Semen Portlan Kg 1.140 1,400.00
3 Pasir pasang M3 0.003 115,000.00
4 Semen warna Kg 0.025 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint keramik Bh 10.600 6,200.00
2 Semen Portland Kg 1.140 1,400.00
3 Pasir pasang M3 0.003 115,000.00
4 Semen warna Kg 0.050 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 65,000.00
2 Tukang Batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plint keramik Bh 5.3000 6,091.00
2 Semen Portland Kg 0.5700 1,400.00
3 Pasir pasang M3 0.0015 115,000.00
4 Semen warna Kg 0.0130 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang Batu L.02 OH 0.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Porslen Bh 86.000 3,177.00
2 Semen Portlan Kg 9.300 1,400.00
3 Pasir pasang M3 0.018 115,000.00
4 Semen warna Kg 1.500 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.900 65,000.00
2 Tukang Batu L.02 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.045 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Porslen Bh 53.000 3,177.00
2 Semen Portlan Kg 9.300 1,400.00
3 Pasir Pasang M3 0.018 115,000.00
4 Semen warna Kg 2.750 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.900 65,000.00
2 Tukang Batu L.02 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.045 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Porslen Bh 26.000 3,177.00
2 Semen Portland Kg 9.300 1,400.00
3 Pasir Pasang M3 0.018 115,000.00
4 Semen warna Kg 1.940 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.900 65,000.00
2 Tukang Batu L.02 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.045 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik artistik Bh 53.000 6,200.00
2 Semen Portlan Kg 9.300 1,400.00
3 Pasir Pasang M3 0.018 115,000.00
4 Semen warna Kg 2.750 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.900 65,000.00
2 Tukang Batu L.02 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.045 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik artistik Bh 106.000 6,200.00
2 Semen Portlan Kg 9.300 1,400.00
3 Pasir Pasang M3 0.018 115,000.00
4 Semen warna Kg 2.900 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.900 65,000.00
2 Tukang Batu L.02 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.045 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik artistik Bh 26.500 6,200.00
2 Semen Portlan Kg 9.300 1,400.00
3 Pasir Pasang M3 0.018 115,000.00
4 Semen warna Kg 1.940 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.300 65,000.00
2 Tukang Batu L.02 OH 0.650 90,000.00
3 Kepala tukang L.03 OH 0.065 0.00
4 Mandor L.04 OH 0.065 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Marmer Bh 1.060 12,348.00
2 Semen Portlan Kg 12.440 1,400.00
3 Pasir Pasang M3 0.025 115,000.00
4 Semen warna Kg 0.650 15,000.00
5 Paku 12cm Bh 3.030 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang Batu L.02 OH 0.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata pelapis Bh 63.000 650.00
2 Semen Portlan Kg 12.440 1,400.00
3 Pasir Pasang M3 0.025 115,000.00
4 Semen warna Kg 2.750 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 65,000.00
2 Tukang Batu L.02 OH 0.350 90,000.00
3 Kepala tukang L.03 OH 0.035 0.00
4 Mandor L.04 OH 0.035 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batu alam marmo Bh 1.100 143,000.00
2 Semen Portlan Kg 11.750 1,400.00
3 Pasir Pasang M3 0.035 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.120 65,000.00
2 Tukang Batu L.02 OH 0.120 90,000.00
3 Kepala tukang L.03 OH 0.012 0.00
4 Mandor L.04 OH 0.006 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu kelas 1 M3 0.003 5,500,000.00
2 Paku/skrup 5cm Kg 0.050 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.210 65,000.00
2 Tukang Batu L.02 OH 0.105 90,000.00
3 Kepala tukang L.03 OH 0.0105 0.00
4 Mandor L.04 OH 0.0053 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Paving Block bh 50.000 1,400.00
2 Pasir urug m3 0.100 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 65,000.00
2 Tukang kayu L.02 OH 0.100 90,000.00
3 Kepala tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Tripleks Lembar 0.375 62,000.00
2 Paku tripleks kg 0.030 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 65,000.00
2 Tukang kayu L.02 OH 0.050 90,000.00
3 Kepala tukang L.03 OH 0.005 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Gypsum board Lembar 0.364 70,000.00
2 Paku skrup kg 0.110 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 65,000.00
2 Tukang Kayu L.02 OH 0.050 90,000.00
3 Kepala tukang L.03 OH 0.005 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 List kayu profil m 1.050 7,500.00
2 Paku kg 0.010 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.1500 65,000.00
2 Tukang Kayu L.03 OH 0.0750 90,000.00
3 Kepala tukang L.11 OH 0.0075 0.00
4 Mandor L.15 OH 0.0080 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng palentong Bh 25.000 600.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Kayu L.03 OH 0.075 90,000.00
3 Kepala tukang L.11 OH 0.008 0.00
4 Mandor L.15 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng kodok Bh 25.000 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Kayu L.03 OH 0.075 90,000.00
3 Kepala tukang L.11 OH 0.008 0.00
4 Mandor L.15 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng kodok Bh 12.000 1,100.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Kayu L.03 OH 0.200 90,000.00
3 Kepala tukang L.11 OH 0.020 0.00
4 Mandor L.15 OH 0.002 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng bubung Bh 5.000 4,500.00
2 Semen Portlan Kg 8.000 1,400.00
3 Pasir pasang M3 0.032 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Kayu L.03 OH 0.200 90,000.00
3 Kepala tukang L.11 OH 0.020 0.00
4 Mandor L.15 OH 0.002 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng bubung Bh 5.000 7,000.00
2 Semen Portlan Kg 8.000 1,400.00
3 Pasir pasang M3 0.032 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Kayu L.03 OH 0.200 90,000.00
3 Kepala tukang L.11 OH 0.020 0.00
4 Mandor L.15 OH 0.002 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng bubung Bh 4.000 4,500.00
2 Semen Portlan Kg 8.000 1,400.00
3 Pasir pasang M3 0.032 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.075 90,000.00
3 Kepala tukang L.11 OH 0.008 0.00
4 Mandor L.15 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.500 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.075 90,000.00
3 Kepala tukang L.11 OH 0.008 0.00
4 Mandor L.15 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.600 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.600 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.750 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.350 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.420 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.440 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.510 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.800 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.370 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.460 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.490 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.007 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Asbes gel 92x250 Lbr 0.570 48,000.00
2 Paku pancing 6x23 Kg 0.120 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.084 65,000.00
2 Tukang Kayu L.03 OH 0.125 90,000.00
3 Kepala tukang L.11 OH 0.013 0.00
4 Mandor L.15 OH 0.004 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bubung stel gel. Lbr 2.400 73,250.00
2 Paku skrup 3,5” Bh 6.000 1,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05m
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.084 65,000.00
2 Tukang Kayu L.03 OH 0.125 90,000.00
3 Kepala tukang L.11 OH 0.013 0.00
4 Mandor L.15 OH 0.004 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bubung stel gel. Lbr 2.100 73,250.00
2 Paku skrup 3,5” Bh 6.000 1,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.084 65,000.00
2 Tukang Kayu L.03 OH 0.125 90,000.00
3 Kepala tukang L.11 OH 0.013 0.00
4 Mandor L.15 OH 0.004 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bubung stel gel. Lbr 2.050 73,250.00
2 Paku skrup 3,5” Bh 6.000 1,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang Kayu L.03 OH 0.100 90,000.00
3 Kepala tukang L.11 OH 0.010 0.00
4 Mandor L.15 OH 0.010 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng beton Bh 11.000 1,600.00
2 Paku biasa 2”-5” Kg 0.030 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang Kayu L.03 OH 0.100 90,000.00
3 Kepala tukang L.11 OH 0.010 0.00
4 Mandor L.15 OH 0.001 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Genteng metal Bh 1.020 45,000.00
2 Paku biasa ½”-1” Kg 0.200 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang Kayu L.03 OH 0.200 90,000.00
3 Kepala tukang L.11 OH 0.020 0.00
4 Mandor L.15 OH 0.020 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Nok genteng beton Bh 3.500 7,700.00
2 Paku biasa ½”-1” Kg 0.050 18,000.00
3 Semen PC Kg 10.800 1,400.00
4 Pasir pasang M3 0.032 115,000.00
5 Semen warna Kg 1.000 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 65,000.00
2 Tukang Kayu L.03 OH 0.150 90,000.00
3 Kepala tukang L.11 OH 0.015 0.00
4 Mandor L.15 OH 0.013 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Nok genteng metal Bh 1.100 35,000.00
2 Paku biasa ½”-1” Kg 0.050 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.120 65,000.00
2 Tukang Kayu L.03 OH 0.060 90,000.00
3 Kepala tukang L.11 OH 0.006 0.00
4 Mandor L.15 OH 0.006 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Seng gel 3”x6” Lbr 0.700 104,500.00
2 Paku biasa ½”-1” Kg 0.020 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Kayu L.03 OH 0.070 90,000.00
3 Kepala tukang L.11 OH 0.007 0.00
4 Mandor L.15 OH 0.006 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Seng plat 3”x6”bjls28 Lbr 0.300 44,900.00
2 Paku biasa ½”-1” Kg 0.040 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Kayu L.03 OH 0.750 90,000.00
3 Kepala tukang L.11 OH 0.080 0.00
4 Mandor L.15 OH 0.006 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Almn gel tbl 0,55 mm Lbr 1.050 41,250.00
2 Paku hak panj 15cm Kg 0.020 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang Kayu L.03 OH 0.060 90,000.00
3 Kepala tukang L.11 OH 0.006 0.00
4 Mandor L.15 OH 0.006 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Galvalume gel tbl 0,3 mm Lbr 1.050 41,250.00
2 - Paku Sumbat / Karet Paku bh 6.000 1,500.00
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.060 65,000.00
2 Tukang Kayu L.03 OH 0.030 90,000.00
3 Kepala tukang L.11 OH 0.003 0.00
4 Mandor L.15 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Nok standar 40x18 Bh 1.100 30,000.00
2 - Paku Sumbat / Karet Paku bh 6.000 1,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 7.000 65,000.00
2 Tukang kayu L.03 OH 21.000 90,000.00
3 Kepala tukang L.03 OH 2.100 0.00
4 Mandor L.04 OH 0.350 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu m3 1.100 5,350,000.00
2 Paku 10 cm Kg 1.250 14,000.00
3 Lem kayu Kg 1.000 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 6.000 65,000.00
2 Tukang kayu L.03 OH 18.000 90,000.00
3 Kepala tukang L.03 OH 1.800 0.00
4 Mandor L.04 OH 0.300 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu m3 1.200 3,675,000.00
2 Paku 10 cm Kg 1.250 14,000.00
3 Lem kayu Kg 1.000 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.350 65,000.00
2 Tukang kayu L.03 OH 1.050 90,000.00
3 Kepala tukang L.03 OH 0.105 0.00
4 Mandor L.04 OH 0.018 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.040 3,800,000.00
2 Paku 5 – 7 cm Kg 0.050 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.350 65,000.00
2 Tukang kayu L.03 OH 1.050 90,000.00
3 Kepala tukang L.03 OH 0.105 0.00
4 Mandor L.04 OH 0.018 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.040 3,000,000.00
2 Paku 5 – 7 cm Kg 0.050 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang kayu L.03 OH 3.000 90,000.00
3 Kepala tukang L.03 OH 0.300 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.040 3,800,000.00
2 Lem kayu Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.800 65,000.00
2 Tukang kayu L.03 OH 2.400 90,000.00
3 Kepala tukang L.03 OH 0.240 0.00
4 Mandor L.04 OH 0.040 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.024 3,800,000.00
2 Lem kayu Kg 0.300 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang kayu L.03 OH 3.000 90,000.00
3 Kepala tukang L.03 OH 0.300 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.064 3,800,000.00
2 Lem kayu Kg 0.500 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
(lebar sampai 90 cm)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 65,000.00
2 Tukang kayu L.03 OH 2.100 90,000.00
3 Kepala tukang L.03 OH 0.210 0.00
4 Mandor L.04 OH 0.035 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.025 3,800,000.00
2 Paku 1 cm – 2,5 cm kg 0.030 18,000.00
3 Lem kayu kg 0.500 23,000.00
4 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.000 62,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.800 65,000.00
2 Tukang kayu L.03 OH 2.400 90,000.00
3 Kepala tukang L.03 OH 0.240 0.00
4 Mandor L.04 OH 0.040 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.0256 3,800,000.00
2 Paku 1 cm – 2,5cm kg 0.0300 18,000.00
3 Lem kayu kg 0.5000 23,000.00
4 Plywood 4 mm 90 x 220) cm Lembar 1.0000 62,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.670 65,000.00
2 Tukang kayu L.03 OH 2.000 90,000.00
3 Kepala tukang L.03 OH 0.200 0.00
4 Mandor L.04 OH 0.335 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.060 3,800,000.00
2 Paku 1 – 2,5 cm kg 0.150 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.800 65,000.00
2 Tukang kayu L.03 OH 2.400 90,000.00
3 Kepala tukang L.03 OH 0.240 0.00
4 Mandor L.04 OH 0.040 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.025 3,800,000.00
2 Paku 1 – 2,5 cm kg 0.030 18,000.00
3 Lem kayu kg 0.300 23,000.00
4 Teakwood 4 mm 90 x 220 cm Lembar 1.000 62,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.850 65,000.00
2 Tukang kayu L.03 OH 2.550 90,000.00
3 Kepala tukang L.03 OH 0.255 0.00
4 Mandor L.04 OH 0.043 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.025 3,800,000.00
2 Paku 1 – 2,5 cm kg 0.030 18,000.00
3 Lem kayu kg 0.800 23,000.00
4 Teakwood 4 mm 90 x 220 cm Lembar 1.000 62,000.00
5 Formika Lembar 0.500 147,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 4.000 65,000.00
2 Tukang kayu L.03 OH 12.000 90,000.00
3 Kepala tukang L.03 OH 1.200 0.00
4 Mandor L.04 OH 0.200 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu m3 1.100 3,675,000.00
2 Besi strip tebal 5mm kg 15.000 11,200.00
3 Paku 12 cm kg 5.600 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 6.700 65,000.00
2 Tukang kayu L.03 OH 20.100 90,000.00
3 Kepala tukang L.03 OH 2.010 0.00
4 Mandor L.04 OH 0.335 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu m3 1.200 3,675,000.00
2 Besi strip tebal 5mm kg 15.000 11,200.00
3 Paku 12 cm kg 5.600 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 6.700 65,000.00
2 Tukang kayu L.03 OH 20.100 90,000.00
3 Kepala tukang L.03 OH 2.010 0.00
4 Mandor L.04 OH 0.335 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu m3 1.100 3,675,000.00
2 Besi strip tebal 5 mm kg 15.000 3,150.00
3 Paku 12 cm kg 3.000 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.1000 65,000.00
2 Tukang kayu L.03 OH 0.1000 90,000.00
3 Kepala tukang L.03 OH 0.0100 0.00
4 Mandor L.04 OH 0.0050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kaso-kaso 5 x 7cm m3 0.0140 3,675,000.00
2 Reng 2 x 3 cm m3 0.0360 3,675,000.00
3 Paku 5 dan 10 cm kg 0.2500 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.1000 65,000.00
2 Tukang kayu L.03 OH 0.1000 90,000.00
3 Kepala tukang L.03 OH 0.0100 0.00
4 Mandor L.04 OH 0.0050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kaso-kaso 5 x 7cm m3 0.0140 3,675,000.00
2 Reng (3 x 4) cm m3 0.0570 3,675,000.00
3 Paku 5 dan 10 cm kg 0.2500 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.120 65,000.00
2 Tukang kayu L.03 OH 0.120 90,000.00
3 Kepala tukang L.03 OH 0.012 0.00
4 Mandor L.04 OH 0.006 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas II m3 0.014 3,675,000.00
2 Paku 5 - 10 cm m3 0.057 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang kayu L.03 OH 0.300 90,000.00
3 Kepala tukang L.03 OH 0.030 0.00
4 Mandor L.04 OH 0.075 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kaso-kaso 5 x 7cm m3 0.015 3,675,000.00
2 Paku 7 cm – 10 cm kg 0.200 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang kayu L.03 OH 0.300 90,000.00
3 Kepala tukang L.03 OH 0.030 0.00
4 Mandor L.04 OH 0.010 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kaso-kaso 5 x 7 cm m3 0.0163 3,675,000.00
2 Paku 7 – 10 cm kg 0.2500 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (2 x 20) cm, kayu kelas I atau kelas II
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 65,000.00
2 Tukang kayu L.03 OH 0.200 90,000.00
3 Kepala tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.0108 3,800,000.00
2 Paku 5 dan 7 cm kg 0.1000 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 65,000.00
2 Tukang kayu L.03 OH 0.200 90,000.00
3 Kepala tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.011 3,800,000.00
2 Paku 5 dan 7 cm kg 0.050 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang kayu L.03 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu m3 0.028 3,675,000.00
2 Paku 5 dan 7 cm kg 0.150 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 65,000.00
2 Tukang kayu L.03 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu, 6 x 12 m3 0.028 3,675,000.00
2 Paku 5 dan 10 kg 0.150 15,000.00
3 Teakwood 4 mm, 120 x 240 Lembar 0.860 62,000.00
4 Lem kayu kg 0.560 23,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 65,000.00
2 Tukang kayu L.03 OH 0.600 90,000.00
3 Kepala tukang L.03 OH 0.060 0.00
4 Mandor L.04 OH 0.010 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Balok kayu,6 x 12 3m 0.028 3,675,000.00
2 Paku 5 dan 10 kg 0.150 15,000.00
3 Plywood 4 mm, 120 x 240 Lembar 0.860 62,000.00
4 Lem kayu kg 0.560 23,000.00
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 65,000.00
2 Tukang kayu L.03 OH 1.800 90,000.00
3 Kepala tukang L.03 OH 0.180 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Papan kayu m3 0.007 3,800,000.00
2 Paku 5 dan 10 kg 0.100 18,000.00
3 Paku skrup 10 cm kg 0.150 25,100.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.060 65,000.00
2 Tukang kayu L.02 OH 0.600 90,000.00
3 Kepala tukang L.03 OH 0.060 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kunci tanam antik Bh 1.000 84,700.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.010 65,000.00
2 Tukang kayu L.02 OH 0.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kunci tanam biasa Bh 1.000 93,700.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.005 65,000.00
2 Tukang kayu L.02 OH 0.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kunci tanam KM Bh 1.000 77,600.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.005 65,000.00
2 Tukang kayu L.02 OH 0.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kunci silinder Bh 1.000 71,500.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0150 65,000.00
2 Tukang kayu L.02 OH 0.1500 90,000.00
3 Kepala tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Engsel pintu Bh 1.000 10,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 65,000.00
2 Tukang kayu L.02 OH 0.100 90,000.00
3 Kepala tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.001 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Engsel kupu-kupu Bh 1.000 6,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.10000 65,000.00
2 Tukang kayu L.02 OH 0.20000 90,000.00
3 Kepala tukang L.03 OH 0.02000 0.00
4 Mandor L.04 OH 0.00050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Engsel angin Bh 1.000 10,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0150 65,000.00
2 Tukang kayu L.02 OH 0.1500 90,000.00
3 Kepala tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0080 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kait angin Bh 1.0000 7,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 65,000.00
2 Tukang kayu L.02 OH 0.200 90,000.00
3 Kepala tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.001 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kunci slot Bh 1.000 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0150 65,000.00
2 Tukang kayu L.02 OH 0.1500 90,000.00
3 Kepala tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kaca tebal 3mm m2 1.100 150,000.00
2 SEalant Kg 0.050 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0150 65,000.00
2 Tukang kayu L.02 OH 0.1500 90,000.00
3 Kepala tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kaca tebal 5 mm m2 1.100 176,000.00
2 SEalant Kg 0.050 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 65,000.00
2 Tukang cat L.02 OH 0.009 90,000.00
3 Kepala tukang L.03 OH 0.006 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Cat menie Kg 0.200 27,000.00
2 Plamuur Kg 0.150 42,500.00
3 Cat dasar Kg 0.170 21,800.00
4 Cat penutup Kg 0.260 21,800.00
5 Kuas Bh 0.010 4,500.00
6 Pengencer Kg 0.030 26,100.00
7 Ampelas Lbr 0.200 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 65,000.00
2 Tukang cat L.02 OH 0.105 90,000.00
3 Kepala tukang L.03 OH 0.004 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Cat menie Kg 0.200 27,000.00
2 Plamuur Kg 0.150 42,500.00
3 Cat dasar Kg 0.170 45,800.00
4 Cat penutup Kg 0.350 45,800.00
5 Kuas Bh 0.010 4,500.00
6 Pengencer Kg 0.030 26,100.00
7 Ampelas Lbr 0.200 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.040 65,000.00
2 Tukang cat L.02 OH 0.063 90,000.00
3 Kepala tukang L.03 OH 0.063 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Teak oil L 0.360 17,900.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.040 65,000.00
2 Tukang cat L.02 OH 0.060 90,000.00
3 Kepala tukang L.03 OH 0.016 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Politur L 0.150 42,000.00
2 Politur jadi L 0.372 42,000.00
3 Ampelas Lbr 2.000 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 65,000.00
2 Mandor L.04 OH 0.006 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Residu atau ter L 0.350 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0200 65,000.00
2 Tukang cat L.02 OH 0.0630 90,000.00
3 Kepala tukang L.03 OH 0.0063 0.00
4 Mandor L.04 OH 0.0030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Plamuur Kg 0.100 42,500.00
2 Cat dasar Kg 0.100 21,800.00
3 Cat penutup Kg 0.260 21,800.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.0280 65,000.00
2 Tukang cat L.02 OH 0.0420 90,000.00
3 Kepala tukang L.03 OH 0.0042 0.00
4 Mandor L.04 OH 0.0030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Cat dasar Kg 0.120 21,800.00
2 Cat penutup Kg 0.180 21,800.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 65,000.00
2 Tukang cat L.02 OH 0.200 90,000.00
3 Kepala tukang L.03 OH 0.020 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Menie besi Kg 0.100 45,000.00
2 Kwas Bh 0.010 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 65,000.00
2 Tukang cat L.02 OH 0.225 90,000.00
3 Kepala tukang L.02 OH 0.023 0.00
4 Mandor L.04 OH 0.008 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Menie besi Kg 0.100 45,000.00
2 Pengencer L 0.010 34,000.00
3 Kwas Bh 0.010 4,500.00
4 Perancah kayu m3 0.002 3,675,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 65,000.00
2 Tukang cat L.02 OH 0.250 90,000.00
3 Kepala tukang L.03 OH 0.025 0.00
4 Mandor L.04 OH 0.001 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Menie A Kg 0.100 45,000.00
2 Menie B Kg 0.100 45,000.00
3 Cat Kg 0.080 52,350.00
4 Kwas Bh 0.010 4,500.00
5 Pengencer L 0.010 34,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.060 65,000.00
2 Tukang cat L.02 OH 0.060 90,000.00
3 Kepala tukang L.03 OH 0.012 0.00
4 Mandor L.04 OH 0.003 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Cat Kg 0.300 52,350.00
2 Kwas Bh 0.010 4,500.00
3 Pengencer L 0.010 34,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 65,000.00
2 Tukang cat L.02 OH 0.700 90,000.00
3 Kepala tukang L.03 OH 0.070 0.00
4 Mandor L.04 OH 0.020 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Cat dasar Kg 0.300 52,350.00
2 Pengencer L 0.010 34,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 3.300 65,000.00
2 Tukang batu L.02 OH 1.100 90,000.00
3 Kepala tukang L.03 OH 0.010 0.00
4 Mandor L.04 OH 0.160 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Closet duduk Unit 1.000 450,000.00
2 Perlengkapan Ls 0.06 50,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang batu L.02 OH 1.500 90,000.00
3 Kepala tukang L.03 OH 0.150 0.00
4 Mandor L.04 OH 0.160 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Closet jongkok Unit 1.000 110,000.00
2 Semen Portland Kg 6.000 1,400.00
3 Pasir pasang M3 0.010 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang batu L.02 OH 1.500 90,000.00
3 Kepala tukang L.03 OH 0.150 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Closet jongkok Unit 1.000 71,500.00
2 Semen Portland Kg 6.000 1,400.00
3 Pasir pasang M3 0.010 115,000.00
4 Bata merah Bh 7.000 650.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 4. Pemasangan 1 buah urinoir
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 65,000.00
2 Tukang batu L.02 OH 1.000 90,000.00
3 Kepala tukang L.03 OH 0.100 0.00
4 Mandor L.04 OH 0.050 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Urinoir Unit 1.000 3,911,800.00
2 Semen Portland Kg 6.000 1,400.00
3 Pasir pasang M3 0.010 115,000.00
4 Perlengkapan % 30.000 2,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.200 65,000.00
2 Tukang batu L.02 OH 1.450 90,000.00
3 Kepala tukang L.03 OH 0.150 0.00
4 Mandor L.04 OH 0.060 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Wastafel Unit 1.200 325,000.00
2 Semen Portland Kg 6.000 1,400.00
3 Pasir pasang M3 0.010 115,000.00
4 Perlengkapan % 12.000 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
No
(Rp)
A TENAGA
1 Pekerja L.01 OH 3.000 65,000.00
2 Tukang batu L.02 OH 4.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.900 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bak fibreglass Unit 1.000 275,000.00
2 Perlengkapan Ls 0.12 50,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 6.000 65,000.00
2 Tukang batu L.02 OH 3.000 90,000.00
3 Kepala tukang L.03 OH 0.300 0.00
4 Mandor L.04 OH 0.030 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bata merah M3 150.000 650.00
2 Semen portlan Kg 120.000 1,400.00
3 Pasir pasang M3 0.300 115,000.00
4 Porselen 11x11 bh 360.000 3,177.00
5 Semen warna Kg 6.000 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 3.000 65,000.00
2 Tukang batu L.02 OH 4.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.900 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bak fibreglass Unit 1.000 275,000.00
2 Perlengkapan Ls 0.120 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 65,000.00
2 Tukang batu L.02 OH 0.450 90,000.00
3 Kepala tukang L.03 OH 0.045 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bak air fibreglass Unit 1.000 275,000.00
2 Perlengkapan % 12.000 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.030 65,000.00
2 Tukang batu L.02 OH 0.300 90,000.00
3 Kepala tukang L.03 OH 0.030 0.00
4 Mandor L.04 OH 0.015 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bak cuci piring Unit 1.000 160,000.00
2 Waterdrain Bh 1.000 37,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 65,000.00
2 Tukang batu L.02 OH 0.500 90,000.00
3 Kepala tukang L.03 OH 0.050 0.00
4 Mandor L.04 OH 0.025 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Bak cuci piring Unit 1.000 160,000.00
2 Waterdrain Bh 1.000 37,500.00
3 Semen portland Kg 20.000 1,400.00
4 Pasir pasang M3 0.050 115,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 65,000.00
2 Tukang batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.027 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa galvanis ½” M 1.200 80,000.00
2 Perlengkapan Ls 0.420 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.010 65,000.00
2 Tukang batu L.02 OH 0.400 90,000.00
3 Kepala tukang L.03 OH 0.040 0.00
4 Mandor L.04 OH 0.005 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Kran air M 1.000 17,500.00
2 Sealtape Buah 0.025 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 65,000.00
2 Tukang batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.027 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa galvanis 3/4” M 1.200 95,000.00
2 Perlengkapan % 35.000 1,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 65,000.00
2 Tukang batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.027 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa galvanis 1” M 1.200 110,000.00
2 Perlengkapan % 35.000 1,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 65,000.00
2 Tukang batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.027 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa PVC ND 20 mm M 1.200 12,500.00
2 Perlengkapan Ls 0.420 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 65,000.00
2 Tukang batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.027 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa PVC ND 50 mm M 1.200 20,000.00
2 Perlengkapan % 35.000 1,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 65,000.00
2 Tukang batu L.02 OH 0.090 90,000.00
3 Kepala tukang L.03 OH 0.009 0.00
4 Mandor L.04 OH 0.027 0.00
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa PVC ND 100 M 1.200 35,000.00
2 Perlengkapan % 35.000 1,500.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Kayu L.02 OH 1.000 760,000.00
3 Kepala tukang L.03 OH 0.009
4 Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
1 Teakblock Lmbr 2.537 300,000.00
2 politur L 0.000 42,000.00
3 Politur Jadi L 0.000 42,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Kayu L.02 OH 1.000 510,000.00
3 Kepala tukang L.03 OH 0.009
4 Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
1 Teakblock Lmbr 2.458 300,000.00
2 politur L 0.000 42,000.00
3 Politur Jadi L 0.000 42,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
AN
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
30,375.00
7,000.00
600.00
2,583.00
264,600.00
840.00
4,880.00
310,878.00
354,878.00
354,878.00
Jumlah
Harga
(Rp)
13,000.00
36,000.00
-
-
49,000.00
30,375.00
3,500.00
125,400.00
600.00
25,830.00
264,600.00
840.00
20,250.00
471,395.00
520,395.00
520,395.00
Jumlah
Harga
(Rp)
13,000.00
27,000.00
-
-
40,000.00
24,300.00
2,800.00
1,625,000.00
600.00
2,583.00
840.00
1,656,123.00
1,696,123.00
1,696,123.00
Jumlah
Harga
(Rp)
6,500.00
9,000.00
-
-
15,500.00
441,000.00
280.00
26,600.00
467,880.00
483,380.00
483,380.00
Jumlah
Harga
(Rp)
130,000.00
180,000.00
90,000.00
-
-
400,000.00
30,375.00
661,500.00
1,120.00
123,200.00
46,900.00
17,250.00
12,000.00
43,050.00
19,500.00
26,125.00
28,200.00
14,080.00
14,055.00
3,720.00
1,041,075.00
1,441,075.00
1,441,075.00
Jumlah
Harga
(Rp)
65,000.00
135,000.00
-
-
200,000.00
72,900.00
1,014,300.00
9,800.00
156,750.00
1,253,750.00
1,453,750.00
1,453,750.00
Jumlah
Harga
(Rp)
65,000.00
180,000.00
-
-
245,000.00
41,310.00
771,750.00
4,200.00
14,700.00
3,600.00
14,350.00
156,750.00
26,125.00
1,032,785.00
1,277,785.00
1,277,785.00
Jumlah
Harga
(Rp)
65,000.00
180,000.00
-
-
245,000.00
30,375.00
683,550.00
4,200.00
25,200.00
3,600.00
14,350.00
156,750.00
83,700.00
1,001,725.00
1,246,725.00
1,246,725.00
Jumlah
Harga
(Rp)
6,500.00
-
6,500.00
6,500.00
6,500.00
Jumlah
Harga
(Rp)
65,000.00
180,000.00
-
-
245,000.00
16,000.00
2,362.20
18,362.20
263,362.20
263,362.20
Jumlah
Harga
(Rp)
27,000.00
-
27,000.00
198,000.00
-
1,200.00
199,200.00
226,200.00
226,200.00
Jumlah
Harga
(Rp)
65,000.00
-
65,000.00
15,000.00
23,850.00
1,150.00
40,000.00
105,000.00
105,000.00
Jumlah
Harga
(Rp)
866,710.00
-
866,710.00
866,710.00
866,710.00
Jumlah
Harga
(Rp)
433,355.00
-
433,355.00
433,355.00
433,355.00
Jumlah
Harga
(Rp)
2,730.00
360.00
-
-
3,090.00
2,868.00
2,868.00
5,958.00
5,958.00
A SATUAN
Jumlah
Harga Kebutuhan
Volume
Volume
(Rp)
48,750.00
-
48,750.00
Jumlah
Harga
(Rp)
58,500.00
-
58,500.00
58,500.00
58,500.00
Jumlah
Harga
(Rp)
68,250.00
-
68,250.00
68,250.00
68,250.00
Jumlah
Harga
(Rp)
65,000.00
-
65,000.00
65,000.00
65,000.00
Jumlah
Harga
(Rp)
97,500.00
-
97,500.00
97,500.00
97,500.00
Jumlah
Harga
(Rp)
78,000.00
-
78,000.00
78,000.00
78,000.00
Jumlah
Harga
(Rp)
3,250.00
-
3,250.00
3,250.00
3,250.00
Jumlah
Harga
(Rp)
21,450.00
-
21,450.00
21,450.00
21,450.00
Jumlah
Harga Kebutuhan
Volume
Volume
(Rp)
32,500.00
-
32,500.00
Jumlah
Harga
(Rp)
32,500.00
-
32,500.00
32,500.00
32,500.00
Jumlah
Harga Kebutuhan
Volume
Volume
(Rp)
157,500.00
-
157,500.00
Jumlah
Harga Kebutuhan
Volume
Volume
(Rp)
86,700.00
9,970.50
96,670.50
Jumlah
Harga
(Rp)
97,500.00
67,500.00
-
-
165,000.00
120,000.00
282,800.00
55,775.00
458,575.00
623,575.00
623,575.00
Jumlah
Harga
(Rp)
97,500.00
67,500.00
-
-
165,000.00
120,000.00
228,200.00
59,800.00
408,000.00
573,000.00
573,000.00
Jumlah
Harga Kebutuhan
Volume
Volume
(Rp)
97,500.00 0.75 1.12 72,902.70
67,500.00 0.75 0.56 50,471.10
-
-
165,000.00
537,960.00
-
537,960.00
Jumlah
Harga
(Rp)
97,500.00
67,500.00
-
-
165,000.00
120,000.00
163,800.00
64,515.00
348,315.00
513,315.00
513,315.00
Jumlah
Harga
(Rp)
97,500.00
67,500.00
-
-
165,000.00
120,000.00
127,400.00
67,160.00
314,560.00
479,560.00
479,560.00
Jumlah
Harga
(Rp)
97,500.00
67,500.00
-
-
165,000.00
120,000.00
58,140.00
238.00
39,100.00
217,478.00
382,478.00
382,478.00
Jumlah
Harga
(Rp)
97,500.00
67,500.00
-
-
165,000.00
120,000.00
85,400.00
50,274.00
56,580.00
312,254.00
477,254.00
477,254.00
Jumlah
Harga
(Rp)
97,500.00
67,500.00
-
-
165,000.00
120,000.00
57,400.00
44,802.00
60,145.00
282,347.00
447,347.00
447,347.00
Jumlah
Harga
(Rp)
50,700.00
35,100.00
-
-
85,800.00
120,000.00
49,680.00
169,680.00
255,480.00
255,480.00
Jumlah
Harga
(Rp)
221,000.00
76,500.00
-
-
297,500.00
48,000.00
271,600.00
37,440.00
134,316.00
1,512,000.00
36,000.00
2,039,356.00
2,336,856.00
2,336,856.00
Jumlah
Harga
(Rp)
156,000.00
72,000.00
-
-
228,000.00
45,000.00
271,600.00
37,440.00
134,316.00
488,356.00
716,356.00
716,356.00
Jumlah
Kebutuhan
Volume
Volume
Kebutuhan
Harga Volume
Volume
(Rp)
780,790.71
89,790.93
870,581.65
Jumlah
Harga
(Rp)
107,250.00
24,750.00
-
-
132,000.00
386,400.00
99,360.00
290,444.00
16,125.00
792,329.00
924,329.00
924,329.00
Jumlah
Harga
(Rp)
107,250.00
24,750.00
-
-
132,000.00
418,600.00
118,800.00
291,879.00
16,125.00
845,404.00
977,404.00
977,404.00
Jumlah
Harga
(Rp)
78,000.00
18,000.00
-
-
96,000.00
322,000.00
107,160.00
294,749.00
15,000.00
738,909.00
834,909.00
834,909.00
Jumlah
Harga
(Rp)
107,250.00
24,750.00
-
-
132,000.00
519,400.00
59,057.14
222,584.44
16,125.00
817,166.59
949,166.59
949,166.59
Jumlah
Harga
(Rp)
107,250.00
24,750.00
-
-
132,000.00
492,800.00
87,720.00
295,897.00
16,125.00
892,542.00
1,024,542.00
1,024,542.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
Jumlah
Harga
(Rp)
107,250.00
24,750.00
-
-
132,000.00
537,600.00
83,040.00
298,193.00
16,125.00
934,958.00
1,066,958.00
1,066,958.00
Jumlah
Harga
(Rp)
107,250.00
24,750.00
-
-
132,000.00
568,400.00
82,080.00
294,462.00
16,125.00
961,067.00
1,093,067.00
1,093,067.00
Jumlah
Harga
(Rp)
107,250.00
24,750.00
-
-
132,000.00
578,200.00
81,720.00
293,027.00
16,125.00
969,072.00
1,101,072.00
1,101,072.00
Jumlah
Harga
(Rp)
136,500.00
31,500.00
-
-
168,000.00
614,600.00
80,400.00
288,722.00
16,125.00
999,847.00
1,167,847.00
1,167,847.00
Jumlah
Harga
(Rp)
136,500.00
31,500.00
-
-
168,000.00
627,200.00
80,040.00
287,000.00
16,125.00
1,010,365.00
1,178,365.00
1,178,365.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
139,850.00
16,082.75
30,067.75
Jumlah
Harga
(Rp)
3,250.00
4,500.00
-
-
7,750.00
126,000.00
2,000.00
128,000.00
135,750.00
135,750.00
Jumlah
Harga
(Rp)
33,800.00
23,400.00
-
-
57,200.00
120,000.00
4,200.00
2,500.00
126,700.00
183,900.00
-
183,900.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
196,400.00
22,684.20
219,084.20
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
-
5,600.00 0.87 0.09 1,212.12
- - -
55,125.00 0.87 0.00 11,931.81
40,250.00 0.87 0.08 8,712.11
48,600.00 0.87 0.43 10,519.47
149,575.00 ###
222,175.00
25,550.13
247,725.13
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
264,350.00
30,400.25
294,750.25
Jumlah
Harga
(Rp)
42,900.00
29,700.00
-
-
72,600.00
120,000.00
5,600.00
5,000.00
55,125.00
40,250.00
145,800.00
371,775.00
444,375.00
-
444,375.00
Jumlah
Harga
(Rp)
42,900.00
29,700.00
-
-
72,600.00
90,000.00
5,600.00
3,750.00
55,125.00
40,250.00
48,600.00
243,325.00
315,925.00
-
315,925.00
Jumlah
Harga
(Rp)
9,750.00
4,500.00
-
-
14,250.00
79,200.00
8,400.00
12,150.00
99,750.00
114,000.00
114,000.00
Jumlah
Harga
(Rp)
344,500.00
24,750.00
117,000.00
94,500.00
-
-
580,750.00
600,000.00
21,000.00
10,000.00
1,890,000.00
45,000.00
470,400.00
64,800.00
232,470.00
3,333,670.00
3,914,420.00
3,914,420.00
Jumlah
Harga
(Rp)
367,250.00
24,750.00
140,400.00
126,000.00
-
-
658,400.00
810,000.00
28,000.00
15,000.00
2,520,000.00
60,000.00
470,400.00
64,800.00
232,470.00
4,200,670.00
4,859,070.00
4,859,070.00
Jumlah
Harga
(Rp)
458,250.00
24,750.00
148,500.00
189,000.00
-
-
820,500.00
1,200,000.00
56,000.00
50,000.00
3,780,000.00
90,000.00
470,400.00
64,800.00
232,470.00
551,250.00
402,500.00
486,000.00
7,383,420.00
8,203,920.00
8,203,920.00
Jumlah
Harga
(Rp)
412,750.00
24,750.00
148,500.00
126,000.00
-
-
712,000.00
960,000.00
44,800.00
40,000.00
2,520,000.00
60,000.00
470,400.00
64,800.00
232,470.00
514,500.00
322,000.00
388,800.00
5,617,770.00
6,329,770.00
6,329,770.00
Jumlah
Harga
(Rp)
344,500.00
24,750.00
117,000.00
94,500.00
-
-
580,750.00
960,000.00
44,800.00
40,000.00
1,890,000.00
45,000.00
470,400.00
64,800.00
232,470.00
441,000.00
322,000.00
777,600.00
5,288,070.00
5,868,820.00
5,868,820.00
Jumlah
Harga
(Rp)
344,500.00
24,750.00
117,000.00
94,500.00
-
-
580,750.00
720,000.00
44,800.00
40,000.00
1,890,000.00
45,000.00
470,400.00
64,800.00
232,470.00
588,000.00
322,000.00
583,200.00
5,000,670.00
5,581,420.00
5,581,420.00
Jumlah
Harga
(Rp)
367,250.00
24,750.00
140,400.00
126,000.00
-
-
658,400.00
750,000.00
42,000.00
30,000.00
2,520,000.00
60,000.00
470,400.00
64,800.00
232,470.00
385,875.00
287,500.00
340,200.00
5,183,245.00
5,841,645.00
5,841,645.00
Jumlah
Harga
(Rp)
11,700.00
1,800.00
1,800.00
1,800.00
-
-
17,100.00
6,000.00
140.00
-
36,000.00
9,000.00
5,600.00
720.00
2,583.00
60,043.00
77,143.00
77,143.00
Jumlah
Harga
(Rp)
19,305.00
2,970.00
2,970.00
2,970.00
-
-
28,215.00
9,000.00
280.00
-
43,200.00
1,000.00
7,700.00
1,080.00
4,305.00
66,565.00
94,780.00
94,780.00
Jumlah
Harga
(Rp)
979,723.33
4,059,146.25
514,920.00
5,553,789.58
5,553,789.58
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
979,723.33
5,146,311.68
638,959.07
6,764,994.08
777,974.32
7,542,968.40
Jumlah
Harga
(Rp)
979,723.33
3,919,032.17
2,190,842.00
7,089,597.50
7,089,597.50
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
979,723.33
5,270,876.58
953,246.28
7,203,846.19
7,203,846.19
Jumlah
Harga
(Rp)
979,723.33
5,355,066.28
3,302,175.92
9,636,965.52
9,636,965.52
Jumlah
Harga
(Rp)
979,723.33
4,746,696.47
5,780,244.66
11,506,664.46
11,506,664.46
Jumlah
Harga
(Rp)
979,723.33
4,338,535.78
4,954,502.50
10,272,761.62
10,272,761.62
Jumlah
Harga
(Rp)
979,723.33
6,140,877.90
3,963,602.00
11,084,203.23
11,084,203.23
Jumlah
Harga
(Rp)
979,723.33
5,363,864.10
3,302,993.41
9,646,580.84
9,646,580.84
Jumlah
Harga
(Rp)
979,723.33
2,894,931.92
2,831,144.29
6,705,799.54
6,705,799.54
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
979,723.33
6,447,386.41
613,817.40
8,040,927.14
8,040,927.14
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
979,723.33
5,391,748.93
1,499,689.27
7,871,161.53
7,871,161.53
Jumlah
Harga
(Rp)
979,723.33
5,237,339.01
4,534,614.70
10,751,677.04
10,751,677.04
Jumlah
Harga
(Rp)
979,723.33
5,503,201.06
5,403,744.76
11,886,669.15
11,886,669.15
Jumlah
Harga
(Rp)
979,723.33
3,961,329.94
3,789,646.07
8,730,699.35
8,730,699.35
Jumlah
Harga
(Rp)
979,723.33
5,065,863.49
3,930,003.33
9,975,590.16
9,975,590.16
Jumlah
Harga
(Rp)
979,723.33
2,604,378.30
3,949,062.50
7,533,164.13
7,533,164.13
Jumlah
Harga
(Rp)
979,723.33
3,710,360.35
4,443,750.00
9,133,833.68
9,133,833.68
Jumlah
Harga
(Rp)
3,445.00
1,620.00
-
5,065.00
5,065.00
5,065.00
Jumlah
Harga
(Rp)
5,785.00
2,700.00
-
8,485.00
8,485.00
8,485.00
Jumlah
Harga
(Rp)
4,615.00
2,160.00
-
6,775.00
6,775.00
6,775.00
Jumlah
Harga
(Rp)
4,160.00
21,960.00
11,520.00
-
-
37,640.00
37,640.00
37,640.00
Jumlah
Harga
(Rp)
4,485.00
21,780.00
12,420.00
-
-
38,685.00
38,685.00
38,685.00
Jumlah
Harga
(Rp)
3,965.00
19,170.00
10,980.00
-
-
34,115.00
34,115.00
34,115.00
Jumlah
Harga
(Rp)
33,030.00
-
-
33,030.00
33,030.00
33,030.00
Jumlah
Harga
(Rp)
9,555.00
13,230.00
-
-
22,785.00
44,100.00
12,000.00
3,696.00
59,796.00
82,581.00
82,581.00
Jumlah
Harga
(Rp)
14,300.00
19,800.00
-
-
34,100.00
34,100.00
34,100.00
Jumlah
Harga
(Rp)
3,900.00
5,400.00
-
-
9,300.00
15,640.00
15,640.00
24,940.00
24,940.00
Jumlah
Harga
(Rp)
3,900.00
5,400.00
-
-
9,300.00
15,640.00
15,640.00
24,940.00
24,940.00
Jumlah
Harga
(Rp)
2,795.00
3,870.00
-
-
6,665.00
246,730.00
150,000.00
2,400.00
399,130.00
405,795.00
405,795.00
Jumlah
Harga
(Rp)
5,525.00
7,650.00
-
-
13,175.00
986,920.00
9,000.00
10,800.00
1,006,720.00
1,019,895.00
1,019,895.00
Jumlah
Harga Uraian Kode Satu Koefisien
No an
(Rp)
A TENAGA
13,000.00 1 Pekerja L.01 OH 0.200
18,000.00 2 Tukang las L.03 OH 0.200
- 3 Kepala L.03 OH 0.020
tukang
- 4 Mandor L.04 OH 0.001
31,000.00 JUMLAH TENAGA KERJA
B BAHAN
155,100.00 1 Besi Kotak M2 1.100
22,000.00 2 Paku Skrup B 10.000
ua
78,400.00 3 Kawa las h
D 0.063
os
255,500.00 4 Besi Siku M 7.000
JUMLAH HARGA BAHAN
C PERALATAN
Mesin las Jam 0.025
JUMLAH HARGA ALAT
286,500.00
D Jumlah (A+B+C)
286,500.00 E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah
Harga
(Rp)
13,000.00
18,000.00
-
-
31,000.00
47,145.00
270.00
72,200.00
119,615.00
150,615.00
150,615.00
Jumlah
Harga
(Rp)
9,750.00
27,000.00
-
-
36,750.00
47,145.00
180.00
5,600.00
52,925.00
89,675.00
89,675.00
Jumlah
Harga
(Rp)
16,250.00
22,500.00
-
-
38,750.00
437,500.00
52,500.00
490,000.00
528,750.00
528,750.00
Jumlah
Harga
(Rp)
22,750.00
31,500.00
-
-
54,250.00
500,000.00
60,000.00
560,000.00
614,250.00
614,250.00
Jumlah
Harga
(Rp)
39,000.00
18,000.00
-
-
57,000.00
91,000.00
60,900.00
9,200.00
161,100.00
218,100.00
218,100.00
Jumlah
Harga
(Rp)
39,000.00
18,000.00
-
-
57,000.00
91,000.00
46,130.00
10,465.00
147,595.00
204,595.00
204,595.00
Jumlah
Harga
(Rp)
39,000.00
18,000.00
-
-
57,000.00
91,000.00
37,170.00
10,695.00
138,865.00
195,865.00
195,865.00
Jumlah
Harga
(Rp)
39,000.00
18,000.00
-
-
57,000.00
91,000.00
31,080.00
11,730.00
133,810.00
190,810.00
190,810.00
Jumlah
Harga
(Rp)
39,000.00
18,000.00
-
-
57,000.00
91,000.00
25,900.00
14,030.00
130,930.00
187,930.00
187,930.00
Jumlah
Harga
(Rp)
39,000.00
18,000.00
-
-
57,000.00
91,000.00
14,112.00
9,405.00
10,637.50
125,154.50
182,154.50
182,154.50
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
45,500.00
26,530.00
4,370.00
76,400.00
104,900.00
104,900.00
Jumlah
Harga
(Rp)
98,718.00
98,718.00
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
45,500.00
16,100.00
4,945.00
66,545.00
95,045.00
95,045.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
92,895.00
10,682.93
103,577.93
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
45,500.00
11,648.00
5,635.00
62,783.00
91,283.00
91,283.00
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
45,500.00
9,100.00
5,750.00
60,350.00
88,850.00
88,850.00
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
45,500.00
6,300.00
5,130.00
5,750.00
62,680.00
91,180.00
91,180.00
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
45,500.00
25.20
6,156.00
2,070.00
53,751.20
82,251.20
82,251.20
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
45,500.00
19.60
4,788.00
3,220.00
53,527.60
82,027.60
82,027.60
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
19,500.00 - - -
9,000.00 - - -
-
-
28,500.00
300,000.00 - - -
15,400.00 - - -
4,025.00 - - -
319,425.00
-
347,925.00
347,925.00
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
300,000.00
15,400.00
4,025.00
319,425.00
347,925.00
347,925.00
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
700,000.00
19,600.00
3,680.00
723,280.00
756,280.00
756,280.00
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
21,705.60
1,840.00
23,545.60
56,545.60
56,545.60
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
14,313.60
2,300.00
16,613.60
49,613.60
49,613.60
Jumlah
Harga
(Rp)
###
46,531.40
46,531.40
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
8,736.00
2,760.00
11,496.00
44,496.00
44,496.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
43,247.60
4,973.47
48,221.07
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
6,182.40
3,105.00
9,287.40
42,287.40
42,287.40
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
5,510.40
3,220.00
8,730.40
41,730.40
41,730.40
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
4,838.40
3,335.00
8,173.40
41,173.40
41,173.40
Jumlah
Harga
(Rp)
23,400.00
10,800.00
-
-
34,200.00
8,064.00
1,026.00
1,495.00
10,585.00
44,785.00
44,785.00
Jumlah
Harga
(Rp)
23,400.00
10,800.00
-
-
34,200.00
4,200.00
1,710.00
2,300.00
8,210.00
42,410.00
42,410.00
Jumlah
Harga
(Rp)
23,400.00
10,800.00
-
-
34,200.00
12.60
3,078.00
1,035.00
4,125.60
38,325.60
38,325.60
Jumlah
Harga
(Rp)
23,400.00
10,800.00
-
-
34,200.00
9.80
2,394.00
1,725.00
4,128.80
38,328.80
38,328.80
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
19,084.80
3,105.00
22,189.80
66,189.80
66,189.80
Jumlah
Harga
(Rp)
16,900.00
18,000.00
-
-
34,900.00
14,515.20
14,515.20
49,415.20
49,415.20
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
11,648.00
3,680.00
15,328.00
59,328.00
59,328.00
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
9,676.80
4,025.00
13,701.80
57,701.80
57,701.80
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
8,243.20
4,140.00
12,383.20
56,383.20
56,383.20
Jumlah
Harga
(Rp)
28,600.00
19,800.00
-
-
48,400.00
12.60
3,078.00
2,070.00
5,160.60
53,560.60
53,560.60
Jumlah
Harga
(Rp)
9,750.00
6,750.00
-
-
16,500.00
7,257.60
2,990.00
10,247.60
26,747.60
26,747.60
Jumlah
Harga
(Rp)
5,200.00
36,000.00
-
-
41,200.00
700.00
1,495.00
2,195.00
43,395.00
43,395.00
Jumlah
Harga
(Rp)
19,500.00
9,000.00
-
-
28,500.00
6,048.00
690.00
6,738.00
35,238.00
35,238.00
Jumlah
Harga
(Rp)
9,750.00
6,750.00
-
-
16,500.00
4,351.20
4,351.20
20,851.20
20,851.20
Jumlah
Harga
(Rp)
4,550.00
3,150.00
-
-
7,700.00
2,240.00
2,240.00
9,940.00
9,940.00
Jumlah
Harga
(Rp)
19,500.00
13,500.00
-
-
33,000.00
8,876.00
1,380.00
10,256.00
43,256.00
43,256.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
26,550.00
3,053.25
29,603.25
Jumlah
Harga
(Rp)
16,250.00
11,250.00
-
-
27,500.00
25,746.50
13,720.00
19,500.00
5,175.00
64,141.50
91,641.50
91,641.50
Jumlah
Harga
(Rp)
16,900.00
11,700.00
-
-
28,600.00
46,095.17
14,000.00
22,500.00
5,175.00
87,770.17
116,370.17
116,370.17
Jumlah
Harga
(Rp)
16,250.00
11,250.00
-
-
27,500.00
276,250.00
13,720.00
19,500.00
5,175.00
314,645.00
342,145.00
342,145.00
Jumlah
Harga
(Rp)
16,900.00
11,700.00
-
-
28,600.00
269,772.73
14,000.00
22,500.00
5,175.00
311,447.73
340,047.73
340,047.73
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
13,708.17
1,596.00
1,500.00
345.00
17,149.17
31,099.17
31,099.17
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
10,290.83
1,596.00
1,500.00
345.00
13,731.83
27,681.83
27,681.83
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
60,227.27
1,596.00
1,500.00
345.00
63,668.27
77,618.27
77,618.27
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
80,227.27
1,596.00
1,500.00
345.00
83,668.27
97,618.27
97,618.27
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
20,991.60
1,596.00
1,500.00
345.00
24,432.60
38,382.60
38,382.60
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
32,722.20
1,596.00
1,500.00
345.00
36,163.20
50,113.20
50,113.20
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
43,588.44
1,596.00
1,500.00
345.00
47,029.44
60,979.44
60,979.44
Jumlah
Harga
(Rp)
45,500.00
31,500.00
-
-
77,000.00
328,600.00
11,466.00
5,175.00
41,250.00
386,491.00
463,491.00
463,491.00
Jumlah
Harga
(Rp)
45,500.00
31,500.00
-
-
77,000.00
657,200.00
11,466.00
5,175.00
48,000.00
721,841.00
798,841.00
798,841.00
Jumlah
Harga
(Rp)
45,500.00
31,500.00
-
-
77,000.00
78,125.00 0.16
11,466.00 6.25
5,175.00
24,300.00
119,066.00
196,066.00
196,066.00
Pekerja
Tukang Batu
pasir beton
Jumlah Pasir urug
Harga Batu belah
(Rp) Semen Portlan
Pasir Pasang
45,500.00 - - - Kerikil (Maks 30mm
31,500.00 - - - Air
- Besi beton (polos/ulir)
- Kawat beton
77,000.00 Paku 5 cm – 12 cm
Balok kayu kelas II
73,594.00 - - - Plywood tebal 9 mm
14,000.00 - - - Dolken kayu g φ 8–0)cm panj4 m
5,175.00 - - - Bata merah
22,500.00 - - - Bata rooster
115,269.00 - Ubin keramik
Semen warna
Galvalume gel tbl 0,3 mm
pintu pvc kamar ma
Mur baut P : 20 cm
192,269.00 - Paku Sumbat / Karet Paku
Nok standar 40x18
192,269.00 Balok kayu
Paku 10 cm
Lem kayu
Papan kayu
Jumlah Paku 1 – 2,5 cm
Harga Besi strip tebal 5mm
(Rp) Paku 12 cm
Kaso-kaso 5 x 7cm
45,500.00 - - - Paku 7 cm – 10 cm
31,500.00 - - - Paku 5 dan 7 cm
- Kunci tanam biasa
- Engsel pintu
77,000.00 Engsel kupu-kupu
Kait angin
164,300.00 - - - Kunci slot
14,560.00 - - - Cat menie
5,175.00 - - - Plamuur
24,300.00 - - - - Cat minyak dasar
208,335.00 Cat minyak penutup
Kuas
Pengencer
Ampelas
Plamuur
285,335.00 Cat tembok dasar
Cat tembok penutup
285,335.00
Jumlah
Harga
(Rp)
68,250.00
47,250.00
-
-
115,500.00
204,600.00
13,720.00
5,175.00
65,550.00
289,045.00
404,545.00
404,545.00
Jumlah
Harga
(Rp)
45,500.00
31,500.00
-
-
77,000.00
73,594.00
19,810.00
4,485.00
30,000.00
127,889.00
204,889.00
204,889.00
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
32,860.00
1,596.00
345.00
375.00
35,176.00
49,126.00
49,126.00
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
65,720.00
1,596.00
345.00
750.00
68,411.00
82,361.00
82,361.00
Jumlah
Harga
(Rp)
5,850.00
8,100.00
-
-
13,950.00
32,282.30
798.00
172.50
195.00
33,447.80
47,397.80
47,397.80
Jumlah
Harga
(Rp)
65,000.00
45,000.00
-
-
110,000.00
273,222.00
13,020.00
2,070.00
22,500.00
310,812.00
420,812.00
420,812.00
Jumlah
Harga
(Rp)
58,500.00
40,500.00
-
-
99,000.00
168,381.00
13,020.00
2,070.00
41,250.00
224,721.00
323,721.00
323,721.00
Jumlah
Harga
(Rp)
58,500.00
40,500.00
-
-
99,000.00
82,602.00
13,020.00
2,070.00
29,100.00
126,792.00
225,792.00
225,792.00
Jumlah
Harga
(Rp)
58,500.00
40,500.00
-
-
99,000.00
328,600.00
13,020.00
2,070.00
41,250.00
384,940.00
483,940.00
483,940.00
Jumlah
Harga
(Rp)
58,500.00
40,500.00
-
-
99,000.00
657,200.00
13,020.00
2,070.00
43,500.00
715,790.00
814,790.00
814,790.00
Jumlah
Harga
(Rp)
58,500.00
40,500.00
-
-
99,000.00
328,600.00
13,020.00
2,070.00
41,250.00
384,940.00
483,940.00
483,940.00
Jumlah
Harga
(Rp)
58,500.00
40,500.00
-
-
99,000.00
164,300.00
13,020.00
2,070.00
29,100.00
208,490.00
307,490.00
307,490.00
Jumlah
Harga
(Rp)
84,500.00
58,500.00
-
-
143,000.00
13,088.88
17,416.00
2,875.00
9,750.00
42,420.00
85,549.88
228,549.88
228,549.88
Jumlah
Harga
(Rp)
65,000.00
45,000.00
-
-
110,000.00
40,950.00
17,416.00
2,875.00
41,250.00
102,491.00
212,491.00
212,491.00
Jumlah
Harga
(Rp)
45,500.00
31,500.00
-
-
77,000.00
157,300.00
16,450.00
4,025.00
177,775.00
254,775.00
254,775.00
Jumlah
Harga
(Rp)
7,800.00
10,800.00
-
-
18,600.00
16,500.00
750.00
17,250.00
35,850.00
35,850.00
Jumlah
Harga
(Rp)
13,650.00
9,450.00
-
-
23,100.00
70,000.00
11,500.00
81,500.00
104,600.00
104,600.00
Jumlah
Harga
(Rp)
6,500.00
9,000.00
-
-
15,500.00
23,250.00
540.00
23,790.00
39,290.00
39,290.00
Jumlah
Harga
(Rp)
6,500.00
4,500.00
-
-
11,000.00
25,480.00
8,250.00
33,730.00
44,730.00
44,730.00
Jumlah
Harga
(Rp)
3,250.00
4,500.00
-
-
7,750.00
7,875.00
150.00
8,025.00
15,775.00
15,775.00
Jumlah
Harga
(Rp)
9,750.00
6,750.00
-
-
16,500.00
15,000.00
15,000.00
31,500.00
31,500.00
Jumlah
Harga
(Rp)
9,750.00
6,750.00
-
-
16,500.00
27,500.00
27,500.00
44,000.00
44,000.00
Jumlah
Harga
(Rp)
9,750.00
6,750.00
-
-
16,500.00
13,200.00
13,200.00
29,700.00
29,700.00
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
22,500.00
11,200.00
3,680.00
37,380.00
81,380.00
81,380.00
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
35,000.00
11,200.00
3,680.00
49,880.00
93,880.00
93,880.00
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
18,000.00
11,200.00
3,680.00
32,880.00
76,880.00
76,880.00
Jumlah
Harga
(Rp)
9,100.00
6,750.00
-
-
15,850.00
24,000.00
2,640.00
26,640.00
42,490.00
42,490.00
Jumlah
Harga
(Rp)
9,100.00
6,750.00
-
-
15,850.00
28,800.00
2,640.00
31,440.00
47,290.00
47,290.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
28,800.00
2,640.00
31,440.00
46,840.00
46,840.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
36,000.00
2,640.00
38,640.00
54,040.00
54,040.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
16,800.00
2,640.00
19,440.00
34,840.00
34,840.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
20,160.00
2,640.00
22,800.00
38,200.00
38,200.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
21,120.00
2,640.00
23,760.00
39,160.00
39,160.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
24,480.00
2,640.00
27,120.00
42,520.00
42,520.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
38,400.00
2,640.00
41,040.00
56,440.00
56,440.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
17,760.00
2,640.00
20,400.00
35,800.00
35,800.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
18,240.00
2,640.00
20,880.00
36,280.00
36,280.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
22,080.00
2,640.00
24,720.00
40,120.00
40,120.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
23,520.00
2,640.00
26,160.00
41,560.00
41,560.00
Jumlah
Harga
(Rp)
9,100.00
6,300.00
-
-
15,400.00
27,360.00
2,640.00
30,000.00
45,400.00
45,400.00
Jumlah
Harga
(Rp)
5,460.00
11,250.00
-
-
16,710.00
175,800.00
9,000.00
184,800.00
201,510.00
201,510.00
Jumlah
Harga
(Rp)
5,460.00
11,250.00
-
-
16,710.00
153,825.00
9,000.00
162,825.00
179,535.00
179,535.00
Jumlah
Harga
(Rp)
5,460.00
11,250.00
-
-
16,710.00
150,162.50
9,000.00
159,162.50
175,872.50
175,872.50
Jumlah
Harga
(Rp)
13,000.00
9,000.00
-
-
22,000.00
17,600.00
450.00
18,050.00
40,050.00
40,050.00
Jumlah
Harga
(Rp)
13,000.00
9,000.00
-
-
22,000.00
45,900.00
3,000.00
48,900.00
70,900.00
70,900.00
Jumlah
Harga
(Rp)
26,000.00
18,000.00
-
-
44,000.00
26,950.00
900.00
15,120.00
3,680.00
15,000.00
61,650.00
105,650.00
105,650.00
Jumlah
Harga
(Rp)
16,250.00
13,500.00
-
-
29,750.00
38,500.00
900.00
39,400.00
69,150.00
69,150.00
Jumlah
Harga
(Rp)
7,800.00
5,400.00
-
-
13,200.00
73,150.00
360.00
73,510.00
86,710.00
86,710.00
Jumlah
Harga
(Rp)
9,750.00
6,300.00
-
-
16,050.00
13,470.00
720.00
14,190.00
30,240.00
30,240.00
Jumlah
Harga
(Rp)
9,750.00
67,500.00
-
-
77,250.00
43,312.50
280.00
43,592.50
120,842.50
120,842.50
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
67,462.50
7,758.19
75,220.69
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
3,900.00 - - -
2,700.00 - - -
-
-
6,600.00
33,000.00 - - -
9,000.00 - - -
42,000.00 -
48,600.00
5,589.00
54,189.00
Jumlah
Harga
(Rp)
455,000.00
1,890,000.00
-
-
2,345,000.00
5,885,000.00
17,500.00
23,000.00
5,925,500.00
8,270,500.00
8,270,500.00
Jumlah
Harga
(Rp)
6,460,500.00
6,460,500.00
Jumlah
Harga
(Rp)
22,750.00
94,500.00
-
-
117,250.00
152,000.00
700.00
152,700.00
269,950.00
269,950.00
Jumlah
Harga
(Rp)
22,750.00
94,500.00
-
-
117,250.00
120,000.00
700.00
120,700.00
237,950.00
237,950.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
494,000.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
52,000.00 - - -
216,000.00 - - -
-
-
268,000.00
91,200.00 - - -
6,900.00 - - -
98,100.00
366,100.00
366,100.00
Jumlah
Harga
(Rp)
65,000.00
270,000.00
-
-
335,000.00
243,200.00
11,500.00
254,700.00
589,700.00
589,700.00
Jumlah
Harga
(Rp)
45,500.00
189,000.00
-
-
234,500.00
95,000.00
540.00
11,500.00
62,000.00
169,040.00
403,540.00
403,540.00
Jumlah
Harga
(Rp)
52,000.00
216,000.00
-
-
268,000.00
97,280.00
540.00
11,500.00
62,000.00
171,320.00
439,320.00
439,320.00
Jumlah
Harga
(Rp)
454,250.00
454,250.00
Jumlah
Harga
(Rp)
52,000.00
216,000.00
-
-
268,000.00
95,000.00
540.00
6,900.00
62,000.00
164,440.00
432,440.00
432,440.00
Jumlah
Harga
(Rp)
55,250.00
229,500.00
-
-
284,750.00
95,000.00
540.00
18,400.00
62,000.00
73,850.00
249,790.00
534,540.00
534,540.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
260,000.00 - - -
1,080,000.00 - - -
-
-
1,340,000.00
4,042,500.00 - - -
168,000.00 - - -
78,400.00 - - - -
4,288,900.00
5,628,900.00
5,628,900.00
Jumlah
Harga
(Rp)
435,500.00
1,809,000.00
-
-
2,244,500.00
4,410,000.00
168,000.00
78,400.00
4,656,400.00
6,900,900.00
6,900,900.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
6,376,250.00
733,268.75
7,109,518.75
Jumlah
Harga
(Rp)
6,500.00
9,000.00
-
-
15,500.00
51,450.00
132,300.00
3,750.00
187,500.00
203,000.00
203,000.00
Jumlah
Harga
(Rp)
6,500.00
9,000.00
-
-
15,500.00
51,450.00
209,475.00
3,750.00
264,675.00
280,175.00
280,175.00
Jumlah
Harga
(Rp)
7,800.00
10,800.00
-
-
18,600.00
51,450.00
855.00
52,305.00
70,905.00
70,905.00
Jumlah
Harga
(Rp)
9,750.00 - - -
27,000.00 - - -
-
-
36,750.00
56,595.00 - - -
3,000.00 - - - -
59,595.00
96,345.00
96,345.00
Jumlah
Harga
(Rp)
13,000.00
27,000.00
-
-
40,000.00
59,902.50
3,750.00
63,652.50
103,652.50
103,652.50
Jumlah
Harga
(Rp)
6,500.00
18,000.00
-
-
24,500.00
41,040.00
1,500.00
42,540.00
67,040.00
67,040.00
Jumlah
Harga
(Rp)
6,500.00
18,000.00
-
-
24,500.00
41,800.00
750.00
42,550.00
67,050.00
67,050.00
Jumlah
Harga
(Rp)
9,750.00 - - -
40,500.00 - - -
-
-
50,250.00
102,900.00 - - -
2,250.00 - - -
105,150.00 -
155,400.00
155,400.00
Jumlah
Harga
(Rp)
9,750.00
40,500.00
-
-
50,250.00
102,900.00
2,250.00
53,320.00
12,880.00
171,350.00
221,600.00
221,600.00
Jumlah
Harga
(Rp)
13,000.00
54,000.00
-
-
67,000.00
102,900.00
2,250.00
53,320.00
12,880.00
171,350.00
238,350.00
238,350.00
Jumlah
Harga
(Rp)
39,000.00
162,000.00
-
-
201,000.00
26,600.00
1,800.00
3,765.00
32,165.00
233,165.00
233,165.00
Jumlah
Harga
(Rp)
3,900.00
54,000.00
-
-
57,900.00
84,700.00
84,700.00
142,600.00
142,600.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
650.00 1.00 0.01 650.00
45,000.00 1.00 0.50 45,000.00
-
-
45,650.00
139,350.00
16,025.25
155,375.25
Jumlah
Harga
(Rp)
325.00
45,000.00
-
-
45,325.00
77,600.00
77,600.00
122,925.00
122,925.00
Jumlah
Harga
(Rp)
325.00
45,000.00
-
-
45,325.00
71,500.00
71,500.00
116,825.00
116,825.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
24,475.00
2,814.63
27,289.63
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
650.00 - - -
9,000.00 - - -
-
-
9,650.00
6,000.00 - - -
6,000.00
15,650.00
1,799.75
17,449.75
Jumlah
Harga
(Rp)
6,500.00
18,000.00
-
-
24,500.00
10,000.00
10,000.00
34,500.00
34,500.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
21,975.00
2,527.13
24,502.13
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
1,300.00 - - -
18,000.00 - - -
-
-
19,300.00
9,000.00 - - -
9,000.00
28,300.00
3,254.50
31,554.50
Jumlah
Harga
(Rp)
975.00
13,500.00
-
-
14,475.00
165,000.00
2,000.00
167,000.00
181,475.00
181,475.00
Jumlah
Kebutuhan
Harga Volume
Volume
(Rp)
210,075.00
210,075.00
2 lapis cat penutup)
Jumlah
Harga
(Rp)
4,550.00
810.00
-
-
5,360.00
5,400.00
6,375.00
3,706.00
5,668.00
45.00
783.00
700.00
22,677.00
28,037.00
28,037.00
Jumlah
Harga
(Rp)
4,550.00 - - -
9,450.00 - - -
-
-
14,000.00
5,400.00 - - -
6,375.00 - - -
7,786.00 - - -
16,030.00 - - -
45.00 - - -
783.00 - - -
700.00 - - - -
37,119.00
51,119.00
51,119.00
Jumlah
Harga
(Rp)
2,600.00
5,670.00
-
-
8,270.00
6,444.00
6,444.00
14,714.00
14,714.00
Jumlah
Harga
(Rp)
2,600.00
5,400.00
-
-
8,000.00
6,300.00
15,624.00
7,000.00
28,924.00
36,924.00
36,924.00
Jumlah
Harga
(Rp)
6,500.00
-
6,500.00
5,250.00
5,250.00
11,750.00
11,750.00
Jumlah
Harga
(Rp)
1,300.00 - - -
5,670.00 - - -
-
-
6,970.00
4,250.00 - - -
2,180.00 - - -
5,668.00 - - -
12,098.00 -
19,068.00
19,068.00
Jumlah
Harga
(Rp)
1,820.00
3,780.00
-
-
5,600.00
2,616.00
3,924.00
6,540.00
12,140.00
12,140.00
Jumlah
Harga
(Rp)
1,300.00
18,000.00
-
-
19,300.00
4,500.00
45.00
4,545.00
23,845.00
23,845.00
Jumlah
Harga
(Rp)
16,250.00
20,250.00
-
-
36,500.00
4,500.00
340.00
45.00
7,350.00
12,235.00
48,735.00
48,735.00
Jumlah
Harga
(Rp)
16,250.00
22,500.00
-
-
38,750.00
4,500.00
4,500.00
4,188.00
45.00
340.00
13,573.00
52,323.00
52,323.00
Jumlah
Harga
(Rp)
3,900.00
5,400.00
-
-
9,300.00
15,705.00
45.00
340.00
16,090.00
25,390.00
25,390.00
Jumlah
Harga
(Rp)
26,000.00
63,000.00
-
-
89,000.00
15,705.00
340.00
16,045.00
105,045.00
105,045.00
Jumlah
Harga
(Rp)
214,500.00
99,000.00
-
-
313,500.00
450,000.00
3,000.00
453,000.00
766,500.00
766,500.00
Jumlah
Harga
(Rp)
65,000.00
135,000.00
-
-
200,000.00
110,000.00
8,400.00
1,150.00
119,550.00
319,550.00
319,550.00
Jumlah
Harga
(Rp)
65,000.00
135,000.00
-
-
200,000.00
71,500.00
8,400.00
1,150.00
4,550.00
85,600.00
285,600.00
285,600.00
Jumlah
Harga
(Rp)
65,000.00
90,000.00
-
-
155,000.00
3,911,800.00
8,400.00
1,150.00
75,000.00
3,996,350.00
4,151,350.00
4,151,350.00
Jumlah
Harga
(Rp)
78,000.00
130,500.00
-
-
208,500.00
390,000.00
8,400.00
1,150.00
60,000.00
459,550.00
668,050.00
668,050.00
Jumlah
Harga
(Rp)
195,000.00
405,000.00
-
-
600,000.00
275,000.00
6,000.00
281,000.00
881,000.00
881,000.00
Jumlah
Harga
(Rp)
390,000.00
270,000.00
-
-
660,000.00
97,500.00
168,000.00
34,500.00
1,143,720.00
90,000.00
1,533,720.00
2,193,720.00
2,193,720.00
Jumlah
Harga
(Rp)
195,000.00
405,000.00
-
-
600,000.00
275,000.00
3,000.00
278,000.00
878,000.00
878,000.00
Jumlah
Harga
(Rp)
19,500.00
40,500.00
-
-
60,000.00
275,000.00
60,000.00
335,000.00
395,000.00
395,000.00
Jumlah
Harga
(Rp)
1,950.00
27,000.00
-
-
28,950.00
160,000.00
37,500.00
197,500.00
226,450.00
226,450.00
Jumlah
Harga
(Rp)
3,250.00
45,000.00
-
-
48,250.00
160,000.00
37,500.00
28,000.00
5,750.00
231,250.00
279,500.00
279,500.00
Jumlah
Harga
(Rp)
3,510.00
8,100.00
-
-
11,610.00
96,000.00
2,100.00
98,100.00
109,710.00
109,710.00
Jumlah
Harga
(Rp)
650.00
36,000.00
-
-
36,650.00
17,500.00
125.00
17,625.00
54,275.00
54,275.00
Jumlah
Harga
(Rp)
3,510.00
8,100.00
-
-
11,610.00
114,000.00
35,000.00
149,000.00
160,610.00
160,610.00
Jumlah
Harga
(Rp)
3,510.00
8,100.00
-
-
11,610.00
132,000.00
52,500.00
184,500.00
196,110.00
196,110.00
Jumlah
Harga
(Rp)
3,510.00
8,100.00
-
-
11,610.00
15,000.00
2,100.00
17,100.00
28,710.00
28,710.00
Jumlah
Harga
(Rp)
3,510.00
8,100.00
-
-
11,610.00
24,000.00
35,000.00
59,000.00
70,610.00
70,610.00
Jumlah
Harga
(Rp)
3,510.00
8,100.00
-
-
11,610.00
42,000.00
52,500.00
94,500.00
106,110.00
106,110.00
Jumlah
Harga
(Rp)
-
760,000.00
-
-
760,000.00
761,153.28
-
-
761,153.28
1900000
### 493,268.61
1,521,153.28
1,521,153.28
Jumlah 3 60
Harga 2 40
(Rp)
-
510,000.00
- ### 635000
-
510,000.00
508000 507435.52
737,435.52 762000 761153.28
-
-
737,435.52
1,247,435.52
1,247,435.52
549.741298 3941.6706514 11576497.105465
495.277188 3378.3681502 9073908.731945
\
308.78944326 429157.31565714
0.04 154,422.02
639.74 895,633.87
1400 Rp 760
1350 Rp 1,029
1,111,603.32 1,354,154.79
1,185,947.23 1,454,474.76
280,848.15 347,505.07
3,156,134.62
26737.885753425
Rp 37
Rp 39
Rp 9
Rp 86
Harga Jumlah
Satuan Harga
(Rp) (Rp)
65,000.00 Rp 13,000
90,000.00 Rp 18,000
0.00 Rp -
0.00 Rp -
AH TENAGA KERJA Rp 31,000
50,000.00 Rp 55,000
2,200.00 Rp 22,000
179,000.00 Rp 11,277
46,800.00 Rp 327,600
AH HARGA BAHAN Rp 415,877
70500 Rp 1,763
AH HARGA ALAT Rp 1,763
Rp 448,640
D Rp 44,864
Rp 448,640
22.49 65,000.00Rp 1,462,025 150,000.00
13.74 90,000.00Rp 1,237,039 2,699,064.00
0.39 120,000.00 Rp 47,208 2,849,064.00
0.48 115,000.00 Rp 54,648
0.90 100,000.00 Rp 89,726
Rp -
1.54 115,000.00 Rp 177,187
0.52 287,000.00 Rp 150,601
eton (polos/ulir)
cm – 12 cm
od tebal 9 mm
kayu g φ 8–0)cm panj4 m
cm – 10 cm
nyak penutup
mbok penutup
- Paku Sumbat / Karet Paku 50.04 Rp 75,060
Air 149.33 Rp 11,200
Balok kayu kelas II 0.04 Rp 154,422
Bata merah 1,260.00 Rp 819,000
Bata rooster - Rp -
Batu belah 0.90 Rp 89,726
Besi beton (polos/ulir) 90.04 Rp 1,080,487
Besi strip tebal 5mm 0.32 Rp 992
Dolken kayu g φ 8–0)cm panj4 m 0.43 Rp 10,519
Engsel kupu-kupu - Rp -
Engsel pintu 2.00 Rp 20,000
Galvalume gel tbl 0,3 mm 8.76 Rp 361,226
Kaca tebal 5 mm 1.83 Rp 322,150
Kait angin 6.00 Rp 45,000
Kawat beton 1.29 Rp 25,726
Kayu kelas III 0.01 Rp 32,147
Kerikil (Maks 30mm) 0.52 Rp 150,601
Kunci slot - Rp -
Kunci tanam biasa 1.00 Rp 93,700
Lem kayu 1.59 Rp 22,389
Nok standar 40x18 - Rp -
Paku 5 cm – 10 cm 0.25 Rp 3,468
Papan kayu 0.13 Rp 480,320
Pasir Beton 0.39 Rp 47,208
Pasir Pasang 1.68 Rp 193,747
Pasir urug 0.48 Rp 54,648
Plywood tebal 9 mm 0.08 Rp 8,712
SEalant 0.08 Rp 3,328
Semen PC 639.74 Rp 895,634
Tanah urug pilihan 1.65 Rp 92,534
TOTAL
(……..…………….) (……………………)
IAYA (RAB)
PAJAK
BIAYA JUMLAH BIAYA
(PPN; PPh)
16,391,314
Dibuat Oleh,
Kader Teknik
………………………………..
DAFTAR REKAPITULASI ANALISA HARGA SAT
NO URAIAN ANALISA HARGA SATUAN
M2 A. 2.2.1.1 354,878.00
M2 A. 2.2.1.2 520,395.00
M2 A. 2.2.1.3. 1,696,123.00
M1 A. 2.2.1.4. 483,380.00
M2 A. 2.2.1.5. -
M2 A. 2.2.1.6. 1,453,750.00
M2 A. 2.2.1.7. 1,277,785.00
M2 A. 2.2.1.8. 1,246,725.00
M2 A. 2.2.1.9. 6,500.00
M A. 2.2.1.10. 263,362.20
BH A. 2.2.1.11. 226,200.00
M2 A. 2.2.1.12. 105,000.00
M3 A. 2.2.1.13. 866,710.00
M3 A. 2.2.1.14. 433,355.00
M2 A. 2.2.1.15. 5,958.00
M3 A.2.3.1.1. 48,750.00
M3 A.2.3.1.2. 58,500.00
M3 A.2.3.1.3. 68,250.00
M3 A.2.3.1.4. 65,000.00
M3 A.2.3.1.5. 97,500.00
M3 A.2.3.1.6. 78,000.00
M2 A.2.3.1.7. 3,250.00
M3 A.2.3.1.8. 21,450.00
M3 A.2.3.1.9. 32,500.00
M3 A.2.3.1.10. 32,500.00
M3 A.2.3.1.11. 157,500.00
M3 A.2.3.1.14. 96,670.50
M3 A.3.2.1.1. 623,575.00
M3 A.3.2.1.2. 573,000.00
Kg A.3.2.1.3. 537,960.00
M2 A.3.2.1.4. 513,315.00
M3 A.3.2.1.5. 479,560.00
M3 A.3.2.1.6. 382,478.00
M3 A.3.2.1.7. 477,254.00
M3 A.3.2.1.8. 447,347.00
M3 A.3.2.1.9. 255,480.00
M3 A.3.2.1.10. 2,336,856.00
M3 A.3.2.1.11. 716,356.00
M3 A. A.4.1.1.5. 979,723.33
M3 A.4.1.1.7. 949,166.59
KG A.4.1.1.17 30,067.75
KG A.4.1.1.18 135,750.00
HARGA SATUAN
SAT KODE ANALIS
( Rp )
M2 A.4.1.1.20 183,900.00
M2 A.4.1.1.21 219,084.20
M2 A.4.1.1.22 247,725.13
M2 A.4.1.1.23 294,750.25
M2 A.4.1.1.24 444,375.00
M2 A.4.1.1.26 315,925.00
M2 A.4.1.1.27 114,000.00
M3 A.4.1.1.37 5,553,789.58
M3 A.4.1.1.38 7,542,968.40
M3 A.4.1.1.39 7,089,597.50
M3 A.4.1.1.40 7,203,846.19
M3 A.4.1.1.41 9,636,965.52
M3 A.4.1.1.42 11,506,664.46
M3 A.4.1.1.43 10,272,761.62
M3 A.4.1.1.44 11,084,203.23
M3 A.4.1.1.45 9,646,580.84
M3 A.4.1.1.46 6,705,799.54
M3 A.4.1.1.47 8,040,927.14
M3 A.4.1.1.48 7,871,161.53
M3 A.4.1.1.49 10,751,677.04
M3 A.4.1.1.50 11,886,669.15
M3 A.4.1.1.51 9,975,590.16
M3 A.4.1.1.52 8,730,699.35
M3 A.4.1.1.53 7,533,164.13
M3 A.4.1.1.54 9,133,833.68
HARGA SATUAN
SAT KODE ANALIS
( Rp )
BH A.4.1.2.8. 5,065.00
BH A.4.1.2.9. 8,485.00
BH A.4.1.2.10. 6,775.00
BH A.4.1.2.11. 37,640.00
BH A.4.1.2.12. 38,685.00
BH A.4.1.2.13. 34,115.00
M3 A.4.1.2.22. 33,030.00
TTK A.4.1.2.23. 82,581.00
TTK A.4.1.2.24. 34,100.00
TTK
KG A.4.2.1.1. 24,940.00
KG A.4.2.1.2. 24,940.00
M1 A.4.2.1.11. 405,795.00
M2 A.4.2.1.13. 1,019,895.00
M2 A.4.2.1.17. 286,500.00
M1 A.4.2.1.18. 150,615.00
M1 A.4.2.1.19 89,675.00
M2 A.4.2.1.20. 528,750.00
M2 A.4.2.1.21. 614,250.00
M2 A. 4.4.1.1. 218,100.00
M2 A. 4.4.1.2. 204,595.00
M2 A. 4.4.1.3. 195,865.00
M2 A. 4.4.1.4. 190,810.00
M2 A. 4.4.1.7 104,900.00
M2 A. 4.4.1.8 98,718.00
M2 A.4.4.1.9 95,045.00
M2 A. 4.4.1.10 103,577.93
M2 A. 4.4.1.11 91,283.00
M2 A. 4.4.1.22 347,925.00
M2 A. 4.4.1.23 347,925.00
M2 A. 4.4.1.24 756,280.00
M2 A.4.4.2.1. 56,545.60
M2 A.4.4.2.2. 49,613.60
M2 A.4.4.2.3. 46,531.40
M2 A.4.4.2.4. 44,496.00
M2 A.4.4.2.5. 48,221.07
M2 A.4.4.2.11. 38,325.60
M2 A.4.4.2.12. 38,328.80
M2 A.4.4.2.13. 66,189.80
M2 A.4.4.2.14. 49,415.20
M2 A.4.4.2.15. 59,328.00
M2 A.4.4.2.16. 57,701.80
M2 A.4.4.2.17. 56,383.20
M2 A.4.4.2.18. 53,560.60
M2 A.4.4.2.19. 26,747.60
M1 A.4.4.2.20. 43,395.00
M2 A.4.4.2.23. 35,238.00
M2 A.4.4.2.24 20,851.20
M2 A.4.4.2.25. 9,940.00
M2 A.4.4.2.26. 43,256.00
HARGA SATUAN
SAT KODE ANALIS
( Rp )
M2 A.4.4.2.27. 29,603.25
HARGA SATUAN
SAT KODE ANALIS
( Rp )
M2 A.4.4.3.32. 463,491.00
M2 A.4.4.3.33. 798,841.00
M2 A.4.4.3.34. 196,066.00
M2 A.4.4.3.35. 192,269.00
M2 A.4.4.3.36. 285,335.00
M2 A.4.4.3.37. 404,545.00
M2 A.4.4.3.38. 204,889.00
M1 A.4.4.3.39. 49,126.00
M1 A.4.4.3.40. 82,361.00
M1 A.4.4.3.41. 47,397.80
M2 A.4.4.3.48. 420,812.00
M2 A.4.4.3.49. 323,721.00
M2 A.4.4.3.50. 225,792.00
M2 A.4.4.3.51. 483,940.00
M2 A.4.4.3.52. 814,790.00
M2 A.4.4.3.53. 483,940.00
M2 A.4.4.3.54. 307,490.00
M2 A.4.4.3.55. 228,549.88
M2 A.4.4.3.56. 212,491.00
M2 A.4.4.3.58. 254,775.00
M1 A.4.4.3.63. 35,850.00
M2 A.4.4.3.64. 104,600.00
M2 A.4.5.1.5. 39,290.00
M2 A.4.5.1.7. 44,730.00
M1 A.4.5.1.9. 15,775.00
M2 A.4.5.2.1. 31,500.00
M2 A.4.5.2.2. 44,000.00
M2 A.4.5.2.3. 29,700.00
M1 A.4.5.2.4. 81,380.00
M1 A.4.5.2.5. 93,880.00
M1 A.4.5.2.6. 76,880.00
M2 A.4.5.2.30. 40,050.00
M2 A.4.5.2.32. 70,900.00
M2 A.4.5.2.33. -
M1 A.4.5.2.34. 105,650.00
M1 A.4.5.2.36. 69,150.00
M2 A.4.5.2.38. 86,710.00
M1 A.4.5.2.39. 30,240.00
M2 A.4.5.2.40. 120,842.50
M2 A.4.5.2.40.a 75,220.69
M1 A.4.5.2.41. 54,189.00
M3 A.4.6.1.1. 8,270,500.00
M3 A.4.6.1.2. 6,460,500.00
M2 A.4.6.1.3. 269,950.00
M2 A.4.6.1.4. 237,950.00
M2 A.4.6.1.5. 494,000.00
M2 A.4.6.1.6. 366,100.00
M2 A.4.6.1.7. 589,700.00
M2 A.4.6.1.8. 403,540.00
HARGA SATUAN
SAT KODE ANALIS
( Rp )
M2 A.4.6.1.9. 439,320.00
M2 A.4.6.1.10. 454,250.00
M2 A.4.6.1.11. 432,440.00
M2 A.4.6.1.12. 534,540.00
HARGA SATUAN
SAT KODE ANALIS
( Rp )
M3 A.4.6.1.13. 5,628,900.00
M3 A.4.6.1.14. 6,900,900.00
M3 A.4.6.1.15. 7,109,518.75
M2 A.4.6.1.16. 203,000.00
M2 A.4.6.1.17. 280,175.00
M2 A.4.6.1.18. 70,905.00
M2 A.4.6.1.19. 96,345.00
M2 A.4.6.1.20. 103,652.50
M1 A.4.6.1.21. 67,040.00
M1 A.4.6.1.22. 67,050.00
M2 A.4.6.1.23. 155,400.00
M2 A.4.6.1.24. 221,600.00
M2 A.4.6.1.25. 238,350.00
M2 A.4.6.1.26. 233,165.00
BH A.4.6.2.1. 142,600.00
BH A.4.6.2.2. 155,375.25
BH A.4.6.2.3. 122,925.00
BH A.4.6.2.4. 116,825.00
BH A.4.6.2.5. 27,289.63
BH A.4.6.2.6. 17,449.75
BH A.4.6.2.7. 34,500.00
BH A.4.6.2.9. 24,502.13
BH A.4.6.2.11. 31,554.50
M2 A.4.6.2.16. 181,475.00
M2 A.4.6.2.17. 210,075.00
M2 A.4.7.1.4. 28,037.00
M2 A.4.7.1.5. 51,119.00
M2 A.4.7.1.6. 14,714.00
M2 A.4.7.1.7. 36,924.00
M2 A.4.7.1.8. 11,750.00
M2 A.4.7.1.10. 19,068.00
M2 A.4.7.1.11 12,140.00
M2 A.4.7.1.16. 23,845.00
M2 A.4.7.1.17. 48,735.00
M2 A.4.7.1.18. 52,323.00
M2 A.4.7.1.19. 25,390.00
M2 A.4.7.1.21. 105,045.00
BH A.5.1.1.1. 766,500.00
BH A.5.1.1 2. 319,550.00
BH A.5.1.1 3. 285,600.00
BH A.5.1.1 4. 4,151,350.00
BH A.5.1.1 5. 668,050.00
BH A.5.1.1 7. 881,000.00
BH A.5.1.1 8. 2,193,720.00
BH A.5.1.1 9. 878,000.00
BH A.5.1.1 10. 395,000.00
BH A.5.1.1 12. 226,450.00
BH A.5.1.1 13. 279,500.00
M1 A.5.1.1 18. 109,710.00
BH A.5.1.1 19. 54,275.00
HARGA SATUAN
SAT KODE ANALIS
( Rp )
M1 A.5.1.1 20. 160,610.00
M1 A.5.1.1 21. 196,110.00
M1 A.5.1.1 22. 28,710.00
M1 A.5.1.1 23. 70,610.00
M1 A.5.1.1 24. 106,110.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
NO URAIAN SATUAN
1 2 3
1 - Pekerja orang/hari
10 - Tukang Batu orang/hari
11 - Tukang Besi Beton orang/hari
12 - Tukang Cat orang/hari
13 - Tukang Kayu orang/hari
14 - Tukang Las orang/hari
15 - Tukang Pelitur orang/hari
17 - Kepala Penganyam Bronjong orang/hari
18 - Kepala Tukang Batu orang/hari
19 - Kepala Tukang Besi Beton orang/hari
20 - Kepala Tukang Cat orang/hari
21 - Kepala Tukang Kayu orang/hari
22 - Kepala Tukang Las orang/hari
23 - Kepala Tukang Pelitur orang/hari
24 - Mandor orang/hari
25 - Mekanik orang/hari
26 - Operator Semi Terlatih orang/hari
27 - Operator Terlatih orang/hari
NO URAIAN SATUAN
1 2 3
1 - Batu Bata Kelas I buah
2 - Batu Bata Kelas II buah
3 - Batu belah 10-15 cm Dam
4 - Batu Gunung/Kali alam M3
5 - Batu Kali / Belah M3
6 - Batu Kali bulat Dam
7 - Batu Kali Keping/Tempel M3
8 - Batu Pecah 2/3 cm M3
9 - Batu Pecah 5-7 cm M3
10 - Batu Pecah 3-5 cm M3
11 - Batu Pecah 2-3 cm M3
12 - Batu Pecah 1-2 cm M3
13 - Batu Pecah 0,5 - 1 cm M3
14 - Dolken / Perancah Dia 10 - 400 buah
15 - Filler/ Abu Batu kg
16 - Filler/Kapur M3
17 - Kapur Gamping/labur kg
18 - Kapur Pasangan M3
19 - Kerikil Alam 0,5-1 cm M3
20 - Kerikil Alam 1/2 cm M3
21 - Kerikil Alam 2 /3 cm M3
22 - Kerikil Alam 3 /5 cm M3
23 - Kerikil Alam 5 /7 cm M3
24 - Kerikil Pecah 1 cm M3
25 - Kerikil Pecah Manual 1 /2 cm M3
26 - Kerikil Pecah Manual 3/5cm M3
27 - Kerikil Pecah Manual 5 /7 cm M3
28 - Kerikil Pecah Mesin Stone Crusher 1 /2 cm M3
29 - Kerikil Pecah Mesin Stone Crusher 3 /5 cm M3
30 - Kerikil Pecah Mesin Stone Crusher 5 /7 cm M3
31 - Kerikil Royalti M3
32 - Pasir Beton M3
33 - Pasir Pasang M3
34 - Pasir Urug M3
35 - PC Basowa Zak (50 kg)
37 - PC Merk Gresik Zak (50 kg)
38 - PC Merk Tiga Roda Zak (50 kg)
39 - PC Padang Zak (50 kg)
40 - Semen Warna (calsigrout) kg
41 - Sirtu M3
42 - Sirtu Royalti M3
43 - Tanah Urug pilihan M3
44 - Tanah Urug M3
45 - Timbunan biasa M3
46 - Timbunan Pilihan M3
NO URAIAN SATUAN
1 2 3
- Bahan Atap
1 - Asbes Bubungan Gelombang Besar Lembar
2 - Asbes Bubungan Gelombang Kecil Lembar
3 - Asbes Gelombang Besar Lembar
4 - Asbes Gelombang Kecil Lembar
5 - Asbes 210 cm Lembar
6 - Asbes 240 cm Lembar
7 - Asbes 180 cm Lembar
8 - Asbes Plapon/Woodplank 20 cm x 4 m Lembar
9 - Atap Dia 13 mm M1
10 - Atap Fiberglass Lembar
11 - Atap Metal Zincalume Lembar
12 - Atap Sirap M2
13 - Bubungan Metal Zincalum buah
14 - Atap Metal Zincalume berpasir Lembar
15 - Bubungan Metal Zincalume buah
16 - Bubungan Metal Zincalume berpasir buah
17 - Bubungan Genteng Pres Lokal/Nijang Super buah
18 - Bubungan Seng Galvalum BJLS 30 M
19 - Genteng Bubungan Keramik buah
20 - Genteng Bubungan Lokal buah
21 - Genteng Bubungan Pres Beton buah
22 - Genteng Bubungan Pres Lokal/Nijang Super buah
23 - Genteng Bubungan Silang/kodok buah
24 - Genteng Kaca buah
25 - Genteng Keramik (Merk Kanmuri Warna Netral) buah
26 - Genteng Bubungan Keramik buah
27 - Genteng Lokal buah
28 - Genteng Pres Beton buah
29 - Genteng Pres Lokal/Nijang Super buah
30 - Genteng silang/kodok buah
31 - Ijuk Atap kg
32 - Plastik Talang Lembar
33 - Seng Gelombang Besar BJLS 20 Lembar
34 - Seng Gelombang Besar BJLS 25 Lembar
35 - Seng Gelombang Besar BJLS 30 Lembar
36 - Seng Gelombang Kecil BJLS 20 Lembar
37 - Seng Plat BJLS 20 Lembar
38 - Seng Plat BJLS 25 Lembar
39 - Seng Plat BJLS 30 Lembar
40 - Seng Plat Talang M'
41 - Seng Dikroll Lembar
42 - Seng Galvalum BJLS 25 M
43 - Seng Galvalum BJLS 30 M
44 - Seng Galvalum BJLS 35 M
45 - Seng Galvalum BJLS 40 M
46 - Seng Biasa Ukuran 240 Lembar
47 - Seng Biasa Ukuran 180 Lembar
48 - Sirap Kalimantan buah
49 - Karpet talang roll
50 - Karpet talang m2
51 Rangka Atap Baja Ringan M2
NO URAIAN SATUAN
1 2 3
- Bahan Kayu
1 - Balok Kayu Klas I M3
2 - Balok Kayu Klas II M3
3 - Balok Kayu Klas III M3
4 - Dolken/Perancah Dia 10 Cm - 2 M Batang
5 - Dolken/Perancah Dia 10 Cm - 4 M Batang
6 - Dolken/Perancah Dia 20 Cm - 4 M Batang
7 - Papan Kayu Klas I M3
8 - Papan Kayu Klas II M3
9 - Papan Kayu Klas III M3
10 - Schapolding Set
11 - Kayu untuk Perancah M3
12 - Kayu untuk Kontruksi Jembatan M3
NO URAIAN SATUAN
1 2 3
- Bahan Bambu
1 - Bambu Besar = 012,5 cm - 6 M Batang
2 - Bambu Kecil > = 0,7 Cm - 6 M Batang
3 - Bambu sedang >= 010 Cm - 6 M Batang
4 - Gedek Biasa M2
5 - Gedek Kulitan M2
6 - Gedek Pagar M2
NO URAIAN SATUAN
1 2 3
- Bahan Cetak
1 - Batako 10 x 20 x 40 Cm buah
2 - Buis Beton 1/2 Dia 20 Cm M'
3 - Buis Beton 1/2 Dia 30 Cm M'
4 - Buis Beton 1/2 Dia 40 Cm M'
5 - Buis Beton Dia 10 Cm M'
6 - Buis Beton Dia 20 Cm M'
7 - Buis Beton Dia 30 Cm M'
8 - Buis Beton Dia 40 Cm M'
9 - Buis Beton Dia 50 Cm M'
10 - Buis Beton Dia 60 Cm M'
11 - Buis Beton Dia 70 Cm M'
12 - Buis Beton Dia 80 Cm M'
13 - Glas Block buah
14 - Gorong-gorong Beton Diameter 40 cm M'
15 - Gorong-gorong Beton Diameter 60 cm M'
16 - Gorong-gorong Beton Diameter 80 cm M'
17 - Lubang Angin 10 x 20 Cm buah
18 - Lubang Angin 20 x 20 Cm buah
19 - Lubang Angin 30 x 20 Cm buah
20 - Lubang Angin 30 x 15 Cm buah
21 - Paving Block 3 Berlian (33 buah/M2) buah
22 - Paving Block Bata (50 buah/M2) M2
23 - Paving Block tebal 6 cm M2
24 - Paving Block tebal 8 cm (K. Biasa) M2
25 - Paving Block tebal 8 cm (K. Khusus) M2
26 - Paving Block tebal 10 cm (K. Biasa) M2
27 - Paving Block tebal 10 cm (K. Khusus) M2
28 - Pal/Patok Batas Beton Ukuran 15 cm x 50 cm Buah
29 - Pal/Patok Batas Beton Ukuran 15 cm x 100 cm Buah
30 Batu Alam Candi Hitam 20 x 40 cm M2
31 Batu Alam Candi Putih 20 x 40 cm M2
32 Batu Alam Marmo Hijau 10 x 20 cm M2
33 Batu Alam Marmo Putih 10 x 20 cm M2
34 - Roster Keramik M2
35 Roster Buah
36 Roster Sedang Buah
36 Glass Blok Buah
NO URAIAN SATUAN
1 2 3
- Bahan Lantai
1 - Batu Tempel Hitam M2
2 - Keramik Anti Selip / Sponeng (20x20) Bh
3 - Keramik Dinding (20x25) Bh
4 - Keramik Kualitas I (Motif) M2
5 - Keramik Kualitas I (Motif) M2
6 - Keramik Kualitas I (Motif) (30x30) Bh
7 - Keramik Kualitas I (Polos) (30x30) Bh
8 - Keramik Kualitas I (Polos) (40x40) Bh
9 - Keramik Kualitas II (Motif) (40x40) Bh
10 - Keramik Kualitas II (Polos) M2
11 - Keramik Kualitas II (Motif) Bh
12 - Keramik Lis Bh
13 - Marmer Kualitas I Bh
14 - Marmer Kualitas II Bh
15 - Porselin Kualitas I (Polos) M2
16 - Porselin Kualitas I (Polos) 20 x 20 Bh
17 - Tegel Abu-abu 20 x 20 cm Bh
18 - Tegel bergaris Abu-abu 20 x 20 cm Bh
19 - Tegel bergaris warna 20 x 20 cm Bh
20 - Tegel traso Klas I 30 x 30 cm Bh
21 - Tegel traso Klas II 30 x 30 cm Bh
22 - Tegel warna 20 x 20 cm Bh
23 Geranit 40 x 40 Bh
24 Geranit 30 x 30 Bh
VII. DAFTAR HARGA SATUAN BAHAN BESI
NO URAIAN SATUAN
1 2 3
- Bahan Besi
1 - Acytilyn botol
2 - Alat Bantu Penyetelan Set
3 - Alat-alat bantu Set
4 - Angkur buah
5 - Baut dan Mur Kotak Suara buah
6 - Baut Mur Plat Strip buah
7 - Baut Baja kg
8 - Baut Mur Plat Strip diameter 12 non buah
9 - Baut diameter 19 panjang 25 cm buah
10 - Baut diameter 19 panjang 23 cm buah
11 - Baut diameter 19 panjang 20 cm buah
12 - Baut diameter 19 panjang 18 cm buah
13 - Baut diameter 19 panjang 15 cm buah
14 - Baut diameter 19 panjang 10 cm buah
15 - Besi Beton Polos Kg
16 - Besi Strep Kg
17 - Besi Beton Polos 10 ml Kg
18 - Besi Beton Polos 12 ml Kg
19 - Besi Beton Polos 5 ml Kg
20 - Besi Beton Polos 6 ml Kg
21 - Besi Beton Polos 8 ml Kg
22 - Besi Beton Polos diameter 10 SNI kg
23 - Besi Beton Ulir kg
24 - Besi Beton Ulir diameter 8 SNI kg
25 - Besi Beugel/Baut (utk Kuda-kuda) kg
26 - Besi Canal 25 Mm kg
27 - Besi Canal Lisplang kg
28 - Besi Grill M2
29 - Besi Pagar BRC M2
30 - Besi Plat 3 Mm kg
31 - Besi Profil I kg
32 - Besi Siku 30 x 30 x 3 mm ( 6 meter ) batang
33 - Besi Siku 50 x 50 x 5 mm M'
34 - Besi Siku 60 x 60 x 6 mm M'
35 - Besi Siku 70 x 70 x 7 mm M'
36 - Besi Siku 80 x 80 x 8 mm M'
37 - Besi Siku 100 x 100 x 10 mm M'
38 - Besi Siku 90.90.9 M'
39 - Besi Siku 70.70.7 M'
40 - Besi Siku 50.50.5 M'
41 - Besi Pipa Diameter 3" M'
42 - Besi Pipa Diameter 4" M'
43 - Besi Pipa biasa 2" M'
44 - Besi Pipa Medium B2 2" M'
45 - Besi Pipa Medium A2 2" M'
46 - Besi Pipa Medium A1 2" M'
47 - Besi Pipa Medium B 3" M'
48 - Besi 10 SNI Lonjor
49 - Besi 6 SNI Lonjor
50 - Besi 8 SNI Lonjor
51 - Besi 12 SNI Lonjor
52 - Besi 19 SNI Lonjor
53 - Besi Galvanisir Kg
54 - Besi Tulangan Kg
55 - Daun Pintu Fiber M2
56 - Daun Pintu Fiber buah
57 - Daun Pintu PUC M2
58 - Daun Pintu LPVC lembar
59 - Daun Pintu/Jendela Aluminium M2
60 - Dinding Rangka Baja Ringan Fiber Cement M2
61 - Dinding Rangka Baja Ringan Lapis Double gypsum M2
62 - Folding Gate M2
63 - Gording Canal kg
64 - Kawat Bronjong digalvansir kg
65 - Kawat Bronjong bwg 4 rol
66 - Kawat Duri Rol
67 - Kawat ikat beton kg
68 - Kawat nyamuk besi M2
69 - Kawat nyamuk plastik/nilon M2
70 - Kawat saringan pasir M2
71 - Kuda - Kuda Baja kg
72 - Kusen Aluminium M'
73 - Pintu Air ( Tipe Ulir, b = 1,00 m ) Unit
74 - Pintu Air (Tipe Sorong dg Plat Baja, b = 0,50 m) Unit
75 - Pintu Air (Tipe Sorong dg Plat Baja, b = 1,00 m) Unit
76 - Pintu Air (Type Ulir b>100) Unit
77 - Pintu Air dgn Skot Balok, b = 0,50 m Unit
78 - Pintu Air dgn Skot Balok, b = 1,00 m Unit
79 - Pintu Baja / Jendela dgn T = 2 m, L = 1,80 m Unit
80 - Plat Gapit kuda - kuda buah
81 - Rangka Atap Baja Ringan ( Hitungan Miring ) M2
82 - Rangka Atap Baja Ringan ( Hitungan Miring ) 4 meter M2
83 - Reling GI kg
84 - Rengka Besi Kotak 5x5 kg
85 - Rengka Besi Kotak 4x4 1,6x6 ( 6 meter ) batang
86 - Skrup/Piles 1,5 Cm Doos Kecil
87 - Skrup/Piles 2,0 Cm Doos Kecil
88 - Gagang Pintu buah
89 - Gagang Pintu buah
90 - Gagang Pintu buah
91 - Pintu Pagar dari besi hollow M2
92 - Pagar dari besi hollow M2
93 - Patok Beton Batas Areal Kerja HKM/HTR ukuran 10x10x1 M buah
NO URAIAN SATUAN
1 2 3
- Bahan Langit-langit
1 - Calksboard 120 x 240 x 6 mm Lembar
2 - Clip Hollow 2x4 buah
3 - Clip Hollow 4x4 buah
4 - Compound zak
5 - Eternit 100 x 100 cm Lembar
6 - Formika putih 120 x 240 cm Lembar
7 - Formika warna 120 x 240 cm Lembar
8 - Gypsum 12 mm uk. 1200x2400 Lembar
9 - Gypsum 9 mm uk. 1200x2400 Lembar
10 - Gypsum :
11 - Jaya Board Lembar
12 - Elephant Lembar
13 - Knauf Lembar
14 - Star Board Lembar
15 - Progyp Lembar
16 - Gyprog Lembar
17 - Hollow Galvanis 2x4x0.3 - 4 m batang
18 - Hollow Galvanis 4x4x0.3 - 4 m batang
19 - Hollow Meni 2x4x0.35 - 4 m batang
20 - Hollow Meni 2x4x0.40 - 4 m batang
21 - Hollow Meni 4x4x0.35 - 4 m batang
22 - Hollow Meni 4x4x0.40 - 4 m batang
23 - List Gypsum M'
24 - List Plafond Profil M'
25 - List Plafond Polos M'
26 - List Plafond gypsum besar M'
27 - Plafon Fiber Cement Lembar
28 - Plafon Fiber Cement rangka Metaforing M2
29 - Plafon Gipsum Rangka Metaforing (Tanpa Les) M2
30 - Profil Gipsum Lembar
31 - Profil Kayu Lembar
32 - Screw dus
33 - Shadow line - 3 m batang
34 - Teakwood 120 x 240 x 3 mm Lembar
35 - Teakwood Pintu Lembar
36 - TextileTape Roll
37 Lem Kayu Kg
38 - Tie rod - 1 m batang
39 - Triplek Pintu Lembar
40 - Triplek Pintu Motif Lembar
41 - Triplek Pintu 90 x 200 Lembar
42 - Triplek 120 x 240 x 12 mm Lembar
43 - Triplek 120 x 240 x 18 mm Lembar
44 - Triplek 120 x 240 x 2 mm Lembar
45 - Triplek 120 x 240 x 3 mm Lembar
46 - Triplek 120 x 240 x 4 mm Lembar
47 - Triplek 120 x 240 x 6 mm Lembar
48 - Triplek 120 x 240 x 9 mm Lembar
49 - U Clamp Hollow 2x4 buah
50 - U Clamp Hollow 4x4 buah
51 - Wall Angle Galvanis - 3 m batang
NO URAIAN SATUAN
1 2 3
- Bahan Pipa
1 Pipa PVC (S 12,5) ND 100 mm M'
2 Pipa PVC (S 12,5)ND 50 mm M'
3 Pipa PVC(S 12,5) ND 20 mm M'
4 Pipa GI Ø 3 inch M'
5 Pipa GI Ø 2 inch M'
6 Pipa GI Ø 3/4 inch M'
7 Pipa GI Ø 1 1/4 inch M'
8 Pipa GI Ø 1 inch M'
9 Pipa GI Ø 0,5 inch M'
10 Knee GI Ø 1 1/4 inch Buah
11 Water Mour 1 1/4 inch Buah
12 Sok GI Ø 1 1/4 inch Buah
13 Knee GI Ø 1 inch Buah
14 Tee GI Ø 1 inch Buah
15 Knee GI Ø 0,5 inch Buah
16 Sok GI Ø DD 0,5 inch Buah
17 Pipa Kotak 4x4x16 M'
18 Pipa Kotak 4x4x1.6 M'
19 Pipa Kotak 2x4x1.6 M'
20 Pipa Kotak 2x4x1.6 M'
21 Plat Eser 0.8 m/m M'
22 Plat Eser 1.2 m/m M'
23 Siku 50 x 50 x 5 mm Batang
24 - Air Valve ND 50 mm buah
NO URAIAN SATUAN
NO URAIAN SATUAN
1 2 3
- Bahan Kaca
1 - Kaca polos 3 mm M2
2 - kaca polos 5 mm M2
3 - Kaca riben tebal 3 mm M2
4 - Kaca riben tebal 5 mm M2
5 - Kerangka nako 5 mm M2
6 Kaca Es tebal 3 mm M2
7 Kerangka Nako 5 mm M2
8 Karet Kaca M1
9 Sealent Tube
NO URAIAN SATUAN
1 2 3
- Bahan Pengunci
1 - Engsel H / pintu Pasang
2 - Engsel H kecil Pasang
3 - Engsel Nylon Pasang
4 - Engsel Nylon jendela Pasang
5 - Expagnolet buah
6 - Grendel Besar 4" buah
7 - Grendel Kecil 2" buah
8 - Haag Angin Besar Stel
9 - Haag Angin Kecil Stel
10 - Kuda Terbang 1 Slag kecil set
11 - Kuda Terbang 1 Slag kecil buah
12 - Kuda Terbang 1 Slag besar set
13 - Kuda Terbang 2 Slag buah
14 - Royal Stel
15 - Union Kecil 1 Slag buah
16 - Union Kecil 2 Slag buah
17 - Yale 1 Slag buah
18 - Yale 2 Slag buah
NO URAIAN SATUAN
1 2 3
- Bahan Sanitaire
1 - Avoir Plastik Buah
2 - Avoir Besi Buah
3 - Bak Cuci Piring Logam Buah
4 - Bak Cuci Piring Logam 1 lubang Buah
5 - Bak Cuci Piring Logam 2 lubang Buah
6 - Bak Fyberglass Kap 0,5 M3 Buah
7 - Bak Mandi LPS Keramik 50 x 50 cm Buah
8 - Bak Mandi Plastik Kap 0,5 M3 Buah
9 - Bak Mandi Teraso 50 x 50 cm Buah
10 - Bak Cuci Piring Plastik Buah
11 - Cermin Dinding Buah
12 - Closet Duduk Buah
13 - Closet Duduk Duty Buah
14 - Closet Duduk Ina Buah
15 - Closet Jongkok Porselin Buah
16 - Closet Jongkok Porselin Duty Buah
17 - Closet Jongkok Porselin Ina Buah
18 - Closet Jongkok Traso Buah
19 - Hand Shop Buah
20 - Hanger Alumunium Buah
21 - Kran Air Buah
22 - Reservoir Fybg Kapasitas 1 M3 Buah
23 - Saringan Air Bersih Buah
24 - Saringan Air Plastik Buah
25 - Septitanck Kapasitas 1 M3 Buah
26 - Septitanck Kapasitas 2 M3 Buah
27 - Shower Buah
28 - Urinoir Porselin Buah
29 - Wastafel Buah
XV. DAFTAR HARGA SATUAN BAHAN PAKU
NO URAIAN SATUAN
1 2 3
- Bahan Paku
1 - Paku Anti Karat kg
2 - Paku Asbes kg
3 - Paku Asbes Ulir kg
4 - Paku Eternit kg
5 - Paku Gypsum kg
6 - Paku Panjang 1-3 Cm kg
7 - Paku Panjang 4-6 Cm kg
8 - Paku Panjang 7-12 Cm kg
9 - Paku Panjang 5-15 Cm kg
10 - Paku Panjang 2 Cm kg
11 - Paku Seng kg
12 - Paku Seng Ulir kg
13 - Paku Sumbat / Karet Paku buah
14 Skrup / Piles 1.5 Cm Dos Kecil
15 Skrup / Piles 2.0 Cm Dos Kecil
16 Paku Sekrup/Driling 7 cm Dos Kecil
17 Paku Sumbat Buah
18 Begel Plat Buah
19 Begel Sudut Buah
20 Begel U Buah
21 Baut Angker Tembok 35 cm Buah
22 Baut Mur 15 Buah
23 Baut Mur 20 Buah
24 Baut Mur 25 Buah
NO URAIAN SATUAN
1 2 3
- Bahan Cat Tembok
1 - Cat Mutu Tinggi Liter
2 - Cat Mutu Menengah Kg
3 - Cat Mutu Rendah Kg
NO URAIAN SATUAN
1 2 3
- Bahan Tambahan Sipil
1 - Alat Bantu Bina Marga Set
2 - Alat Bantu Pengairan Set
3 - Aspal (AC) kg
4 - Aspal Bitumen kg
5 - Aspal Emulsi Ton
6 - Buton Granular Asphalt ( BGA ) Ton
7 - Elastomer Unit
8 - Flux Oil Liter
9 - Minyak Flug Liter
10 - Patok Pengaman Dia 10-150 Cm buah
11 - Asbuton ton
12 - Modifier liter
13 - Minyak Aspal liter
14 - Minyak Tanah Liter
15 - Baja kerangka kg
16 - Baja Propil kg
17 - Kayu Bakar M3
1 2 3
HARGA SATUAN
KETERANGAN
( Rp )
4 5
65,000.00 E7
90,000.00 E16
90,000.00 E17
90,000.00 E18
90,000.00 E19
90,000.00 E20
90,000.00 E21
E23
E24
E25
E26
E27
E28
E29
- E30
81,000.00 E31
81,000.00 E32
96,000.00 E33
HARGA SATUAN
KETERANGAN
( Rp )
4 5
650.00 E41
600.00 E42
1,000,000.00 E43
98,500.00 E44
100,000.00 E45
250,000.00 E46
99,000.00 E47
265,000.00 E48
200,000.00 E49
220,000.00 E50
264,000.00 E51
287,000.00 E52
300,000.00 E53
18,000.00 E54
2,000.00 E55
342,000.00 E56
2,450.00 E57
342,000.00 E58
306,200.00 E59
293,200.00 E60
264,200.00 E61
114,200.00 E62
113,200.00 E63
250,000.00 E64
241,000.00 E65
182,000.00 E66
107,000.00 E67
287,000.00 E68
220,000.00 E69
200,000.00 E70
75,000.00 E71
120,000.00 E72
115,000.00 E73
115,000.00 E74
1,260.00 E75
1,340.00 E77
1,400.00 E78
- E79
15,000.00 E80
90,000.00 E81
25,000.00 E82
56,000.00 E83
46,500.00 E84
46,000.00 E85
46,500.00 E86
HARGA SATUAN
KETERANGAN
( Rp )
4 5
73,250.00 E96
42,500.00 E97
48,000.00 E98
45,000.00 E99
43,000.00 E100
48,000.00 E101
38,000.00 E102
67,000.00 E103
18,600.00 E104
96,100.00 E105
45,000.00 E106
355,000.00 E107
35,000.00 E108
85,000.00 E109
41,600.00 E110
57,700.00 E111
5,800.00 E112
30,000.00 E113
24,300.00 E114
4,500.00 E115
7,700.00 E116
5,800.00 E117
7,000.00 E118
14,100.00 E119
20,500.00 E120
24,300.00 E121
600.00 E122
1,600.00 E123
1,000.00 E124
1,100.00 E125
12,700.00 E126
32,000.00 E127
61,600.00 E128
79,800.00 E129
104,500.00 E130
71,100.00 E131
55,000.00 E132
75,000.00 E133
44,900.00 E134
17,500.00 E135
32,000.00 E136
35,000.00 E137
41,250.00 E138
45,000.00 E139
55,000.00 E140
65,000.00 E141
50,000.00 E142
1,000.00 E143
230,000.00 E144
6,000.00 E145
195,000.00
70,000.00 E148
33,000.00 E149
HARGA SATUAN
KETERANGAN
( Rp )
4 5
5,350,000.00 E157
3,675,000.00 E158
2,870,000.00 E159
18,400.00 E160
24,300.00 E161
50,000.00 E162
5,500,000.00 E163
3,800,000.00 E164
3,000,000.00 E165
1,153,400.00 E166
2,870,000.00 E167
5,350,000.00 E168
HARGA SATUAN
KETERANGAN
( Rp )
4 5
18,000.00 E176
12,800.00 E177
15,600.00 E178
21,800.00 E179
25,600.00 E180
16,700.00 E181
HARGA SATUAN
KETERANGAN
( Rp )
4 5
3,200.00 E189
50,000.00 E190
60,000.00 E191
65,000.00 E192
45,000.00 E193
85,000.00 E194
110,000.00 E195
150,000.00 E196
190,000.00 E197
250,000.00 E198
310,000.00 E199
340,000.00 E200
22,000.00 E201
66,000.00 E202
133,000.00 E203
216,000.00 E204
45,000.00 E205
52,500.00 E206
57,000.00 E207
41,300.00 E208
2,400.00 E209
70,000.00 E210
70,000.00 E211
90,000.00 E212
140,000.00 E213
120,000.00 E214
160,000.00 E215
18,500.00 E216
36,500.00 E217
181,500.00
176,000.00
143,000.00
154,000.00
70,000.00
10,000.00
15,000.00
22,000.00
HARGA SATUAN
KETERANGAN
( Rp )
4 5
220,000.00 E226
2,500.00 E227
4,100.00 E228
12,500.00 E229
65,000.00 E230
6,200.00 E231
6,091.00 E232
11,333.00 E233
11,666.67 E234
61,000.00 E235
11,167.00 E236
9,000.00 E237
12,348.00 E238
9,320.00 E239
69,900.00 E240
3,177.00 E241
2,200.00 E242
1,492.00 E243
2,200.00 E244
3,883.33 E245
3,541.67 E246
2,200.00
41,666.67
22,727.27
E247
HARGA SATUAN
KETERANGAN
( Rp )
4 5
352,400.00 E255
32,000.00 E256
94,000.00 E257
7,200.00 E258
600.00 E259
21,500.00 E260
15,000.00 E261
75,000.00 E262
3,500.00 E263
3,400.00 E264
3,150.00 E265
2,850.00 E266
2,500.00 E267
1,750.00 E268
12,000.00 E269
11,200.00 E270
57,000.00 E271
95,000.00 E272
16,000.00 E273
30,000.00 E274
45,000.00 E275
75,000.00 E276
12,500.00 E277
42,500.00 E278
20,000.00 E279
13,600.00 E280
15,400.00 E281
320,400.00 E282
448,600.00 E283
24,400.00 E284
13,600.00 E285
60,000.00 E286
46,800.00 E287
76,375.00 E288
96,200.00 E289
149,500.00 E290
300,625.00 E291
52,000.00 E292
48,000.00 E293
18,000.00 E294
82,000.00 E295
121,900.00 E296
119,000.00 E297
240,000.00 E298
370,000.00 E299
425,000.00 E300
368,500.00 E301
62,500.00 E302
26,000.00 E303
42,500.00 E304
95,000.00 E305
257,500.00 E306
15,000.00 E307
12,500.00 E308
550,000.00 E309
250,000.00 E310
250,000.00 E311
250,000.00 E312
961,100.00 E313
300,000.00 E314
250,000.00 E315
1,601,900.00 E316
13,600.00 E317
13,600.00 E318
650,000.00 E319
65,000.00 E344
20,000.00 E345
22,000.00 E346
25,000.00 E347
30,000.00 E348
22,400.00 E349
224,300.00 E350
12,622,800.00 E351
4,357,100.00 E352
6,343,400.00 E353
20,311,800.00 E354
1,601,900.00 E355
2,242,600.00 E356
750,000.00 E357
14,400.00 E358
250,000.00 E359
45,000.00 E360
17,300.00 E361
16,000.00 E362
125,000.00 E363
25,100.00 E364
25,800.00 E365
95,000.00 E366
100,000.00 E367
95,000.00 E368
650,000.00 E369
500,000.00 E370
25,000.00 E371
HARGA SATUAN
KETERANGAN
( Rp )
4 5
175,000.00 E379
700.00 E380
800.00 E381
49,000.00 E382
16,500.00 E383
147,700.00 E384
153,800.00 E385
110,000.00 E386
70,000.00 E387
E388
58,000.00 E389
68,000.00 E390
57,000.00 E391
55,000.00 E392
55,000.00 E393
55,000.00 E394
21,000.00 E395
28,000.00 E396
22,000.00 E397
26,000.00 E398
27,000.00 E399
32,000.00 E400
33,000.00 E401
7,500.00 E402
5,000.00 E403
32,500.00 E404
70,500.00 E405
145,000.00 E406
135,000.00 E407
34,600.00 E408
25,000.00 E409
75,000.00 E410
19,000.00 E411
135,000.00 E412
90,000.00 E413
6,000.00 E414
23,000.00
2,500.00 E415
45,000.00 E416
85,000.00 E417
35,800.00 E418
172,000.00 E419
240,000.00 E420
38,500.00 E421
50,000.00 E422
62,000.00 E423
85,000.00 E424
115,000.00 E425
800.00 E426
900.00 E427
9,000.00 E428
HARGA SATUAN
KETERANGAN
( Rp )
4 5
35,000.00
20,000.00
12,500.00
35,000.00
160,000.00
95,000.00
145,000.00
110,000.00
80,000.00
15,000.00
15,000.00
15,000.00
12,500.00
12,500.00
10,000.00
10,000.00
97,500.00
70,000.00
50,000.00
67,500.00
210,000.00
270,000.00
109,000.00
661,000.00 E436
HARGA SATUAN
KETERANGAN
KETERANGAN
( Rp )
4 5
150,000.00 E631
176,000.00 E632
160,000.00 E633
187,000.00 E634
141,000.00
160,000.00
141,000.00
2,000.00
40,000.00
E635
HARGA SATUAN
KETERANGAN
( Rp )
4 5
10,000.00 E643
6,000.00 E644
30,000.00 E645
10,000.00 E646
20,400.00 E647
11,000.00 E648
9,000.00 E649
7,500.00 E650
4,900.00 E651
65,000.00 E652
77,600.00 E653
85,000.00 E654
93,700.00 E655
84,700.00 E656
71,500.00 E657
127,500.00 E658
90,000.00 E659
150,000.00 E660
HARGA SATUAN
KETERANGAN
( Rp )
4 5
35,000.00 E668
37,500.00 E669
160,000.00 E670
210,000.00 E671
365,000.00 E672
275,000.00 E673
1,601,900.00 E674
350,000.00 E675
256,300.00 E676
165,000.00 E677
160,200.00 E678
450,000.00 E679
450,000.00 E680
1,500,000.00 E681
110,000.00 E682
135,000.00 E683
165,000.00 E684
71,500.00 E685
32,000.00 E686
57,700.00 E687
17,500.00 E688
416,500.00 E689
5,478,400.00 E690
891,900.00 E691
3,203,800.00 E692
4,164,900.00 E693
175,000.00 E694
3,911,800.00 E695
325,000.00 E696
HARGA SATUAN
KETERANGAN
( Rp )
4 5
22,500.00 E704
22,000.00 E705
30,000.00 E706
25,000.00 E707
20,000.00 E708
18,000.00 E709
15,000.00 E710
14,000.00 E711
14,000.00 E712
17,000.00 E713
20,000.00 E714
30,000.00 E715
1,500.00
25,100.00
25,800.00
52,000.00
2,200.00
24,400.00
25,000.00
25,000.00
15,000.00
2,500.00
3,150.00
3,500.00
HARGA SATUAN
KETERANGAN
( Rp )
4 5
120,700.00 E724
21,800.00 E725
17,500.00 E726
52,700.00 E729
45,800.00 E730
39,400.00 E731
85,300.00 E734
52,350.00 E735
39,200.00 E736
34,100.00 E739
26,100.00 E740
24,100.00 E741
27,000.00 E744
17,500.00 E745
3,500.00 E746
22,500.00 E747
16,700.00 E748
33,000.00 E749
12,200.00 E750
17,900.00 E751
45,000.00 E752
44,000.00 E753
42,500.00 E754
15,000.00 E755
42,000.00 E756
57,700.00 E757
34,000.00 E758
45,000.00 E759
13,800.00 E760
7,000.00 E761
4,500.00 E762
40,000.00 E763
45,000.00 E764
150,000.00 E765
792.000
110.000
68.000
66.000
67.000
106.000
30.000
62.500
50.000
71.000
8.500
11.000
8.300
20.000
14.000
14.000
18.000
HARGA SATUAN
KETERANGAN
( Rp )
4 5
94,000.00 E799
88,000.00 E800
13,500.00 E801
13,500.00 E802
451,088.00 E803
1,105,000.00 E804
825,000.00 E805
25,000.00 E806
2,600.00 E807
51,000.00 E808
1,105,000.00 E809
1,500.00 E810
2,600.00 E811
3,500.00 E812
15,000.00 E813
13,600.00 E814
448,000.00 E815
300,000.00 E818
40,000.00 E819
60,000.00 E820
55,000.00 E821
65,000.00 E822
90,000.00 E823
45,000.00 E824
75,000.00
HARGA SATUAN
KETERANGAN
( Rp )
4 5
13,000.00 E835
24,700.00 E836
14,100.00 E837
10,200.00 E838
13,500.00 E839
600,000.00 E840
150,000.00 E841
9,000.00 E842
8,000.00 E843
175,000.00 E844
37,500.00
35,000.00
37,500.00
30,000.00
600,000.00
200,000.00
54,750.00
125,000.00
125,000.00
MERINTAH
DINAS KABUPATEN
PEKERJAAN PEMERINT
SUMBA
UMUMDINA
Pekerjaan Jl. Garuda
No. 81 Telp. (0371
Item Pekerjaan
Volume
No.Sum
- 21087) 81 T
RENCANA ANGGARAN BIAYA UNTUK ITEM PEKERJAAN
: PEKERJAAN PERSIAPAN dan PELAPORAN
:
: M3
No
I
Jl. Garuda
No. 81 Telp. (0371 - 21087)No.
Upah Pekerja
Sum8
Jenis Biaya Volume Satuan
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
1 Pekerja OH 65,000.00 -
2 Tukang Kayu OH 90000.00 -
PEMERINTAH
SUMBAWA KABUPATEN SUM
Pekerjaan : PEKERJAAN PLAPOND
a
7)No. 81 Telp.Besar
Sumbawa
No
I
(0371 - 21087) Su
Upah Pekerja
Jenis Biaya Volume Satuan
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
-
-
EN SUMBAWA
Pekerjaan : PEKERJAAN FURNITURE
N UMUM
Item Pekerjaan : Pek. Rak Teakblock Ukuran P= 2,4 M
Volume : 1.00 Unit
I Upah Pekerja
Jenis Biaya Volume Satuan
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
1 2 3 4 5 6 7
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Tembok Lama 0.26 M2 559,104.00 669,696.00
2 Pek. Pengecatan Lis plafond 0.36 M2 287,742.00 782,468.52
3 Pek. Pengecatan Plapond 0.34 M2 515,112.60 907,108.04
V PEKERJAAN FURNITURE
1 Pek. Rak Teakblock Ukuran P= 2,4 M 1.00 Unit 1,000,000.00 900,000.00
2 Pek. Rak Teakblock Ukuran P=1,4 M 1.00 Unit 900,000.00 600,000.00
BIAYA
TOTAL BIAYA
PERALATAN TOTAL PPN
(Rp) (Rp)
7 8 = (5+6+7) 9 10 =(8+9)
1,100,000.00
500,000.00 50,000.00 550,000.00
500,000.00 50,000.00 550,000.00
9,312,555.63
30,790.88 7,837,732.07 783,773.21 8,621,505.27
-
628,227.60 62,822.76 691,050.36
2,626,965.00
1,357,650.00 135,765.00 1,493,415.00
310,500.00 31,050.00 341,550.00
720,000.00 72,000.00 792,000.00
4,093,354.28
1,228,800.00 122,880.00 1,351,680.00
1,070,210.52 107,021.05 1,177,231.57
1,422,220.64 142,222.06 1,564,442.70
3,740,000.00
1,900,000.00 190,000.00 2,090,000.00
1,500,000.00 150,000.00 1,650,000.00
4,155,929.05
314,550.00 31,455.00 346,005.00
3,203,800.00 320,380.00 3,524,180.00
259,767.32 25,976.73 285,744.05
-