Gambar 2.1 Urea Bersubsidi ................................................................................12
Gambar 2.2 Urea Nonsubsidi ...............................................................................12 Gambar 2.3 Grafik Pencapaian Produksi Urea .....................................................14
Gambar 3.1 Diagram Blok Proses Produksi Pupuk Urea .....................................17
Gambar 3.2 Diagram Alir Proses Pembuatan Urea PT Pupuk Kujang ................18 Gambar 3.3 Diagram Alir Proses di Unit Sistesis Urea .......................................19 Gambar 3.4 Diagram Alir Proses di Unit Purifikasi .............................................27 Gambar 3.5 Diagram Alir Proses di Unit Recovery .............................................32 Gambar 3.6 Diagram Alir Proses di Unit Kristalisasi dan Pembutiran ................40
Gambar 4.1 Spesifikasi Alat Urea Synthesis Reactor ..........................................47
Gambar 4.2 High Pressure Decomposer ..............................................................53 Gambar 4.3 Low Pressure Decomposer ...............................................................54 Gambar 4.4 Gas Separator ...................................................................................55 Gambar 4.5 Off Gas Absorber ..............................................................................58 Gambar 4.6 Low Pressure Absorber ....................................................................59 Gambar 4.7 High Pressure Absorber Cooler .......................................................60 Gambar 4.8 High Pressure Absorber ...................................................................61 Gambar 4.9 Crystallizer .......................................................................................67 Gambar 4.10 Prilling Tower.................................................................................68
Gambar 5.1 Kolam Emergency ............................................................................77
Gambar 5.2 Diagram Alir Unit Water Treatment.................................................78 Gambar 5.3 Susunan Sand Filter..........................................................................80 Gambar 5.4 Diagram Alir Proses Demineralisasi ................................................82 Gambar 5.5 Bagian Alat Deaerator ......................................................................86 Gambar 5.6 Bagan Alat Packed Boiler ................................................................88 Gambar 5.7 Bagan Alat Waste Heat Boiler ..........................................................90 Gambar 5.8 Alat Cooling Tower ..........................................................................93 Gambar 5.9 Unit Cooling Tower ..........................................................................93 Gambar 5.10 Laju Alir Pembuatan Instrument Air ..............................................96
PROGRAM STUDI D-III TEKNIK KIMIA xii
JURUSAN TEKNIK KIMIA POLITEKNIK NEGERI BANDUNG LAPORAN KERJA PRAKTIK PT PUPUK KUJANG CIKAMPEK PABRIK UREA 1A
Gambar 6.1 PT Pupuk Kujang ..............................................................................99
Gambar 6.2 Logo PT Pupuk Kujang ..................................................................100 Gambar 6.3 Struktur Organisasi PT Pupuk Kujang ...........................................102 Gambar 6.4 Berbagai Warna Safety Helmet yang digunakan di PT Pupuk Kujang Cikampek ................................................................................112 Gambar 6.5 Safety Google .................................................................................112 Gambar 6.6 Jenis dari Hearing Protection (Earplug dan Earmuff) ...................113 Gambar 6.7 Masker yang digunakan di PT Pupuk Kujang, A. Mono Mask B. full gas mask with cadtridge ...................................................114 Gambar 6.8 Berbagai Safety Shoes yang digunakan di PT Pupuk Kujang Cikampek .............................................................................................................114 Gambar 6.9 Sarung Tangan yang Digunakan di PT Pupuk Kujang, A. Sarung Tangan Kain B. Sarung Tangan Karet ................................................115 Gambar 6.10 Kartu Safety Induction ..................................................................116
Gambar 7.1 Layout Pabrik Urea dan Ammonia .................................................124
Gambar 7.2 Layout Plant Urea 1A Pupuk ..........................................................125
Gambar 8.1 Proses Pengolahan Air Limbah ......................................................127
Gambar 8.2 Pengolahan dan Pemanfaatan Air Limbah .....................................127 Gambar 8.3 Bagan Alat Penarik Minyak pada Oily Separator ..........................128 Gambar 8.4 Unit Oily Separator ........................................................................128 Gambar 8.5 Penghilangan Ammonia pada Ammonia Removal ..........................130
PROGRAM STUDI D-III TEKNIK KIMIA xiii
JURUSAN TEKNIK KIMIA POLITEKNIK NEGERI BANDUNG LAPORAN KERJA PRAKTIK PT PUPUK KUJANG CIKAMPEK PABRIK UREA 1A
DAFTAR LAMPIRAN
LAMPIRAN A DAFTAR NOTASI
LAMPIRAN B DATA PENDUKUNG Process Flow Diagram Pabrik Urea 1A Material Balance Sheet Pabrik Urea 1A Data Control Room Struktur Organisasi LAMPIRAN C FORMULIR BIMBINGAN KAMPUS LAMPIRAN D FORMULIR BIMBINGAN KERJA PRAKTEK LAMPIRAN E CONTOH PRODUK