RAB Saluran Air Drainase Dan Irigasi Trapesium DANA DESA
RAB Saluran Air Drainase Dan Irigasi Trapesium DANA DESA
2
0.60 1 0.6
0.20
0.3
3 0.2
Volume Plesteran
P = 0.30 + 0.10 x 2
= 0.80 m'
Luas Plesteran = 0.80 x 161.0
= 128.80 M2
volume galian
v.1 = 0.80 x 0.80 x 161.0
= 103.04 m3
Volume 1/2 Pekerjaan galian
= 51.52 m3
DAFTAR HARGA BAHAN SATUAN BAHAN , ALAT DAN UPAH
SATUAN
NO. JENIS UPAH VOLUME
HARGA SATUAN
SATUAN
NO. JENIS BAHAN VOLUME
HARGA SATUAN
SATUAN
NO. JENIS BAHAN VOLUME
HARGA SATUAN
1 m3 pekerjaan galian
Pekerja Gali 1.500 hok 46,600
1 M2 Pekerjaan Acian
PC 40 Kg 0.080 sak 65,500
Tk Batu 0.100 hok 61,100
Pekerja 0.200 hok 53,800
Kepala Tukang 0.010 hok 82,600
550,200
148,122
231,012
107,600 Rekapitulasi Kebutuhan Bahan
21,385 Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total
2,891 Split 2/3 - 52.16 52.16
1,061,210 PC @ 40 kg - 16.74 10.30 540.96 568.01
Pasir pas 34.78 3.09 34.8 72.64
35,432,880
9,539,057
14,877,173 Rekapitulasi Kebutuhan Alat dan Upah
6,929,440
1,377,194 Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total
186,180 Pekerja 52.16 38.64 25.76 128.80 245.36
68,341,924 Tukang Batu 34.78 19.32 12.88 22.54 89.52
Kepala Tukang 128.80 1.93 1.288 2.25 134.27
69,900 Pekerja gali 77.28 77.28
69,900
3,601,248
3,601,248
8,515
6,583
9,165
16,140
1,239
41,642
1,096,732
847,916
1,180,452
2,078,832
159,583
5,363,515
5,240
6,110
10,760
826
22,936
674,912
786,968
1,385,888
106,389
2,954,157
AN UPAH RENCANA ANGGARAN BIAYA DAN KEGIATAN DANA DESA (RAB-DANA DESA
DESA TUNJUNGAN KECAMATAN NGOMBOL
TAHUN ANGGARAN 2018
HARGA
NO URAIAN VOLUME
SATUAN ( Rp )
Kegiatan Pembangunan Talud Jalan
1 Belanja Barang dan Jasa
1.1. Operasional Kegiatan
Dibulatkan sat 1.1.1. ATK Kegiatan
246.00 HOK
90.00 HOK
135.00 HOK
78.00 HOK 1.1.2. Cetak Pengandaan
Foto copy lbr 300
Cetak Foto 3R lbr 3000
Jilid bendel 7000
Bedrat 1 kg 19,000
1.3. Upah Kerja
Kepala Tukang 135 Hok 82,600
Tukang 90 Hok 61,100
Pekerja 246 Hok 61,100
Pekerja galian 78.00 Hok 46,600
2 Belanja Modal
Semen/PC 40 kg 569 zak 65,500
Batu Pecah 2/3 ( split ) 53 m3 285,200
Pasir Pasang 73 m3 274,300
JUMLAH
AN BIAYA DAN KEGIATAN DANA DESA (RAB-DANA DESA)
SA TUNJUNGAN KECAMATAN NGOMBOL
TAHUN ANGGARAN 2018
JUMLAH ( Rp )
108,496,400
36,087,400
0
0
0
0
0
0
0
0
0
0
0
0
0
772,000
390,000
165,000
30,000
18,000
150,000
19,000
35,315,400
11,151,000
5,499,000
15,030,600
3,634,800
72,409,000
37,269,500
15,115,600
20,023,900
108,496,400
TAKE OF SHEET ( TOS )
Kemiringan 1:4
I
0.80
1 Pasangan Batu Camp. 1:4
I1 0.6
3 0.10
2
2
0.10
II
0.35 0.40 0.35
= 57.96 m3
V.2 = 0.10 x 0.35 x 2 x 2
= 0.14 m3
Volume Plesteran
= 0.25 + 0.60 + 0.3 + 0.6 x 161.0
= 273.7 m2
volume galian
V = 0.80 x 1.10 x 161.0
= 141.68 m3
Pasir 35.11 m3
1 m3 pekerjaan galian
Pekerja Gali 0.750 hok
1 M2 Acian
PC 50 Kg 0.065 zak
Tk Batu 0.100 hok
Pekerja 0.200 hok
Mandor 0.010 hok
273.7 M2 Acian 1 m2
PC 40 Kg 17.791 zak
Tk Batu 27.370 hok
Pekerja 54.74 hok
Mandor 2.737 hok
Rekapitulasi Kebutuhan Bahan
Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total Dibulatkan
Batu Blondon 77.45 77.45 78.00
PC @ 50 kg 175.55 34.16 17.79 227.50 228.00
Pasir pas 35.11 6.57 41.68 42.00
Uraian Pas. Batu 1:5 Plesteran GALIAN Acian BETON total Dibulatkan
Pekerja 96.81 41.06 27.37 165.24 166.00
Tukang Batu 48.41 6.57 17.79 72.76 73.00
Mandor 4.84 82.11 54.74 141.69 142.00
Pekerja gali 106.26 106.26 107.00
sat
m3
zak
m3
sat
HOK
HOK
HOK
HOK
RENCANA ANGGARAN BIAYA DAN KEGIATAN DANA DESA (RAB-DANA DESA)
DESA ................... KECAMATAN ...............
TAHUN ANGGARAN 2018
HARGA
NO URAIAN VOLUME JUMLAH ( Rp )
SATUAN ( Rp )
Kegiatan Pembangunan
Drainasi/Selokan 75,124,300
1 Belanja Barang dan Jasa 31,705,300
1.1. Operasional Kegiatan
1.1.1. ATK Kegiatan 355,800
Kertas HVS 70 gram 2 rim 49,500 99,000
Tinta Computer 1 bh 49,000 49,000
Materai 5 lbr 6,000 30,000
Materai 5 lbr 3,000 15,000
Lakban 2 glg 11,000 22,000
Data Prin Warna 3 btl 37,600 112,800
Pensil 2B 7 bh 4,000 28,000