I PEKERJAAN PERSIAPAN ………………………………………………………………… Rp 17,023,000
II PEKERJAAN PONDASI ……………………………………………………………………. Rp 15,444,180 III PEKERJAAN BETON ………………………………………………………………………. Rp 118,915,993 IV PEKERJAAN DINDING …………………………………………………………………….. Rp 125,294,121 V PEKERJAAN KUSEN ………………………………………………………………………. Rp 27,061,581 VI PEKERJAAN ATAP & PLAFON……………………………………………………………. Rp 76,764,618 VII PEKERJAAN LANTAI ………………………………………………………………………. Rp 18,309,954 VIII PEKERJAAN PENGECATAN ……………………………………………………………… Rp 48,338,060 IX PEKERJAAN SANITAIR ……………………………………………………………………. Rp 6,962,560 X PEKERJAAN INSTALASI LISTRIK ……………………………………………………….. Rp 9,493,600 JUMLAH Rp 463,607,667
Dibulatkan ………………………………………………………………….……………….. Rp 463,600,000
Terbilang : ( Empat ratus enam puluh tiga juta enam ratus ribu rupiah)