IV URAIAN PEKERJAAN
- Galian Tanah Biasa 147.03 m3
- Timbunan Tanah 17.90 m3
- Mengangkut material 190.80 m3
- Pasangan batu dengan Mortar tipe N 198.16 m3
- Plesteran tebal 1,0 cm, dengan mortar jenis PC-PP tipe S 174.20 m2
- Siaran dengan mortar jenis PC-PP tipe M 433.95 m2
- Bongkaran 102.00 m3
- Pasangan Bekas Bongkaran 61.20 m3
Mengetahui :
KEPALA DINAS PEPEKERJAAN UMUM
SUMBER DAYA AIR DAN TATA RUANG KAB. PASURUAN
Harga
No. Mata Pembayaran
Rp.
Mengetahui :
KEPALA DINAS PEPEKERJAAN UMUM
SUMBER DAYA AIR DAN TATA RUANG KAB. PASURUAN
Harga Total
No. Satuan
No. Uraian Pekerjaan Kuantitas Satuan Harga
Analisa Ukuran
Rp. Rp.
A MATA PEMBAYARAN PEK. UTAMA
I Pekerjaan Tanah
1 Galian Tanah Biasa T.06a m³ 147.03 57,600.00 8,468,812.80
-Galian tanah sedalam ≤ 1 m
2 Plesteran tebal 1,0 cm, dengan mortar jenis PC-PP tipe S P.03b m² 174.20 57,700.00 10,051,340.00
3 Siaran dengan mortar jenis PC-PP tipe M P.02a m² 433.95 57,800.00 25,082,310.00
4 Bongkaran m³ 102.00 156,900.00 16,003,800.00
5 Pasangan Bekas Bongkaran m³ 61.20 578,900.00 35,428,680.00
HSP
NO URAIAN PEKERJAAN KODE SATUAN
(Rp)
A MATA PEMBAYARAN PEKERJAAN UTAMA
I Pekerjaan Tanah
1 Galian Tanah Biasa
- Galian tanah sedalam 1 m' T.06a m3 57,600.00
- Mengangkut material m3 57,700.00
2 Timbunan Tanah
- Timbunan Tanah / Pasir dari galian T.14a m3 33,700.00
II Pekerjaan Pasangan
1 Bongkaran pasangan batu kali & dibersihkan m3 156,900.00
2 Pasangan batu kali bekas bongkaran 1 PC : 4 Ps m3 578,900.00
3 Pasangan batu dengan mortar jenis PC-PP, Mortar tipe N P.01c m3 838,100.00
4 Siaran dengan mortar jenis PC-PP tipe M P.02a m2 57,800.00
5 Plesteran Tebal 1.0 cm, dengan mortar jenis PC-PP Tipe S P.03b m2 57,700.00
wilayah III
Harga Satuan
URAIAN Sat. KET.
(Rp.)
No.
1 2 3 4 5
U P A H :
1 Tukang org/hr 90,000
2 Kepala Tukang org/hr 100,000
3 Pekerja org/hr 80,000
4 Mandor org/hr 110,000
B A H A N :
1 Batu belah 15/20 M3 192,000
ALAT :
1 Molen unit/hr 100,000
A. TENAGA
1 Pekerja L.01 OH 1.250 80,000.00 100,000.00
2 Mandor L.04 OH 0.125 110,000.00 13,750.00
JUMLAH TENAGA KERJA 113,750.00
B. BAHAN
b) 1 m3 Pemadatan tanah
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA
1 Pekerja L.01 OH 0.500 80,000.00 40,000.00
2 Mandor L.04 OH 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 45,500.00
wilayah II
B. BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
1 Pemadat Timbunan (Stamper) E.04 Hari-sewa 0.050 45,000.00 2,250.00
JUMLAH HARGA PERALATAN 2,250.00
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang batu L.04 OH 0.150 90,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
4 Mandor L.15 OH 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 42,300.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.012 136,000.00 1,632.00
2 Portland Cement M.15 kg 6.340 1,175.00 7,449.50
JUMLAH HARGA BAHAN 9,081.50
C PERALATAN
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang batu L.02 OH 0.150 90,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
4 Mandor L.04 OH 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 42,300.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.016 136,000.00 2,176.00
2 Portland Cement M.15 kg 5.840 1,175.00 6,862.00
JUMLAH HARGA BAHAN 9,038.00
C PERALATAN
Lembar
NO. URAIAN PEKERJAAN SAT. Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Jumlah
1 2 3 4 5 6 7 8 9 10 11 12
A MATA PEMBAYARAN PEKERJAAN UTAMA
I. PEKERJAAN TANAH
1 Galian Tanah m3 38.50 55.00 40.00 10.00 3.53 - - 147.03
2 Timbunan Tanah m3 0.90 17.00 - - - - - 17.90
3 Mengangkut material m3 12.00 120.00 29.40 29.40 - - - 190.80
Pasangan
Galian Timbunan Mengangkut Plesteran 1 Siaran 1 Pas. Bekas
NO. SKET GAMBAR RINCIAN PERHITUNGAN VOLUME Batu kali Bongkaran Bekisting Beton Pembesian Kistdam
Tanah Tanah Material PC : 3 Ps PC : 2 Ps Bongkaran
1PC : 4Ps
(m )
3
(m )
3
(m )
3
(m )
2
(m )
2
(m )
3
(m )
3
(m )2
(m )
3
( Kg ) m'
1 PENAMPANG P 8 PANJANG KA+KI 20.00 m
F1 = 0.400 x 0.500 = 0.200 m2
F2 = 0.500 x 1.000 x( 0.300 + 0.500 ) = 0.400 m2
SF = 0.600 m2
PASANGAN BATU KALI
V = 0.600 x 20.000 = 12.000 m3 12.000
SIARAN
F = 1.000 x 20.000 = 20.000 m2 20.000
PLESTERAN
F = 0.400 x 20.000 = 8.000 m2 8.000
LANGSIR = 12.000 m3 12.000
GALIAN TANAH
P8 FP = 0.400 x 0.500 x 2.000 = 0.400 m2
F.KI = 0.500 x 0.500 x 0.500 = 0.125 m2
F.KA = 0.500 x 1.000 x( 0.800 + 2.000 ) = 1.400 m2
SF = 1.925 m2
V = 1.925 x 20.000 = 38.500 m3 38.50
TIMBUNAN TANAH
V = 0.500 x 0.400 x 0.450 x 10.000 = 0.900 m3 0.900
TOTAL VOLUME = 38.50 0.90 12.00 12.00 8.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00
RINCIAN PERHITUNGAN VOLUME
KEGIATAN : PERENCANAAN PEMBANGUNAN JARINGAN IRIGASI
PEKERJAAN : SUMBER LAMER (LANJUTAN) JI. SUMBER LAMER DESA KAMBINGAN KEC. GRATI
TAHUN ANGGARAN : 2019
LOKASI : DESA : KAMBINGAN
KECAMATAN : GRATI
KABUPATEN : PASURUAN Lembar Ke : 2
Pasangan
Galian Timbunan Mengangkut Plesteran 1 Siaran 1 Pas. Bekas
NO. SKET GAMBAR RINCIAN PERHITUNGAN VOLUME Batu kali Bongkaran Bekisting Beton Pembesian Kistdam
Tanah Tanah Material PC : 3 Ps PC : 2 Ps Bongkaran
1PC : 4Ps
(m )
3
(m )
3
(m )
3
(m )
2
(m )
2
(m )
3
(m )
3
(m )2
(m )
3
( Kg ) m'
2 PENAMPANG P 7 PANJANG KA+KI 50 + 50 = 100.00 m
F1 = 0.400 x 0.500 = 0.200 m2
F2 = 0.50 x 1.00 x( 0.30 + 0.50 ) = 0.40 m2
SF = 0.60 m2
PASANGAN BATU KALI
V = 0.60 x 100.00 = 60.00 m3 60.00
SIARAN
F = 1.00 x 100.00 = 100.00 m2 100.00
P7 PLESTERAN
F = 0.40 x 100.00 = 40.00 m2 40.00
LANGSIR = 60.00 m3 60.00
GALIAN TANAH P7
FP = 0.400 x 0.500 x 2.000 = 0.400 m2
F.KI = 0.500 x 0.500 x 1.000 = 0.250 m2
F.KA = 0.500 x 0.500 x 0.200 = 0.050 m2
SF = 0.700 m2
TIMBUNAN TANAH P7
F = 0.500 x 1.700 x 0.800 = 0.680 m2
PENAMPANG P 6 PANJANG KA+KI 50 + 50 = 100.00 m
F1 = 0.400 x 0.500 = 0.200 m2
F2 = 0.50 x 1.00 x( 0.30 + 0.50 ) = 0.40 m2
SF = 0.60 m2
P6 PASANGAN BATU KALI
V = 0.60 x 100.00 = 60.00 m3 60.00
SIARAN
F = 1.00 x 100.00 = 100.00 m2 100.00
PLESTERAN
F = 0.40 x 100.00 = 40.00 m2 40.00
LANGSIR = 60.00 m3 60.00
GALIAN TANAH P6
FP = 0.400 x 0.500 x 2.000 = 0.400 m2
F.KI = 0.500 x 1.000 x( 0.500 + 1.000 ) = 0.750 m2
F.KA = 0.500 x 1.000 x( 0.200 + 0.500 ) = 0.350 m2
SF = 1.500 m2
V.7-6 = 0.500 x 50.000 x( 0.700 + 1.500 ) = 55.000 m3 55.000
TIMBUNAN TANAH P6
F = 0.000 x 0.000 x( 0.000 + 0.000 ) = - m2
V.7-6 = 0.500 x 50.000 x( 0.680 + 0.000 ) = 17.000 m3 17.000
TOTAL VOLUME = 55.00 17.00 120.00 120.00 80.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00
RINCIAN PERHITUNGAN VOLUME
KEGIATAN : PERENCANAAN PEMBANGUNAN JARINGAN IRIGASI
PEKERJAAN : SUMBER LAMER (LANJUTAN) JI. SUMBER LAMER DESA KAMBINGAN KEC. GRATI
TAHUN ANGGARAN : 2019
LOKASI : DESA : KAMBINGAN
KECAMATAN : GRATI
KABUPATEN : PASURUAN Lembar Ke : 3
Pasangan
Galian Timbunan Mengangkut Plesteran 1 Siaran 1 Pas. Bekas
NO. SKET GAMBAR RINCIAN PERHITUNGAN VOLUME Batu kali Bongkaran Bekisting Beton Pembesian Kistdam
Tanah Tanah Material PC : 3 Ps PC : 2 Ps Bongkaran
1PC : 4Ps
(m )
3
(m )
3
(m )
3
(m )
2
(m )
2
(m )
3
(m )
3
(m )2
(m )
3
( Kg ) m'
3 BONGKARAN P5 PANJANG KA+KI 50 + 50 = 100.00 m
F1 = 0.400 x 0.400 = 0.160 m2
F2 = 0.50 x 1.00 x( 0.30 + 0.40 ) = 0.35 m2
SF = 0.51 m2
BONGKARAN
V = 0.51 x 100.00 = 51.00 m3 51.00
PAS. BEKAS BONGKARAN
V = 51.00 x 0.60 = 30.60 m3 30.60
PENAMPANG P 5 PANJANG KA+KI 50 + 50 = 100.00 m
F1 = 0.40 x 0.50 = 0.20 m2
P5 F2 = 0.50 x 1.00 x( 0.30 + 0.50 ) = 0.40 m2
SF = 0.60 m2
PASANGAN BATU KALI
V = 0.60 x 100.00 = 60.00 m3
V = 60.00 - 30.60 = 29.40 m3 29.40
SIARAN
F = 1.00 x 100.00 = 100.00 m2 100.00
PLESTERAN
F = 0.40 x 100.00 = 40.00 m2 40.00
LANGSIR = 29.40 m3 29.40
GALIAN TANAH P5
FP = 0.100 x 0.500 x 2.000 = 0.100 m2
F.KI = = - m2
F.KA = = - m2
SF = 0.100 m2
V.6-5 = 0.500 x 50.000 x( 1.500 + 0.100 ) = 40.000 m3 40.000
TIMBUNAN TANAH P5
F = = - m2
F = 0.000 x 0.000 x( 0.000 + 0.000 ) = - m2
V.6-5 = 0.500 x 50.000 x( 0.000 + 0.000 ) = - m3 -
TOTAL VOLUME = 40.00 0.00 29.40 29.40 40.00 100.00 51.00 30.60 0.00 0.00 0.00 0.00
RINCIAN PERHITUNGAN VOLUME
KEGIATAN : PERENCANAAN PEMBANGUNAN JARINGAN IRIGASI
PEKERJAAN : SUMBER LAMER (LANJUTAN) JI. SUMBER LAMER DESA KAMBINGAN KEC. GRATI
TAHUN ANGGARAN : 2019
LOKASI : DESA : KAMBINGAN
KECAMATAN : GRATI
KABUPATEN : PASURUAN Lembar Ke : 4
Pasangan
Galian Timbunan Mengangkut Plesteran 1 Siaran 1 Pas. Bekas
NO. SKET GAMBAR RINCIAN PERHITUNGAN VOLUME Batu kali Bongkaran Bekisting Beton Pembesian Kistdam
Tanah Tanah Material PC : 3 Ps PC : 2 Ps Bongkaran
1PC : 4Ps
(m )
3
(m )
3
(m )
3
(m )
2
(m )
2
(m )
3
(m )
3
(m )2
(m )
3
( Kg ) m'
BONGKARAN P4 PANJANG KA+KI 50 + 50 = 100.00 m
F1 = 0.400 x 0.400 = 0.160 m2
F2 = 0.50 x 1.00 x( 0.30 + 0.40 ) = 0.35 m2
SF = 0.51 m2
BONGKARAN
V = 0.51 x 100.00 = 51.00 m3 51.00
PAS. BEKAS BONGKARAN
V = 51.00 x 0.60 = 30.60 m3 30.60
PENAMPANG P 4 PANJANG KA+KI 50 + 50 = 100.00 m
P4 F1 = 0.40 x 0.50 = 0.20 m2
F2 = 0.50 x 1.00 x( 0.30 + 0.50 ) = 0.40 m2
SF = 0.60 m2
PASANGAN BATU KALI
V = 0.60 x 100.00 = 60.00 m3
V = 60.00 - 30.60 = 29.40 m3 29.40
SIARAN
F = 1.00 x 100.00 = 100.00 m2 100.00
PLESTERAN
F = 0.40 x 100.00 = 40.00 m2 40.00
LANGSIR = 29.40 m3 29.40
GALIAN TANAH P4
FP = 0.100 x 0.500 x 2.000 = 0.100 m2
F.KI = = - m2
F.KA = = - m2
SF = 0.100 m2
V.5-4 = 0.500 x 50.000 x( 0.100 + 0.100 ) = 5.000 m3 5.000
V.4-3 = 0.100 x 50.000 = 5.000 m3 5.000
10.00 0.00 29.40 29.40 40.00 100.00 51.00 30.60 0.00 0.00 0.00 0.00
RINCIAN PERHITUNGAN VOLUME
KEGIATAN : PERENCANAAN PEMBANGUNAN JARINGAN IRIGASI
PEKERJAAN : SUMBER LAMER (LANJUTAN) JI. SUMBER LAMER DESA KAMBINGAN KEC. GRATI
TAHUN ANGGARAN : 2019
LOKASI : DESA : KAMBINGAN
KECAMATAN : GRATI
KABUPATEN : PASURUAN Lembar Ke : 5
Pasangan
Galian Timbunan Mengangkut Plesteran 1 Siaran 1 Pas. Bekas
NO. SKET GAMBAR RINCIAN PERHITUNGAN VOLUME Batu kali Bongkaran Bekisting Beton Pembesian Kistdam
Tanah Tanah Material PC : 3 Ps PC : 2 Ps Bongkaran
1PC : 4Ps
(m )
3
(m )
3
(m )
3
(m )
2
(m )
2
(m )
3
(m )
3
(m )2
(m )
3
( Kg ) m'
PENAMPANG P 2 PANJANG KA+KI 0 + 15.5 = 15.50 m
F1 = 0.400 x 0.400 = 0.160 m2
F2 = 0.50 x 0.90 x( 0.30 + 0.40 ) = 0.32 m2
SF = 0.48 m2
PASANGAN BATU KALI
V = 0.48 x 15.50 = 7.36 m3 7.36
SIARAN
F = 0.90 x 15.50 = 13.95 m2 13.95
PLESTERAN
F = 0.40 x 15.50 = 6.20 m2 6.20
P2
GALIAN TANAH P7
FP = 0.400 x 0.400 = 0.160 m2
F.KI = 0.500 x 0.400 x 0.400 = 0.080 m2
F.KA = = - m2
SF = 0.240 m2
V = 0.24 x 14.70 = 3.53 m3 3.53
TOTAL VOLUME = 3.53 0.00 0.00 7.36 6.20 13.95 0.00 0.00 0.00 0.00 0.00 0.00
TIME SCHEDULE PELAKSANAAN