URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3-4 M3
2 Tenaga Pw 100.0 HP
3 Kapasitas Cp 6.0 Ton
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 170,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 136,000,000 Rupiah Alat baru

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 13,600,000 Rupiah

2 Faktor Angsuran Modal = i x (1 + i)^A' D 0.27741 -


(1 + i)^A' - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 16,977.48 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 136.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 17,113.48 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 187,500.00 Rupiah

2 Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 20,000.00 Rupiah

3 Perawatan dan (12,5 % - 17,5 %) x B' K 8,500.00 Rupiah


perbaikan = W'

4 Operator = ( 1 Orang / Jam ) x U1 L 15,000.00 Rupiah


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 8,000.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 239,000.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 256,113.48 Rupiah

E. LAIN - LAIN
1 Tingkat Suku Bunga i 12.00 % / Tahun
2 Upah Operator / Sopir / Mekanik U1 15,000.00 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 8,000.00 Rp./Jam
4 Bahan Bakar Bensin Mb 7,500.00 Liter
5 Bahan Bakar Solar Ms 15,000.00 Liter
6 Minyak Pelumas Mp 20,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 165.0 HP
3. Kapasitas Cp 0.97 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 695,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 556,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 55,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.27741 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 69,407.91 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 0.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 69,407.91 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 103,125.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 33,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 34,750.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 17,857.14 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,428.57 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 205,160.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 274,568.63 Rupiah

E. LAIN - LAIN
1 Tingkat Suku Bunga i 12.00 % / Tahun
2 Upah Operator / Sopir U1 17,857.14 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 16,428.57 Rp./Jam
4 Bahan Bakar Bensin Mb 7,500.00 Liter
5 Bahan Bakar Solar Ms 5,000.00 Liter
6 Minyak Pelumas Mp 20,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
JENIS PEKERJAAN : Hamparan dan meratakan batu 2,14 ton
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.50 menit
- Lain-lain T2 0.30 menit
Ts1 1.80 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 12.45 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0803 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 12.45 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 87.15 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2410 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0803 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0344 OH
- Mandor = L03:7 0.0115 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 1,4 ton
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.45 menit
- Lain-lain T2 0.30 menit
Ts1 1.75 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 12.81 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0781 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 12.81 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 89.64 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2343 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0781 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0335 OH
- Mandor = L03:7 0.0112 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 0,84 ton
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.40 menit
- Lain-lain T2 0.30 menit
Ts1 1.70 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 13.18 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0759 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 13.18 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 92.28 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2276 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0759 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0325 OH
- Mandor = L03:7 0.0108 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 220 kg
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.35 menit
- Lain-lain T2 0.30 menit
Ts1 1.65 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 13.58 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0736 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 13.58 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 95.07 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2209 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0736 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0316 OH
- Mandor = L03:7 0.0105 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 140 kg
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.30 menit
- Lain-lain T2 0.30 menit
Ts1 1.60 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 14.01 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0714 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 14.01 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 98.04 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2142 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0714 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0306 OH
- Mandor = L03:7 0.0102 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 84 kg
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.25 menit
- Lain-lain T2 0.30 menit
Ts1 1.55 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 14.46 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0692 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 14.46 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 101.21 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2075 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0692 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0296 OH
- Mandor = L03:7 0.0099 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 20 - 50 kg
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.20 menit
- Lain-lain T2 0.30 menit
Ts1 1.50 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 14.94 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0669 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 14.94 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 104.58 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2008 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0669 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0287 OH
- Mandor = L03:7 0.0096 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 10 - 20 kg
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.15 menit
- Lain-lain T2 0.30 menit
Ts1 1.45 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 15.46 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0647 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 15.46 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 108.19 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1941 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0647 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0277 OH
- Mandor = L03:7 0.0092 OH
JENIS PEKERJAAN : Hamparan dan meratakan batu 8 - 10 kg
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Muara sungai Sigeleng
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.00 -

II. URUTAN KERJA


1 Batu yang dihampar didatangkan
2 Penghamparan oleh dump truk
3 Selanjutnya Excavator meratakan
dan membentuk sesuai gambar kerja

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Material timbunan = 1 x Fk 1.00 M3

2. ALAT
2.a. EXCAVATOR + PONTON (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menghampar / meratakan T1 1.10 menit
- Lain-lain T2 0.30 menit
Ts1 1.40 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 16.01 M3/Jam


Ts1 x Fh

Koefisien Alat / M = 1 : Q1 (E10) 0.0625 Jam

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 16.01 M3/Jam
Produksi hamparan / hari = Tk x Q1 Qt 112.05 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1874 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0625 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0268 OH
- Mandor = L03:7 0.0089 OH
JENIS PEKERJAAN : Galian / Pengerukan tanah alur sungai dan pembuangan
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KET.

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Sungai Sigeleng Kab. Brebes
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.10 -

II. URUTAN KERJA


1 Tanah yang digali berada di dalam air
2 Penggalian dilakukan dengan menggunakan Excavator+ponton
3 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 7.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menggali / memuat T1 0.90 menit
- Lain-lain T2 0.30 menit
Ts1 1.20 menit

Kap. Prod. V x Fb x Fa x 60 Q1 16.98 M3/Jam


Ts1 x Fh

Koefisien = 1 : Q1 (E10) 0.0589 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 4.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts2 menit
- Waktu tempuh isi = (L : v1) x 60 T1 16.80 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 10.50 menit
- Muat = (V : Q1) x 60 T3 14.14 menit
- Lain-lain T4 1.00 menit
Ts2 42.44 menit
Berlanjut ke halaman berikut
JENIS PEKERJAAN : Galian / Pengerukan tanah alur sungai dan pembuangan
SATUAN : M3
Lanjutan

No. URAIAN KODE KOEF. SATUAN KET.

Kapasitas Produksi / Jam = V x Fa x 60 Q2 4.27 M3/Jam


Fk x Ts2

Koefisien = 1 : Q2 (E08) 0.2343 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Ls
- Sekop
- Keranjang

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 16.98 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 118.84 M3
Kebutuhan tenaga :
- Pekerja P 1.00 orang
- Mandor M 0.50 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0589 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0295 Jam

Koefisien tenaga / M3 :
- Pekerja 0.0084 OH
- Mandor 0.0042 OH
JENIS PEKERJAAN : Galian / Pengerukan tanah alur sungai + urugan dan perataan tanggul
SATUAN : M3

No. URAIAN KODE KOEF. SATUAN KET.

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Sungai Sigeleng Kab. Brebes
3 Jam kerja efektif per-hari Tk 7.00 Jam
4 Faktor pengembangan bahan Fk 1.10 -

II. URUTAN KERJA


1 Tanah yang digali berada di dalam air
2 Penggalian dilakukan dengan menggunakan Excavator+ponton
3 Selanjutnya Excavator menuangkan material hasil
galian diatas tanggul
4 Excavator memdatkan dan meratakan urugan tanggul

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menggali / memuat T1 1.00 menit
- Memadatkan, meratakan, dan Lain-Lain T2 1.00 menit
Ts1 2.00 menit

Kap. Prod. V x Fb x Fa x 60 Q1 10.19 M3/Jam


Ts1 x Fh

Koefisien = 1 : Q1 (E10) 0.0982 Jam

2.b. ALAT BANTU


Diperlukan alat-alat bantu kecil Ls
- Sekop
- Keranjang
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 10.19 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 71.30 M3
Kebutuhan tenaga :
- Pekerja P 1.00 orang
- Mandor M 0.50 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0982 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0491 Jam

Koefisien tenaga / M3 :
- Pekerja = L01:7 0.0140 OH
- Mandor = L03:7 0.0070 OH
DAFTAR HARGA BAHAN

No JENIS BAHAN SATUAN HARGA (Rp)


1 Pasir Pasang/teras m³ 228,000.00
2 Batu Kali Belah m³ 150,000.00
3 Batu Split 2/3 m³ 155,000.00
4 Semen PC (40 kg) Holcim zak 60,000.00
5 Batu bulat belah W= 8-10 kg m³ 90,000.00
6 Batu bulat belah W= 10-20 kg m³ 95,000.00
7 Batu bulat belah W= 20-50 kg m³ 100,000.00
8 Batu bulat belah W= 84 kg m³ 105,000.00
9 Batu bulat belah W= 140 kg m³ 110,000.00
10 Batu bulat belah W= 220 kg m³ 115,000.00
11 Batu bulat belah W= 0,84 ton m³ 120,000.00
12 Batu bulat belah W= 1,4 ton m³ 125,000.00
13 Batu bulat belah W= 2,14 ton m³ 130,000.00
14 Pipa PVC Ø 2" (Panjang 4 m) m´ 35,000.00
15 Ijuk Ikat 6,000.00
16 Bensin Liter 7,500.00
17 Solar Liter 5,000.00
18 Pelumas Liter 20,000.00

DAFTAR HARGA UPAH PEKERJA

No JENIS PEKERJAAN SATUAN HARGA (Rp)


1 Kepala Tukang OH -
2 Mandor OH 130,000.00
3 Pekerja OH 100,000.00
4 Tukang Batu OH 110,000.00
5 Operator OH 125,000.00
6 Pembantu Operator OH 115,000.00

DAFTAR HARGA SEWA ALAT

No JENIS PEKERJAAN SATUAN HARGA (Rp)


1 Excavator jam 274,568.63
2 Dump Truck jam 256,113.48
3 Ponton jam 150,000.00
4 Alat bantu Ls 1,000.00
PEKERJAAN PERENCANAAN NORMALISASI SUNGAI KENDAL
LOKASI KABUPATEN KENDAL
TAHUN ANGGARAN : 2019

No. ANALISA KETERANGAN SAT INDEK HARGA (Rp) ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH (Rp)
a. b. c. d. e. f. g = (exf) h = (exf) i = (exf) j = (g+h+i)

SGL-01 1 m³ Pengerukan tanah menggunakan alat berat + pembuangan sejauh 2 km


(Dihitung) Pekerja OH 0.0084 100,000.00 841.46 841.46
Mandor OH 0.0042 130,000.00 546.95 546.95
Excavator jam 0.0589 274,568.63 16,172.72 16,172.72
1 Dump Truck jam 0.2343 256,113.48 60,017.21 60,017.21
Ponton jam 0.1000 150,000.00 15,000.00 15,000.00
Alat bantu Ls 1.0000 1,000.00 1,000.00 1,000.00
Total 92,189.93 1,388.41
Total Harga 93,578.34
SGL-02 1 m³ Pengerukan tanah menggunakan alat berat + urugan tanggul diratakan dan dipadatkan
(Dihitung) Pekerja OH 0.0140 100,000.00 1,402.44 1,402.44
Mandor OH 0.0070 130,000.00 911.58 911.58
Excavator jam 0.0982 274,568.63 26,954.53 26,954.53
2
Ponton jam 0.1000 150,000.00 15,000.00 15,000.00
Alat bantu Ls 1.0000 1,000.00 1,000.00 1,000.00
Total 42,954.53 2,314.02
Total Harga 45,268.55
BLR-03 Menggali 1 m3 tanah biasa sedalam 1 meter
(DT 91-0006 2007) Pekerja OH 0.750 29,400.00 22,050.00 22,050.00
3 Mandor OH 0.025 43,050.00 1,076.25 1,076.25
Total 23,126.25
Total Harga 23,126.25
SGL-04 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
(DT 91-0007 2007) Batu Kali Belah m³ 1.2000 150,000.00 180,000.00 180,000.00
Semen PC (40 kg) Holcim zak 4.0750 60,000.00 244,500.00 244,500.00
Pasir Pasang/teras m³ 0.5200 228,000.00 118,560.00 118,560.00
Pekerja OH 1.5000 100,000.00 150,000.00 150,000.00
4
Tukang Batu OH 0.6000 110,000.00 66,000.00 66,000.00
Kepala Tukang OH 0.0600 - - -
Mandor OH 0.0750 130,000.00 9,750.00 9,750.00
Total - 225,750.00 543,060.00
Total Harga 768,810.00
SGL-05 1 bh Pipa resap
(Dihitung) Batu Split 2/3 m³ 0.0080 155,000.00 1,240.00 1,240.00
Pipa PVC Ø 2" (Panjang 4 m) m´ 0.1000 35,000.00 3,500.00 3,500.00
5 Ijuk Ikat 2.0000 6,000.00 12,000.00 12,000.00
Pekerja OH 0.3000 100,000.00 30,000.00 30,000.00
Total 30,000.00 16,740.00
Total Harga 46,740.00
SGL-06 1 m³ Menghampar dan meratakan batu kosong W = 8 - 10 kg
(Dihitung) Batu bulat belah W= 8-10 kg m³ 1.0000 90,000.00 90,000.00 90,000.00
Pekerja OH 0.0268 100,000.00 2,677.38 2,677.38
6
Mandor OH 0.0089 130,000.00 1,160.20 1,160.20
Excavator jam 0.0625 274,568.63 17,152.88 17,152.88
Total 17,152.88 3,837.57 90,000.00 110,990.45
SGL-07 1 m³ Menghampar dan meratakan batu kosong W = 10 - 20 kg
(Dihitung) Batu bulat belah W= 10-20 kg m³ 1.0000 95,000.00 95,000.00 95,000.00
Pekerja OH 0.0277 100,000.00 2,773.00 2,773.00
7
Mandor OH 0.0092 130,000.00 1,201.63 1,201.63
Excavator jam 0.0647 274,568.63 17,765.48 17,765.48
Total 17,765.48 3,974.63 95,000.00 116,740.11
SGL-08 1 m³ Menghampar dan meratakan batu kosong W = 20 - 50 kg
(Dihitung) Batu bulat belah W= 20-50 kg m³ 1.0000 100,000.00 100,000.00 100,000.00
Pekerja OH 0.0287 100,000.00 2,868.62 2,868.62
8
Mandor OH 0.0096 130,000.00 1,243.07 1,243.07
Excavator jam 0.0669 274,568.63 18,378.09 18,378.09
Total 18,378.09 4,111.68 100,000.00 122,489.77
SGL-09 1 m³ Menghampar dan meratakan batu kosong W = 84 kg
(Dihitung) Batu bulat belah W= 84 kg m³ 1.0000 105,000.00 105,000.00 105,000.00
Pekerja OH 0.0296 100,000.00 2,964.24 2,964.24
9
Mandor OH 0.0099 130,000.00 1,284.50 1,284.50
Excavator jam 0.0692 274,568.63 18,990.69 18,990.69
Total 18,990.69 4,248.74 105,000.00 128,239.43
SGL-10 1 m³ Menghampar dan meratakan batu kosong W = 140 kg
(Dihitung) Batu bulat belah W= 140 kg m³ 1.0000 110,000.00 110,000.00 110,000.00
Pekerja OH 0.0306 100,000.00 3,059.86 3,059.86
10
Mandor OH 0.0102 130,000.00 1,325.94 1,325.94
Excavator jam 0.0714 274,568.63 19,603.29 19,603.29
Total 19,603.29 4,385.80 110,000.00 133,989.09
SGL-11 1 m³ Menghampar dan meratakan batu kosong W = 220 kg
(Dihitung) Batu bulat belah W= 220 kg m³ 1.0000 115,000.00 115,000.00 115,000.00
Pekerja OH 0.0316 100,000.00 3,155.48 3,155.48
11
Mandor OH 0.0105 130,000.00 1,367.37 1,367.37
Excavator jam 0.0736 274,568.63 20,215.90 20,215.90
Total 20,215.90 4,522.85 115,000.00 139,738.75
12 SGL-12 1 m³ Menghampar dan meratakan batu kosong W = 0,84 ton
(Dihitung) Batu bulat belah W= 0,84 ton m³ 1.0000 120,000.00 120,000.00 120,000.00
Pekerja OH 0.0325 100,000.00 3,251.10 3,251.10
Mandor OH 0.0108 130,000.00 1,408.81 1,408.81
Excavator jam 0.0759 274,568.63 20,828.50 20,828.50
Total 20,828.50 4,659.91 120,000.00 145,488.41
13 SGL-13 1 m³ Menghampar dan meratakan batu kosong W = 1,4 ton
(Dihitung) Batu bulat belah W= 1,4 ton m³ 1.0000 125,000.00 125,000.00 125,000.00
Pekerja OH 0.0335 100,000.00 3,346.72 3,346.72
Mandor OH 0.0112 130,000.00 1,450.25 1,450.25
Excavator jam 0.0781 274,568.63 21,441.10 21,441.10
Total 21,441.10 4,796.97 125,000.00 151,238.07
14 SGL-14 1 m³ Menghampar dan meratakan batu kosong W = 2,14 ton
(Dihitung) Batu bulat belah W= 2,14 ton m³ 1.0000 130,000.00 130,000.00 130,000.00
Pekerja OH 0.0344 100,000.00 3,442.34 3,442.34
Mandor OH 0.0115 130,000.00 1,491.68 1,491.68
Excavator jam 0.0803 274,568.63 22,053.71 22,053.71
Total 22,053.71 4,934.02 130,000.00 156,987.73
HARGA SATUAN PEKERJAAN

PEKERJAAN : PEMELIHARAAN BERKALA SUNGAI BATANG GEDE


LOKASI : KABUPATEN SUBANG
TAHUN ANGGARAN : 2019

No.ITEM PEKERJAAN KODE SATUAN HARGA SATUAN


ANALISA (Rp)

I PEKERJAAN PERSIAPAN
1 Direksi Keet - Ls 2,000,000.00
2 Mobilisasi & Demobilisasi - Ls 15,000,000.00
3 Pembersihan Lokasi - Ls 4,000,000.00
4 Penyediaan Air Kerja dan Listrik - Ls 1,000,000.00
5 Pengukuran dan Pemasangan Bowplank - Ls 3,000,000.00
6 Papan Nama Proyek - Ls 1,000,000.00

II PEKERJAAN NORMALISASI SUNGAI


1 Pengerukan tanah dan pembuangan SGL-01 m³ 93,578.34
2 Pengerukan tanah dan perataan tanggul SGL-02 m³ 45,268.55
3 Galian tanah manual BLR-03 m³ 23,126.25
4 Pasangan Batu Kali 1Pc : 4Pp SGL-04 m³ 768,810.00
5 Pipa resap / suling - suling SGL-05 buah 46,740.00
6 Kisdam - Ls 13,000.00

III PEKERJAAN BREAKWATER


1 Menghampar dan meratakan batu kosong W = 8 - 10 kg SGL-06 m³ 110,990.45
2 Menghampar dan meratakan batu kosong W = 10 - 20 kg SGL-07 m³ 116,740.11
3 Menghampar dan meratakan batu kosong W = 20 - 50 kg SGL-08 m³ 122,489.77
4 Menghampar dan meratakan batu kosong W = 84 kg SGL-09 m³ 128,239.43
5 Menghampar dan meratakan batu kosong W = 140 kg SGL-10 m³ 133,989.09
6 Menghampar dan meratakan batu kosong W = 220 kg SGL-11 m³ 139,738.75
7 Menghampar dan meratakan batu kosong W = 0,84 ton SGL-12 m³ 145,488.41
8 Menghampar dan meratakan batu kosong W = 1,4 ton SGL-13 m³ 151,238.07
9 Menghampar dan meratakan batu kosong W = 2,14 ton SGL-14 m³ 156,987.73
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PERENCANAAN NORMALISASI SUNGAI SILANDAK


LOKASI : KABUPATEN SUBANG
TAHUN ANGGARAN : 2019

No. ITEM PEKERJAAN SAT. VOLUME KODE HARGA SATUAN JUMLAH


ANALISA (Rp) (Rp)

I PEKERJAAN PERSIAPAN
2 Mobilisasi & Demobilisasi Ls 1.00 - 15,000,000.00 15,000,000.00
3 Pembersihan Lokasi Ls 1.00 - 4,000,000.00 4,000,000.00
4 Penyediaan Air Kerja dan Listrik Ls 1.00 - 1,000,000.00 1,000,000.00
5 Pengukuran dan Pemasangan Bowplank Ls 1.00 - 3,000,000.00 3,000,000.00
6 Papan Nama Proyek Ls 1.00 - 1,000,000.00 1,000,000.00
SUB TOTAL I 24,000,000.00

II PEKERJAAN NORMALISASI SUNGAI


1 Pengerukan tanah dan pembuangan m³ 78380.08 SGL-01 93,578.34 7,334,677,704.34
2 Pengerukan tanah dan perataan tanggul m³ 17637.86 SGL-02 45,268.55 798,440,285.63
3 Kisdam Ls 2,800.00 - 13,000.00 36,400,000.00

SUB TOTAL II 8,169,517,989.96

III PEKERJAAN BREAKWATER


1 Menghampar dan meratakan batu kosong W = 20 - 50 kg m³ 4879.87 SGL-08 122,489.77 597,734,160.66
2 Menghampar dan meratakan batu kosong W = 220 kg m³ 9210.35 SGL-11 139,738.75 1,287,043,241.98
3 Menghampar dan meratakan batu kosong W = 2,14 ton m³ 23615.45 SGL-14 156,987.73 3,707,336,595.55

SUB TOTAL III 5,592,113,998.19


REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMELIHARAAN BERKALA SUNGAI BATANG GEDE


LOKASI : KABUPATEN SUBANG
TAHUN ANGGARAN : 2019

NO
URAIAN PEKERJAAN TOTAL (Rp)
I PEKERJAAN PESIAPAN 24,000,000.00
II PEKERJAAN NORMALISASI SUNGAI 8,169,517,989.96
II PEKERJAAN BREAKWATER 5,592,113,998.19

JUMLAH Rp. 13,785,631,988.15


PPN 10 % Rp. 1,378,563,198.82

JUMLAH TOTAL Rp. 15,164,195,186.97


DIBULATKAN Rp. 15,164,195,000.00

Terbilang :
Galian
Patok Jarak (m) Luas (m2) Volume (m3) Patok
P.0 11.317 P.0 + 050
50 472.05
P.0 + 050 7.565 P1
P1 7.183 P.1 + 050
50 554.075
P.1 + 050 14.98 P.2
P.2 10.394 P.2 + 050
50 632.1
P.2 + 050 14.89 P.2 + 097
P.2 + 097 2.1 P.3
2.5 3.625
P.3 0.8 P.3 + 050
P.3 + 050 4.229 P.5
150 392.175
P.5 1 P.5 + 050
P.5 + 050 17.59 P.6
50 885.15
P.6 17.816 P.6 + 050
P.6 + 050 13.192 P.7
50 690.8
P.7 14.44 P.7 + 023.6
P.7 + 023.6 16.677 P.7 + 050
13.4 190.5547
P.7 + 050 11.764 P.8
P.8 17.734 P.8 + 050
50 804.725
P.8 + 050 14.455 P.9
P.9 22.889 P.9 + 050
50 1237.25
P.9 + 050 26.601 P.10
P.10 16.117 P.10 + 050
50 982
P.10 + 050 23.163 P.11
P.11 24.114 P.11 + 050
50 991.775
P.11 + 050 15.557 P.11 + 056
P.11 + 056 2.1 P.12
44 369.028
P.12 14.674 P.12 + 050
P.12 + 050 15.71 P.13
50 800.7
P.13 16.318 P.13 + 050
P.13 + 050 17.161 P.13 + 065
15 154.2075
P.13 + 065 3.4 P.14
P.14 15.179 P.14 + 050
50 845.4
P.14 + 050 18.637 P.15
P.15 13.72 P.15 + 031
31 228.16
P.15 + 031 1 P.15 + 050
P.15 + 050 14.374 P.16
50 773.25
P.16 16.556 P.16 + 036.6
P.16 + 036.6 2.1 P.16 + 050
13.4 107.468
P.16 + 050 13.94 P.17
P.17 5.188 P.17 + 050
50 317.05
P.17 + 050 7.494 P.18
P.18 17.016 P.18 + 050
50 781.3
P.18 + 050 14.236 P.19
P.19 11.05 P.19 + 050
50 565.125
P.19 + 050 11.555 P.20
P.20 14.314 P.20 + 050
50 644.5
P.20 + 050 11.466 P.21
P.21 13.047 P.21 + 050
50 486.5
P.21 + 050 6.413 P.22
P.22 14.221 P.22 + 050
50 526.6
P.22 + 050 6.843 P.23
P.23 9.675 P.23 + 050
50 351.5
P.23 + 050 4.385 P.24
P.24 12.27 P.24 + 050
50 477.225
P.24 + 050 6.819 P.25
P.25 14.483 P.25 + 065
65 496.6975
P.25 + 065 0.8 P.26 + 013
P.26 + 013 2.2 P.26 + 050
37 219.595
P.26 + 050 9.67 P.27
P.27 8.343 P.27 + 050
50 450.65
P.27 + 050 9.683 P.28
P.28 12.536 P.28 + 050
50 523.6
P.28 + 050 8.408 P.29
P.29 9.844 P.29 + 050
50 441.175
P.29 + 050 7.803 P.29 + 060
P.29 + 060 0.2 P.30
40 231.92
P.30 11.396 P.30 + 050
P.30 + 050 10.526 P.31 A
50 528.925
P.31 A 10.631 P.31 + 050
P.31 + 050 9.396 P.31 B
50 422.05
P.31 B 7.486 P.31 + 050
P.31 + 050 2.413 P.32
50 148.5
P.32 3.527 P.32 + 050
P.32 + 050 2.1 P.33
50 222.35
P.33 6.794 P.33 + 050
P.33 + 050 5.795 P.34
50 227.55
P.34 3.307 P.34 + 050
P.34 + 050 2.824 P.35
50 142.625
P.35 2.881 P.35 + 050
P.35 + 050 3.441 P.36
50 177.55
P.36 3.661 P.36 + 050
P.36 + 050 3.264 P.37
50 134.9
P.37 2.132 P.37 + 050
P.37 + 050 1.105 P.38
50 292
P.38 10.575 P.38 + 050
P.38 + 050 2.491 P.39
50 166.95
P.39 4.187 P.39 + 050
P.39 + 050 9 P.40
50 250
P.40 1 P. 40 + 050
P. 40 + 050 2.276 P.41
50 158.175
P.41 4.051 P.41 + 050
P.41 + 050 3.861 P.42
50 195.05
P.42 3.941 P.42 + 050
P.42 + 050 4.585 P.43
50 237.675
P.43 4.922 P.43 + 050
P.43 + 050 2.352 P.44
50 172.25
P.44 4.538 P.44 + 027
P.44 + 027 2.1 P.44+ 050
23 177.8475
P.44+ 050 13.365 P.45
P.45 12.63 P.45 + 050
50 623.3
P.45 + 050 12.302 P.46
P.46 11.412 P.46 +050
50 786.7
P.46 +050 20.056 P.47
P.47 11.068 P.47 + 040
40 237.36
P.47 + 040 0.8 P.47 + 050
P.47 + 050 15.723 P.47 + 080
30 250.845
P.47 + 080 1 P.48
P.48 13.884 P.48 + 048
48 414.816
P.48 + 048 3.4 P.48 + 050
P.48 + 050 17.605 P.49
50 754.325
P.49 12.568 P.49 + 050
P.49 + 050 14.479 P.50
50 386.975
P.50 1 P.50 + 050
P.50 + 050 12.911 P.51
50 700.275
P.51 15.1 P.51 + 050
P.51 + 050 17.309 P.52
50 603.25
P.52 6.821 P.52 + 050
P.52 + 050 11.047 P.52 + 076
26 143.611
P.52 + 076 0 P.53
P.53 15.941 P.53 + 050
50 642.75
P.53 + 050 9.769 P.54
P.54 11.813 P.54 + 050
50 752.525
P.54 + 050 18.288 P.55
P.55 11.867 P.55 + 050
50 634.875
P.55 + 050 13.528 P.56
P.56 18.514 P.56 + 050
50 818.2
P.56 + 050 14.214 P.57
P.57 30.694 P.57+ 050
50 1177.9
P.57+ 050 16.422 P.58
P.58 24.917 P.58 + 025
25 495.6875
P.58 + 025 14.738 P.58 + 050
P.58 + 050 21.316 P.59
50 1134.55
P.59 24.066 P.59 + 050
P.59 + 050 26.57 P.60
50 1874.125
P.60 48.395 P.60 + 050
P.60 + 050 56.979 P.61
50 2494.875
P.61 42.816 P.61 + 050
P.61 + 050 41.5 P.62
50 2561.5
P.62 60.96 P.62 + 050
P.62 + 050 66.134 P.63
50 3199.475
P.63 61.845 P.63 + 050
P.63 + 050 63.806 P.64
50 3799.875
P.64 88.189 P.64 + 050
P.64 + 050 95.607 P.65
50 4688.225
P.65 91.922 P.65 + 050
P.65 + 050 45.667 P.66
50 3474.55
P.66 93.315 P.66 + 050
P.66 + 050 2.1 P.67
50 1755.325
P.67 68.113 P.67 + 050
P.67 + 050 65.97 P.68
50 3966.2
P.68 92.678 P.68 + 050
P.68 + 050 0.2 P.69
50 90
P.69 3.4 P.69+ 050
P.69+ 050 2.1 P.70
50 2334.725
P.70 91.289 P.70 + 050
P.70 + 050 72.632 P.71
50 3741.75
P.71 77.038 P.71 + 050
P.71 + 050 76.435 P.72 A
50 3825.225
P.72 A 76.574 P.72
P.72 62.968 P.72 + 050
50 3391.875
P.72 + 050 72.707 P.73
P.73 63.459 P.73 + 050
50 3929.9
P.73 + 050 93.737 P.74
P.74 92.497 P.74 + 050
50 3387.775
P.74 + 050 43.014 P.75
P.75 71.229 P.75 + 050
50 3544.275
P.75 + 050 70.542 P.76
P.76 59.939 P.76 + 050
50 2996.775
P.76 + 050 59.932 P.77
P.77 55 P.77 + 050
50 2096.6
P.77 + 050 28.864 P.78
P.78 50.878 P.78 + 050
50 3003.05
P.78 + 050 69.244 P.79
P.79 72.166 P.79 + 050
50 3409.725
P.79 + 050 64.223 P. 80
P. 80 77.823 P.80 + 050
50 2030.575
P.80 + 050 3.4 P.81
P.81 122.833 P.81 + 050
50 3090.825
P.81 + 050 0.8 P.82
P.82 2.2 P.82 + 050
50 2334.55
P.82 + 050 91.182 P.83
P.83 96.872 P.83 + 050
50 5046.8
P.83 + 050 105
Galian
Jarak (m) Luas (m2) Volume (m3) Patok Jarak (m)
7.565 P.0
50 368.7 50
7.183 P.0 + 050
14.98 P1
50 634.35 50
10.394 P.1 + 050
10.394 P.2
47.5 600.495 50
14.89 P.2 + 050
2.1 P.2 + 097
50 72.5 2.5
0.8 P.3
2.2 P.3 + 050
150 240 150
1 P.5
17.816 P.5 + 050
50 775.2 50
13.192 P.6
14.44 P.6 + 050
23.69 368.580865 50
16.677 P.7
11.764 P.7 + 023.6
50 637.45 13.4
13.734 P.7 + 050
14.455 P.8
50 933.6 50
22.889 P.8 + 050
26.601 P.9
50 1067.95 50
16.117 P.9 + 050
23.163 P.10
50 1181.925 50
24.114 P.10 + 050
15.557 P.11
6 56.871 50
3.4 P.11 + 050
14.674 P.11 + 056
50 759.6 44
15.71 P.12
16.318 P.12 + 050
50 836.975 50
17.161 P.13
0.2 P.13 + 050
35 269.1325 15
15.179 P.13 + 065
18.637 P.14
50 808.925 50
13.72 P.14 + 050
2.2 P.15
19 157.453 31
14.374 P.15 + 031
16.556 P.15 + 050
36.6 365.1948 50
3.4 P.16
13.94 P.16 + 036.6
50 478.2 13.4
5.188 P.16 + 050
7.494 P.17
50 612.75 50
17.016 P.17 + 050
14.236 P.18
50 632.15 50
11.05 P.18 + 050
11.555 P.19
50 646.725 50
14.314 P.19 + 050
11.466 P.20
50 612.825 50
13.047 P.20 + 050
6.413 P.21
50 515.85 50
14.221 P.21 + 050
6.843 P.22
50 412.95 50
9.675 P.22 + 050
4.385 P.23
50 416.375 50
12.27 P.23 + 050
6.819 P.24
50 532.55 50
14.483 P.24 + 050
2.1 P.25
63 91.35 65
0.8 P.25 + 065
9.67 P.26 + 013
50 450.325 37
8.343 P.26 + 050
9.683 P.27
50 555.475 50
12.536 P.27 + 050
8.408 P.28
50 456.3 50
9.844 P.28 + 050
7.803 P.29
10 44.015 50
1 P.29 + 050
11.396 P.29 + 060
50 548.05 40
10.526 P.30
10.631 P.30 + 050
50 500.675 50
9.396 P.31 A
7.486 P.31 + 050
50 247.475 50
2.413 P.31 B
3.527 P.31 + 050
50 173.175 50
3.4 P.32
6.794 P.32 + 050
50 314.725 50
5.795 P.33
3.307 P.33 + 050
50 153.275 50
2.824 P.34
2.881 P.34 + 050
50 158.05 50
3.441 P.35
3.661 P.35 + 050
50 173.125 50
3.264 P.36
2.132 P.36 + 050
50 80.925 50
1.105 P.37
10.575 P.37 + 050
50 326.65 50
2.491 P.38
4.187 P.38 + 050
50 329.675 50
9 P.39
2.2 P.39 + 050
50 111.9 50
2.276 P.40
4.051 P. 40 + 050
50 197.8 50
3.861 P.41
3.941 P.41 + 050
50 213.15 50
4.585 P.42
4.922 P.42 + 050
50 181.85 50
2.352 P.43
4.538 P.43 + 050
27 107.163 50
3.4 P.44
13.365 P.44 + 027
50 649.875 23
12.63 P.44+ 050
12.302 P.45
50 592.85 50
11.412 P.45 + 050
20.056 P.46
50 778.1 50
11.068 P.46 +050
2.1 P.47
10 89.115 40
15.723 P.47 + 040
2.2 P.47 + 050
20 160.874 30
13.8874 P.47 + 080
0.2 P.48
2 17.805 48
17.605 P.48 + 048
12.568 P.48 + 050
50 676.175 50
14.479 P.49
2.2 P.49 + 050
50 377.775 50
12.911 P.50
15.1 P.50 + 050
50 810.225 50
17.309 P.51
6.821 P.51 + 050
50 446.7 50
11.047 P.52
0 P.52 + 050
24 191.292 26
15.941 P.52 + 076
9.769 P.53
50 539.55 50
11.813 P.53 + 050
18.288 P.54
50 753.875 50
11.867 P.54 + 050
13.528 P.55
50 801.05 50
18.514 P.55 + 050
14.214 P.56
50 1122.7 50
30.694 P.56 + 050
16.422 P.57
50 1033.475 50
24.917 P.57+ 050
14.738 P.58
25 450.675 25
21.316 P.58 + 025
24.066 P.58 + 050
50 1265.9 50
26.57 P.59
48.395 P.59 + 050
50 2634.35 50
56.979 P.60
42.816 P.60 + 050
50 2096.65 50
41.05 P.61
60.96 P.61 + 050
50 1524 50
P.62
61.845 P.62 + 050
50 3141.275 50
63.806 P.63
88.189 P.63 + 050
50 4594.9 50
95.607 P.64
91.922 P.64 + 050
50 3439.725 50
45.667 P.65
93.315 P.65 + 050
50 2417.875 50
3.4 P.66
68.113 P.66 + 050
50 3352.075 50
65.97 P.67
92.678 P.67 + 050
50 2341.95 50
1 P.68
0.2 P.68 + 050
50 90 50
3.4 P.69
91.289 P.69+ 050
50 4098.025 50
72.632 P.70
77.038 P.70 + 050
50 3836.825 50
76.435 P.71
76.574 P.71 + 050
50 3488.55 50
62.968 P.72 A
72.707 P.72
50 3404.15 50
63.459 P.72 + 050
93.737 P.73
50 4655.85 50
92.497 P.73 + 050
43.014 P.74
50 2856.075 50
71.229 P.74 + 050
70.542 P.75
50 3262.025 50
59.939 P.75 + 050
59.932 P.76
50 2873.3 50
55 P.76 + 050
28.864 P.77
50 1993.55 50
50.878 P.77 + 050
69.244 P.78
50 3535.25 50
72.166 P.78 + 050
64.223 P.79
50 3551.15 50
77.823 P.79 + 050
0.2 P. 80
50 3075.825 50
122.833 P.80 + 050
2.1 P.81
50 72.5 50
0.8 P.81 + 050
91.182 P.82
50 4701.35 50
96.872 P.82 + 050
50 105 2625 P.83
50
P.83 + 050
Urugan Urugan
Luas (m2) Volume (m3) Patok Jarak (m) Luas (m2)
11.317 P.0 + 050 7.565
472.05 50
7.565 P1 7.183
7.183 P.1 + 050 14.98
554.075 50
14.98 P.2 10.394
10.394 P.2 + 050 10.394
632.1 47.5
14.89 P.2 + 097 14.89
2.1 P.3 2.1
3.625 50
0.8 P.3 + 050 0.8
4.229 P.5 2.2
392.175 150
1 P.5 + 050 1
17.59 P.6 17.816
885.15 50
17.816 P.6 + 050 13.192
13.192 P.7 14.44
690.8 23.69
14.44 P.7 + 023.6 16.677
16.677 P.7 + 050 11.764
190.5547 50
11.764 P.8 13.734
17.734 P.8 + 050 14.455
804.725 50
14.455 P.9 22.889
22.889 P.9 + 050 26.601
1237.25 50
26.601 P.10 16.117
16.117 P.10 + 050 23.163
982 50
23.163 P.11 24.114
24.114 P.11 + 050 15.557
991.775 6
15.557 P.11 + 056 3.4
2.1 P.12 14.674
369.028 50
14.674 P.12 + 050 15.71
15.71 P.13 16.318
800.7 50
16.318 P.13 + 050 17.161
17.161 P.13 + 065 0.2
154.2075 35
3.4 P.14 15.179
15.179 P.14 + 050 18.637
845.4 50
18.637 P.15 13.72
13.72 P.15 + 031 2.2
228.16 19
1 P.15 + 050 14.374
14.374 P.16 16.556
773.25 36.6
16.556 P.16 + 036.6 3.4
2.1 P.16 + 050 13.94
107.468 50
13.94 P.17 5.188
5.188 P.17 + 050 7.494
317.05 50
7.494 P.18 17.016
17.016 P.18 + 050 14.236
781.3 50
14.236 P.19 11.05
11.05 P.19 + 050 11.555
565.125 50
11.555 P.20 14.314
14.314 P.20 + 050 11.466
644.5 50
11.466 P.21 13.047
13.047 P.21 + 050 6.413
486.5 50
6.413 P.22 14.221
14.221 P.22 + 050 6.843
526.6 50
6.843 P.23 9.675
9.675 P.23 + 050 4.385
351.5 50
4.385 P.24 12.27
12.27 P.24 + 050 6.819
477.225 50
6.819 P.25 14.483
14.483 P.25 + 065 2.1
496.6975 63
0.8 P.26 + 013 0.8
2.2 P.26 + 050 9.67
219.595 50
9.67 P.27 8.343
8.343 P.27 + 050 9.683
450.65 50
9.683 P.28 12.536
12.536 P.28 + 050 8.408
523.6 50
8.408 P.29 9.844
9.844 P.29 + 050 7.803
441.175 10
7.803 P.29 + 060 1
0.2 P.30 11.396
231.92 50
11.396 P.30 + 050 10.526
10.526 P.31 A 10.631
528.925 50
10.631 P.31 + 050 9.396
9.396 P.31 B 7.486
422.05 50
7.486 P.31 + 050 2.413
2.413 P.32 3.527
148.5 50
3.527 P.32 + 050 3.4
2.1 P.33 6.794
222.35 50
6.794 P.33 + 050 5.795
5.795 P.34 3.307
227.55 50
3.307 P.34 + 050 2.824
2.824 P.35 2.881
142.625 50
2.881 P.35 + 050 3.441
3.441 P.36 3.661
177.55 50
3.661 P.36 + 050 3.264
3.264 P.37 2.132
134.9 50
2.132 P.37 + 050 1.105
1.105 P.38 10.575
292 50
10.575 P.38 + 050 2.491
2.491 P.39 4.187
166.95 50
4.187 P.39 + 050 9
9 P.40 2.2
250 50
1 P. 40 + 050 2.276
2.276 P.41 4.051
158.175 50
4.051 P.41 + 050 3.861
3.861 P.42 3.941
195.05 50
3.941 P.42 + 050 4.585
4.585 P.43 4.922
237.675 50
4.922 P.43 + 050 2.352
2.352 P.44 4.538
172.25 27
4.538 P.44 + 027 3.4
2.1 P.44+ 050 13.365
177.8475 50
13.365 P.45 12.63
12.63 P.45 + 050 12.302
623.3 50
12.302 P.46 11.412
11.412 P.46 +050 20.056
786.7 50
20.056 P.47 11.068
11.068 P.47 + 040 2.1
237.36 10
0.8 P.47 + 050 15.723
15.723 P.47 + 080 2.2
250.845 20
1 P.48 13.8874
13.884 P.48 + 048 0.2
414.816 2
3.4 P.48 + 050 17.605
17.605 P.49 12.568
754.325 50
12.568 P.49 + 050 14.479
14.479 P.50 2.2
386.975 50
1 P.50 + 050 12.911
12.911 P.51 15.1
700.275 50
15.1 P.51 + 050 17.309
17.309 P.52 6.821
603.25 50
6.821 P.52 + 050 11.047
11.047 P.52 + 076 0
143.611 24
0 P.53 15.941
15.941 P.53 + 050 9.769
642.75 50
9.769 P.54 11.813
11.813 P.54 + 050 18.288
752.525 50
18.288 P.55 11.867
11.867 P.55 + 050 13.528
634.875 50
13.528 P.56 18.514
18.514 P.56 + 050 14.214
818.2 50
14.214 P.57 30.694
30.694 P.57+ 050 16.422
1177.9 50
16.422 P.58 24.917
24.917 P.58 + 025 14.738
495.6875 25
14.738 P.58 + 050 21.316
21.316 P.59 24.066
1134.55 50
24.066 P.59 + 050 26.57
26.57 P.60 48.395
1874.125 50
48.395 P.60 + 050 56.979
56.979 P.61 42.816
2494.875 50
42.816 P.61 + 050 41.05
41.5 P.62 60.96
2561.5 50
60.96 P.62 + 050
66.134 P.63 61.845
3199.475 50
61.845 P.63 + 050 63.806
63.806 P.64 88.189
3799.875 50
88.189 P.64 + 050 95.607
95.607 P.65 91.922
4688.225 50
91.922 P.65 + 050 45.667
45.667 P.66 93.315
3474.55 50
93.315 P.66 + 050 3.4
2.1 P.67 68.113
1755.325 50
68.113 P.67 + 050 65.97
65.97 P.68 92.678
3966.2 50
92.678 P.68 + 050 1
0.2 P.69 0.2
90 50
3.4 P.69+ 050 3.4
2.1 P.70 91.289
2334.725 50
91.289 P.70 + 050 72.632
72.632 P.71 77.038
3741.75 50
77.038 P.71 + 050 76.435
76.435 P.72 A 76.574
3825.225 50
76.574 P.72 62.968
62.968 P.72 + 050 72.707
3391.875 50
72.707 P.73 63.459
63.459 P.73 + 050 93.737
3929.9 50
93.737 P.74 92.497
92.497 P.74 + 050 43.014
3387.775 50
43.014 P.75 71.229
71.229 P.75 + 050 70.542
3544.275 50
70.542 P.76 59.939
59.939 P.76 + 050 59.932
2996.775 50
59.932 P.77 55
55 P.77 + 050 28.864
2096.6 50
28.864 P.78 50.878
50.878 P.78 + 050 69.244
3003.05 50
69.244 P.79 72.166
72.166 P.79 + 050 64.223
3409.725 50
64.223 P. 80 77.823
77.823 P.80 + 050 0.2
2030.575 50
3.4 P.81 122.833
122.833 P.81 + 050 2.1
3090.825 50
0.8 P.82 0.8
2.2 P.82 + 050 91.182
2334.55 50
91.182 P.83 96.872
96.872 P.83 + 050 50 105
5046.8
105
Urugan
Volume (m3)

368.7

634.35

600.495

72.5

240

775.2

368.580865

637.45

933.6

1067.95

1181.925

56.871

759.6

836.975

269.1325

808.925

157.453

365.1948

478.2

612.75

632.15

646.725
612.825

515.85

412.95

416.375

532.55

91.35

450.325

555.475

456.3

44.015

548.05

500.675

247.475

173.175

314.725

153.275

158.05

173.125

80.925

326.65

329.675

111.9

197.8

213.15
181.85

107.163

649.875

592.85

778.1

89.115

160.874

17.805

676.175

377.775

810.225

446.7

191.292

539.55

753.875

801.05

1122.7

1033.475

450.675

1265.9

2634.35

2096.65

1524

3141.275
4594.9

3439.725

2417.875

3352.075

2341.95

90

4098.025

3836.825

3488.55

3404.15

4655.85

2856.075

3262.025

2873.3

1993.55

3535.25

3551.15

3075.825

72.5

4701.35

2625
Daftar besi (baja) beton :
Diameter (mm) Luas Penampang (m) Berat (kg/m)
6 2.82857142857143E-05 0.2220
8 5.02857142857143E-05 0.3947
10 7.85714285714286E-05 0.6168
11 9.50714285714285E-05 0.7463
12 0.000113142857143 0.8882
13 0.000132785714286 1.0424
14 0.000154 1.2089
15 0.000176785714286 1.3878
16 0.000201142857143 1.5790
18 0.000254571428571 1.9984
20 0.000314285714286 2.4671
21 0.0003465 2.7200
22 0.000380285714286 2.9852
25 0.000491071428571 3.8549