Anda di halaman 1dari 38

POWER DISTRIBUTION

SISTEM
DEPT 250.

TEL/EID/03/09

EL/EID/03/09 1
SUMBER POWER
◼ PEMBANGKIT LISTRIK TENAGA UAP
DENGAN KAPASITAS 71,5 MW,FAKTOR
DAYA 0,8,DENGAN BRUSHLESS
EXCITATION SYSTEM.
◼ 4 BUAH D/G DENGAN DAYA TERPASANG
12 MW TOTAL DARI (16 MVA)
EMERGENCY POWER.
◼ UNTUK YANG AKAN DATANG
DIHUBUNGKAN KE GRID(PLN).

EL/EID/03/09 2
YANG AKAN DTANG HUBUNGAN
KE GRID(PLN).
◼ BUS B TELAH DISEDIAKAN DAYA YANG
DIIZINKAN MENDEKATI 10 MVA DIAMBIL
DARI GRID (PLN) BEBAS DARI T/G
◼ DIMASA AKAN DATANG BUS B AKAN
BEROPERASI TERPISAH DARI BUS A DAN
AKAN DIIKUTI IZIN DARI AREA YANG
AKAN DI UMPAN DARI GRID (PLN).

EL/EID/03/09 3
YANG AKAN DATANG
HUBUNGAN KE GRID(PLN)
◼ TOWN SITE
◼ WATER TREATMENT PLANT
◼ EFFLUENT TREATMENT PLANT
◼ WOOD YARD

EL/EID/03/09 4
YANG AKAN DTANG HUBUNGAN
KE GRID(PLN).
◼ BEBERAPA POINT PENTING SEBAGAI
CATATAN :
◼ IZIN SPARE BREAKER MEMINDAHKAN
ANTARA BUS A DAN B
◼ TIE BREAKER (A6) HARUS CLOSE UNTUK
MEMINDAHKAN/MENJAMIN KEDUA BUS
ADALAH SYNKRON.

EL/EID/03/09 5
SUMBER DAYA UTAMA
◼ DAYA YANG DIBANGKITKAN PADA 11,5KV
DIDALAM 71,5 MW,PF:0,8 TENAGA UAP
T/G DENGAN PENGUATAN TANPA
SIKAT(BRUSHLESS EXCITATION SYSTEM).
◼ TEGANGAN DINAIKKAN KE TEGANGAN
DISTRIBUSI 24 KV DI 90MVA
TRANSFORMER DELTA-WYE DIISI OIL
DENGAN PENTANAHAN NETRAL DENGAN
TAHANAN TINGGI.

EL/EID/03/09 6
PENTANAHAN TAHANAN TINGGI
◼ UMUM DI AMERIKA UTARA ,KURANG DIBAGIAB
BAGIAN LAIN DI DUNIA.
◼ PENTANAHAN YANG SOLID ,TIDAK ADA
PERGESERAN NETRALTETAPI ARUS TINGGI.
◼ SISTEM YANG TIDAK DITANAHKAN-TIDAK ADA
KEHILANGANAN DAYA PADA PERTAMA GROUND
FAULT TETAPI PERGESERAN NETRAL
MENEGANGKAN SISTEM ISOLASI.

EL/EID/03/09 7
PENTANAHAN TAHANAN TINGGI
◼ RESISTOR YANG DIPILIH SEHINGGA
ARUS TAHANAN ≥ARUS SISTEM
PENGUATAN (3XIo).
◼ TIDAK ADA PERGESERAN TITIK NETRAL
◼ ARUS GROUND FAULT RENDAH
◼ TIDAK ADA IRON YANG RUSAK JIKA ARUS
KURANG DARI 7 AMPS.

EL/EID/03/09 8
KENAPA TEGANGAN DINAIKKAN
◼ MENURUNKAN ARUS GANGGUAN DAN
MENUTUP KERUGIAN.
◼ TIDAK PERLU MEMPARAREL INCOMING
BREAKER.
◼ MENURUNKAN UKURAN DISTRIBUSI
KABEL.

EL/EID/03/09 9
24 KV SWITCHGEAR
◼ SWITCHGEAR ADALAH KONSTRUKSI
STANDARD METAL CLAD
◼ NOMINAL MAIN SWITCHGEAR 24 KV,50
HZ,3 PHASE,2500 A,31 KA.
◼ NOMINAL BUS CABANNGNYA 1200 A
◼ BREAKER BREAKER DIOPERASIKAN
SECARA DRAW OUT TYPE SF 6,NOMINAL
2500 A UNTUK T/G DAN 1200 A UNTUK
YANG LAINNYA.

EL/EID/03/09 10
24 KV SWITCHGEAR
◼ RATING GANGGUAN 31 KA BERDASARKAN
KEMUNGKINAN YANG PALING BURUK.
◼ KESEMUA TIGA SUMBER
(T/G,EMERGENCY GENERATOR)
DIOPERASIKAN SECARA PARALEL.

EL/EID/03/09 11
PROTEKSI DAN METERING
◼ PROTEKSI GENERATOR DI PASANG DI
CUBICLE GENERATOR CONTROL-
TERMASUK GENERATOR/GENERATOR
TRANSFORMER,DIFRENSIAL PROTEKSI.

EL/EID/03/09 12
PROTEKSI DAN METERING
◼ PROKTEKSI FEEDER 3 PHASE AND
GROUND INVERSE TIME O/C PLUS HIGH
SET PADA ELEMEN ELEMEN PHASE.
◼ A17 JUGA MEMPUNYAI DIRECTIONAL O/C
RELAY (DEVICE 67)
◼ SIGNAL TEGANGAN DARI A17 KE
GENERATOR CONTROL CUBICLE 24 KV
SECARA LANGSUNG DI T/G

EL/EID/03/09 13
PROTEKSI DAN METERING
◼ DIDALAM PENAMBAHAN PROTEKSI
FEEDER-PROTEKSI TRANSFORMER DI
KIRIM KE MASING-MASING BREAKER.
◼ DIDALAM MEMBANTU TROUBLE SOOTING
LOCK OUT RELAY (DEVICE 86)
DISEDIAKAN TERPISAH PROTEKSI
FEEDER DAN TRANSFORMER

EL/EID/03/09 14
PROTEKSI DAN METERING
◼ MASING-MASING BREAKER FEEDER MEMILIKI
MIKROPROCESSOR MULTI FUNGSI
BERDASARKAN METERING UNIT MEMBERIKAN
3 PHASE AMP,WATSS,DAN WATTHOURS.
◼ A17 DAN A18 MEMILIKI PENAMBAHAN BACAAN
SEPERTI DITUNJUKKAN PADA DIGRAM SATU
GARIS.
◼ DATA INI DIKIRIMKAN KE DCS DAN TERSEDIA
KE OPERATOR.

EL/EID/03/09 15
CONTROL
◼ MASING-MASING BREAKER MEMPUNYAI
LOCAL/REMOTE SELETOR SWITCH.
◼ SECARA NORMAL REMOTE DI KONTROL
DARI DCS
◼ MASING-MASING BREAKER MEMILIKI
KONTROL SWICTH UNTUK LOCAL
SWITCH.
◼ BREAKER SELALU DAPAT TRIP DARI
SALAH SATU LOKASI.

EL/EID/03/09 16
KONTROL SINKRONISASI
◼ GENERATOR DAPAT DISINKRON KE GRID
MELALUI A6
◼ TURBINE GENERATOR KE DIESEL
GENERATOR MELALUI A17
◼ DIESEL GENERATOR TO TURBIN
GENERATOR MELALUI A18
◼ PERALATAN SINKRONISASI T/G DI
GENERATOR CONTROL CUBICLE
DITEMPATKAN DI RUANG UTAMA ELECT

EL/EID/03/09 17
KONTROL SINKRONISASI
◼ SKEMA SINKRONISASI MENGIJINKAN
HANYA SATU BREAKER.AKAN DIPILIH
SEBAGAI BREAKER SINKRONISASI.
◼ BREAKER JUGA MEMPUNYAI SINKRON
CHECK RELAY UNTUK MENAMBAH
KEAMANAN.

EL/EID/03/09 18
SISTEM POWER EMERGENCY
◼ SISTEM POWER EMERGENCY TERDIRI DARI :
◼ 2 UNIT 2 MW D/G PENDINGIN UDARA PF:0,8.
◼ 2 UNIT 4 MW D/G PENDINGIN AIR PF :0,8
◼ POWER DIBANGKITKAN PADA 6,3 KV DAN DI
NAIKKAN KE 24 KV DI 16 MVA DELTA-WYE
TRANSFORMER YANG DI ISI MINYAK DENGAN
NETRAL YANG DITANAHKAN DENGAN TAHANAN
TINGGI.

EL/EID/03/09 19
SISTEM POWER EMERGENCY
◼ POWER EMERGENCY DITERIMA MELALUI
SISTEM POWER DISTRIBUSI UTAMA.
◼ AREA 441 (CHEMICAL PLANT) KHUSUS,

MEMILIKI DIESEL GENERATOR SENDIRI


500 KW YANG MEMBERIKAN DAYA
SECARA CEPAT KE BEBERAPA
PERALATAN.

EL/EID/03/09 20
SISTEM POWER EMERGENCY
◼ T/G TRIP BEARING-BEARING HARUS
DILUBRIKASI SEMENTARA UNITNYA
BERHENTI-MEMBERIKAN 110 V DC DC
POWER YANG TERDIRI DARI 88 BANK
NiCd BATTERY DAN BATTERY CHARGER
AKAN MEMBERIKAN POWER KE MOTOR
DC YANG DIKENDALIKAN EMERGENCY
OIL PUMP.

EL/EID/03/09 21
SISTEM POWER EMERGENCY
◼ BEBAN EMERGENCY YANG DIPERLUKAN 6
MW.12 MW TERSEDIA MESTART 1300 KW
BFW DIBAWAH KEADAAN COLD START.
◼ D/G TERHUBUNG KE STEP UP
TRANSFORMER MELALUI SWITCHGEAR
YANG NOMINALNYA 7,2 KV,2000A ,34 KA.

EL/EID/03/09 22
SISTEM POWER EMERGENCY
◼ BATAS GANGUAN BERDASARKAN PADA
KEMUNGKINAN HAL YANG PALING
BURUK-D/G BEROPRASI PARAREL
DENGAN T/G.

EL/EID/03/09 23
SISTEM POWER EMERGENCY
SISTEM POWER EMERGENCY
◼ KETIKA T/G TRIP ATAU BREAKER A17
BERIKUTNYA TERJADI :
◼ TRIP SIGNAL DIKIRIM KE SEMUA
BREAKER-BREAKER FEEDING KE
TRANSFORMER TIDAK DIPERLUKAN
UNTUK EMERGENCY POWER.
◼ SIGNAL BLOKING DIKIRIM KE SEMUA
MOTOR-MOTOR TIDAK DIPERLUKAN
BEROPERASI SELAMA EMERGENCY.

EL/EID/03/09 24
SISTEM POWER EMERGENCY
◼ SIGNAL CLOSE DIKIRIM KE BREAKER A18
◼ SIGNAL START DIKIRIM KE EMERGENCY
D/G COMMON CONTROL CUBICLE.
◼ 2 MW D/G DIPILIH TERHUBUNG KE
SISTEM TEGANGAN NAIK PERLAHAN-
LAHAN UNTUK MENHINDARKAN INRUSH
CURRENT PADA TRANSFORMER.

EL/EID/03/09 25
SISTEM POWER EMERGENCY
◼ SEKARANG POWER TERSEDIA UNTUK
AUXILIARI T/G.
◼ TINGGAL D/G SINKRON DENGAN UNIT
PERTAMA.

EL/EID/03/09 26
POWER DISTRIBUTION
◼ POWER DISTRIBUSI KE MILL SALAH SATU
SECARA LANGSUNG DARI MAIN SWITCHGEAR
ATAU MELALUI PEMBAGIAN BUS.
◼ 4 BAGIAN BUS YANG TERSEDIA

# AREA FILTER BUILDING 210 BUS C


# AREA WOOD YARD BUS D
# AREA DIGESTER/WASHING/BLEACHING BUS E
# AREA PULP MACHINE BUS F

EL/EID/03/09 27
POWER DISTRIBUTION

◼ SEMUA CABANG BUS MEMILIKI CIRI-CIRI YANG


SAMA DENGAN MAIN BUS (SWITCHGEAR A)
◼ STEP-DOWN TRANSFORMER DELTA-WYE YANG
BERISI MINYAK DITEMPATKAN DIMASING-
MASING AREA MEYEDIAKAN POWER PADA
TEGANGAN YANG TERPASANG.
◼ SEBAGAI PESAN SEBELUMNYA SEMUA NETRAL
DITANAHKAN DENGAN TAHANAN TINGGI.

EL/EID/03/09 28
POWER DISTRIBUTION
◼ SISTEM DISTRIBUSI UNTUK MOTOR-
MOTOR YANG NOMINALNYA LEBIH BESAR
DARI 250 KW = 6,3 KV,3 Ø,3 KAWAT.
◼ SISTEM DISTRIBUSI TEGANAN RENDAH
=0,4 KV,3Ø,3 KAWAT.
◼ KECUALI-MOTOR MOTOR YANG DI
SUPPLAY DARI VFD 400 V TIDAK ADA
URUSAN BERAPA UKURAN MEREKA.

EL/EID/03/09 29
POWER DISTRIBUTION
◼ CATATAN PADA LEVEL-LEVEL TEGANGAN
:SEMENTARA YANG SISTEM DISTRIBUSI
NOMINALNYA 6,3 KV DAN 400 V ,RATING
MOTORNYA 6 KV DAN 380 V.INI ADALAH
MENGATASI NILAI DROP TEGANGAN
YANG DIAMBIL SAMPAI 5 % PADA
TERMINAL MOTOR UNTUK FEEDER,KABEL
DLL.

EL/EID/03/09 30
POWER DISTRIBUTION
◼ DUA LEVEL TEGANGAN YANG LAIN JUGA
DIPAKAI.
◼ LIGHTING DAN UTILITY POWER (HAND
TOOLS DLL).LISTRIKNYA DIBERIKAN
PADA TEGANGAN 230 V,1 Ø DITERIMA
DARI 400 Δ/400 -230 Y 4 KAWAT
TRANSFORMER ISOLASI DENGAN NETRAL
DITANAHKAN SECARA SOLID.

EL/EID/03/09 31
POWER DISTRIBUTION
◼ POWER CONTROL DAN POWER UNTUK
INSTRUMENT ADALAH 110 V 1Ø
DITERIMA DARI SATU PHASA
TRANSFOMER DISTRBUSI DAN PANEL DI
MCC.

EL/EID/03/09 32
POWER DISTRIBUTION
◼ POWER PADA 400 V ADALAH
DIDISTRIBUSIKAN KE BERAMCAM-MACAM
MCC MELALUI SWITCHGEAR LOGAM
YANG TERTUTUP NOMINAL 635 V,4000
A,65 KA SIMETRIS UNTUK SECUNDER.
◼ SAMPAI 4 BREAKER TERPASANG
DIDALAM SUSUNAN TUNGGAL.

EL/EID/03/09 33
POWER DISTRIBUTION
◼ BREAKER-BREAKER ADALAH DITARIK KELUAR
DIOPREASIKAN SECARA MANUAL,TYPE VACUUM
CIRCUIT BREAKER MEMPUNYAI POWER
SENDIRI DAN ELETRONIC PROTEKSI UNIT
DENGAN CARA INDIVIDU DAPAT DIATUR LONG
TIME,SHORT TIME,DAN INSTANEUOS TRIP.
◼ NOMINAL BREAKER 2000 A,75KA
INTERUPTING,65 KA FOR 1 DETIK.

EL/EID/03/09 34
POWER DISTRIBUTION
◼ PROTEKSI GANGGUAN TANAH DIBERIKAN
OLEH JENIS DSP MK II DAN RELAY
PROTEKSI.
◼ GANGGUAN TANAH PERTAMA
MEMBERIKAN ALARM DAN TIDAK
MENTRIPKAN.
◼ GANGGUAN KEDUA AKAN MENYEBABKAN
TRIP PADA BREAKER ITU ATAU BREAKER
YANG LAIN.

EL/EID/03/09 35
POWER DISTRIBUTION
◼ KEMUNGKINAN MEMILIH SAMPAI 16
PERBEDAAN PRIORITAS SEHINGGA ADA
GANGGUAN TANAH GANDA(DOUBLE)
HANYA BREAKER PRIORITAS YANG
PALING RENDAH AKAN TRIP .

EL/EID/03/09 36
6,3 KV MCC
◼ MOTOR-MOTOR 6 KV DIBERI DARI
SALURAN MCC YANG TERDIRI DARI
BAGIAN VERTIKAL SAMPAI DUA STARTER
PERBAGIAN
◼ NOMINAL MCC 7,2KV,1200 A,60 KA RMS
SIMETRIS.
◼ STARTER ADALAH SECARA MAGNETIK
MENGUNAKAN VACUUM CONTACTOR.

EL/EID/03/09 37
POWER DISTRIBUTION
◼ TERIMAKASIH.

EL/EID/03/09 38

Anda mungkin juga menyukai