FINAL DOCUMENT

DOCUMENT VERSION: 1.0


PUBLISHED DATE: 30/05/2016

DESI LALA
DEAF SIGN LANGUAGE TRANSLATOR

KELAS A – KELOMPOK 3
LIA NINDA SAFITRI – 135150400111058
OKI ARI SAPUTRA – 135150400111066
FARHAN ISHAMI – 135150400111078
AGUNG YUDHA B. – 13515040111121
IRSALINA KHAIRINA – 135150407111055

NAMA PERUSAHAAN
Jalan Veteran Malang, 65145
hrd@iocorp.com
IOcorp.com
+6281222390118 / (+62341)463328
TABLE OF CONTENTS
TABLE OF CONTENTS

Contents
COMPANY PROFILE______________________________________________________________________________________1
COMPANY OVERVIEW________________________________________________________________________________________1
ORGANIZATION STRUCTURE________________________________________________________________________________2
PROJECT STRUCTURE________________________________________________________________________________________3

PROJECT CHARTER______________________________________________________________________________________5
PROJECT STAKEHOLDERS___________________________________________________________________________________5
PROJECT DESCRIPTION______________________________________________________________________________________5
MEASUREMENT ORGANIZATIONAL VALUE (MOV)_______________________________________________________6
PROJECT SCOPE_______________________________________________________________________________________________6
PROJECT SCHEDULE SUMMARY_____________________________________________________________________________6
PROJECT BUDGET SUMMARY_______________________________________________________________________________6
QUALITY CONTROL___________________________________________________________________________________________6
COMPLEMENT RESOURCE___________________________________________________________________________________7
ASSUMPTION AND RISKS____________________________________________________________________________________8
PROJECT ADMINISTRATION_________________________________________________________________________________9
ACCEPTANCE AND APPROVAL_____________________________________________________________________________13
REFERENCES_________________________________________________________________________________________________13
TERMINOLOGY OR GLOSSARY_____________________________________________________________________________13

TEAM CONTRACT_______________________________________________________________________________________15
SOFTWARE REQUIREMENT SPECIFICATION________________________________________________________17
SYSTEM DESCRIPTION______________________________________________________________________________________17
USER CHARACTERISTIC____________________________________________________________________________________17
USE CASE DIAGRAM_________________________________________________________________________________________18
SYSTEM SCOPE_______________________________________________________________________________________________18
OPERATION SCOPE__________________________________________________________________________________________18
SOFTWARE REQUIREMENT IDENTIFICATION___________________________________________________________19
FUNCTIONAL REQUIREMENT______________________________________________________________________________19
NON-FUNCTIONAL REQUIREMENT_______________________________________________________________________20

FINANCIAL ANALYSIS___________________________________________________________________________________21
TOTAL COST OWNERSHIP__________________________________________________________________________________21
TABLE OF CONTENTS

TOTAL BENEFIT OWNERSHIP______________________________________________________________________________21


PAYBACK PERIOD____________________________________________________________________________________________22
PROJECT CASH FLOW_______________________________________________________________________________________22
BREAKEVEN__________________________________________________________________________________________________22
RETURN OF INVESTMENT__________________________________________________________________________________23
NET PRESENT VALUE_______________________________________________________________________________________23

PROJECT SCHEDULE____________________________________________________________________________________24
WORK BREAKDOWN STRUCTURE________________________________________________________________________24
GANTT CHART_______________________________________________________________________________________________26

IMPLEMENTATION______________________________________________________________________________________27
STATECHART_________________________________________________________________________________________________27
ACTIVITY DIAGRAM_________________________________________________________________________________________28
USER INTERFACE____________________________________________________________________________________________38
TESTING______________________________________________________________________________________________________45
MOV’S VERIFICATION SCENARIO__________________________________________________________________________48

ATTACHMENT___________________________________________________________________________________________51
TABLE OF CONTENTS

COMPANY PROFILE
COMPANY OVERVIEW
Experience:

I/O Corporation merupakan perusahaan yang bergerak di bidang IT. Menghasilkan


produk atau jasa IT yang inovatif. Berdiri sejak 5 Mei 2013 di kota Malang. Sejak berdirinya
I/O Corporation telah menangani beberapa proyek IT. Proyek yang ditangani merupakan
proyek dibidang IT yang mencangkup konsultasi dan pembangunan perangkat lunak.
Klien-klien proyek yang sudah dikerjakan sebagian besar dari Kota Malang sendiri.
Beberapa proyek yang telah ditangani adalah :

- Proyek Perencanaan Strategis Sistem Informasi Badan Pertanahan Nasional


Kabupaten Malang pada tahun 2013
- Proyek Perancangan Data Warehouse dan Investasi IT pada UTERO ADVERTISING
Malang tahun 2014-2015
- Proyek Investasi IT pada Everyday Smart Hotel Malang tahun 2014
- Proyek Web Travelisa tahun 2014
- Proyek Aplikasi Mobile Me and Go Indonesia tahun 2015
- Proyek Web Lembaga KBMSI
- Proyek Mobile Wangsit

Vision:

Menjadi perusahaan IT terdepan yang concern dan innovative dalam menghasilkan


produk dan jasa di bidang IT.

Mission:

- Membangun dan mengembangkan produk IT yang kompetitif


- Selalu berupaya memberikan layanan yang terbaik kepada klien
- Menjunjung profesionalisme dan teamwork dalam menghasilkan layanan yang
berkualitas
- Mengembangkan inovasi teknologi terbaik dan terkini dalam setiap produk atau
jasa yang dihasilkan
- Mengembangkan kerjasama dan kemitraan usaha yang harmonis dengan saling
menguntungkan
- Meningkatkan keuntungan dan nilai tambah bagi klien dan stake holder serta stock
holder
TABLE OF CONTENTS

ORGANIZATION STRUCTURE
Chart:

Presiden
Director

Operational Financial Marketing


Manager Manager HRD Manager Manager

Project Staff Staff Staff


Manager A

Project
Staff Staff Staff
Manager B

Project
Manager C Staff Staff Staff

Table:
No. Name Role Job Description

1 Irsalina Khairina President Director 1. Koordinator, komunikator,


pengambilan keputusan,
pemimpin, pengelola dan
eksekutor.
2. Menjalankan dan memimpin
perusahaan.
2 Agung Yudha Operational 1. Mengelola kegiatan operasional
Berliantara Manager pabrik dan managemen pasokan.
2. Bertanggung jawab untuk
membuat perencanaan produksi
3 Lia Ninda Safitri Financial Manager 1. Mengelola fungsi akuntansi dalam
memproses data informasi
keuangan.
2. Merencanakan,
mengkoordinasikan dan
mengontrol kas perusahaan (cash
flow).
4 Farhan Ishami Human Resource 1. Mengelola dan mengembangkan
TABLE OF CONTENTS

Development sumber daya manusia.


2. Membuat SOP, job description,
5training dan development.
5 Oki Ari Saputra Marketing Manager 1. Menentukan strategi penjualan
terhadap pelanggan
2. Bertanggung jawab hasil penjualan
dan penggunaan dana promosi

PROJECT ORGANIZATION STRUCTURE


Chart:

Project
Manager

Financial
Programmer System Analyst Designer
Accounting

Table:
No. Name Role Job Description

1 Lia Ninda Safitri Project Manager 1. Memonitor status proyek


2. Mengidentifikasi masalah masalah
teknis
2 Agung Yudha Programmer 1. Membangun/mengembangkan
Berliantara software terutama pada tahap
construction
Oki Ari Saputra
2. Mengimplementasikan
requirement menggunakan
algoritma dan bahasa
pemrograman
3 Lia Ninda Safitri Financial dan 1. Mengkoordinasikan dan
Inventory melakukan perencanaan dan
Irsalina Khairina
analisa keuangan
2. Merencanakan dan
mengkoordinasi pengembangan
sistem dan prosedur keuangan
TABLE OF CONTENTS

inventori yang lain


4 Farhan Ishami System Analyst 1. Menganalisa sistem yang sudah
ada dan membuat feasibilty
Oki Ari Saputra
pengembangan sistem
2. Menerjemahkan kebutuhan clientr
ke dalam spesifikasi teknis yang
jelas dan terstruktur.
5 Farhan Ishami Designer 1. Merancang konsep layout
(Wireframing)
2. Merancang layout secara visual
TABLE OF CONTENTS

PROJECT CHARTER
PROJECT STAKEHOLDERS
No Name Role Phone Email
.
1 Admaja Dwi H. Klien 085647104169 herlambang@ub.ac.id
2 Prof. Dr. Ir. Sponsor (0341)551611 rektor@ub.ac.id
Mohammad
Bisri, M.S.
3 Dita Humas Pusat
Studi Layanan
Disabilitas
4 Sulis Bendahara Pusat
Studi Layanan
Disabilitas
5 Lia Ninda S. Manajer proyek 08123229810 lianindasafitri@gmail.com
& Financial
6 Oki Ari S. Tim proyek: 088210406026 okiarisaputra@gmail.com
Programmer &
Sistem Analis
7 Farhan Ishami Tim proyek: 08992248122 farhanishami @gmail.com
Sistem Analis &
Designer
8 Agung Yudha B. Tim proyek: 081945779341 Agung.yudha007@gmail.com
Programmer
9 Irsalina Khairina Tim proyek: 082257410867 irsalinakhairina@gmail.com
Financial &
inventory

PROJECT DESCRIPTION
Mahasiswa tuna rungu berkomunikasi mengunakan bahasa isyarat agar mahasiswa
bisa mengerti pelajaran yang diberikan oleh dosen , setiap mahasiswa tuna rungu
didampingi oleh satu pendamping untuk menjadi translator dari apa yang disampaikan
oleh dosen menggunakan bahasa isyarat agar mahasiswa tuna rungu dapat mengerti
materi yang disampaikan dosen. Namun dalam beberapa disiplin ilmu terdapat kata-kata
yang belum memiliki bahasa isyarat seperti “microprosesor” sehingga translator
kesusahan dan membutuhkan waktu yang lama untuk menjelakan kepada mahasiswa
tuna rungu, Karena belum adanya sistem dukungan bagi mereka untuk menyelesaikan
permasalahan tersebut, sehingga mereka memiliki kesulitan dalam kegiatan belajar
TABLE OF CONTENTS

mengajar. Dari uraian ini, kami merasa perlu untuk melakukan penelitian dengan judul “
Rancang Bangun Sistem DESI LALA (Deaf Sign Language Translator) Studi kasus: Universitas
Brawijaya”. Dengan adanya penelitian tersebut diharapkan dapat membuktikan bahwa
sistem dapat membantu kegiatan belajar mengajar bagi penderita tuna rungu.

MEASUREMENT ORGANIZATIONAL VALUE (MOV)


1. Motivasi Mahasiswa untuk belajar bertambah 80%
2. Mahasiswa disabilitas Universitas Brawijaya bertambah menjadi 2 kali lipat
3. Mempercepat penyampaian materi terhadap Bahasa yang tidak dipahami oleh
pendamping / mahasiswa disabilitas sebesar 60%
4. Meningkatkan pemahaman pendamping dan mahasiswa penyandang disabilitas
sebesar 60%

PROJECT SCOPE
Inside:
1. Penentuan target pengguna yaitu civitas akademika Universitas Brawijaya
2. Bahasa disabilitas yang dijadikan sebagai materi
3. Penentuan ruang lingkup operasi (sesuai dengan SRS)
4. Penentuan tanggal proyek 2 Maret 2016 sampai dengan tanggal 1 Juni 2016
5. Aplikasi berbasis web

Outside:
1. Materi semua bidang keilmuan
2. Dapat diakses menggunakan IOS

PROJECT SCHEDULE SUMMARY


Project Start Date : 02-03-2016
Project Finish Date : 01-06-2016

PROJECT BUDGET SUMMARY


Total Cost Ownership: Rp. 32.000.000
No Type Total (Rp.)
1 Direct 21.000.000
2 On Going 9.000.000
3 Indirect 2.000.000
Grand Total 32.000.000

QUALITY CONTROL
No Activity Result Date
TABLE OF CONTENTS

1 Initiating Dokumen observasi informasi, dan dokumen 2-3-16 s/d 11-4-16


business case
2 Planning Dokumen software requirement spesification, 20-4-16 s/d 21-4-
dokumen spesifikasi kebutuhan perangkat 16
lunak
3 Executing Dokumen uji perangkat lunak 19-5-16 s/d 23-5-
16
4 Monitoring Sistem DESI LALA 2-3-16 s/d 1-6-16
5 Closeout Dokumen final project dan sistem DESI LALA 23-5-16 s/d 1-6-16

COMPLEMENT RESOURCE
People:
No Name Provider Date provided Responsibly
1 Dita Humas Pusat Studi 01-04-2016/ Memberikan
Layanan Disabilitas 08-04-2016 informasi terkait
PSLD secara umum
2 Sulis Bendahara Pusat 01-04-2016/ Memberikan
Studi Layanan 08-04-2016 informasi terkait
Disabilitas keuangan kegiatan
PSLD

Technology:
No Name Provider Date Provided Responsibly
1 Bootsrap V3.3.1 Twitter, Inc 02-03-2016 - Sebagai perangkat
01-06-2016 lunak pengelola
halaman user (CSS,
JS) website
2 JQuery JQuery Foundation 02-03-2016 - Sebagai perangkat
01-06-2016 lunak pengelola
halaman user (JS)
website (client side
scripting)

Facilities:
No Name Provider Date Provided Responsibly
1 Printer 1 buah Epson L210 02-03-2016 - Perangkat keras
01-06-2016 untuk mencetak file
dan dokumen
penting
TABLE OF CONTENTS

2 Ruang Meeting luar 1 buah ruang meeting 02-03-2016 - Digunakan untuk


kantor dan 1 buah proyektor 01-06-2016 berkumpul semua
Sony tim proyek
melakukan rapat
bersama

ASSUMPTION AND RISKS


Assumption:
Tujuan dari proyek ini adalah membuat suatu aplikasi untuk membantu civitas
akademika Universitas Brawijaya yang berkebutuhan khusus dalam hal bahasa isyarat
dalam pemahaman materi khususnya bahasa teknologi. Dalam hal kelayakan (Economic,
Technical, Organizational dan Other) proyek ini mampu memenuhi MOV (Measurable
Organization Value) yang telah disepakati.

Implementation Risk:
No Risk Implication Mitigation
1 Tidak ada koneksi internet Tidak dapat Menyediakan wifi di
mengakses dan Universitas Brawijaya
menggunakan selama 24 jam sehari.
aplikasi DESI LALA
2 Materi yang tidak sesuai Materi yang Adanya penambahan materi
dibutuhkan tidak seiringnya waktu
ada/salah
3 Ada biaya tambahan Biaya kerusakan Menyediakan biaya tak
pada sistem DESI terduga dalam
LALA menyelesaikan proyek
tersebut

PROJECT ADMINISTRATION
Communication Management
Membuat perencanaan, pengorganisasian, pengendalian serta memimpin sebuah
proyek meggunakan informasi agar terhubung dengan lingkungan dan orang lain.
Mengemukakan suatu kegiatan / progress report tiap penanggung jawab divisi sesuai
dengan prosedur berlaku dari arus atasan ke bawahan atau sebaliknya. Sehingga
mewujudkan keharmonisan dalam komunikasi dan upaya menciptakan ketrampilan dalam
mengaplikasikan ilmu dibidang komunkasi.

Reporting Performance and Progress:


Mengidentifikasi kondisi pelaksanaan proyek yang mendorong perbaikan proyek
yang sedang dikerjakan. Menyediakan petunjuk permasalahan dan apa yang harus
TABLE OF CONTENTS

dilakukan dalam meningkatkan hasil proyek. Melaporkan hasil kinerja tim proyek dan
memaparkan apa yang telah dicapai dari pengerjaan proyek. Selain itu menjelaskan hasil
dari observasi dan wawancara dari pihak pusat studi layanan disabilitas Universitas
Brawijaya.

Information Distribution:
Cara untuk memperoleh informasi dan berbagi pada tim proyek menggunakan
metode-metode elektronik seperti e-mail digunakan untuk mengirim dokumen-dokumen
penting secara pribadi kepada salah satu/lebih tim proyek, intranet membantu dalam
pengembangan proyek dengan dukungan world wide web, dropbox sebagai media
berbagi file atau format dokumen kepada semua tim proyek, media sosial seperti
WhatsApp dan Line sebagai media komunikasi dengan tim proyek.

Scope Management
Acuan semua pekerjaan yang termasuk harus dikerjakan dalam rangka
menghasilkan produk proyek, beserta proses-proses yang dilakukan untuk membuat
produk yang dimaksud. Setelah melakukan observasi dan wawancara ke Pusat Studi dan
Layanan Disabilitas, kami melakukan rapat mengenai hasil observasi dan wawacanra.
Membuat WBS, memastikan penyelesaian dari proyek yang dikerjakan dan mengontrol
perubahan pada lingkup proyek.

Collecting Requirements:
Proses mendefinisikan dan mendokumentasikan stakeholder dan kebutuhan untuk
memenuhi tujuan proyek. Melakukan observasi dan wawancara ini harus menimbulkan,
dianalisis, dan dicatat dalam cukup detail untuk diukur setelah pelaksanaan proyek
dimulai. Mengumpulkan data-data dari observasi dan wawancara untuk mendefinisikan
dan mengelola harapan pelanggan serta menjadi dasar dari biaya, jadwal, dan
perencanaan kualitas WBS.

Defining Scope:
Proses mengembangkan penjelasan rinci tentang proyek dan produk. Penyusunan
pernyataan lingkup proyek rinci sangat penting untuk keberhasilan proyek dan dibangun
berdasarkan besar kiriman, asumsi, dan kendala yang didokumentasikan selama inisiasi
proyek.

Scope Change Control:


Bersangkutan dengan mempengaruhi faktor-faktor yang membuat perubahan
ruang lingkup untuk memastikan bahwa perubahan yang disepakati, menentukan bahwa
perubahan lingkup telah terjadi, dan mengelola perubahan aktual ketika dan jika mereka
terjadi. Lingkup pengendalian perubahan harus benar-benar terintegrasi dengan proses
kontrol lainnya (jadwal kontrol, pengendalian biaya, kontrol kualitas, dan lain-lain).
TABLE OF CONTENTS

Quality Management:
MOV’s Before After Tools
Value
Faster Penyampaian materi Penyampaian materi Menginputkan kata ke
terhadap bahasa yang terhadap bahasa yang DESI LALA lalu output
tidak dipahami oleh tidak dipahami oleh nya bahasa isyarat
pendamping / mahasiswa pendamping /
disabilitas membutuhkan mahasiswa disabilitas
waktu 3 menit membutuhkan waktu
1 menit
Better Pendamping kesulitan Pendamping kesulitan Memberikan pelatihan
menterjemahkan bahasa menterjemahkan khusus untuh bahasa
teknis ilmu komputer bahasa teknis ilmu teknis ilmu komputer
sebesar 80% komputer sebesar kepada para
60% pendamping yang
mendampingi
mahasiswa tuna rungu
Do more Proses belajar yang Proses belajar Adanya aplikasi bahasa
lambat menurunkan menjadi efisien isyarat yang mudah
pemahaman dan motivasi meningkatkan digunakan dan bisa
belajar pendamping dan pemahaman dan digunakan kapanpun
mahasiswa penyandang motivasi belajar dimanapn mahasiswa /
disabilitas pendamping dan pendamping butuhkan.
mahasiswa Dengan cara ini akan
penyandang lebih efisien dalam
disabilitas waktu dan tempat yang
dibutuhkan.

Change Management:
Change Conflict Mitigation
Pengurangan biaya Pada biaya langsung Biaya pengeluaran untuk pakar bisa
dicantumkan pengeluaran dimasukkan pada biaya tak terduga
biaya untuk pakar. Pada
saat ke PSLD sudah
disiapkan seorang pakar
bahasa isyarat
Perubahan SRS Adanya perubahan Melakukan perubahan pada SRS
kebutuhan fungsional sesuai dengan kebutuhan sistem
pada sistem DESI LALA

Human Resource:
TABLE OF CONTENTS

Stakeholder Role Influence Potential Conflict


Klien Membutuhkan 3 Tidak ada rancang
layanan suatu aplikasi bangun DESI LALA
Sponsor Pemasok dana 3 Tidak dapat
menyelesaikan
proyek
Manager Penanggung jawab 2 Proyek tetap
Proyek dan koordinasi proyek berjalan tetapi
tidak ada
penanggung jawab
dan
mengkoordinasi
jalannya proyek
Tim Proyek Beberapa orang 3 Proyek tidak akan
memiliki keahlian jadi apabila tidak
ada sumber daya
yang mengerjakan
proyek

Implementation and Project Closure:


Implementation:
Suatu prosedur atau uraian mengenai tahapan yang akan dilakukan dan
menjelaskan segala sesuatu yang dibutuhkan dalam proses implementasi yang berupa
komputerisasi sistem. Teknik konversi sistem yang dapat digunakan untuk
mengimplementasikan sistem baru agar dapat dioperasikan secara tepat dan benar adalah
(1) cutover, sistem lama dihentikan sama sekali dan sistem yang baru mulai dioperasikan,
(2) paralel run, mengoperasikan sistem yang baru bersama-sama dengan sistem yang lama
selama satu periode tertentu dan (3) phased, menerapkan masing-masing modul sistem
yang berbeda secara urut. Dalam hal ini kita menggunakan parrarel run, agar pengguna
terbiasa perlahan menggunakan sistem ini. Kegiatan atau sistem lama tidak serta merta
dapat digantikan dengan sistem baru, pengguna dan instamsi butuh penyesuaian.
Project Closure:
Condition Description
Normal Saat sebuah proyek berakhir biasanya ada salah satu
rencana yang telah terselesaikan. Ruang lingkup proyek
yang dicapai dalam tujuan biaya, kualitas dan jadwal,
meskipun mungkin ada beberapa variasi dan modifikasi
sepanjang berjalannya proyek. Akhir dari proyek ini di
transferkan ke sponsor proyek, dan proyek ini adalah di
tandai dengan perayaan, penghargaan, dan pengakuan
atas kerja keras yang dilakukan dengan baik oleh yang
TABLE OF CONTENTS

terlibat.
Premature Proyek ini dikatakan sebagai proyek premature ketika
tim proyek didorong untuk menyelesaikan sebuah
proyek lebih awal meskipun sistem tidak dapat
melengkapi semua fitur atau fungsi dibayangkan.
Prepetual Proyek tidak memiliki akhir. Proyek ini dikatakan sebagai
proyek perpetual apabila ada penundaan atau ruang
lingkup atau MOV yang tidak jelas atau tidak di
sepakati. Kemudian, sponsor proyek (atau bahkan tim)
mungkin mencoba untuk menambahkan berbagai fitur
atau fungsi pada sistem, yang hasilnya malah akan
memakan banyak waktu dan sumberdaya yang dapat
meningkatkan jadwal proyek dan menguras anggaran
proyek
Failed Proyek gagal. Proyek ini dikatakan gagal apabila jika
proyek tidak cukup perhatian yang di berikan kepada
orang, proses, atau teknologi. Menjadikan proyek
berada pada titik di mana biaya untuk menyelesaikan
proyek lebih besar dari pada manfaatnya dan
pembengkakan biaya saat pembangunan proyek.
Change Priorities Proyek ini dapat diakhiri sebagai akibat dari perubahan
dalam prioritas (changed priority) apabila perubahan
terjadi ketika kepentingan awal atau nilai proyek salah
dalam eksekusi atau salah dalam memahami atau
teknologi berubah selama proyek jangka panjang,
keuangan atau ekonomi dapat menjadi alasan bahwa
sumber daya tidak tersedia untuk proyek. Atau,
manajemen mungkin memutuskan untuk mengalihkan
sumberdaya untuk proyek-proyek yang memiliki
prioritas yang lebih tinggi.

ACCEPTANCE AND APPROVAL

Date : 30 Mei 2016


Place : Malang

Client, Sponsor, Project Manager,


TABLE OF CONTENTS

Admaja Dwi H. Prof. Dr. Ir. Mohammad Bisri, M.S. Lia Ninda Safitri

REFERENCES
- http://psld.ub.ac.id
- Business Case
- Software Requirement Spesification
- Kathy Schwalbe, Information Technology Project Management (7th Edition),
Course Technology, 2014
- Jack T. Marchewka, Information Technology Project Management, 2003
- David Olson, Information Systems Projects Management, Business Expert Press,
2015
- Dan Brandon, Project Management for Modern Information Systems, 2006

TERMINOLOGY OR GLOSSARY

No Term Description
1 Translator Orang yang dapat menerjemahkan kata. Pada dokumen ini
yang sebagai translator adalah DESI LALA
2 Microprosesor Singkatan dari prosesor biasa juga disebut CPU (central
processing unit). Komponen ini merupakan sebuah cip. Cip
(chip atau IC/Integrated circuit) adalah sekeping silikon
berukuran beberapa milimeter persegi yang mengandung
puluhan ribu transistor dan komponen elektronik lain.
3 Deaf Sign Language Bahasa yang mengutamakan komunikasi manual, bahasa
tubuh dan gerak bibir, bukannya suara untuk berkomunikasi.
TABLE OF CONTENTS

TEAM CONTRACT
Project Name: DESI LALA
Project Team Members’ Names and Sign-off:
No Name Date Sign-Off
1 Lia Ninda Safitri 02/03/2016 01/06/2016
2 Agung Yudha Berliantara 02/03/2016 01/06/2016
3 Farhan Ishami 02/03/2016 01/06/2016
4 Irsalina Khairina 02/03/2016 01/06/2016
5 Oki Ari Saputra 02/03/2016 01/06/2016

Code of Conduct
Sebagai tim proyek, kami akan:
1. Memenuhi ketentuan-ketentuan yang telah disepakati antara tim proyek dan
stakeholders.
2. Memenuhi tanggung jawab sesuai dengan kontrak yang disepakati.
3. Menjaga kerahasian data dari pihak yang tidak berkepentingan.
4. Mematuhi semua peraturan dan hukum yang berlaku.
5. Mementingkan integritas menjadi dasar dari hubungan, baik dengan klien,
pemasok dan tim proyek.
6. Menciptakan lingkungan kerja yang positif
Participation
Kami akan:
1. Memenuhi kewajiban dalam rapat atau pembahasan proyek bersama stakeholder
2. Memenuhi tanggung jawab dalam pelatihan penggunaan aplikasi saat aplikasi
telah selesai dan siap digunakan.
3. Mengerjakan proyek denga cara terbaik kami serta selaras dengan visi, misi dan
strategi di perusahaan kami.
4. Ikut serta dalam kegiatan di bidang pengembangan ilmu teknologi sekaligus
terlibat dalam pengambilan keputusan bidang tersebut.
Communication
Kami akan:
1. Menjaga komunikasi dengan stakeholder selama pembangunan system dan
pemeliharaan sistem.
TABLE OF CONTENTS

2. Selalu tanggap terhadap pertanyaan-pertanyaan/permasalahan yang berkaitan


dengan sistem.
3. Menjelaskan tentang proyek-proyek tim dan bagaimana proyek-proyek tim
berhubungan dengan tujuan-tujuan perusahaan.
4. Menghargai setiap penyampaian pendapat, informasi serta ide-ide tentang proyek
maupun perusahaan.
5. Memberikan umpan-balik konstuktif kinerja pada proyek.
Problem Solving
Kami akan:
1. Mensupport penuh terhadap permasalahan yang terjadi setelah aplikasi
diselesaikan dan digunakan
2. Mensupprot penuh permasalahan bug-bug yang terjadi pada saat aplikasi
digunakan.
3. Dengan cepat mempertanyakan penyebab masalah.
4. Mengidentifikasi beberapa solusi dan memprioritaskan solusi potensial.
5. Membuat keputusan dengan tegas dan memiliki tanggung jawab atas keputusan
tersebut.
Meeting Guidelines
Kami akan:
1. Melakukan rapat rutin bersama stakeholder untuk melakukan progress report
terhadap system yang dikerjakan.
2. Ketua divisi selalu hadir dalam rapat bersama stakeholder.
3. Memecahkan atau mencari jalan keluar suatu masalah pada proyek dan
perusahaan.
4. Menyampaikan informasi terkait proyek dan perusahaan.
5. Ikut berpartisipasi kepada masalah-masalah yang sedang dikemukakan.
6. Mengadakan perundingan yang bertujuan menghindari timbulnya perselisihan,
mencari jalan tengah agar tidak saling merugikan keduabelah pihak/lebih.
TABLE OF CONTENTS

SOFTWARE REQUIREMENT SPECIFICATION


SYSTEM DESCRIPTION
DESI LALA (Deaf Sign Language Translator) adalah aplikasi yang ditujukan untuk civitas
akademika Universitas Brawijaya yang membutuhkan sarana untuk menerjemahkan kata
teknis dalam perkuliahan ke bahasa isyarat, khususnya mahasiswa pendamping dan
penyandang disabilitas. Aplikasi ini merupakan aplikasi berbasis Android Mobile sehingga
user lebih praktis menggunakan aplikasi ini.

Aplikasi ini memungkinkan user / pengguna mencari kata yang ingin dicari, kemudian
aplikasi akan menampilkan materi sesuai kata tersebut berupa video. Pencarian kata juga
dapat berdasar pada keilmuan yang sering diminati. Video materi ini juga dapat di
download oleh user ke smartphone user.

Terdapat juga kritik dan saran terhadap aplikasi ini. Diharapkan dari fitur ini pengembang
dapat mengerti apa kekurangan dan kelebihan sehingga dapat mengembangkan aplikasi
menjadi lebih baik.

Aplikasi DESI LALA ini memiliki fitur untuk mengatur profil user karena setiap user
nantinya akan memiliki ID sendiri. Kemudian terdapat fitur untuk mencari kata dan
download video materi untuk pemahaman materi.

USER CHARACTERISTIC
No Actor Role
1 User - Member Melihat homepage
Memberi kritik / saran
Mencari materi / video sesuai dengan kata yang diinputkan
Memberi rate pada materi
2 User - Admin Melihat dan menghapus data user member
Melihat kritik dan saran dari user member
Melihat, menghapus dan menambah kata / video / materi
Melihat statistik kata yang sering dicari
TABLE OF CONTENTS

USE CASE DIAGRAM

Gambar Use Case Diagram DESI LALA

SYSTEM SCOPE
Aplikasi DESI LALA (Deaf Sign Language Translator) diperuntukan kepada kalangan Civitas
akademika Universitas Brawijaya terutama orang-orang yang termasuk dalam PSLD (Pusat
Studi dan Layanan Disabiliias) Universitas Brawijaya, khususnya mahasiswa penyandang
disabilitas dan pendamping. Aplikasi ini bisa diakses di lokal saja, cakupan Indonesia
dengan koneksi jaringan internet yang memadai. Sistem hanya dapat berjalan di sistem
operasi Android minimal versi jelly bean. Harus ada space memory kosong minimal 5Mb.

OPERATION SCOPE
Perangkat lunak yang dibutuhkan oleh DESI LALA (Deaf Sign Language Translator) pada
adalah :

- OS : Android Jelly Bean ( minimal untuk mobile member),


Windows 7 / Linux (untuk operasional admin)
- Framework : CI (PHP 5.2)
- Pemrograman : PHP, HTML, Java
- DBMS : MySQL 5.6.
TABLE OF CONTENTS

SOFTWARE REQUIREMENT IDENTIFICATION


Identifikasi yang kami lakukan untuk memahami kebutuhan perangkat lunak yang
kami rancang adalah melakukan wawancara dengan calon pengguna, pendamping dan
dari bagian operasional Pusat Studi dan Layanan Disabilitas (PSLD) Universitas Brawijaya,
Malang.

Kebutuhan utama aplikasi adalah P/L harus mampu menyediakan sarana bagi
pengguna untuk melakukan Search word yaitu untuk melakukan pencarian kata yang
dibutuhkan pengguna dalam mencari definsi kelimuan dari materi yang diterima dari
dosen. Karena belum adanya aplikasi yang menyediakan fasilitas untuk mencari definisi
bidang ilmu yang ditekuni oleh disabilitas yang informatif dan lebih singkat karna dengan
interface yang menggunakan video.

Berdasarkan pada referensi tersebut, Aplikasi DESI LALA ini dibuat untuk
memudahkan permasalahan seorang pendambing disabilitas pada Universitas Brawijaya
yang masih belum memahami dari materi yang disampaikan dosen kepada mahasiswa
disabilitas yang didampinginya. Dengan aplikasi yang mudah dipahami oleh pendamping
dan mahasiswa disabilitas dengan fitur-fitur yang memudahkan dalam melakukan
kegiatan belajar mengajar.

FUNCTIONAL REQUIREMENT
User - Member

No Function Name Description


1 Cari Kata Fitur yang berfungsi untuk mencari kata
sebagai materi yang diterima, dapat melihat
kata yang sering digunakan
2 Homepage Fitur yang berfungsi sebagai halaman
utama dari aplikasi. Merupakan gerbang
utama user untuk menggunakan aplikasi ini.
3 Download Videoi User dapat men-download video materi
yang dapat dilakukan pada waktu dan
tempat yang berbeda sebagai bahan
pembelajaran
4 Kritik dan Saran User dapat memberikan kritik dan saran,
dengan tujuan untuk membangun aplikasi
yang lengkap dan sesuai dari kebutuhan
TABLE OF CONTENTS

yang diinginkan
5 Rate User dapat memberikan rate pada materi
yang tersedia

User - Admin

No Function Name Description


1 Melihat Statistik Fitur yang berfungsi untuk melihat kata-kata
dan materi yang sering dilihat berdasarkan
statistik
2 Daftar Kata Fitur yang menampilkan kesuluruhan materi
berdasarkan kata atau Keyword
3 Tambah materi dan video Admin dapat menambahkan atau
mengupdate materi yang berbentuk kata
atau video
4 Rate Admin dapat melihat rate pada materi yang
tersedia, kata apa saja yang memiliki rate
tinggi.
5 Mengatur Member List Admin dapat melihat daftar User-member
dan dapat menghapus user-member yang
terdaftar pada aplikasi ini
6 Melihat Kritik dan Saran Admin dapat melihat kritik dan saran yang
disampaikan oleh user-member, dengan
tujuan untuk membangun aplikasi yang
lengkap dan sesuai dari kebutuhan yang
diinginkan

NON-FUNCTIONAL REQUIREMENT
No Function Name Description
1. Availability Sistem dapat diakses 24 jam sehari, 7 hari
seminggu
2. Portability Bisa dijalankan menggunakan platform
Android minimal versi Jelly Bean.
3. Security Sistem dilengkapi dengan password untuk
user-member maupun user-admin untuk
melindungi data menggunakan md5
TABLE OF CONTENTS

sehingga password yang dimiliki dapat


terlindungi. Serta menggunaka enkripsi SSL
untuk website admin, lalu juga memberikan
enkripsi pada data member.
TABLE OF CONTENTS

FINANCIAL ANALYSIS
TOTAL COST OWNERSHIP
Type Description Cost (Rp.)
Biaya Langsung Pembuatan Aplikasi (Gaji) 1 x Project Manajer @ 4.000.000 4.000.000
2 x System Analyst @3.500.000 7.000.000
2x Programmer @3.000.000 6.000.000
2 x Financial & Inventory @1.500.000 3.000.000
1 x Designer @1.000.000 1.000.000
Sub Total 21.000.000
Biaya Kemajuan Pengembangan Aplikasi Perbulan @750.000 9.000.000
bulanan

Biaya Tak Biaya lain-lain 2.000.000


Langsung
Sub Total 9.000.000
GRAND TOTAL 32.000.000

Tafsir dari biaya yang harus dikeluarkan untuk proyek ini adalah sebesar Rp.
32.000.000. Hasil ini didapatkan dari biaya langsung berupa pembuatan aplikasi yang
dikerjakan team project dengan sub jumlah Rp. 21.500.000. Ditambah dengan biaya untuk
mengembangkan aplikasi yaitu berupa penambahan kata perbulan sebesar Rp. 750.000,
maka dalam setahun sebesar Rp. 9.000.000. Perlu ditekankan disini kami tidak
menambahkan maintenance karena biaya maintenance web dibiayai oleh UB dari
sebelum proyek ini ada. Kemudian untuk biaya tak langsung sebesar Rp. 2.000.000.

TOTAL BENEFIT OWNERSHIP


Investation (1 Year)
Type Description Sesudah (Rp.) Benefit (Rp.)
Sebelum (Rp.)
Menambah Mengurangi jam tambahan 10 x 15.000 = 0 1.800.000
kinerja tutor 150.000/ bulan

150.000 x 12 =
1.800.000

Mengurangi biaya 400 x 12 = 0 4.800.000


pelatihan bulanan 4.800.000
pendamping
Mengurangi biaya acara 10.000.000 7.500.000 2.500.000
pelatihan besar tahunan
yaitu “Disability
Awareness”
TABLE OF CONTENTS

Sub Total 9.100.000


Menambah Calon mahasiswa 20 x 250.000 = 40 x 250.000 5.000.000
pelayanan disabilitas mendaftar di UB 5.000.000 = 10.000.000
bertambah dua kali lipat
Sub Total 5.000.000
GRAND TOTAL 14.100.000

Dari tabel TBO diatas dihasilkan angka Rp. 14.100.000. hasil ini didapat dari
pengurangan biaya kegiatan organisasi sebesar Rp. 9.100.000 dan dari bertambahnya
calon mahasiswa disabilitas yang daftar di UB sesuai dengan MOV yaitu liama juta rupiah.
Angka-angka terseut didapat dari perhitungan dengan observasi lapangan ke PSLD UB .

PAYBACK PERIOD
TCO 32.000 .000
Payback= ¿ =6,27
TBO−Biaya Kemajuan 14.100.000−9.000 .000

Dari perhitungan payback period menurut rumus diatas dihasilkan angka 6,27.
Angka ini menunjukan waktu dimana biaya modal yang dikeluarkan telah terbayar atau
dengan kata lain balik modal. Angka 6.27 berarti modal akan tertutupi dalam 6 tahun 3
bulan 21 hari.

PROJECT CASH FLOW


Flow Description Thn 1 Thn 2 Thn 3 Thn 4 Thn 5 Thn 6 Thn 7 Total
Cost Investasi 21,000,00 - - - - - 21,000,00
(Rp.) Proyek 0 0
(TCO –
Biaya
Kemajuan)
Biaya - 9,000,00 9,000,00 9,000,00 9,000,00 9,000,00 9,000,00 54,000,00
Kemajuan 0 0 0 0 0 0 0
Bene Menambah 9,100,000 9,100,00 9,100,00 9,100,00 9,100,00 9,100,00 9,100,00 63,700,00
fit Kinerja 0 0 0 0 0 0 0
(Rp.)
Menambah 5,000,000 5,000,00 5,000,00 5,000,00 5,000,00 5,000,00 5,000,00 35,000,00
Pelayanan 0 0 0 0 0 0 0
Net Benefit – 14,100,00 5,100,00 5,100,00 5,100,00 5,100,00 5,100,00 5,100,00 44,700,00
Cash Biaya 0 0 0 0 0 0 0 0
Flow Kemajuan
(Rp.)
ROI Total net
(%) Cash Flow/
Payback/ 0.34
Investasi
Proyek
TABLE OF CONTENTS

BREAKEVEN
Investasi Proyek 21.000 .000
Breakeven= ¿ =4,12
TBO−Biaya Kemajuan 14.100.000−9.000 .000

Breakeven merupakan titik dimana modal yang kita keluarkan dengan keuntungan
yang kita dapat seimbang dalam satuan waktu (tahun). Pada perhitungan breakeven
diatas didapatkan nilai 4.12 yang berarti titik tersebut dapat dicapai dalam kurun waktu 4
tahun 1 bulan 6 hari.

RETURN OF INVESTMENT
Total Net Cash Flow /Payback 44.700 .000/6.27
RoI = ¿ =0.34
TCO 21.000 .000

ROI merupakan Rasio pengembalian atas investasi merupakan rasio perbandingan


antara laba setelah pajak dengan total aktiva (investasi) yang dimiliki oleh perusahaan.
Dari perhitungan ROI diatas didapati angka 0.34 atau bisa dikatakan bahwa rasio
keuntungan dari investasi aplikasi ini adlah 34% dari biaya yang kita berikan selama kurun
waktu 6 tahun.

NET PRESENT VALUE


Descriptio Tahun 1 Tahun 2 Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Total
n
Net Cash 14,100,00 5,100,00 5,100,00 5,100,00 5,100,00 5,100,00 5,100,00 44,700,00
Flow (Rp.) 0 0 0 0 0 0 0 0
Discount 0.1 0.1 0.1 0.1 0.1 0.1 0.1 -
rate (%)
Discounted 12,818,18 4,214,87 3,831,70 3,483,36 3,166,69 2,878,81 2,617,10 33,010,75
Cash Flow 2 6 5 9 9 7 6 4
(Rp.)
NPV (Rp.) -21,000,000+33,010,754 12.010.75
4

Net Present Value yang didapatkan dari perhitungan diatas adalah sebesar Rp.
12.010.754. ini adalah nilai yang didapatkan dari sistem ini setelah 7 tahun (sesuai dengan
payback). Dengan Discount rate 10%. Maka nilai sesungguhnya pada tahun ke-dua nanti
yang sesuai dengan payback besarya adalah Rp. 12.010.754.
TABLE OF CONTENTS

PROJECT SCHEDULE
WORK BREAKDOWN STRUCTURE
Chart:

Aplikasi DESI
LALA

Analaisis Analisis
Analisis Proses Menulis Kode Monitoring &
Kebutuhan yang Kebutuhan Implementasi Closing
Kerja Program Controlling
Diperlukan Programming

Menganalisa Menentukan Menulis Kode


Observasi Menulis Kode Testing dan
Bagaimana Bahasa Android
Informasi Web (Admin) Debugging
Sistem Berjalan Pemrograman (Member)

Analisa
Membuat Alur Menentukan Jenis
MOV Mengatur Home Mengatur Profile Kesalahan dan
Program Database
Kekurangan

Membuat Logika
Business Case Membuat SRS Melihat Statistik Cari Kata Evaluasi
Program

Cari Kata
Daftar Kata
Standart

Tambah Materi Cari Kata Sesuai


dan Video Keilmuan

Rate Download Video

Mengatur
Kritik dan Saran
Member List

Melihat Kritik
Rate
dan Saran
TABLE OF CONTENTS

Tabular:
1.0 Analisis Kebutuhan yang Diperlukan
1.1 Observasi Informasi
1.2 Measurable Organization Value
1.3 Business Case

2.0 Analisis Proses Kerja


2.1 Menganalisa Bagaimana Sistem Berjalan
2.2 Membuat Alur Program
2.3 Membuat Logika Program

3.0 Analisis Kebutuhan Programming


3.1 Menentukan Bahasa Pemrograman
3.2 Menentukan Jenis Database
3.3 Membuat Software Requirement Spesification

4.0 Menulis Kode Program


4.1 Menulis Kode Web (Admin)
4.1.1 Mengatur Home
4.1.2 Melihat Statistik
4.1.3 Daftar Kata
4.1.4 Tambah Materi dan Video
4.1.5 Rate
4.1.6 Mengatur Member List
4.1.7 Melihat Kritik dan Saran
4.2 Menulis Kode Android (Member)
4.2.1 Mengatur Profile
4.2.2 Cari Kata
4.2.2.1 Cari Kata Standart
4.2.2.2 Cari Kata Sesuai Keilmuan
4.2.3 Download Video
4.2.4 Kritik dan Saran
4.2.5 Rate

5.0 Implementasi
5.1 Testing dan Debugging
5.2 Analisa Kesalahan dan Kekurangan
5.3 Evaluasi

6.0 Monitoring dan Controlling

7.0 Closing
TABLE OF CONTENTS

GANTT CHART
TABLE OF CONTENTS

IMPLEMENTATION
STATECHART

Gambar Statechart Diagram


TABLE OF CONTENTS

ACTIVITY DIAGRAM

Gambar Activity Diagram Insert Video


TABLE OF CONTENTS

Gambar Activity Diagram Update Video


TABLE OF CONTENTS

Gambar Activity Diagram Pencarian Kata (Mobile App)


TABLE OF CONTENTS

Gambar Pencarian Kata (Website)


TABLE OF CONTENTS

Gambar Memberi Kritik Saran

Gambar Memberi Rate pada Materi


TABLE OF CONTENTS

Gambar Melihat data member


TABLE OF CONTENTS

Gambar Menghapus data member


TABLE OF CONTENTS

Gambar Menghapus kata dan video materi


TABLE OF CONTENTS

Gambar Melihat statistik kata yang sering dicari


TABLE OF CONTENTS

Gambar Melihat kritik saran user member


TABLE OF CONTENTS

USER INTERFACE
Tampilan User-Admin

Halaman Daftar Kata

Halaman Dashboard Admin


TABLE OF CONTENTS

Halaman Edit Kata

Halaman tambah kata


TABLE OF CONTENTS

List Member

Halaman Login
TABLE OF CONTENTS

Halaman Awal (Client Website)


TABLE OF CONTENTS

Tampilan User-Member

Halaman utama (Homepage)


TABLE OF CONTENTS

Halaman Cari Kata


TABLE OF CONTENTS

Halaman Hasil Cari Kata (Materi Video)


TABLE OF CONTENTS

TESTING
No Function Name Expected Result Result Status
1 Cari Kata - Sistem dapat - Sistem dapat Valid
mencari kata mencari kata
sebagai materi sebagai materi
yang diterima yang diterima
- sistem - sistem
menampilkan menampilkan
kata yang kata yang
sering sering
digunakan digunakan
2 Melihat - sistem - sistem Valid
Homepage menampilkan menampilkan
halaman halaman
utama utama
- -
3 Download - sistem dapat - sistem dapat Vallid
video menyediakan menyediakan
video yang video yang
didownload didownload
oleh user oleh user
4 Kritik dan Saran - Sistem - Sistem Valid
merekam kritik merekam kritik
dan saran, dan dan saran, dan
menyimpannya menyimpannya
kedalam kedalam
database database
5 Rate - Sistem - Sistem Valid
merekam rate merekam rate
materi dan materi dan
menyimpannya menyimpannya
kedalam kedalam
database database
6 Menghapus - System dapat - System dapat Valid
data member mendelete mendelete
data member data member
sesuai perintah sesuai perintah
user-admin user-admin
7 Melihat data - System - System Valid
memeber menampilkan menampilkan
data member data member
TABLE OF CONTENTS

8 Menghapus - Sistem dapat - Sistem dapat Valid


kata video mendelete mendelete
data kata video data kata video
9 Melihat statistik - System - System Valid
kata manampilkan manampilkan
statistik kata statistik kata
yang sering yang sering
dicari dicari
10 Melihat kritik - System - System Valid
saran user menampilkan menampilkan
member kritik saran kritik saran
dari user dari user
member member
11 Availability - Sistem dapat - Sistem dapat Valid
diakses 24 jam diakses 24 jam
sehari, 7 hari sehari, 7 hari
seminggu seminggu
12 Portability - Sistem Bisa - Sistem Bisa Valid
dijalankan dijalankan
menggunakan menggunakan
platform platform
Android Android
minimal versi minimal versi
Jelly Bean. Jelly Bean.
TABLE OF CONTENTS

MOV’S VERIFICATION SCENARIO


1. MOV 1 : Motivasi Mahasiswa untuk belajar bertambah 80%

Hasil Wawancara
Posiitif

Ragu

Negatif
20%

80%

Keterangan :
Melakukan sesuatu atau memberikan solusi yang lebih efektif (tepat
sasaran) dan efisien (sesuai tujuan) daripada sebelumnya. Setelah kami observasi
ke PSLD secara langsung kami mendapatkan angka 80%. Dari 20 orang yang kami
wawancara terkait dengan proyek kami, 16 orang memberi jawaban positif berupa
dukungan dan 4 orang masih ragu ragu. Sample wawancara kami lakukan terhadap
mahasiswa pendamping, staff, mahasiswa penyandang disabilitas

2. MOV 2 : Mahasiswa disabilitas Universitas Brawijaya bertambah menjadi 2 kali


lipat
TABLE OF CONTENTS

Jumlah Mahasiswa Disabilitas Universitas Brawijaya


45

40

35

30

25

20

15

10

0
2016 2017

Keterangan :
Bertambahnya mahasiswa disabilitas pada tahun akademik baru, maka
pelayanan harus dilakukan lebih. Universitas Brawijaya memiliki potensi lebih
dalam menampung mahasiswa disabilitas karena memiliki Pusat Pelayanan
Disabilitas (PLD). Di Indonesia sendiri baru ada di UB dan UIN Yogyakarta yang
memiliki PLD. Jika kita membuat suatu kegiatan yang menunjukan kepedulian
khusus terhadap mahasiswa disabilitas, maka angka keminatan terhadap UB oleh
calon mahasiswa disabilitas akan bertambah

3. MOV 3 : Mempercepat penyampaian materi terhadap Bahasa yang tidak dipahami


oleh pendamping / mahasiswa disabilitas sebesar 60%
 Sebelum menggunakan aplikasi :

 Sesudah menggunakan aplikasi :


TABLE OF CONTENTS

Keterangan :
Dalam kegiatan belajar mengajar dikelas, dosen menjelaskan materi kepada
pendamping dan mahasiswa disabilitas. Kemudian pendamping membutuhkan waktu
selama 3 menit untuk menjelaskan materi dengan Bahasa isyarat kepada mahasiswa
disabilitas. Setelah kami melakukan simulasi dari waktu 3 menit rata-rata yang kami
gunakan sebelum memakai aplikasi ini menjadi 1 menit

4. MOV 4 : Meningkatkan pemahaman pendamping dan mahasiswa penyandang


disabilitas sebesar 60%
 Sebelum menggunakan aplikasi :

9 simulator tidak memahami


1 simulator tidak
materi
memahami materi
 Setelah menggunakan aplikasi :
TABLE OF CONTENTS

4 simulator tidak memahami 6 simulator memahami materi


materi
TABLE OF CONTENTS

ATTACHMENT
1. Reporting Performance and Progress:

No Activity Date Result Documents


1 Reviews 02-03- Medapatkan revisi tentang solusi Meeting Report
2016 dan masalah yang diangkat yaitu 2
permasalahan yang dialami
pendamping dan mahasiswa
disabilitas Universitas Brawijaya.
2 Status 18-04- Dokumen Bussines Case telah Bussines Case
Reporting 2016 disetujui, dengan beberapa revisi
seperti TCO untuk perhitungan
gaji, dan Indirect Cost
3 Progress 27-04- Persetujuan tentang kebutuhan Dokumen SRS
Reporting 2016 fungsional dan nonfungsional
diperinci, sesuaikan fitur
utamanya.
4 Forecast 16-05- Penjelasan tentang WBS dengan Dokumen WBS
Reporting 2016 setiap task dideskripsikan dengan
jelas, penambahan
penaggungjawab, output,
predecessor dan successors

2. Information Distribution:
No Activity Date Result Documents
1 Face to face 28-02- Mendapatkan ide tentang MOV, Bussiness Case ,
meetings 2016 s/d proyek dan masalah apa SRS, final document
30-05- yng
2016 muncul,Mendapatkan
gambaran lebih jelas
tentang proyek,
mendapatkan revisi
tentang dokumen yang
sebelumnya dibuat.
2 Focus group 02-03- Melakuakn pekerjaan SRS, WBS
discussion 2016 s/d yang diberikan sesuai
30-05- dengan divisi
2016
3 Telephone 30-02- Mendapatkan laporan Bussiness Case , SRS,
TABLE OF CONTENTS

2016 s/d atau informasi penting final document


01-06- yang terkait dokumen
2016 sesuai dengan anggota
yang dituju
4 Email 30-02- Memberikan dokumen Bussiness Case , SRS,
2016 s/d bersifat privat kepada final document, pesan
29-05- anggota yang dituju singkat
2016
5 Collaboration 30-02- Penyebaran informasi Pesan dan tugas
Technology 2016 s/d singkat
29-05-
2016
6 Dropbox 30-02- Sharing Dokumen untuk Final document,
2016 s/d semua anggota tim business case, SRS,
29-05- WBS
2016

3. Collecting Requirements:
No Activity Date Result Documents
1 Observasi 01-03- Terkumpulnya daftar Solution Document
2016 masalah dan solusi Presentation
permasalahan
2 Interview 02-04- Terkumpulnya fitur fitur MOV
2016 s/d yang diperlukan untuk
08-04- membangun sistem ini
2016
3 Face to face 02-04- Mendapatkan persetujuan MOV, Bussines Case
2016 s/d ide dan solusi untuk
08-04- masalah yang dihadapi
2016
4 Focus Group 23-04- Kebutuhan fungsional dan Dokumen SRS
2016 s/d non fungsional
07-05-
2016

4. Defining Scope:
No Activity Date Result Documents
1 The Scope 18-04- Mendapatkan batasan Scope Boundary
Boundary 2016 system Document
TABLE OF CONTENTS

2 The Statement 20-05- Pernyataan dan definisi Statement of Work


of Work 2016 pekerjaan sebagai tim Document
proyek.
3 The Scope 18-04- Pernyataan dari scope Scope statement pada
Statement 2016 proyek. Final Document

5. Scope Change Control:


Request Request Date of Requested Response Approved Documents
Numbe Title Request by Date
r
1 Ide 02-03- Stakeholder 03-03- Yes Scope
sistem 2016 2016 Change
Request
Form 1
2 Business 18-04- Stakeholder 18-04- Yes Scope
Case 2016 – client 2016 Change
Request
Form 2
3 SRS 27-04- Stakeholder 28-04- Yes Scope
2016 – client, 2016 Change
sponsor Request
Form 3
4 WBS 16-05- Stakeholder 17-05- Yes Scope
2016 – client 2016 Change
Request
Form 4
TABLE OF CONTENTS

6. Quality Management Document

Dokumen Bussiness Case


TABLE OF CONTENTS

Dokumen Spesifikasi Kebutuhan Perangkat Lunak (System Requirement Spesification)


TABLE OF CONTENTS

7. WBS Dictionary

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 1.0


WBS Item Name : Analisis kebutuhan yang diperlukan
Penaggung Jawab : Lia Ninda Safitri, Irsalina Khairina, Farhan Ishami
Output : Dokumes Software Requirement Specification
Start : 2-3-16 Finish : 4-3-16
Predecessors : Successors :
- 2.0

Description :
Langkah awal untuk menentukan perangkat lunak seperti apa yang akan dihasilkan
dan menentukan kebutuhan apa saja yang diperlukan ketika membuat dan
membangun DESI LALA.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 1.1


WBS Item Name : Observasi informasi
Penaggung Jawab : Lia Ninda Safitri, Irsalina Khairina
Output : Dokumen Obeservasi Informasi
Start : 2-3-16 Finish : 24-3-16
Predecessors : Successors :
- 1.2

Description :
Dalam mengerjakan proyek DESI LALA melakukan pengamatan terhadap objek
berdasarkan pengetahuan dan gagasan yang sudah diketahui sebelumnya untuk
mendapatkan informasi-informasi yang dibutuhkan untuk melanjutkan penelitian.
Penelitian dapat dilakukan dengan tes dan kuisioner
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 1.2


WBS Item Name : Measureable organization value
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Measureable Organization Value
Start : 14-3-16 Finish : 28-3-16
Predecessors : Successors :
- 1.1 - 1.3

Description :
Mendeskripsikan tujuan menyeluruh DESI LALA dan mengukur keberhasilan.
Untuk menyelaraskan dengan tujuan perusahaan/organisasi, misi dan tujuan
dibuatnya DESI LALA
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 1.3


WBS Item Name : Business case
Penaggung Jawab : Lia Ninda Safitri, Oki Ari Saputra
Output : Dokumen Business Case
Start : 30-3-16 Finish : 11-4-16
Predecessors : Successors :
- 1.2 - 2.1

Description :
Menganalisis nilai perusahaan/organisasi, kelayakan, biaya, manfaat dan risiko
dari rencana dibuatnya DESI LALA
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 2.0


WBS Item Name : Analisis proses kerja
Penaggung Jawab : Irsalina Khairina, Agung Yudha Berliantara, Farhan
Ishami
Output : Dokumen Spesifikasi Kebutuhan Perangkat Lunak
Start : 20-4-16 Finish : 21-4-16
Predecessors : Successors :
- 1.0 - 3.0

Description :
Prosedur untuk menentukan tanggung jawab dan persyaratan ketrampilan yang
dibutuhkan dari pekerjaan untuk memberikan informasi yang digunakan untuk
membuat deskripsi pekerjaan DESI LALA berjalan.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 2.1


WBS Item Name : Menganalisa bagaimana sistem berjalan
Penaggung Jawab : Irsalina Khairina, Farhan Ishami
Output : Dokumen Spesifikasi Kebutuhan Perangkat Lunak
Start : 20-4-16 Finish : 20-4-16
Predecessors : Successors :
- 1.3 - 2.2
- 2.3
- 3.3 FF

Description :
Gambaran tentang sistem yang saat ini sedang berjalan di Universitas Brawijaya
mengenai mahasiswa disabilitas. Saat ini, proses belajar mengajar agak sulit
ditangkap dan lama untuk dimengerti oleh mahasiswa disabilitas karena sulit
meragakan bahasa pemrograman kedalam bahasa tubuh. Tujuan analisis sistem ini
untuk membuat sistem baru yaitu DESI LALA untuk membantu kegiatan belajar
mengajar kepada mahasiswa disabilitas khususnya mahasiswa di Fakultas Ilmu
Komputer Universitas Brawijaya. Serta bagaimana berjalannya Aplikasi / Sistem
berjalan dengan baik sesuai dengan kebutuhan.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 2.2


WBS Item Name : Membuat alur program
Penaggung Jawab : Agung Yudha Berliantara, Farhan Ishami
Output : Dokumen Spesifikasi Kebutuhan Perangkat Lunak
Start : 20-4-16 Finish : 20-4-16
Predecessors : Successors :
- 2.1

Description :
Melakukan pembuatan dan pengkodean program. Langkah–langkah dalam
membuat alur program DESI LALA: mendefinisikan masalah, analisa
permasalahan, desain algoritma dan representasi, pengkodean, uji coba dan
pembuatan dokumentasi.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 2.3


WBS Item Name : Membuat logika program
Penaggung Jawab : Agung Yudha Berliantara, Oki Ari Saputra
Output : Dokumen Spesifikasi Kebutuhan Perangkat Lunak
Start : 21-4-16 Finish : 21-4-16
Predecessors : Successors :
- 2.1 - 3.1

Description :
Urutan langkah-langkah logis untuk menyelesaikan masalah yang disusun secara
sistematis dan logis. DESI LALA memberikan keluaran yang dikehendaki dari
sejumlah masukan yang diberikan serta membuat algoritma yang efisien untuk
memberikan keluaran yang baik dan benar. Tidak harus menunggu berjam-jam dan
tidak memakan memori yang banyak.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 3.0


WBS Item Name : Analisis kebutuhan programming
Penaggung Jawab : Agung Yudha Berliantara, Oki Ari Saputra, Farhan Ishami
Output : Dokumen Software Requirement Specification
Start : 20-4-16 Finish : 25-4-16
Predecessors : Successors :
- 2.0 - 4.0

Description :
Menentukan kebutuhan apa saja yang dibutuhkan dari sisi program. Menentukan
bahasa pemrograman, jenis database dan membuat SRS (Software Requirement
Spesification).
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 3.1


WBS Item Name : Menentukan bahasa pemrograman
Penaggung Jawab Agung Yudha Berliantara, Oki Ari Saputra
Output : Dokumen Software Requirement Specification
Start : 22-4-16 Finish : 22-4-16
Predecessors : Successors :
- 2.3 - 3.2
- 3.3 FF

Description :
Menentukan Bahasa pemrograman pada DESI LALA menggunakan Java, HTML
dan PHP.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 3.2


WBS Item Name : Menentukan jenis database
Penaggung Jawab : Agung Yudha Berliantara, Farhan Ishami
Output : Dokumen Software Requirement Specification
Start : 22-4-16 Finish : 22-4-16
Predecessors : Successors :
- 3.1 - 3.3 FF

Description :
Menentukan jenis database yang digunakan pada sistem DESI LALA adalah
MySQL
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 3.3


WBS Item Name : Membuat Software Requirement Specification
Penaggung Jawab : Farhan Ishami
Output : Dokumen Software Requirement Specification
Start : 24-4-16 Finish : 25-4-16
Predecessors : Successors :
- 2.1 FF - 4.0
- 3.1 FF - 4.1
- 3.2 FF - 4.1.1
- 4.1.2
- 4.1.3
- 4.1.4
- 4.1.5
- 4.1.6
- 4.1.7
TABLE OF CONTENTS

- 4.1.2
- 4.2
- 4.2.1
- 4.2.2
- 4.2.2.1
- 4.2.2.2
- 4.2.3
- 4.2.4
- 4.2.5

Description :
Membuat dokumen yang menjelaskan tentang kebutuhan software yang harus
dipenuhi

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.0


WBS Item Name : Menulis Kode Program
Penaggung Jawab Agung Yudha Berliantara, Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 18-5-16
Predecessors : Successors :
- 3.0 - 5.0
- 3.3 - 5.1

Description :
Menulis suatu rangkaian pernyataan atau deklarasi yang ditulis dalam Bahasa
pemrograman computer yang terbaca manusia dan menulis kode program sesuai
TABLE OF CONTENTS

dengan fitur-fitur yang akan disediakan untuk admin maupun pengguna..


TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1


WBS Item Name : Menulis kode web (admin)
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 18-5-16
Predecessor : Successors :
- 3.3 - 4.2 SS

Description :
Menulis atau mendeklarasikan kode program yang menggunakan bahasa
pemrograman PHP (Processor Hypertext) agar admin dapat menggunakan fitur-
fitur yang disediakan dalam website DESI LALA.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1.1


WBS Item Name : Mengatur Home
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 9-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program untuk fitur Mengatur Home pada admin, agar admin
dengan mudah untuk mengelola halaman depan aplikasi yang informatif untuk
fitur-fitur pengguna.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1.2


WBS Item Name : Melihat Statistik
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Kode Program, Program Aplikasi
Start : 10-5-16 Finish : 12-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program pada fitur halaman statistic, agar admin dapat memantau
dan melihat statistik berdasarkan kata yang sering dilihat dan materi yang sering
dilihat oleh pendamping maupun mahasiswa disabilitas.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1.3


WBS Item Name : Daftar Kata
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 18-5-16
Predecessors : Successors :
- 3.3 - 4.1.4 FF

Description :
Menulis kode program untuk Mengelola kata atau keyword yang tersedia oleh
untuk mempermudah pengguna dalam mencari materi berdasarkan kata-kata atau
kalimat pada materi ayng akan dipilih.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1.4


WBS Item Name : Tambah Materi dan Video
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 18-5-16
Predecessors : Successors :
- 3.3
- 4.1.3 FF

Description :
Menulis kode program agar Admin dapat menambah atau mengupdate materi dan
video yang bertujuan untuk memudahkan kegiatan belajar mengajar pendamping
maupun mahasiswa disabilitas.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1.5


WBS Item Name : Rate
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Kode Program, Program Aplikasi
Start : 12-5-16 Finish : 13-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Admin dapat dapat melihat materi atau video yang
rate tertinggi dan tefavorit yang akan di rate oleh pendamping maupun mahasiswa
disabilitas yang menggunakan materi yang disediakan.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1.6


WBS Item Name : Mengatur member list
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Kode Program, Program Aplikasi
Start : 16-5-16 Finish : 17-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Admin dapat menambah, mengupdate, atau
menghapus member yang terdaftar pada database DESI LALA serta mengelola
fitur fitur dan kebutuhan pengguna.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.1.7


WBS Item Name : Melihat kritik dan saran
Penaggung Jawab : Agung Yudha Berliantara
Output : Dokumen Spesifikasi Kebutuhan Perangkat Lunak
Start : 17-5-16 Finish : 18-5-16
Predecessors : Succesors :
- 3.3

Description :
Menulis kode program agar Admin dapat melihat kritik dan saran dari pengguna,
dengan tujuan pengembangan sistem yang sesuai dengan kebutuhan pengguna dan
dapat dijadikan sebagai bahan laporan kepada developer aplikasi DESI LALA.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2


WBS Item Name : Menulis Kode Android (Member)
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 18-5-16
Predecessors : Successors :
- 3.3
- 4.1 SS

Description :
Menulis kode program agar Member dapat melakukan atau menggunakan fitur
fitur yang disediakan pada aplikasi mobile beserta operating system yang
digunakan adalah Android.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2.1


WBS Item Name : Mengatur Profile
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 10-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program serangkaian petunjuk kepada pengguna yang memberitakan
profil member, member dapat merubah data diri atau profil dirinya, member dapat
berbagi informasi tentang dirinya melalui profil.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2.2


WBS Item Name : Cari Kata
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 11-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Member dapat mencari materi atau video yang
disediakan berdasarkan kata, agar lebih mempermudah, mempercepat
pembelajaran dan tidak membutuhkan waktu yang lama.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2.2.1


WBS Item Name : Cari Kata Standart
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 11-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Member dapat mencari materi berdasarkan kata yang
lebih umum dalam pemilihan materi matakuliah, agar lebih mempermudah dan
mempercepat pembelajaran oleh pengguna yaitu pendamping dan mahasiswa
disabilitas.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2.2.2


WBS Item Name : Cari Kata Keilmuan
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 9-5-16 Finish : 11-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Member dapat mencari materi berdasarkan kata yang
sesuai keilmuan yang ditempuh dan lebih spesifik pada materi yang disampaikan
melalui video.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2.3


WBS Item Name : Download Video
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 12-5-16 Finish : 12-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Member dapat mengunduh/download video yang
tersedia, untuk mempermudahkan pengguna atau diutamakan untuk mahasiswa
disabilitas dalam belajar dimanapun dan kapanpun.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2.4


WBS Item Name : Kritik dan Saran
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 13-5-16 Finish : 16-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Member dapat memberikan kritik dan saran kepada
sistem sebagai bahan pertimbangan dan pengembangan sistem lalu dijadikan
laporan untuk developer untuk menambahkan fitur sesuai kebutuhan pengguna.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 4.2.5


WBS Item Name : Rate
Penaggung Jawab : Oki Ari Saputra
Output : Dokumen Kode Program, Program Aplikasi
Start : 17-5-16 Finish : 18-5-16
Predecessors : Successors :
- 3.3

Description :
Menulis kode program agar Member dapat memberikan rating kepada materi dan
video yang disediakan dan admin dapat mengetahui materi atau video yang sesuai
dengan kebutuhan pengguna sebagai materi yang terfavorit.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 5.0


WBS Item Name : Implementasi
Penaggung Jawab : Lia Ninda Safitri, Irsalina Khairina, Agung Yudha
Berliantara, Oki Ari Saputra, Farhan Ishami
Output : Dokumen Uji Perangkat Lunak
Start : 19-5-16 Finish :23-5-16
Predecessors : Successors :
- 4.0

Description :
Menerapkan rancangan menjadi program aplikasi. Dari analisa dan rancangan
menjadi dalam bentuk source code yang siap untuk dipublikasi menjadi aplikasi.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 5.1


WBS Item Name : Testing dan Debugging
Penaggung Jawab : Agung Yudha Berliantara, Oki Ari Saputra
Output : Dokumen Uji Perangkat Lunak
Start : 19-5-16 Finish : 20-5-16
Predecessors : Successors :
- 4.0 - 5.2

Description :
Tester melakukan pengujian dan pencarian kesalahan (error), mencari kecacatan
pada aplikasi Desi Lala.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 5.2


WBS Item Name : Analisa Kesalahan dan Kekurangan
Penaggung Jawab : Lia Ninda Safitri, Irsalina Khairina, Farhan Ishami
Output : Dokumen Uji Perangkat Lunak
Start : 20-5-16 Finish : 20-5-16
Predecessors : Successors :
- 5.1 - 5.3

Description :
Tester dan analisator aplikasi menganalisa kesalahan dari aplikasi yang telah
ditemukan ketika melakukan Testing dan Debugging yang selanjutnya akan bisa
menjadi bahan evaluasi dan perbaikan dalam pengembangan aplikasi selanjutnya.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 5.3


WBS Item Name : Evaluasi
Penaggung Jawab Farhan Ishami
Output : Dokumen Uji Perangkat Lunak
Start : 23-5-16 Finish : 23-5-16
Predecessors : Successors :
- 5.2 - 7.0

Description :
Evaluasi terhadap apa saja yang dianalisis pada aplikasi, dilakukan apakah dari
analisa tersebut perlu dilakukan perbaikan secepatnya atau bisa bertahap.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 6.0


WBS Item Name : Monitoring dan controlling
Penaggung Jawab : Lia Ninda Safitri, Irsalina Khairina, Agung Yudha
Berliantara, Oki Ari Saputra, Farhan Ishami
Output : Sistem DESI LALA
Start : 2-3-16 Finish : 1-6-16
Predecessors : Successors :
Description :
Monitoring dilakukan untuk mengetahui kecocokan dan ketepatan kegiatan yang
dilaksanakan dengan rencana yang telah disusun. Monitoring digunakan pula
untuk memperbaiki kegiatan yang menyimpang dari rencana, mengoreksi
penyalahgunaan aturan dan sumber-sumber, serta untuk mengupayakan agar
tujuan dicapai seefektif dan seefisien mungkin. Controlling (pengawasan) dalam
menetapkan ukuran kinerja dan pengambilan tindakan yang dapat mendukung
pencapaian hasil yang diharapkan sesuai dengan kinerja yang telah ditetapkan
tersebut. Dari kegiatan monitoring dan controlling seperti yang dijelaskan
sebelumnya merupakan tugas dan tanggung jawab projek manager.
TABLE OF CONTENTS

WBS Dictionary Entry


16 May 2016

Project Name: DESI LALA (Deaf Sign Languange Translator)

WBS Item Number : 7.0


WBS Item Name : Closing
Penaggung Jawab : Lia Ninda Safitri
Output : Dokumen Final Project dan Sistem DESI LALA
Start : 23-5-16 Finish : 1-6-16
Predecessors : Successors :
- 5.3

Description :
Pada tahap ini proyek dinyatakan selesai. Waktu closing terhitung setelah proses
eksekusi (saat Go-Live) selesai dilakukan. Dalam masa itu,
dilakukan review dengan memberikan kuesioner kepada pengguna tentang DESI
LALA. Hasil dan analisis pada DESI LALA akan dipresentasikan untuk
menyampaikan hasil review kepada Tim Proyek dan beberapa pengguna yang
diundang dalam Project Closing Meeting. Dalam pertemuan tersebut proyek harus
dinyatakan selesai.
TABLE OF CONTENTS

8. Surat Pengantar Observasi


TABLE OF CONTENTS

9. Gantt Chart