Anda di halaman 1dari 51

Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok

Nama Panjang L. Total


No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2
NAMLEA - SAMALAGI

1 03+195 12.50 3 4 11.96 0.10 0.2067 1.2 12 0.248 5.952 18.16


S.03.23032◦ 2.3 0.4 0.88 4 22.688
Wai Lala
E.127.09583◦

Total 40.85

2 06+500 12.00 12.00 0.29 0.85 2 48.746


S.03.20599◦ Wai 2.3 0.35 1.07 4 25.904
E.120.08323◦ Ubung

Total 74.65

3 12+240 12.30 3 4 11.77 0.1 0.1733 1 12 0.208 4.16 16.14


Wai 1.8 0.43 1.5 4 29.856
S.03.17490◦
E.127.04280◦ Jikumeras
a1 12.3 0.5 12.3

Total 58.30
Luasan Total 173.80
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama Panjang L. Total
No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

4 13+984 41.70 41.7 0.35 0.8 2 163.75


Wai 2.87 0.45 0.98 4 31.1948
S.03.17434◦
E.127.02575◦ Jikumeras
a2 41.7 0.15 12.51

Total 207.45

5 18+850 12.20 12.2 0.25 0.8 2 45.94


S.03.14739◦ Wai 1.65 0.34 1.56 4 27.0792
E.126.99756◦ Miting 12.4 0.2 4.96

Total 77.98

6 27+075 41.50 3 4 39.72 0.1 0.1733 1 12 0.208 4.16 44.09


S.03.14254◦ Wai 1.8 0.43 1.5 4 29.856
E.126.95172◦ Perang 41.5 0.5 41.5

Total 115.44
Luasan Total 400.88
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Panjang Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

7 30+750 4.00 3 4 3.83 0.1 0.18 0.9 8 0.144 2.592 6.56


Wai Rata 2.19 0.47 0.55 4 15.8212
S.03.1495◦ Gelomban
E.126.92223◦ 4 0.15 1.2
g

Total 23.59

8 31+100 4.00 3 4 3.83 0.1 0.18 0.9 8 0.144 2.592 6.56


wai rata 2.19 0.47 0.55 4 15.8212
S.03.14767◦ gelomban
E.126.91951◦ 4 0.15 1.2
g2
S.03.14767◦ wai rata
gelomban
E.126.91951◦ g2

Total 23.59

9 31+185 4.00 3 4 3.83 0.1 0.18 0.9 8 0.144 2.592 6.56


wai rata 2.19 0.47 0.55 4 15.8212
S.03.14718◦
E.126.91886◦ gelomban
g3 4 0.15 1.2

Total 23.59
Luasan Total 70.76
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama Panjang L. Total
No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

10 31+915 4.00 3 4 3.83 0.1 0.18 0.9 8 0.144 2.592 6.56


wai rata 2.19 0.47 0.55 4 15.8212
S.03.14413◦
E.126.91311◦ gelomban
g4 4 0.15 1.2

Total 23.59

11 37+550 63.20 63.20 0.35 1.7 2 476.38


2.8 0.35 1.16 4 33.152
S.03.12883◦ wai
E.126.88418◦ waplau 64.10 0.5 64.1

2 0.4 0.3 109 244.16


Total 817.79

12 44+275 11.00 11.00 0.3 0.9 2 47.28


1.9 0.43 1.18 4 25.263
S.03.09111◦ wai sia
E.126.84910◦ 11.90 0.5 11.9

2.5 0.33 2.5 38 569.05


Total 653
Luasan Total 1,494.87
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Panjang Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

13 45+375 25.60 3 4 24.50 0.12 0.2067 1 12 0.2976 4.96 29.76


2.95 0.5 1.05 4 34.88
S.03.08791◦
wai ura 25.6 0.5 25.6
E.126.84022◦

2 0.3 0.3 24 47.52


Total 137.76

14 47+565 21.00 21.00 0.25 0.9 2 87.00


wai 1.9 0.4 1.12 4 23.648
S.03.08791◦ tempayan
E.126.84022◦ 2.5 0.3 0.2 86 160.82
g
22.15 0.2 8.86
Total 280.33
Luasan Total 418.09
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama Panjang L. Total
No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2
SAMALAGI - AIR BUAYA

1 00+075 16.00 3 4 15.31 0.15 0.1867 0.7 24 0.672 6.272 22.26


2.07 0.5 0.7 4 18.532
wai sisi
16.70 0.8 26.72

Total 67.51

2 01+100 102.30 3 4 97.91 97.91


wai 3.5 0.4 1.33 4 47.096
samalagi 2 0.4 0.4 170 462.4
103.30 0.15 30.99

Total 638.39

3 04+795 11.00 11.00 0.27 1.4 2 69.052


2 0.3 1.1 4 22.64
wai tei

0
Total 91.69

4 06+250 wai 11.70 11.70 0.3 0.9 2 50.22


buntut 2.55 0.4 1.05 4 28.86
(wai
hatawano
) 0
Total 79.08
Luasan Total 876.68
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama Panjang L. Total
No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

5 06+550 15.50 15.50 0.3 0.87 2 64.284


wai 2.03 0.3 1.1 4 22.94
hatawano 0
16.45 0.15 4.935

Total 92.16

6 09+760 8.50 3 4 8.14 0.1 0.2133 1.00 10 0.2133 2.1333 6.48


2.35 0.4 1.3 4 32.36
wai talabi

8.80 0.18 3.168


Total 42.01

7 10+285 21.00 21.00 0.26 1.00 2 95.96


wai lihang 2 0.45 1.4 4 31.04
2
21.95 0.2 8.78
Total 135.78
Luasan Total 269.95
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Jembatan Panjang
Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

8 15+210 6.15 6.15 0.3 0.9 2 26.91


wai
Wapre
wai 1.55 0.4 1.15 4 20.42
Wapre 1.56 0.3 0.3 12 19.008
6.65 0.14 1.862

Total 68.20

9 15+475 10.10 10.10 0.25 0.9 2 42.31


1.55 0.3 1.25 4 20.36
wai air
terjun 2 0.35 0.35 7 16.415

10.35 0.2 4.14


Total 83.23

10 18+583 57.70 3 4 55.22 0.1 0.1867 1.00 86 1.6053 16.053 50.912


2.5 0.5 1.1 4 31.4
wai Una

58.15 0.2 23.26


Total 105.57
Luasan Total 257.00
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Panjang Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

11 19+620 122.50 3 4 117.24 0


wai poti 2 0.45 1.4 4 31.04
besar 2 0.45 0.4 303 866.58
123.50 0.2 49.4

Total 947.02

12 22+650 31.50 3 4 30.15 0.12 0.19 1.00 36 0.8208 6.84 23.141


1.8 0.6 1.2 4 27.36
wai mase

32.20 0.2 12.88


Total 63.38

13 24+100 52.20 3 4 49.96 0.1 0.2233 1.00 56 1.2507 12.507 37.464


wai 2.8 0.55 1.1 4 35.64
wahalmat
a
52.65 0.2 21.06
0.15 0.75 2 0.9
Total 95.06
Luasan Total 1,105.46
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Jembatan Panjang
Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

14 22+650 42.00 3 4 40.20 0.1 0.18 1.00 44 0.792 15.84 25.432


Wai 2.4 0.3 1.1 4 26.64
Tehowana
t
42.70 0.2 17.08
Total 69.15

15 27+050 25.00 25.00 0.15 0.9 2 98.04


wai nibe 2.5 0.23 1.1 4 26.324
kecil 1.9 0.2 0.3 154 252.56
25.50 0.2 10.2
Total 387.12

16 27+205 125.00 3 4 119.63 0


wai 2.8 0.6 1.15 4 38
masewai 1.95 0.4 0.2 254 436.88
nibe besar
125.90 0.25 62.95
Total 537.83

17 18+585 78.20 3 4 74.84 0.1 0.2067 0.90 84 1.736 15.624 48.104


wai 2.75 0.4 1.25 4 35.9
waspait 0
78.40 0.15 23.52

Total 107.52
Luasan Total 1,101.63
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama Panjang L. Total
No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

18 32+175 12.70 3 4 12.15 0.1 0.21 1.00 16 0.336 3.36 10.256


wai 2 0.4 1.1 4 24.32
pamali
13.10 0.1 2.62
0
Total 37.20

19 32+475 6.00 6.00 0.3 0.7 2 21.24


2.6 0.5 1.1 4 32.48
waikodi

6.95 0.2 2.78


Total 56.50

20 33+715 31.50 3 4 30.15 0.1 0.2367 0.90 36 0.852 7.668 22.668


2 0.5 1.3 4 30.000
wai tabi

32.10 0.17 10.914


0
Total 63.58
Luasan Total 157.28
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama Panjang L. Total
No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

21 35+050 93.00 3 4 89.01 0.1 0.2 0.95 102 2.04 19.38 60.18
wai 2.3 0.35 1 4 24.42
wamlana
1
93.45 0.15 28.035
0
Total 112.64

22 37+375 100.00 3 4 95.71 0.12 0.2133 1.00 112 2.8672 23.893 77.53386667
wai 2.5 0.5 1.2 3 25.35
wamlana
2 1.5 0.35 0.4 44 88.22
100.45 0.2 40.18

0.15 0.7 40 16.8


Total 248.08
23 42+200 78.00 3 4 74.65 0.14 0.22 0.97 84 2.5872 17.926 61.2528
2.4 0.4 1.1 2 14.240
wai pure

78.40 0.3 47.04


0
Total 122.53
Luasan Total 483.25
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Jembatan Panjang
Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

24 42+025 125.20 3 4 119.83 0.1 0.21 0.95 130 2.73 51.87 79.3
wai 2.45 0.4 1.1 4 29
mangit
125.52 0.26 65.2704
0
Total 173.57

25 47+250 17.90 3 4 17.13 0.2 0.2267 0.95 18 0.816 3.876 15.408


wai air 2.5 0.58 1.4 4 40.296
buaya
18.35 0.27 9.909
0
Total 65.61
Luasan Total 239.18
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama Panjang L. Total
No STA Koordinat Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2
AIR BUAYA - TELUK BARA

1 00+130 25.90 3 4 24.79 0.14 0.17 1.00 28 0.6664 4.76 18.0264


2.5 0.56 1.43 4 40.606
wai sula
0
26.59 0.2 10.636

Total 69.27

2 00+975 158.50 3 4 151.70 0.1 0.1833 0.95 28 0.5133 4.8767 157.09


1.78 0.5 1.59 4 32.562
wai lala 0.15 0.9 71 38.34

25.6 25.60 0.14 7.168


26.2 26.20 0.14 7.336
Total 242.49

3 02+550 21.20 21.20 0.24 0.95 2 91.648


wai ili 2.6 0.3 1.35 4 34.44
kecil
22.38 0.2 8.952
0
Total 135.04

4 02+955 246.80 3 4 236 0.1 0.1833 0.95 28 0.5133 4.8767 241.60


25.90 25.90 0.5 0.95 2 126.22
26.00 26.00 0.5 0.95 2 126.7
wai illi
besar 2.1 0.43 1.25 4 28.912
0.15 0.7 386 162.12

26.90 0.28 15.064


27.00 0.28 15.12
Total 715.73
Luasan Total 1,162.53
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Panjang Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

5 06+265 40.00 3 4 38 38.28


1.04 0.6 0.45 4 8.4
2 0.4 0.5 36 115.2
wai kose
2.3 0.7 1 4 30.440
0.15 0.7 84 35.28
40.20 0.28 22.512

Total 250.11

6 08+030 40.70 40.70 0.2 0.9 2 163.52


wai 3 0.3 1.3 4 37.92
langga 1.96 0.37 0.22 100 175.04
41.88 0.2 16.752

Total 393.23

7 14+300 11.80 3 4 11 0.12 0.1533 0.95 12 0.2208 1.748 13.26

wai kase
0
0
wai kase
1.94 0.4 0.97 4 21.262
0
12.80 0.15 3.84

Total 38.36
Luasan Total 681.71
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Jembatan Panjang
Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

8 15+840 133.00 3 4 127 127.29

1.9 0.32 0.25 140 240.52


wai bebe
3 0.4 1.2 4 37.440
0.15 0.87 58 30.276
133.20 0.3 79.92
0
Total 515.45

9 18+925 24.30 24.30 0.35 0.97 2 112.652


2.4 0.38 2 4 48.128
wai mboti
2 0.38 0.2 68 116.416
24.60 0.2 9.84

Total 287.04

10 19+823 60.00 3 4 57 57.42


1.9 0.37 0.25 169 310.622
2.18 0.5 1.02 4 26.229
wai kusa 1
0.9 0.53 0.46 4 7.170
0.15 0.65 82 31.98
61.00 0.2 24.4

Total 457.83
Luasan Total 1,260.31
Sandaran Parapet Jembatan Parapet Oprit Trotoar Patok
Nama L. Total
No STA Koordinat Panjang Φ nΦ LΦ p l t n L1 L2 p l t n p l t n p t p l t n
Jembatan
m m m buah m2 m2 m m m buah m m m buah m m m m m buah m2

11 21+370 11.80 11.80 1.15 0.36 2 45.788


2.5 0.4 1.4 4 36.48
wai kusa 2 2.2 0.3 0.25 74 141.34
12.10 0.2 4.84

Total 228.45

12 24+990 228.50 3 4 219 218.69


15.60 15.60 0.42 0.95 2 73.98
10.80 10.80 0.42 0.95 2 51.708
wai duna 2.2 0.46 1.1 4 27.456
0.15 0.75 104 46.8

15.60 0.22 6.864


10.80 0.22 4.752
Total 430.25
Luasan Total 658.70
12 24+990 6.00 0 0 - -
0.00 0.42 0.95 2 1.596
0.00 0 0 0 0
wai duna
2 6 0.3 0.405 2 13.806
0 0 0 0

0.00 0 0
0.00 0 0
Total 15.40
NO STA NAMA JEMBTAN PANJANG (M)

1 03+195 Wai Lala 12.50


2 06+500 Wai Ubung 12.00
3 12+240 Wai Jikumerasa 1 12.30
4 13+984 Wai Jikumerasa 2 41.70
5 18+850 Wai Miting 12.20
6 27+075 Wai Perang 41.50
7 30+750 Wai Rata Gelombang 4.00
8 31+100 wai rata gelombang 2 4.00
9 31+185 wai rata gelombang 3 4.00
10 31+915 wai rata gelombang 4 4.00
11 37+550 wai waplau 63.20
12 44+275 wai sia 11.00
13 45+375 wai ura 25.60
14 47+565 wai tempayang 21.00

15 00+075 wai sisi 16.00


16 01+100 wai samalagi 102.30
17 04+795 wai tei 11.00
18 06+250 wai buntut (wai hatawano ) 11.70
19 06+550 wai hatawano 15.50
20 09+760 wai talabi 8.50
21 10+285 wai lihang 2 21.00
22 15+210 wai Wapre 6.15
23 15+475 wai air terjun 10.10
24 18+583 wai Una 57.70
25 19+620 wai poti besar 122.50
26 22+650 wai mase 31.50
27 24+100 wai wahalmata 52.20
28 22+650 Wai Tehowanat 42.00
29 27+050 wai nibe kecil 25.00
30 27+205 wai masewai nibe besar 125.00
31 18+585 wai waspait 78.20
32 32+175 wai pamali 12.70
33 32+475 waikodi 6.00
34 33+715 wai tabi 31.50
35 35+050 wai wamlana 1 93.00
36 37+375 wai wamlana 2 100.00
37 42+200 wai pure 78.00
38 42+025 wai mangit 125.20
39 47+250 wai air buaya 17.90

40 00+130 wai sula 25.90


41 00+975 wai lala 158.50
42 02+550 wai ili kecil 21.20
43 02+955 wai illi besar 246.80
44 06+265 wai kose 40.00
45 08+030 wai langga 40.70
46 14+300 wai kase 11.80
47 15+840 wai bebe 133.00
48 18+925 wai mboti 24.30
49 19+823 wai kusa 1 60.00
50 21+370 wai kusa 2 11.80
51 24+990 wai duna 228.50
52 24+990 wai duna 2 6.00
L.TOTAL (M2) RUAS PENGECATAN PEMBERSIHAN

40.85 Namle - Samalagi 1,225,542.00 450,000.00


74.65 2,239,500.00 432,000.00
58.30 1,748,879.57 442,800.00
207.45 6,223,644.00 1,501,200.00
77.98 2,339,376.00 439,200.00
400.88 12,026,294.64 1,494,000.00
23.59 707,564.64 144,000.00
23.59 707,564.64 144,000.00
70.76 2,122,693.92 144,000.00
23.59 707,564.64 144,000.00
817.79 24,533,760.00 2,275,200.00
653.49 19,604,796.00 396,000.00
137.76 4,132,759.30 921,600.00
280.33 8,409,840.00 756,000.00
86,729,779.34 9,684,000.00
67.51 Samalagi-Air Buaya 2,025,274.56 576,000.00
638.39 19,151,833.97 3,682,800.00
91.69 2,750,760.00 396,000.00
79.08 2,372,400.00 421,200.00
92.16 2,764,770.00 558,000.00
42.01 1,260,240.00 306,000.00
135.78 4,073,400.00 756,000.00
68.20 2,046,000.00 221,400.00
83.23 2,496,750.00 363,600.00
105.57 3,167,160.00 2,077,200.00
947.02 28,410,600.00 4,410,000.00
63.38 1,901,424.00 1,134,000.00
95.06 2,851,920.00 1,879,200.00
69.15 2,074,560.00 1,512,000.00
387.12 11,613,720.00 900,000.00
537.83 16,134,900.00 4,500,000.00
107.52 3,225,720.00 2,815,200.00
37.20 1,115,880.00 457,200.00
56.50 1,695,000.00 216,000.00
63.58 1,907,460.00 1,134,000.00
112.64 3,379,050.00 3,348,000.00
248.08 7,442,516.00 3,600,000.00
122.53 3,675,984.00 2,808,000.00
173.57 5,207,112.00 4,507,200.00
65.61 1,968,390.00 644,400.00
134,712,824.53 43,223,400.00
69.27 Air Buaya-Tlk.Bara 2,078,064.00 932,400.00
242.49 7,274,745.36 5,706,000.00
135.04 4,051,200.00 763,200.00
715.73 21,471,941.09 8,884,800.00
250.11 7,503,446.40 1,440,000.00
393.23 11,796,960.00 1,465,200.00
38.36 1,150,939.49 424,800.00
515.45 15,463,397.28 4,788,000.00
287.04 8,611,080.00 874,800.00
457.83 13,734,765.60 2,160,000.00
228.45 6,853,440.00 424,800.00
430.25 12,907,528.56 8,226,000.00
15.40 462,060.00 216,000.00
113,359,567.78 36,306,000.00

334,802,171.65 89,213,400.00
PEMBERSIHAN DASPERBAIKAN SEDERHANAPERBAIKAN RAILING KONTRAK

1,000,000.00 125,000.00 125,000.00 2,925,542.00 33,800,000.00


960,000.00 120,000.00 120,000.00 3,871,500.00 33,200,000.00
984,000.00 123,000.00 123,000.00 3,421,679.57 33,200,000.00
3,336,000.00 417,000.00 417,000.00 11,894,844.00 25,700,000.00
976,000.00 122,000.00 122,000.00 3,998,576.00 27,600,000.00
3,320,000.00 415,000.00 415,000.00 17,670,294.64 25,700,000.00
320,000.00 40,000.00 40,000.00 1,251,564.64
320,000.00 40,000.00 40,000.00 1,251,564.64
320,000.00 40,000.00 40,000.00 2,666,693.92
320,000.00 40,000.00 40,000.00 1,251,564.64
5,056,000.00 632,000.00 632,000.00 33,128,960.00 25,700,000.00
880,000.00 110,000.00 110,000.00 21,100,796.00 28,600,000.00
2,048,000.00 256,000.00 256,000.00 7,614,359.30 32,500,000.00
1,680,000.00 210,000.00 210,000.00 11,265,840.00 25,700,000.00
21,520,000.00 2,690,000.00 2,690,000.00 123,313,779.34 291,700,000.00
1,280,000.00 160,000.00 160,000.00 4,201,274.56
8,184,000.00 1,023,000.00 1,023,000.00 33,064,633.97 28,600,000.00
880,000.00 110,000.00 110,000.00 4,246,760.00 30,000,000.00
936,000.00 117,000.00 117,000.00 3,963,600.00
1,240,000.00 155,000.00 155,000.00 4,872,770.00 27,400,000.00
680,000.00 85,000.00 85,000.00 2,416,240.00 28,600,000.00
1,680,000.00 210,000.00 210,000.00 6,929,400.00 26,650,000.00
492,000.00 61,500.00 61,500.00 2,882,400.00
808,000.00 101,000.00 101,000.00 3,870,350.00 27,600,000.00
4,616,000.00 577,000.00 577,000.00 11,014,360.00 33,200,000.00
9,800,000.00 1,225,000.00 1,225,000.00 45,070,600.00 30,500,000.00
2,520,000.00 315,000.00 315,000.00 6,185,424.00
4,176,000.00 522,000.00 522,000.00 9,951,120.00 30,000,000.00
3,360,000.00 420,000.00 420,000.00 7,786,560.00 30,500,000.00
2,000,000.00 250,000.00 250,000.00 15,013,720.00 30,000,000.00
10,000,000.00 1,250,000.00 1,250,000.00 33,134,900.00 32,500,000.00
6,256,000.00 782,000.00 782,000.00 13,860,920.00 25,700,000.00
1,016,000.00 127,000.00 127,000.00 2,843,080.00 30,000,000.00
480,000.00 60,000.00 60,000.00 2,511,000.00 25,700,000.00
2,520,000.00 315,000.00 315,000.00 6,191,460.00 32,500,000.00
7,440,000.00 930,000.00 930,000.00 16,027,050.00 25,700,000.00
8,000,000.00 1,000,000.00 1,000,000.00 21,042,516.00 27,600,000.00
6,240,000.00 780,000.00 780,000.00 14,283,984.00 32,500,000.00
10,016,000.00 1,252,000.00 1,252,000.00 22,234,312.00 28,600,000.00
1,432,000.00 179,000.00 179,000.00 4,402,790.00 30,500,000.00
96,052,000.00 12,006,500.00 12,006,500.00 298,001,224.53 614,350,000.00
2,072,000.00 259,000.00 259,000.00 5,600,464.00 27,600,000.00
12,680,000.00 1,585,000.00 1,585,000.00 28,830,745.36 33,800,000.00
1,696,000.00 212,000.00 212,000.00 6,934,400.00 38,500,000.00
19,744,000.00 2,468,000.00 2,468,000.00 55,036,741.09 34,500,000.00
3,200,000.00 400,000.00 400,000.00 12,943,446.40 28,600,000.00
3,256,000.00 407,000.00 407,000.00 17,332,160.00 28,600,000.00
944,000.00 118,000.00 118,000.00 2,755,739.49 27,600,000.00
10,640,000.00 1,330,000.00 1,330,000.00 33,551,397.28 32,800,000.00
1,944,000.00 243,000.00 243,000.00 11,915,880.00 28,600,000.00
4,800,000.00 600,000.00 600,000.00 21,894,765.60 30,500,000.00
944,000.00 118,000.00 118,000.00 8,458,240.00 30,000,000.00
18,280,000.00 2,285,000.00 2,285,000.00 43,983,528.56 33,200,000.00
480,000.00 60,000.00 60,000.00 1,278,060.00 25,700,000.00
80,680,000.00 10,085,000.00 10,085,000.00 250,515,567.78 400,000,000.00

198,252,000.00 24,781,500.00 24,781,500.00 671,830,571.65 1,306,050,000.00

1,390,850,000.00
MUSTAFA
RABP

21,970,000.00 19,044,458.00 29,558,100.00 87.45


21,580,000.00 17,708,500.00 28,784,400.00 86.70
21,580,000.00 18,158,320.43 28,386,000.00 85.50
16,705,000.00 4,810,156.00 22,230,500.00 86.50
17,940,000.00 13,941,424.00 23,584,200.00 85.45
16,705,000.00 (965,294.64) 21,703,650.00 84.45
(1,251,564.64)
(1,251,564.64)
(2,666,693.92)
(1,251,564.64)
16,705,000.00 (16,423,960.00) 21,973,500.00 85.50
18,590,000.00 (2,510,796.00) 24,739,000.00 86.50
21,125,000.00 13,510,640.70 28,437,500.00 87.50
16,705,000.00 5,439,160.00 21,973,500.00 85.50
189,605,000.00 25,025,000.00
(4,201,274.56) 276,395,350.00
18,590,000.00 (14,474,633.97)
19,500,000.00 15,253,240.00
- (3,963,600.00)
17,810,000.00 12,937,230.00
18,590,000.00 16,173,760.00
17,322,500.00 10,393,100.00
- (2,882,400.00)
17,940,000.00 14,069,650.00
21,580,000.00 10,565,640.00
19,825,000.00 (25,245,600.00)
- (6,185,424.00)
19,500,000.00 9,548,880.00
19,825,000.00 12,038,440.00
19,500,000.00 4,486,280.00
21,125,000.00 (12,009,900.00)
16,705,000.00 2,844,080.00
19,500,000.00 16,656,920.00
16,705,000.00 14,194,000.00
21,125,000.00 14,933,540.00
16,705,000.00 677,950.00
17,940,000.00 (3,102,516.00)
21,125,000.00 6,841,016.00
18,590,000.00 (3,644,312.00)
19,825,000.00 15,422,210.00
399,327,500.00
17,940,000.00 12,339,536.00
21,970,000.00 (6,860,745.36)
25,025,000.00 18,090,600.00
22,425,000.00 (32,611,741.09)
18,590,000.00 5,646,553.60
18,590,000.00 1,257,840.00
17,940,000.00 15,184,260.51
21,320,000.00 (12,231,397.28)
18,590,000.00 6,674,120.00
19,825,000.00 (2,069,765.60)
19,500,000.00 11,041,760.00
21,580,000.00 (22,403,528.56)
16,705,000.00 15,426,940.00
260,000,000.00 177,101,928.35 904,052,500.00
644,052,500.00
848,932,500.00
NO STA NAMA JEMBTAN PANJANG (M)

1 03+195 Wai Lala 12.50


2 06+500 Wai Ubung 12.00
3 12+240 Wai Jikumerasa 1 12.30
4 13+984 Wai Jikumerasa 2 41.70
5 18+850 Wai Miting 12.20
6 27+075 Wai Perang 41.50
7 30+750 Wai Rata Gelombang 4.00
8 31+100 wai rata gelombang 2 4.00
9 31+185 wai rata gelombang 3 4.00
10 31+915 wai rata gelombang 4 4.00
11 37+550 wai waplau 63.20
12 44+275 wai sia 11.00
13 45+375 wai ura 25.60
14 47+565 wai tempayang 21.00

15 00+075 wai sisi 16.00


16 01+100 wai samalagi 102.30
17 04+795 wai tei 11.00
18 06+250 wai buntut (wai hatawano ) 11.70
19 06+550 wai hatawano 15.50
20 09+760 wai talabi 8.50
21 10+285 wai lihang 2 21.00
22 15+210 wai Wapre 6.15
23 15+475 wai air terjun 10.10
24 18+583 wai Una 57.70
25 19+620 wai poti besar 122.50
26 22+650 wai mase 31.50
27 24+100 wai wahalmata 52.20
28 22+650 Wai Tehowanat 42.00
29 27+050 wai nibe kecil 25.00
30 27+205 wai masewai nibe besar 125.00
31 18+585 wai waspait 78.20
32 32+175 wai pamali 12.70
33 32+475 waikodi 6.00
34 33+715 wai tabi 31.50
35 35+050 wai wamlana 1 93.00
36 37+375 wai wamlana 2 100.00
37 42+200 wai pure 78.00
38 42+025 wai mangit 125.20
39 47+250 wai air buaya 17.90

40 00+130 wai sula 25.90


41 00+975 wai lala 158.50
42 02+550 wai ili kecil 21.20
43 02+955 wai illi besar 246.80
44 06+265 wai kose 40.00
45 08+030 wai langga 40.70
46 14+300 wai kase 11.80
47 15+840 wai bebe 133.00
48 18+925 wai mboti 24.30
49 19+823 wai kusa 1 60.00
50 21+370 wai kusa 2 11.80
51 24+990 wai duna 228.50
52 24+990 wai duna 2 6.00
L.TOTAL (M2) RUAS PENGECATAN PEMBERSIHAN

40.85 Namle - Samalagi 1,225,542.00 450,000.00


74.65 2,239,500.00 432,000.00
58.30 1,748,879.57 442,800.00
207.45 6,223,644.00 1,501,200.00
77.98 2,339,376.00 439,200.00
400.88 12,026,294.64 1,494,000.00
23.59 707,564.64 144,000.00
23.59 707,564.64 144,000.00
70.76 2,122,693.92 144,000.00
23.59 707,564.64 144,000.00
817.79 24,533,760.00 2,275,200.00
653.49 19,604,796.00 396,000.00
137.76 4,132,759.30 921,600.00
280.33 8,409,840.00 756,000.00
86,729,779.34 9,684,000.00
67.51 Samalagi-Air Buaya 2,025,274.56 576,000.00
638.39 19,151,833.97 3,682,800.00
91.69 2,750,760.00 396,000.00
79.08 2,372,400.00 421,200.00
92.16 2,764,770.00 558,000.00
42.01 1,260,240.00 306,000.00
135.78 4,073,400.00 756,000.00
68.20 2,046,000.00 221,400.00
83.23 2,496,750.00 363,600.00
105.57 3,167,160.00 2,077,200.00
947.02 28,410,600.00 4,410,000.00
63.38 1,901,424.00 1,134,000.00
95.06 2,851,920.00 1,879,200.00
69.15 2,074,560.00 1,512,000.00
387.12 11,613,720.00 900,000.00
537.83 16,134,900.00 4,500,000.00
107.52 3,225,720.00 2,815,200.00
37.20 1,115,880.00 457,200.00
56.50 1,695,000.00 216,000.00
63.58 1,907,460.00 1,134,000.00
112.64 3,379,050.00 3,348,000.00
248.08 7,442,516.00 3,600,000.00
122.53 3,675,984.00 2,808,000.00
173.57 5,207,112.00 4,507,200.00
65.61 1,968,390.00 644,400.00
134,712,824.53 43,223,400.00
69.27 Air Buaya-Tlk.Bara 2,078,064.00 932,400.00
242.49 7,274,745.36 5,706,000.00
135.04 4,051,200.00 763,200.00
715.73 21,471,941.09 8,884,800.00
250.11 7,503,446.40 1,440,000.00
393.23 11,796,960.00 1,465,200.00
38.36 1,150,939.49 424,800.00
515.45 15,463,397.28 4,788,000.00
287.04 8,611,080.00 874,800.00
457.83 13,734,765.60 2,160,000.00
228.45 6,853,440.00 424,800.00
430.25 12,907,528.56 8,226,000.00
15.40 462,060.00 216,000.00
113,359,567.78 36,306,000.00

334,802,171.65 89,213,400.00
PEMBERSIHAN DASPERBAIKAN SEDERHANAPERBAIKAN RAILING KONTRAK

3,000,000.00 125,000.00 125,000.00 4,925,542.00 33,800,000.00


2,880,000.00 120,000.00 120,000.00 5,791,500.00 33,200,000.00
2,952,000.00 123,000.00 123,000.00 5,389,679.57 33,200,000.00
10,008,000.00 417,000.00 417,000.00 18,566,844.00 25,700,000.00
2,928,000.00 122,000.00 122,000.00 5,950,576.00 27,600,000.00
9,960,000.00 415,000.00 415,000.00 24,310,294.64 25,700,000.00
960,000.00 40,000.00 40,000.00 1,891,564.64
960,000.00 40,000.00 40,000.00 1,891,564.64
960,000.00 40,000.00 40,000.00 3,306,693.92
960,000.00 40,000.00 40,000.00 1,891,564.64
15,168,000.00 632,000.00 632,000.00 43,240,960.00 25,700,000.00
2,640,000.00 110,000.00 110,000.00 22,860,796.00 28,600,000.00
6,144,000.00 256,000.00 256,000.00 11,710,359.30 32,500,000.00
5,040,000.00 210,000.00 210,000.00 14,625,840.00 25,700,000.00
64,560,000.00 2,690,000.00 2,690,000.00 166,353,779.34 291,700,000.00
3,840,000.00 160,000.00 160,000.00 6,761,274.56
24,552,000.00 1,023,000.00 1,023,000.00 49,432,633.97 28,600,000.00
2,640,000.00 110,000.00 110,000.00 6,006,760.00 30,000,000.00
2,808,000.00 117,000.00 117,000.00 5,835,600.00
3,720,000.00 155,000.00 155,000.00 7,352,770.00 27,400,000.00
2,040,000.00 85,000.00 85,000.00 3,776,240.00 28,600,000.00
5,040,000.00 210,000.00 210,000.00 10,289,400.00 26,650,000.00
1,476,000.00 61,500.00 61,500.00 3,866,400.00
2,424,000.00 101,000.00 101,000.00 5,486,350.00 27,600,000.00
13,848,000.00 577,000.00 577,000.00 20,246,360.00 33,200,000.00
29,400,000.00 1,225,000.00 1,225,000.00 64,670,600.00 30,500,000.00
7,560,000.00 315,000.00 315,000.00 11,225,424.00
12,528,000.00 522,000.00 522,000.00 18,303,120.00 30,000,000.00
10,080,000.00 420,000.00 420,000.00 14,506,560.00 30,500,000.00
6,000,000.00 250,000.00 250,000.00 19,013,720.00 30,000,000.00
30,000,000.00 1,250,000.00 1,250,000.00 53,134,900.00 32,500,000.00
18,768,000.00 782,000.00 782,000.00 26,372,920.00 25,700,000.00
3,048,000.00 127,000.00 127,000.00 4,875,080.00 30,000,000.00
1,440,000.00 60,000.00 60,000.00 3,471,000.00 25,700,000.00
7,560,000.00 315,000.00 315,000.00 11,231,460.00 32,500,000.00
22,320,000.00 930,000.00 930,000.00 30,907,050.00 25,700,000.00
24,000,000.00 1,000,000.00 1,000,000.00 37,042,516.00 27,600,000.00
18,720,000.00 780,000.00 780,000.00 26,763,984.00 32,500,000.00
30,048,000.00 1,252,000.00 1,252,000.00 42,266,312.00 28,600,000.00
4,296,000.00 179,000.00 179,000.00 7,266,790.00 30,500,000.00
288,156,000.00 12,006,500.00 12,006,500.00 490,105,224.53 614,350,000.00
6,216,000.00 259,000.00 259,000.00 9,744,464.00 27,600,000.00
38,040,000.00 1,585,000.00 1,585,000.00 54,190,745.36 33,800,000.00
5,088,000.00 212,000.00 212,000.00 10,326,400.00 38,500,000.00
59,232,000.00 2,468,000.00 2,468,000.00 94,524,741.09 34,500,000.00
9,600,000.00 400,000.00 400,000.00 19,343,446.40 28,600,000.00
9,768,000.00 407,000.00 407,000.00 23,844,160.00 28,600,000.00
2,832,000.00 118,000.00 118,000.00 4,643,739.49 27,600,000.00
31,920,000.00 1,330,000.00 1,330,000.00 54,831,397.28 32,800,000.00
5,832,000.00 243,000.00 243,000.00 15,803,880.00 28,600,000.00
14,400,000.00 600,000.00 600,000.00 31,494,765.60 30,500,000.00
2,832,000.00 118,000.00 118,000.00 10,346,240.00 30,000,000.00
54,840,000.00 2,285,000.00 2,285,000.00 80,543,528.56 33,200,000.00
1,440,000.00 60,000.00 60,000.00 2,238,060.00 25,700,000.00
242,040,000.00 10,085,000.00 10,085,000.00 411,875,567.78 400,000,000.00

594,756,000.00 24,781,500.00 24,781,500.00 1,068,334,571.65 1,306,050,000.00

1,390,850,000.00
MUSTAFA
RABP

21,970,000.00 17,044,458.00 29,558,100.00 87.45


21,580,000.00 15,788,500.00 28,784,400.00 86.70
21,580,000.00 16,190,320.43 28,386,000.00 85.50
16,705,000.00 (1,861,844.00) 22,230,500.00 86.50
17,940,000.00 11,989,424.00 23,584,200.00 85.45
16,705,000.00 (7,605,294.64) 21,703,650.00 84.45
(1,891,564.64)
(1,891,564.64)
(3,306,693.92)
(1,891,564.64)
16,705,000.00 (26,535,960.00) 21,973,500.00 85.50
18,590,000.00 (4,270,796.00) 24,739,000.00 86.50
21,125,000.00 9,414,640.70 28,437,500.00 87.50
16,705,000.00 2,079,160.00 21,973,500.00 85.50
189,605,000.00 25,025,000.00
(6,761,274.56) 276,395,350.00
18,590,000.00 (30,842,633.97)
19,500,000.00 13,493,240.00
- (5,835,600.00)
17,810,000.00 10,457,230.00
18,590,000.00 14,813,760.00
17,322,500.00 7,033,100.00
- (3,866,400.00)
17,940,000.00 12,453,650.00
21,580,000.00 1,333,640.00
19,825,000.00 (44,845,600.00)
- (11,225,424.00)
19,500,000.00 1,196,880.00
19,825,000.00 5,318,440.00
19,500,000.00 486,280.00
21,125,000.00 (32,009,900.00)
16,705,000.00 (9,667,920.00)
19,500,000.00 14,624,920.00
16,705,000.00 13,234,000.00
21,125,000.00 9,893,540.00
16,705,000.00 (14,202,050.00)
17,940,000.00 (19,102,516.00)
21,125,000.00 (5,638,984.00)
18,590,000.00 (23,676,312.00)
19,825,000.00 12,558,210.00
399,327,500.00
17,940,000.00 8,195,536.00
21,970,000.00 (32,220,745.36)
25,025,000.00 14,698,600.00
22,425,000.00 (72,099,741.09)
18,590,000.00 (753,446.40)
18,590,000.00 (5,254,160.00)
17,940,000.00 13,296,260.51
21,320,000.00 (33,511,397.28)
18,590,000.00 2,786,120.00
19,825,000.00 (11,669,765.60)
19,500,000.00 9,153,760.00
21,580,000.00 (58,963,528.56)
16,705,000.00 14,466,940.00
260,000,000.00 (219,402,071.65) 904,052,500.00
644,052,500.00
848,932,500.00
Pemeliharaan Kinerja Jembatan WAI AIR BUAYA bentang 17 m Ls 1 30,500,000.00
Pemeliharaan Kinerja Jembatan WAI AIR TERJUN bentang 10 m Ls 1 27,600,000.00
Pemeliharaan Kinerja Jembatan WAI BEBE bentang 133.2 m Ls 1 32,800,000.00
Pemeliharaan Kinerja Jembatan WAI BUTUT bentang 6 m Ls 1 27,200,000.00
Pemeliharaan Kinerja Jembatan WAI DUNA (G+R+R+R+R+R+G) bentang 245 Ls 1 33,200,000.00
Pemeliharaan Kinerja Jembatan WAI DUNA II bentang 6 m Ls 1 25,700,000.00
Pemeliharaan Kinerja Jembatan WAI HATAWANO bentang 15.4 m Ls 1 27,400,000.00
Pemeliharaan Kinerja Jembatan WAI ILI BESAR (G+R+R+R+R+G) bentang 292. Ls 1 34,500,000.00
Pemeliharaan Kinerja Jembatan WAI ILI KECIL (G+R+R+R+G) bentang 171.8 mLs 1 38,500,000.00
Pemeliharaan Kinerja Jembatan WAI JIKUMERASA I bentang 12 m Ls 1 33,200,000.00
Pemeliharaan Kinerja Jembatan WAI JIKUMERASA II bentang 41.7 m Ls 1 25,700,000.00
Pemeliharaan Kinerja Jembatan WAI KASE bentang 16 m Ls 1 27,600,000.00
Pemeliharaan Kinerja Jembatan WAI KODI bentang 6 m Ls 1 25,700,000.00
Pemeliharaan Kinerja Jembatan WAI KOSE bentang 40 m Ls 1 28,600,000.00
Pemeliharaan Kinerja Jembatan WAI KUSA I bentang 60 m Ls 1 30,500,000.00
Pemeliharaan Kinerja Jembatan WAI KUSA II bentang 11.9 m Ls 1 30,000,000.00
Pemeliharaan Kinerja Jembatan WAI LALA bentang 13.2 m Ls 1 33,800,000.00
Pemeliharaan Kinerja Jembatan WAI LALA (G+R+R+R+G) bentang 210.5 m Ls 1 33,800,000.00
Pemeliharaan Kinerja Jembatan WAI LANGA bentang 40.9 m Ls 1 28,600,000.00
Pemeliharaan Kinerja Jembatan WAI LIHANG I bentang 8.3 m Ls 1 30,000,000.00
Pemeliharaan Kinerja Jembatan WAI LIHANG II bentang 20.9 m Ls 1 26,650,000.00
Pemeliharaan Kinerja Jembatan WAI MANGIT bentang 100 m Ls 1 28,600,000.00
Pemeliharaan Kinerja Jembatan WAI MBOTI bentang 24.3 m Ls 1 28,600,000.00
Pemeliharaan Kinerja Jembatan WAI MITING bentang 12 m Ls 1 27,600,000.00
Pemeliharaan Kinerja Jembatan WAI NIBE BESAR bentang 121 m Ls 1 32,500,000.00
Pemeliharaan Kinerja Jembatan WAI NIBE KECIL bentang 25.1 m Ls 1 30,000,000.00
Pemeliharaan Kinerja Jembatan WAI PAMALI bentang 13 m Ls 1 30,000,000.00
Pemeliharaan Kinerja Jembatan WAI PERANG bentang 42 m Ls 1 25,700,000.00
Pemeliharaan Kinerja Jembatan WAI POTI bentang 100 m Ls 1 30,500,000.00
Pemeliharaan Kinerja Jembatan WAI PURE bentang 78 m Ls 1 32,500,000.00
Pemeliharaan Kinerja Jembatan WAI SAMALAGI bentang 100 m Ls 1 28,600,000.00
Pemeliharaan Kinerja Jembatan WAI SIA bentang 11 m Ls 1 28,600,000.00
Pemeliharaan Kinerja Jembatan WAI SULA bentang 26 m Ls 1 27,600,000.00
Pemeliharaan Kinerja Jembatan WAI TABI (P+G) bentang 32 m Ls 1 32,500,000.00
Pemeliharaan Kinerja Jembatan WAI TALABI bentang 6.2 m Ls 1 28,600,000.00
Pemeliharaan Kinerja Jembatan WAI TEHOWANAT bentang 42 m Ls 1 30,500,000.00
Pemeliharaan Kinerja Jembatan WAI TEI bentang 16.6 m Ls 1 30,000,000.00
Pemeliharaan Kinerja Jembatan WAI TEMPAYAN bentang 21.3 m Ls 1 25,700,000.00
Pemeliharaan Kinerja Jembatan WAI UBUNG bentang 12 m Ls 1 33,200,000.00
Pemeliharaan Kinerja Jembatan WAI UNA bentang 78.4 m Ls 1 33,200,000.00
Pemeliharaan Kinerja Jembatan WAI URA bentang 25.6 m Ls 1 32,500,000.00
Pemeliharaan Kinerja Jembatan WAI WAHALMATA bentang 52 m Ls 1 30,000,000.00
Pemeliharaan Kinerja Jembatan WAI WAMLANA I bentang 93.5 m Ls 1 25,700,000.00
Pemeliharaan Kinerja Jembatan WAI WAMLANA II bentang 100 m Ls 1 27,600,000.00
Pemeliharaan Kinerja Jembatan WAI WAPALE bentang 7 m Ls 1 27,600,000.00
Pemeliharaan Kinerja Jembatan WAI WAPLAUW bentang 63.1 m Ls 1 25,700,000.00
Pemeliharaan Kinerja Jembatan WAI WASPAIT bentang 80 m Ls 1 25,700,000.00
PERKIR
PRESERV

Harga

Panjang Kontrak
No Uraian Lebar (M') Satuan Kuantitas
(M')

( Rp. )

10 PEKERJAAN PEMELIHARAAN RUTIN

10.2.(1) Pemeliharaan Kinerja Jembatan Wai Tiena bentang 15,0 M' 15.0 7.8 LS 1.00 22,500,000.00

10.2.(2) Pemeliharaan Kinerja Jembatan Wai Tawanue / Kelen bentang 11 M' 11.0 4.0 LS 1.00 16,500,000.00

10.2.(3) Pemeliharaan Kinerja Jembatan Wai Salatena bentang 10,0 M' 10.0 4.0 LS 1.00 15,000,000.00

10.2.(4) Pemeliharaan Kinerja Jembatan Wai Anale bentang 6,0 M' 6.0 4.0 LS 1.00 9,000,000.00

10.2.(5) Pemeliharaan Kinerja Jembatan Wai Ilana bentang 6,0 M' 6.0 4.0 LS 1.00 9,000,000.00

10.2.(6) Pemeliharaan Kinerja Jembatan Wai Tilopo bentang 6,0 M' 6.0 4.0 LS 1.00 9,000,000.00

10.2.(7) Pemeliharaan Kinerja Jembatan Wai Ani Une bentang 9,0 M' 9.0 4.0 LS 1.00 13,500,000.00

10.2.(8) Pemeliharaan Kinerja Jembatan Wai Heid bentang 6,0 M' 6.0 4.0 LS 1.00 9,000,000.00

10.2.1(9) Pemeliharaan Kinerja Jembatan Wai Patiamai bentang 11,0 M' 2.0 11.0 LS 1.00 16,500,000.00

10.2.(10) Pemeliharaan Kinerja Jembatan Wai Yali bentang 30,5 M' 30.5 3.8 LS 1.00 45,750,000.00

10.2.(11) Pemeliharaan Kinerja Jembatan Wai Samajeje bentang 6,0 M' 6.0 6.0 LS 1.00 9,000,000.00

10.2.(12) Pemeliharaan Kinerja Jembatan Wai Maleta bentang 6,0 M' 6.0 4.5 LS 1.00 9,000,000.00

10.2.(13) Pemeliharaan Kinerja Jembatan Wai Nukuhai/ Roropi bentang 10,8 M' 10.8 6.0 LS 1.00 16,200,000.00

10.2.(14) Pemeliharaan Kinerja Jembatan Wai Walela bentang 26,0 M' 26.0 7.7 LS 1.00 39,000,000.00

10.2.(15) Pemeliharaan Kinerja Jembatan Wai Halaya bentang 10,0 M' 10.0 4.0 LS 1.00 15,000,000.00

10.2.(16) Pemeliharaan Kinerja Jembatan Wai Waa/ Nua bentang 6,0 M' 6.0 3.5 LS 1.00 9,000,000.00

10.2.(17) Pemeliharaan Kinerja Jembatan Wai Toaya bentang 6,0 M' 6.0 3.5 LS 1.00 9,000,000.00

10.2.(18) Pemeliharaan Kinerja Jembatan Wai Teha bentang 67,5 M' 67.5 7.9 LS 1.00 101,250,000.00

10.2.(19) Pemeliharaan Kinerja Jembatan Wai Sibenpopo bentang 24,6 M' 24.6 7.6 LS 1.00 36,900,000.00

10.2.(20) Pemeliharaan Kinerja Jembatan Wai Tayale bentang 16,8 M' 16.8 8.1 LS 1.00 25,200,000.00

10.2.(21) Pemeliharaan Kinerja Jembatan Wai Mananua bentang 15,3 M' 15.3 8.1 LS 1.00 22,950,000.00

10.2.(22) Pemeliharaan Kinerja Jembatan Wai Tuanawa I/ Sapia bentang 11,0 M' 11.0 4.0 LS 1.00 16,500,000.00

10.2.(23) Pemeliharaan Kinerja Jembatan Wai Uli Kecil I bentang 6,0 M' 6.0 4.0 LS 1.00 9,000,000.00

10.2.(24) Pemeliharaan Kinerja Jembatan Wai Nawaya II bentang 10,0 M' 10.0 8.1 LS 1.00 15,000,000.00

10.2.(25) Pemeliharaan Kinerja Jembatan Wai Nawaya I bentang 24,7 M' 24.7 7.9 LS 1.00 37,050,000.00

10.2.(26) Pemeliharaan Kinerja Jembatan Wai Hanu bentang 20,6 M' 20.6 8.1 LS 1.00 30,900,000.00

10.2.(27) Pemeliharaan Kinerja Jembatan Wai Tebu bentang 20,6 M' 20.6 8.0 LS 1.00 30,900,000.00

10.2.(28) Pemeliharaan Kinerja Jembatan Wai Wakurule bentang 10,0 M' 10.0 5.0 LS 1.00 15,000,000.00

10.2.(29) Pemeliharaan Kinerja Jembatan Wai Waya bentang 36,8 M' 36.8 7.7 LS 1.00 55,200,000.00

10.2.(30) Pemeliharaan Kinerja Jembatan Wai Aliate bentang 68,2 M' 68.2 7.4 LS 1.00 102,300,000.00

10.2.(31) Pemeliharaan Kinerja Jembatan Wai Tamaile bentang 8,0 M' 8.0 5.5 LS 1.00 12,000,000.00
10.2.(32) Pemeliharaan Kinerja Jembatan Wai Era/ Polosi bentang 20,6 M' 20.6 7.7 LS 1.00 30,900,000.00

10.2.(33) Pemeliharaan Kinerja Jembatan Wai Ela Kecil bentang 10,9 M' 10.9 7.3 LS 1.00 16,350,000.00

10.2.(34) Pemeliharaan Kinerja Jembatan Wai Walosa bentang 16,0 M' 16.0 7.4 LS 1.00 24,000,000.00

10.2.(35) Pemeliharaan Kinerja Jembatan Wai Miohu bentang 51,4 M' 51.4 7.3 LS 1.00 77,100,000.00

10.2.(36) Pemeliharaan Kinerja Jembatan Wai Upata bentang 26,1 M' 26.1 7.3 LS 1.00 39,150,000.00

10.2.(37) Pemeliharaan Kinerja Jembatan Wai Miu bentang 42,3 M' 42.3 7.3 LS 1.00 63,450,000.00

10.2.(38) Pemeliharaan Kinerja Jembatan Wai Yala bentang 100 M' 100.0 7.9 LS 1.00 150,000,000.00

10.2.(39) Pemeliharaan Kinerja Jembatan Wai Timoya bentang 20,6 M' 20.6 7.1 LS 1.00 30,900,000.00

10.2.(40) Pemeliharaan Kinerja Jembatan Wai Mololua bentang 12 M' 12.0 4.0 LS 1.00 18,000,000.00

10.2.(41) Pemeliharaan Kinerja Jembatan Wai Kara bentang 10 M' 10.0 11.0 LS 1.00 15,000,000.00

10.2.(42) Pemeliharaan Kinerja Jembatan Wai Sala bentang 36,5 M' 36.5 7.9 LS 1.00 54,750,000.00

10.2.(43) Pemeliharaan Kinerja Jembatan Wai Sapia/ Salahit bentang 11 M' 11.0 8.0 LS 1.00 16,500,000.00

10.2.(44) Pemeliharaan Kinerja Jembatan Wai Kuning/ Tihisa bentang 26 M' 26.0 7.9 LS 1.00 39,000,000.00

10.2.(45) Pemeliharaan Kinerja Jembatan Wai Karlutu/ Musiha bentang 25,5 M' 25.5 7.6 LS 1.00 38,250,000.00

10.2.(46) Pemeliharaan Kinerja Jembatan Wai Ela bentang 160 M' 160.0 8.1 LS 1.00 240,000,000.00

10.2.(47) Pemeliharaan Kinerja Jembatan Wai Kaputy bentang 120 M' 120.0 8.1 LS 1.00 180,000,000.00

10.2.(48) Pemeliharaan Kinerja Jembatan Wai Manipuli bentang 8 M' 8.0 3.5 LS 1.00 12,000,000.00

10.2.(49) Pemeliharaan Kinerja Jembatan Wai Mapuale bentang 6 M' 6.0 4.0 LS 1.00 9,000,000.00

10.2.(50) Pemeliharaan Kinerja Jembatan Wai Miaka bentang 60 M' 60.0 8.1 LS 1.00 90,000,000.00

10.2.(51) Pemeliharaan Kinerja Jembatan Wai Nikitahauel bentang 9,2 M' 9.2 11.0 LS 1.00 13,800,000.00

10.2.(52) Pemeliharaan Kinerja Jembatan Wai Wamatau bentang 10 M' 10.0 4.0 LS 1.00 15,000,000.00

10.2.(53) Pemeliharaan Kinerja Jembatan Wai Yole bentang 7,5 M' 7.5 4.0 LS 1.00 11,250,000.00

10.2.(54) Pemeliharaan Kinerja Jembatan Wai Kondale bentang 6,0 M' 6.0 4.5 LS 1.00 9,000,000.00

10.2.(55) Pemeliharaan Kinerja Jembatan Wai Makina bentang 91,8 M' 91.8 7.3 LS 1.00 137,700,000.00

10.2.(56) Pemeliharaan Kinerja Jembatan Wai Nawaya bentang 11 M' 11.0 6.1 LS 1.00 16,500,000.00

10.2.(57) Pemeliharaan Kinerja Jembatan Wai Kuhu bentang 101,9 M' 101.9 7.5 LS 1.00 152,850,000.00

10.2.(58) Pemeliharaan Kinerja Jembatan Wai Uli Besar bentang 92,7 M' 92.7 7.3 LS 1.00 139,050,000.00

10.2.(59) Pemeliharaan Kinerja Jembatan Wai Uli Kecil II bentang 12 M' LS 1.00 18,000,000.00

10.2.(60) Pemeliharaan Kinerja Jembatan Wai Walosa Kecil bentang 12 M' 2.0 11.0 LS 1.00 18,000,000.00

10.2.(61) Pemeliharaan Kinerja Jembatan Wai Yeli bentang 52 M' 52.0 7.0 LS 1.00 78,000,000.00

Jumlah Sub 1,659.40 2,535,600,000.00


Jumlah Di Bulatkan
Terbilang :
PERKIRAAN HARGA PEKERJAAN
PRESERVASI JALAN TANIWEL - SALEMAN

Pembersihan
Pembersihan
Daerah Aliran Pengecatan Perbaikan dan
Struktur Pembersihan
sungai yang Sederhana pada Pengecatan Jembatan Papan Nama
Jembatan Kotoran dan
pengaruhi jembatan, kerb, Kayu, Gelagar Kayu, Normalisasi Sungai Jembatan
(Bangunan Atas, Sampah di sekitar
keamanan parapet dan Lantai Kayu, Sandaran
Bawah dan Jembatan (p * l * t * Harga)
Jembatan ± 100 sandaran Kayu
Pelengkap)
(Hulu dan Hilir)

#REF! 4,800,000.00 187,200.00 #REF! -

#REF! 3,520,000.00 70,400.00 - #REF!

#REF! 1,920,000.00 38,400.00 - #REF!

#REF! 38,400.00 - #REF! 47,400,000.00

#REF! 38,400.00 - #REF! 47,400,000.00

#REF! 2,880,000.00 57,600.00 - #REF!

#REF! 1,920,000.00 38,400.00 - #REF!

#REF! 9,760,000.00 185,440.00 - #REF!

#REF! 1,920,000.00 57,600.00 #REF! -

#REF! 1,920,000.00 43,200.00 #REF! -

#REF! 3,456,000.00 103,680.00 #REF! - 2,518,400.00

#REF! 8,320,000.00 320,320.00 #REF! - 2,518,400.00

#REF! 3,200,000.00 64,000.00 - #REF!

#REF! 1,920,000.00 33,600.00 - #REF!

#REF! 1,920,000.00 33,600.00 - #REF!

#REF! 21,600,000.00 853,200.00 #REF! - 2,518,400.00

#REF! 7,872,000.00 299,136.00 #REF! - 2,518,400.00

#REF! 217,728.00 #REF! - 132,720,000.00 2,518,400.00

#REF! 4,896,000.00 198,288.00 #REF! -

#REF! 3,520,000.00 70,400.00 - #REF!

#REF! 1,920,000.00 38,400.00 - #REF!

#REF! 3,200,000.00 129,600.00 #REF! -

#REF! 312,208.00 #REF! - 195,130,000.00

#REF! 6,592,000.00 266,976.00 #REF! -

#REF! 6,592,000.00 263,680.00 #REF! -

#REF! 3,200,000.00 80,000.00 #REF! - 2,518,400.00

#REF! 453,376.00 #REF! - 290,720,000.00

#REF! 21,824,000.00 807,488.00 #REF! - 2,518,400.00

#REF! 2,560,000.00 70,400.00 #REF! - 2,518,400.00


#REF! 6,592,000.00 253,792.00 #REF! -

#REF! 3,488,000.00 127,312.00 #REF! -

#REF! 5,120,000.00 189,440.00 #REF! -

#REF! 16,448,000.00 600,352.00 #REF! - 2,518,400.00

#REF! 8,352,000.00 304,848.00 #REF! -

#REF! 13,536,000.00 494,064.00 #REF! - 2,518,400.00

#REF! 32,000,000.00 1,264,000.00 #REF! -

#REF! 6,592,000.00 234,016.00 #REF! - 1,259,200.00

#REF! 3,840,000.00 76,800.00 #REF! #REF!

#REF! 3,200,000.00 176,000.00 #REF! -

#REF! 11,680,000.00 461,360.00 #REF! -

#REF! 3,520,000.00 140,800.00 #REF! -


- - -
#REF! 8,320,000.00 328,640.00 #REF! -

#REF! 8,160,000.00 310,080.00 #REF! - 2,518,400.00

#REF! 51,200,000.00 2,073,600.00 #REF! -

#REF! 38,400,000.00 1,555,200.00 #REF! -

#REF! 2,560,000.00 44,800.00 - #REF!

#REF! 1,920,000.00 38,400.00 - #REF!

#REF! 19,200,000.00 777,600.00 #REF! -

#REF! 2,944,000.00 161,920.00 #REF! -


-
#REF! 64,000.00 - #REF! 79,000,000.00

#REF! 2,400,000.00 48,000.00 - #REF!

#REF! 43,200.00 #REF! - 47,400,000.00

#REF! 29,376,000.00 1,072,224.00 #REF! - 2,518,400.00

#REF! 3,520,000.00 107,360.00 #REF! -

#REF! 32,608,000.00 1,222,800.00 #REF! -

#REF! 29,664,000.00 1,082,736.00 #REF! - 2,518,400.00

#REF! - - #REF! -

#REF! 16,640,000.00 582,400.00 #REF! - 2,518,400.00

#REF! 492,512,000.00 19,206,864.00 #REF! #REF! 839,770,000.00 36,516,800.00


#REF!
Perbaikan Lantai
Keropos & Total Harga Untuk 1x Jumlah
Berlubang Penanganan Penanganan Rutin Bobot ( % ) Keterangan
Jembatan
(p * l * t * Harga) ( Rp. )

#REF! #REF! #REF!


-
#REF! #REF! #REF!
-
- 0
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
- 0
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
31,242,321.50 #REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
82,597,758.75 #REF! #REF! #REF!
-
28,959,169.20 #REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
30,224,661.35 #REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
2,509,299.00 #REF! #REF! #REF!
-
#REF! #REF! #REF!
-
#REF! #REF! #REF!
-
110,729,788.65 #REF! #REF! #REF!
-
#REF! #REF!
-
- 0
-
56,381,780.00 #REF! #REF! #REF!

342,644,778.45 #REF!
#REF!
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN : Pembersihan Jembatan
SATUAN PEMBAYARAN M1

No. URAIAN KODE

I. ASUMSI
1 Menggunakan alat ringan
2 Lokasi pekerjaan : sepanjang jembatan
3 Kondisi jalan : baik
4 Jam kerja efektif per hari Tk
5 faktor pengenmbangan bahan Fk
6 berat volume D

II URUTAN KERJA
Pembersihan dilakukan dengan compressor dan sapu
sekelompok pekerja akan merapikan hasil galian

III PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
tidak ada bahan yang diperlukan
PERALATAN

2 ALAT
Water Jet

kap. Prod. / jam = Q2


Koefisien Alat / Ltr = 1 : Q2

2.d ALAT BANTU


diperlukan alat-alat bantu kecil
- sekop
- Keranjang + sapu
3. TENAGA
Produksi menentukan : Water Jet Q1
Produksi galian / hari = Tk x Q1 Qt

Kebutuhan tenaga : - Mandor M

- Pekerja P

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- Pekerja = (Tk x P) : Qt (L01)

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / M2

: Pembersihan Jembatan
M1

URAIAN KODE

ASUMSI
Menggunakan alat ringan
Lokasi pekerjaan : sepanjang jembatan
Kondisi jalan : baik
Jam kerja efektif per hari Tk
faktor pengenmbangan bahan Fk
berat volume D

URUTAN KERJA
Pembersihan dilakukan dengan compressor dan sapu
sekelompok pekerja akan merapikan hasil galian

PEMAKAIAN BAHAN, ALAT DAN TENAGA


BAHAN
tidak ada bahan yang diperlukan
PERALATAN

ALAT
AIR COMPRESSOR

kap. Prod. / jam = Q2


Koefisien Alat / Ltr = 1 : Q2
ALAT BANTU
diperlukan alat-alat bantu kecil
- sekop
- Keranjang + sapu
TENAGA
Produksi menentukan : Compressor Q1
Produksi galian / hari = Tk x Q1 Qt

Kebutuhan tenaga : - Mandor M

- Pekerja P

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)

- Pekerja = (Tk x P) : Qt (L01)

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,600.00 / M2

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN : Pengecatan Sederhana
SATUAN PEMBAYARAN M1

No. URAIAN KODE

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jembatan
3 Dasar yang dicat (Baja/Beton)
Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per hari Tk
faktor kehilangan material Fh
tebal lapsan cat secara manual t
5 berat jenis bahan cat Bj.cat
6 perbandingan pemakaian bahan - cat C
- thinner T

II URUTAN KERJA
permukaan yang akan dicat harus dibersihkan terlebih dahulu dari debu
kotoran dan minyal
permukaan yang telah dibersihkan kemudian digosok dengan kertas amplas
pengecatan dilakukan secara manual dengan kuas tangan
pengecatan dilakukan sebanyak minimal 3 lapis

III PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
1 Kg cat minyak dapat mengecat
Cat minyak
Thinner
Amplas

ALAT
2.d ALAT BANTU
diperlukan :
- Kuas 3" = 3 Buah
- Sikat Kawat = 1 Buah
Rambu-rambu peringantan = 1 Unit

3. TENAGA
Produksi pekerjaan per hari = Q1 X Tk Qt
dibutuhkan tenaga

Kebutuhan tenaga : - Mandor M


- Tukang cat Tc
- Pekerja P

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- = (Tk x Tc) : Qt
- Pekerja = (Tk x P) : Qt (L01)

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / M2

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN : Pengecatan Sederhana
SATUAN PEMBAYARAN M1

No. URAIAN KODE

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jembatan
3 Dasar yang dicat (Baja/Beton)
Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per hari Tk
faktor kehilangan material Fh
tebal lapsan cat secara manual t
5 berat jenis bahan cat Bj.cat
6 perbandingan pemakaian bahan - cat C
- thinner T

II URUTAN KERJA
permukaan yang akan dicat harus dibersihkan terlebih dahulu dari debu
kotoran dan minyal
permukaan yang telah dibersihkan kemudian digosok dengan kertas amplas
pengecatan dilakukan secara manual dengan kuas tangan
pengecatan dilakukan sebanyak minimal 3 lapis

III PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
1 Kg cat minyak dapat mengecat
Cat minyak
Thinner
Amplas
Kayu Bulat Ø 25 cm
Kayu Balok 6/12
Kayu Papan t=10 cm
Paku

ALAT
2.d ALAT BANTU
diperlukan :
- Kuas 3" = 3 Buah
- Sikat Kawat = 1 Buah
Rambu-rambu peringantan = 1 Unit

3. TENAGA
Produksi pekerjaan per hari = Q1 X Tk Qt
dibutuhkan tenaga

Kebutuhan tenaga : - Mandor M


- Tukang cat Tc
- Pekerja P

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03)
- = (Tk x Tc) : Qt
- Pekerja = (Tk x P) : Qt (L01)

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. #REF! / M2
Analisa Skh-10.1.17

FORMULIR STANDAR U
PEREKAMAN ANALISA MASING-MAS

KOEF. SATUAN KETERANGAN

ANALISA HARGA SATU

Jenis Pekerjaan Pembersihan Struktur Jem


Satuan / Unit M1
7.00 Jam Nomor Pembayaran
-
Ton/M3
M
jam NO. URAIAN

(1) (2)

I Upah / Tenaga Kerja

1. Pekerja
2. Mandor

3,012.90 Liter Sub Jumlah I


0.0003 Jam
II Bahan / Material

3,012.90 Ltr/Jam
21,090.30 Ltr/Jam
Sub Jumlah II
1.00 orang
III Peralatan
10.00 orang
1 Mobil pick up terbuka

0.0003 jam 2 Water Jet


0.0033 jam Alat Bantu

Sub Jumlah III


Sub Jumlah (I+II+III)
IV Lain - lain
- Biaya Umum
- Keuntungan
Sub Jumlah IV
Jumlah Harga = I+II+III+IV
Harga satuan pekerjaan Pengendalian Tanaman Pada Rumija (dibulatk

Analisa Skh-10.1.17

FORMULIR STANDAR U
PEREKAMAN ANALISA MASING-MAS

KOEF. SATUAN KETERANGAN

Jenis Pekerjaan Pembersihan Daerah Alir


Satuan / Unit M1
7.00 Jam Nomor Pembayaran
-
Ton/M3
M
jam NO. URAIAN

(1) (2)

I Upah / Tenaga Kerja

1. Pekerja
2. Mandor

Liter Sub Jumlah I


Jam
II Bahan / Material

Ltr/Jam
Ltr/Jam
Sub Jumlah II
1.00 orang
III Peralatan
10.00 orang
1 Mobil pick up terbuka

7.0000 jam 2

70.0000 jam Alat Bantu

Sub Jumlah III


Sub Jumlah (I+II+III)
IV Lain - lain
- Biaya Umum
- Keuntungan
Sub Jumlah IV
Jumlah Harga = I+II+III+IV
Harga satuan pekerjaan Pengendalian Tanaman Pada Rumija (dibulatk

FORMULIR STANDAR U
PEREKAMAN ANALISA MASING-MAS

KOEF. SATUAN KETERANGAN

Jenis Pekerjaan : Pengecatan Sederhana


Satuan / Unit M1
47.00 Km
7.00 Jam Nomor Pembayaran
1.00 -
1.00 M
1.0 Kg/Liter
75.00 %
25.00 %
NO. URAIAN

(1) (2)

I Upah / Tenaga Kerja

1. Pekerja
2. Tukang
3. Mandor
1 M2
0.01 Kg
0.00 Liter Sub Jumlah I
1 Lbr
II Bahan / Material

Ls Cat Minyak

Thinner
Kuas, Sikat kawat

Sub Jumlah II
7.00 Ltr/Jam
III Peralatan

1.00 orang 1 Mobil pick up terbuka


2.00
10.00 orang 2 Compressor

1.0000 jam
2.0000 jam
10.0000 jam

Sub Jumlah III


Sub Jumlah (I+II+III)
IV Lain - lain
- Biaya Umum
- Keuntungan
Sub Jumlah IV
Jumlah Harga = I+II+III+IV
Harga satuan pekerjaan Pengecatan Sederhana (dibulatkan)

FORMULIR STANDAR U
PEREKAMAN ANALISA MASING-MAS

KOEF. SATUAN KETERANGAN

Jenis Pekerjaan : Pengecatan Sederhana


Satuan / Unit M1
47.00 Km
7.00 Jam Nomor Pembayaran
1.00 -
1.00 M
1.0 Kg/Liter
75.00 %
25.00 %
NO. URAIAN

(1) (2)

I Upah / Tenaga Kerja

1. Pekerja
2. Tukang
3. Mandor
1 M2
0.01 Kg
0.00 Liter Sub Jumlah I
1.00 Lbr
0.50 m3 II Bahan / Material
0.50 m3
0.50 m3 Kayu Bulat Ø 25 cm
1.00 Kg Kayu Balok 6/12
Kayu Papan t=10 cm
Paku

II

Ls Cat Minyak

Thinner
Kuas, Sikat kawat

Sub Jumlah II
7.00 Ltr/Jam
III Peralatan

1.00 orang 1 Mobil pick up terbuka


2.00
10.00 orang 2 Compressor

1.0000 jam
2.0000 jam
10.0000 jam

Sub Jumlah III


Sub Jumlah (I+II+III)
IV Lain - lain
- Biaya Umum
- Keuntungan
Sub Jumlah IV
Jumlah Harga = I+II+III+IV
Harga satuan pekerjaan Pengecatan Sederhana (dibulatkan)
Analisa Skh-10.1.17

ORMULIR STANDAR UNTUK


ALISA MASING-MASING HARGA SATUAN

NALISA HARGA SATUAN PEKERJAAN (HSP)

Pembersihan Struktur Jembatan (Bangunan Atas, Bawah dan Pelengkap)


###
:
###
:

KUANTITAS/ HARGA
SATUAN KOEFISIEN SATUAN HARGA
DASAR (Rp.)
(Rp.)
(3) (4) (5) (6)

jam 0.0033 17,083.33 56.70


jam 0.0003 21,369.05 7.09

63.79

###

Jam 0.0070 66,666.67 466.67

Jam 0.0003 #REF! #REF!


Ls 1.0000 1,000.00 1,000.00

#REF!
#REF!

5.0 % x Sub Jumlah (I+II+III) #REF!


5.0 % x Sub Jumlah (I+II+III) #REF!
#REF!
#REF!
naman Pada Rumija (dibulatkan) #REF!
###

Analisa Skh-10.1.17

ORMULIR STANDAR UNTUK


ALISA MASING-MASING HARGA SATUAN

Pembersihan Daerah Aliran sungai yang pengaruhi keamanan Jembatan ± 100 (Hulu dan Hilir)
###
:
###
:

KUANTITAS/ HARGA
SATUAN KOEFISIEN SATUAN HARGA
DASAR (Rp.)
(Rp.)
(3) (4) (5) (6)

jam 0.0033 17,083.33 56.70


jam 0.0003 21,369.05 7.09

63.79
###

Jam 0.0070 66,666.67 466.67

Ls 1.0000 1,000.00 1,000.00

1,466.67
1,530.46

5.0 % x Sub Jumlah (I+II+III) 76.52


5.0 % x Sub Jumlah (I+II+III) 76.52
76.52
1,606.98
naman Pada Rumija (dibulatkan) 1,600.00
###

Analisa Skh-10.1.17

ORMULIR STANDAR UNTUK


ALISA MASING-MASING HARGA SATUAN

: Pengecatan Sederhana ###


:
###
:
###
:

KUANTITAS/ HARGA
SATUAN KOEFISIEN SATUAN HARGA
DASAR (Rp.)
(Rp.)
(3) (4) (5) (6)

jam 10.0000 17,083.33 170,833.33

jam 1.0000 21,369.05 21,369.05

192,202.38

Kg 0.0075 50,000.00 375.00

Liter 0.0019 #REF! #REF!


Ls 1.0000 30,000.00 30,000.00

#REF!

Jam 0.0000 66,666.67 0.00

Jam 0.0000 #REF! #REF!

#REF!
#REF!

5.0 % x Sub Jumlah (I+II+III) #REF!


5.0 % x Sub Jumlah (I+II+III) #REF!
#REF!
#REF!
erhana (dibulatkan) #REF!
###

Analisa Skh-10.1.17

ORMULIR STANDAR UNTUK


ALISA MASING-MASING HARGA SATUAN

: Pengecatan Sederhana ###


:
###
:

###
:

KUANTITAS/ HARGA
SATUAN KOEFISIEN SATUAN HARGA
DASAR (Rp.)
(Rp.)
(3) (4) (5) (6)

jam 10.0000 17,083.33 170,833.33

jam 1.0000 21,428.57 21,428.57

192,261.90

m3 0.5000 200,000.00 100,000.00


m3 0.5000 500,000.00 250,000.00
m3 0.5000 500,000.00 250,000.00
Kg 1.0000 30,000.00 30,000.00

Kg 0.0000 50,000.00 0.00

Liter 0.0000 #REF! #REF!


Ls 1.0000 30,000.00 30,000.00

#REF!

Jam 0.0010 257,329.28 257.33

Jam 0.0010 171,515.32 171.52

428.84
#REF!

5.0 % x Sub Jumlah (I+II+III) #REF!


5.0 % x Sub Jumlah (I+II+III) #REF!
#REF!
#REF!
erhana (dibulatkan) #REF!
###

Anda mungkin juga menyukai