BAB IV

PERENCANAAN
BALOK INDUK
Muhammad Yusuf Rjito (201910340311015)
Moh. Algebrieco R (201910340311021)
Fathur Rizqi (201910340311025)

PERENCANAAN BALOK INDUK ATAP MELINTANG (35 x 75)


PEMBEBANAN BALOK INDUK MELINTANG

Beban Merata

Beban Mati
Berat sendiri pelat (qDL)= 299 kg/
Beban Hidup
Beban guna ruang pertemuan (qLL)= 96 kg/
Beban Berfaktor

q= 1,2 (qDL) + 1,6 (qLL)


= 1,2 (299) + 1,6 (96)
= 512.4 kg/
Distribusi Bebas dari pelat ke Balok Anak
Beban Pelat
R = 2 [1/2 (1.5+6)2.25x512.4)
= 8646.75
F1= 2 (1/2 x 2.25 x 2.25) 512.4 = 2595.025
F2= 2 (2.25 x 0.75) 512.4 =1729.35
Meq = Mc
1/8 qeq 62 = (R x 3) – F1((1/3 x 2.25 )+0.75) – F2 ( ½ x 0.75 )
1/8 qeq 62 = (8646.75 x 3) – (2595.025 x 1.5 ) – ( 1729.35 x 0.375)
1/8 qeq 62 = 21399.2

Qeq = 4755.38 kg/m

75
Berat sendiri balok= b x h x bj. Beton
= 0.35 x 0.75 x 2400
= 630 kg/m

Q = qeq +berat sendiri balok


=4755.38 kg/m+ 300kg
= 5385.38 kg/m

F1= 2 (1/2 x 2.25 x 2.25) 512.4 = 2595.025


F2= 2 (2.25 x 0.75) 512.4 =1729.35
Meq = Mc
1/8 -qeq 6 = - (R x 3) – F1((1/3 x 2.25 )+0.75) – F2 ( ½ x 0.75 )
2

1/8 - qeq 62 = - (8646.75 x 3) – (2595.025 x 1.5 ) – ( 1729.35 x 0.375)


1/8 - qeq 62 = - 21399.2
Qeq2 = 4755.38 kg/m

Berat sendiri balok= b x h x bj. Beton


= 0.35 x 0.75 x 2400
= 630 kg/m
Q = qeq2 +berat sendiri baloK

\ =4755.38 kg/m+ 300kg/m

= 5385.38 kg/m

P terpusat = 179.424 (Diambil dari gaya lintang tumpuan terbesar


Balok anak memanjang )
Pterpusat = 114,592 KN (diambil dari gaya lintang tumpuan terbesar balok
anak atap memanjang) x 2
= 229,184 KN
Beban trapezium

R 1=R 2=2 ( 12 ( 0,5+4 ) 1,75 x 512,4 )=4035,15


1
F =2 ( x 1,75 x 1,75 ) x 512,4=1569,225
1
2
1
F =2 ( 1,75 ) x 512,4=896,7
2
2
Meq = Mc
1 1
8 ( )
x qeq 4 2=R 2−F 1 x 1,75+ 0,25 −F2 0,25
3
1 1
x qeq 4 =4035,15 x 2−1569,225 ( x 1,75+0,25 )−896,7 x 0,25
2
8 3
2 qeq=8070,3−1307,687−224,175
6538,438
qeq=
2
qeq=3269,219 Kg/m2
Berat sendiri balok = b x h x bj beton
= 0,25 x 0,5 x 2400
= 300 kg/m’
Q = qeq + berat sendiri balok
= 3269,219 kg/m’ + 300 kg/m’
= 3569,219kg/m2
= 35,692 KN/m2
PERENCANAAN PENULANGAN BALOK INDUK ATAP MELINTANG
(35/70)
PENULANGAN DAERAH TUMPUAN

Mu = 396,218 KNm
b = 350 mm
h = 700 mm
fc’ = 30 MPa
fy = 400 MPa
drencana = 700 – 70 = 630 mm
1. Tulangan pokok
Mu = 396,218 KNm
Mu 396,218 x 1 06
Rn= = =3,169
∅ x b x d2 0,9 x 350 x 6 302
f c ' −28 30−28
β=0,85−0,05 =0,85−0,05 =0,835
7 7

0,85 f c'
ρ=
fy [ √
x 1− 1−
2 Rn
0,85 f c ' ]
¿
0,85 x 30
400 [ √
x 1− 1−
2 x 3,169
0,85 x 30 ]
= 0,0085

0,85 f c' β 600 0,85 x 30 x 0,835 600


ρb= x = x =0,032
fy 600+fy 400 600+ 400
ρmax=0,75 x ρb=0,75 x 0,032=0,024
1,4 1,4
ρmin= = =0,0035
fy 400
Dipakai ρ=0,0085 karena ρmin< ρ< ρmax

LUAS TULANGAN
AS= ρ x b d
¿ 0,0085 x 350 x 630
¿ 1874,25 mm2
Dipakai tulangan 3D29 (AS= 1982 mm2)

dpakai = h – selimut beton - ∅ sengkang – 1/2 ∅ tulangan


= 700 – 40 – 10 – ½ 29
= 635,5 mm
dpakai = 635,5 mm > drencana = 630 mm
kontrol:
AS x fy 1982 x 400
a= = =88,829mm
'
0,85 x f c x b 0,85 x 30 x 350
a 88,829
letak garis netral ( C )= = =74,172mm
β 0,835

Mn=As x fy x d−( a2 )
88,829
¿ 1982 x 400 ( 635,5−
2 )
−6
x 10 =468,612 KNm

Mr=∅ x Mn=0,9 x 468,612=421,751 KNm


Mr=421,751 KNm> Mu=396,218 KNm[ AMAN ]
TULANGAN BAGI
Dibutuhkan tulangan bagi (tinggi balok = 70 cm)
AS = 0,002 x b x d
= 0,002 x 350 x 700
= 490 mm2
Dipakai tulangan 2D19 (AS = 567 mm2)

PENULANGAN DAERAH LAPANGAN


Mu = 370,357 KNm
bw = 350 mm
h = 700 mm
hf = 100 mm
fc’ = 30 MPa
fy = 400 MPa
drencana = 700 – 70 = 630 mm
Lebar efektif balok T (dengan mengambil nilai terkecil dari b efektif)
befektif = ¼ L = ¼ 8000 = 2000 mm
befektif = bw + 16 hf = 350 + (16 x 100) =1950 mm
befektif ≤ bo = 8000 mm
dipakai befektif = 1950 mm
- Anggap sebuah sayap tertekan
hf
Mr = ϕ (0,85 x fc’ x bw x hf ( d - ¿)
2
100
= 0,9 (0,85 x 30 x 350 x 100 ( 630 - ¿) x 10-6
2
= 465,885 KNm
Mr = 465,885 KNm> Mu = 370,357 KNm (termasuk balok T persegi)
Mu
- Rn =
ϕ x bf x d2
370,357 x 106
=
0,9 x 1950 x 6302
= 0,532
( f ' c−30 )
- β=0,85−0,05
7
( 30−28 )
¿ 0,85−0,05
7
= 0,835
0,85 f c '
 ρ¿ x¿
fy
0,85 x 30
¿ x¿
400
= 0,00134
0,85 x f c ' x β 1 600
- ρb = x
fy ( 600+ fy )
0,85× 30 ×0,835 600
¿ × =0 ,032
400 ( 600+ 400 )
- ρ Max = 0,75 ρb = 0,75 × 0,032 = 0,024
1,4 1,4
- ρ Min ¿ = =0,0035
fy 400
Dipakai ρmin = 0,0035 karena ρ < ρmin < ρmax

LUAS TULANGAN
As =ρxbxd
= 0,0035 x 350 x 630
= 771,75 mm2
Dipakai tulangan 3D29 ( As = 1982 mm2 )

dpakai = h – selimut beton - ∅ sengkang – 1/2 ∅ tulangan


= 700 – 40 – 10 – ½ 29
= 635,5 mm
dpakai = 635,5 mm > drencana = 630 mm
kontrol:
AS x fy 1982 x 400
a= = =88,829mm
'
0,85 x f c x b 0,85 x 30 x 350

Mn=As x fy x d−( a2 )
88,829
¿ 1982 x 400 ( 635,5−
2 )
−6
x 10 =468,612 KNm

Mr=∅ x Mn=0,9 x 468,612=421,751 KNm


Mr=421,751 KNm> Mu=370,357 KNm[ AMAN ]
TULANGAN BAGI
Dibutuhkan tulangan bagi (tinggi balok = 70 cm)
AS = 0,002 x b x d
= 0,002 x 350 x 700
= 490 mm2
Dipakai tulangan 2D19 (AS = 567 mm2)

Perhitungan Sengkang Balok Induk Atap Melintang


Vu = 263,028 KNm (Diambil dari gaya lintang terbesar program
STAAD PRO)
bw = 350 mm
h = 700 mm
Fc’ = 30 Mpa
Fy = 240 Mpa
d = 700 – 70
= 630 mm
Nilai λ = 1,0 untuk beton normal (SNI 2847-2013 Pasal 11.6.4.3)
- ϕvc = ϕ (0,17 λ √ fc bw d )
= 0,75 (0,17 x 1,0 x √ 30 x 350 x 630) x 10-3
= 153, 985 kN
- ½ ϕvc = ½ x 153,985 kN

= 76,992 kN

Vu kritis terjadi pada penampang sejarak d dari muka tumpuan

x1 4−0,175
vu kritis 1=¿ =
263,028 4
X1 = 0,96 x 263,028 = 252,507 kN
x2 4−2
vu kritis 2=¿ =
263,028 4
X2 = 0,5 x 263,028 = 131,514 kN
Persyaratan :
 jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
 jika ½ ϕVc < Vu < ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak
maksimum di tentukan.
 Jika Vu > ϕVc tulangan geser harus disediakan .
 sengkang daerah tumpuan (0,175 m s/d 2 m )
½ ϕVc < Vu1kritis
76,992 KN < 252,507kN (dibutuhkan tulangan geser)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 630
S1= = =70,508
Vu 252,507 x 103 /0,75

Jadi dipakai sengkang jarak 70,508 mm = 50 mm
 sengkang daerah lapangan ( 2 m s/d 4 m )
½ ϕVc < Vu1kritis
76,992 KN < 131,514 kN (tidak dibutuhkan tulangan geser, tetapi
dilapangan tetap digunakan tulangan geser minimum)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 630
S1= = =135,376
Vu 131,514 x 103 /0,75

Keterangan:
1
Jika ∅ Vc ≤Vu ≤ ∅ Vc , dibutuhkan tulangan geser minimum sehingga Vs =
2
0. Dapat dipasang tulangan sengkang vertical berdiameter 10mm dengan jarak
maksimum tulangan sengkang sesuai dengan persyaratan SNI 2847:2013 (diambil
dari nilai terkecil S2 dan S3) sebagai berikut:
- S2 = d/2 ≤ 700 mm
= 630/2 ≤ 700 mm
= 315 mm ≤ 700 mm
Av x fy
- S3 = ; f c ' ≤ 30 MPa
0,35 x bw
157 x 240
= =307,592 mm
0,35 x 350
- S4 = 700 mm
Jadi tetap dipakai sengkang dengan jarak 50 mm (tumpuan) dan 300 mm
(lapangan)

Tabel Penulangan Balok Induk Atap melintang


TABEL PENULANGAN BALOK INDUK ATAP MELINTANG
Daerah Mu/Vu As Pakai Tulangan
Tumpuan 1982 mm² 3 D 29
396,218 KNm
Tulangan bagi 567 mm2 2 D 19
Lapangan 1982 mm² 3 D 29
370,357 KNm
Tulangan bagi 567 mm2 2 D 19
Tumpuan 263,028 kNm - Φ10-50 mm
Sengkang
Lapangan 263,028 kNm - Φ10-300mm

PERENCANAAN BALOK INDUK ATAP MEMANJANG (25/50)


PEMBEBANAN BALOK INDUK MEMANJANG (L=500)

Beban Merata
 Beban Mati
Berat sendiri plat = 299 kg/m2
 Beban Hidup (SNI 1727 tabel 4-1)
Beban guna atap dasar = 96 kg/m2
Beban berfaktor = 1,2 qDL + 1,6 qLL
= 1,2 (299) + 1,6 (96)
= 512,4 Kg/m2
 Distribusi bebas dari plat ke balok
Beban trapesium plat
 Beban equivalen

R=2 ( 12 ( 2,5+5 ) 1,25 x 512,4 )=4803,75


1
F =2 ( x 1,25 x 1,25 ) x 512,4=800,625
1
2
1
F =2 ( 1,25 ) x 512,4=640,5
2
2
Meq = Mc
1 1
8 (
x qeq 52=R 2,5−F1 x 1,25+1,25 −F2 1,25
3 )
1 1
8 ( )
x qeq 52=4803,75 x 2,5−800,625 x 1,25+1,25 −640.5 x 1,25
3
3,125 qeq=12009,375−1334,375−800,625
9874,375
qeq=
3,125
qeq=3159,8 Kg/m2
Berat sendiri balok = b x h x bj beton
= 0,25 x 0,5 x 2400
= 300 kg/m’
Q = qeq + berat sendiri balok
= 3159,8 kg/m’ + 300 kg/m’
= 3459,8 kg/m2
= 34,598 KN/m2

PERENCANAAN PENULANGAN BALOK INDUK ATAP MEMANJANG


25/50
PENULANGAN DAERAH TUMPUAN
Mu = 74,868 KNm (diambil dari momen tumpuan terbesar program
STAAD PRO)
b = 250 mm
h = 500 mm
fc’ = 30 MPa
fy = 400 MPa
drencana = 500-70 = 430 mm

Mu 74,868 x 106
Rn= = =1,799
∅ x b x d2 0,9 x 250 x 4302
f c ' −28 30−28
β=0,85−0,05 =0,85−0,05 =0,835
7 7
0,85 f c'
ρ=
fy [ √
x 1− 1−
2 Rn
0,85 f c ' ]
¿
0,85 x 30
400 [ √
x 1− 1−
2 x 1,799
0,85 x 30 ]
= 0,00467

0,85 f c' β 600 0,85 x 30 x 0,835 600


ρb= x = x =0,032
fy 600+fy 400 600+ 400
ρmax=0,75 x ρb=0,75 x 0,032=0,024
1,4 1,4
ρmin= = =0,0035
fy 400
Dipakai ρ=0,00467 karena ρmin< ρ< ρmax
LUAS TULANGAN
AS= ρ x b d
¿ 0,00467 x 250 x 430
¿ 502,025 mm2
Dipakai tulangan 3D19 (AS= 603 mm2)
dpakai = h- selimut beton-∅ sengkang -½ ∅ tulangan
= 500 – 40 – 10 – ½ 16
= 442 mm
dpakai = 442 mm > drencana = 430 mm [OK]
kontrol:
AS x fy 603 x 400
a= = =37,835 mm
0,85 x f c x b 0,85 x 30 x 250
'

a 37,835
letak garis netral ( C )= = =45,311 mm
β 0,835

Mn=As x fy x d− ( a2 )
37,835
¿ 603 x 400 ( 442−
2 )
−6
x 10 =102,047 KNm

Mr=∅ x Mn=0,9 x 102,047=91,842 KNm


Mr=91,842 KNm> Mu=74,868 KNm[ AMAN ]

PENULANGAN DAERAH LAPANGAN


Mu = 38,264 KNm (diambil dari momen tumpuan terbesar program
STAAD PRO)
Bw = 250 mm
h = 500 mm
hf = 100 mm
fc’ = 30 MPa
fy = 400 MPa
drencana = 500-70 = 430 mm
Lebar efektif balok T (dengan mengambil nilai terkecil dari b efektif)
befektif = ¼ L = ¼ 5000 = 1250 mm
befektif = bw + 16 hf = 250 + (16 x 100) =1850 mm
befektif ≤ bo = 5000 mm
dipakai befektif = 1250 mm
- Anggap sebuah sayap tertekan
hf
Mr = ϕ (0,85 x fc’ x bw x hf ( d - ¿)
2
100
= 0,9 (0,85 x 30 x 250 x 100 ( 430 - ¿) x 10-6
2
= 218,025 KNm
Mr = 218,025 KNm> Mu = 11,936 KNm (termasuk balok T persegi)
Mu
- Rn =
ϕ x bf x d2
38,264 x 106
=
0,9 x 1250 x 430 2
= 0,184
( f ' c−30 )
- β=0,85−0,05
7
( 30−28 )
¿ 0,85−0,05
7
= 0,835
0,85 f c '
 ρ¿ x¿
fy
0,85 x 30
¿ x¿
400
= 0,000462
0,85 x f c ' x β 1 600
- ρb = x
fy ( 600+ fy )
0,85× 30 ×0,835 600
¿ × =0 ,032
400 ( 600+ 400 )
- ρ Max = 0,75 ρb = 0,75 × 0,032 = 0,024
1,4 1,4
- ρ Min ¿ = =0,0035
fy 400
Dipakai ρmin = 0,0035 karena ρ < ρmin < ρmax
LUAS TULANGAN
As =ρxbxd
= 0,0035 x 250 x 430
= 376,25 mm2
Dipakai tulangan 2D16 ( As = 402 mm2 )
d aktual = h – selimut beton – ϕ sengkang - ½ ϕ tulangan
= 500 – 40 – 10 – ½ x 16
= 442mm
d pakai = 442 mm > d rencana = 430 mm (OK)
Pemeriksaan tulangan penampang :
As = 402 mm2
Fy = 400 Mpa
Fc’ = 30 Mpa
As x fy 402× 400
a¿ = =5,044 mm
'
0,85 x f c x bf 0,85× 30 ×1250

Mn ¿ As x Fy x d− ( a2 )
5,044
(
¿ 402 × 400 × 442−
2 )x 10-6

¿ 70,668 kNm
( SNI 2847 2013 PASAL 9.2 ∅=0,9, penampang terkendali tarik )
Mr ¿ ∅ x Mn
¿ 0,9 x 70,668 KNm
¿ 63,601 KNm
Mr =63,601 KNm> Mu = 38,264 KNm (OK)
PERHITUNGAN SENGKANG BALOK INDUK ATAP MEMANJANG

Vu = 88,500 KN (Diambil dari gaya lintang terbesar program


STAAD PRO)
bw = 250 mm
h = 500 mm
Fc’ = 30 Mpa
Fy = 240 Mpa
d = 500 – 40 – 10 – ½ 16
= 442 mm
- Hitung ϕvc ; ½ ϕvc ; vc1 ; vc2

Nilai λ = 1,0 untuk beton normal (SNI 2847-2013 Pasal 11.6.4.3)


- ϕvc = ϕ (0,17 λ √ fc bw d )
= 0,75 (0,17 x 1,0 x √ 30 x 250 x 442) x 10-3
= 77,167 kN
- ½ ϕvc = ½ x 77,167 kN

= 38,583 kN

x1 2,50−0,125
vu kritis 1=¿ =
88,500 2,50
X1 = 0,95 x 88,500 = 84,075 kN
x2 2,50−1,25
vu kritis 2=¿ =
88,500 2,50
X2 = 0,5 x 88,500 = 44,25 kN
Persyaratan :
 jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
 jika ½ ϕVc < Vu < ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak
maksimum di tentukan.
 Jika Vu > ϕVc tulangan geser harus disediakan .
 sengkang daerah tumpuan (0,125m s/d 1,25 m )
½ ϕVc < Vu1kritis
38,583 KN< 84,075 KN (tidak dibutuhkan tulangan geser, tetapi
dilapangan tetap digunakan tulangan geser minimum)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 442
S1= = =148,569
Vu 84,075 x 103 /0,75

Jadi dipakai sengkang jarak 148,569 mm =100
 sengkang daerah lapangan ( 1,25 m s/d 2,50 m )
½ ϕVc < Vu2
38,583 kN < 44,25 KN (tidak dibutuhkan tulangan geser, tetapi dilapangan
tetap digunakan tulangan geser minimum)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 442
S1= = =282,281
Vu 44,25 x 10 3 /0,75

Keterangan:
1
Jika ∅ Vc ≤Vu ≤ ∅ Vc , dibutuhkan tulangan geser minimum sehingga Vs =
2
0. Dapat dipasang tulangan sengkang vertical berdiameter 10mm dengan jarak
maksimum tulangan sengkang sesuai dengan persyaratan SNI 2847:2013 (diambil
dari nilai terkecil S2 dan S3) sebagai berikut:
- S2 = d/2 ≤ 500 mm
= 430/2 ≤ 500 mm
= 215 mm ≤ 500 mm
Av x fy
- S3 = ; f c ' ≤ 30 MPa
0,35 x bw
157 x 240
= =430,629mm
0,35 x 250
- S4 = 500 mm
Jadi dipilih jarak terkecil antara S2, S3, S4 yaitu 215 mm = 200 mm (maka
dipasang tulangan sengkang minimum ∅ 10−200( Lapangan) ¿
Tabel penulangan balok induk atap memanjang 25/50

TABEL PENULANGAN BALOK INDUK LANTAI MELINTANG


Daerah Mu/Vu As Pakai Tulangan
Tumpuan 603 mm² 3 D 16
74,868kNm
Lapangan 402 mm² 2 D 16
38,264 kNm
Tumpuan 88,500 kNm - Φ10-100 mm
Sengkang
Lapangan 88,500 kNm - Φ10-200 mm
PERENCANAAN BALOK INDUK LANTAI MELINTANG
(35/70)
PEMBEBANAN BALOK INDUK MELINTANG (L=800)

Beban merata
Perencanaan pembebanan pada plat
Berat sendiri pelat = 0,12 × 2400 = 288 kg/m2
Berat keramik + spesi
- Keramik 40 x 40 = 0,01 x 2200 = 22 kg/m2
- Spesi 2 cm = 0,02 x 2200 = 44 kg/m2
Berat plafond + penggantung
- Rangka galvalum hollow 2/4 = 10 = 10 kg/m2
- Plafond calciborad / gypsum =5 = 5 kg/m2 +
qDL = 369 kg/m2
Beban hidup ( Rumah Sakit ) (SNI 1727 2013 tabel 4-1)
Beban guna merata
- Ruang Pasien = 1.92 KN/m2 = 192 kg/m2 +
qLL = 192 kg/m2
 Beban hidup ( Rumah Sakit ) (SNI 1727 2013 tabel 4-1)
 Beban guna terpusat (P)
- Ruang Pasien = 4.5 KN = 450 kg
 Beban berfaktor (SNI 2847 2013 pasal 9.2.1)
- qu = 1,2 qDL+ 1,6 qLL
= 1,2 × 369 + 1,6 × 192
= 750 kg/m2
= 7,50 KN/m2
Distribusi bebas dari plat ke balok
Beban trapesium plat

R 1=R 2=2 ( 12 ( 0,5+4 ) 1,75 x 750 )=5906,25


a. Mencari q-eq1 dan q-eq2

F 1=2( 12 x 1,75 x 1,75) x 750=2296,875


1
F =2 ( 1,75 ) x 750=1312,5
2
2
Meq = Mc
1 1
8 ( )
x qe q 1 4 2=R 2−F 1 x 1,75+ 0,25 −F2 0,25
3
1 1
8 ( )
x qe q 1 4 2=5906,25 x 2−2296,875 x 1,75+ 0,25 −1312,5 x 0,25
3
2 qe q 1=11812,5−1914,062−328,125
9570,313
qe q1=
2
qe q1=4785,156 Kg/m2
Berat sendiri balok = b x h x bj beton
= 0,25 x 0,5 x 2400
= 300 kg/m’
Q = qe q1 + berat sendiri balok
= 4785,156 kg/m’ + 300 kg/m’
= 5085,156 kg/m2
= 50,852 KN/m2

F 1=2 ( 12 x 1,75 x 1,75) x 750=2296,875


F 2=2 ( 12 1,75 ) x 750=1312,5
Meq = Mc
1 1
8 ( )
x (−qe q2 )42=−R2+ F 1 x 1,75+ 0,25 + F 2 0,25
3
1 1
8 ( )
x (−qe q2 )42=−5906,25 x 2+2296,875 x 1,75+ 0,25 +1312,5 x 0,25
3
−2 qe q 2=−11812,5+ 1914,062+328,125
−9570,313
qe q2=
−2
qe q2=4785,156 Kg/m2
Berat sendiri balok = b x h x bj beton
= 0,25 x 0,5 x 2400
= 300 kg/m’
Q = qe q2 + berat sendiri balok
= 4785,156kg/m’ + 300 kg/m’
= 5085,156 kg/m2
= 50,852 KN/m2
Pterpusat = 165,405KN (diambil dari gaya lintang tumpuan terbesar balok
anak lantai memanjang) x 2
= 330,81 KN
Beban trapezium

F 1=2( 12 x 1,75 x 1,75) x 750=2296,875


1
F =2 ( 1,75 ) x 750=1312,5
2
2
Meq = Mc
1 1
8 ( )
x qe q 1 4 2=R 2−F 1 x 1,75+ 0,25 −F2 0,25
3
1 1
8 ( )
x qe q 1 4 2=5906,25 x 2−2296,875 x 1,75+ 0,25 −1312,5 x 0,25
3
2 qe q 1=11812,5−1914,062−328,125
9570,313
qe q1=
2
qe q1=4785,156 Kg/m2
Berat sendiri balok = b x h x bj beton
= 0,25 x 0,5 x 2400
= 300 kg/m’
Q = qe q1 + berat sendiri balok
= 4785,156 kg/m’ + 300 kg/m’
= 5085,156 kg/m2
= 50,852 KN/m2
PERENCANAAN PENULANGAN BALOK INDUK LANTAI
MELINTANG (35/70)
PENULANGAN DAERAH TUMPUAN

Mu = 574,874 kNm (Diambil dari momen tumpuan terbesar program


STAAD.Pro)
b = 350 mm
h = 700 mm
fc’ = 30 MPa
fy = 400 MPa
drencana = 700 – 70 = 630 mm
1. Tulangan Pokok
Mu = 574,874 kNm
Mu 574,874 ×106
Rn = = =4,598
∅ × b ×d 2 0,9× 350 ×6302
f c ' −28 30−28
β=0,85−0,05 =0,85−0,05 =0,835
7 7

0,85 f c '
ρ perlu=
fy [ √
x 1− 1−
2 Rn
0,85 f c' ]
¿
0,85 x 30
400 [ √
x 1− 1−
2 x 4,598
0,85 x 30 ]
=0,01277

0,85 f c' β 600 0,85 x 30 x 0,835 600


ρb= x = x =0,032
fy (600+ fy) 400 600+ 400
ρmax=0,75 x ρb=0,75 x 0,032=0,024
1,4 1,4
ρmin= = =0,0035
fy 400
Dipakai ρ perlu=0,01277 karena ρmin< ρ perlu< ρmax
LUAS TULANGAN
AS= ρ× b ×d
¿ 0,01277 x 350 x 630
¿ 2815,785 mm2
Dipakai tulangan 6D25 (AS= 2945 mm2)
Daktual = h – selimut beton - ∅ sengkang – 1/2 ∅ tulangan
= 700 – 40 – 10 – ½ x 25
= 637,5 mm
dpakai = 637,5 mm > drencana = 630 mm (OK)
kontrol:
As = 2945 mm2
fy = 400 MPa
fc’ = 30 MPa
As x fy 2945 x 400
a= = =131,989 mm
0,85 x f c x b 0,85 x 30 x 350
'

a 131,989
letak garis netral ( C )= = =158,070mm
β 0,835

Mn=As x fy x d−( a2 )
131,989 mm
(
¿ 2945 mm2 x 400 637,5 mm−
2 )
x 10−6=673,233 KNm

Mr=∅ x Mn=0,9 x 673,233 KNm=605,91 KNm


Mr=605,91 KNm> Mu=574,874 KNm[ AMAN ]
2. Tulangan Bagi
Dibutuhkan tulangan bagi (tinggi balok = 70 cm)
As = 0,002 x b x d
= 0,002 x 350 x 637,5
= 446,25 mm2
Dipakai tulangan 2D19 (AS = 567 mm2)
PENULANGAN DAERAH LAPANGAN

Mu = 78,535 KNm (Diambil dari momen lapangan terbesar program


STAAD PRO)
bw = 350 mm
h = 700 mm
hf = 120 mm
fc’ = 30 MPa
fy = 400 MPa
drencana = 700 – 70 = 630 mm
1. Tulangan Pokok
Lebar efektif balok T
befektif = ¼ L = ¼ 8000 = 2000 mm
befektif = bw + 16 hf = 350 + (16 x 120) =2270 mm
befektif ≤ bo = 8000 mm
dipakai befektif = 2000 mm
- Anggap sebuah sayap tertekan
hf
Mr = ϕ (0,85 x fc’ x bw x hf ( d - ¿)
2
120
= 0,9 (0,85 x 30 x 350 x 120 ( 630 - ¿) x 10-6
2
= 549,423 KNm
Mr = 549,423 KNm> Mu = 78,535 KNm (termasuk balok T persegi)
Mu
- Rn =
ϕ x bf x d2
78,535 x 106
=
0,9 x 2000 x 6302
= 0,1099
( f ' c−30 )
- β=0,85−0,05
7
( 30−28 )
¿ 0,85−0,05
7
= 0,835
0,85 f c '
 ρ perlu= x¿
fy
0,85 x 30
¿ x¿
400
= 0,000275
0,85 x f c ' x β 1 600
- ρb = x
fy ( 600+ fy )
0,85× 30 ×0,835 600
¿ × =0 ,032
400 ( 600+ 400 )
- ρ Max = 0,75 ρb = 0,75 × 0,032 = 0,024
1,4 1,4
- ρ Min ¿ = =0,0035
fy 400
Dipakai ρmin = 0,0035 karena ρperlu < ρmin < ρmax
LUAS TULANGAN
As =ρxbxd
= 0,0035 x 350 x 630
= 771,75 mm2
Dipakai tulangan 2D25 ( As = 982 mm2 )
daktual = h – selimut beton - ∅ sengkang – 1/2 ∅ tulangan
= 700 – 40 – 10 – ½ 25
= 637,5 mm
dpakai = 637,5 mm > drencana = 630 mm
kontrol:
AS x fy 982 x 400
a= = =44,011 mm
0,85 x f c x b 0,85 x 30 x 350
'

Mn=As x fy x d− ( a2 )
44,011
¿ 982 x 400 ( 637,5−
2 )
−6
x 10 =241,766 KNm

Mr=∅ x Mn=0,9 x 241,766=217,589 KNm


Mr=217,589 KNm> Mu=146,6 KNm[ AMAN ]
TULANGAN BAGI
Dibutuhkan tulangan bagi (tinggi balok = 70 cm)
AS = 0,002 x b x d
= 0,002 x 350 x 637,5
= 446,25 mm2
Dipakai tulangan 2D19 (AS = 567 mm2)
Perhitungan Sengkang Balok Induk Lantai Melintang

Vu = 371,728 KNm (Diambil dari gaya lintang terbesar program


STAAD PRO)
bw = 350 mm
h = 700 mm
Fc’ = 30 Mpa
Fy = 240 Mpa
d = 700 – 70
= 630 mm
Nilai λ = 1,0 untuk beton normal (SNI 2847-2013 Pasal 11.6.4.3)
- ϕvc = ϕ (0,17 λ √ fc bw d )
= 0,75 (0,17 x 1,0 x √ 30 x 350 x 630) x 10-3
= 153, 985 kN
- ½ ϕvc = ½ x 153,985 kN

= 76,992 kN

Vu kritis terjadi pada penampang sejarak d dari muka tumpuan

371,728 kNm

X1

X2
0,175 m
2m
4 cm

x1 4−0,175
vu kritis 1=¿ =
371,728 4
X1 = 0,95 x 371,728 = 353,142 kN
x2 4−2
vu kritis 2=¿ =
371,728 4
X2 = 0,5 x 371,728 = 185,864 kN
Persyaratan :
 jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
 jika ½ ϕVc < Vu < ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak
maksimum di tentukan.
 Jika Vu > ϕVc tulangan geser harus disediakan .
 sengkang daerah tumpuan (0,175 m s/d 2 m )
½ ϕVc < Vu1kritis
76,992 KN < 353,142 kN (dibutuhkan tulangan geser)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 630
S1= = =50,415
Vu 353,142 x 103 /0,75

Jadi dipakai sengkang jarak 50,415 mm = 50 mm
 sengkang daerah lapangan ( 2 m s/d 4 m )
Vu2 > ½ ϕvc
185,864 kN > 76,992 KN (dibutuhkan tulangan geser)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 630
S1= = =95,789
Vu 185,864 x 103 /0,75

Keterangan:
1
Jika ∅ Vc ≤Vu ≤ ∅ Vc , dibutuhkan tulangan geser minimum sehingga Vs =
2
0. Dapat dipasang tulangan sengkang vertical berdiameter 10mm dengan jarak
maksimum tulangan sengkang sesuai dengan persyaratan SNI 2847:2013 (diambil
dari nilai terkecil S2 dan S3) sebagai berikut:
- S2 = d/2 ≤ 500 mm
= 630/2 ≤ 500 mm
= 315 mm ≤ 500 mm
Av x fy
- S3 = ; f c ' ≤ 30 MPa
0,35 x bw
157 x 240
= =430,629mm
0,35 x 250
- S4 = 500 mm
Jadi dipilih jarak terkecil antara S2, S3, S4 yaitu 315 mm = 300 mm (maka
dipasang tulangan sengkang minimum ∅ 10−300 ¿
Tabel Penulangan Balok Induk Lantai Melintang
TABEL PENULANGAN BALOK INDUK LANTAI MELINTANG
Daerah Mu/Vu As Pakai Tulangan
Tumpuan 2945 mm² 6 D 25
574,874 KNm
Tulangan bagi 567 mm2 2 D 19
Lapangan 982 mm² 2 D 25
78,535 kNm
Tulangan bagi 567 mm2 2 D 19
Tumpuan 371,728kNm - Φ10-50 mm
Sengkang
Lapangan 371,728kNm - Φ10-300 mm

PERENCANAAN BALOK INDUK LANTAI MEMANJANG


(25/50)
PEMBEBANAN BALOK INDUK LANTAI MEMANJANG (L=500)

Beban Merata
 Beban Mati
Berat sendiri pelat = 0,12 × 2400 = 288 kg/m2
Berat keramik + spesi
Keramik 40 x 40 = 0,01 x 2200 = 22 kg/m2
Spesi 2 cm = 0,02 x 2200 = 44 kg/m2
Berat plafond + penggantung
Rangka galvalum hollow 2/4 = 10 = 10 kg/m2
Plafond calciborad / gypsum =5 = 5 kg/m2 +
qDL = 369 kg/m2
 Beban Hidup (SNI 1727 tabel 4-1)
Beban guna merata
Ruang Pasien = 1.92 KN/m2 = 192 kg/m2 +
qLL = 192 kg/m2
 Beban berfaktor (SNI 2847 2013 pasal 9.2.1)
- qu = 1,2 qDL+ 1,6 qLL
= 1,2 × 369 + 1,6 × 192
= 750 kg/m2
= 7,50 KN/m2
 Distribusi bebas dari plat ke balok
Beban trapesium plat

R=2 ( 12 ( 2,5+5 ) 1,25 x 750)=7031,25


1
F =2 ( x 1,25 x 1,25 ) x 750=1171,875
1
2
1
F =2 ( 1,25 ) x 750=937,5
2
2
Meq = Mc
1 1
8 ( )
x qeq 52=R 2,5−F1 x 1,25+1,25 −F2 1,25
3
1 1
x qeq 5 =7031,25 x 2,5−1171,875 ( x 1,25+1,25 )−937,5 x 1,25
2
8 3
3,125 qeq=17578,125−1953,125−1171,875
14453,125
qeq=
3,125
qeq=4625 Kg/m2
Berat sendiri balok = b x h x bj beton
= 0,25 x 0,5 x 2400
= 300 kg/m’
Berat bata ringan = b x h (bersih) x bj bata ringan
= 0,12 x 4,4 x 650
= 343,2 kg/m
Q = qeq + berat sendiri balok +berat bata ringan
= 4625 kg/m’ + 300 kg/m + 343,2 kg/m
= 5268,2 kg/m2
= 52,682 KN/m2

PERENCANAAN PENULANGAN BALOK INDUK LANTAI


MEMANJANG 25/50
PENULANGAN DAERAH TUMPUAN

Mu = 56,622 kN/m (Diambil dari momen tumpuan terbesar program STAAD


Pro)

b = 250 mm

h = 500 mm

Fc’ = 30 Mpa
Fy = 400 Mpa
d = 500 – 70
= 430 mm

1. Tulangan Pokok
Mu = 56,622 kN/m
Mu 56,622 x 106
Rn= = =1,361
∅ x b x d2 0,9 x 250 x 4302
f c ' −28 30−28
β=0,85−0,05 =0,85−0,05 =0,835
7 7

0,85 f c '
ρ perlu=
fy [ √
x 1− 1−
2 Rn
0,85 f c' ]
¿
0,85 x 30
400 [ √
x 1− 1−
2 x 1,361
0,85 x 30 ]
= 0,003498

0,85 f c' β 600 0,85 x 30 x 0,835 600


ρb= x = x =0,032
fy 600+fy 400 600+ 400
ρmax=0,75 x ρb=0,75 x 0,032=0,024
1,4 1,4
ρmin= = =0,0035
fy 400
Dipakai ρ min=0,0035 karena ρmin> ρ< ρmax
LUAS TULANGAN
AS= ρ x b d
¿ 0,0035 x 250 x 430
¿ 376,25 mm2
Dipakai tulangan 2 D 19 (AS= 402 mm2)

dpakai = h- selimut beton-∅ sengkang -½ ∅ tulangan


= 500 – 40 – 10 – ½ 16
= 442 mm
dpakai = 442mm > drencana = 430 mm [OK]
kontrol:
AS x fy 603 x 400
a= = =35,576 mm
0,85 x f c x b 0,85 x 30 x 250
'

a 35,576
letak garis netral ( C )= = =42,606 mm
β 0,835

Mn=As x fy x d− ( a2 )
35,576
¿ 567 x 400 ( 440,5−
2 )
−6
x 10 =95,871 KNm

Mr=∅ x Mn=0,9 x 95,871=86,284 KNm


Mr=86,284 KNm> Mu=56,622 KNm[ AMAN ]
2. Tulangan Bagi
Dibutuhkan tulangan bagi (tinggi balok= 50 cm)
As = 0,002 x b x d
= 0,002 x 250 x 500
= 250 mm2
Dipakai Tulangan 2 D 13 (As = 265 mm2)

PENULANGAN DAERAH LAPANGAN

Mu = 111,769 KNm (diambil dari momen lapangan terbesar program


STAAD PRO)
Bw = 250 mm
h = 500 mm
hf = 120 mm
fc’ = 30 MPa
fy = 400 MPa
drencana = 500 - 70 = 430 mm
Lebar efektif balok T
befektif = ¼ L = ¼ 5000 = 1250 mm
befektif = bw + 16 hf = 250 + (16 x 120) =2170 mm
befektif ≤ bo = 5000 mm
dipakai befektif = 1250 mm
- Anggap sebuah sayap tertekan
hf
Mr = ϕ (0,85 x fc’ x bw x hf ( d - ¿)
2
120
= 0,9 (0,85 x 30 x 250 x 120 ( 430 - ¿) x 10-6
2
= 254,745 KNm
Mr = 254,745 KNm> Mu = 111,769 KNm (termasuk balok T persegi)
Mu
- Rn =
ϕ x bf x d2
111,769 x 10 6
= =0,537
0,9 x 1250 x 430 2
( f ' c−30 )
- β=0,85−0,05
7
( 30−28 )
¿ 0,85−0,05
7
= 0,835
0,85 f c '
 ρ¿ x¿
fy
0,85 x 30
¿ x¿
400
= 0,00136
0,85 x f c ' x β 1 600
- ρb = x
fy ( 600+ fy )
0,85× 30 ×0,835 600
¿ × =0 ,032
400 ( 600+ 400 )
- ρ Max = 0,75 ρb = 0,75 × 0,032 = 0,024
1,4 1,4
- ρ Min ¿ = =0,0035
fy 400
Dipakai ρmin = 0,0035 karena ρ < ρmin < ρmax
LUAS TULANGAN
As =ρxbxd
= 0,0035 x 250 x 430
= 376,25 mm2
Dipakai tulangan 2D16 ( As = 402 mm2 )

d aktual = h – selimut beton – ϕ sengkang - ½ ϕ tulangan


= 500 – 40 – 10 – ½ x 16
= 442 mm
d pakai = 442 mm > d rencana = 430 mm (OK)
Pemeriksaan tulangan penampang :
As = 402 mm2
Fy = 400 Mpa
Fc’ = 30 Mpa
As x fy 402× 400
a¿ = =5,045 mm
0,85 x f c x bf 0,85× 30 ×1250
'

Mn ¿ As x Fy x d−( a2 )
5,045
(
¿ 402 × 400 × 442−
2 )x 10-6

¿ 70,667 kNm
( SNI 2847 2013 PASAL 9.2 ∅=0,9, penampang terkendali tarik )
Mr ¿ ∅ x Mn
¿ 0,9 x 70,667 KNm
¿ 63,6003 KNm
Mr =63,6003 KNm> Mu = 16,869 KNm (OK)
2. Tulangan Bagi
Dibutuhkan tulangan bagi (tinggi balok = 50 cm)
As = 0,002 x b x d
= 0,002 x 250 x 500
= 250 mm2
Dipakai Tulangan 2 D 13

Perhitungan Sengkang Balok Induk Lantai Memanjang


Vu = 48,004 KNm (Diambil dari gaya lintang terbesar program
STAAD PRO)
bw = 250 mm
h = 500 mm
Fc’ = 30 Mpa
Fy = 240 Mpa
d = 500 – 40 – 10 – ½ 16
= 442 mm
- Hitung ϕvc ; ½ ϕvc ; vc1 ; vc2

Nilai λ = 1,0 untuk beton normal (SNI 2847-2013 Pasal 11.6.4.3)


- ϕvc = ϕ (0,17 λ √ fc bw d )
= 0,75 (0,17 x 1,0 x √ 30 x 250 x 442) x 10-3
= 77,167 kN

- ½ ϕvc = ½ x 77,167 kN

= 38,583 kN

48,004 kNm

X1

X2
0,125 m
1,25 m
2,50 cm

x1 2,50−0,125
vu kritis 1=¿ =
48,004 2,50
X1 = 0,95 x 48,004= 45,604 kN
x2 2,50−1,25
vu kritis 2=¿ =
48,004 2,50
X2 = 0,5 x 48,004= 24,004 kN
Persyaratan :
 jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
 jika ½ ϕVc < Vu < ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak
maksimum di tentukan.
 Jika Vu > ϕVc tulangan geser harus disediakan .
 sengkang daerah tumpuan (0,125 m s/d 1,25 m )
½ ϕVc < Vu1kritis
38,583 KN < 45,604 kN (dibutuhkan tulangan geser)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 442
S1= = =273,899
Vu 45,604 x 103 /0,75

Jika dipakai Sengkang jarak 273,899 mm = 400 (Dipasang Φ10-400
mm)

 sengkang daerah lapangan ( 1,25 m s/d 2,50 m )


Vu2 < ½ ϕvc
24,002 kN < 38,583 kN (tidak dibutuhkan tulangan geser, tetapi
dilapangan tetap digunakan tulangan geser minimum)
1
Av=2 x x πx 102=157 mm 2
4
Av x fy x d 157 x 240 x 442
S1= = =520,412
Vu 24,002 x 103 /0,75

Jadi dipakai sengkang jarak 520,412 mm = 400

Keterangan:
1
Jika ∅ Vc ≤Vu ≤ ∅ Vc , dibutuhkan tulangan geser minimum sehingga Vs =
2
0. Dapat dipasang tulangan sengkang vertical berdiameter 10mm dengan jarak
maksimum tulangan sengkang sesuai dengan persyaratan SNI 2847:2013 (diambil
dari nilai terkecil S2 dan S3) sebagai berikut:
- S2 = d/2 ≤ 500 mm
= 442/2 ≤ 500 mm
= 221 mm ≤ 500 mm
Av x fy
- S3 = ; f c ' ≤ 30 MPa
0,35 x bw
157 x 240
= =430,629mm
0,35 x 250
- S4 = 500 mm
Jadi dipilih jarak terkecil antara S2, S3, S4 yaitu 221 mm = 200 mm (maka
dipasang tulangan sengkang minimum ∅ 10−200 ¿

Tabel penulangan balok induk lantai memanjang 25/50

TABEL PENULANGAN BALOK INDUK LANTAI MEMANJANG


Daerah Mu/Vu As Pakai Tulangan
Tumpuan 402 mm² 2 D 16
Tulangan bagi 265 mm2 2 D 13
40,288 kNm
Lapangan 402 mm² 2 D 16
16,869 kNm
Tulangan bagi 265 mm2 2 D 13
Tumpuan 48,004 kNm - Φ10-400 mm
Sengkang
Lapangan 48,004 kNm - Φ10-200 mm