PENGUJIAN KONSOLIDASI
0.25 0.50
1.00 1.00
2.25 1.50
4.00 2.00
6.25 2.50
9.00 3.00
12.25 3.50
16.00 4.00
25.00 5.00
36.00 6.00
49.00 7.00
64.00 8.00
81.00 9.00
100.00 10.00
121.00 11.00
144.00 12.00
24 jam
Lokasi : Nama :
Titik Bor : Grup :
Kedalaman : Tgl. Uji :
PENGUJIAN KONSOLIDASI
2
Tegangan : kg/cm
Waktu (t) √t Penurunan
Penentuan t90 dng Square-root-of-time methode
(menit) (menit) (mm)
0.00 0.00
0.25 0.50
1.00 1.00
2.25 1.50
4.00 2.00
6.25 2.50
9.00 3.00
12.25 3.50
Penurunan (mm)
16.00 4.00
25.00 5.00
36.00 6.00
49.00 7.00
64.00 8.00
81.00 9.00
100.00 10.00
121.00 11.00
144.00 12.00
24 jam 37.95
A = menit
B =
= menit
0 1 2 3 4 5 6 7 8 9 10 11 12
C = √t90 =
PENGUJIAN KONSOLIDASI
Tekanan Pembacaan Penurunan Tinggi Tinggi Angka Tinggi Benda Uji t90 CV CV
(p) Dial Terakhir (ΔH) Benda Uji (Ht) Pori (Hv) Pori Rata-rata (Hm) Rata-rata
(kg/cm2) (cm) (cm) (cm) (cm) (e) (cm) (menit) (cm2/dtk) (cm2/dtk)
1 2 3 4 5 6 7 8 9 10
0.00
0.25
0.50
1.00
2.00
4.00
8.00
Rebound
2.00
0.25
Pekerjaan : Kedalaman :
Lokasi : Tanggal Uji :
No. Sampel : Dikerjakan Oleh :
TES KONSOLIDASI
GRAFIK HUBUNGAN ANTARA TEKANAN DAN ANGKA PORI
Angka Pori (e)
0.1 1 10 100
Tekanan (kg/cm2)
GRAFIK HUBUNGAN ANTARA TEKANAN DAN KOEFISIEN KONSOLIDASI (Cv)
Koefisien Konsolidasi Cv (cm2/dt)
0.1 1 10 100
Tekanan (kg/cm2)