RENCANA ANGGARAN BIAYA ( RAB )
Program : RAHAB LAP. HR YONIF 731/KABARESI
Pekerjaan : REHAB LAPANGAN HR YONIF 731/ KABARESI
Lokasi : KOTA MASOHI (MALUKU TENGAH)
Thn Anggaran : 2018
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOLUME SATUAN HARGA
Rp Rp
A. PEKERJAAN PERSIAPAN
1. Pek. Pembongkaran m2 4000.00 4,370.00 17,480,000.00
2. Pek. Listrik Kerja Unit 1.00 9,781,120.00 9,781,120.00
3. Air Kerja Ls 1.00 10,000,000.00 10,000,000.00
4 Pek. Papan Nama proyek Ls 1.00 694,390.00 694,390.00
5 Dokumentasi Set 2.00 739,010.00 1,478,020.00
6 Direksi Keet m2 24.00 821,910.00 19,725,840.00
Jumlah 37,261,120.00
JUMLAH A 37,261,120.00
f
PEKERJAAN TOWER AIR 2 BUAH
ANALISA HARGA SATUAN
18. An. Suppl V + 3/4 I. 200 kg Mengerjakan Besi Dengan Upah Memotong
200.000 kg Besi beton a 5.10 1,020.00
4.0000 kg Kawat ikat a 5.10 20.40
13.5000 Tukang besi a 5.10 68.87
13.5000 Pekerja a 5.10 68.87
Jumlah 1,178.13
19. An. Suppl V + F.8. 10 m2. Cetakan Bagisting Beton Tiap 1 m2
0.2800 m3 Kayu klas II a Rp. 5.10 1.43
4.0000 kg Paku campuran a Rp. 5.10 20.40
5.0000 Tukang kayu a Rp. 5.10 25.50
2.0000 Pekerja a Rp. 5.10 10.20
38. An. K.9 + 23 + 30. 10 m2. Pengecatan Dengan Cat Tembok dan Plamir
0.2830 kg Cat tembok a 58.48 16.55
0.0800 kg Plamir tembok a 58.48 4.68
0.1000 lbr Kertas amplas a 58.48 5.85
0.2400 Tukang cat a 58.48 14.04
0.714 0.357
10.2 5.1
12.75 6.375
5.1 2.55
Owner Estimer ( OE )
REKAPITULASI BIAYA
PROGRAM : PENDIDIKAN ANAK USIA DINI, WAJAR DIKDAS 9 TAHUN DAN PENDIDIKAN
MENENGAH KANWIL DEPARTEMEN AGAMA PROVINSI MALUKU
PEKERJAAN : PENYELESAIAN PEMBANGUNAN RUANG GURU DAN RUANG KEPALA
SEKOLAH MAN 1 AMBON 200 M2
LOKASI : WARA- AMBON
THN ANGG. : 2007
TERBILANG : TIGA RATUS LIMA PULUH TUJUH JUTA DUA RATUS LIMA PILIH RIBU RUPIAH,-
Kepda Yth :
Panitia Pelelangan
Proyek Peningkatan Pendidikan Agama dan
Pelatihan Tenaga Kependidikan Ambon
di -
A M B O N.
Dengan Hormat,
Sehubungan Undangan Pelelangan Proyek Peningkatan Pendidikan Agama dan
Pelatihan Tenaga Kependidikan Ambon Tahun Anggaran 2004 Nomor :
15.B/P.PPATK/Bdl.12/5/2004, tanggal 17 Mei 2004 untuk pekerjaan : Pembangunan
Ruang Belajar 2 lantai 400 m2 dan Pembangunan Gedung Asrama 2 lantai 648 m2.
Penawaran tersebut lumpsum dan mengikat dalam jangka waktu 30 (tiga puluh) hari
kalender sesudah tanggal tersebut dalam Surat Penawaran ini.
T. TALAHATU
Direktur
OWNER ESTIMATE
( OE )
PEKERJAAN :
PENYELESAIAN PEMBANGUNAN RUANG GURU DAN
RUANG KEPALA SEKOLAH MAN 1 AMBON 200 M2
LOKASI:
WARA - AMBON
II. PEKERJAAN PASANGAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
III. PEKERJAAN PLESTERAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
IV. PEKERJAAN BETON #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
75
V. PEKERJAAN LANTAI #REF! #REF! #REF! #REF! #REF! #REF!
VI. PEKERJAAN ATAP DAN PLAFON #REF! #REF! #REF! #REF! #REF! #REF!
VII. PEK. KOSEN PINTU, JENDELA, VENTILASI #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VIII. PEKERJAAN PENGECATAN #REF! #REF! #REF! #REF! #REF! #REF! #REF!
C. LANTAI 02
I. PEKERJAAN BETON #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
II. PEKERJAAN PASANGAN/PLESTERAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
IV. PEKERJAAN ATAP DAN PLAFON #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
25
V. PEK. KOSEN PINTU, JENDELA, VENTILASI #REF! #REF! #REF! #REF! #REF! #REF!
T. TALAHATU
Direktur
GRAFIK " S "
JADWAL PELAKSANAAN PEKERJAAN
PROYEK : RAHAB LAP. HR YONIF 731/KABARESI
PEKERJAAN : REHAB LAPANGAN HR YONIF 731/ KABARESI
LOKASI : KOTA MASOHI (MALUKU TENGAH)
THN ANGGARAN : 2018
JUMLAH JANGKA WAKTU PELAKSANAAN 150 (SERATUS LIMA PULUH) HARI KALENDER
NO URAIAN PEKERJAAN HARGA BOBOT BULAN - 1 BULAN - 2 BULAN - 3 BULAN - 4 BULAN - 5 BOBOT
(Rp) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 (%)
6 PEK. PLAT U & BAUT 1/2' 30 CM 292,680.00 0.06 0.01 0.01 0.01 0.01 0.01
7 PEK URAGAN PASIR URUG 21,539.00 0.00 0.00 0.00 0.00 0.00 0.00
3 PAS. BALOK KAYU KLS I DIA. 30/30 CM 29,476,590.00 5.68 1.42 1.42 1.42 1.42 1.42
4 PLESTERAN 1:4 + ACIAN 5,159,556.00 0.99 0.25 0.25 0.25 0.25 0.25
V PEKERJAAN RINTANGAN NO. 5
1 PEK. GALIAN TANAH PONDASI 207,034.80 0.04 0.04
4 PAS. DINDING PAPAN KAYU KLS I TBL 5/25 CM 3,364,929.00 0.65 0.11
3 PEK.COR TIANG BETON BERTULANG dia. 30/30 11,905,248.00 2.29 0.38 2.29
3 PEK. COR PONDASI PLAT BETON 2,569,027.20 0.49 0.07 0.07 0.07 0.49
5 PAS. DINDING PAPAN KAYU KLS I tbl 5/25 cm 7,477,620.00 1.44 0.21 0.21 0.21 0.21
7 PEK. PLAT U & BAUT 1/2' 30 cm 2,926,800.00 0.56 0.08 0.08 0.08 0.08
4 PEK. PENGECATAN TEMBOK 2,562,000.00 0.49 0.12 0.12 0.12 0.12 0.12
4 PAS. KAWAT HARMONIKA 4,011,908.40 0.77 0.15 0.15 0.15 0.15 0.15
7 PEK. PLAT U & BAUT 1/2' 30 cm 1,170,720.00 0.23 0.03 0.03 0.03 0.03 0.03
0
XVIII PEKERJAAN RINTANGAN NO. 18
1 PEK. GALIAN TANAH PONDASI 956,102.40 0.18 0.03 0.03 0.18
7 PEK. PLAT U & BAUT 1/2' 30 cm 1,756,080.00 0.34 0.05 0.05 0.05 0.05 0.05 50
0
XIX PEKERJAAN RINTANGAN NO. 19
1 PEK. GALIAN TANAH PONDASI 724,320.00 0.14 0.14
2 PEK. PLESTERAN 1:4 + ACIAN 3,546,630.00 0.68 0.17 0.17 0.17 0.17 0.17
3 PAS. TALI 1 " cm 3,410,400.00 0.66 0.16 0.16 0.16 0.16 0.16
MUHAMMAD OHORELLA
Direktur
LAPORAN KEMAJUAN PEKERJAAN
% BOBOT VOLUME
No. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA % BOBOT KEMAJUAN REALISASI
Rp Rp PEKERJAAN PEKERJAAN PEKERJAAN
A. PEKERJAAN PERSIAPAN
1. Pek. Pembongkaran m2 4000.00 4,370.00 17,480,000.00 3.10 29.55 3.10
2. Pek. Listrik Kerja Unit 1.00 9,781,120.00 9,781,120.00 1.74 16.53 1.74
3. Air Kerja Ls 1.00 10,000,000.00 10,000,000.00 1.77 16.90 1.77
4. Pek. Papan Nama proyek Ls 1.00 694,390.00 694,390.00 0.12 1.17 0.12
5. Dokumentasi Set 2.00 739,010.00 1,478,020.00 0.26 2.50 0.26
6. Direksi Keet m2 24.00 821,910.00 19,725,840.00 3.50 33.34 3.50
10.49 100.00 10.49
B REHAB HALANG RINTANG
I PEKERJAAN RINTANGAN NO. 1
1 Pek. Galian Tanah pondasi m3 1.18 60,360.00 71,224.80 0.01 1.13 0.01
2 Pek. Cor Pondasi plat beton m3 0.21 6,265,920.00 1,315,843.20 0.23 20.94 0.23
3 Pek. Cor tiang beton 20/20 m3 0.21 5,901,560.00 1,239,327.60 0.22 19.72 0.22
4 Pas. Balok kayu kls I 20/20 cm m 3
0.32 7,477,620.00 2,392,838.40 0.42 0.00 0.06
5 Pek. Pengecatan m2 15.57 61,000.00 949,770.00 0.17 0.00 0.02
6 Pas. Plat U & baut 1/2" 30 cm bh 3.00 97,560.00 292,680.00 0.05 0.00 0.01
7 Pek. Urugan pasir urug m3 0.10 215,390.00 21,539.00 0.00 0.00 0.00
1.11 41.80 0.56
II PEKERJAAN RINTANGAN NO. 2
1 Pek. Galian Tanah pondasi m3 1.18 60,360.00 71,224.80 0.01 1.10 0.01
2 Pek. Cor Pondasi plat beton m3 0.21 6,265,920.00 1,315,843.20 0.23 20.32 0.23
3 Pek. Cor tiang beton 20/20 m3 0.19 5,901,560.00 1,121,296.40 0.20 17.31 0.20
4 Pas. Balok kayu kls I 20/20 cm m3 0.32 7,477,620.00 2,392,838.40 0.42 0.00 0.07
5 Pek. Pengecatan m2 21.02 61,000.00 1,282,220.00 0.23 0.00 0.04
6 Pas. Plat U & baut 1/2" 30 cm bh 3.00 97,560.00 292,680.00 0.05 0.00 0.01
1.15 38.73 0.56
% BOBOT VOLUME
No. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA % BOBOT KEMAJUAN REALISASI
Rp Rp PEKERJAAN PEKERJAAN PEKERJAAN
III PEKERJAAN RINTANGAN NO. 3
1. Pek. Galian Tanah pondasi m3 20.74 60,360.00 1,251,866.40 0.22 6.86 0.22
2. Pek. Pasangan batu kali m3
13.98 800,100.00 11,185,398.00 1.98 61.34 1.98
3. Plesteran 1:4 + acian m2 58.23 99,580.00 5,798,543.40 1.03 31.80 1.03
3.23 100 3.23
IV PEKERJAAN RINTANGAN NO. 4
1 Pek. Galian Tanah pondasi m3 34.56 60,360.00 2,086,041.60 0.370 4.25 0.370
2 Pek. Pasangan batu kali m3 15.40 800,100.00 12,321,540.00 2.186 25.12 2.19
3 Pas. Balok kayu kls I 20/20 cm m3 3.90 7,558,100.00 29,476,590.00 5.229 15.03 1.307
4 Plesteran 1:4 + acian m2 68.52 75,300.00 5,159,556.00 0.915 2.63 0.915
8.70 47.03 4.78
V PEKERJAAN RINTANGAN NO. 5
1 Pek. Galian Tanah pondasi m3 3.43 60,360.00 207,034.80 0.04 1.58 0.04
2 Pek. Cor Pondasi plat beton m3 0.65 6,265,920.00 4,072,848.00 0.72 31.17 0.72
3 Pek. Cor tiang beton + skur m3 0.34 5,901,560.00 2,006,530.40 0.36 15.35 0.36
4 Pas. Dinding papan kayu kls I tbl. 5/25 cm m3 0.45 7,477,620.00 3,364,929.00 0.60 4.29 0.10
5 Pek. Pengecatan m2 32.03 61,000.00 1,953,830.00 0.35 2.49 0.06
6 Pas. Plat U & baut 1/2" 30 cm bh 15.00 97,560.00 1,463,400.00 0.26 1.87 0.04
2.32 56.75 1.32
VI PEKERJAAN RINTANGAN NO. 6
1 Pek. Galian Tanah pondasi m3 17.48 60,360.00 1,055,092.80 0.19 1.92 0.19
2 Pek. Urugan pasir urug m3
6.48 215,390.00 1,395,727.20 0.25 2.54 0.25
3 Pek. Cor tiang beton 20/20 m3 1.90 6,265,920.00 11,905,248.00 2.11 21.70 2.11
4 Pek. Cor tiang beton bertulang 20/20 m3 2.70 5,901,560.00 15,934,212.00 2.83 29.04 2.83
5 Pas. Balok kayu kls I 20/20 cm m2 2.80 7,477,620.00 20,937,336.00 3.71 5.45 0.53
6 Pek. Pengecatan m2 43.80 61,000.00 2,671,800.00 0.47 0.70 0.07
7 Pek. Plat U & baut 1/2" 30 cm bh 10.00 97,560.00 975,600.00 0.17 0.25 0.02
% BOBOT VOLUME
No. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA % BOBOT KEMAJUAN REALISASI
Rp Rp PEKERJAAN PEKERJAAN PEKERJAAN
A. PEKERJAAN PERSIAPAN
1. Pek. Listrik Kerja Unit 1.00 4,905,420.00 4,905,420.00 0.50 35.29 0.50
2. Pek. Papan nama proyek Ls 1.00 595,100.00 595,100.00 0.06 4.28 0.06
3. Direksi keet m2 9.00 801,900.00 7,217,100.00 0.73 51.92 0.73
4. Air Kerja Ls 1.00 500,000.00 500,000.00 0.05 3.60 0.05
5. Dokumentasi Set 1.00 682,550.00 682,550.00 0.07 4.91 0.07
Jumlah 13,900,170.00 1.41 100.00 1.41
B RUMDIS K 45 / 4 KK
I I. PEK. TANAH
1. Pek. Bowplank m1 65.00 54,750.00 3,558,750.00 0.36 15.55 0.36
2. Pek. Galian tanah pondasi m3 57.68 59,810.00 3,449,840.80 0.35 15.08 0.35
3. Pek. Urugan tanah kembali m3 28.84 19,930.00 574,781.20 0.06 2.51 0.06
4. Pek. Urugan sirtu dipadatkan m3 78.53 194,780.00 15,296,073.40 1.55 64.53 1.55
Jumlah 22,879,445.40 2.32 100.00 2.32
II PEK PONDASI & BETON
1 Urugan pasir bwh pondasi m3 5.50 206,080.00 1,134,058.24 0.12 0.82 0.12
2 Pek. Pondasi batu kali m3 30.00 786,810.00 23,604,300.00 2.40 17.16 2.40
3 Pek. Sloof 15/20 m3 4.94 5,681,420.00 28,088,940.48 2.85 20.42 2.85
4 Pek.Beton kolom 20/20 m3 1.02 5,251,380.00 5,377,413.12 0.55 3.91 0.55
5 Pek.Beton kolom 15/15 m3 5.18 5,251,380.00 27,223,153.92 2.77 19.79 2.77
6 Pek.Beton kolom 12/12 m3 1.60 5,251,380.00 8,402,208.00 0.85 6.11 0.85
7 Pek.Beton ring balok 15/20 m3 6.74 5,681,420.00 38,270,045.12 3.89 27.83 3.89
8 Pek. Cor meja dapur m3 0.54 5,681,420.00 3,054,331.39 0.31 2.22 0.31
9 Pek. Carport ( t : 10 cm) m3 3.03 784,140.00 2,374,297.51 0.24 1.73 0.24
Jumlah 137,528,747.78 13.97 100.00 13.97
% BOBOT VOLUME
No. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA % BOBOT KEMAJUAN REALISASI
Rp Rp PEKERJAAN PEKERJAAN PEKERJAAN
III PEKERJAAN DINDING & PLESTERAN
1 Pas. Dinding batako m2 506.97 133,640.00 67,751,417.34 6.88 38.02 6.88
2 Plesteran dinding 1:4 m2 1013.94 46,080.00 46,722,318.34 4.75 26.22 4.75
3 Acian dinding m2 967.94 28,340.00 27,431,396.93 2.79 15.39 2.79
4 Pek. Dinding batu alam m2 89.60 386,510.00 34,631,296.00 3.52 19.43 3.52
5 Pek. Roster angin Bh 64.00 26,089.25 1,669,712.00 0.17 0.94 0.17
Jumlah 178,206,140.61 18.11 100.00 18.11
IV PEK KUSEN PINTU DAN JENDELA
1 Pek. Kusen aluminium 4 " pintu P-1 m1 19.20 139,780.00 2,683,776.00 0.273 4.48 0.273
2 Pek. Kusen aluminium 4 " jendela PJ-2 m1 110.40 139,780.00 15,431,712.00 1.568 25.78 1.568
3 Pek. Kusen aluminium 4 " jendela J-2 m1 72.00 139,780.00 10,064,160.00 1.022 16.82 1.022
4 Pek. Kusen aluminium 4 " jendela BV m1 8.00 139,780.00 1,118,240.00 0.114 1.87 0.114
5 Pek. Pintu panel kayu m2 26.88 588,880.00 15,829,094.40 1.608 26.45 1.61
6 Pek. Pintu aluminium km/wc Set 3.20 982,810.00 3,144,992.00 0.320 5.25 0.320
7 Pek. jendela kaca 5 mm rangka aluminium m2 18.55 624,360.00 11,580,129.79 1.177 19.35 1.177
Jumlah 59,852,104.19 6.08 100.00 6.08
V PEKERJAAN ATAP
1 Pek. Rangka atap baja ringan m2 394.40 218,090.00 86,014,696.00 8.74 67.38 8.74
2 Pek. Genteng metal m2 394.40 83,650.00 32,991,560.00 3.35 25.85 3.35
3 Pek. Bumbungan m2 40.00 96,580.00 3,863,200.00 0.39 3.03 0.39
4 Pek.Seng licin m1 19.20 34,030.00 653,376.00 0.07 0.51 0.07
5 Pek. Calsiplank 30/300 m1 117.60 35,090.00 4,126,584.00 0.42 3.23 0.42
Jumlah 127,649,416.00 12.97 100.00 12.97
VI PEKERJAAN PLAFOND
1 Penutup Plafon Gypsumboard 9mm m2 347.00 139,180.00 48,295,460.00 4.91 0.00 0.00
2 List Plafon Gypsum tinggi 8 cm m1 560.00 34,380.00 19,252,800.00 1.96 0.00 0.00
Jumlah 67,548,260.00 6.86 0.00 0.00
% BOBOT VOLUME
No. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA % BOBOT KEMAJUAN REALISASI
Rp Rp PEKERJAAN PEKERJAAN PEKERJAAN
VII PEKERJAAN LANTAI DAN KERAMIK
1 Pas. Lantai keramik 40x40 m2 192.00 220,980.00 42,428,160.00 4.31 0.00 0.00
2 Pek. Keramik 20/20 KM/WC m2 8.00 215,640.00 1,725,120.00 0.18 0.00 0.00
3 Pas. Keramik 20/25 Km / Wc m2 44.00 223,540.00 9,835,760.00 1.00 0.00 0.00
4 Pek. Keramik 20/20 meja dapur m2 6.72 215,640.00 1,449,100.80 0.15 0.00 0.00
5 Pek. Keramik 20/25 dinding dapur m2 2.00 223,540.00 447,080.00 0.05 0.00 0.00
6 Pek. Cor rabat beton T = 10 cm m3 14.70 784,140.00 11,526,858.00 1.17 0.00 0.00
Jumlah 67,412,078.80 6.85 0.00 0.00
VIII PEKERJAAN SANITAIR DAN PLUMBING
1 Pas. Closet jongkok bh 4.00 840,550.00 3,362,200.00 0.34 0.00 0.00
2 Pas. Kran air Bh 8.00 35,360.00 282,880.00 0.03 0.00 0.00
3 Pas Pipa PVC air bersih dia 3/4 m1 80.00 19,530.00 1,562,400.00 0.16 5.61 0.16
4 Pas. Pipa PVC air kotor dia 2" m1 16.00 52,150.00 834,400.00 0.08 3.00 0.08
5 pas Pipa PVC air bersih dia 4'' m1 16.00 109,370.00 1,749,920.00 0.18 6.29 0.18
6 Pas. Septictank Unit 4.00 4,554,220.00 18,216,880.00 1.85 0.00 0.00
7 Pas. Tempat cuci piring Unit 4.00 426,450.00 1,705,800.00 0.17 0.00 0.00
8 Pek. Floor drain bh 4.00 31,420.00 125,680.00 0.01 0.00 0.00
Jumlah 27,840,160.00 2.83 14.89 0.42
IX PEKERJAAN ALAT PENGGANTUNG
1 Pas. Kunci tanam bh 24.00 184,760.00 4,434,240.00 0.45 0.00 0.00
2 Pek. Engsel pintu bh 72.00 34,440.00 2,479,680.00 0.25 0.00 0.00
3 Pek. Engsel jendela bh 96.00 29,080.00 2,791,680.00 0.28 0.00 0.00
4 Pas. Hak angin bh 96.00 33,630.00 3,228,480.00 0.33 0.00 0.00
5 Pas. Grendel bh 48.00 35,000.00 1,680,000.00 0.17 0.00 0.00
Jumlah 14,614,080.00 1.48 0.00 0.00
X PEKERJAAN PENGECATAN
1 Pengecatan dinding m2 967.94 33,930.00 32,842,204.20 3.34 0.00 0.00
2 Cat plafon m2 347.00 33,930.00 11,773,710.00 1.20 0.00 0.00
3 Cat Kayu m2 26.88 51,680.00 1,389,158.40 0.14 0.00 0.00
Jumlah 46,005,045.46 4.67 0.00 0.00
% BOBOT VOLUME
No. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA % BOBOT KEMAJUAN REALISASI
Rp Rp PEKERJAAN PEKERJAAN PEKERJAAN
XI PEKERJAAN ELEKTRIKAL
1 Instalasi titik lampu Ttk 40.00 273,700.00 10,948,000.00 1.11 0.00 0.00
2 Instalasi titik stop kontak Ttk 20.00 281,280.00 5,625,600.00 0.57 0.00 0.00
3 Pek.Beton ring balok 15/20 bh 40.00 50,000.00 2,000,000.00 0.20 0.00 0.00
4 Pek. Cor meja dapur bh 20.00 32,980.75 659,615.00 0.07 0.00 0.00
5 Pas. Saklar ganda bh 12.00 32,500.00 390,000.00 0.04 0.00 0.00
6 Pas. Saklar tunggal bh 16.00 32,500.00 520,000.00 0.05 0.00 0.00
7 Pek. Titik MCB Ttk 4.00 281,280.00 1,125,120.00 0.11 0.00 0.00
8 Pas. MCB bh 4.00 70,000.00 280,000.00 0.03 0.00 0.00
Jumlah 21,548,335.00 2.19 0.00 0.00
XII PEKERJAAN GOT KELILING
1 Pek. Salura air hujan m1 80.00 113,120.00 9,049,600.00 0.92 0.00 0.00
Jumlah 9,049,600.00 0.92 0.00 0.00
C PRASARANA
I PRASARANA JALAN
1 Pek. Perkerasan badan jalan m3 108.00 194,780.00 21,036,240.00 2.14 0.00 0.00
2 Pek. Saluran drainase m1 95.00 434,200.00 41,249,000.00 4.19 0.00 0.00
3 Pek. Plat beton m3 1.20 5,979,040.00 7,174,848.00 0.73 0.00 0.00
Jumlah 69,460,088.00 7.06 0.00 0.00
II PRASARANA INST AIR BERSIH
1 Pas. Pipa PVC air bersih dia 1" AW m1 56.00 29,140.00 1,631,840.00 0.17 0.00 0.00
Jumlah 1,631,840.00 0.17 0.00 0.00
% BOBOT VOLUME
No. JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA % BOBOT KEMAJUAN REALISASI
Rp Rp PEKERJAAN PEKERJAAN PEKERJAAN
Hari/Tanggal :
Pekerjaan :
Bagian/sub Bagian :
1,400,000
1,300,000
6,000,000
4,000,000
2,100,000
14,800,000
13,900,170
22,879,445
137,528,747
178,206,140
127,649,416
59,852,104
540,016,022 55