Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.)
Pek. Papan Nama Infor Ls 1.00 500,000.00 10.00 50,000.00
Pek. Papan Nama ProgrLs 1.00 500,000.00 10.00 50,000.00
Pek. Prsasti Ls 1.00 1,500,000.00 10.00 150,000.00
Pengadaan Air Kerja Ls 1.00 1,500,000.00 10.00 150,000.00
Peng. Alat Kesehatan, KLs 1.00 1,500,000.00 10.00 150,000.00
Pek. Pemasangan Bowpm 42.00 50,000.00 10.00 210,000.00
Pek. Galian Tanah Ponda m3 6.30 135,125.00 10.00 85,128.75
Pek. Urugan Kembali bem3 1.89 97,750.00 10.00 18,474.75
Pek. Urugan Pasir Bawam3 1.47 54,050.00 10.00 7,945.35
Pas. Pondasi Batu Koso m3 2.10 502,982.00 10.00 105,626.22
Pas. Pondasi Batu Kara m3 6.88 1,406,096.00 10.00 967,394.05
Pek. Angkur Besi 10 padttk 31.00 10,000.00 10.00 31,000.00
Pek. Adukan Beton dudm3 0.37 1,444,499.00 10.00 53,446.46
Pek. Beton Sloof Utamam3 0.98 7,671,731.00 10.00 751,829.64
Pek. Beton Sloof Selasam3 0.13 7,671,731.00 10.00 99,732.50
Pek. Beton Kolom Utama m3 0.76 7,024,281.00 10.00 533,845.36
Pek. Beton Kolom Selasm3 0.43 7,024,281.00 10.00 302,044.08
Pek. Beton Kolom Praktim3 20.00 120,017.00 10.00 240,034.00
Pek. Beton Balok Konsolm3 0.03 8,024,781.00 10.00 24,074.34
Pek. Beton Balok Konsom3 0.04 8,024,781.00 10.00 32,099.12
Pek. Beton Balok Gantum3 0.17 8,024,781.00 10.00 136,421.28
Pek. Beton Ring Balok 1m3 0.54 8,024,781.00 10.00 433,338.17
Pek. Angkur Besi 10 padttk 95.00 10,000.00 10.00 95,000.00
Pas. Dinding Batako 14 m2 47.30 268,006.00 10.00 1,267,668.38
Pek. Plesteran Dinding m2 94.60 147,612.00 10.00 1,396,409.52
Pek. Acian Kolom Utamam2 12.00 70,035.00 10.00 84,042.00
Pek. Acian Kolom Selasam2 4.27 70,035.00 10.00 29,904.95
Pek. Acian Balok Konsolm2 2.00 70,035.00 10.00 14,007.00
Pek. Acian Balok Gantunm2 4.40 70,035.00 10.00 30,815.40
Pek. Kusen Pintu ( P1) Kam3 0.19 8,754,375.00 10.00 166,333.13
Pek. Kusen Jendela ( J1 )m3 0.25 8,754,375.00 10.00 218,859.38
Pek. Kusen Jendela ( J2 )m3 0.44 8,754,375.00 10.00 385,192.50
Pek. Daun Pintu ( P1 ) Km2 3.78 1,172,425.00 10.00 443,176.65
Pek. Daun Jendela Kacam2 ( 3.74 1,291,795.00 10.00 483,131.33
Pek. Jalusi Kusen Pintu m2 4.20 825,700.00 10.00 346,794.00
Pek. Kusen Layang - La m3 0.19 8,754,375.00 10.00 166,333.13
Pek. Jalusi Kusen Layangm2 2.52 825,700.00 10.00 208,076.40
Kaca Mati m2 2.64 453,043.00 10.00 119,603.35
Pek. Rangka Atap Baja m2 101.66 313,375.00 10.00 3,185,770.25
Pek. Penutup Atap Zyn m2 101.66 125,385.00 10.00 1,274,663.91
Pek. Nok Zyncalum 0, m1 10.00 49,200.00 10.00 49,200.00
Pemasangan lisplank P m1 40.00 95,450.00 10.00 381,800.00
Pek. Rangka Plafond Kayu m2 72.00 159,735.00 10.00 1,150,092.00
Pek. Penutup Plafond Tm2 72.00 83,605.00 10.00 601,956.00
Pek. List Plafond 3/3 m 52.00 61,065.00 10.00 317,538.00
Pek. Urugan Tanah bawa m3 21.67 251,390.00 10.00 544,762.13
Pek. Urugan Pasir bawah m3 3.87 54,050.00 10.00 20,917.35
Pek. Beton Tumbuk Lanta m3 2.53 1,444,499.00 10.00 365,458.25
Pek. Lantai keramik int m2 52.81 293,497.00 10.00 1,549,957.66
Pek. Lantai keramik extem2 16.00 293,497.00 10.00 469,595.20
Pek. Cat Dinding berikum2 94.60 35,374.00 10.00 334,638.04
Pek. Cat Plafond berikum2 72.00 34,965.00 10.00 251,748.00
Pek. Cat Kayu berikut mm2 31.97 100,119.00 10.00 320,080.44
Pas. Instalasi Listrik m 10.00 30,952.00 10.00 30,952.00
Pas. Instalasi Titik La ttk 10.00 30,952.00 10.00 30,952.00
Pas. Instalasi Titik Sak ttk 2.00 228,275.00 10.00 45,655.00
Pas. Instalasi Lampu Pij bh 10.00 60,000.00 10.00 60,000.00
Pas. MCB + Box Sekringbh 1.00 409,113.00 10.00 40,911.30
Pas. Kabel Antar Bang m 11.00 108,000.00 10.00 118,800.00
Pas. Engsel Pintu 4 (3bhbh 4.00 70,323.00 10.00 28,129.20
Pas. Engsel Jendela 3 ( bh 12.00 50,025.00 10.00 60,030.00
Pas. Kait / Hak Angin (2 bh 12.00 54,683.00 10.00 65,619.60
Pas. Slot Pintu (2 bh/p bh 2.00 80,270.00 10.00 16,054.00
Pas. Grendel Jendela bh 12.00 80,270.00 10.00 96,324.00
Pas. Kunci Pintu 2 X Putabh 2.00 252,253.00 10.00 50,450.60
Meja Baca Serbaguna bh 7.00 1,500,000.00 10.00 1,050,000.00
Meja Kerja bh 2.00 1,500,000.00 10.00 300,000.00
Kursi Siswa Tunggal bh 14.00 900,000.00 10.00 1,260,000.00
Kursi Kerja bh 1.00 1,200,000.00 10.00 120,000.00
Papan Tulis Gantung bh 1.00 600,000.00 10.00 60,000.00
Kotak Sampah bh 2.00 340,000.00 10.00 68,000.00
erabotnya SD Inpres Padang