batching plant

bersama ini kami tawarkan harga pembuatan , dan seting bathing plant
di banjarnegara dengan rincian sbb :
no items list dimension jml sat harsat total keterangan
A silo cemen
1 silo semen cap @ 50 ton 2 units 115,000,000.0 230,000,000.0
dinding silo plat 5 mm -
kaki silo pipa dia 6 "
dust collector
silo valve dia 8 "
2 screw conveyor dia 8 " x 6 meter 2 units 55,000,000.0 110,000,000.0
3 cement weigher cap 1.300 kg 1 units 45,000,000.0 45,000,000.0
electronic weighing scale
4 water weigher cap 1.000 kg 1 units 30,000,000.0 30,000,000.0
electronic weighing scale
5 Incline conveyor Width 750 x 10.000 mm length 1 units 60,000,000.0 60,000,000.0
6 hopper marterial - 200 x 7.500 x 3.700 cm 1 units 225,000,000.0 225,000,000.0
- 3 compartment
- material weigher cap 6 ton
- conveyor flat width 700 x 8000 mm length
- dinding hopper plat t -5 mm
- dinding material weigher plat t - 6 mm
- weigher material cap 6 ton
- frame h beam 125
7 control room 1 units 65,000,000.0 65,000,000.0
- electrical panel -
- compessor
- air piping
8 water pump cap 500 l/m 1 units 3,000,000.0 3,000,000.0
water piping to batcing plant -
9 painting 1 ls 40,000,000.0 40,000,000.0
10 ongkos kirim 1 ls 80,000,000.0 80,000,000.0
11 pasang 1 ls 60,000,000.0 60,000,000.0
total - RP 948,000,000.0
total - Rp. 948.000.000,- ( sembilan ratus empat puluh delapan juta rupiah )
demikian penawaran dari kami dan atas terealisasinya kami sampaikan terima kasih.

note :
-1.term of payment -
- DP 50 % saat spk kami terima
- 20 % saat pekerjaan selesai 50 %
- 20 % saat pengiriman sidoarjo 5 juni 2017
- 10 % saat pekerjaan selesai hormat kami
- waktu pembuatan 60 hari
- waktu pemasangan 20 hari

-2.fasilitas & akomodasi


- crane 50 ton telescopic dari owner ( saat erection)
- power listrik dari owner ( saat erection) supartono
- tempat pekerja dari owner ( saat erection)

Anda mungkin juga menyukai