I PEKERJAAN PERSIAPAN
1.1 PEMBERSIHAN LAHAN 451.5 m2
1.2 PENGUKURAN DAN BOWPLANG 97.5 m
1.3 PENYEDIAAN AIR KERJA 1 ls
1.4 ADMINISTRASI 1 ls
1.5 PAPAN NAMA PROYEK 1 ls
1.6 LISTRIK KERJA HARIAN 1 ls
1.7 PRASASTI PERESMIAN 1 ls
1.8 PEMBUATAN PAGAR PENGAMAN 1 ls
1.9 BIAYA IMB 1 ls
II PEKERJAAN PONDASI
2.1 PONDASI FOOTPLAT
2.1.1 GALIAN TANAH FOOTPLAT 259 m3
2.1.1.1 TYPE 1 62.72 m3
2.1.1.2 TYPE 2 150.92 m3
2.1.1.3 TYPE 3 45.36 m3
PEKERJAAN LANTAI I
III.A PEKERJAAN STRUKTUR
3.1 PEK. SLOOF BETON BERTULANG
3.1.1 TYPE S1
Pembesian 2353.659 kg
Bekisting 154 m2
Beton Cor K-225 15.4 m3
3.1.2 TYPE S2
Pembesian 48.7084 kg
Bekisting 3.9 m2
Beton Cor K-225 0.293 m3
PEKERJAAN LANTAI II
III.B PEKERJAAN STRUKTUR
3.2 PEK. KOLOM BETON BERTULANG
3.2.3 TYPE K3
Pembesian 1672.651 kg
Bekisting 123.5 m2
Beton Cor K-250 7.719 m3
3.2.4 TYPE K4
Pembesian 259.738 kg
Bekisting 19 m2
Beton Cor K-250 1.781 m3
3.2.5 TYPE KP
Pembesian 157.445 kg
REKAPITULASI VOLUME PEKERJAAN PEMBANGUNAN PMI BOYOLALI
Bekisting 19.95 m2
Beton Cor K-250 0.748 m3
3.4.3 TYPE R3
Pembesian 633.320 kg
Bekisting 70.62 m2
Beton Cor K-250 3.852 m3
6.1.3.5Handel 4 bh
6.1.3.6Engsel 4 bh
6.2 JENDELA
6.2.2 TYPE J2 (6 BUAH)
6.2.2.1 Kusen Alumunium 73.2 m
6.2.2.2 Daun Jendela 56.52 m2
6.2.2.3 Kaca T = 5 mm 4.32 m2
6.2.2.4 Kaca T = 8 mm 7.334 m2
6.2.2.5 Engsel 36 bh
Kaca T = 8 mm 9.178 m2
I PEKERJAAN PERSIAPAN
1.1 PEMBERSIHAN LAHAN
1 m2 Membersihkan Lapangan dan Perataan
A. Tenaga Rp 9,000.00
Pekerja 0.1 OH Rp 55,000.00 Rp 5,500.00
Mandor 0.05 OH Rp 70,000.00 Rp 3,500.00
B. Bahan
C. Peralatan
D. Jumlah ( A+B+C ) Rp 9,000.00
E. Overhead & Profit ( 10% ) Rp 900.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 9,900.00
1.2 PENGUKURAN DAN BOWPLANNK
1 m' Pengukuran dan Pemasangan Bouwplank
A. Tenaga Rp 14,150.00
Pekerja 0.1 OH Rp 55,000.00 Rp 5,500.00
Tukang Kayu 0.1 OH Rp 75,000.00 Rp 7,500.00
Kepala Tukang 0.01 OH Rp 80,000.00 Rp 800.00
Mandor 0.005 OH Rp 70,000.00 Rp 350.00
B. Bahan Rp 107,060.00
3
Kayu 5/7 x 4m Kayu Kruing 0.012 m Rp 5,400,000.00 Rp 64,800.00
Paku Biasa 2" - 5" 0.02 kg Rp 13,000.00 Rp 260.00
Kayu Papan 3/20 Kruing 0.007 m3 Rp 6,000,000.00 Rp 42,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 121,210.00
E. Overhead & Profit ( 10% ) Rp 12,121.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 672,013.91
Portland Semen 230 kg Rp 1,300.00 Rp 299,000.00
Pasir Beton 893 kg Rp 192.86 Rp 172,223.98
Kerikil (Maksimum 30mm) 1027 kg Rp 192.59 Rp 197,789.93
Air 200 ltr Rp 15.00 Rp 3,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 755,033.91
E. Overhead & Profit ( 10% ) Rp 75,503.39
F. Harga Satuan Pekerjaan ( D+E ) Rp 830,537.30
3.2 1 m3 Membuat Beton Mutu f'c = 19.3 Mpa (K225), slum (12±2)cm, w/c = 0.58
A. Tenaga Rp 119,425.00
Pekerja 1.65 OH Rp 55,000.00 Rp 90,750.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 821,783.01
Portland Semen 371 kg Rp 1,300.00 Rp 482,300.00
Pasir Beton 698 kg Rp 192.86 Rp 134,616.28
Kerikil (Maksimum 30mm) 1047 kg Rp 192.59 Rp 201,641.73
Air 215 ltr Rp 15.00 Rp 3,225.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 941,208.01
E. Overhead & Profit ( 10% ) Rp 94,120.80
F. Harga Satuan Pekerjaan ( D+E ) Rp 1,035,328.81
3.3 1 m3 Membuat Beton Mutu f'c = 21,7 Mpa (K250), slum (12±2)cm, w/c = 0.56
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
A. Tenaga Rp 119,425.00
Pekerja 1.65 OH Rp 55,000.00 Rp 90,750.00
Tukang Batu 0.275 OH Rp 75,000.00 Rp 20,625.00
Kepala Tukang 0.028 OH Rp 80,000.00 Rp 2,240.00
Mandor 0.083 OH Rp 70,000.00 Rp 5,810.00
B. Bahan Rp 835,985.13
Portland Semen 384 kg Rp 1,300.00 Rp 499,200.00
Pasir Beton 692 kg Rp 192.86 Rp 133,459.12
Kerikil (Maksimum 30mm) 1039 kg Rp 192.59 Rp 200,101.01
Air 215 ltr Rp 15.00 Rp 3,225.00
C. Peralatan
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 133,425.00
Besi Beton (polos/ulir) 10.5 kg Rp 12,500.00 Rp 131,250.00
Kawat Beton 0.15 ltr Rp 14,500.00 Rp 2,175.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 143,365.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
B. Bahan Rp 84,800.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 136,800.00
E. Overhead & Profit ( 10% ) Rp 13,680.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 150,480.00
4.2 1 m2 Memasang Bekisting untuk Sloof
A. Tenaga Rp 52,000.00
Pekerja 0.52 OH Rp 55,000.00 Rp 28,600.00
Tukang Kayu 0.26 OH Rp 75,000.00 Rp 19,500.00
Kepala Tukang 0.026 OH Rp 80,000.00 Rp 2,080.00
Mandor 0.026 OH Rp 70,000.00 Rp 1,820.00
B. Bahan Rp 94,800.00
Kayu Klas III (Terentang) 0.045 m3 Rp 2,000,000.00 Rp 90,000.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
C. Peralatan
D. Jumlah ( A+B+C ) Rp 146,800.00
E. Overhead & Profit ( 10% ) Rp 14,680.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 161,480.00
4.3 1 m2 Memasang Bekisting untuk Kolom
A. Tenaga Rp 66,000.00
Pekerja 0.66 OH Rp 55,000.00 Rp 36,300.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 242,500.00
3
Kayu Klas III (Terentang) 0.04 m Rp 2,000,000.00 Rp 80,000.00
Paku Biasa 2" - 5" 0.4 kg Rp 13,000.00 Rp 5,200.00
Minyak Bekisting 0.2 ltr Rp 9,000.00 Rp 1,800.00
Balok Kayu Klas II 0.015 m3 Rp 5,400,000.00 Rp 81,000.00
Plywood tebal 9mm 0.35 lbr Rp 110,000.00 Rp 38,500.00
Dolken Kayu Galam diameter 8-10 cm / 4 m 2 btg Rp 18,000.00 Rp 36,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 308,500.00
E. Overhead & Profit ( 10% ) Rp 30,850.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 339,350.00
4.4 1 m2 Memasang Bekisting untuk Balok
A. Tenaga Rp 66,000.00
B. Bahan Rp 258,700.00
Kayu Klas III (Terentang) 0.04 m3 Rp 2,000,000.00 Rp 80,000.00
Paku Biasa 2" - 5" 0.4 kg Rp 13,000.00 Rp 5,200.00
Minyak Bekisting 0.2 ltr Rp 9,000.00 Rp 1,800.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 324,700.00
E. Overhead & Profit ( 10% ) Rp 32,470.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 357,170.00
4.5 1 m2 Memasang Bekisting untuk Tangga
A. Tenaga Rp 66,000.00
Pekerja 0.66 OH Rp 55,000.00 Rp 36,300.00
Tukang Kayu 0.33 OH Rp 75,000.00 Rp 24,750.00
Kepala Tukang 0.033 OH Rp 80,000.00 Rp 2,640.00
Mandor 0.033 OH Rp 70,000.00 Rp 2,310.00
B. Bahan Rp 222,050.00
Kayu Klas III (Terentang) 0.03 m3 Rp 2,000,000.00 Rp 60,000.00
Paku Biasa 2" - 5" 0.4 kg Rp 13,000.00 Rp 5,200.00
Minyak Bekisting 0.15 ltr Rp 9,000.00 Rp 1,350.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
C. Peralatan
D. Jumlah ( A+B+C ) Rp 288,050.00
E. Overhead & Profit ( 10% ) Rp 28,805.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 316,855.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 314,500.00
3
Kayu Klas III (Terentang) 0.04 m Rp 2,000,000.00 Rp 80,000.00
Paku Biasa 2" - 5" 0.4 kg Rp 13,000.00 Rp 5,200.00
Minyak Bekisting 0.2 ltr Rp 9,000.00 Rp 1,800.00
Balok Kayu Klas II (Borneo) 0.015 m3 Rp 5,400,000.00 Rp 81,000.00
Plywood tebal 9mm 0.35 lbr Rp 110,000.00 Rp 38,500.00
Dolken Kayu Galam diameter 8-10 cm / 4 m 6 btg Rp 18,000.00 Rp 108,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 380,500.00
E. Overhead & Profit ( 10% ) Rp 38,050.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 418,550.00
4.7 1 m2 Memasang Bekisting untuk Atap
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
A. Tenaga Rp 66,000.00
Pekerja 0.66 OH Rp 55,000.00 Rp 36,300.00
Tukang Kayu 0.33 OH Rp 75,000.00 Rp 24,750.00
Kepala Tukang 0.033 OH Rp 80,000.00 Rp 2,640.00
Mandor 0.033 OH Rp 70,000.00 Rp 2,310.00
B. Bahan Rp 314,500.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 380,500.00
E. Overhead & Profit ( 10% ) Rp 38,050.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 418,550.00
V. PEKERJAAN PASANGAN BATU BATA DAN PLESTERAN
5.1 1 m2 Pemasangan Dinding Bata Merah Ukuran(5x11x22)cm Tebal 1/2 Bata Camp. 1PS : 3PP
A. Tenaga Rp 25,850.00
Pekerja 0.3 OH Rp 55,000.00 Rp 16,500.00
Tukang Batu 0.1 OH Rp 75,000.00 Rp 7,500.00
Kepala Tukang 0.01 OH Rp 80,000.00 Rp 800.00
Mandor 0.015 OH Rp 70,000.00 Rp 1,050.00
B. Bahan Rp 61,681.00
Bata Merah 5 x 11 x 22 70 Buah Rp 500.00 Rp 35,000.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
C. Peralatan
D. Jumlah ( A+B+C ) Rp 87,531.00
E. Overhead & Profit ( 10% ) Rp 8,753.10
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 56,584.00
Bata Merah 5 x 11 x 22 70 Buah Rp 500.00 Rp 35,000.00
Portland Semen 9.68 kg Rp 1,300.00 Rp 12,584.00
Pasir Pasang 0.045 m3 Rp 200,000.00 Rp 9,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 82,434.00
E. Overhead & Profit ( 10% ) Rp 8,243.40
F. Harga Satuan Pekerjaan ( D+E ) Rp 90,677.40
5.3 1 m2 Pemasangan Plesteran 1PC : 3PP Tebal 20 mm
A. Tenaga Rp 31,810.00
Pekerja 0.26 OH Rp 55,000.00 Rp 14,300.00
Tukang Batu 0.2 OH Rp 75,000.00 Rp 15,000.00
Kepala Tukang 0.02 OH Rp 80,000.00 Rp 1,600.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
B. Bahan Rp 19,678.40
Portland Semen 10.368 kg Rp 1,300.00 Rp 13,478.40
Pasir Pasang 0.031 m3 Rp 200,000.00 Rp 6,200.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 51,488.40
E. Overhead & Profit ( 10% ) Rp 5,148.84
F. Harga Satuan Pekerjaan ( D+E ) Rp 56,637.24
5.4 1 m2 Pemasangan Plesteran 1PC : 5PP Tebal 20 mm
A. Tenaga Rp 40,140.00
Pekerja 0.4 OH Rp 55,000.00 Rp 22,000.00
Tukang Batu 0.2 OH Rp 75,000.00 Rp 15,000.00
Kepala Tukang 0.02 OH Rp 80,000.00 Rp 1,600.00
Mandor 0.022 OH Rp 70,000.00 Rp 1,540.00
B. Bahan Rp 15,985.60
Portland Semen 6.912 kg Rp 1,300.00 Rp 8,985.60
3
Pasir Pasang 0.035 m Rp 200,000.00 Rp 7,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 56,125.60
E. Overhead & Profit ( 10% ) Rp 5,612.56
F. Harga Satuan Pekerjaan ( D+E ) Rp 61,738.16
5.5 1 m2 Pemasangan Acian
A. Tenaga Rp 20,000.00
Pekerja 0.2 OH Rp 55,000.00 Rp 11,000.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
B. Bahan Rp 4,225.00
Portland Semen 3.25 kg Rp 1,300.00 Rp 4,225.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 24,225.00
E. Overhead & Profit ( 10% ) Rp 2,422.50
F. Harga Satuan Pekerjaan ( D+E ) Rp 26,647.50
VI. PEKERJAAN KUSEN
6.1 1 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III
A. Tenaga Rp 107,660.00
Pekerja 0.35 OH Rp 55,000.00 Rp 19,250.00
Tukang Kayu 1.05 OH Rp 75,000.00 Rp 78,750.00
Kepala Tukang 0.105 OH Rp 80,000.00 Rp 8,400.00
Mandor 0.018 OH Rp 70,000.00 Rp 1,260.00
B. Bahan Rp 304,650.00
Kayu Klas II (Kamfer) papan 0.04 m3 Rp 7,600,000.00 Rp 304,000.00
Paku Biasa 2" - 5" 0.05 kg Rp 13,000.00 Rp 650.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 412,310.00
E. Overhead & Profit ( 10% ) Rp 41,231.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 453,541.00
6.2 1m' Pemasangan Kusen Pintu Allumunium
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
A. Tenaga Rp 6,081.00
Pekerja 0.043 OH Rp 55,000.00 Rp 2,365.00
Tukang Besi 0.043 OH Rp 75,000.00 Rp 3,225.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 92,500.00
Profil Allumunium 1.1 m' Rp 80,000.00 Rp 88,000.00
Skrup Fixer 2 bh Rp 750.00 Rp 1,500.00
Seatant 0.06 tube Rp 50,000.00 Rp 3,000.00
3
C. Peralatan
D. Jumlah ( A+B+C ) Rp 98,581.00
E. Overhead & Profit ( 10% ) Rp 9,858.10
F. Harga Satuan Pekerjaan ( D+E ) Rp 108,439.10
6.3 1 m2 Pemasangan Pintu Kaca Rangka Allumunium
A. Tenaga Rp 12,120.00
Pekerja 0.085 OH Rp 55,000.00 Rp 4,675.00
Tukang Besi 0.085 OH Rp 75,000.00 Rp 6,375.00
Kepala Tukang 0.009 OH Rp 80,000.00 Rp 720.00
Mandor 0.005 OH Rp 70,000.00 Rp 350.00
B. Bahan Rp 388,000.00
Pintu Allumunium 4.4 m' Rp 80,000.00 Rp 352,000.00
Profil Kaca 4.5 bh Rp 5,000.00 Rp 22,500.00
Seatant 0.27 tube Rp 50,000.00 Rp 13,500.00
3
C. Peralatan
D. Jumlah ( A+B+C ) Rp 400,120.00
B. Bahan Rp 6,000.00
Engsel Pintu 1 bh Rp 6,000.00 Rp 6,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 19,800.00
E. Overhead & Profit ( 10% ) Rp 1,980.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 21,780.00
6.5 1 m2 Pemasangan Kaca tebal 5 mm
A. Tenaga Rp 13,327.50
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.00075 OH Rp 70,000.00 Rp 52.50
B. Bahan Rp 77,000.00
2
Kaca Tebal 5 mm 1.1 m Rp 70,000.00 Rp 77,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 90,327.50
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
B. Bahan Rp 154,000.00
2
Kaca Tebal 8 mm 1.1 m Rp 140,000.00 Rp 154,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 167,327.50
E. Overhead & Profit ( 10% ) Rp 16,732.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 184,060.25
6.7 1 Buah Pemasangan Handle Pintu HINGE ES SL 9″ SN
A. Tenaga Rp 13,800.00
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.0075 OH Rp 70,000.00 Rp 525.00
B. Bahan Rp 50,000.00
Handle Pintu 1 bh Rp 50,000.00 Rp 50,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 63,800.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 68,750.00
Kaca Buram T = 5 mm 1.1 m2 Rp 62,500.00 Rp 68,750.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 82,077.50
E. Overhead & Profit ( 10% ) Rp 8,207.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 90,285.25
6.9 1 m2 Pembuatan & Pemasangan Pintu Kayu Lapis ( Plywood ) Rangkap Rangka Kayu Klass II ( lbr s/d 90 cm )
A. Tenaga Rp 13,327.50
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.00075 OH Rp 70,000.00 Rp 52.50
B. Bahan Rp 297,390.00
3
Kayu Klas II (Kamfer) papan 0.025 m Rp 7,600,000.00 Rp 190,000.00
Paku Biasa 1/2" - 1" 0.03 kg Rp 13,000.00 Rp 390.00
Lem Kayu 0.5 lbr Rp 18,000.00 Rp 9,000.00
Multipleks ( 9 mm ) 1 lbr Rp 98,000.00 Rp 98,000.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 310,717.50
E. Overhead & Profit ( 10% ) Rp 31,071.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 341,789.25
VII. PEKERJAAN MECHANICAL AND ELECTRICAL
VIII. PEKERJAAN SANITASI
8.1 1 Unit Memasang Closet Jongkok Porselen
A. Tenaga Rp 298,700.00
Pekerja 1 OH Rp 55,000.00 Rp 55,000.00
Tukang Batu 1.5 OH Rp 75,000.00 Rp 112,500.00
Kepala Tukang 1.5 OH Rp 80,000.00 Rp 120,000.00
Mandor 0.16 OH Rp 70,000.00 Rp 11,200.00
B. Bahan Rp 149,800.00
Kloset Jongkok 1 bh Rp 140,000.00 Rp 140,000.00
Portland Semen 6 kg Rp 1,300.00 Rp 7,800.00
Pasir Pasang 0.01 m3 Rp 200,000.00 Rp 2,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 448,500.00
E. Overhead & Profit ( 10% ) Rp 44,850.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 493,350.00
8.2 1 Unit Memasang Wastafel
A. Tenaga Rp 95,875.00
Pekerja 1.2 OH Rp 55,000.00 Rp 66,000.00
Tukang Batu 0.145 OH Rp 75,000.00 Rp 10,875.00
Kepala Tukang 0.15 OH Rp 80,000.00 Rp 12,000.00
Mandor 0.1 OH Rp 70,000.00 Rp 7,000.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 367,300.00
Wastafel 1 bh Rp 275,000.00 Rp 275,000.00
Perlengkapan 30% Harga Wastafel 0.3 Rp 275,000.00 Rp 82,500.00
Portland Semen 6 kg Rp 1,300.00 Rp 7,800.00
Pasir Pasang 0.01 m3 Rp 200,000.00 Rp 2,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 463,175.00
E. Overhead & Profit ( 10% ) Rp 46,317.50
F. Harga Satuan Pekerjaan ( D+E ) Rp 509,492.50
8.3 1 Unit Memasang Bak Mandi Batu Bata Vol. 0.30 m3
A. Tenaga Rp 581,100.00
Pekerja 6 OH Rp 55,000.00 Rp 330,000.00
Tukang Batu 3 OH Rp 75,000.00 Rp 225,000.00
Kepala Tukang 0.3 OH Rp 80,000.00 Rp 24,000.00
Mandor 0.03 OH Rp 70,000.00 Rp 2,100.00
B. Bahan Rp 529,392.00
Batu Bata 150 bh Rp 500.00 Rp 75,000.00
Portland Semen 120 kg Rp 1,300.00 Rp 156,000.00
Pasir Pasang 0.3 m3 Rp 200,000.00 Rp 60,000.00
Porselen 11 x 11 cm 360 bh Rp 512.20 Rp 184,392.00
Semen Nat 6 kg Rp 9,000.00 Rp 54,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 1,110,492.00
E. Overhead & Profit ( 10% ) Rp 111,049.20
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 15,000.00
Floor Drain 1 bh Rp 15,000.00 Rp 15,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 24,200.00
E. Overhead & Profit ( 10% ) Rp 2,420.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 26,620.00
8.5 1 Buah Pemasangan Bak Kontrol Pas. Batu Bata 45 x 45 tinggi 50 cm
A. Tenaga Rp 264,250.00
Pekerja 3.2 OH Rp 55,000.00 Rp 176,000.00
Tukang Batu 1.15 OH Rp 75,000.00 Rp 86,250.00
Kepala Tukang 0.011 OH Rp 80,000.00 Rp 880.00
Mandor 0.016 OH Rp 70,000.00 Rp 1,120.00
B. Bahan Rp 203,100.00
Batu Bata 70 bh Rp 500.00 Rp 35,000.00
Portland Semen 77 kg Rp 1,300.00 Rp 100,100.00
Pasir Pasang 0.13 m3 Rp 200,000.00 Rp 26,000.00
3
Pasir Beton 0.09 m Rp 270,000.00 Rp 24,300.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 467,350.00
E. Overhead & Profit ( 10% ) Rp 46,735.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 514,085.00
8.6 1 Buah Pemasangan Kran diameter 1/2" atau 3/4"
A. Tenaga Rp 34,100.00
Pekerja 0.01 OH Rp 55,000.00 Rp 550.00
Tukang Batu 0.4 OH Rp 75,000.00 Rp 30,000.00
Kepala Tukang 0.04 OH Rp 80,000.00 Rp 3,200.00
Mandor 0.005 OH Rp 70,000.00 Rp 350.00
B. Bahan Rp 15,009.75
Kran Air 1 bh Rp 15,000.00 Rp 15,000.00
Sealtape 0.0025 kg Rp 3,900.00 Rp 9.75
C. Peralatan
D. Jumlah ( A+B+C ) Rp 49,109.75
E. Overhead & Profit ( 10% ) Rp 4,910.98
F. Harga Satuan Pekerjaan ( D+E ) Rp 54,020.73
8.7 1 m' Pemasangan Pipa PVC tipe AW diameter 2.5"
A. Tenaga Rp 15,940.00
Pekerja 0.081 OH Rp 55,000.00 Rp 4,455.00
Tukang Batu 0.135 OH Rp 75,000.00 Rp 10,125.00
Kepala Tukang 0.0135 OH Rp 80,000.00 Rp 1,080.00
Mandor 0.004 OH Rp 70,000.00 Rp 280.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 51,666.66
Pipa PVC diameter 2.5" 1.2 m' Rp 33,333.33 Rp 40,000.00
Perlengkapan 35% x pipa 0.35 Ls Rp 33,333.33 Rp 11,666.67
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
C. Peralatan
D. Jumlah ( A+B+C ) Rp 67,606.66
E. Overhead & Profit ( 10% ) Rp 6,760.67
F. Harga Satuan Pekerjaan ( D+E ) Rp 74,367.33
8.8 1 m' Pemasangan Pipa PVC tipe AW diameter 4"
A. Tenaga Rp 7,100.00
Pekerja 0.036 OH Rp 55,000.00 Rp 1,980.00
Tukang Batu 0.06 OH Rp 75,000.00 Rp 4,500.00
Kepala Tukang 0.006 OH Rp 80,000.00 Rp 480.00
Mandor 0.002 OH Rp 70,000.00 Rp 140.00
B. Bahan Rp 77,500.00
Pipa PVC diameter 4" 1.2 m' Rp 50,000.00 Rp 60,000.00
Perlengkapan 35% x pipa 0.35 Ls Rp 50,000.00 Rp 17,500.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 84,600.00
E. Overhead & Profit ( 10% ) Rp 8,460.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 93,060.00
IX. PEKERJAAN FINISHING
9.1 1 m2 Memasang Langit-Langit Gypsum Board, Uk (120x240) tebal 9 mm
A. Tenaga Rp 10,070.00
Pekerja 0.1 OH Rp 55,000.00 Rp 5,500.00
Tukang Kayu 0.05 OH Rp 75,000.00 Rp 3,750.00
Kepala Tukang 0.005 OH Rp 80,000.00 Rp 400.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 25,310.00
Gypsum Board 0.364 lbr Rp 65,000.00 Rp 23,660.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 35,380.00
E. Overhead & Profit ( 10% ) Rp 3,538.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 38,918.00
9.2 1 m2 Pemasangan Rangka Besi Hollow 1 x 40.40.2 mm; Modul 60x60 cm dinding plafond
A. Tenaga Rp 49,560.00
Pekerja 0.35 OH Rp 55,000.00 Rp 19,250.00
Tukang Besi 0.35 OH Rp 75,000.00 Rp 26,250.00
Kepala Tukang 0.035 OH Rp 80,000.00 Rp 2,800.00
Mandor 0.018 OH Rp 70,000.00 Rp 1,260.00
B. Bahan Rp 120,000.00
Rangka Metal Hollow 40.40.2 mm 4 m Rp 15,000.00 Rp 60,000.00
Aksessoris (perkuatan, las, dll ) 1 Rp 60,000.00 Rp 60,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 169,560.00
E. Overhead & Profit ( 10% ) Rp 16,956.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 186,516.00
9.3 1 m List Langit-Langit Kayu Profil
A. Tenaga Rp 7,110.00
Pekerja 0.05 OH Rp 55,000.00 Rp 2,750.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 5,170.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 12,280.00
E. Overhead & Profit ( 10% ) Rp 1,228.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 13,508.00
9.4 1 m2 Pemasangan Lantai Keramik 20 x 20 cm
A. Tenaga Rp 70,000.00
Pekerja 0.7 OH Rp 55,000.00 Rp 38,500.00
Tukang Batu 0.35 OH Rp 75,000.00 Rp 26,250.00
Kepala Tukang 0.035 OH Rp 80,000.00 Rp 2,800.00
Mandor 0.035 OH Rp 70,000.00 Rp 2,450.00
B. Bahan Rp 94,340.00
Ubin Keramik 20 x 20 cm 26.5 bh Rp 2,160.00 Rp 57,240.00
Portland Semen 10.4 kg Rp 1,300.00 Rp 13,520.00
Semen Warna 1.62 kg Rp 9,000.00 Rp 14,580.00
Pasir Pasang 0.045 m3 Rp 200,000.00 Rp 9,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 164,340.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 91,612.69
Keramik 30 x 30 cm 11.87 bh Rp 4,727.27 Rp 56,112.69
Portland Semen 10 kg Rp 1,300.00 Rp 13,000.00
Semen Warna 1.5 kg Rp 9,000.00 Rp 13,500.00
Pasir Pasang 0.045 m3 Rp 200,000.00 Rp 9,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 161,612.69
E. Overhead & Profit ( 10% ) Rp 16,161.27
F. Harga Satuan Pekerjaan ( D+E ) Rp 177,773.96
9.6 1 m' Pemasangan Plint Keramik Ukuran 10 x 20 cm
A. Tenaga Rp 12,770.00
Pekerja 0.09 OH Rp 55,000.00 Rp 4,950.00
Tukang Batu 0.09 OH Rp 75,000.00 Rp 6,750.00
Kepala Tukang 0.009 OH Rp 80,000.00 Rp 720.00
Mandor 0.005 OH Rp 70,000.00 Rp 350.00
B. Bahan Rp 15,557.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 28,327.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
B. Bahan Rp 83,070.00
Keramik 20 x 20 26 bh Rp 1,920.00 Rp 49,920.00
Portland Semen 9.3 kg Rp 1,300.00 Rp 12,090.00
Pasir Pasang 0.018 m3 Rp 200,000.00 Rp 3,600.00
Semen Warna 1.94 kg Rp 9,000.00 Rp 17,460.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 173,070.00
E. Overhead & Profit ( 10% ) Rp 17,307.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 190,377.00
9.8 1 m2 Pengecat Tembok Baru ( 1 Lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup ( Eksterior )
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
A. Tenaga Rp 6,539.00
Pekerja 0.02 OH Rp 55,000.00 Rp 1,100.00
Tukang Batu 0.063 OH Rp 75,000.00 Rp 4,725.00
Kepala Tukang 0.0063 OH Rp 80,000.00 Rp 504.00
Mandor 0.003 OH Rp 70,000.00 Rp 210.00
B. Bahan Rp 89,500.00
Plamir 0.1 kg Rp 20,000.00 Rp 2,000.00
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
C. Peralatan
D. Jumlah ( A+B+C ) Rp 96,039.00
E. Overhead & Profit ( 10% ) Rp 9,603.90
F. Harga Satuan Pekerjaan ( D+E ) Rp 105,642.90
9.9 1 m2 Pengecat Tembok Baru ( 1 Lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup ( Interior )
A. Tenaga Rp 6,539.00
Pekerja 0.02 OH Rp 55,000.00 Rp 1,100.00
Tukang Batu 0.063 OH Rp 75,000.00 Rp 4,725.00
Kepala Tukang 0.0063 OH Rp 80,000.00 Rp 504.00
Mandor 0.003 OH Rp 70,000.00 Rp 210.00
B. Bahan Rp 58,300.00
Plamir 0.1 kg Rp 20,000.00 Rp 2,000.00
Cat Dasar 0.1 kg Rp 15,000.00 Rp 1,500.00
Cat Penutup 2 Kali ( Dulux 2.5 liter ) 1 ltr Rp 54,800.00 Rp 54,800.00
C. Peralatan
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
B. Bahan Rp 58,300.00
Plamir 0.1 kg Rp 20,000.00 Rp 2,000.00
Cat Dasar 0.1 kg Rp 15,000.00 Rp 1,500.00
Cat Penutup 2 Kali ( Dulux 2.5 liter ) 1 ltr Rp 54,800.00 Rp 54,800.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 64,839.00
E. Overhead & Profit ( 10% ) Rp 6,483.90
F. Harga Satuan Pekerjaan ( D+E ) Rp 71,322.90
9.11 1 m2 Pengecat Tembok Baru ( 1 Lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup ( Kusen )
A. Tenaga Rp 6,539.00
Pekerja 0.02 OH Rp 55,000.00 Rp 1,100.00
Tukang Batu 0.063 OH Rp 75,000.00 Rp 4,725.00
Kepala Tukang 0.0063 OH Rp 80,000.00 Rp 504.00
Mandor 0.003 OH Rp 70,000.00 Rp 210.00
B. Bahan Rp 43,500.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
C. Peralatan
D. Jumlah ( A+B+C ) Rp 50,039.00
E. Overhead & Profit ( 10% ) Rp 5,003.90
F. Harga Satuan Pekerjaan ( D+E ) Rp 55,042.90
DAFTAR HARGA SATUAN BAHAN DAN UPAH
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
NO.
URAIAN HARGA SATUAN ( Rp. )
ANALISA
LANTAI II
III.B PEKERJAAN STRUKTUR
3.2 PEKERJAAN KOLOM
10 Kg Pembesian dg Besi Polos atau Besi Ulir Rp 157,701.50
1 m2 Memasang Bekisting untuk Kolom Rp 339,350.00
1 m3 Membuat Beton Mutu f'c = 21,7 Mpa (K250), slum (12±2)cm, w/c = 0.56 Rp 1,050,951.14
5.2 PLESTERAN
1 m2 Pemasangan Plesteran 1PC : 3PP Tebal 20 mm Rp 56,637.24
1 m2 Pemasangan Plesteran 1PC : 5PP Tebal 20 mm Rp 61,738.16
NO.
URAIAN HARGA SATUAN ( Rp. )
ANALISA
1 Buah Pemasangan Kran diameter 1/2" atau 3/4" Rp 54,020.73
1 m' Pemasangan Pipa PVC tipe AW diameter 2.5" Rp 74,367.33
1 m' Pemasangan Pipa PVC tipe AW diameter 4" Rp 93,060.00
1 Buah Pemasangan Bak Kontrol Pas. Batu Bata 45 x 45 tinggi 50 cm Rp 514,085.00
A. UPAH
1 Pekerja OH Rp 55,000.00
2 Tukang Kayu, Batu, Besi OH Rp 75,000.00
3 Kepala Tukang Kayu, Batu, Besi OH Rp 80,000.00
4 Mandor OH Rp 70,000.00
B. BAHAN
1 Kayu 5/7 x 4m Kayu Kruing m3 Rp 5,400,000.00
2 Paku Biasa 2" - 5" kg Rp 13,000.00
3 Kayu Papan 3/20 Kruing m3 Rp 6,000,000.00
4 Pasir Urug m3 Rp 120,000.00
3
5 Batu Belah 15/20 m Rp 190,000.00
6 Portland Cement kg Rp 1,300.00
7 Pasir Pasang m3 Rp 200,000.00
8 Pasir Beton kg Rp 192.86
9 Kerikil (Maksimum 30mm) kg Rp 192.59
10 Air ltr Rp 15.00
11 Besi Beton (polos/ulir) kg Rp 12,500.00
12 Kawat Beton ltr Rp 14,500.00
13 Kayu Klas III (Terentang) m3 Rp 2,000,000.00
14 Minyak Bekisting ltr Rp 9,000.00
15 Balok Kayu Klas II m3 Rp 5,400,000.00
16 Plywood tebal 9mm lbr Rp 110,000.00
17 Dolken Kayu Galam diameter 8-10 cm / 4 m btg Rp 18,000.00
18 Bata Merah 5 x 11 x 22 Buah Rp 500.00
19 Kayu Klas II (Kamfer) papan m3 Rp 7,600,000.00
20 Profil Allumunium m' Rp 80,000.00
21 Skrup Fixer bh Rp 750.00
22 Seatant tube Rp 50,000.00
23 Profil Kaca bh Rp 5,000.00
24 Engsel Pintu bh Rp 6,000.00
25 Handle Pintu bh Rp 50,000.00
26 Kaca Tebal 5 mm m2 Rp 70,000.00
27 Kaca Tebal 8 mm m2 Rp 140,000.00
28 Gypsum Board lbr Rp 65,000.00
29 Paku Sekrup kg Rp 15,000.00
30 Rangka Metal Hollow 40.40.2 mm m Rp 15,000.00
31 Aksessoris (perkuatan, las, dll ) Rp 60,000.00
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
I PEKERJAAN PERSIAPAN
1.1 PEMBERSIHAN LAHAN 451.5 m2 Rp 9,900.00 Rp 4,469,850.00
1.2 PENGUKURAN DAN BOWPLANG 97.5 m Rp 133,331.00 Rp 12,999,772.50
1.3 ADMINISTRASI 1 ls Rp 8,000,000.00 Rp 8,000,000.00
TOTAL Rp 25,469,622.50
PEKERJAAN PERSIAPAN Rp 25,469,622.50
II PEKERJAAN PONDASI
2.1 PONDASI FOOTPLAT
2.1.1 GALIAN TANAH FOOTPLAT 259 m3 Rp 68,684.00 Rp 17,789,156.00
3
2.1.2 URUGAN TANAH KEMBALI FOOTPLAT 225.8 m Rp 34,100.00 Rp 7,699,780.00
3
2.1.3 PASIR URUG FOOTPLAT 7.39 m Rp 177,320.00 Rp 1,310,394.80
2.1.4 LANTAI KERJA FOOTPLAT K 100 3.68 m3 Rp 830,537.30 Rp 3,056,377.27
2.1.5 BETON COR PONDASI FOOTPLAT K250 26.585 m3 Rp 1,050,951.14 Rp 27,939,536.14
2.1.6 PEMBESIAN PONDASI FOOTPLAT 1843.721 kg Rp 157,701.50 Rp 29,075,756.73
2.1.7 BEKISTING PONDASI FOOTPLAT 22.92 m2 Rp 150,480.00 Rp 3,449,001.60
TOTAL Rp 90,320,002.53
2.2 PONDASI BATU BELAH
2.2.1 PAS. BATU BELAH 87.384 m3 Rp 729,960.00 Rp 63,786,824.64
3
2.2.2 AANSTAMPING 39.72 m Rp 393,624.00 Rp 15,634,745.28
3
2.2.3 PASIR URUG BATU BELAH 19.86 m Rp 177,320.00 Rp 3,521,575.20
2.2.4 URUGAN TANAH 317.264 m3 Rp 34,100.00 Rp 10,818,702.40
TOTAL Rp 93,761,847.52
PEKERJAAN PONDASI Rp 184,081,850.05
ANALISA RENCANA ANGGARAN BIAYA ( RAB )
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
TOTAL Rp 23,944,219.19
PEKERJAAN BATU BATA DAN PLESTERAN LANTAI 1 Rp 59,286,955.24
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
Rp 8,314,636.47
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
TYPE P4 (5 BUAH)
Kusen Pintu Alumunium 34 m Rp 108,439.10 Rp 3,686,929.40
Daun Pintu 11.62 m2 Rp 453,541.00 Rp 5,270,146.42
Kaca T = 5 mm 0.576 m 2
Rp 99,360.25 Rp 57,214.94
Kaca Buram 0.576 m 2
Rp 90,285.25 Rp 51,989.26
Multipleks 2.566 m2 Rp 341,789.25 Rp 876,974.25
Handel 10 bh Rp 70,180.00 Rp 701,800.00
Engsel 10 bh Rp 21,780.00 Rp 217,800.00
Rp 10,862,854.27
TYPE P5 (2 BUAH)
Kusen Alumunium 9.8 m Rp 108,439.10 Rp 1,062,703.18
Daun Pintu 1.070 m2 Rp 453,541.00 Rp 485,062.10
Multipleks 1.731 m 2
Rp 341,789.25 Rp 591,466.30
Handle 2 bh Rp 70,180.00 Rp 140,360.00
Engsel 2 bh Rp 21,780.00 Rp 43,560.00
Rp 2,323,151.58
TYPE P6 (1 BUAH)
Kusen Alumunium 12.15 m Rp 108,439.10 Rp 1,317,535.07
Daun Pintu 10.753 m2 Rp 453,541.00 Rp 4,876,926.37
Multipleks 6.627 m 2
Rp 341,789.25 Rp 2,265,037.36
Handle 0 bh Rp 70,180.00 Rp -
Engsel 16 bh Rp 21,780.00 Rp 348,480.00
Rp 8,807,978.80
TOTAL Rp 37,646,212.15
ANALISA RENCANA ANGGARAN BIAYA ( RAB )
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
PEMASANGAN JENDELA
TYPE J1 (1 BUAH)
Kusen Alumunium 8.7 m Rp 108,439.10 Rp 943,420.17
Kaca T = 5 mm 0.48 m2 Rp 99,360.25 Rp 47,692.92
Kaca T = 8 mm 1.38 m 2
Rp 184,060.25 Rp 254,003.15
Rp 1,245,116.24
TYPE J2 (2 BUAH)
Kusen Alumunium 24.4 m Rp 108,439.10 Rp 2,645,914.04
Daun Jendela 18.84 m2 Rp 453,541.00 Rp 8,544,712.44
Kaca T = 5 mm 1.44 m2 Rp 99,360.25 Rp 143,078.76
Kaca T = 8 mm 2.445 m 2
Rp 184,060.25 Rp 449,935.28
Engsel 12 bh Rp 21,780.00 Rp 261,360.00
Rp 12,045,000.52
TYPE J3 (1 BUAH)
Kusen Alumunium 12.2 m Rp 108,439.10 Rp 1,322,957.02
Kaca T = 5 mm 0.72 m 2
Rp 99,360.25 Rp 71,539.38
Kaca T = 8 mm 2.07 m2 Rp 184,060.25 Rp 381,004.72
Rp 1,775,501.12
TYPE J4 (3 BUAH)
Kusen Alumunium 24.3 m Rp 108,439.10 Rp 2,635,070.13
Daun Jendela 17.64 m 2
Rp 453,541.00 Rp 8,000,463.24
Kaca T = 5 mm 5.763 m2 Rp 99,360.25 Rp 572,613.12
Engsel 12 bh Rp 21,780.00 Rp 261,360.00
ANALISA RENCANA ANGGARAN BIAYA ( RAB )
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
Rp 11,469,506.49
TYPE J5 (1 BUAH)
Kusen Alumunium 8.1 m Rp 108,439.10 Rp 878,356.71
Kaca T = 5 mm 0.4 m 2
Rp 99,360.25 Rp 39,744.10
Kaca T = 8 mm 1.15 m2 Rp 184,060.25 Rp 211,669.29
Rp 1,129,770.10
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
TYPE J6 (1 BUAH)
Kusen Alumunium 5.2 m Rp 108,439.10 Rp 563,883.32
Daun Jendela 0.647 m2 Rp 453,541.00 Rp 293,441.03
Kaca T = 5 mm 3.14 m 2
Rp 99,360.25 Rp 311,991.19
Engsel 2 bh Rp 21,780.00 Rp 43,560.00
Rp 1,212,875.53
BOUVEN BV1 (2 BUAH)
Kusen Alumunium 2.8 m Rp 108,439.10 Rp 303,629.48
Kaca T = 5 mm 0.32 m 2
Rp 99,360.25 Rp 31,795.28
Rp 335,424.76
TOTAL Rp 29,213,194.75
PEMASANGAN PARTISI
TYPE PTS1 (1 BUAH)
Kusen Alumunium 5.22 m Rp 108,439.10 Rp 566,052.10
Daun Pintu 5.8 m Rp 453,541.00 Rp 2,630,537.80
Multipleks 0.67 m2 Rp 341,789.25 Rp 228,998.80
Gypsum 2.268 m 2
Rp 38,918.00 Rp 88,266.02
Handle 2 bh Rp 70,180.00 Rp 140,360.00
Engsel 2 bh Rp 21,780.00 Rp 43,560.00
Rp 3,697,774.72
TYPE PTS2 (1 BUAH)
Kusen Alumunium 4.9 m Rp 108,439.10 Rp 531,351.59
ANALISA RENCANA ANGGARAN BIAYA ( RAB )
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
Rp 2,444,458.80
TYPE P4 (7 BUAH)
Kusen Pintu Alumunium 47.6 m Rp 108,439.10 Rp 5,161,701.16
Daun Pintu 16.268 m Rp2
453,541.00 Rp 7,378,204.99
Kaca T = 5 mm 0.806 m2 Rp 99,360.25 Rp 80,100.92
Kaca Buram 0.806 m2 Rp 90,285.25 Rp 72,784.96
Multipleks 3.592 m2 Rp 341,789.25 Rp 1,227,763.95
handel 14 bh Rp 70,180.00 Rp 982,520.00
Engsel 14 bh Rp 21,780.00 Rp 304,920.00
Rp 15,207,995.98
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
TYPE P5 (2 BUAH)
Kusen Pintu Alumunium 9.8 m Rp 108,439.10 Rp 1,062,703.18
Daun Pintu 1.070 m2 Rp 453,541.00 Rp 485,062.10
Multipleks 1.731 m2 Rp 341,789.25 Rp 591,466.30
handel 2 bh Rp 70,180.00 Rp 140,360.00
Engsel 2 bh Rp 21,780.00 Rp 43,560.00
Rp 2,323,151.58
TOTAL Rp 19,975,606.36
PEMASANGAN JENDELA
TYPE J2 (6 BUAH)
Kusen Alumunium 73.2 m Rp 108,439.10 Rp 7,937,742.12
Daun Jendela 56.52 m2 Rp 453,541.00 Rp 25,634,137.32
Kaca T = 5 mm 4.32 m 2
Rp 99,360.25 Rp 429,236.28
Kaca T = 8 mm 7.334 m 2
Rp 184,060.25 Rp 1,349,805.84
Engsel 36 bh Rp 21,780.00 Rp 784,080.00
Rp 36,135,001.56
TYPE J4 (3 BUAH)
Kusen Alumunium 24.3 m Rp 108,439.10 Rp 2,635,070.13
ANALISA RENCANA ANGGARAN BIAYA ( RAB )
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. JUMLAH Rp.
TYPE J7 (1 BUAH)
Kusen Alumunium 28.3 m Rp 108,439.10 Rp 3,068,826.53
Kaca T = 8 mm 9.178 m2 Rp 184,060.25 Rp 1,689,304.97
Rp 4,758,131.50
BOUVEN (2 BUAH)
Kusen Alumunium 2.8 m Rp 108,439.10 Rp 303,629.48
Kaca T = 5 mm 0.32 m 2
Rp 99,360.25 Rp 31,795.28
Rp 335,424.76
TOTAL Rp 53,910,939.85
TOTAL PEKERJAAN KUSEN LANTAI 2 Rp 73,886,546.21
VII.B PEKERJAAN MECHANICAL DAN ELECTRICAL
7.1 LAMPU TL 40 WATT 20 bh Rp 150,000.00 Rp 3,000,000.00
7.2 LAMPU SL 18 WATT 11 bh Rp 50,000.00 Rp 550,000.00
7.3 STOPKONTAK 200 WATT 5 bh Rp 25,000.00 Rp 125,000.00
7.4 SAKLAR TUNGGAL 4 bh Rp 25,000.00 Rp 100,000.00
7.5 SAKLAR GANDA 5 bh Rp 30,000.00 Rp 150,000.00
7.6 INSTALASI STOPKONTAK DAN TITIK LAMPU 36 titik Rp 80,000.00 Rp 2,880,000.00
7.7 SUB PANEL PENERANGAN 1 titik Rp 500,000.00 Rp 500,000.00
ANALISA RENCANA ANGGARAN BIAYA ( RAB )
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
JUMLAH Rp 2,111,642,022.38
PPN 10% Rp 211,164,202.24
JUMLAH ( SETELAH PPN) Rp 2,322,806,224.62
DIBULATKAN Rp 2,322,806,000.00
Terbilang : Dua Milyar Tiga Ratus Dua Puluh Dua Juta Delapan Ratus Enam Ribu Rupiah
REKAPITULASI PERHITUNGAN PERSENTASE BOBOT
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. BOBOT
I PEKERJAAN PERSIAPAN
II PEKERJAAN PONDASI
2.1 PONDASI FOOTPLAT
2.1.1 GALIAN TANAH FOOTPLAT 259 m3 Rp 68,684.00 Rp 17,789,156.00 0.842%
3
2.1.2 URUGAN TANAH KEMBALI FOOTPLAT 225.8 m Rp 34,100.00 Rp 7,699,780.00 0.365%
2.1.3 PASIR URUG FOOTPLAT 7.39 m3 Rp 177,320.00 Rp 1,310,394.80 0.062%
3
2.1.4 LANTAI KERJA FOOTPLAT K 100 3.68 m Rp 830,537.30 Rp 3,056,377.27 0.145%
3
2.1.5 BETON COR PONDASI FOOTPLAT K250 26.585 m Rp 1,050,951.14 Rp 27,939,536.14 1.323%
2.1.6 PEMBESIAN PONDASI FOOTPLAT 1843.721 kg Rp 157,701.50 Rp 29,075,756.73 1.377%
2.1.7 BEKISTING PONDASI FOOTPLAT 22.92 m2 Rp 150,480.00 Rp 3,449,001.60 0.163%
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. BOBOT
VI.A KUSEN
PEK. PEMASANGAN PINTU DAN JENDELA
KUSEN ALMUNIUM 210.620 m2 Rp 108,439.10 Rp 22,839,443.24 1.082%
2
DAUN KUSEN 77.800 m Rp 453,541.00 Rp 35,285,263.03 1.671%
KACA BURAM T = 5 MM 0.926 m2 Rp 90,285.25 Rp 83,589.09 0.004%
KACA T = 5 MM 15.363 m 2
Rp 99,360.25 Rp 1,526,454.96 0.072%
KACA T = 8 MM 14.065 m 2
Rp 184,060.25 Rp 2,588,715.39 0.123%
GYSUM 3.956 m2 Rp 38,918.00 Rp 153,959.61 0.007%
MULTIPLEKS 13.217 m2 Rp 341,789.25 Rp 4,517,428.52 0.214%
HANDEL 34 bh Rp 70,180.00 Rp 2,386,120.00 0.113%
REKAPITULASI PERHITUNGAN PERSENTASE BOBOT
GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. BOBOT
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. BOBOT
Topi-topi + 6.30
Pembesian 134.37 kg Rp 157,701.50 Rp 2,119,035.06 0.100%
Bekisting 26.46 m2 Rp 418,550.00 Rp 11,074,833.00 0.524%
3
Beton Cor K-225 2.356 m Rp 1,035,328.81 Rp 2,439,234.68 0.116%
NO URAIAN PEKER JAAN VOLUME HARGA SATUAN Rp. JUMLAH HARGA Rp. BOBOT
PEKERJAAN PENGECATAN
CAT TEMBOK EKSTERIOR 320 m2 Rp 105,642.90 Rp 33,805,728.00 1.601%
CAT TEMBOK INTERIOR 480 m2 Rp 71,322.90 Rp 34,234,992.00 1.621%
2
CAT PLAFON 251.56 m Rp 71,322.90 Rp 17,941,988.72 0.850%
2
CAT KUSEN 9.84 m Rp 55,042.90 Rp 541,622.14 0.026%
DURASI BULAN KE- 1 BULAN KE- 2 BULAN KE- 3 BULAN KE- 4 BULAN KE- 5 BULAN KE- 6
NO JENIS PEKERJAAN URAIAN PEKER JAAN BOBOT
(MINGGU) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
I PEKERJAAN PERSIAPAN ADMINISTRASI 0.379% 24 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016%
PEMBERSIHAN LAHAN 0.212% 1 0.212%
PENGUKURAN DAN BOWPLANG 0.616% 1 0.616%
II PEKERJAAN PONDASI GALIAN TANAH FOOTPLAT 0.842% 2 0.421% 0.421%
PASIR URUG FOOTPLAT 0.062% 1 0.062%
LANTAI KERJA FOOTPLAT K 100 0.145% 1 0.145%
PEK.PONDASI FOOTPLAT 2.863% 3 0.818% 0.545% 1.500%
URUGAN TANAH KEMBALI FOOTPLAT 0.365% 1 0.365%
PASIR URUG BATU KALI 0.167% 1 0.167%
AANSTAMPING 0.740% 1 0.740%
PAS. BATU BELAH 3.021% 2 1.599% 1.422%
URUGAN TANAH BATU KALI 0.512% 2 0.293% 0.220%
III PEKERJAAN STRUKTUR PEKERJAAN SLOOF K-225 3.770% 2 2.011% 1.759%
PEKERJAAN LANTAI 1 PEKERJAAN KOLOM K-250 9.364% 3 3.121% 6.087% 0.156%
PEKERJAAN BALOK K-250 9.833% 2 5.450% 4.383%
PEKERJAAN TANGGA K-250 0.676% 2 0.254% 0.423%
PEK.PLAT LANTAI II K-250 8.999% 3 0.409% 8.181% 0.409%
PEK.TOPI-TOPI +3.17 K-225 0.905% 1 0.905%
PEKERJAAN LANTAI 2 PEKERJAAN KOLOM K-250 4.682% 3 2.417% 2.114% 0.151%
PEKERJAAN BALOK RING K-250 3.560% 2 0.668% 2.893%
PEK.PLAT ATAP K-250 9.090% 4 8.636% 0.152% 0.152% 0.152%
PEK.TOPI-TOPI+6.30 K-225 0.740% 2 0.342% 0.398%
V PEK. PAS.BT. BATA & PLESTERAN PAS. BATA 2.835% 7 1.575% 0.315% 0.315% 0.315% 0.315%
PLESTERAN 1.919% 5 0.384% 0.209% 0.872% 0.384% 0.070%
VI PEKERJAAN KUSEN KUSEN ALMUNIUM 2.108% 2 1.756% 0.351%
DAUN KUSEN 3.690% 2 3.339% 0.351%
KACA BURAM, T 5 MM, T 8 MM 0.428% 1 0.428%
GYSUM 0.007% 2 0.005% 0.002%
MULTIPLEK 0.300% 2 0.225% 0.075%
AKSESORIES KUSEN 0.338% 1 0.338%
VII PEKERJAAN M & E PROPERTIES DAN INSTALASI M & E 3.086% 2 1.715% 1.372%
VIII PEKERJAAN SANITASI INSTALASI PIPA AIR BERSIH 0.335% 1 0.335%
INSTALASI PIPA AIR KOTOR 0.331% 1 0.331%
SEPTICTANK 0.061% 1 0.061%
PEMASANGAN PROPERTIES SANITASI 0.941% 4 0.470% 0.059% 0.353% 0.059%
IX PEKERJAAN FINISHING RANGKA HOLLOW 4.468% 3 0.670% 2.010% 1.787%
PLAFON TYPE A, B, DAN C (GYSUM BOARD) 1.100% 2 0.110% 0.990%
LIST LANGIT-LANGIT KAYU PROFIL 0.274% 1 0.274%
URUGAN PASIR BAWAH ( T = 10 CM ) 0.425% 1 0.425%
LANTAI KERJA ( T = 5 CM ) BAWAH LANTAI 0.995% 2 0.332% 0.663%
PLINT KERAMIK 10 X 20 CM 0.386% 2 0.193% 0.193%
KERAMIK DINDING KM/WC DAN LAB. UK 20 X 20 CM 0.601% 1 0.601%
PEMASANGAN KERAMIK LANTAI RUANGAN DAN KM/WC 4.475% 4 0.195% 2.140% 1.946% 0.195%
URUGAN PASIR BAWAH LANTAI RABAT BETON KORIDO 0.016% 1
LANTAI RABAT BETON KORIDOR ( T = 7 CM ) 0.051% 1
CAT TEMBOK, PLAFON DAN KUSEN 9.287% 4 1.114% 2.229%
JUMLAH 100.00% 0.227% 0.631% 1.255% 1.250% 1.880% 2.815% 3.668% 4.896% 7.677% 5.936% 7.929% 11.489% 4.885% 2.776% 3.569% 8.651% 5.691% 4.141% 3.619% 4.189% 4.066% 2.713%
JUMLAH KUMULATIF 0.227% 0.859% 2.114% 3.364% 5.244% 8.059% 11.726% 16.623% 24.300% 30.236% 38.166% 49.655% 54.540% 57.316% 60.885% 69.537% 75.228% 79.369% 82.988% 87.176% 91.243% 93.956%
MBANGUNAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
BULAN KE- 6
23 24
0.016% 0.016%
0.016%
0.051%
4.644% 1.300%
4.675% 1.367%
98.631% 100.00%
TIME SCHEDULE ( KURVA S ) PEMBANGUNAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
DURASI BULAN KE- 1 BULAN KE- 2 BULAN KE- 3 BULAN KE- 4 BULAN KE- 5 BULAN KE- 6
NO JENIS PEKERJAAN URAIAN PEKER JAAN BOBOT
(MINGGU) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
A PEKERJAAN PERSIAPAN ADMINISTRASI 0.379% 26 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015%
PEMBERSIHAN LAHAN 0.212% 1 0.212%
PENGUKURAN DAN BOWPLANG 0.616% 1 0.616%
B PEKERJAAN PONDASI GALIAN TANAH FOOTPLAT 0.842% 2 0.421% 0.421%
PASIR URUG FOOTPLAT 0.062% 1 0.062%
LANTAI KERJA FOOTPLAT K 100 0.145% 1 0.145%
PEMBESIAN PONDASI FOOTPLAT 1.377% 2 0.688% 0.688%
BEKISTING PONDASI FOOTPLAT 0.163% 2 1.323% 1.323%
BETON COR PONDASI FOOTPLAT K250 1.323% 1 1.323%
URUGAN TANAH KEMBALI FOOTPLAT 0.365% 1 0.365%
GALIAN TANAH BATU KALI Err:509 2 Err:509 Err:509
PASIR URUG BATU KALI 0.740% 1 0.740%
AANSTAMPING 0.167% 1 0.167%
PAS. BATU BELAH 0.512% 2 0.256% 0.256%
URUGAN TANAH BATU KALI 3.021% 1 3.021%
C PEKERJAAN STRUKTUR SLOOF Pembesian 1.794% 2 0.897% 0.897%
C.1 PEKERJAAN LANTAI 1 SLOOF Bekisting 1.207% 2 1.207% 1.207%
SLOOF Beton Cor K-225 0.769% 1 0.769%
KOLOM Pembesian 3.897% 3 1.299% 1.299% 1.299%
KOLOM Bekisting 4.505% 3 1.502% 1.502% 1.502%
KOLOM Beton Cor K-250 0.962% 2 0.481% 0.481%
BALOK Bekisting 5.167% 2 2.584% 2.584%
BALOK Pembesian 3.359% 2 1.679% 1.679%
BALOK Beton Cor K-225 1.307% 1 1.307%
TANGGA Bekisting 0.229% 1 0.229%
TANGGA Pembesian 0.304% 1 0.304%
TANGGA Beton Cor K-250 0.143% 1 0.143%
PLAT LT. II Bekisting 5.332% 2 2.666% 2.666%
PLAT LT. II Pembesian 2.107% 2 1.054% 1.054%
PLAT LT. II Beton Cor K-250 1.560% 1 1.560%
DAK + 3.17 Bekisting 0.637% 1 0.637%
DAK + 3.17 Pembesian 0.126% 1 0.126%
DAK + 3.17 Beton Cor K-225 0.142% 1 0.142%
C.2 PEKERJAAN LANTAI 2 KOLOM Pembesian 1.561% 3 0.520% 0.520% 0.520%
KOLOM Bekisting 2.611% 3 0.870% 0.870% 0.870%
KOLOM Beton Cor K-250 0.510% 2 0.255% 0.255%
BALOK RING Pembesian 0.848% 2 0.424% 0.424%
BALOK RING Bekisting 2.310% 2 1.155% 1.155%
BALOK RING Beton Cor K-225 0.402% 1 0.402%
PLAT ATAP Bekisting 5.423% 2 2.712% 2.712%
PLAT ATAP Pembesian 2.107% 2 1.054% 1.054%
PLAT ATAP Beton Cor K-250 1.560% 1 1.560%
TOPI-TOPI +6.30 Bekisting 0.524% 1 0.524%
TOPI-TOPI +6.30 Pembesian 0.100% 1 0.100%
TOPI-TOPI +6.30 Beton Cor K-225 0.116% 1 0.116%
D PEK. PAS.BT. BATA & PLESTERAN PAS. BATA 1.161% 7 0.166% 0.166% 0.166% 0.166% 0.166% 0.166% 0.166%
PLESTERAN 1:3 0.785% 5 0.157% 0.157% 0.157% 0.157% 0.157%
SPONENGAN 0.000% 3 0.000% 0.000% 0.000%
E PEKERJAAN KUSEN KUSEN ALMUNIUM 1.026% 2 0.513% 0.513%
DAUN KUSEN Err:509 2 Err:509 Err:509
KACA BURAM, T 5 MM, T 8 MM 0.229% 1 0.229%
AKSESORIES KUSEN 0.139% 1 0.139%
F PEKERJAAN SANITASI INSTALASI PIPA AIR KOTOR 0.116% 5 0.023% 0.023% 0.023% 0.023% 0.023%
SEPTICTANK 0.003% 1 0.003%
INSTALASI PIPA AIR BERSIH Err:509 1 Err:509 Err:509 Err:509 Err:509 Err:509
PEMASANGAN PROPERTIES SANITASI 0.047% 1 0.047%
G PEKERJAAN M & E PROPERTIES DAN INSTALASI M & E LT. 1 Err:509 2 Err:509 Err:509
H PEKERJAAN FINISHING RANGKA HOLLOW 2.276% 3 0.759% 0.759% 0.759%
PLAFON TYPE A, B, DAN C (GYSUM BOARD) 0.580% 2 0.290% 0.290%
LIST LANGIT-LANGIT KAYU PROFIL 0.151% 1 0.151%
URUGAN PASIR BAWAH ( T = 10 CM ) 0.208% 1 0.208%
LANTAI KERJA ( T = 5 CM ) BAWAH LANTAI 0.488% 2 0.244% 0.244%
PLINT KERAMIK 10 X 20 CM 0.165% 2 0.083% 0.083%
KERAMIK DINDING KM/WC DAN LAB. UK 20 X 20 CM 0.243% 1 0.243%
PEMASANGAN KERAMIK LANTAI RUANGAN DAN KM/WC 2.215% 4 0.554% 0.554% 0.554% 0.554%
URUGAN PASIR BAWAH LANTAI RABAT BETON KORIDOR Err:509 1 Err:509
LANTAI RABAT BETON KORIDOR ( T = 7 CM ) Err:509 1 Err:509
CAT TEMBOK, PLAFON DAN KUSEN 4.097% 4 1.024% 1.024% 1.024% 1.024%
JUMLAH Err:509 0.226% 0.630% 0.436% 2.657% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 5.460% 2.705% 2.756% 3.645% 6.824% Err:509 Err:509 Err:509 1.617% 2.033% 1.593% 1.039% 1.039%
JUMLAH KUMULATIF 0.226% 0.856% 1.292% 3.949% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
B. PEKERJAAN PONDASI
B.1 PONDASI FOOTPLAT
B.1.1 GALIAN TANAH FOOTPLAT 259.000 m3 14 Pekerja 1.05 271.950 19.425 20 22
Mandor 0.067 17.353 1.240 2
B.1.3 LANTAI KERJA FOOTPLAT K 100 3.680 m3 7 Pekerja 1.200 4.416 0.631 1 4
Tukang Batu 0.200 0.736 0.105 1
Kepala Tukang 0.020 0.074 0.011 1
Mandor 0.006 0.022 0.003 1
B.1.6 BETON COR PONDASI FOOTPLAT K250 26.585 m3 7 Pekerja 1.650 43.865 6.266 7 11
Tukang Batu 0.275 7.311 1.044 2
Kepala Tukang 0.028 0.744 0.106 1
Mandor 0.083 2.207 0.315 1
B.1.7 URUGAN TANAH KEMBALI FOOTPLAT 225.800 m3 7 Pekerja 0.500 112.900 16.129 17 19
Mandor 0.050 11.290 1.613 2
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
B.2.5 URUGAN TANAH BATU KALI 317.264 14 Pekerja 0.500 158.632 11.331 12 14
Mandor 0.050 15.863 1.133 2
C. PEKERJAAN STRUKTUR
C.1 PEKERJAAN LANTAI 1
C.1.1 SLOOF Pembesian 2402.367 kg 14 Pekerja 0.070 168.166 12.012 13 29
Tukang Besi 0.070 168.166 12.012 13
Kepala Tukang 0.007 16.817 1.201 2
Mandor 0.004 9.609 0.686 1
C.1.3 SLOOF Beton Cor K-225 15.693 m3 7 Pekerja 1.650 25.893 3.699 4 7
Tukang Batu 0.275 4.316 0.617 1
Kepala Tukang 0.028 0.439 0.063 1
Mandor 0.083 1.303 0.186 1
C.1.9 BALOK Beton Cor K-225 26.263 m3 7 Pekerja 1.650 43.334 6.191 7 11
Tukang Batu 0.275 7.222 1.032 2
Kepala Tukang 0.028 0.735 0.105 1
Mandor 0.083 2.180 0.311 1
C.1.12 TANGGA Beton Cor K-250 2.865 m3 7 Pekerja 1.650 4.727 0.675 1 4
Tukang Batu 0.275 0.788 0.113 1
Kepala Tukang 0.028 0.080 0.011 1
Mandor 0.083 0.238 0.034 1
C.1.16 TOPI - TOPI + 3.17 Bekisting 32.160 m2 7 Pekerja 0.660 21.226 3.032 4 8
Tukang Kayu 0.330 10.613 1.516 2
Kepala Tukang 0.033 1.061 0.152 1
Mandor 0.033 1.061 0.152 1
C.1.17 TOPI - TOPI + 3.17 Pembesian 168.127 kg 7 Pekerja 0.070 11.769 1.681 2 6
Tukang Besi 0.070 11.769 1.681 2
Kepala Tukang 0.007 1.177 0.168 1
Mandor 0.004 0.673 0.096 1
C.1.18 TOPI - TOPI + 3.17 Beton Cor K-225 2.898 m3 7 Pekerja 1.650 4.782 0.683 1 4
Tukang Batu 0.275 0.797 0.114 1
Kepala Tukang 0.028 0.081 0.012 1
Mandor 0.083 0.241 0.034 1
C.2.3 KOLOM Beton Cor K-250 10.248 m3 14 Pekerja 1.650 16.909 1.208 2 5
Tukang Batu 0.275 2.818 0.201 1
Kepala Tukang 0.028 0.287 0.020 1
Mandor 0.083 0.851 0.061 1
C.2.6 BALOK RING Beton Cor K-225 8.069 m3 7 Pekerja 1.650 13.314 1.902 2 5
Tukang Batu 0.275 2.219 0.317 1
Kepala Tukang 0.028 0.226 0.032 1
Mandor 0.083 0.670 0.096 1
C.2.9 PLAT ATAP Beton Cor K-250 31.344 m3 7 Pekerja 1.650 51.718 7.388 8 12
Tukang Batu 0.275 8.620 1.231 2
Kepala Tukang 0.028 0.878 0.125 1
Mandor 0.083 2.602 0.372 1
C.2.12 TOPI-TOPI +6.30 Beton Cor K-225 2.356 m3 7 Pekerja 1.650 3.887 0.555 1 4
Tukang Batu 0.275 0.648 0.093 1
Kepala Tukang 0.028 0.066 0.009 1
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
E. PEKERJAAN KUSEN
E.1 KUSEN ALMUNIUM 410.420 m 14 Pekerja 0.043 17.648 1.261 2 6
Tukang Besi 0.043 17.648 1.261 2
Kepala Tukang 0.004 1.765 0.126 1
Mandor 0.002 0.862 0.062 1
F. PEKERJAAN SANITASI
F.1 INSTALASI PIPA AIR KOTOR 75.000 m 7 Pekerja 0.036 2.700 0.386 1 4
Tukang Batu 0.06 4.500 0.643 1
Kepala Tukang 0.006 0.450 0.064 1
Mandor 0.002 0.150 0.021 1
F.3 INSTALASI PIPA AIR BERSIH 95.000 m 7 Pekerja 0.081 7.695 1.099 2 6
Tukang Batu 0.135 12.825 1.832 2
Kepala Tukang 0.0135 1.283 0.183 1
Mandor 0.004 0.380 0.054 1
H. PEKERJAAN FINISHING
PEKERJAAN PEMASANGAN PLAFON
H.1 RANGKA HOLLOW 505.800 m2 21 Pekerja 0.350 177.030 8.430 9 20
Tukang Besi 0.350 177.030 8.430 9
Kepala Tukang 0.035 17.703 0.843 1
Mandor 0.018 9.104 0.434 1
H.2 PLAFON TYPE A, B, DAN C (GYSUM 597.063 m2 14 Pekerja 0.1 59.706 4.265 5 10
Tukang Kayu 0.05 29.853 2.132 3
Kepala Tukang 0.005 2.985 0.213 1
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
H.3 LIST LANGIT-LANGIT KAYU PROFIL 428.000 m 7 Pekerja 0.050 21.400 3.057 4 10
Tukang Kayu 0.050 21.400 3.057 4
Kepala Tukang 0.005 2.140 0.306 1
Mandor 0.003 1.284 0.183 1
H.8 P.KERAMIK LANTAI RUANGAN DAN KM/WC 546.540 m2 28 Pekerja 0.700 382.578 13.664 14 23
Tukang Batu 0.350 191.289 6.832 7
Kepala Tukang 0.035 19.129 0.683 1
Mandor 0.035 19.129 0.683 1
H.9 URUGAN PASIR BAWAH LANTAI RABAT BETON 1.858 m3 7 Pekerja 0.300 0.557 0.080 1 2
Mandor 0.010 0.019 0.003 1
H.10 LANTAI RABAT BETON KORIDOR ( T = 7 CM ) 1.300 m3 7 Pekerja 1.200 1.560 0.223 1 4
Tukang Batu 0.200 0.260 0.037 1
Kepala Tukang 0.020 0.026 0.004 1
Mandor 0.006 0.008 0.001 1
PEKERJAAN PENGECATAN
H.11 CAT TEMBOK, PLAFON DAN KUSEN 2404.060 m2 28 Pekerja 0.020 48.081 1.717 2 10
Tukang Batu 0.063 151.456 5.409 6
Kepala Tukang 0.006 15.146 0.541 1
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
JUMLAH DURASI BULAN KE- 1 BULAN KE- 2 BULAN KE- 3 BULAN KE- 4 BULAN KE- 5 BULAN KE- 6
NO JENIS PEKERJAAN URAIAN PEKER JAAN
PEKERJA (MINGGU) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I PEKERJAAN PERSIAPAN ADMINISTRASI 20 24 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PEMBERSIHAN LAHAN 55 1 55
PENGUKURAN DAN BOWPLANG 30 1 30
II PEKERJAAN PONDASI GALIAN TANAH FOOTPLAT 110 2 85 10
PASIR URUG FOOTPLAT 10 1 10
LANTAI KERJA FOOTPLAT K 100 20 1 20
PEMBESIAN PONDASI FOOTPLAT 110 2 70 40
BEKISTING PONDASI FOOTPLAT 20 2 10 10
BETON COR PONDASI FOOTPLAT K250 55 1 55
URUGAN TANAH KEMBALI FOOTPLAT 95 1 95
PASIR URUG BATU KALI 35 1 35
AANSTAMPING 50 1 50
PAS. BATU BELAH 85 2 10 75
URUGAN TANAH BATU KALI 70 2 5 65
III PEKERJAAN STRUKTUR SLOOF Pembesian 145 2 73 73
PEKERJAAN LANTAI 1 SLOOF Bekisting 55 2 27 28
SLOOF Beton Cor K-225 35 1 35
KOLOM Pembesian 195 3 65 115 2
KOLOM Bekisting 80 3 27 50 3
KOLOM Beton Cor K-250 30 2 25 5
BALOK Bekisting 125 2 45 80
BALOK Pembesian 255 2 180 75
BALOK Beton Cor K-225 55 1 55
TANGGA Bekisting 25 1 25
TANGGA Pembesian 60 1 60
TANGGA Beton Cor K-250 20 1 20
PLAT LT. II Bekisting 110 2 30 80
PLAT LT. II Pembesian 165 2 20 145
PLAT LT. II Beton Cor K-250 60 1 60
DAK + 3.17 Bekisting 40 1 40
DAK + 3.17 Pembesian 30 1 30
DAK + 3.17 Beton Cor K-225 20 1 20
PEKERJAAN LANTAI 2 KOLOM Pembesian 80 3 38 8 24
KOLOM Bekisting 55 3 28 8 19
KOLOM Beton Cor K-250 25 2 12 13
BALOK RING Pembesian 70 2 65 5
BALOK RING Bekisting 65 2 60 5
BALOK RING Beton Cor K-225 25 1 25
PLAT ATAP Bekisting 110 2 40 70
PLAT ATAP Pembesian 165 2 145 20
PLAT ATAP Beton Cor K-250 60 1 60
TOPI-TOPI +6.30 Bekisting 35 1 35
TOPI-TOPI +6.30 Pembesian 30 1 30
TOPI-TOPI +6.30 Beton Cor K-225 20 1 20
D. 1 PEK. PAS.BT. BATA & PLESTERAN PAS. BATA 45 7 6 6 6 11 2 6 6
2 PLESTERAN 1:3 55 5 11 20 2 11 11
E. 1 PEKERJAAN KUSEN KUSEN ALMUNIUM 30 2 25 5
2 DAUN KUSEN 105 2 105 10
3 KACA BURAM, T 5 MM, T 8 MM 25 1 25
GYSUM 20 2
MULTIPLEKS 20 2
4 AKSESORIES KUSEN 40 1 40
G. PEKERJAAN M & E PROPERTIES DAN INSTALASI M & E LT. 1 85 1 85
F. 1 PEKERJAAN SANITASI INSTALASI PIPA AIR KOTOR 20 1 20 20 20 20 20
2 SEPTICTANK 25 1 25
3 INSTALASI PIPA AIR BERSIH 30 1 30 30 30 30 30
4 PEMASANGAN PROPERTIES SANITASI 80 1 80
H. 1 PEKERJAAN FINISHING RANGKA HOLLOW 100 3 45 5 50
2 PLAFON TYPE A, B, DAN C (GYSUM BOARD) 50 2 25 25
3 LIST LANGIT-LANGIT KAYU PROFIL 50 1 50
4 URUGAN PASIR BAWAH ( T = 10 CM ) 20 1 20
5 LANTAI KERJA ( T = 5 CM ) BAWAH LANTAI 30 2 25 5
6 PLINT KERAMIK 10 X 20 CM 30 2 15 15
7 KERAMIK DINDING KM/WC DAN LAB. UK 20 X 20 CM 65 1 65
8 PEMASANGAN KERAMIK LANTAI RUANGAN DAN KM/WC 115 4 5 71 34 5
9 URUGAN PASIR BAWAH LANTAI RABAT BETON KORIDOR 10 1 10
10 LANTAI RABAT BETON KORIDOR ( T = 7 CM ) 20 1 20
11 CAT TEMBOK, PLAFON DAN KUSEN 50 4 12 12 19 7
JUMLAH 56 32 86 146 201 101 290 278 241 286 311 292 188 206 228 310 298 273 96 147 72 68 30 28
JUMLAH KUMULATIF 56 88 174 320 520 621 912 1190 1430 1716 2027 2319 2508 2714 2942 3251 3550 3823 3919 4066 4137 4205 4235 4263
GRAFIK MAN POWER PEMBANGUNAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
JUMLAH DURASI BULAN KE- 1 BULAN KE- 2 BULAN KE- 3 BULAN KE- 4 BULAN KE- 5 BULAN KE- 6
NO JENIS PEKERJAAN URAIAN PEKER JAAN
PEKERJA (MINGGU) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I PEKERJAAN PERSIAPAN ADMINISTRASI 20 24 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PEMBERSIHAN LAHAN 55 1 55
PENGUKURAN DAN BOWPLANG 30 1 30
II PEKERJAAN PONDASI GALIAN TANAH FOOTPLAT 110 2 55 55
PASIR URUG FOOTPLAT 10 1 10
LANTAI KERJA FOOTPLAT K 100 20 1 20
PEK.PONDASI FOOTPLAT 105 3 30 20 55
URUGAN TANAH KEMBALI FOOTPLAT 95 1 95
PASIR URUG BATU KALI 35 1 35
AANSTAMPING 50 1 50
PAS. BATU BELAH 85 2 45 40
URUGAN TANAH BATU KALI 70 2 40 30
III PEKERJAAN STRUKTUR PEK. SLOOF K-225 225 2 120 105
PEKERJAAN LANTAI I PEK KOLOM K-250 300 3 100 195 5
PEK. BALOK K-250 415 2 230 185
PEK.TANGGA K-250 80 2 30 50
PEK. PLAT LANTAI II K-250 220 3 10 200 10
PEK. TOPI - TOPI K-225 90 1 90
PEKERJAAN LANTAI 2 PEK. KOLOM K-250 155 3 80 70 5
PEK.BALOK RING K-250 155 2 30 130
PEK.PLAT ATAP K-250 180 4 171 3 3 3
PEK.TOPI-TOPI +630 K-225 65 2 30 35
V PEK. PAS.BT. BATA & PLESTERAN PAS. BATA 45 7 25 5 5 5 5
PLESTERAN 55 5 11 6 25 11 2
VI PEKERJAAN KUSEN KUSEN ALMUNIUM 30 2 25 5
DAUN KUSEN 105 2 95 10
KACA BURAM, T 5 MM, T 8 MM 25 1 25
GYSUM 20 2 15 5
MULTIPLEKS 20 2 15 5
AKSESORIES KUSEN 40 1 40
VII PEKERJAAN M & E PROPERTIES DAN INSTALASI M & E LT. 1 45 2 25 20
VIII PEKERJAAN SANITASI INSTALASI PIPA AIR KOTOR 20 1 20
INSTALASI PIPA AIR BERSIH 30 1 30
SEPTICTANK 25 1 25
PEMASANGAN PROPERTIES SANITASI 80 4 40 5 30 5
IX PEKERJAAN FINISHING RANGKA HOLLOW 100 3 15 45 40
PLAFON TYPE A, B, DAN C (GYSUM BOARD) 50 2 5 45
LIST LANGIT-LANGIT KAYU PROFIL 50 1 50
URUGAN PASIR BAWAH ( T = 10 CM ) 20 1 20
LANTAI KERJA ( T = 5 CM ) BAWAH LANTAI 30 2 10 20
PLINT KERAMIK 10 X 20 CM 30 2 15 15
KERAMIK DINDING KM/WC DAN LAB. UK 20 X 20 CM 65 1 65
PEMASANGAN KERAMIK LANTAI RUANGAN DAN KM/WC 115 4 5 55 50 5
URUGAN PASIR BAWAH LANTAI RABAT BETON KORIDOR 10 1 10
LANTAI RABAT BETON KORIDOR ( T = 7 CM ) 20 1 20
CAT TEMBOK, PLAFON DAN KUSEN 50 4 6 12 25 7
JUMLAH 56 31 86 131 151 171 191 206 221 241 287 297 231 207 183 172 164 149 134 116 102 68 36 28
JUMLAH KUMULATIF 56 87 173 304 454 625 816 1022 1243 1484 1770 2067 2298 2505 2688 2859 3023 3172 3306 3422 3524 3591 3627 3655
KETERANGAN GAMBAR
I PEKERJAAN PERSIAPAN
1.1 PEMBERSIHAN LAHAN
1 m2 Membersihkan Lapangan dan Perataan
A. Tenaga Rp 9,000.00
Pekerja 0.1 OH Rp 55,000.00 Rp 5,500.00
Mandor 0.05 OH Rp 70,000.00 Rp 3,500.00
B. Bahan
C. Peralatan
D. Jumlah ( A+B+C ) Rp 9,000.00
E. Overhead & Profit ( 10% ) Rp 900.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 9,900.00
1.2 PENGUKURAN DAN BOWPLANNK
1 m' Pengukuran dan Pemasangan Bouwplank
A. Tenaga Rp 14,150.00
Pekerja 0.1 OH Rp 55,000.00 Rp 5,500.00
Tukang Kayu 0.1 OH Rp 75,000.00 Rp 7,500.00
Kepala Tukang 0.01 OH Rp 80,000.00 Rp 800.00
Mandor 0.005 OH Rp 70,000.00 Rp 350.00
B. Bahan Rp 107,060.00
3
Kayu 5/7 x 4m Kayu Kruing 0.012 m Rp 5,400,000.00 Rp 64,800.00
Paku Biasa 2" - 5" 0.02 kg Rp 13,000.00 Rp 260.00
Kayu Papan 3/20 Kruing 0.007 m3 Rp 6,000,000.00 Rp 42,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 121,210.00
E. Overhead & Profit ( 10% ) Rp 12,121.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 133,331.00
B. Bahan Rp 144,000.00
Pasir Urug 1.2 m3 Rp 120,000.00 Rp 144,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 161,200.00
E. Overhead & Profit ( 10% ) Rp 16,120.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 177,320.00
2.1.4 LANTAI KERJA FOOTPLAT K100
1 m3 Membuat Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K100), slum (3-6)cm, w/c = 0.87
A. Tenaga Rp 83,020.00
Pekerja 1.2 OH Rp 55,000.00 Rp 66,000.00
Tukang Batu 0.2 OH Rp 75,000.00 Rp 15,000.00
Kepala Tukang 0.02 OH Rp 80,000.00 Rp 1,600.00
Mandor 0.006 OH Rp 70,000.00 Rp 420.00
B. Bahan Rp 672,013.91
Portland Semen 230 kg Rp 1,300.00 Rp 299,000.00
Pasir Beton 893 kg Rp 192.86 Rp 172,223.98
Kerikil (Maksimum 30mm) 1027 kg Rp 192.59 Rp 197,789.93
Air 200 ltr Rp 15.00 Rp 3,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 755,033.91
E. Overhead & Profit ( 10% ) Rp 75,503.39
F. Harga Satuan Pekerjaan ( D+E ) Rp 830,537.30
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
2.1.5 BETON COR PONDASI FOOTPLAT K250
1 m3 Membuat Beton Mutu f'c = 21,7 Mpa (K250), slum (12±2)cm, w/c = 0.56
A. Tenaga Rp 119,425.00
Pekerja 1.65 OH Rp 55,000.00 Rp 90,750.00
Tukang Batu 0.275 OH Rp 75,000.00 Rp 20,625.00
Kepala Tukang 0.028 OH Rp 80,000.00 Rp 2,240.00
Mandor 0.083 OH Rp 70,000.00 Rp 5,810.00
B. Bahan Rp 835,985.13
Portland Semen 384 kg Rp 1,300.00 Rp 499,200.00
Pasir Beton 692 kg Rp 192.86 Rp 133,459.12
Kerikil (Maksimum 30mm) 1039 kg Rp 192.59 Rp 200,101.01
Air 215 ltr Rp 15.00 Rp 3,225.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 955,410.13
E. Overhead & Profit ( 10% ) Rp 95,541.01
F. Harga Satuan Pekerjaan ( D+E ) Rp 1,050,951.14
2.1.6 PEMBESIAN PONDASI FOOTPLAT
10 Kg Pembesian dg Besi Polos atau Besi Ulir
A. Tenaga Rp 9,940.00
Pekerja 0.07 OH Rp 55,000.00 Rp 3,850.00
Tukang Besi 0.07 OH Rp 75,000.00 Rp 5,250.00
Kepala Tukang 0.007 OH Rp 80,000.00 Rp 560.00
Mandor 0.004 OH Rp 70,000.00 Rp 280.00
B. Bahan Rp 133,425.00
Besi Beton (polos/ulir) 10.5 kg Rp 12,500.00 Rp 131,250.00
Kawat Beton 0.15 ltr Rp 14,500.00 Rp 2,175.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 143,365.00
B. Bahan Rp 513,600.00
Batu Belah 15/20 1.2 m3 Rp 190,000.00 Rp 228,000.00
Portland Cement 136 kg Rp 1,300.00 Rp 176,800.00
Pasir Pasang 0.544 m3 Rp 200,000.00 Rp 108,800.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 663,600.00
E. Overhead & Profit ( 10% ) Rp 66,360.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 729,960.00
2.2.2 AANSTAMPING
1 m3 Pemasangan Batu Kosong / Anstamping
A. Tenaga Rp 78,000.00
Pekerja 0.78 OH Rp 55,000.00 Rp 42,900.00
Tukang Batu 0.39 OH Rp 75,000.00 Rp 29,250.00
Kepala Tukang 0.039 OH Rp 80,000.00 Rp 3,120.00
Mandor 0.039 OH Rp 70,000.00 Rp 2,730.00
B. Bahan Rp 279,840.00
Batu Belah 15/20 1.2 m3 Rp 190,000.00 Rp 228,000.00
3
Pasir Urug 0.432 m Rp 120,000.00 Rp 51,840.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 357,840.00
E. Overhead & Profit ( 10% ) Rp 35,784.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 393,624.00
2.2.3 PASIR URUG BATU KALI
1 m3 Urugan Pasir
A. Tenaga Rp 17,200.00
Pekerja 0.3 OH Rp 55,000.00 Rp 16,500.00
Mandor 0.01 OH Rp 70,000.00 Rp 700.00
B. Bahan Rp 144,000.00
3
Pasir Urug 1.2 m Rp 120,000.00 Rp 144,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 161,200.00
E. Overhead & Profit ( 10% ) Rp 16,120.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 177,320.00
2.2.4 URUGAN TANAH KEMBALI BATU KALI
1 m3 Pengurugan Kembali
A. Tenaga Rp 31,000.00
Pekerja 0.5 OH Rp 55,000.00 Rp 27,500.00
Mandor 0.05 OH Rp 70,000.00 Rp 3,500.00
B. Bahan
C. Peralatan
D. Jumlah ( A+B+C ) Rp 31,000.00
E. Overhead & Profit ( 10% ) Rp 3,100.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 34,100.00
PEKERJAAN LANTAI 1
III.A PEKERJAAN STRUKTUR
3.1 PEKERJAAN SLOOF BETON BERTULANG K225
PEMBESIAN SLOOF
10 Kg Pembesian dg Besi Polos atau Besi Ulir
A. Tenaga Rp 9,940.00
Pekerja 0.07 OH Rp 55,000.00 Rp 3,850.00
Tukang Besi 0.07 OH Rp 75,000.00 Rp 5,250.00
Kepala Tukang 0.007 OH Rp 80,000.00 Rp 560.00
Mandor 0.004 OH Rp 70,000.00 Rp 280.00
B. Bahan Rp 133,425.00
Besi Beton (polos/ulir) 10.5 kg Rp 12,500.00 Rp 131,250.00
Kawat Beton 0.15 ltr Rp 14,500.00 Rp 2,175.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 143,365.00
E. Overhead & Profit ( 10% ) Rp 14,336.50
F. Harga Satuan Pekerjaan ( D+E ) Rp 157,701.50
BEKISTING SLOOF
1 m2 Memasang Bekisting untuk Sloof
A. Tenaga Rp 52,000.00
Pekerja 0.52 OH Rp 55,000.00 Rp 28,600.00
Tukang Kayu 0.26 OH Rp 75,000.00 Rp 19,500.00
Kepala Tukang 0.026 OH Rp 80,000.00 Rp 2,080.00
Mandor 0.026 OH Rp 70,000.00 Rp 1,820.00
B. Bahan Rp 94,800.00
Kayu Klas III (Terentang) 0.045 m3 Rp 2,000,000.00 Rp 90,000.00
Paku Biasa 2" - 5" 0.3 kg Rp 13,000.00 Rp 3,900.00
Minyak Bekisting 0.1 ltr Rp 9,000.00 Rp 900.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 1,820.00
E. Overhead & Profit ( 10% ) Rp 182.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 2,002.00
BETON COR K225
1 m3 Membuat Beton Mutu f'c = 19.3 Mpa (K225), slum (12±2)cm, w/c = 0.58
A. Tenaga Rp 119,425.00
Pekerja 1.65 OH Rp 55,000.00 Rp 90,750.00
Tukang Batu 0.275 OH Rp 75,000.00 Rp 20,625.00
BEKISTING KOLOM
1 m2 Memasang Bekisting untuk Kolom
A. Tenaga Rp 66,000.00
Pekerja 0.66 OH Rp 55,000.00 Rp 36,300.00
Tukang Kayu 0.33 OH Rp 75,000.00 Rp 24,750.00
Kepala Tukang 0.033 OH Rp 80,000.00 Rp 2,640.00
Mandor 0.033 OH Rp 70,000.00 Rp 2,310.00
B. Bahan Rp 242,500.00
Kayu Klas III (Terentang) 0.04 m3 Rp 2,000,000.00 Rp 80,000.00
Paku Biasa 2" - 5" 0.4 kg Rp 13,000.00 Rp 5,200.00
Minyak Bekisting 0.2 ltr Rp 9,000.00 Rp 1,800.00
Balok Kayu Klas II 0.015 m3 Rp 5,400,000.00 Rp 81,000.00
Plywood tebal 9mm 0.35 lbr Rp 110,000.00 Rp 38,500.00
Dolken Kayu Galam diameter 8-10 cm / 4 m 2 btg Rp 18,000.00 Rp 36,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 308,500.00
E. Overhead & Profit ( 10% ) Rp 30,850.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 339,350.00
BETON COR K250
1 m3 Membuat Beton Mutu f'c = 21,7 Mpa (K250), slum (12±2)cm, w/c = 0.56
A. Tenaga Rp 119,425.00
Pekerja 1.65 OH Rp 55,000.00 Rp 90,750.00
Tukang Batu 0.275 OH Rp 75,000.00 Rp 20,625.00
Kepala Tukang 0.028 OH Rp 80,000.00 Rp 2,240.00
Mandor 0.083 OH Rp 70,000.00 Rp 5,810.00
B. Bahan Rp 835,985.13
Portland Semen 384 kg Rp 1,300.00 Rp 499,200.00
Pasir Beton 692 kg Rp 192.86 Rp 133,459.12
Kerikil (Maksimum 30mm) 1039 kg Rp 192.59 Rp 200,101.01
Air 215 ltr Rp 15.00 Rp 3,225.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 955,410.13
E. Overhead & Profit ( 10% ) Rp 95,541.01
F. Harga Satuan Pekerjaan ( D+E ) Rp 1,050,951.14
3.3 PEKERJAAN BALOK BETON BERTULANG K250
PEMBESIAN BALOK
10 Kg Pembesian dg Besi Polos atau Besi Ulir
A. Tenaga Rp 9,940.00
Pekerja 0.07 OH Rp 55,000.00 Rp 3,850.00
Tukang Besi 0.07 OH Rp 75,000.00 Rp 5,250.00
Kepala Tukang 0.007 OH Rp 80,000.00 Rp 560.00
Mandor 0.004 OH Rp 70,000.00 Rp 280.00
B. Bahan Rp 133,425.00
Besi Beton (polos/ulir) 10.5 kg Rp 12,500.00 Rp 131,250.00
Kawat Beton 0.15 ltr Rp 14,500.00 Rp 2,175.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 143,365.00
E. Overhead & Profit ( 10% ) Rp 14,336.50
F. Harga Satuan Pekerjaan ( D+E ) Rp 157,701.50
BEKISTING BALOK
1 m2 Memasang Bekisting untuk Balok
A. Tenaga Rp 66,000.00
Pekerja 0.66 OH Rp 55,000.00 Rp 36,300.00
Tukang Kayu 0.33 OH Rp 75,000.00 Rp 24,750.00
B. Bahan Rp 314,500.00
3
Kayu Klas III (Terentang) 0.04 m Rp 2,000,000.00 Rp 80,000.00
Paku Biasa 2" - 5" 0.4 kg Rp 13,000.00 Rp 5,200.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 380,500.00
E. Overhead & Profit ( 10% ) Rp 38,050.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 418,550.00
BETON COR K250
1 m3 Membuat Beton Mutu f'c = 21,7 Mpa (K250), slum (12±2)cm, w/c = 0.56
A. Tenaga Rp 119,425.00
Pekerja 1.65 OH Rp 55,000.00 Rp 90,750.00
Tukang Batu 0.275 OH Rp 75,000.00 Rp 20,625.00
Kepala Tukang 0.028 OH Rp 80,000.00 Rp 2,240.00
Mandor 0.083 OH Rp 70,000.00 Rp 5,810.00
B. Bahan Rp 835,985.13
Portland Semen 384 kg Rp 1,300.00 Rp 499,200.00
Pasir Beton 692 kg Rp 192.86 Rp 133,459.12
Kerikil (Maksimum 30mm) 1039 kg Rp 192.59 Rp 200,101.01
Air 215 ltr Rp 15.00 Rp 3,225.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 955,410.13
E. Overhead & Profit ( 10% ) Rp 95,541.01
F. Harga Satuan Pekerjaan ( D+E ) Rp 1,050,951.14
PEKERJAAN PLESTERAN 1 : 5
1 m2 Pemasangan Plesteran 1PC : 5PP Tebal 20 mm
A. Tenaga Rp 40,140.00
Pekerja 0.4 OH Rp 55,000.00 Rp 22,000.00
Tukang Batu 0.2 OH Rp 75,000.00 Rp 15,000.00
Kepala Tukang 0.02 OH Rp 80,000.00 Rp 1,600.00
Mandor 0.022 OH Rp 70,000.00 Rp 1,540.00
B. Bahan Rp 15,985.60
Portland Semen 6.912 kg Rp 1,300.00 Rp 8,985.60
3
Pasir Pasang 0.035 m Rp 200,000.00 Rp 7,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 56,125.60
E. Overhead & Profit ( 10% ) Rp 5,612.56
F. Harga Satuan Pekerjaan ( D+E ) Rp 61,738.16
VI.A PEKERJAAN KUSEN
PINTU DAN JENDELA
KUSEN PINTU ALUMUNIUM
1m' Pemasangan Kusen Pintu Allumunium
A. Tenaga Rp 6,081.00
Pekerja 0.043 OH Rp 55,000.00 Rp 2,365.00
Tukang Besi 0.043 OH Rp 75,000.00 Rp 3,225.00
Kepala Tukang 0.0043 OH Rp 80,000.00 Rp 344.00
Mandor 0.0021 OH Rp 70,000.00 Rp 147.00
B. Bahan Rp 92,500.00
Profil Allumunium 1.1 m' Rp 80,000.00 Rp 88,000.00
Skrup Fixer 2 bh Rp 750.00 Rp 1,500.00
B. Bahan Rp 154,000.00
Kaca Tebal 8 mm 1.1 m2 Rp 140,000.00 Rp 154,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 167,327.50
E. Overhead & Profit ( 10% ) Rp 16,732.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 184,060.25
KACA T = 5 mm
1 m2 Pemasangan Kaca tebal 5 mm
A. Tenaga Rp 13,327.50
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.00075 OH Rp 70,000.00 Rp 52.50
B. Bahan Rp 77,000.00
Kaca Tebal 5 mm 1.1 m2 Rp 70,000.00 Rp 77,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 90,327.50
E. Overhead & Profit ( 10% ) Rp 9,032.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 99,360.25
HANDEL
1 Buah Pemasangan Handle Pintu HINGE ES SL 9″ SN
A. Tenaga Rp 13,800.00
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.0075 OH Rp 70,000.00 Rp 525.00
B. Bahan Rp 50,000.00
Handle Pintu 1 bh Rp 50,000.00 Rp 50,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 63,800.00
E. Overhead & Profit ( 10% ) Rp 6,380.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 70,180.00
KACA BURAM
1 m2 Pemasangan Kaca Buram T = 5 mm
A. Tenaga Rp 13,327.50
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.00075 OH Rp 70,000.00 Rp 52.50
B. Bahan Rp 68,750.00
Kaca Buram T = 5 mm 1.1 m2 Rp 62,500.00 Rp 68,750.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 82,077.50
E. Overhead & Profit ( 10% ) Rp 8,207.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 90,285.25
ENGSEL
1 Buah Pemasangan Engsel Pintu
A. Tenaga Rp 13,800.00
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.0075 OH Rp 70,000.00 Rp 525.00
B. Bahan Rp 529,392.00
Batu Bata 150 bh Rp 500.00 Rp 75,000.00
Portland Semen 120 kg Rp 1,300.00 Rp 156,000.00
Pasir Pasang 0.3 m3 Rp 200,000.00 Rp 60,000.00
Porselen 11 x 11 cm 360 bh Rp 512.20 Rp 184,392.00
Semen Nat 6 kg Rp 9,000.00 Rp 54,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 1,110,492.00
E. Overhead & Profit ( 10% ) Rp 111,049.20
F. Harga Satuan Pekerjaan ( D+E ) Rp 1,221,541.20
FLOOR DRAIN
1 Buah Pemasangan Floor Drain
A. Tenaga Rp 9,200.00
Pekerja 0.01 OH Rp 55,000.00 Rp 550.00
Tukang Batu 0.1 OH Rp 75,000.00 Rp 7,500.00
Kepala Tukang 0.01 OH Rp 80,000.00 Rp 800.00
Mandor 0.005 OH Rp 70,000.00 Rp 350.00
B. Bahan Rp 15,000.00
Floor Drain 1 bh Rp 15,000.00 Rp 15,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 24,200.00
E. Overhead & Profit ( 10% ) Rp 2,420.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 26,620.00
KRAN AIR
1 Buah Pemasangan Kran diameter 1/2" atau 3/4"
A. Tenaga Rp 34,100.00
Pekerja 0.01 OH Rp 55,000.00 Rp 550.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
B. Bahan Rp 15,009.75
Kran Air 1 bh Rp 15,000.00 Rp 15,000.00
Sealtape 0.0025 kg Rp 3,900.00 Rp 9.75
C. Peralatan
D. Jumlah ( A+B+C ) Rp 49,109.75
E. Overhead & Profit ( 10% ) Rp 4,910.98
F. Harga Satuan Pekerjaan ( D+E ) Rp 54,020.73
PIPA PVC DIAMETER 2.5"
1 m' Pemasangan Pipa PVC tipe AW diameter 2.5"
A. Tenaga Rp 15,940.00
Pekerja 0.081 OH Rp 55,000.00 Rp 4,455.00
Tukang Batu 0.135 OH Rp 75,000.00 Rp 10,125.00
Kepala Tukang 0.0135 OH Rp 80,000.00 Rp 1,080.00
Mandor 0.004 OH Rp 70,000.00 Rp 280.00
B. Bahan Rp 51,666.66
Pipa PVC diameter 2.5" 1.2 m' Rp 33,333.33 Rp 40,000.00
Perlengkapan 35% x pipa 0.35 Ls Rp 33,333.33 Rp 11,666.67
C. Peralatan
D. Jumlah ( A+B+C ) Rp 67,606.66
E. Overhead & Profit ( 10% ) Rp 6,760.67
F. Harga Satuan Pekerjaan ( D+E ) Rp 74,367.33
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
DINDING KERAMIK 20 X 20
1 m2 Pemasangan Dinding Keramik 20 x 20 cm
A. Tenaga Rp 90,000.00
Pekerja 0.9 OH Rp 55,000.00 Rp 49,500.00
Tukang Batu 0.45 OH Rp 75,000.00 Rp 33,750.00
Kepala Tukang 0.045 OH Rp 80,000.00 Rp 3,600.00
Mandor 0.045 OH Rp 70,000.00 Rp 3,150.00
B. Bahan Rp 83,070.00
Keramik 20 x 20 26 bh Rp 1,920.00 Rp 49,920.00
Portland Semen 9.3 kg Rp 1,300.00 Rp 12,090.00
Pasir Pasang 0.018 m3 Rp 200,000.00 Rp 3,600.00
Semen Warna 1.94 kg Rp 9,000.00 Rp 17,460.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 173,070.00
E. Overhead & Profit ( 10% ) Rp 17,307.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 190,377.00
9.3 PEKERJAAN PENGECETAN
CAT TEMBOK EXERIOR
1 m2 Pengecat Tembok Baru ( 1 Lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup ( Eksterior )
A. Tenaga Rp 6,539.00
Pekerja 0.02 OH Rp 55,000.00 Rp 1,100.00
Tukang Batu 0.063 OH Rp 75,000.00 Rp 4,725.00
Kepala Tukang 0.0063 OH Rp 80,000.00 Rp 504.00
Mandor 0.003 OH Rp 70,000.00 Rp 210.00
B. Bahan Rp 89,500.00
Plamir 0.1 kg Rp 20,000.00 Rp 2,000.00
PEKERJAAN LANTAI 2
III.B PEKERJAAN STRUKTUR
3.2 PEKERJAAN KOLOM BETON BERTULANG K250
PEMBESIAN KOLOM
10 Kg Pembesian dg Besi Polos atau Besi Ulir
A. Tenaga Rp 9,940.00
Pekerja 0.07 OH Rp 55,000.00 Rp 3,850.00
Tukang Besi 0.07 OH Rp 75,000.00 Rp 5,250.00
Kepala Tukang 0.007 OH Rp 80,000.00 Rp 560.00
Mandor 0.004 OH Rp 70,000.00 Rp 280.00
B. Bahan Rp 133,425.00
Besi Beton (polos/ulir) 10.5 kg Rp 12,500.00 Rp 131,250.00
Kawat Beton 0.15 ltr Rp 14,500.00 Rp 2,175.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 143,365.00
E. Overhead & Profit ( 10% ) Rp 14,336.50
F. Harga Satuan Pekerjaan ( D+E ) Rp 157,701.50
BEKISTING KOLOM
1 m2 Memasang Bekisting untuk Kolom
A. Tenaga Rp 66,000.00
Pekerja 0.66 OH Rp 55,000.00 Rp 36,300.00
Tukang Kayu 0.33 OH Rp 75,000.00 Rp 24,750.00
Kepala Tukang 0.033 OH Rp 80,000.00 Rp 2,640.00
Mandor 0.033 OH Rp 70,000.00 Rp 2,310.00
B. Bahan Rp 242,500.00
Kayu Klas III (Terentang) 0.04 m3 Rp 2,000,000.00 Rp 80,000.00
PEKERJAAN PLESTERAN 1 : 5
1 m2 Pemasangan Plesteran 1PC : 5PP Tebal 20 mm
A. Tenaga Rp 40,140.00
Pekerja 0.4 OH Rp 55,000.00 Rp 22,000.00
Tukang Batu 0.2 OH Rp 75,000.00 Rp 15,000.00
Kepala Tukang 0.02 OH Rp 80,000.00 Rp 1,600.00
Mandor 0.022 OH Rp 70,000.00 Rp 1,540.00
B. Bahan Rp 15,985.60
Portland Semen 6.912 kg Rp 1,300.00 Rp 8,985.60
3
Pasir Pasang 0.035 m Rp 200,000.00 Rp 7,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 56,125.60
E. Overhead & Profit ( 10% ) Rp 5,612.56
F. Harga Satuan Pekerjaan ( D+E ) Rp 61,738.16
VI.B PEKERJAAN KUSEN
PINTU DAN JENDELA
KUSEN PINTU ALUMUNIUM
1m' Pemasangan Kusen Pintu Allumunium
A. Tenaga Rp 6,081.00
Pekerja 0.043 OH Rp 55,000.00 Rp 2,365.00
Tukang Besi 0.043 OH Rp 75,000.00 Rp 3,225.00
Kepala Tukang 0.0043 OH Rp 80,000.00 Rp 344.00
Mandor 0.0021 OH Rp 70,000.00 Rp 147.00
B. Bahan Rp 92,500.00
Profil Allumunium 1.1 m' Rp 80,000.00 Rp 88,000.00
Skrup Fixer 2 bh Rp 750.00 Rp 1,500.00
B. Bahan Rp 154,000.00
Kaca Tebal 8 mm 1.1 m2 Rp 140,000.00 Rp 154,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 167,327.50
E. Overhead & Profit ( 10% ) Rp 16,732.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 184,060.25
KACA T = 5 mm
1 m2 Pemasangan Kaca tebal 5 mm
A. Tenaga Rp 13,327.50
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.00075 OH Rp 70,000.00 Rp 52.50
B. Bahan Rp 77,000.00
Kaca Tebal 5 mm 1.1 m2 Rp 70,000.00 Rp 77,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 90,327.50
E. Overhead & Profit ( 10% ) Rp 9,032.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 99,360.25
HANDEL
1 Buah Pemasangan Handle Pintu HINGE ES SL 9″ SN
A. Tenaga Rp 13,800.00
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.0075 OH Rp 70,000.00 Rp 525.00
B. Bahan Rp 50,000.00
Handle Pintu 1 bh Rp 50,000.00 Rp 50,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 63,800.00
E. Overhead & Profit ( 10% ) Rp 6,380.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 70,180.00
KACA BURAM
1 m2 Pemasangan Kaca Buram T = 5 mm
A. Tenaga Rp 13,327.50
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.00075 OH Rp 70,000.00 Rp 52.50
B. Bahan Rp 68,750.00
Kaca Buram T = 5 mm 1.1 m2 Rp 62,500.00 Rp 68,750.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 82,077.50
E. Overhead & Profit ( 10% ) Rp 8,207.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 90,285.25
ENGSEL
1 Buah Pemasangan Engsel Pintu
A. Tenaga Rp 13,800.00
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.0075 OH Rp 70,000.00 Rp 525.00
B. Bahan Rp 6,000.00
Engsel Pintu 1 bh Rp 6,000.00 Rp 6,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 19,800.00
E. Overhead & Profit ( 10% ) Rp 1,980.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 21,780.00
MULTIPLEKS
1 m2 Pembuatan & Pemasangan Pintu Kayu Lapis ( Plywood ) Rangkap Rangka Kayu Klass II ( lbr s/d 90 cm )
A. Tenaga Rp 13,327.50
Pekerja 0.015 OH Rp 55,000.00 Rp 825.00
Tukang Kayu 0.15 OH Rp 75,000.00 Rp 11,250.00
Kepala Tukang 0.015 OH Rp 80,000.00 Rp 1,200.00
Mandor 0.00075 OH Rp 70,000.00 Rp 52.50
B. Bahan Rp 297,390.00
Kayu Klas II (Kamfer) papan 0.025 m3 Rp 7,600,000.00 Rp 190,000.00
Paku Biasa 1/2" - 1" 0.03 kg Rp 13,000.00 Rp 390.00
Lem Kayu 0.5 lbr Rp 18,000.00 Rp 9,000.00
Multipleks ( 9 mm ) 1 lbr Rp 98,000.00 Rp 98,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 310,717.50
E. Overhead & Profit ( 10% ) Rp 31,071.75
F. Harga Satuan Pekerjaan ( D+E ) Rp 341,789.25
PINTU KACA RANGKA ALUMUNIUM
1 m2 Pemasangan Pintu Kaca Rangka Allumunium
A. Tenaga Rp 12,120.00
Pekerja 0.085 OH Rp 55,000.00 Rp 4,675.00
B. Bahan Rp 529,392.00
Batu Bata 150 bh Rp 500.00 Rp 75,000.00
Portland Semen 120 kg Rp 1,300.00 Rp 156,000.00
Pasir Pasang 0.3 m3 Rp 200,000.00 Rp 60,000.00
Porselen 11 x 11 cm 360 bh Rp 512.20 Rp 184,392.00
Semen Nat 6 kg Rp 9,000.00 Rp 54,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 1,110,492.00
E. Overhead & Profit ( 10% ) Rp 111,049.20
F. Harga Satuan Pekerjaan ( D+E ) Rp 1,221,541.20
FLOOR DRAIN
1 Buah Pemasangan Floor Drain
A. Tenaga Rp 9,200.00
Pekerja 0.01 OH Rp 55,000.00 Rp 550.00
Tukang Batu 0.1 OH Rp 75,000.00 Rp 7,500.00
Kepala Tukang 0.01 OH Rp 80,000.00 Rp 800.00
Mandor 0.005 OH Rp 70,000.00 Rp 350.00
B. Bahan Rp 15,000.00
Floor Drain 1 bh Rp 15,000.00 Rp 15,000.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 24,200.00
E. Overhead & Profit ( 10% ) Rp 2,420.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 26,620.00
KRAN AIR
1 Buah Pemasangan Kran diameter 1/2" atau 3/4"
A. Tenaga Rp 34,100.00
Pekerja 0.01 OH Rp 55,000.00 Rp 550.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 49,109.75
E. Overhead & Profit ( 10% ) Rp 4,910.98
F. Harga Satuan Pekerjaan ( D+E ) Rp 54,020.73
PIPA PVC DIAMETER 2.5"
1 m' Pemasangan Pipa PVC tipe AW diameter 2.5"
A. Tenaga Rp 15,940.00
Pekerja 0.081 OH Rp 55,000.00 Rp 4,455.00
Tukang Batu 0.135 OH Rp 75,000.00 Rp 10,125.00
Kepala Tukang 0.0135 OH Rp 80,000.00 Rp 1,080.00
Mandor 0.004 OH Rp 70,000.00 Rp 280.00
B. Bahan Rp 51,666.66
Pipa PVC diameter 2.5" 1.2 m' Rp 33,333.33 Rp 40,000.00
Perlengkapan 35% x pipa 0.35 Ls Rp 33,333.33 Rp 11,666.67
C. Peralatan
D. Jumlah ( A+B+C ) Rp 67,606.66
E. Overhead & Profit ( 10% ) Rp 6,760.67
F. Harga Satuan Pekerjaan ( D+E ) Rp 74,367.33
DINDING KERAMIK 20 X 20
1 m2 Pemasangan Dinding Keramik 20 x 20 cm
A. Tenaga Rp 90,000.00
Pekerja 0.9 OH Rp 55,000.00 Rp 49,500.00
Tukang Batu 0.45 OH Rp 75,000.00 Rp 33,750.00
Kepala Tukang 0.045 OH Rp 80,000.00 Rp 3,600.00
Mandor 0.045 OH Rp 70,000.00 Rp 3,150.00
B. Bahan Rp 83,070.00
Keramik 20 x 20 26 bh Rp 1,920.00 Rp 49,920.00
Portland Semen 9.3 kg Rp 1,300.00 Rp 12,090.00
Pasir Pasang 0.018 m3 Rp 200,000.00 Rp 3,600.00
Semen Warna 1.94 kg Rp 9,000.00 Rp 17,460.00
C. Peralatan
D. Jumlah ( A+B+C ) Rp 173,070.00
E. Overhead & Profit ( 10% ) Rp 17,307.00
F. Harga Satuan Pekerjaan ( D+E ) Rp 190,377.00
9.3 PEKERJAAN PENGECETAN
CAT TEMBOK EXERIOR
1 m2 Pengecat Tembok Baru ( 1 Lap. Plamir, 1 Lap. Cat Dasar, 2 Lap. Cat Penutup ( Eksterior )
A. Tenaga Rp 6,539.00
Pekerja 0.02 OH Rp 55,000.00 Rp 1,100.00
Tukang Batu 0.063 OH Rp 75,000.00 Rp 4,725.00
Kepala Tukang 0.0063 OH Rp 80,000.00 Rp 504.00
Mandor 0.003 OH Rp 70,000.00 Rp 210.00
B. Bahan Rp 89,500.00
Plamir 0.1 kg Rp 20,000.00 Rp 2,000.00
DAFTAR ANALISA PEKERJAAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
EDISI SEPTEMBER 2015 SEMARANG
NO URAIAN PEKERJAAN KOEF SAT HARGA BAHAN / UPAH (Rp) JUMLAH
II PEKERJAAN PONDASI
GALIAN TANAH FOOTPLAT 259.000 m3 14 Pekerja 1.05 271.950 19.425 20 22
Mandor 0.067 17.353 1.240 2
BETON COR PONDASI FOOTPLAT K250 26.585 m3 Pekerja 1.650 43.865 3.133 4 7
Tukang Batu 0.275 7.311 0.522 1
Kepala Tukang 0.028 0.744 0.053 1
Mandor 0.083 2.207 0.158 1
TOPI - TOPI + 3.17 Beton Cor K-225 2.898 m3 Pekerja 1.650 4.782 0.683 1 4
Tukang Batu 0.275 0.797 0.114 1
Kepala Tukang 0.028 0.081 0.012 1
Mandor 0.083 0.241 0.034 1
PEKERJAAN LANTAI II
PEKERJAAN KOLOM 21
KOLOM Pembesian 2089.834 kg Pekerja 0.07 146.288 6.966 7 16
Tukang Besi 0.07 146.288 6.966 7
Kepala Tukang 0.007 14.629 0.697 1
Mandor 0.004 8.359 0.398 1
BALOK RING Beton Cor K-225 8.069 m3 Pekerja 1.650 13.314 0.951 1 4
Tukang Batu 0.275 2.219 0.158 1
Kepala Tukang 0.028 0.226 0.016 1
Mandor 0.083 0.670 0.048 1
PEKERJAAN PLAT ATAP 28
PLAT ATAP Bekisting 273.620 m2 Pekerja 0.660 180.589 6.450 7 13
Tukang Kayu 0.330 90.295 3.225 4
Kepala Tukang 0.033 9.029 0.322 1
Mandor 0.033 9.029 0.322 1
PLAT ATAP Beton Cor K-250 31.344 m3 Pekerja 1.650 51.718 1.847 2 5
Tukang Batu 0.275 8.620 0.308 1
Kepala Tukang 0.028 0.878 0.031 1
Mandor 0.083 2.602 0.093 1
PEK.TOPI-TOPI +6.30 14
2
TOPI-TOPI +6.30 Bekisting 26.460 m 7 Pekerja 0.660 17.464 1.247 2 5
Tukang Kayu 0.330 8.732 0.624 1
Kepala Tukang 0.033 0.873 0.062 1
Mandor 0.033 0.873 0.062 1
TOPI-TOPI +6.30 Beton Cor K-225 2.356 m3 7 Pekerja 1.650 3.887 0.278 1 4
Tukang Batu 0.275 0.648 0.046 1
Kepala Tukang 0.028 0.066 0.005 1
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
VI PEKERJAAN KUSEN
KUSEN ALMUNIUM 410.420 m 14 Pekerja 0.043 17.648 1.261 2 6
Tukang Besi 0.043 17.648 1.261 2
Kepala Tukang 0.004 1.765 0.126 1
Mandor 0.002 0.862 0.062 1
IX PEKERJAAN FINISHING
PEKERJAAN PEMASANGAN PLAFON
RANGKA HOLLOW 505.800 m2 21 Pekerja 0.350 177.030 8.430 9 20
Tukang Besi 0.350 177.030 8.430 9
Kepala Tukang 0.035 17.703 0.843 1
Mandor 0.018 9.104 0.434 1
PLAFON TYPE A, B, DAN C (GYSUM BOA 597.063 m2 14 Pekerja 0.1 59.706 4.265 5 10
Tukang Kayu 0.05 29.853 2.132 3
Kepala Tukang 0.005 2.985 0.213 1
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
H.8 P.KERAMIK LANTAI RUANGAN DAN KM/WC 546.540 m2 28 Pekerja 0.700 382.578 13.664 14 23
Tukang Batu 0.350 191.289 6.832 7
Kepala Tukang 0.035 19.129 0.683 1
Mandor 0.035 19.129 0.683 1
H.9 URUGAN PASIR BAWAH LANTAI RABAT BETON 1.858 m3 7 Pekerja 0.300 0.557 0.080 1 2
Mandor 0.010 0.019 0.003 1
H.10 LANTAI RABAT BETON KORIDOR ( T = 7 CM ) 1.300 m3 7 Pekerja 1.200 1.560 0.223 1 4
Tukang Batu 0.200 0.260 0.037 1
Kepala Tukang 0.020 0.026 0.004 1
Mandor 0.006 0.008 0.001 1
PEKERJAAN PENGECATAN
H.11 CAT TEMBOK, PLAFON DAN KUSEN 2404.060 m2 14 Pekerja 0.020 48.081 3.434 4 18
Tukang Batu 0.063 151.456 10.818 11
Kepala Tukang 0.006 15.146 1.082 2
ANALISA KEBUTUHAN TENAGA KERJA PEMBANGUNAN GED. PMI BOYOLALI
DURASI BULAN KE- 1 BULAN KE- 2 BULAN KE- 3 BULAN KE- 4 BULAN KE- 5 BULAN KE- 6
NO JENIS PEKERJAAN URAIAN PEKER JAAN BOBOT
(MINGGU) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
I 1.1 PEKERJAAN PERSIAPAN ADMINISTRASI 0.379% 24 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016%
1.2 PEMBERSIHAN LAHAN 0.212% 1 0.212%
1.3 PENGUKURAN DAN BOWPLANG 0.616% 1 0.616%
II 2.1 PEKERJAAN PONDASI GALIAN TANAH FOOTPLAT 0.842% 2 0.459% 0.383%
2.2 PASIR URUG FOOTPLAT 0.062% 1 0.062%
2.3 LANTAI KERJA FOOTPLAT K 100 0.145% 1 0.145%
2.4 PEK.PONDASI FOOTPLAT 2.863% 2 1.301% 1.562%
2.5 URUGAN TANAH KEMBALI FOOTPLAT 0.365% 3 0.156% 0.156% 0.052%
2.6 PASIR URUG BATU KALI 0.167% 1 0.167%
2.7 AANSTAMPING 0.740% 1 0.740%
2.8 PAS. BATU BELAH 3.021% 2 0.711% 2.310%
2.9 URUGAN TANAH BATU KALI 0.512% 2 0.220% 0.293%
III 3.1 PEKERJAAN STRUKTUR PEKERJAAN SLOOF K-225 3.770% 3 0.343% 0.914% 2.513%
3.2 PEKERJAAN LANTAI 1 PEKERJAAN KOLOM K-250 9.364% 3 6.867% 2.341% 0.156%
3.3 PEKERJAAN BALOK K-250 9.833% 2 3.910% 5.923%
3.4 PEKERJAAN TANGGA K-250 0.676% 2 0.423% 0.254%
3.5 PEK.PLAT LANTAI II K-250 8.999% 3 6.136% 2.454% 0.409%
3.6 PEK.TOPI-TOPI +3.17 K-225 0.905% 1 0.905%
3.7 PEKERJAAN LANTAI 2 PEKERJAAN KOLOM K-250 4.682% 3 4.229% 0.302% 0.151%
3.8 PEKERJAAN BALOK RING K-250 3.560% 2 1.952% 1.608%
3.9 PEK.PLAT ATAP K-250 9.090% 4 0.253% 3.030% 2.778% 3.030%
3.10 PEK.TOPI-TOPI+6.30 K-225 0.740% 2 0.398% 0.342%
V 5.1 PEK. PAS.BT. BATA & PLESTERAN PAS. BATA 2.835% 5 1.134% 0.284% 0.284% 0.567% 0.567%
5.2 PLESTERAN 1.919% 3 1.188% 0.457% 0.274%
VI 6.1 PEKERJAAN KUSEN KUSEN ALMUNIUM 2.108% 2 1.756% 0.351%
6.2 DAUN KUSEN 3.690% 2 1.757% 1.933%
6.3 KACA BURAM, T 5 MM, T 8 MM 0.428% 1 0.428%
6.4 GYSUM 0.007% 2 0.002% 0.005%
6.5 MULTIPLEK 0.300% 2 0.150% 0.150%
6.6 AKSESORIES KUSEN 0.338% 1 0.338%
VII 7.1 PEKERJAAN M & E PROPERTIES DAN INSTALASI M & E 3.086% 2 2.057% 1.029%
VIII 8.1 PEKERJAAN SANITASI INSTALASI PIPA AIR BERSIH 0.335% 2 0.167% 0.167%
8.2 INSTALASI PIPA AIR KOTOR 0.331% 2 0.165% 0.165%
8.3 SEPTICTANK 0.061% 1 0.061%
8.4 PEMASANGAN PROPERTIES SANITASI 0.941% 4 0.529% 0.118% 0.235% 0.059%
IX 9.1 PEKERJAAN FINISHING RANGKA HOLLOW 4.468% 3 2.010% 1.787% 0.670%
9.2 PLAFON TYPE A, B, DAN C (GYSUM BOARD) 1.100% 2 0.110% 0.990%
9.3 LIST LANGIT-LANGIT KAYU PROFIL 0.274% 1 0.274%
9.4 URUGAN PASIR BAWAH ( T = 10 CM ) 0.425% 1 0.425%
9.5 LANTAI KERJA ( T = 5 CM ) BAWAH LANTAI 0.995% 2 0.332% 0.663%
9.6 PLINT KERAMIK 10 X 20 CM 0.386% 2 0.193% 0.193%
9.7 KERAMIK DINDING KM/WC DAN LAB. UK 20 X 20 CM 0.601% 2 0.301% 0.301%
9.8 PEMASANGAN KERAMIK LANTAI RUANGAN DAN KM/WC 4.475% 4 0.195% 2.140% 1.946% 0.195%
9.9 URUGAN PASIR BAWAH LANTAI RABAT BETON KORIDO 0.016% 1
9.10 LANTAI RABAT BETON KORIDOR ( T = 7 CM ) 0.051% 1
9.11 CAT TEMBOK, PLAFON DAN KUSEN 9.287% 2
JUMLAH 100.00% 0.227% 0.631% 0.475% 0.606% 1.473% 1.734% 2.029% 3.792% 3.215% 6.883% 6.266% 6.095% 10.799% 6.648% 3.090% 5.636% 5.979% 5.809% 4.133% 5.848% 5.729% 3.514%
JUMLAH KUMULATIF 0.227% 0.859% 1.334% 1.939% 3.413% 5.146% 7.175% 10.967% 14.182% 21.064% 27.331% 33.426% 44.225% 50.874% 53.963% 59.599% 65.578% 71.387% 75.519% 81.368% 87.097% 90.611%
MBANGUNAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
BULAN KE- 6
23 24
0.016% 0.016%
0.016%
0.051%
7.223% 2.064%
7.255% 2.131%
97.866% 100.00%
GRAFIK MAN POWER PEMBANGUNAN GEDUNG PMI CAB. BOYOLALI : KABUPATEN BOYOLALI
JUMLAH DURASI BULAN KE- 1 BULAN KE- 2 BULAN KE- 3 BULAN KE- 4 BULAN KE- 5 BULAN KE- 6
NO JENIS PEKERJAAN URAIAN PEKER JAAN
PEKERJA (MINGGU) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I 1.1 PEKERJAAN PERSIAPAN ADMINISTRASI 20 24 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1.2 PEMBERSIHAN LAHAN 55 1 55
1.3 PENGUKURAN DAN BOWPLANG 30 1 30
II 2.1 PEKERJAAN PONDASI GALIAN TANAH FOOTPLAT 110 2 60 50
2.2 PASIR URUG FOOTPLAT 10 1 10
2.3 LANTAI KERJA FOOTPLAT K 100 20 1 20
2.4 PEK.PONDASI FOOTPLAT 165 2 75 90
2.5 URUGAN TANAH KEMBALI FOOTPLAT 35 3 15 15 5
2.6 PASIR URUG BATU KALI 35 1 35
2.7 AANSTAMPING 50 1 50
2.8 PAS. BATU BELAH 85 2 20 65
2.9 URUGAN TANAH BATU KALI 70 2 30 40
III 3.1 PEKERJAAN STRUKTUR PEK. SLOOF K-225 165 3 15 40 110
3.2 PEKERJAAN LANTAI I PEK KOLOM K-250 300 3 220 75 5
3.3 PEK. BALOK K-250 415 2 165 250
3.4 PEK.TANGGA K-250 80 2 50 30
3.5 PEK. PLAT LANTAI II K-250 220 3 150 60 10
3.6 PEK. TOPI - TOPI K-225 90 1 90
3.7 PEKERJAAN LANTAI 2 PEK. KOLOM K-250 155 3 140 10 5
3.8 PEK.BALOK RING K-250 155 2 85 70
3.9 PEK.PLAT ATAP K-250 180 4 5 60 55 60
3.10 PEK.TOPI-TOPI +630 K-225 65 2 35 30
V 5.1 PEK. PAS.BT. BATA & PLESTERAN PAS. BATA 50 5 20 5 5 10 10
5.2 PLESTERAN 105 3 65 25 15
VI 6.1 PEKERJAAN KUSEN KUSEN ALMUNIUM 30 2 25 5
6.2 DAUN KUSEN 105 2 50 55
6.3 KACA BURAM, T 5 MM, T 8 MM 25 1 25
6.4 GYSUM 20 2 5 15
6.5 MULTIPLEKS 20 2 10 10
6.6 AKSESORIES KUSEN 40 1 40
VII 7.1 PEKERJAAN M & E PROPERTIES DAN INSTALASI M & E LT. 1 45 2 30 15
VIII 8.1 PEKERJAAN SANITASI INSTALASI PIPA AIR KOTOR 20 2 10 10
8.2 INSTALASI PIPA AIR BERSIH 20 2 10 10
8.3 SEPTICTANK 25 1 25
8.4 PEMASANGAN PROPERTIES SANITASI 80 4 45 10 20 5
IX 9.1 PEKERJAAN FINISHING RANGKA HOLLOW 100 3 45 40 15
9.2 PLAFON TYPE A, B, DAN C (GYSUM BOARD) 50 2 5 45
9.3 LIST LANGIT-LANGIT KAYU PROFIL 50 1 50
9.4 URUGAN PASIR BAWAH ( T = 10 CM ) 20 1 20
9.5 LANTAI KERJA ( T = 5 CM ) BAWAH LANTAI 30 2 10 20
9.6 PLINT KERAMIK 10 X 20 CM 30 2 15 15
9.7 KERAMIK DINDING KM/WC DAN LAB. UK 20 X 20 CM 40 2 20 20
9.8 PEMASANGAN KERAMIK LANTAI RUANGAN DAN KM/WC 115 4 5 55 50 5
9.9 URUGAN PASIR BAWAH LANTAI RABAT BETON KORIDOR 10 1 10
9.10 LANTAI RABAT BETON KORIDOR ( T = 7 CM ) 20 1 20
9.11 CAT TEMBOK, PLAFON DAN KUSEN 90 2 70 20
JUMLAH 56 31 61 81 91 106 126 156 196 221 241 256 246 241 226 216 196 186 171 161 151 116 81 41
JUMLAH KUMULATIF 56 87 148 229 319 425 551 707 903 1124 1364 1620 1866 2107 2333 2549 2744 2930 3101 3262 3413 3528 3609 3650