299 B299 Seng Plat 3" x 6" BJLS 28 Gajah Berlian Rp 50,000 Lbr
300 B300 Sisalation / Alluminium Foil Rp 21,000 m2
301 B301 Soda Api Rp 1,800 Kg
302 B302 Softboard 4' x 8' x 4mm Rp 28,000 lbr
303 B303 Spring Knip Dekkson Rp 47,000 Bh
304 B304 Stop kontak Broco Rp 110,000 bh
305 B305 Strorox - 100 Rp 15,000 Kg
306 B306 Suncreen Allumunium Rp 32,000 m2
307 B307 Tali Ijuk Rp 3,000 Kg
308 B308 Tanah Rp 90,000 m3
309 B309 Teak Oil Rp 12,000 Ltr
310 B310 Teakwood 4' x 8' x 4mm Rp 47,500 lbr
311 B311 Terali Besi 2 x 3 Rp 155,000 m'
312 B312 Terawang (Roster) Rp 3,200 bh
313 B313 Tripleks Rp 30,000 lbr
314 B314 Ubin Abu -abu 20 x 20 cm Roman Rp 3,200 bh
315 B315 Ubin Abu -abu 30 x 30 cm Roman Rp 4,000 bh
316 B316 Ubin Abu -abu 40 x40 cm Roman Rp 4,500 bh
317 B317 Ubin Granito 30 x 30 cm Mulia Rp 6,200 bh
318 B318 Ubin Granito 40 x 40 cm Mulia Rp 7,500 bh
319 B319 Ubin Keramik 10 x 33 cm Roman Rp 4,000 bh
320 B320 Ubin Keramik 15 x 15 cm Roman Rp 4,500 bh
321 B321 Ubin Keramik 15 x 20 cm Roman Rp 5,500 bh
322 B322 Ubin Keramik 20 x 20 cm Roman Rp 7,600 bh
323 B323 Ubin Keramik 25 x 25 cm Roman Rp 9,000 bh
324 B324 Ubin Keramik 33 x 33 cm Roman Rp 10,500 bh
325 B325 Ubin Keramik 33 x 33 cm anti slip Roman Rp 12,000 bh
326 B326 Ubin Keramik 10 x 20 cm Roman Rp 3,800 bh
327 B327 Ubin Keramik Artistik 10 x 20 cm Mulia Rp 5,500 bh
328 B328 Ubin Tahan Asam Mulia Rp 35,000 m2
329 B329 Ubin Teralux Kerang 30 x 30 cm Mulia Rp 5,500 bh
330 B330 Ubin Teralux Kerang 40 x 40 cm Mulia Rp 7,200 bh
331 B331 Ubin Teralux Marmer 30 x 30 cm Mulia Rp 15,000 bh
332 B332 Ubin Teralux Marmer 40 x 40 cm Mulia Rp 17,500 bh
333 B333 Ubin Teralux Marmer 60 x 60 cm Mulia Rp 25,000 bh
334 B334 Ubin Teraso 30 x 30 cm Mulia Rp 3,200 bh
335 B335 Ubin Teraso 40 x 40 cm Mulia Rp 5,000 bh
336 B336 Ubin Warna 20 x 20 cm Roman Rp 3,500 bh
337 B337 Ubin Warna 30 x 30 cm Roman Rp 5,500 bh
338 B338 Ubin Warna 40 x 40 cm Roman Rp 7,500 bh
339 B339 Underlyer, tebal 6 mm / Rubber Corrugated Rp 65,000 m2
340 B340 Urinoir Toto Rp 175,000 bh
341 B341 Venetions Blinds Rp 38,000 m2
342 B342 Vernis Rp 27,000 Ltr
343 B343 Vinyl Asbes 30 x 30 cm Rp 25,000 Bh
344 B344 Vinyl Karet 30 x 30 cm KL I Rp 30,000 Bh
345 B345 Vinyl Karet 30 x 30 cm KL II Rp 27,000 Bh
346 B346 Vinyl Motif Kembang ex DN Rp 25,000 Bh
347 B347 Vinyl Wall Covering lebar 50 cm Rp 125,000 m2
348 B348 Wall Paper Rp 150,000 m3
A PEKERJAAN PERSIAPAN
A001 Pengukuran dan Pemasangan bouplank
A Bahan Material
B130 Kayu 5/7 x 2m 0.012 m3 Rp 3,250,000 Rp 39,000
B188 Paku biasa 2" - 5" 0.02 Kg Rp 18,000 Rp 360
B134 Kayu Papan 3/20 x 2m 0.007 m3 Rp 2,170,000 Rp 15,190
B Tenaga Kerja
U014 Pekerja 0.1 Oh Rp 85,000 Rp 8,500
U009 Tukang kayu 0.1 Oh Rp 110,000 Rp 11,000
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.005 Oh Rp 150,000 Rp 750
Jumlah Rp 76,050
Overhead (10%) Rp 7,605
Jumlah Total Rp 83,655
Pembulatan Rp 84,000
A002 1 m2 Pembuatan Kantor dan Gudang Sementara
A Bahan Material
B070 Dolken Kayu Ø 8-10/ 400 cm 1.25 Btg Rp 18,000 Rp 22,500
B125 Kayu albasia 0.18 m3 Rp 875,000 Rp 157,500
B184 Paku Biasa 0.85 kg Rp 18,000 Rp 15,300
B292 Semen Portland 35 kg Rp 1,500 Rp 52,500
B205 Pasir Pasang 0.15 m3 Rp 275,000 Rp 41,250
B296 Seng Gelombang 0.25 Lbr Rp 65,000 Rp 16,250
B261 Playwood 3 mm 1 Lbr Rp 37,500 Rp 37,500
B Tenaga Kerja
U014 Pekerja 0.2 Oh 85000 Rp 17,000
U009 Tukang Kayu 0.2 Oh 110000 Rp 22,000
U002 Kepala Tukang 0.02 Oh 125000 Rp 2,500
U001 Mandor 0.002 Oh 150000 Rp 300
Jumlah Rp 384,600
Overhead (10%) Rp 38,460
Jumlah Total Rp 423,060
Pembulatan Rp 424,000
A003 1 m2 Membersihkan Lapangan dan Perawatan
B Tenaga Kerja
U014 Pekerja 0.1 Oh Rp 85,000 Rp 8,500
U001 Mandor 0.05 Oh Rp 150,000 Rp 7,500
Jumlah Rp 16,000
Overhead (10%) Rp 1,600
Jumlah Total Rp 17,600
Pembulatan Rp 18,000
A004 1 m3 Bongkaran Beton
B Tenaga Kerja
U014 Pekerja 6.667 Oh Rp 85,000 Rp 566,695
U001 Mandor 0.333 Oh Rp 150,000 Rp 49,950
Jumlah Rp 616,645
Overhead (10%) Rp 61,665
Jumlah Total Rp 678,310
Pembulatan Rp 679,000
A005 1 m2 Bongkaran Dinding
B Tenaga Kerja
U014 Pekerja 0.33 Oh Rp 85,000 Rp 28,050
U001 Mandor 0.033 Oh Rp 150,000 Rp 4,950
Jumlah Rp 33,000
Overhead (10%) Rp 3,300
Jumlah Total Rp 36,300
Pembulatan Rp 37,000
B PEKERJAAN TANAH
B001 Menggali 1 m3 Tanah Biasa sedalam 1 meter
B Tenaga Kerja
U014 Pekerja 0.75 Oh Rp 85,000 Rp 63,750
U001 Mandor 0.025 Oh Rp 150,000 Rp 3,750
Jumlah Rp 67,500
Overhead (10%) Rp 6,750
Jumlah Total Rp 74,250
Pembulatan Rp 75,000
B002 Menggali 1 m3 Tanah Biasa sedalam 2 meter
B Tenaga Kerja
U014 Pekerja 0.9 Oh Rp 85,000 Rp 76,500
U001 Mandor 0.045 Oh Rp 150,000 Rp 6,750
Jumlah Rp 83,250
Overhead (10%) Rp 8,325
Jumlah Total Rp 91,575
Pembulatan Rp 92,000
B003 Menggali 1 m3 Tanah Biasa sedalam 3 meter
B Tenaga Kerja
U014 Pekerja 0.945 Oh Rp 85,000 Rp 80,325
U001 Mandor 0.067 Oh Rp 150,000 Rp 10,050
Jumlah Rp 90,375
Overhead (10%) Rp 9,038
Jumlah Total Rp 99,413
Pembulatan Rp 100,000###
B004 Menggali 1 m3 Tanah Keras sedalam 1 meter
B Tenaga Kerja
U014 Pekerja 1 Oh Rp 85,000 Rp 85,000
U001 Mandor 0.032 Oh Rp 150,000 Rp 4,800
Jumlah Rp 89,800
Overhead (10%) Rp 8,980
Jumlah Total Rp 98,780
Pembulatan Rp 99,000
B005 Menggali 1 m3 Tanah Cadas sedalam 1 meter
B Tenaga Kerja
U014 Pekerja 1.5 Oh Rp 85,000 Rp 127,500
U001 Mandor 0.06 Oh Rp 150,000 Rp 9,000
Jumlah Rp 136,500
Overhead (10%) Rp 13,650
Jumlah Total Rp 150,150
Pembulatan Rp 151,000
B006 Menggali 1 m3 Tanah Lumpur sedalam 1 meter
B Tenaga Kerja
U014 Pekerja 1.2 Oh Rp 85,000 Rp 102,000
U001 Mandor 0.045 Oh Rp 150,000 Rp 6,750
Jumlah Rp 108,750
Overhead (10%) Rp 10,875
Jumlah Total Rp 119,625
Pembulatan Rp 120,000
B007 Mengerjakan 1 m2 Stripping tebing setinggi 1 meter
B Tenaga Kerja
U014 Pekerja 0.05 Oh Rp 85,000 Rp 4,250
U001 Mandor 0.005 Oh Rp 150,000 Rp 750
Jumlah Rp 5,000
Overhead (10%) Rp 500
Jumlah Total Rp 5,500
Pembulatan Rp 6,000
B008 Membuang 1 m3 Tanah sejauh 15 meter
B Tenaga Kerja
U014 Pekerja 0.33 Oh Rp 85,000 Rp 28,050
U001 Mandor 0.01 Oh Rp 150,000 Rp 1,500
Jumlah Rp 29,550
Overhead (10%) Rp 2,955
Jumlah Total Rp 32,505
Pembulatan Rp 33,000
B009 Mengurug Kembali 1 m3 Galian tanah biasa sdlm 1m
B Tenaga Kerja
U014 Pekerja 0.25 Oh Rp 85,000 Rp 21,250
U001 Mandor 0.0083 Oh Rp 150,000 Rp 1,245
Jumlah Rp 22,495
Overhead (10%) Rp 2,250
Jumlah Total Rp 24,745
Pembulatan Rp 25,000
B010 Mengurug Kembali 1 m3 Galian tanah biasa sdlm 2m
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 27,750
Overhead (10%) Rp 2,775
Jumlah Total Rp 30,525
Pembulatan Rp 31,000
B011 Mengurug Kembali 1 m3 Galian tanah biasa sdlm 3m
B Tenaga Kerja
U014 Pekerja 0.35 Oh Rp 85,000 Rp 29,750
U001 Mandor 0.0223 Oh Rp 150,000 Rp 3,345
Jumlah Rp 33,095
Overhead (10%) Rp 3,310
Jumlah Total Rp 36,405
Pembulatan Rp 37,000
B012 Mengurug Kembali 1 m3 Galian tanah Keras sdlm 1 meter
B Tenaga Kerja
U014 Pekerja 0.3333 Oh Rp 85,000 Rp 28,331
A Material
B114 Kapur Padam 0.135 m3 Rp 165,000 Rp 22,275
B205 Pasir Pasang 0.4 m3 Rp 275,000 Rp 110,000
B308 Tanah 0.948 m3 Rp 90,000 Rp 85,320
B Tenaga Kerja
U014 Pekerja 0.8 Oh Rp 85,000 Rp 68,000
U008 Tukang Batu 0.4 Oh Rp 110,000 Rp 44,000
U002 Kepala Tukang 0.04 Oh Rp 125,000 Rp 5,000
U001 Mandor 0.08 Oh Rp 150,000 Rp 12,000
Jumlah Rp 346,595
Overhead (10%) Rp 34,660
Jumlah Total Rp 381,255
Pembulatan Rp 382,000
B019 Memasang 1 m3 Lapisan Pudel Camp:1KP:3TL untuk stabilisasi tanah
A Material
B114 Kapur Padam 0.248 m3 Rp 165,000 Rp 40,920
B308 Tanah 1.24 m3 Rp 90,000 Rp 111,600
B Tenaga Kerja
U014 Pekerja 0.8 Oh Rp 85,000 Rp 68,000
U008 Tukang Batu 0.4 Oh Rp 110,000 Rp 44,000
U002 Kepala Tukang 0.04 Oh Rp 125,000 Rp 5,000
U001 Mandor 0.08 Oh Rp 150,000 Rp 12,000
Jumlah Rp 281,520
Overhead (10%) Rp 28,152
Jumlah Total Rp 309,672
Pembulatan Rp 310,000
B020 Memasang 1 m2 Lapisan Ijuk tebal 10 cm, untuk bidang resapan
A Material
B101 Ijuk - 1kg 6 Kg Rp 20,000 Rp 120,000
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 135,000
Overhead (10%) Rp 13,500
Jumlah Total Rp 148,500
Pembulatan Rp 149,000
B021 Mengurug 1 m3 Sirtu padat untuk peninggian lantai bangunan
A Material
B308 Sirtu 1.2 m3 Rp 90,000 Rp 108,000
B Tenaga Kerja
U014 Pekerja 0.25 Oh Rp 85,000 Rp 21,250
U001 Mandor 0.025 Oh Rp 150,000 Rp 3,750
Jumlah Rp 133,000
Overhead (10%) Rp 13,300
Jumlah Total Rp 146,300
Pembulatan Rp 147,000
C PEKERJAAN PONDASI
C001 Memasang 1 m3 Pondasi Batu Belah, 1PC : 3 PP
A Bahan Material
Jumlah Rp 698,025
Overhead (10%) Rp 69,803
Jumlah Total Rp 767,828
Pembulatan Rp 768,000
C005 Memasang 1 m3 Pondasi Batu Belah, 1PC : 8 PP
A Bahan Material
B036 Batu Belah 15 / 20 1.2 m3 Rp 130,000 Rp 156,000
B292 Semen Portland 91 kg Rp 1,500 Rp 136,500
B205 Pasir Pasang 0.584 m3 Rp 275,000 Rp 160,600
B Tenaga Kerja
U014 Pekerja 1.5 Oh Rp 85,000 Rp 127,500
U008 Tukang Batu 0.6 Oh Rp 110,000 Rp 66,000
U002 Kepala Tukang 0.06 Oh Rp 125,000 Rp 7,500
U001 Mandor 0.075 Oh Rp 150,000 Rp 11,250
Jumlah Rp 665,350
Overhead (10%) Rp 66,535
Jumlah Total Rp 731,885
Pembulatan Rp 732,000
C006 Memasang 1 m3 Pondasi Batu Kosong (Aanstamping)
A Bahan Material
B036 Batu Belah 15 / 20 1 m3 Rp 130,000 Rp 130,000
B207 Pasir Urug 0.432 m3 Rp 250,000 Rp 108,000
B Tenaga Kerja
U014 Pekerja 0.6 Oh Rp 85,000 Rp 51,000
U008 Tukang Batu 0.3 Oh Rp 110,000 Rp 33,000
U002 Kepala Tukang 0.039 Oh Rp 125,000 Rp 4,875
U001 Mandor 0.039 Oh Rp 150,000 Rp 5,850
Jumlah Rp 332,725
Overhead (10%) Rp 33,273
Jumlah Total Rp 365,998
Pembulatan Rp 366,000###
C007 Memasang 1 m3 Pondasi Siklop, 60% beton camp:1PC:2PB:3KR dan 40% Batu Belah
A Bahan Material
B036 Batu Belah 15 / 20 0.48 m3 Rp 130,000 Rp 62,400
B292 Semen Portland 194 Kg Rp 1,500 Rp 291,000
B203 Pasir Beton 0.312 m3 Rp 325,000 Rp 101,400
B040 Batu Batu Kerikil 0.468 m3 Rp 185,000 Rp 86,580
B047 Besi Beton 126 Kg Rp 8,500 Rp 1,071,000
B118 Kawat Beton 1.8 Kg Rp 15,000 Rp 27,000
B Tenaga Kerja
U014 Pekerja 3.4 Oh Rp 85,000 Rp 289,000
U008 Tukang Batu 0.85 Oh Rp 110,000 Rp 93,500
U002 Kepala Tukang 0.085 Oh Rp 125,000 Rp 10,625
U001 Mandor 0.17 Oh Rp 150,000 Rp 25,500
Jumlah Rp 1,603,205
Overhead (10%) Rp 160,321
Jumlah Total Rp 1,763,526
Pembulatan Rp 1,764,000
C008 Memasang 1 m3 Pondasi Sumuran, diameter 100 cm
A Bahan Material
A Bahan Material
B133 Kayu kelas III 0.27 m3 Rp 2,200,000 Rp 594,000
B187 Paku Biasa 1/2" - 1" 2 Kg Rp 18,000 Rp 36,000
B174 Minyak Bekisting 0.6 Lt Rp 29,000 Rp 17,400
B049 Besi Beton polos 210 Kg Rp 8,500 Rp 1,785,000
B118 Kawat Beton 3 Kg Rp 15,000 Rp 45,000
B292 Semen Portland 336 Kg Rp 1,500 Rp 504,000
B203 Pasir Beton 0.54 m3 Rp 325,000 Rp 175,500
B151 Koral Beton 0.81 m3 Rp 215,000 Rp 174,150
B Tenaga Kerja
U014 Pekerja 5.65 Oh Rp 85,000 Rp 480,250
U008 Tukang Batu 0.275 Oh Rp 110,000 Rp 30,250
U009 Tukang Kayu 1.56 Oh Rp 110,000 Rp 171,600
U010 Tukang Besi 1.4 Oh Rp 110,000 Rp 154,000
U002 Kepala Tukang 0.323 Oh Rp 125,000 Rp 40,375
U001 Mandor 0.283 Oh Rp 150,000 Rp 42,450
Jumlah Rp 4,249,975
Overhead (10%) Rp 424,998
Jumlah Total Rp 4,674,973
Pembulatan Rp 4,675,000
D027 1 m3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting )
A Bahan Material
B133 Kayu kelas III 0.4 m3 Rp 2,200,000 Rp 880,000
B187 Paku Biasa 1/2" - 1" 4 Kg Rp 18,000 Rp 72,000
B174 Minyak Bekisting 2 Lt Rp 29,000 Rp 58,000
B049 Besi Beton polos 315 Kg Rp 8,500 Rp 2,677,500
B118 Kawat Beton 4.5 Kg Rp 15,000 Rp 67,500
B292 Semen Portland 336 Kg Rp 1,500 Rp 504,000
B203 Pasir Beton 0.54 m3 Rp 325,000 Rp 175,500
B151 Koral Beton 0.81 m3 Rp 215,000 Rp 174,150
B132 Kayu kelas II 0.15 m3 Rp 3,175,000 Rp 476,250
B262 Plywood 9 mm 3.5 lbr Rp 85,000 Rp 297,500
B068 Dolken Kayu Galam Ø 8 - 10 / 4m 20 btg Rp 16,000 Rp 320,000
B Tenaga Kerja
U014 Pekerja 7.05 Oh Rp 85,000 Rp 599,250
U008 Tukang Batu 0.275 Oh Rp 110,000 Rp 30,250
U009 Tukang Kayu 1.65 Oh Rp 110,000 Rp 181,500
U010 Tukang Besi 2.1 Oh Rp 110,000 Rp 231,000
U002 Kepala Tukang 0.403 Oh Rp 125,000 Rp 50,375
U001 Mandor 0.353 Oh Rp 150,000 Rp 52,950
Jumlah Rp 6,847,725
Overhead (10%) Rp 684,773
Jumlah Total Rp 7,532,498
Pembulatan Rp 7,533,000
D028 1 m3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting )
A Bahan Material
B133 Kayu kelas III 0.32 m3 Rp 2,200,000 Rp 704,000
B187 Paku Biasa 1/2" - 1" 3.2 Kg Rp 18,000 Rp 57,600
B174 Minyak Bekisting 1.6 Lt Rp 29,000 Rp 46,400
B049 Besi Beton polos 210 Kg Rp 8,500 Rp 1,785,000
B Tenaga Kerja
U014 Pekerja 0.18 Oh Rp 85,000 Rp 15,300
U008 Tukang Batu 0.02 Oh Rp 110,000 Rp 2,200
U009 Tukang Kayu 0.02 Oh Rp 110,000 Rp 2,200
U010 Tukang Besi 0.02 Oh Rp 110,000 Rp 2,200
U002 Kepala Tukang 0.006 Oh Rp 125,000 Rp 750
U001 Mandor 0.009 Oh Rp 150,000 Rp 1,350
Jumlah Rp 70,715
Overhead (10%) Rp 7,072
Jumlah Total Rp 77,787
Pembulatan Rp 78,000
D033 1 m Ring Balok Beton Bertulang ( 10 x 15 ) cm
A Bahan Material
B133 Kayu kelas III 0.003 m3 Rp 2,200,000 Rp 6,600
B187 Paku Biasa 1/2" - 1" 0.02 Kg Rp 18,000 Rp 360
B174 Minyak Bekisting Lt Rp 29,000 Rp -
B049 Besi Beton polos 3.6 Kg Rp 8,500 Rp 30,600
B118 Kawat Beton 0.05 Kg Rp 15,000 Rp 750
B292 Semen Portland 5.5 Kg Rp 1,500 Rp 8,250
B203 Pasir Beton 0.009 m3 Rp 325,000 Rp 2,925
B151 Koral Beton 0.015 m3 Rp 215,000 Rp 3,225
B Tenaga Kerja
U014 Pekerja 0.297 Oh Rp 85,000 Rp 25,245
U008 Tukang Batu 0.033 Oh Rp 110,000 Rp 3,630
U009 Tukang Kayu 0.033 Oh Rp 110,000 Rp 3,630
U010 Tukang Besi 0.033 Oh Rp 110,000 Rp 3,630
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 92,345
Overhead (10%) Rp 9,235
Jumlah Total Rp 101,580
Pembulatan Rp 102,000
D034 1 m3 Beton Sloof Bertulang ( 15 x 20 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 180.89 Kg Rp 8,500 Rp 1,537,565
B046 Bekisting papan 13.332 m2 Rp 22,000 Rp 293,304
Jumlah Rp 2,630,869
Pembulatan Rp 2,631,000
D034.A 1 m3 Beton Sloof Bertulang ( 15 x 25 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 184,89 Kg Rp 8,500 Rp 1,571,565
B046 Bekisting papan 13.335 m2 Rp 22,000 Rp 293,370
Jumlah Total Rp 2,664,935
Pembulatan Rp 2,665,000
D034.B 1 m3 Beton Sloof Bertulang ( 20 x 25 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 179.6 Kg Rp 8,500 Rp 1,526,600
Pembulatan Rp 2,527,000
D037.B 1 m3 Beton Balok Bertulang ( 15 x 40 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 152.51 Kg Rp 8,500 Rp 1,296,335
B046 Bekisting papan 15.837 m2 Rp 22,000 Rp 348,414
Jumlah Total Rp 2,444,749
Pembulatan Rp 2,445,000
D037.c 1 m3 Beton Balok Bertulang ( 20 x 30 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 232.11 Kg Rp 8,500 Rp 1,972,935
B046 Bekisting papan 13.336 m2 Rp 22,000 Rp 293,392
Jumlah Total Rp 3,066,327
Pembulatan Rp 3,067,000
D037.e 1 m3 Beton Balok Bertulang ( 25 x 40 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 154.27 Kg Rp 8,500 Rp 1,311,295
B046 Bekisting papan 10.5 m2 Rp 22,000 Rp 231,000
Jumlah Total Rp 2,342,295
Pembulatan Rp 2,343,000
D037.f 1 m3 Beton Balok Bertulang ( 25 x 50 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 136.32 Kg Rp 8,500 Rp 1,158,720
B046 Bekisting papan 10 m2 Rp 22,000 Rp 220,000
Jumlah Total Rp 2,178,720
Pembulatan Rp 2,179,000
D037.g 1 m3 Beton Balok Bertulang ( 15 x 35 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 153.51 Kg Rp 8,500 Rp 1,304,835
B046 Bekisting papan 16.193 m2 Rp 22,000 Rp 356,246
Jumlah Total Rp 2,461,081
Pembulatan Rp 2,462,000
D037.h 1 m3 Beton Balok Bertulang ( 20 x 25 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 179.6 Kg Rp 8,500 Rp 1,526,600
B046 Bekisting papan 14 m2 Rp 22,000 Rp 308,000
Jumlah Total Rp 2,634,600
Pembulatan Rp 2,635,000
D037.i 1 m3 Beton Balok Bertulang ( 20 x 45 ) cm
A Bahan Material
B065 Cor beton K-175 1 m3 Rp 800,000 Rp 800,000
B049 Besi Beton Polos 111.63 Kg Rp 8,500 Rp 948,855
B046 Bekisting papan 12.221 m2 Rp 22,000 Rp 268,862
Jumlah Total Rp 2,017,717
Pembulatan Rp 2,018,000
Jumlah Rp 165,800
Overhead (10%) Rp 16,580
Jumlah Total Rp : Rp 182,380
Pembulatan Rp 183,000
E015 Memasang 1 m2 Dinding Terawang (Roster) , Camp : 1PC : 4 PP
A Bahan Material
B312 Terawang (Roster) 30 Bh Rp 3,200 Rp 96,000
B292 Semen Portland 11 Kg Rp 1,500 Rp 16,500
B205 Pasir Pasang 0.035 m3 Rp 275,000 Rp 9,625
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U008 Tukang Batu 0.1 Oh Rp 110,000 Rp 11,000
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 162,125
Overhead (10%) Rp 16,213
Jumlah Total Rp : Rp 178,338
Pembulatan Rp 179,000
E016 Memasang 1 m2 Dinding Bata Berongga Ekspose, Camp : 1PC : 3 PP
A Bahan Material
B028 Bata Berongga Ekspose 30 Bh Rp 1,100 Rp 33,000
B292 Semen Portland 14 Kg Rp 1,500 Rp 21,000
B205 Pasir Pasang 0.032 m3 Rp 275,000 Rp 8,800
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U008 Tukang Batu 0.1 Oh Rp 110,000 Rp 11,000
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 102,800
Overhead (10%) Rp 10,280
Jumlah Total Rp : Rp 113,080
Pembulatan Rp 114,000
E017 Memasang 1 m2 Dinding Bata Ringan
A Bahan Material
B033 Bata Ringan 9 Bh Rp 7,200 Rp 64,800
B177 Mortar 5.0715 Kg Rp 2,750 Rp 13,947
B001 Air 1.26788 m3 Rp 250 Rp 317
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U008 Tukang Batu 0.13 Oh Rp 110,000 Rp 14,300
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 122,364
Overhead (10%) Rp 12,236
Jumlah Total Rp : Rp 134,600
Pembulatan Rp 135,000###
F PEKERJAAN PLESTERAN
F001 Membuat 1 m2 Plesteran 1 PC : 1 PP, tebal 15 mm
A Bahan Material
B292 Semen Portland 15.504 Kg Rp 1,500 Rp 23,256
A Bahan Material
B292 Semen Portland 5.184 Kg Rp 1,500 Rp 7,776
B205 Pasir Pasang 0.026 m3 Rp 275,000 Rp 7,150
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U008 Tukang Batu 0.15 Oh Rp 110,000 Rp 16,500
U002 Kepala Tukang 0.015 Oh Rp 125,000 Rp 1,875
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 61,051
Overhead (10%) Rp 6,105
Jumlah Total Rp 67,156
Pembulatan Rp 68,000
F006 Membuat 1 m2 Plesteran 1 PC : 6 PP, tebal 15 mm
A Bahan Material
B292 Semen Portland 4.416 Kg Rp 1,500 Rp 6,624
B205 Pasir Pasang 0.027 m3 Rp 275,000 Rp 7,425
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U008 Tukang Batu 0.15 Oh Rp 110,000 Rp 16,500
U002 Kepala Tukang 0.015 Oh Rp 125,000 Rp 1,875
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 60,174
Overhead (10%) Rp 6,017
Jumlah Total Rp 66,191
Pembulatan Rp 67,000
F007 Membuat 1 m2 Plesteran 1 PC : 7 PP, tebal 15 mm
A Bahan Material
B292 Semen Portland 3.936 Kg Rp 1,500 Rp 5,904
B205 Pasir Pasang 0.028 m3 Rp 275,000 Rp 7,700
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U008 Tukang Batu 0.15 Oh Rp 110,000 Rp 16,500
U002 Kepala Tukang 0.015 Oh Rp 125,000 Rp 1,875
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 59,729
Overhead (10%) Rp 5,973
Jumlah Total Rp 65,702
Pembulatan Rp 66,000
F008 Membuat 1 m2 Plesteran 1 PC : 8 PP, tebal 15 mm
A Bahan Material
B292 Semen Portland 3.456 Kg Rp 1,500 Rp 5,184
B205 Pasir Pasang 0.029 m3 Rp 275,000 Rp 7,975
B Tenaga Kerja
U014 Pekerja 0.3 Oh Rp 85,000 Rp 25,500
U008 Tukang Batu 0.15 Oh Rp 110,000 Rp 16,500
U002 Kepala Tukang 0.015 Oh Rp 125,000 Rp 1,875
U001 Mandor 0.015 Oh Rp 150,000 Rp 2,250
Jumlah Rp 59,284
Overhead (10%) Rp 5,928
Jumlah Total Rp 65,212
Pembulatan Rp 66,000
F009 Membuat 1 m2 Plesteran 1 PC : 2 PP, tebal 20 mm
A Bahan Material
B292 Semen Portland 13.632 Kg Rp 1,500 Rp 20,448
B205 Pasir Pasang 0.027 m3 Rp 275,000 Rp 7,425
B Tenaga Kerja
U014 Pekerja 0.4 Oh Rp 85,000 Rp 34,000
U008 Tukang Batu 0.2 Oh Rp 110,000 Rp 22,000
U002 Kepala Tukang 0.02 Oh Rp 125,000 Rp 2,500
U001 Mandor 0.022 Oh Rp 150,000 Rp 3,300
Jumlah Rp 89,673
Overhead (10%) Rp 8,967
Jumlah Total Rp 98,640
Pembulatan Rp 99,000
F010 Membuat 1 m2 Plesteran 1 PC : 3 PP, tebal 20 mm
A Bahan Material
B292 Semen Portland 10.368 Kg Rp 1,500 Rp 15,552
B205 Pasir Pasang 0.031 m3 Rp 275,000 Rp 8,525
B Tenaga Kerja
U014 Pekerja 0.26 Oh Rp 85,000 Rp 22,100
U008 Tukang Batu 0.2 Oh Rp 110,000 Rp 22,000
U002 Kepala Tukang 0.02 Oh Rp 125,000 Rp 2,500
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 72,627
Overhead (10%) Rp 7,263
Jumlah Total Rp 79,890
Pembulatan Rp 80,000
F011 Membuat 1 m2 Plesteran 1 PC : 4 PP, tebal 20 mm
A Bahan Material
B292 Semen Portland 8.32 Kg Rp 1,500 Rp 12,480
B205 Pasir Pasang 0.032 m3 Rp 275,000 Rp 8,800
B Tenaga Kerja
U014 Pekerja 0.4 Oh Rp 85,000 Rp 34,000
U008 Tukang Batu 0.2 Oh Rp 110,000 Rp 22,000
U002 Kepala Tukang 0.02 Oh Rp 125,000 Rp 2,500
U001 Mandor 0.022 Oh Rp 150,000 Rp 3,300
Jumlah Rp 83,080
Overhead (10%) Rp 8,308
Jumlah Total Rp 91,388
Pembulatan Rp 92,000
F012 Membuat 1 m2 Plesteran 1 PC : 5 PP, tebal 20 mm
A Bahan Material
B292 Semen Portland 6.912 Kg Rp 1,500 Rp 10,368
B205 Pasir Pasang 0.035 m3 Rp 275,000 Rp 9,625
B Tenaga Kerja
U014 Pekerja 0.4 Oh Rp 85,000 Rp 34,000
U008 Tukang Batu 0.2 Oh Rp 110,000 Rp 22,000
U002 Kepala Tukang 0.02 Oh Rp 125,000 Rp 2,500
U001 Mandor 0.022 Oh Rp 150,000 Rp 3,300
Jumlah Rp 81,793
A Bahan Material
B194 Papan Kayu Kelas I 0.064 m3 Rp 4,570,000 Rp 292,480
B164 Lem Kayu 0.5 Kg Rp 18,000 Rp 9,000
B Tenaga Kerja
U014 Pekerja 1 Oh Rp 85,000 Rp 85,000
U009 Tukang Kayu 3 Oh Rp 110,000 Rp 330,000
U002 Kepala Tukang 0.3 Oh Rp 125,000 Rp 37,500
U001 Mandor 0.05 Oh Rp 150,000 Rp 7,500
Jumlah Rp 761,480
Overhead (10%) Rp 76,148
Jumlah Total Rp 837,628
Pembulatan Rp 838,000
G008 Membuat 1 m2 Daun Pintu Kayu Lapis (Plywood) rangkap,rangka tertutup Kayu Kelas II (lebar
A Bahan Material
B195 Papan Kayu Kelas II 0.025 m3 Rp 3,250,000 Rp 81,250
B187 Paku Biasa 1/2" - 1" 0.03 Kg Rp 18,000 Rp 540
B164 Lem Kayu 0.5 Kg Rp 18,000 Rp 9,000
B261 Plywood 4 mm 1 Lembar Rp 37,500 Rp 37,500
B Tenaga Kerja
U014 Pekerja 0.7 Oh Rp 85,000 Rp 59,500
U009 Tukang Kayu 2.1 Oh Rp 110,000 Rp 231,000
U002 Kepala Tukang 0.21 Oh Rp 125,000 Rp 26,250
U001 Mandor 0.035 Oh Rp 150,000 Rp 5,250
Jumlah Rp 450,290
Overhead (10%) Rp 45,029
Jumlah Total Rp 495,319
Pembulatan Rp 496,000
G009 Membuat 1 m2 Daun Pintu Plywood rangkap,rangka Expose Kayu Kelas I atau II
A Bahan Material
B194 Papan Kayu Kelas I 0.0256 m3 Rp 4,570,000 Rp 116,992
B187 Paku Biasa 1/2" - 1" 0.03 Kg Rp 18,000 Rp 540
B164 Lem Kayu 0.5 Kg Rp 18,000 Rp 9,000
B261 Plywood 4 mm 1 Lembar Rp 37,500 Rp 37,500
B Tenaga Kerja
U014 Pekerja 0.8 Oh Rp 85,000 Rp 68,000
U009 Tukang Kayu 2.4 Oh Rp 110,000 Rp 264,000
U002 Kepala Tukang 0.24 Oh Rp 125,000 Rp 30,000
U001 Mandor 0.04 Oh Rp 150,000 Rp 6,000
Jumlah Rp 532,032
Overhead (10%) Rp 53,203
Jumlah Total Rp 585,235
Pembulatan Rp 586,000
G010 Memasang 1 m2 jalusi kusen,Kayu Kelas I atau II
A Bahan Material
B194 Papan Kayu Kelas I 0.06 m3 Rp 4,570,000 Rp 274,200
B187 Paku Biasa 1/2" - 1" 0.15 Kg Rp 18,000 Rp 2,700
B Tenaga Kerja
U014 Pekerja 0.67 Oh Rp 85,000 Rp 56,950
U009 Tukang Kayu 2 Oh Rp 110,000 Rp 220,000
U002 Kepala Tukang 0.2 Oh Rp 125,000 Rp 25,000
G023 Memasang 1 m2 rangka dinding pemisah (60x120)cm, kayu Kelas II atau III
A Bahan Material
B022 Balok Kayu 0.028 m3 Rp 3,750,000 Rp 105,000
B188 Paku Biasa 2" - 5" 0.15 Kg Rp 18,000 Rp 2,700
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U009 Tukang Kayu 0.45 Oh Rp 110,000 Rp 49,500
U002 Kepala Tukang 0.045 Oh Rp 125,000 Rp 5,625
U001 Mandor 0.008 Oh Rp 150,000 Rp 1,200
Jumlah Rp 176,775
Overhead (10%) Rp 17,678
Jumlah Total Rp 194,453
Pembulatan Rp 195,000
G024 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu Kelas II
A Bahan Material
B022 Balok Kayu 0.028 m3 Rp 3,750,000 Rp 105,000
B188 Paku Biasa 2" - 5" 0.15 Kg Rp 18,000 Rp 2,700
B310 Teakwood 4' x 8' x 4mm 0.86 Lembar Rp 47,500 Rp 40,850
B164 Lem Kayu 0.56 Kg Rp 18,000 Rp 10,080
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U009 Tukang Kayu 0.45 Oh Rp 110,000 Rp 49,500
U002 Kepala Tukang 0.045 Oh Rp 125,000 Rp 5,625
U001 Mandor 0.008 Oh Rp 150,000 Rp 1,200
Jumlah Rp 227,705
Overhead (10%) Rp 22,771
Jumlah Total Rp 250,476
Pembulatan Rp 251,000
A Bahan Material
B167 List kayu profil 1.05 m¹ Rp 24,000 Rp 25,200
B185 Paku Biasa ½" - 1" 0.01 Kg Rp 18,000 Rp 180
B Tenaga Kerja
U014 Pekerja 0.05 Oh Rp 85,000 Rp 4,250
U009 Tukang Kayu 0.05 Oh Rp 110,000 Rp 5,500
U002 Kepala Tukang 0.005 Oh Rp 125,000 Rp 625
U001 Mandor 0.003 Oh Rp 150,000 Rp 450
Jumlah Rp 36,205
Overhead (10%) Rp 3,621
Jumlah Total Rp 39,826
Pembulatan Rp 40,000
H009 Memasang 1 m1 List Plafond Gypsum Profil 15 cm
A Bahan Material
B166 List Gypsum 1.05 m¹ Rp 12,000 Rp 12,600
B191 Paku Sekrup 0.15 kg Rp 25,000 Rp 3,750
B Tenaga Kerja
U014 Pekerja 0.05 Oh Rp 85,000 Rp 4,250
U009 Tukang Kayu 0.05 Oh Rp 110,000 Rp 5,500
U002 Kepala Tukang 0.005 Oh Rp 125,000 Rp 625
U001 Mandor 0.0025 Oh Rp 150,000 Rp 375
Jumlah Rp 27,100
Overhead (10%) Rp 2,710
Jumlah Total Rp 29,810
Pembulatan Rp 30,000###
H009.A Memasang 1 m1 List Plafond Gypsum Profil 10 cm
A Bahan Material
B166 List Gypsum 1.05 m¹ Rp 12,000 Rp 12,600
B191 Paku Sekrup 0.15 kg Rp 25,000 Rp 3,750
B Tenaga Kerja
U014 Pekerja 0.06 Oh Rp 85,000 Rp 5,100
U009 Tukang Kayu 0.06 Oh Rp 110,000 Rp 6,600
U002 Kepala Tukang 0.006 Oh Rp 125,000 Rp 750
U001 Mandor 0.003 Oh Rp 150,000 Rp 450
Jumlah Rp 29,250
Overhead (10%) Rp 2,925
Jumlah Total Rp 32,175
Pembulatan Rp 33,000
H009.B Memasang 1 m1 List Plafond Gypsum Profil 7 cm
A Bahan Material
B166 List Gypsum 1.05 m¹ Rp 12,000 Rp 12,600
B191 Paku Sekrup 0.15 kg Rp 25,000 Rp 3,750
B Tenaga Kerja
U014 Pekerja 0.06 Oh Rp 85,000 Rp 5,100
U009 Tukang Kayu 0.06 Oh Rp 110,000 Rp 6,600
U002 Kepala Tukang 0.006 Oh Rp 125,000 Rp 750
U001 Mandor 0.003 Oh Rp 150,000 Rp 450
Jumlah Jumlah Rp 29,250
Overhead (5%)
Overhead (10%) Rp 2,925
Jumlah Total
Jumlah Total Rp 32,175
Pembulatan
Pembulatan Rp 33,000
B Tenaga Kerja
U014 Pekerja 0.26 Oh Rp 85,000 Rp 22,100
U008 Tukang batu 0.13 Oh Rp 110,000 Rp 14,300
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 114,830
Overhead (10%) Rp 11,483
Jumlah Total Rp 126,313
Pembulatan Rp 127,000
J003 Memasang 1 m2 Lantai Ubin PC Abu-abu Ukuran (20x20) cm
A Bahan Material
B314 Ubin Abu -abu 20 x 20 cm 26.5 Bh Rp 3,200 Rp 84,800
B292 Semen Portland 10.4 kg Rp 1,500 Rp 15,600
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B Tenaga Kerja
U014 Pekerja 0.27 Oh Rp 85,000 Rp 22,950
U008 Tukang batu 0.135 Oh Rp 110,000 Rp 14,850
U002 Kepala Tukang 0.014 Oh Rp 125,000 Rp 1,750
U001 Mandor 0.014 Oh Rp 150,000 Rp 2,100
Jumlah Rp 154,425
Overhead (10%) Rp 15,443
Jumlah Total Rp 169,868
Pembulatan Rp 170,000
J004 Memasang 1 m2 Lantai Ubin Warna Ukuran (40x40) cm Merk Roman
A Bahan Material
B338 Ubin Warna 40 x 40 cm 6.63 Bh Rp 7,500 Rp 49,725
B292 Semen Portland 9.8 kg Rp 1,500 Rp 14,700
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.3 kg Rp 1,300 Rp 1,690
B Tenaga Kerja
U014 Pekerja 0.25 Oh Rp 85,000 Rp 21,250
U008 Tukang batu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 117,065
Overhead (10%) Rp 11,707
Jumlah Total Rp 128,772
Pembulatan Rp 129,000
J005 Memasang 1 m2 Lantai Ubin Warna Ukuran (30x30) cm Merk Roman
A Bahan Material
B337 Ubin Warna 30 x 30 cm 11.87 Bh Rp 5,500 Rp 65,285
B292 Semen Portland 10 kg Rp 1,500 Rp 15,000
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.5 kg Rp 1,300 Rp 1,950
B Tenaga Kerja
U014 Pekerja 0.26 Oh Rp 85,000 Rp 22,100
U008 Tukang batu 0.13 Oh Rp 110,000 Rp 14,300
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 134,585
A Bahan Material
B318 Ubin Granito 40 x 40 cm 6.63 Bh Rp 7,500 Rp 49,725
B292 Semen Portland 9.8 kg Rp 1,500 Rp 14,700
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.3 kg Rp 1,300 Rp 1,690
B Tenaga Kerja
U014 Pekerja 0.25 Oh Rp 85,000 Rp 21,250
U008 Tukang batu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 117,065
Overhead (10%) Rp 11,707
Jumlah Total Rp 128,772
Pembulatan Rp 129,000
J010 Memasang 1 m2 Lantai Ubin Granit Ukuran (30x30) cm
A Bahan Material
B317 Ubin Granito 30 x 30 cm 11.87 Bh Rp 6,200 Rp 73,594
B292 Semen Portland 10 kg Rp 1,500 Rp 15,000
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.5 kg Rp 1,300 Rp 1,950
B Tenaga Kerja
U014 Pekerja 0.26 Oh Rp 85,000 Rp 22,100
U008 Tukang batu 0.13 Oh Rp 110,000 Rp 14,300
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 142,894
Overhead (10%) Rp 14,289
Jumlah Total Rp 157,183
Pembulatan Rp 158,000
J011 Memasang 1 m2 Lantai Ubin Teralux Ukuran (40x40) cm
A Bahan Material
B330 Ubin Teralux Kerang 40 x 40 cm 6.63 Bh Rp 7,200 Rp 47,736
B292 Semen Portland 9.8 kg Rp 1,500 Rp 14,700
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.3 kg Rp 1,300 Rp 1,690
B Tenaga Kerja
U014 Pekerja 0.25 Oh Rp 85,000 Rp 21,250
U008 Tukang batu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 115,076
Overhead (10%) Rp 11,508
Jumlah Total Rp 126,584
Pembulatan Rp 127,000
J012 Memasang 1 m2 Lantai Ubin Teralux Ukuran (30x30) cm
A Bahan Material
B329 Ubin Teralux Kerang 30 x 30 cm 11.87 Bh Rp 5,500 Rp 65,285
B292 Semen Portland 10 kg Rp 1,500 Rp 15,000
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.5 kg Rp 1,300 Rp 1,950
B Tenaga Kerja
U014 Pekerja 0.26 Oh Rp 85,000 Rp 22,100
U008 Tukang batu 0.13 Oh Rp 110,000 Rp 14,300
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 134,585
Overhead (10%) Rp 13,459
Jumlah Total Rp 148,044
Pembulatan Rp 149,000
J013 Memasang 1 m2 Lantai Ubin Teralux Marmer Ukuran (60x60) cm
A Bahan Material
B333 Ubin Teralux Marmer 60 x 60 cm 3.1 Bh Rp 25,000 Rp 77,500
B292 Semen Portland 9.6 kg Rp 1,500 Rp 14,400
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.5 kg Rp 1,300 Rp 1,950
B Tenaga Kerja
U014 Pekerja 0.24 Oh Rp 85,000 Rp 20,400
U008 Tukang batu 0.12 Oh Rp 110,000 Rp 13,200
U002 Kepala Tukang 0.012 Oh Rp 125,000 Rp 1,500
U001 Mandor 0.012 Oh Rp 150,000 Rp 1,800
Jumlah Rp 143,125
Overhead (10%) Rp 14,313
Jumlah Total Rp 157,438
Pembulatan Rp 158,000
J014 Memasang 1 m2 Lantai Ubin Teralux Marmer Ukuran (40x40) cm
A Bahan Material
B332 Ubin Teralux Marmer 40 x 40 cm 6.63 Bh Rp 17,500 Rp 116,025
B292 Semen Portland 9.8 kg Rp 1,500 Rp 14,700
B205 Pasir Pasang 0.045 m3 Rp 275,000 Rp 12,375
B294 Semen Warna 1.3 kg Rp 1,300 Rp 1,690
B Tenaga Kerja
U014 Pekerja 0.25 Oh Rp 85,000 Rp 21,250
U008 Tukang batu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.013 Oh Rp 150,000 Rp 1,950
Jumlah Rp 183,365
Overhead (10%) Rp 18,337
Jumlah Total Rp 201,702
Pembulatan Rp 202,000
Pembulatan Rp 96,000
J045 Memasang 1 m2 underlayer/pelapis bawah karpet
A Bahan Material
B339 Underlyer, tebal 6 mm / Rubber Corrugat 1.05 m2 Rp 65,000 Rp 68,250
B163 Lem 0.35 kg Rp 8,000 Rp 2,800
B Tenaga Kerja
U014 Pekerja 0.12 Oh Rp 85,000 Rp 10,200
U009 Tukang kayu 0.12 Oh Rp 110,000 Rp 13,200
U002 Kepala Tukang 0.012 Oh Rp 125,000 Rp 1,500
U001 Mandor 0.006 Oh Rp 150,000 Rp 900
Jumlah Rp 96,850
Overhead (10%) Rp 9,685
Jumlah Total Rp 106,535
Pembulatan Rp 107,000
J046 Memasang 1 m2 Lantai parquet kayu
A Bahan Material
B202 Parquet jati 1.05 m2 Rp 112,000 Rp 117,600
B163 Lem 0.6 kg Rp 8,000 Rp 4,800
B Tenaga Kerja
U014 Pekerja 0.7 Oh Rp 85,000 Rp 59,500
U009 Tukang kayu 0.35 Oh Rp 110,000 Rp 38,500
U002 Kepala Tukang 0.035 Oh Rp 125,000 Rp 4,375
U001 Mandor 0.035 Oh Rp 150,000 Rp 5,250
Jumlah Rp 230,025
Overhead (10%) Rp 23,003
Jumlah Total Rp 253,028
Pembulatan Rp 254,000
J047 Memasang 1 m2 Lantai kayu (gymfloor)
A Bahan Material
B097 Gymfloor 1.05 m2 Rp 42,000 Rp 44,100
B163 Lem 0.6 kg Rp 8,000 Rp 4,800
B Tenaga Kerja
U014 Pekerja 0.7 Oh Rp 85,000 Rp 59,500
U009 Tukang kayu 0.35 Oh Rp 110,000 Rp 38,500
U002 Kepala Tukang 0.035 Oh Rp 125,000 Rp 4,375
U001 Mandor 0.035 Oh Rp 150,000 Rp 5,250
Jumlah Rp 156,525
Overhead (10%) Rp 15,653
Jumlah Total Rp 172,178
Pembulatan Rp 173,000
J048 Memasang 1 m2 dinding porselen, Ukuran (11x11) cm
A Bahan Material
B265 Porselen 11 x 11 cm putih 86 bh Rp - Rp -
B292 Semen Portland 9.3 kg Rp 1,500 Rp 13,950
B205 Pasir Pasang 0.018 m3 Rp 275,000 Rp 4,950
B294 Semen Warna 1.5 kg Rp 1,300 Rp 1,950
B Tenaga Kerja
U014 Pekerja 1 Oh Rp 85,000 Rp 85,000
U008 Tukang batu 0.5 Oh Rp 110,000 Rp 55,000
U002 Kepala Tukang 0.05 Oh Rp 125,000 Rp 6,250
B Tenaga Kerja
U014 Pekerja 0.7 Oh Rp 85,000 Rp 59,500
U008 Tukang batu 0.35 Oh Rp 110,000 Rp 38,500
U002 Kepala Tukang 0.035 Oh Rp 125,000 Rp 4,375
U001 Mandor 0.035 Oh Rp 150,000 Rp 5,250
Jumlah Rp 214,867,250
Overhead (10%) Rp 21,486,725
Jumlah Total Rp 236,353,975
Pembulatan Rp 236,354,000
K PEKERJAAN PENUTUP ATAP
K001 Memasang 1 m2 atap genteng palentong kecil
A Bahan Material
B094 Genteng palentong glazzur 25 bh Rp 6,000 Rp 150,000
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U009 Tukang kayu 0.075 Oh Rp 110,000 Rp 8,250
U002 Kepala Tukang 0.008 Oh Rp 125,000 Rp 1,000
U001 Mandor 0.008 Oh Rp 150,000 Rp 1,200
Jumlah Rp 173,200
Overhead (10%) Rp 17,320
Jumlah Total Rp 190,520
Pembulatan Rp 191,000
K002 Memasang 1 m2 atap genteng palentong glazzur kecil
A Bahan Material
B094 Genteng palentong glazzur 25 bh Rp 6,000 Rp 150,000
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U009 Tukang kayu 0.075 Oh Rp 110,000 Rp 8,250
U002 Kepala Tukang 0.008 Oh Rp 125,000 Rp 1,000
U001 Mandor 0.008 Oh Rp 150,000 Rp 1,200
Jumlah Rp 173,200
Overhead (10%) Rp 17,320
Jumlah Total Rp 190,520
Pembulatan Rp 191,000
K003 Memasang 1 m2 atap genteng Morando Natural
A Bahan Material
B091 Genteng morando natural 18 bh Rp 6,000 Rp 108,000
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U009 Tukang kayu 0.075 Oh Rp 110,000 Rp 8,250
U002 Kepala Tukang 0.008 Oh Rp 125,000 Rp 1,000
U001 Mandor 0.008 Oh Rp 150,000 Rp 1,200
Jumlah Rp 131,200
Overhead (10%) Rp 13,120
Jumlah Total Rp 144,320
Pembulatan Rp 145,000
K004 Memasang 1 m2 atap genteng Morando Glazzur
A Bahan Material
B092 Genteng morando glazzur 18 bh Rp 6,000 Rp 108,000
B Tenaga Kerja
A Bahan Material
B056 Bubung stel gelombang 2.4 Lbr Rp 47,000 Rp 112,800
B191 Paku sekrup 6 bh Rp 25,000 Rp 150,000
B Tenaga Kerja
U014 Pekerja 0.084 Oh Rp 85,000 Rp 7,140
U009 Tukang kayu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.004 Oh Rp 150,000 Rp 600
Jumlah Rp 285,915
Overhead (10%) Rp 28,592
Jumlah Total Rp 314,507
Pembulatan Rp 315,000
K028 Memasang 1 m nok stel gelombang 1.05 m
A Bahan Material
B181 Nok stel gelombang 2.1 Lbr Rp 12,000 Rp 25,200
B191 Paku sekrup 6 bh Rp 25,000 Rp 150,000
B Tenaga Kerja
U014 Pekerja 0.084 Oh Rp 85,000 Rp 7,140
U009 Tukang kayu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.004 Oh Rp 150,000 Rp 600
Jumlah Rp 198,315
Overhead (10%) Rp 19,832
Jumlah Total Rp 218,147
Pembulatan Rp 219,000
K029 Memasang 1 m nok stel gelombang 1.08 m
A Bahan Material
B181 Nok stel gelombang 2.05 Lbr Rp 12,000 Rp 24,600
B191 Paku sekrup 6 bh Rp 25,000 Rp 150,000
B Tenaga Kerja
U014 Pekerja 0.084 Oh Rp 85,000 Rp 7,140
U009 Tukang kayu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.004 Oh Rp 150,000 Rp 600
Jumlah Rp 197,715
Overhead (10%) Rp 19,772
Jumlah Total Rp 217,487
Pembulatan Rp 218,000
K030 Memasang 1 m nok paten 0.92 m
A Bahan Material
B179 Nok paten 1.2 Lbr Rp 12,000 Rp 14,400
B191 Paku sekrup 6 bh Rp 25,000 Rp 150,000
B Tenaga Kerja
U014 Pekerja 0.084 Oh Rp 85,000 Rp 7,140
U009 Tukang kayu 0.125 Oh Rp 110,000 Rp 13,750
U002 Kepala Tukang 0.013 Oh Rp 125,000 Rp 1,625
U001 Mandor 0.004 Oh Rp 150,000 Rp 600
Jumlah Rp 187,515
Overhead (10%) Rp 18,752
Jumlah Rp 183,015
Overhead (10%) Rp 18,302
Jumlah Total Rp 201,317
Pembulatan Rp 202,000
K035 Memasang 1 m2 atap genteng beton
A Bahan Material
B083 Genteng beton 11 bh Rp 12,000 Rp 132,000
B188 Paku biasa 2" - 5" 0.03 kg Rp 18,000 Rp 540
B Tenaga Kerja
U014 Pekerja 0.2 Oh Rp 85,000 Rp 17,000
U009 Tukang kayu 0.1 Oh Rp 110,000 Rp 11,000
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.01 Oh Rp 150,000 Rp 1,500
Jumlah Rp 163,290
Overhead (10%) Rp 16,329
Jumlah Total Rp 179,619
Pembulatan Rp 180,000
K036 Memasang 1 m2 atap genteng aspal
A Bahan Material
B082 Genteng aspal 6.9 Lbr Rp 14,000 Rp 96,600
B261 Plywood 4 mm 0.35 Lbr Rp 37,500 Rp 13,125
B187 Paku biasa 1/2" - 1" 0.03 kg Rp 18,000 Rp 540
B235 Plastic aerator 0.5 bh Rp 22,000 Rp 11,000
B Tenaga Kerja
U014 Pekerja 0.2 Oh Rp 85,000 Rp 17,000
U009 Tukang kayu 0.3 Oh Rp 110,000 Rp 33,000
U002 Kepala Tukang 0.003 Oh Rp 125,000 Rp 375
U001 Mandor 0.01 Oh Rp 150,000 Rp 1,500
Jumlah Rp 173,140
Overhead (10%) Rp 17,314
Jumlah Total Rp 190,454
Pembulatan Rp 191,000
K037 Memasang 1 m2 atap genteng metal
A Bahan Material
B090 Genteng Metal Zincalum 1.02 Lbr Rp 21,000 Rp 21,420
B188 Paku biasa 2" - 5" 0.2 kg Rp 18,000 Rp 3,600
B Tenaga Kerja
U014 Pekerja 0.2 Oh Rp 85,000 Rp 17,000
U009 Tukang kayu 0.1 Oh Rp 110,000 Rp 11,000
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.01 Oh Rp 150,000 Rp 1,500
Jumlah Rp 55,770
Overhead (10%) Rp 5,577
Jumlah Total Rp 61,347
Pembulatan Rp 62,000
K038 Memasang 1 m2 atap sirap
A Bahan Material
B096 Genteng sirap 6 bh Rp 6,000 Rp 36,000
B187 Paku biasa 1/2" - 1" 0.2 kg Rp 18,000 Rp 3,600
B Tenaga Kerja
Pembulatan Rp 53,000
K042 Memasang 1 m2 atap sirap
A Bahan Material
B299 Seng plat 3" x 6" bjls 28 0.4 Lbr Rp 50,000 Rp 20,000
B187 Paku biasa 1/2" - 1" 0.06 kg Rp 18,000 Rp 1,080
B188 Paku biasa 2" - 5" 0.05 kg Rp 18,000 Rp 900
B134 Kayu Papan 3 / 20 borneo 0.004 m3 Rp 2,170,000 Rp 8,680
B Tenaga Kerja
U014 Pekerja 0.125 Oh Rp 85,000 Rp 10,625
U009 Tukang kayu 0.25 Oh Rp 110,000 Rp 27,500
U002 Kepala Tukang 0.025 Oh Rp 125,000 Rp 3,125
U001 Mandor 0.006 Oh Rp 150,000 Rp 900
Jumlah Rp 72,810
Overhead (10%) Rp 7,281
Jumlah Total Rp 80,091
Pembulatan Rp 81,000
K043 Memasang 1 m2 atap seng gelombang
A Bahan Material
B295 Seng Gelombang 3" x 6" BJLS 28 0.7 Lbr Rp 50,000 Rp 35,000
B187 Paku biasa 1/2" - 1" 0.02 kg Rp 18,000 Rp 360
B Tenaga Kerja
U014 Pekerja 0.12 Oh Rp 85,000 Rp 10,200
U009 Tukang kayu 0.06 Oh Rp 110,000 Rp 6,600
U002 Kepala Tukang 0.006 Oh Rp 125,000 Rp 750
U001 Mandor 0.006 Oh Rp 150,000 Rp 900
Jumlah Rp 53,810
Overhead (10%) Rp 5,381
Jumlah Total Rp 59,191
Pembulatan Rp 60,000
K044 Memasang 1 m2 atap nok seng
A Bahan Material
B299 Seng plat 3" x 6" bjls 28 0.3 Lbr Rp 50,000 Rp 15,000
B187 Paku biasa 1/2" - 1" 0.04 kg Rp 18,000 Rp 720
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U009 Tukang kayu 0.07 Oh Rp 110,000 Rp 7,700
U002 Kepala Tukang 0.008 Oh Rp 125,000 Rp 1,000
U001 Mandor 0.006 Oh Rp 150,000 Rp 900
Jumlah Rp 38,070
Overhead (10%) Rp 3,807
Jumlah Total Rp 41,877
Pembulatan Rp 42,000
K045 Memasang 1 m2 atap allumunium Merk Alexindo
A Bahan Material
B014 Atap Alluminium Gelombang 1.05 m2 Rp 42,500 Rp 44,625
B189 Paku Hak Pnjang 15 cm 0.02 kg Rp 21,000 Rp 420
B Tenaga Kerja
U014 Pekerja 0.15 Oh Rp 85,000 Rp 12,750
U009 Tukang kayu 0.75 Oh Rp 110,000 Rp 82,500
U002 Kepala Tukang 0.008 Oh Rp 125,000 Rp 1,000
Pembulatan Rp 364,000
L011 Memasang 1 buah kunci selot
A Bahan Material
B156 Kunci selot 1 bh Rp 125,000 Rp 125,000
B Tenaga Kerja
U014 Pekerja 0.02 Oh Rp 85,000 Rp 1,700
U009 Tukang kayu 0.2 Oh Rp 110,000 Rp 22,000
U002 Kepala Tukang 0.02 Oh Rp 125,000 Rp 2,500
U001 Mandor 0.001 Oh Rp 150,000 Rp 150
Jumlah Rp 151,350
Overhead (10%) Rp 15,135
Jumlah Total Rp 166,485
Pembulatan Rp 167,000
L012 Memasang 1 buah pegangan pintu Merk Dekkson
A Bahan Material
B072 Door holder 1 bh Rp 220,000 Rp 220,000
B Tenaga Kerja
U014 Pekerja 0.05 Oh Rp 85,000 Rp 4,250
U009 Tukang kayu 0.5 Oh Rp 110,000 Rp 55,000
U002 Kepala Tukang 0.05 Oh Rp 125,000 Rp 6,250
U001 Mandor 0.0025 Oh Rp 150,000 Rp 375
Jumlah Rp 285,875
Overhead (10%) Rp 28,588
Jumlah Total Rp 314,463
Pembulatan Rp 315,000
L013 Memasang 1 buah door stop
A Bahan Material
B073 Door stop 1 bh Rp 220,000 Rp 220,000
B Tenaga Kerja
U014 Pekerja 0.01 Oh Rp 85,000 Rp 850
U009 Tukang kayu 0.1 Oh Rp 110,000 Rp 11,000
U002 Kepala Tukang 0.01 Oh Rp 125,000 Rp 1,250
U001 Mandor 0.0005 Oh Rp 150,000 Rp 75
Jumlah Rp 233,175
Overhead (10%) Rp 23,318
Jumlah Total Rp 256,493
Pembulatan Rp 257,000
L014 Memasang 1 buah rel pintu dorong
A Bahan Material
B277 Rel pintu dorong 1 bh Rp - Rp -
B Tenaga Kerja
U014 Pekerja 0.06 Oh Rp 85,000 Rp 5,100
U009 Tukang kayu 0.6 Oh Rp 110,000 Rp 66,000
U002 Kepala Tukang 0.06 Oh Rp 125,000 Rp 7,500
U001 Mandor 0.003 Oh Rp 150,000 Rp 450
Jumlah Rp 79,050
Overhead (10%) Rp 7,905
Jumlah Total Rp 86,955
Pembulatan Rp 87,000
L015 Memasang 1 buah kunci lemari
A Bahan Material
B155 Kunci Lemari 1 bh Rp 250,000 Rp 250,000
B Tenaga Kerja
U014 Pekerja 0.025 Oh Rp 85,000 Rp 2,125
U009 Tukang kayu 0.25 Oh Rp 110,000 Rp 27,500
U002 Kepala Tukang 0.025 Oh Rp 125,000 Rp 3,125
U001 Mandor 0.0013 Oh Rp 150,000 Rp 195
Jumlah Rp 282,945
Overhead (10%) Rp 28,295
Jumlah Total Rp 311,240
Pembulatan Rp 312,000
L016 Memasang 1 m2 kaca, tebal 3 mm Merk Asahimas
A Bahan Material
B110 Kaca polos 1.1 m2 Rp 475,000 Rp 522,500
B Tenaga Kerja
U014 Pekerja 0.015 Oh Rp 85,000 Rp 1,275
U009 Tukang kayu 0.15 Oh Rp 110,000 Rp 16,500
U002 Kepala Tukang 0.015 Oh Rp 125,000 Rp 1,875
U001 Mandor 0.0008 Oh Rp 150,000 Rp 120
Jumlah Rp 542,270
Overhead (10%) Rp 54,227
Jumlah Total Rp 596,497
Pembulatan Rp 597,000
L017 Memasang 1 m2 kaca, tebal 5 mm Merk Asahimas
A Bahan Material
B110 Kaca polos 1.1 m2 Rp 475,000 Rp 522,500
B Tenaga Kerja
U014 Pekerja 0.015 Oh Rp 85,000 Rp 1,275
U009 Tukang kayu 0.15 Oh Rp 110,000 Rp 16,500
U002 Kepala Tukang 0.015 Oh Rp 125,000 Rp 1,875
U001 Mandor 0.0008 Oh Rp 150,000 Rp 120
Jumlah Rp 542,270
Overhead (10%) Rp 54,227
Jumlah Total Rp 596,497
Pembulatan Rp 597,000
L018 Memasang 1 m2 kaca, tebal 8 mm Merk Asahimas
A Bahan Material
B110 Kaca polos 1.1 m2 Rp 475,000 Rp 522,500
B Tenaga Kerja
U014 Pekerja 0.0165 Oh Rp 85,000 Rp 1,403
U009 Tukang kayu 0.165 Oh Rp 110,000 Rp 18,150
U002 Kepala Tukang 0.0165 Oh Rp 125,000 Rp 2,063
U001 Mandor 0.0008 Oh Rp 150,000 Rp 120
Jumlah Rp 544,235
Overhead (10%) Rp 54,424
Jumlah Total Rp 598,659
Pembulatan Rp 599,000
L019 Memasang 1 m2 kaca buram, tebal 12 mm Merk Asahimas
A Bahan Material
B107 Kaca buram 1.1 m2 Rp 550,000 Rp 605,000
M008 Pengecatan 1 m2 bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
2 lapis cat penutup
A Bahan Material
B062 Cat meni 0.2 kg Rp 26,000 Rp 5,200
B233 Plamir 0.15 kg Rp 2,000 Rp 300
B061 Cat dasar 0.17 kg Rp 31,000 Rp 5,270
B063 Cat penutup 0.26 kg Rp 45,000 Rp 11,700
B Tenaga Kerja
U014 Pekerja 0.07 Oh Rp 85,000 Rp 5,950
U011 Tukang cat 0.009 Oh Rp 110,000 Rp 990
U002 Kepala Tukang 0.006 Oh Rp 125,000 Rp 750
U001 Mandor 0.0025 Oh Rp 150,000 Rp 375
Jumlah Rp 25,335
Overhead (10%) Rp 2,534
Jumlah Total Rp 27,869
Pembulatan Rp 28,000
M009 Pengecatan 1 m2 bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 3 lapis cat penutup
3 lapis cat penutup
A Bahan Material
B062 Cat meni 0.2 kg Rp 26,000 Rp 5,200
B233 Plamir 0.15 kg Rp 2,000 Rp 300
B061 Cat dasar 0.17 kg Rp 31,000 Rp 5,270
B063 Cat penutup 0.35 kg Rp 45,000 Rp 15,750
B Tenaga Kerja
U014 Pekerja 0.07 Oh Rp 85,000 Rp 5,950
U011 Tukang cat 0.105 Oh Rp 110,000 Rp 11,550
U002 Kepala Tukang 0.004 Oh Rp 125,000 Rp 500
U001 Mandor 0.0025 Oh Rp 150,000 Rp 375
Jumlah Rp 39,695
Overhead (10%) Rp 3,970
Jumlah Total Rp 43,665
Pembulatan Rp 44,000
M010 Pelaburan 1 m2 bidang kayu dengan teak oil / Residu
A Bahan Material
B309 Teak oil 0.36 lt Rp 12,000 Rp 4,320
B Tenaga Kerja
U014 Pekerja 0.04 Oh Rp 85,000 Rp 3,400
U011 Tukang cat 0.063 Oh Rp 110,000 Rp 6,930
M014 Pengecatan 1 m2 tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
A Bahan Material
Pembulatan Rp 234,000
M025 Pengecatan 1 m2 permukaan baja lapis seng (galbani) secara semprot
( airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal 200 um
A Bahan Material
B061 Cat dasar 0.3 kg Rp 31,000 Rp 9,300
B Tenaga Kerja
U014 Pekerja 0.4 Oh Rp 85,000 Rp 34,000
U011 Tukang cat 0.7 Oh Rp 110,000 Rp 77,000
U002 Kepala Tukang 0.2 Oh Rp 125,000 Rp 25,000
U001 Mandor 0.2 Oh Rp 150,000 Rp 30,000
Jumlah Rp 175,300
Overhead (10%) Rp 17,530
Jumlah Total Rp 192,830
Pembulatan Rp 193,000
N PEKERJAAN SANITASI
N001 Memasang 1 buah kloset duduk merk Toto
A Bahan Material
B147 Kloset Duduk / Monoblok 1 bh Rp 1,250,000 Rp 1,250,000
Perlengkapan 1 75000 Rp 75,000
B Tenaga Kerja
U014 Pekerja 3.3 Oh Rp 85,000 Rp 280,500
U008 Tukang Batu 1.1 Oh Rp 110,000 Rp 121,000
U002 Kepala Tukang 0.001 Oh Rp 125,000 Rp 125
U001 Mandor 0.16 Oh Rp 150,000 Rp 24,000
Jumlah Rp 1,750,625
Overhead (10%) Rp 175,063
Jumlah Total Rp 1,925,688
Pembulatan Rp 1,926,000
N002 Memasang 1 buah kloset jongkok porselen Merk Toto
A Bahan Material
B148 Kloset jongkok porselen 1 bh Rp 750,000 Rp 750,000
B292 Semen portland 6 kg Rp 1,500 Rp 9,000
B205 Pasir pasang 0.01 m3 Rp 275,000 Rp 2,750
B Tenaga Kerja
U014 Pekerja 1 Oh Rp 85,000 Rp 85,000
U008 Tukang Batu 1.5 Oh Rp 110,000 Rp 165,000
U002 Kepala Tukang 1.5 Oh Rp 125,000 Rp 187,500
U001 Mandor 0.16 Oh Rp 150,000 Rp 24,000
Jumlah Rp 1,223,250
Overhead (10%) Rp 122,325
Jumlah Total Rp 1,345,575
Pembulatan Rp 1,346,000
N003 Memasang 1 buah kloset jongkok teraso Merk Toto
A Bahan Material
B149 Kloset jongkok teraso 1 bh Rp 875,000 Rp 875,000
B029 Bata merah 7 bh Rp 600 Rp 4,200
B292 Semen portland 6 kg Rp 1,500 Rp 9,000
B205 Pasir pasang 0.01 m3 Rp 275,000 Rp 2,750
B Tenaga Kerja
U014 Pekerja 1 Oh Rp 85,000 Rp 85,000
Pembulatan Rp : Rp 752,000
N007 Memasang 1 buah bak mandi Fibreglass volume 0.30 m3 Merk Toto
A Bahan Material
B021 Bak Fiberglass 1 bh Rp 285,000 Rp 285,000
Perlengkapan 1 Rp 51,300 Rp 51,300
B Tenaga Kerja
U014 Pekerja 1.8 Oh Rp 85,000 Rp 153,000
U008 Tukang Batu 2.7 Oh Rp 110,000 Rp 297,000
U002 Kepala Tukang 0.54 Oh Rp 125,000 Rp 67,500
U001 Mandor 0.11 Oh Rp 150,000 Rp 16,500
Jumlah Rp 870,300
Overhead (10%) Rp 87,030
Jumlah Total Rp 957,330
Pembulatan Rp : Rp 958,000
N008 Memasang 1 buah bak mandi batu bata volume 0.30 m3
A Bahan Material
B029 Bata Merah 0.4 m3 Rp 600 Rp 240
B292 Semen portland 120 kg Rp 1,500 Rp 180,000
B205 Pasir pasang 0.3 m3 Rp 275,000 Rp 82,500
B263 Porselen ( 11 x 11 ) cm 360 bh Rp - Rp -
B291 Semen nat 6 kg Rp 1,425 Rp 8,550
B Tenaga Kerja
U014 Pekerja 6 Oh Rp 85,000 Rp 510,000
U008 Tukang Batu 3 Oh Rp 110,000 Rp 330,000
U002 Kepala Tukang 0.3 Oh Rp 125,000 Rp 37,500
U001 Mandor 0.3 Oh Rp 150,000 Rp 45,000
Jumlah Rp 1,193,790
Overhead (10%) Rp 119,379
Jumlah Total Rp 1,313,169
Pembulatan Rp : Rp 1,314,000
N009 Memasang 1 buah badkip porselen
A Bahan Material
B015 Badkip 1 bh Rp 9,500 Rp 9,500
Perlengkapan 20% Rp 1,900
B Tenaga Kerja
U014 Pekerja 0.0075 Oh Rp 85,000 Rp 638
U008 Tukang Batu 0.075 Oh Rp 110,000 Rp 8,250
U002 Kepala Tukang 0.0075 Oh Rp 125,000 Rp 938
U001 Mandor 0.0038 Oh Rp 150,000 Rp 570
Jumlah Rp 21,795
Overhead (10%) Rp 2,180
Jumlah Total Rp 23,975
Pembulatan Rp : Rp 24,000
Pembulatan Rp : Rp 289,000
N020 Memasang 1 m pipa galvanis diameter 3/4"
A Bahan Material
B222 Pipa galvanis 1.2 m' Rp 150,000 Rp 180,000
Perlengkapan 35% Rp 63,000
B Tenaga Kerja
U014 Pekerja 0.054 Oh Rp 85,000 Rp 4,590
U008 Tukang Batu 0.09 Oh Rp 110,000 Rp 9,900
U002 Kepala Tukang 0.009 Oh Rp 125,000 Rp 1,125
U001 Mandor 0.027 Oh Rp 150,000 Rp 4,050
Jumlah Rp 262,665
Overhead (10%) Rp 26,267
Jumlah Total Rp 288,932
Pembulatan Rp : Rp 289,000
N021 Memasang 1 m pipa galvanis diameter 1"
A Bahan Material
B222 Pipa galvanis 1.2 m' Rp 150,000 Rp 180,000
Perlengkapan 35% Rp 63,000
B Tenaga Kerja
U014 Pekerja 0.054 Oh Rp 85,000 Rp 4,590
U008 Tukang Batu 0.09 Oh Rp 110,000 Rp 9,900
U002 Kepala Tukang 0.009 Oh Rp 125,000 Rp 1,125
U001 Mandor 0.027 Oh Rp 150,000 Rp 4,050
Jumlah Rp 262,665
Overhead (10%) Rp 26,267
Jumlah Total Rp 288,932
Pembulatan Rp : Rp 289,000
N022 Memasang 1 m pipa galvanis diameter 1 1/2"
A Bahan Material
B222 Pipa galvanis 1.2 m' Rp 150,000 Rp 180,000
Perlengkapan 35% Rp 63,000
B Tenaga Kerja
U014 Pekerja 0.108 Oh Rp 85,000 Rp 9,180
U008 Tukang Batu 0.18 Oh Rp 110,000 Rp 19,800
U002 Kepala Tukang 0.018 Oh Rp 125,000 Rp 2,250
U001 Mandor 0.0054 Oh Rp 150,000 Rp 810
Jumlah Rp 275,040
Overhead (10%) Rp 27,504
Jumlah Total Rp 302,544
Pembulatan Rp : Rp 303,000
N023 Memasang 1 m pipa galvanis diameter 3"
A Bahan Material
B222 Pipa galvanis 1.2 m' Rp 150,000 Rp 180,000
Perlengkapan 35% Rp 63,000
B Tenaga Kerja
U014 Pekerja 0.108 Oh Rp 85,000 Rp 9,180
U008 Tukang Batu 0.18 Oh Rp 110,000 Rp 19,800
U002 Kepala Tukang 0.018 Oh Rp 125,000 Rp 2,250
U001 Mandor 0.0054 Oh Rp 150,000 Rp 810
Jumlah Rp 275,040
P PEKERJAAN LISTRIK
P001 1 titik Pekerjaan Instalasi Lampu dan Kotak Kontak
A Bahan
B106 Kabel listrik NYA 3 x 2.5 mm 11 m1 Rp 22,000 Rp 242,000.00
B102 Inst. Lampu dan stop kontak 1 titik Rp 25,000 Rp 25,000.00
B Tenaga
U014 Pekerja 0.48 Oh Rp 85,000 Rp 40,800.00
U007 Tukang 0.048 Oh Rp 110,000 Rp 5,280.00
U002 Kepala Tukang 0.048 Oh Rp 125,000 Rp 6,000.00
Jumlah Rp 319,080
Overhead (10%) Rp 31,908
Jumlah Total Rp 350,988
Pembulatan Rp : Rp 351,000
HARGA SATUAN PEKERJAAN
P002 1 bh Pekerjaan Stop Kontak Dinding Merk
A Bahan
B304 Stop kontak 1 bh Rp 110,000 Rp 110,000.00
B Tenaga
U014 Pekerja 0.2 Oh Rp 85,000 Rp 17,000.00
U007 Tukang 0.02 Oh Rp 110,000 Rp 2,200.00
U002 Kepala Tukang 0.02 Oh Rp 125,000 Rp 2,500.00
Jumlah Rp 131,700
Overhead (10%) Rp 13,170
Jumlah Total Rp 144,870
Pembulatan Rp : Rp 145,000
HARGA SATUAN PEKERJAAN
P003 1 bh Pek. Lampu Merk
A Bahan
B162 Lampu 1 bh Rp 35,000 Rp 35,000.00
B Tenaga
U014 Pekerja 0.2 Oh Rp 85,000 Rp 17,000.00
U007 Tukang 0.02 Oh Rp 110,000 Rp 2,200.00
U002 Kepala Tukang 0.02 Oh Rp 125,000 Rp 2,500.00
Jumlah Rp 56,700
Overhead (10%) Rp 5,670
Jumlah Total Rp 62,370
Pembulatan Rp : Rp 63,000
HARGA SATUAN PEKERJAAN
P004 1 unit Pek. Sekring Kast
A Bahan
B288 Sekring Kast 1 bh Rp 20,000 Rp 20,000.00
B Tenaga