REKAPITULASI FOLUME PEKERJAAN

JEMBATAN TANJUNG DALAM

NO PEKERJAAN VOLUME VOLUME TOTAL

1 BETON Fc' 30
a Bangunan Atas 76.10 m3
76.10 m3
2 BETON Fc' 25
Bangunan Bawah
a Abutment 149.46 m3
b Wing Wall 7.05 m3
c Pelat Injak 9.15 m3
d Dinding Sumuran 16.59 m3
182.25 m3
3 BETON Fc' 15 (LANTAI KERJA)
a Lantai Kerja Di Bawah Poer 10.00 m3
b Lantai Kerja Di Bawah Pelat Injak 3.00 m3
13.00 m3
BETON CYCLUB
Beton Cyclub pondasi sumuran 22.682 m3

22.68 m3
4 PASANGAN BATU
a Tembok Sedada 10.00 m3
10.00 m3
5 PASANGAN BATU
a Talud Kiri Abt 1 400.00 m3
b Talud Kanan Abt 1 40.00 m3
c Talud Kiri Abt 2 36.35 m3
d Talud Kanan Abt 2 36.35 m3
512.70 m3
6 PEMBESIAN BANGUNAN ATAS
a Bangunan Atas 11,752.65 kg
11,752.65 kg
7 PEMBESIAN BANGUNAN BAWAH

a Abutment 1
Pelat Injak 554.73 kg
Back Wall 2,514.39 kg
Konsol 1,456.60 kg
Rib 3,753.35 kg
Poer 7,501.27 kg
Wing Wall 1,070.36 kg
Sumuran 972.05 kg

b Abutment 2
Pelat Injak 554.73 kg
Back Wall 2,514.39 kg
Konsol 1,456.60 kg
Rib 4,166.42 kg
Poer 7,501.27 kg
Wing Wall 1,227.88 kg
Sumuran 972.05 kg

36,216.10 kg
8 GALIAN TANAH KONSTRUKSI
a 0 - 2 Meter 258.34 m3
b 2 -4 Meter 154.16 m3
NO PEKERJAAN VOLUME VOLUME TOTAL
412.50 m3
9 TIMBUNAN TANAH PILIHAN
a Timbunan Oprit 109.18 m3
109.18 m3

9 GALIAN TANAH BIASA


a Area Oprit 86.72 m3

86.72 m3

10 RANGKA BAJA

Rangka Bentang 50 meter 101,138.00 kg


101,138.00 kg

#REF! m1

5 PASANGAN BATU DENGAN MORTAR (2.2)


a Pasangan Batu 80.40 m3
80.40 m3

5 GALIAN MANUAL UNTUK SELOKAN DRAINASE


a Galian 155.40 m3
155.40 m3
PERHITUNGAN GALIAN TANAH

No STATION JARAK LUAS VOLUME KET


(M) (M) (M3)

1 0+000 -
10 0.00
2 0+010 -
10 33.00
3 0+020 6.600
10 46.75
4 0+030 2.750
10 0.00
5 0+040 -
10 0.00
6 0+050 -
10 0.00
7 0+060 -
10 0.00
8 0+070 -
10 0.00
9 0+080 -
10 2.75
10 0+090 0.550
10 4.22
11 0+100 0.294

TOTAL 86.72
PERHITUNGAN TIMBUNAN TANAH BIASA

No STATION JARAK LUAS VOLUME KET


(M) (M) (M3)

1 0+000 0.000
10 0.00
2 0+010 0.000
10 0.00
3 0+020 0.000
10 6.61
4 0+030 1.322
10 0.00
5 0+040 0.000
10 0.00
6 0+050 0.000
10 0.00
7 0+060 0.000
10 0.00
8 0+070 0.000
10 0.00
9 0+080 28.100
7.3 102.57
10 0+087 0.000
10 0.00
11 0+097 0.000

TOTAL 109.18
PERHITUNGAN ACUAN BETON

BANGUNAN ATAS (Bentang 10 m)

PELAT LANTAI & GELAGAR MEMANJANG Sisi Samping

Luas 1 = Lebar x Tinggi Luas 2 = 0.65 + 0.75 x 1.4


= 5.2 x 0.95 2
= 4.94 m2 = 0.98 m2

Luas 3 = 0.75 x 1.6


= 1.20 m2

20
20

95
Luas 4 = 0.65 + 0.75 x 1.4
75

75
65

65 2
= 0.98 m2
140 40 160 40 140

Luas Sisi Samping (A1) = Luas 1 - Luas 2 - Luas 3 - Luas 4


= 4.94 0.98 + 1.20 + 0.98
= 1.78 m2

Luas 2 Sisi = A1 x 2 bh
= 1.78 x 2
= 3.56 m2

Sisi Bawah

Panjang = 10.8 m
Lebar = 8.4 m

Luas Sisi Bawah = Panjang x Lebar


= 10.8 x 8.4
= 90.72 m2
DIAFRAGMA
Panjang = 1.6 m
Jumlah Diafragma = 5 bh

Luas = ( 0.45 + 0.3 + 0.45 ) x 1.6 x 5


5
4

30
= 9.6 m2
TIANG SANDARAN
Luas 1 = 0.41 x 1.15 Luas 2 = 0.45 + 1.15 x 0.16
= 0.4715 2
= 0.13 m2

Jumlah = 6.0 bh Luas 3 = 0.50 x 0.11 x 0.7


25
Tebal = 10.0 cm = 0.04 m2

Luas Sisi 1 = Luas 1 - Luas 2 - Luas 3


5
4

= 0.4715 - 0.13 - 0.04


= 0.31 m2

Luas Sisi 2 = Tinggi x Tebal


= 1.15 x 0.1
= 0.115 m2
0
7

Luas Total = Luas Sisi 1 + Luas Sisi 2


30 1 = 0.31 + 0.115
= 0.42 m2

Luas Tiang Sandaran Total = Luas Total x 2 x 6.0 bh


= 0.42 x 2 x 6.0 bh
= 5.04 m2

BANGUNAN ATAS (Bentang 20 m)

PELAT LANTAI & GELAGAR MEMANJANG Sisi Samping

Luas 1 = Lebar x Tinggi Luas 2 = 1.20 + 1.25 x 1.4


= 5.2 x 1.4 2
= 7.28 m2 = 1.72 m2

Luas 3 = 1.25 x 1.44


= 1.80 m2
20

170 Luas 4 = 1.20 + 1.25 x 1.4


2
75

75
70

70

140

= 1.72 m2
35

35
35

35

Luas Sisi Samping (A1) = Luas 1 - Luas 2 - Luas 3 - Luas 4


132 56 144 56 132
= 7.28 1.72 + 1.80 + 1.72
= 2.05 m2
35

35
35

35
132 56 144 56 132

Luas 2 Sisi = A1 x 2 bh
= 2.05 x 2
= 4.1 m2

Sisi Bawah

Panjang = 20.8 m
Lebar = 11.06 m

Luas Sisi Bawah = Panjang x Lebar


= 20.8 x 11.06
= 230.05 m2
DIAFRAGMA
Panjang = 1.7 m
Jumlah Diafragma = 5 bh

Luas = ( 0.8 + 0.3 + 0.8 ) x 1.7 x 5


= 16.15 m2
0
8

30

TIANG SANDARAN
Luas 1 = 0.41 x 1.15 Luas 2 = 0.45 + 1.15 x 0.16
= 0.4715 2
= 0.13 m2

Jumlah = 11.0 bh Luas 3 = 0.50 x 0.11 x 0.7


25
Tebal = 10.0 cm = 0.04 m2

Luas Sisi 1 = Luas 1 - Luas 2 - Luas 3


5
4

= 0.4715 - 0.13 - 0.04


= 0.31 m2

Luas Sisi 2 = Tinggi x Tebal


= 1.15 x 0.1
= 0.115 m2
0
7

Luas Total = Luas Sisi 1 + Luas Sisi 2


30 1 = 0.31 + 0.115
0
7
30 1
= 0.42 m2

Luas Tiang Sandaran Total = Luas Total x 2 x 11.0 bh


= 0.42 x 2 x 11.0 bh
= 9.24 m2

PERHITUNGAN ACUAN BETON

BANGUNAN BAWAH (ABUTMENT 1)


ABUTMENT
Luas Sisi 1
1 = 0.3 x 1.10 = 0.33 m2
30 30 115 2 = 0.50 x 1.75 = 0.88 m2
3 ='' (' 1.75 + 0.80 )x
0.7 = 0.89 m2
2
4 = 0.80 x 4.15 = 3.32 m2
5 ='' (' 0.80 + 3.00 )x
1 0.3 = 0.57 m2
0

2
1
1

6 = 0.50 x 3.00 = 1.50 m2


7.49 m2

2 Luas 2 sisi 1 = 7.49 x 2.00 sisi


0
5

= 14.98 m2

3 Panjang = 6.62 m
0
7

Tinggi 1 = 8.35 m
Tinggi 2 = 8.15 m

Luas Sisi 2 =
4 Panjang x Tinggi 1
= 6.62 x 8.35
= 55.277 m2
1
45

Luas Sisi 3 = Panjang x Tinggi 2


= 6.62 x 8.15
= 53.953 m2
5
0
3

6
0

Luas Total = 14.98 + 55.277 + 53.953


5

= 124.21 m2

80
300
80
300

295 WING WALL


265 30 Jmlh Wing Wall = 2 bh

Luas Sisi 1
1
1 = 2.95 x 1.10 = 3.25 m2
0

0
1

1
1

2 = 2.65 x 0.50 = 1.33 m2


2 3 ='' (' 2.88 + 5.15 )x 2.20
0

= 8.83 m2
5

2
4 4 ='' (' 0.45 + 1.10 )x 0.70
0
7

= 0.54 m2
2
5 ='' (' 4.15 + 4.45 )x 1.20
= 5.16 m2
2
88

= 19.106 m2
2

TEBAL RATA-RATA (t) = 0.45 m


5 JUMLAH WING WALL (n) = 2.00 buah
5

6.45 m
1

Tinggi =
4

Luas Sisi 2 = Tinggi x Tebal


= 2.9025 m2
2
27

Luas Total = ( Luas Sisi 1 x 2 ) + Luas sisi 2


0
3

= ( 19.106 x 2 ) + 2.9025
220 110 = 41.1135 m2

Luas 2 Wing Wall = 41.114 x 2 bh


= 82.227 m2

PELAT INJAK
250 Luas Sisi 1
20

I = 2.50 x 0.20 = 0.5 m2


25

30
35 II = 0.05 x 0.35 = 0.0175 m2
0.5175 m2

Lebar Pelat (B) 3.5 m


Luas Sisi 2 = 3.5 x 2.50
= 8.75 m2

Luas Sisi 3 = 0.2 x 3.50


= 0.7 m2

Luas Total = ( Luas Sisi 1 x 2.00 ) + Luas Sisi 2 + Luas Sisi 3


= ( 0.5175 x 2.00 )+ 8.75 + 0.7
= 10.485 m2

PONDASI SUMURAN

Jumlah Sumuran (n) = 2 bh


250 Tinggi Sumuran (h) = 3 m
190

Keliling Lingkaran = Π x D
= 3.1416 x 2.5
= 7.854 m

Luas Acuan Beton Pondasi Sumuran = n x h x Keliling Lingkaran


= 2 x 3 x 7.85
= 47.12389 m2

BANGUNAN BAWAH (ABUTMENT 2)


ABUTMENT
Luas Sisi 1
1 = 0.3 x 1.56 = 0.47 m2
115 30 30
2 = 0.50 x 1.75 = 0.88 m2
3 ='' (' 1.75 + 0.80 )x
0.7 = 0.89 m2
2
4 = 0.80 x 3.70 = 2.96 m2
5 ='' (' 0.80 + 3.00 )x
1 0.3 = 0.57 m2
56

2
1

6 = 0.50 x 3.00 = 1.50 m2


7.27 m2

2 Luas 2 sisi 1 = 7.27 x 2.00 sisi


0
5

= 14.53 m2

3
0

Panjang = 6.62 m
7

Tinggi 1 = 8.16 m
Tinggi 2 = 8.36 m
4
7
30
3

0
7
4
Luas Sisi 2 = Panjang x Tinggi 1

7
30
= 6.62 x 8.16
= 54.0192 m2

5 Luas Sisi 3 = Panjang x Tinggi 2

0
3
= 6.62 x 8.36
6 = 55.3432 m2

0
5

80
300 Luas Total = 14.53 + 54.0192 + 55.3432
= 123.89 m2

295
265
30 45 WING WALL
Jmlh Wing Wall = 2 bh

Luas Sisi 1
1 1 = 2.95 x 1.55 = 4.57 m2
5

5
5

5
1

2 = 2.65 x 0.50 = 1.33 m2


3 ='' (' 2.43 + 4.70 )x 2.20
= 7.84 m2
2 2
0

0
5

4 ='' (' 0.45 + 1.10 )x 0.70


= 0.54 m2
2
4
0
7

5 ='' (' 3.70 + 4.00 )x 1.10


= 4.24 m2
2
= 18.518 m2
4
23

3
TEBAL RATA-RATA (t) = 0.45 m
JUMLAH WING WALL (n) = 2.00 buah
5
Tinggi = 6.75 m
7
30

Luas Sisi 2 = Tinggi x Tebal


= 3.0375 m2
2
27

Luas Total = ( Luas Sisi 1 x 2 ) + Luas sisi 2


0
3

110 220
2
27
= ( 18.518 x 2 ) + 3.0375

0
3
110 220
PERHITUNGAN VOLUME GALIAN TANAH KONSTRUKSI

Galian Pada Abutment 1


Panjang = 11 m
Galian tanah 0-2 m

Luas = 2 + 2 x 6
2
= 12 m2

Galian tanah 2-4 m


385.0000
323.0000

Luas = 1.85 + 1.23 x 6


2
600.0000 = 9.24 m2

Volume 0-2 m = Panjang x Luas


= 11 x 12.000
= 132.00 m3

Volume 2-4 m = Panjang x Luas


= 11 x 9.240
= 101.64 m3

Galian Pada Abutment 2


Panjang = 11 m

LUAS TOTAL

Luas = 1.57 + 2.66 x 6


2
= 12.69 m2

Galian tanah 0-2 m

200.0000 Luas = L. Tot - L. 2 x 6


266.2000

157.4000

66.2000
= 11.4855 m2
365.0735
600.0000

Galian tanah 2-4 m

Luas = 0 + 0.66 x 3.65


2
= 1.2045 m2

Volume 0-2 m = Panjang x Luas


= 11 x 11.486
= 126.34 m3

Volume 2-4 m = Panjang x Luas


= 11 x 1.205
= 13.25 m3
GALIAN TANAH PADA PONDASI SUMURAN

Volume = 0.25 x Π x D² x Tinggi


250 = 0.25 x Π x 2,5² x 2
= 9.817 m3

Volume Total = Vol. 1 x Jumlah Sumuran


= 9.81748 x 4
= 39.270 m3

0
20
PERHITUNGAN VOLUME BETON (Fc'30)
BANGUNAN ATAS

DARI SPESIFIKASI BUKAKA (UTK BENTANG 50 M) = 76.10 m3


PERHITUNGAN VOLUME BETON (Fc'25)

BANGUNAN BAWAH (Abutment)


ABUTMENT 1
LUAS 1
0.25 + 0.45
20 40 115 1 ='' (' ) x 0.48 = 0.17 m2
48 2
1
25

2 = 0.40 x 1.29 = 0.52 m2


20
74

2
3 0.30 + 0.55
30

3 ='' (' )x 0.2 = 0.09 m2


25

4 2
50

5 0.50 + 1.00
50

4 ='' (' )x 0.3 = 0.23 m2


30
2
61

6
5 = 1.25 x 0.61 = 0.76 m2
30

7
1.25 + 5.00
80

6 ='' (' )x 0.3 = 0.94 m2


2
7 = 0.80 x 5.00 = 4.00 m2
39 25

8 9
LUAS TOTAL (A) = 6.69 m2
39
26

170

PANJANG (P) = 10.00 m

VOLUME ABUTMEN 1
= A x P
= 6.69 x 10.00
= 66.94 m3

ABUTMENT 2
LUAS 1
0.25 + 0.45
1 ='' (' ) x 0.48 = 0.17 m2
2
20 40
48
115
2 = 0.40 x 1.29 = 0.52 m2
1
0.30 + 0.55
5
2
0
4

2
7

2
3 ='' (' )x 0.2 = 0.09 m2
3
2
0
3
5
2

4
0.50 + 1.00
0
5

5
4 ='' (' )x 0.3 = 0.23 m2
0
5

30
2
5 = 1.25 x 1.61 = 2.01 m2
6
11

6 1.25 + 5.00
6 ='' (' )x 0.3 = 0.94 m2
0
3

7
2
0
8

180 125 195 7 = 0.80 x 5.00 = 4.00 m2

LUAS TOTAL (A) = 7.94 m2


PANJANG (P) = 10.00 m

VOLUME ABUTMEN 2
= A x P
= 7.94 x 10.00
= 79.44 m3
LUAS 2
20 40 115
8 = 0.26 x 1.70 x 2 = 0.88 m2
0.25 + 0.64
48

2 02 5
1

6 1 5 0 5 0 2 53 0 7 4
2

='' (' ) x 0.39 = 0.35 m2


3

9 x 2
2
5

30
80 30

39 25

39
9
26

1.23 m2
170

LUAS TOTAL (A) =


PANJANG (P) = 1.25 m

VOLUME 2
= A x P x 2.00 bh
= 1.23 x 1.25 x 2
= 3.08 m3

VOLUME ABUTMENT TOTAL

= VOLUME ABUTMEN 1 + VOLUME ABUTMEN 2 + VOLUME 2

= 66.94 + 79.44 + 3.08


= 149.46 m3 (1)
WING WALL ABT 1

LUAS
1 = 0.20 x 0.74 = 0.15 m2
2 = 1.30 x 1.79 = 2.33 m2
0.75 + 0.50
3 ='' (' ) x 0.20 = 0.13 m2
2
1.50 + 1.80
117 130 20 4 ='' (' ) x 0.50 = 0.83 m2
2
0.61 + 0.91
1 5 ='' (' ) x 1.80 = 1.37 m2
74

2
20 2.00 + 3.20
0
3

6 ='' (' ) x 1.17 = 3.04 m2


200

6 2
2
5
2

3
50

4 LUAS TOTAL (A) = 7.835 m2


50

TEBAL (t) = 0.40 m


5 JUMLAH WING WALL (n) = 2.00 buah
61
120

180
VOLUME =
= A x t x n
= 7.835 x 0.45 x 2.00
= 7.05 m3 (2)

WING WALL ABT 1


117 130 20
LUAS
1 1 = 0.20 x 0.74 = 0.15 m2
4
7

2 = 1.30 x 1.79 = 2.33 m2


20
0.75 + 0.50
0
3

2 3 ='' (' ) x 0.20 = 0.13 m2


2
5
2

3
1.50 + 1.80
00

0
3

6 4 ='' (' ) x 0.50 = 0.83 m2


2
4
0
5

1.61 + 1.91
5 ='' (' ) x 1.80 = 3.17 m2
2
3.00 + 4.20
5 6 ='' (' ) x 1.17 = 4.21 m2
2
6
10
9
10
20

10.805 m2
1

LUAS TOTAL (A) =


TEBAL (t) = 0.40 m
JUMLAH WING WALL (n) = 2.00 buah
180

ABTMEN 2 VOLUME =
= A x t x n
= 10.805 x 0.45 x 2.00
= 9.72 m3 (2)

VOLUME WING WAAL TOTAL = 7.05 + 9.72 = 16.78 m3

PELAT INJAK
LUAS (A)
250
I = 2.50 x 0.30 = 0.75 m2
II = 0.05 x 0.25 = 0.013 m2
30

35

20
25
0.763 m2

JUMLAH PELAT (n) 2 buah


LEBAR PELAT (B) 6 m
VOLUME =
= A x B x n
= 0.7625 x 6.00 x 2
= 9.15 m3 (3)
LANTAI KERJA BETON Fc' 15
Abutment Lebar Poer (B) = 5 m
Panjang Poer (L) = 10.00 m
Tebal (t) = 0.1 m
Jumlah Abutment (n) = 2 bh

Volume = B x L x t x n
= 5.00 x 10.0 x 0.10 x 2.00
= 10.00 m3

Pelat Injak Lebar (B) = 6 m


Panjang (L) = 2.50 m
Tebal (t) = 0.1 m
Jumlah (n) = 2 bh

Volume = B x L x t x n
= 6.00 x 2.50 x 0.10 x 2.00
= 3.00 m3

PONDASI SUMURAN
Luas Total = 0.25 x Π x D²
= 0.25 x 3.14 x 2,5²
= 4.909 m2

Luas 1 = 0.25 x Π x D²
= 0.25 x 3.14 1.9 ²
= 2.835 m2

Volume Beton Cyclop


250.0000 = Luas 1 x Tinggi x Jumlah Sumuran
= 2.835 x 2.00 x 4.00
190.0000 = 22.682 m3
BETON K-225

Volume Beton Fc'25 (Pondasi Sumuran)


= ( Luas Tot. - Luas 1 ) x Tinggi x Jumlah Sumuran
1 =( 4.909 - 2.84 ) x 2.00 x 4.00
BETON CYCLUB = 16.59 m3 (4)
PERHITUNGAN VOLUME PASANGAN BATU

Tembok Sedada
Jumlah = 4 bh

Luas = 1.25 x 0.5


= 0.625 m2

Volume = Luas x Panjang x Jumlah Leneng


= 0.625 x 4 x 4
= 10 m3

Talud Pasangan Batu Kiri Abutment 1 Panjang = 100 m

t = 1.2 m
Luas 1 = 0.6 + 1.2 + 0.2 + 0.6 x 1.7 = 2.21 m2
abt 2 KIRI 2
Luas 2 = 0.6 + 1.2 + 0.6 + x 0.8 = 0.96 m2
30
2
Luas A = Luas 1 - Luas 2 = 1.25 m2
0
2

20 t = 3.2 m
Luas 1 = 0.6 + 3.2 + 0.2 + 0.6 x 3.7 = 8.51 m2
2
10~2
30

2
Luas 2 = 0.6 + 3.2 + 0.6 + x 0.8 = 1.76 m2
2
Luas B = Luas 1 - Luas 2 = 6.75 m2
0
6

40 Luas Rata - Rata = Luas A + Luas B = 4.0 m2


2
Volume = Panjang x Luas Rata - Rata
= 100 x 4
= 400 m3
PERHITUNGAN VOLUME PASANGAN BATU

Talud Pasangan Batu Kanan Abutment 1


Panjang = 10 m
t = 1.2 m
Luas 1 = 0.6 + 1.2 + 0.2 + 0.6 x 1.7 = 2.21 m2
2
Luas 2 = 0.6 + 1.2 + 0.6 + x 0.8 = 0.96 m2
2
Luas A = Luas 1 - Luas 2 = 1.25 m2
t = 3.2 m
Luas 1 = 0.6 + 3.2 + 0.2 + 0.6 x 3.7 = 8.51 m2
2
Luas 2 = 0.6 + 3.2 + 0.6 + x 0.8 = 1.76 m2
2
Luas B = Luas 1 - Luas 2 = 6.75 m2

Luas Rata - Rata = Luas A + Luas B = 4 m2


2
Volume = Panjang x Luas Rata - Rata
= 10 x 4
= 40 m3

Talud Pasangan Batu Kiri Abutment 2


Panjang = 10 m
t = 1.2 m
Luas 1 = 0.6 + 1.2 + 0.2 + 0.6 x 1.7 = 2.21 m2
2
Luas 2 = 0.6 + 1.2 + 0.6 + x 0.8 = 0.96 m2
2
Luas A = Luas 1 - Luas 2 = 1.25 m2
t = 3 m
Luas 1 = 0.6 + 3 + 0.2 + 0.6 x 3.5 = 7.7 m2
2
Luas 2 = 0.6 + 3 + 0.6 + x 0.8 = 1.68 m2
2
Luas B = Luas 1 - Luas 2 = 6.02 m2

Luas Rata - Rata = Luas A + Luas B = 3.635 m2


2
Volume = Panjang x Luas Rata - Rata
= 10 x 3.635
= 36.35 m3
Talud Pasangan Batu Kanan Abutment 2
Panjang = 10 m

t = 1.2 m
30 Luas 1 = 0.6 + 1.2 + 0.2 + 0.6 x 1.7 = 2.21 m2
2
Luas 2 = 0.6 + 1.2 + 0.6 + x 0.8 = 0.96 m2
0
2 2
Luas A = Luas 1 - Luas 2 = 1.25 m2
20
t = 3 m
0.6 + 3 + 0.2 + 0.6
0

Luas 1 = x 3.5 = 7.7 m2


1
2 4
7~2

2
Luas 2 = 0.6 + 3 + 0.6 + x 0.8 = 1.68 m2
2
Luas B = Luas 1 - Luas 2 = 6.02 m2

Luas Rata - Rata = Luas A + Luas B = 3.635 m2


0
6

2
Volume = Panjang x Luas Rata - Rata
40 = 10 x 3.635
= 36.35 m3

PASANGAN BATU DENGAN MORTAR


Panjang = 200 m

Luas 1 = 0.9 + 1.32 x 0.7 = 0.777 m2


2

Luas 2 = 0.6 + 0.9 x 0.5 = 0.375 m2


2

Luas Total = Luas 1 - Luas 2


= 0.777 - 0.375
= 0.402 m2

Volume = Luas Total x Panjang


= 0.402 x 200
= 80.4 m3
GALIAN TANAH SIRING PASANGAN
Panjang = 200 m

Luas = 0.9 + 1.32 x 0.7 = 0.777 m2


2

Volume = Luas x Panjang


= 0.777 x 200
= 155.4 m3
TULANGAN LANTAI JEMBATAN

16 Ø19 ( f ) 16 Ø19 ( f )

Ø8 - 200 ( g)

Ø8- 200 ( h)
16 Ø19 ( f )
5 Ø19 - 70 ( e )

60 Ø12 - 100 ( b ) 60 Ø12 - 100 ( b )


60 Ø12 - 100 ( b )
60 Ø12 - 100 ( a )

CL

125Ø12 - 400( d)
251Ø12 - 200( c)
B

16 Ø19 ( f ) 16 Ø19 ( f )
A

Ø8 - 200 ( g)

Ø8- 200 ( h)
16 Ø19 ( f )
5 Ø19 - 70 ( e )

TIPE II I I I II I III III

MARKING TULANGAN a b c d e f g h
DIAMETER 12 12 12 19 19 19 8 8
a 500 7000 6500 6500 500 6000 350 350
b 160 420 330 430
c 170 200 400 420
d 320 420
e
JUMLAH (mm) 830 7000 6500 6500 1120 6000 1400 1620
KOREKSI (+/- mm) 200 200
PANJANG TUL 830 7000 6500 6500 1120 6000 1600 1820
JML TUL 120 600 251 125 20 320 252 252
TOTAL PJG 99.60 4200.00 1631.50 812.50 22.40 1920.00 403.20 458.64 BERAT TOTAL
BERAT 88.48 3731.00 1449.32 1811.88 49.95 4281.60 159.26 181.16 11752.65 KG
ABUTMEN 2
Lebar Pelat Injak 6m
Panjang Pelat Injak 2.5 m
D 22 -10 0 (B2)

Pe la t Inja k 30x250x 600 D 12 - 150 (P I3)

D 12 - 15 0 (B 3)
D 16 - 1 50 (PI 2)
D 16 - 150 (P I1)
D 22 -10 0 (B4)

D1 2 - 150/20 0 (B 5)
D1 2 - 1 50/200 (K 2)
D1 2 - 150 (K3)
D22 - 100(R1& R2 )
D 22 - 100 (K 1.1 )
2 D 16 (W1) D1 2 - 1 50/200 (R6)
D 22 - 10 0 (R3&R 4)
D1 2 - 150 (R5)
D 16 - 150 (W2)

D 22 - 100 (P1)
D1 9 - 150 (W3)
D12 - 150(P5)
D 22 -1 00 (P3)

D 12 - 150/2 00 (P4)

D 22 - 100 (P2 )

DETAIL PENULANGAN ABUT MENT 1 J EMBATAN WAY T ALANG BUAH BALAK


Skala 1 : 25

244

24
Ø 12 - 200 (PI 1)

29
15

Ø 12 - 200 (PI 2)

244

Ø 12 - 200 (PI 3)

600

DAFTAR PENULANGAN PELAT INJAK (ABUTMENT 1)


TIPE PI 1 PI 2 PI 3 Berat Total
Keterangan
Dia (mm) 16 16 12 (kg)
a cm 24 244 600
b cm 244
c cm 29
d cm 15
e cm 35
f cm
g cm
Panjang (m) 3.47 2.44 6
Jarak Tulangan (cm) 15 15 15
Jumlah (btg) 40 40 34
Jumlah Total (m) 138.8 97.6 204
Berat (kg/m') 1.580 1.580 0.888
Total Berat (kg) 219.304 154.208 181.220 554.732 Ulir (U-32)
Jumlah 554.732
Lebar Abutment 10 m
Tinggi Back Wall 1.29 m

D 22 - 10 0 (B2)

Pelat Inj ak 30x 250x600 D 12 - 1 50 (P I3 )

D 22 - 100 (B1)
D 12 - 1 50 (B3)
D 16 - 15 0(PI 2)
D 1 6- 1 50 (P I 1)
D2 2- 100 (B4)

D 12 - 150/200 (B5)

D 12 - 1 50/20 0(K2 )
D 12 - 150 (K 3)

D 2 2- 100 (R1&R2)
D 22 - 100 (K 1.1 )
2 D 16 (W 1) D 12 - 15 0/200 (R 6)
D 2 2- 10 0 (R3&R4)
D 12 - 1 50 (R 5)
D 16 - 15 0 (W2)

D 22 - 1 00 (P1 )
D 19 - 150 (W3)
D 12 - 1 50 (P5)
D 22 - 100 (P3 )

D 12 - 15 0/200 (P4)

D 2 2 -10 0 (P 2)

DETAIL PENULANGAN ABUTMENT 1 JEMBATAN WAY TALANG BUAH BALAK


BACK WALL
Skala 1 : 25
Ø 22 - 100 (B1) 52
30 78

23
Ø 22 - 100 (B4)

17
71
Ø 12 - 150 /200 (B5)
Ø 22 - 100 (B2)

164
30

182
Ø 12 - 150 (B3)

1000

DAFTAR PENULANGAN BACK WALL (ABUTMENT 1)


TIPE B1 B2 B3 B4 B5 Berat Total
Keterangan
Dia (mm) 22 22 12 22 12 (kg)
a cm 164 71 1000 74 12
b cm 30 78 23
c cm 182 17 52
d cm 83
e cm
f cm
g cm
Panjang (m) 3.76 2.49 10 1.49 0.12
Jarak Tulangan (cm) 10 10 15 10 15
Jumlah (btg) 100 100 18 100 450
Jumlah Total (m) 376 249 180 149 54
Berat (kg/m') 2.980 2.980 0.888 2.980 0.888
Total Berat (kg) 1120.480 742.020 159.900 444.020 47.970 2514.390 Ulir (U-32)
Jumlah 2514.390
Lebar Abutment 10 m
Tinggi Konsol 1 m
Lebar Dudukan 1 1.4 m
Lebar Dudukan 2 1.15 m
D 22 - 1 00 (B2)

Pela t Injak 30x25 0x6 00 D 12 - 15 0(PI 3)

D 22 - 1 00 (B 1)
D 1 2- 150 (B 3)
D 16 - 150 (PI 1) D 16- 150 (PI 2)

D 22 - 100 (B4)

D 12 - 1 50/200(B5)
D 12 - 150/2 00 (K 2)
D 12 - 15 0 (K 3)
D 22 - 100(R1&R2)
D 22 - 100 (K1 .1)
2 D 16 (W1 ) D 12 - 1 50/20 0(R6)
D 22 - 100 (R3&R4)
D 12 - 15 0 (R5 )
D 16 - 15 0(W2)
D 22 - 100 (P1)
D 19 - 150 (W3)
D 1 2- 15 0 (P 5)
D 22 - 100 (P3)

D 1 2- 150/200 (P4)

KONSOL
D 22 - 10 0(P2)

DETAIL PENULANGAN ABUTMENT 1 JEMBATAN WAY TALANG BUAH BALAK


Skala 1 : 25

155
155 Ø 12 - 150/200 (K2)

44

70
Ø 22 - 100 (K1.1) Ø 22 - 100 (K1.2) ± 140

160

26
Ø 12 - 150 (K4)

118
385

19

Ø 12 - 150 (K3) Ø 12 (K6)

80
1000

46
155

Ø 12 - 150 (K5)

39 25
39

9
26

8
170

DAFTAR PENULANGAN KONSOL (ABUTMENT 1)


TIPE K1.1 K1.2 K2 K3 K4 K5 K6 Berat Total
Keterangan
Dia (mm) 22 22 12 12 12 12 12 (kg)
a cm 104 104 140 1000 118 46 155
b cm 44 70 160 50
c cm 155 155 26 19
d cm 385 80
e cm
f cm
g cm
Panjang (m) 3.03 3.29 1.4 10 6.89 1.95 1.55
Jarak Tulangan (cm) 10 10 15 15 15 15 15
Jumlah (btg) 72 28 175 20 16 16 8
Jumlah Total (m) 218.16 92.12 245 200 110.24 31.2 12.4
Berat (kg/m') 2.980 2.980 0.888 0.888 0.888 0.888 0.888
Total Berat (kg) 650.117 274.518 217.642 177.667 97.930 27.716 11.015 1456.604 Ulir (U-32)
Jumlah 1456.604
Lebar Abutment 10 m
Tinggi RIB 0.61 m

D 22 - 100 ( B2)
RIB
Pelat Injak 30x250x600 D 12 - 150 (PI 3)

D 22 - 100 (B1)
D 12 - 150 (B3)
D 16 - 150 (PI 2)

Ø 22 - 100 (R3&R4)
D 16 - 150 (PI 1)
D 22 - 100 (B4)
Ø 22 - 100 (R1&R2)
D 12 - 150/200 (B5)
D 12 - 150/200 (K2)
D 12 - 150 (K3)

D 22 - 100 (R1&R2)
D 22 - 100 (K1.1)
2 D 16 (W1)

D 16 - 150 (W2)
D 12 - 150 (R5)
D 12 - 150/200 ( R6)
D 22 - 100 (R3&R4) Ø 12 - 150/200 (R6)
D 22 - 100 (P1)
D 19 - 150 (W3) D 12 - 150 (P5)
D 22 - 100 ( P3)

D 12- 150/200 (P4)


115
D 22 - 100 (P2)

261

261
DETAIL PENULANGAN ABUTMENT 1 JEMBATAN WAY TALANG BUAH BALAK
Ska la 1 : 25
Ø 12 - 150 (R5)

1000

50 50

DAFTAR PENULANGAN RIB (ABUTMENT 1)


TIPE R1 R2 R3 R4 R5 R6 Berat Total
Keterangan
Dia (mm) 22 22 22 22 12 12 (kg)
a cm 50 50 261 261 1000 115
b cm 261 261
c cm
d cm
e cm
f cm
g cm
Panjang (m) 3.11 3.11 2.61 2.61 10 1.15
Jarak Tulangan (cm) 10 10 10 10 15 15
Jumlah (btg) 100 100 100 100 10 250
Jumlah Total (m) 311 311 261 261 100 287.5
Berat (kg/m') 2.980 2.980 2.980 2.980 0.888 0.888
Total Berat (kg) 926.780 926.780 777.780 777.780 88.833 255.396 3753.349 Ulir (U-32)
Jumlah 3753.349
Lebar Abutment 10 m
Lebar Poer 5m

POER
D 2 2 - 10 0 (B2)
D 12 - 1 50 (P I 3)
Pe la t I nja k 30x250x600
122
D 22 - 100 (B1)
D 12 - 150 (B3)

D 16 - 15 0 (PI 1)
D 16 - 150 (PI 2) Ø 12 - 150/400 (P4)
D 22 - 100 (B4) Ø 22 - 100 (P1)
D 12 - 1 50/ 20 0 (B5)

D 12 - 15 0/2 00 (K2)

±96
D 12 - 150 (K3)

Ø 22 - 100 (P2)
D 22 - 100 (R1&R2)

71

71
D 22 - 100 (K1.1)
2 D 16 (W 1) D 12 - 150 /2 00 (R6)
D 22 - 100 (R 3&R 4)
D 12 - 150 (R5)
D 16 - 150 (W2 )
492
D 22 - 100 (P1)
D19 - 150 (W3)
D 12 - 150 (P5)
D 22 - 100 (P3)

D 12 - 150/200 (P4)
Ø 22 - 100 (P3)
D 22 -1 00 (P2)

492

DETAIL PENULANGAN ABUTMENT 1 JEMBATAN WAY TALANG BUAH BALAK Ø 12 - 150 (P5)
S ka la 1 : 25

1000

DAFTAR PENULANGAN POER (ABUTMENT 1)


TIPE P1 P2 P3 P4 P5 Berat Total
Keterangan
Dia (mm) 22 22 22 12 12 (kg)
a cm 180 71 492 96 1000
b cm 122 492
c cm 192 71
d cm
e cm
f cm
g cm
Panjang (m) 4.94 6.34 3.50 0.96 10
Jarak Tulangan (cm) 10 10 10 15 15
Jumlah (btg) 100 100 200 1700 68
Jumlah Total (m) 494 634 700 1632 680
Berat (kg/m') 2.980 2.980 2.980 0.888 0.888
Total Berat (kg) 1472.120 1889.320 2086.000 1449.760 604.067 7501.267 Ulir (U-32)
Jumlah 7501.267
Tinggi 1 = 2 m
Tinggi 2 = 1.2 m
Lebar 1 = 1.8 m
Lebar 2 = 1.25 m

D 22 - 100 (B2)
Pela t In ja k 30x250x600 D 12 - 150(PI 3)

D 22 - 100 (B1)
D 12 - 150 (B3)
D 16 - 150 (PI 2)
D 16 - 150 (PI 1)
D 22 - 100 (B4)

D 12 - 150/200 ( B5)
D 12 - 150/200 (K2)
Ø 16 - 200 (W2.1)
D 12 - 150 (K3)

D 22 - 100 (R1&R2)
D 22 - 100 (K1.1)
2 D 16 (W1) D 12 - 150/200 (R6)
D 22 - 100 (R3&R4)
D 12 - 150 (R5)

± 281
D 16 - 150 (W2)

D 19 - 150 (W3)
D 22 - 100 (P1)
D 12 - 150 (P5)
40
D 22 - 100 (P 3)

23
Ø 16 - 200 (W2.2)
D 12 - 150/2 00 (P4)

D 22 - 100 (P2)
Ø 16 - 20 (W5)
DETAIL PENULANGAN ABUTMENT 1 JEMBATAN WAY TALANG BUAH BALAK

± 215
Skala 1 : 25

Ø 19 - 200 (W3.1) Ø 19 - 200 (W3.2)

200
2 Ø 16 (W1)

±250
±305
Ø 12 - 400/400 (W4)

30

DAFTAR PENULANGAN WING WALL (ABUTMENT 1)


TIPE W1 W2.1 W2.2 W3.1 W3.2 W4 W5 Angkur Berat Total
Keterangan
Dia (mm) 16 16 16 19 19 12 19 16 (kg)
a cm 200 281 215 305 250 30 58 80
b cm 164 23 2
c cm 40 bh Wing Wall
d cm
e cm
f cm
g cm
Panjang (m) 3.64 2.81 2.15 3.05 2.5 0.3 1.21 0.8
Jarak Tulangan (cm) - 15 15 15 15 30 15 15
Jumlah (btg) 2 28 16 24 18 36 21 12
Jumlah Total (m) 7.28 78.68 34.4 73.2 45 10.8 25.41 9.6
Berat (kg/m') 1.580 1.580 1.580 2.230 2.230 0.888 2.230 1.580
Total Berat (kg) 11.502 124.314 54.352 163.236 100.350 9.594 56.664 15.168 535.181 Ulir (U-32)
Jumlah 1070.362
Tinggi Sumuran 2m
Diameter 1 2.43 m
Diameter 2 1.98 m

Angkur D 19 - 150 Lantai Kerja


BETON K - 225 D 12 - 150 (S3)

D 12 - 150 (S4)

D 12 - 150 (S1)
D 12 - 150 (S2)
SUMURAN
BETON CYCLOP

25

Angkur Ø 19 - 20

65
BETON K - 225 Ø 12 - 15 (S2) Ø 12 - 15 (S1)
21 20
25

283

330
Ø 12 - 15 (S3) Ø 12 - 15 (S4)

14
198 243

DAFTAR PENULANGAN PONDASI SUMURAN


TIPE S1 S2 S3 S4 Angkur Berat Total
Keterangan
Dia (mm) 12 12 12 12 19 (kg)
a cm 20 20 622 763 25
b cm 230 183 65 2
c cm 15 48 25 bh sumuran
d cm
e cm
f cm
g cm
Panjang (m) 2.65 2.51 6.22 7.63 1.15
Jarak Tulangan (cm) 15 15 15 15 20
Jumlah (btg) 51 42 14 14 39
Jumlah Total (m) 135.15 105.42 87.08 106.88 44.85
Berat (kg/m') 0.888 0.888 0.888 0.888 2.230
Total Berat (kg) 120.058 93.648 77.360 94.942 100.016 486.025 Ulir (U-32)
Jumlah 972.049
Lebar Pelat Injak 6m
Panjang Pelat Injak 2.5 m

244
D 22 - 100 (B2)
D 12 - 150 (PI 3) Pelat Injak 30x250x600

24
Ø 12 - 200 (PI 1)

29
D 22 - 100 (B1)
D 12 - 150 (B3)
D 16 - 150 (PI 2) 15
D 16 - 150 (PI 1)
D 22 - 100 (B4)

D 12 - 150/200 (B5) Ø 12 - 200 (PI 2)


D 12 - 150/200 (K2)
D 12 - 150 (K3)
244
D 22 - 100 (R1&R2)
D 22 - 100 (K1.1) 2 D 16 (W1)
D 12 - 150/200 (R6) 2 D 16 (W3)
D 22 - 100 (R3&R4)
D 12 - 150 (R5) Ø 12 - 200 (PI 3)
D 16 - 150 (W2)

600

D 22 - 100 (P1)
D 19 - 150 (W3)
D 12 - 150 (P5)
D 22 - 100 (P3)

D 12 - 150/200 (P4)

D 22 - 100 (P2)

BETON K - 225

DETAIL PENULANGAN ABUTMENT 2 JEMBATAN WAY TALANG BUAH BALAK


Skala 1 : 25

DAFTAR PENULANGAN PELAT INJAK (ABUTMENT 2)


TIPE PI 1 PI 2 PI 3 Berat Total
Keterangan
Dia (mm) 16 16 12 (kg)
a cm 24 244 600
b cm 244
c cm 29
d cm 15
e cm 35
f cm
g cm
Panjang (m) 3.47 2.44 6
Jarak Tulangan (cm) 15 15 15
Jumlah (btg) 40 40 34
Jumlah Total (m) 138.8 97.6 204
Berat (kg/m') 1.580 1.580 0.888
Total Berat (kg) 219.304 154.208 181.220 554.732 Ulir (U-32)
Jumlah 554.732
Lebar Abutment 10 m
Tinggi Back Wall 1.29 m

D 22 - 100 (B2)
D 12 - 150 (PI 3) Pelat Injak 30x250x600

D 22 - 100 (B1)
D 12 - 150 (B3)
D 16 - 150 (PI 2)
D 16 - 150 (PI 1)
D 22 - 100 (B4)

D 12 - 150/200 (B5)

D 12 - 150/200 (K2)
D 12 - 150 (K3)

D 22 - 100 (R1&R2)
D 22 - 100 (K1.1) 2 D 16 (W1) BACK WALL
D 12 - 150/200 (R6) 2 D 16 (W3) Ø 22 - 100 (B1) 52
D 22 - 100 (R3&R4)
D 12 - 150 (R5)
D 16 - 150 (W2)
30 78

23
Ø 22 - 100 (B4)

17
71
Ø 12 - 150 /200 (B5)
Ø 22 - 100 (B2)

164
D 22 - 100 (P1)
30

182
D 19 - 150 (W3)
D 12 - 150 (P5)
D 22 - 100 (P3)

Ø 12 - 150 (B3)
D 12 - 150/200 (P4)

D 22 - 100 (P2) 1000

BETON K - 225

DETAIL PENULANGAN ABUTMENT 2 JEMBATAN WAY TALANG BUAH BALAK


Skala 1 : 25

DAFTAR PENULANGAN BACK WALL (ABUTMENT 2)


TIPE B1 B2 B3 B4 B5 Berat Total
Keterangan
Dia (mm) 22 22 12 22 12 (kg)
a cm 164 71 1000 74 12
b cm 30 78 23
c cm 182 17 52
d cm 83
e cm
f cm
g cm
Panjang (m) 3.76 2.49 10 1.49 0.12
Jarak Tulangan (cm) 10 10 15 10 15
Jumlah (btg) 100 100 18 100 450
Jumlah Total (m) 376 249 180 149 54
Berat (kg/m') 2.980 2.980 0.888 2.980 0.888
Total Berat (kg) 1120.480 742.020 159.900 444.020 47.970 2514.390 Ulir (U-32)
Jumlah 2514.390
Lebar Abutment 10 m
Tinggi Konsol 1 m
Lebar Dudukan 1 1.4 m
D 22 - 100 (B2)
D 12 - 150 (PI 3) Pelat Injak 30x250x600
Lebar Dudukan 2 1.15 m
D 22 - 100 (B1)
D 12 - 150 (B3)
D 16 - 150 (PI 2)
D 16 - 150 (PI 1)
D 22 - 100 (B4)

D 12 - 150/200 (B5)

D 12 - 150/200 (K2)
D 12 - 150 (K3)
D 22 - 100 (R1&R2)
D 22 - 100 (K1.1) 2 D 16 (W1)
D 12 - 150/200 (R6) 2 D 16 (W3)
D 22 - 100 (R3&R4)
D 12 - 150 (R5)
D 16 - 150 (W2)

KONSOL
D 22 - 100 (P1)
D 19 - 150 (W3)
D 12 - 150 (P5)
D 22 - 100 (P3)
155
155 Ø 12 - 150/200 (K2)
D 12 - 150/200 (P4)

44

70
D 22 - 100 (P2)
Ø 22 - 100 (K1.1) Ø 22 - 100 (K1.2) ± 140

BETON K - 225
160
DETAIL PENULANGAN ABUTMENT 2 JEMBATAN WAY TALANG BUAH BALAK

26
Skala 1 : 25
Ø 12 - 150 (K4)

118
385

19

Ø 12 - 150 (K3) Ø 12 (K6)

80
1000
155

46
Ø 12 - 150 (K5)

39 25
39

9
26

8
170

DAFTAR PENULANGAN KONSOL (ABUTMENT 2)


TIPE K1.1 K1.2 K2 K3 K4 K5 K6 Berat Total
Keterangan
Dia (mm) 22 22 12 12 12 12 12 (kg)
a cm 104 104 140 1000 118 46 155
b cm 44 70 160 50
c cm 155 155 26 19
d cm 385 80
e cm
f cm
g cm
Panjang (m) 3.03 3.29 1.4 10 6.89 1.95 1.55
Jarak Tulangan (cm) 10 10 15 15 15 15 15
Jumlah (btg) 72 28 175 20 16 16 8
Jumlah Total (m) 218.16 92.12 245 200 110.24 31.2 12.4
Berat (kg/m') 2.980 2.980 0.888 0.888 0.888 0.888 0.888
Total Berat (kg) 650.117 274.518 217.642 177.667 97.930 27.716 11.015 1456.604 Ulir (U-32)
Jumlah 1456.604
Lebar Abutment 10 m
Tinggi RIB 1.61 m

D 22 - 100 (B2)
D 12 - 150 (PI 3) Pelat Injak 30x250x600
D 22 - 100 (B1)
D 12 - 150 (B3)
Ø 22 - 100 (R1&R2) Ø 22 - 100 (R3&R4)
D 16 - 150 (PI 2)
D 16 - 150 (PI 1)
D 22 - 100 (B4)

D 12 - 150/200 (B5)
Ø 12 - 150/200 (R6)
D 12 - 150/200 (K2)
D 12 - 150 (K3)
D 22 - 100 (R1&R2)
D 22 - 100 (K1.1) 2 D 16 (W1) 115
D 12 - 150/200 (R6) 2 D 16 (W3)
D 22 - 100 (R3&R4)
D 12 - 150 (R5)
D 16 - 150 (W2)

361

361
Ø 12 - 150 (R5)

1000
D 22 - 100 (P1)
D 19 - 150 (W3)
D 12 - 150 (P5)
D 22 - 100 (P3)

D 12 - 150/2 00 (P4)
50 50
D 22 - 100 (P2)

BETON K - 225

DETAIL PENULANGAN ABUTMENT 2 JEMBATAN WAY TALANG BUAH BALAK


Skala 1 : 25

DAFTAR PENULANGAN RIB (ABUTMENT 2)


TIPE R1 R2 R3 R4 R5 R6 Berat Total
Keterangan
Dia (mm) 22 22 22 22 12 12 (kg)
a cm 50 50 261 261 1000 115
b cm 261 261
c cm
d cm
e cm
f cm
g cm
Panjang (m) 3.11 3.11 2.61 2.61 10 1.15
Jarak Tulangan (cm) 10 10 10 10 15 15
Jumlah (btg) 100 100 100 100 22 550
Jumlah Total (m) 311 311 261 261 220 632.5
Berat (kg/m') 2.980 2.980 2.980 2.980 0.888 0.888
Total Berat (kg) 926.780 926.780 777.780 777.780 195.433 561.871 4166.424 Ulir (U-32)
Jumlah 4166.424
Lebar Abutment 10 m
Lebar Poer 5m

D 22 - 100 (B2)
D 12 - 150 (PI 3) Pelat Injak 30x250x600
D 22 - 100 (B1)
D 12 - 150 (B3)
D 16 - 150 (PI 2)
D 16 - 150 (PI 1) POER
D 22 - 100 (B4)
122
D 12 - 150/200 (B5)
Ø 12 - 150/400 (P4)
Ø 22 - 100 (P1)
D 12 - 150/200 (K2)
D 12 - 150 (K3)

±96
D 22 - 100 (R1&R2) Ø 22 - 100 (P2)

71

71
D 22 - 100 (K1.1) 2 D 16 (W1)
492
D 12 - 150/200 (R6) 2 D 16 (W3)
D 22 - 100 (R3&R4)
D 12 - 150 (R5) Ø 22 - 100 (P3)
D 16 - 150 (W2)

492

Ø 12 - 150 (P5)

1000

D 22 - 100 (P1)
D 19 - 150 (W3)
D 12 - 150 (P5)
D 22 - 100 (P3)

D 12 - 150/200 (P4)

D 22 - 100 (P2)

BETON K - 225

DETAIL PENULANGAN ABUTMENT 2 JEMBATAN WAY TALANG BUAH BALAK


Skala 1 : 25

DAFTAR PENULANGAN POER (ABUTMENT 2)


TIPE P1 P2 P3 P4 P5 Berat Total
Keterangan
Dia (mm) 22 22 22 12 12 (kg)
a cm 180 71 492 96 1000
b cm 122 492
c cm 192 71
d cm
e cm
f cm
g cm
Panjang (m) 4.94 6.34 3.50 0.96 10
Jarak Tulangan (cm) 10 10 10 15 15
Jumlah (btg) 100 100 200 1700 68
Jumlah Total (m) 494 634 700 1632 680
Berat (kg/m') 2.980 2.980 2.980 0.888 0.888
Total Berat (kg) 1472.120 1889.320 2086.000 1449.760 604.067 7501.267 Ulir (U-32)
Jumlah 7501.267
Tinggi 1 = 2 m
Tinggi 2 = 1.2 m
Lebar 1 = 1.8 m
Lebar 2 = 1.25 m

D 22 - 100 (B2)
D 12 - 150 (PI 3) Pelat Inja k 30x250x600
D 22 - 100 (B1)
D 12 - 150 (B3)
D 16 - 150 (PI 2)
D 16 - 150 (PI 1)
D 22 - 100 (B4)

D 12 - 150/200 (B5)
D 12 - 150/200 (K2)
D 12 - 150 (K3) Ø 16 - 200 (W2.1)
D 22 - 100 (R1&R2)
D 22 - 100 (K1.1) 2 D 16 (W1)
± 281 40
D 12 - 150/200 (R6) 2 D 16 (W3)
D 22 - 100 (R3&R4)

23
D 12 - 150 (R5)
D 16 - 150 (W2) Ø 16 - 200 (W2.2) Ø 16 - 20 (W5)

± 215

Ø 19 - 200 (W3.1) Ø 19 - 200 (W3.2)

D 22 - 100 (P1)

300
D 19 - 150 (W3)
D 12 - 150 (P5)
D 22 - 100 (P3) 2 Ø 16 (W1)

±405

±350
D 12 - 150/200 (P4) Ø 12 - 400/400 (W4)

D 22 - 100 (P2)
30

BETON K - 225

DETAIL PENULANGAN ABUTMENT 2 JEMBATAN WAY TALANG BUAH BALAK


Skala 1 : 25

DAFTAR PENULANGAN WING WALL (ABUTMENT 2)


TIPE W1 W2.1 W2.2 W3.1 W3.2 W4 W5 Angkur Berat Total
Keterangan
Dia (mm) 16 16 16 19 19 12 19 16 (kg)
a cm 300 281 215 405 305 30 58 80
b cm 164 23 2
c cm 40 bh Wing Wall
d cm
e cm
f cm
g cm
Panjang (m) 4.64 2.81 2.15 4.05 3.05 0.3 1.21 0.8
Jarak Tulangan (cm) - 15 15 15 15 30 15 15
Jumlah (btg) 2 28 16 24 18 36 21 12
Jumlah Total (m) 9.28 78.68 34.4 97.2 54.9 10.8 25.41 9.6
Berat (kg/m') 1.580 1.580 1.580 2.230 2.230 0.888 2.230 1.580
Total Berat (kg) 14.662 124.314 54.352 216.756 122.427 9.594 56.664 15.168 613.938 Ulir (U-32)
Jumlah 1227.876
Tinggi Sumuran 2m
Diameter 1 2.43 m
Diameter 2 1.98 m

Angkur D 19 - 150 Lantai Kerja


BETON K - 225 D 12 - 150 (S3)

D 12 - 150 (S4)

D 12 - 150 (S1)
D 12 - 150 (S2)
SUMURAN
BETON CYCLOP

25

Angkur Ø 19 - 20

65
BETON K - 225 Ø 12 - 15 (S2) Ø 12 - 15 (S1)
21 20
25

283

330
Ø 12 - 15 (S3) Ø 12 - 15 (S4)

14
198 243

DAFTAR PENULANGAN PONDASI SUMURAN


TIPE S1 S2 S3 S4 Angkur Berat Total
Keterangan
Dia (mm) 12 12 12 12 19 (kg)
a cm 20 20 622 763 25
b cm 230 183 65 2
c cm 15 48 25 bh sumuran
d cm
e cm
f cm
g cm
Panjang (m) 2.65 2.51 6.22 7.63 1.15
Jarak Tulangan (cm) 15 15 15 15 20
Jumlah (btg) 51 42 14 14 39
Jumlah Total (m) 135.15 105.42 87.08 106.88 44.85
Berat (kg/m') 0.888 0.888 0.888 0.888 2.230
Total Berat (kg) 120.058 93.648 77.360 94.942 100.016 486.025 Ulir (U-32)
Jumlah 972.049