Zamratul Rizki
Kordinator Proyek
RENCANA ANGGARAN BIAYA
PEKERJAAN : REHAB MASJID DAN MUSHOLA KKM 2017
LOKASI : MAKROMAN
No Uraian Pekerjaan Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6
I ITEM PEKERJAAN
1 Pekerjaan Cor Rabat Halaman Masjid, T=10 cm 3.55 M3 Rp 1,036,671.37 Rp 3,675,000.00
2 Pekerjaan Pas. Bata (WC Masjid) 1.40 RET Rp 208,928.57 Rp 292,500.00
3 Pekerjaan Plesteran + Acian (WC Masjid) 2.80 RET Rp 69,642.86 Rp 195,000.00
4 Pekerjaan Plesteran + Acian (Dinding Masjid) 24.50 M3 Rp 30,000.00 Rp 735,000.00
5 Pekerjaan Perbaikan T. Wudhu 1.40 RET Rp 353,571.43 Rp 495,000.00
6 Pekerjaan Plesteran + Acian (Dinding Masjid) 24.50 M3 Rp 30,000.00 Rp 735,000.00
7 Pekerjaan Pengecatan Exterior Masjid dan WC 90.41 RET Rp 11,281.94 Rp 1,020,000.00
8 Pekerjaan Pengecatan Interior Masjid dan WC 62.49 RET Rp 13,603.26 Rp 850,000.00
9 Pekerjaan Pengecatan Exterior Mushola 64.00 RET Rp 9,296.88 Rp 595,000.00
10 Pekerjaan Pengecatan Interior Mushola 64.00 RET Rp 9,296.88 Rp 595,000.00
11 Pekerjaan Pengecatan Kusen dan Daun Pintu Masjid 5.00 RET Rp 97,000.00 Rp 485,000.00
12 Pekerjaan Pengecatan Kusen dan Daun Pintu Mushola 4.00 RET Rp 92,500.00 Rp 370,000.00
13 Pekerjaan Listplang 1.00 Ls Rp 2,015,000.00 Rp 2,015,000.00
14 Pekerjaan Lain-Lain 1.00 Ls Rp 5,600,000.00 Rp 5,600,000.00
15 Material Pelengkap 1.00 Ls Rp 2,793,000.00 Rp 2,793,000.00
JUMLAH Rp 20,450,500.00
DAFTAR ANALISA HARGA SATUAN
PEMBANGUNAN DAN REHAB BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
I. PEKERJAAN PERSIAPAN
1 1 M² PEMBERSIHAN LOKASI
0.100 OH Pekerja 80,500.00 8,050.00
0.050 OH Mandor 138,000.00 6,900.00
jumlah total - 14,950.00 14,950.00
3 1 M' PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER - SNI 03-2835-2002
1.250 BTG Dolken Kayu Ø 8-10/400 cm 17,000.00 21,250.00
2.500 KG Semen Portland 1,700.00 4,250.00
1.200 LBR Seng Gelombang 3"-5" 55,000.00 66,000.00
0.005 M3 Pasir Beton 375,000.00 1,875.00
0.009 M3 Koral Beton 375,000.00 3,375.00
0.072 M3 Kayu 5/7 2,700,000.00 194,400.00
0.060 KG Paku biasa 2"-5" 20,150.00 1,209.00
0.450 KG Meni Besi 42,000.00 18,900.00
0.400 OH Pekerja 80,500.00 32,200.00
0.200 OH Tukang Kayu 115,000.00 23,000.00
0.020 OH Kepala Tukang 126,500.00 2,530.00
0.020 OH Mandor 138,000.00 2,760.00
jumlah total 311,259.00 60,490.00 371,749.00
AHS Page 3
DAFTAR ANALISA HARGA SATUAN
PEMBANGUNAN DAN REHAB BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
AHS Page 4
DAFTAR ANALISA HARGA SATUAN
PEMBANGUNAN DAN REHAB BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
7 1 M2 Pekerjaan bekisitng untuk kolom - SNI 7394:2008 SNI 7394:2008 (3 kali pakai)
0.019 M3 Kayu Perancah 3,050,000.00 57,911.88
0.400 Kg Paku biasa 20,150.00 8,060.00
0.200 Ltr Minyak begisting 25,000.00 5,000.00
0.117 Lbr Plywood 9 mm 99,000.00 11,550.00
0.330 OH Tukang 115,000.00 37,950.00
0.033 OH Kepala tukang 126,500.00 4,174.50
0.660 OH Pekerja 80,500.00 53,130.00
0.033 OH Mandor 138,000.00 4,554.00
jumlah total 82,521.88 99,808.50 182,330.38
AHS Page 5
DAFTAR ANALISA HARGA SATUAN
PEMBANGUNAN DAN REHAB BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
AHS Page 6
DAFTAR ANALISA HARGA SATUAN
PEMBANGUNAN DAN REHAB BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
AHS Page 7
DAFTAR ANALISA HARGA SATUAN
PEMBANGUNAN DAN REHAB BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
17 1 M3 Kolom pedestal 60 x 60 cm
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
342.444 kg Besi Tulangan 19,471.45 6,667,889.01
6.667 m2 Bekisting 123,477.00 823,180.04
jumlah total 9,435,515.05 - 9,435,515.05
18 1 M3 Sloof S1 30 x 50 cm
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
185.250 kg Besi Tulangan 19,471.45 3,607,086.11
6.667 m2 Bekisting 123,477.00 823,180.00
jumlah total 6,374,712.12 - 6,374,712.12
19 1 M3 Sloof S2 20 x 40 cm
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
229.903 kg Besi Tulangan 19,471.45 4,476,552.73
10.000 m2 Bekisting 123,477.00 1,234,770.00
jumlah total 7,655,768.73 - 7,655,768.73
20 1 M3 Sloof S3 30 x 60 cm
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
185.800 kg Besi Tulangan 19,471.45 3,617,795.41
6.667 m2 Bekisting 123,477.00 823,180.04
jumlah total 6,385,421.45 - 6,385,421.45
21 1 M3 Sloof S4 20 x 40 cm
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
232.318 kg Besi Tulangan 19,471.45 4,523,560.53
10.000 m2 Bekisting 123,477.00 1,234,770.00
jumlah total 7,702,776.53 - 7,702,776.53
22 1 M3 Sloof S5 30 x 50 cm
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
359.690 kg Besi Tulangan 19,471.45 7,003,685.85
6.667 m2 Bekisting 123,477.00 823,180.04
jumlah total 9,771,311.89 - 9,771,311.89
AHS Page 8
DAFTAR ANALISA HARGA SATUAN
PEMBANGUNAN DAN REHAB BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
24 1 M3 Selimut Kolom 40 x 40 cm
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
136.300 kg Besi Tulangan 19,471.45 2,653,958.64
10.000 m2 Bekisting 123,477.00 1,234,770.00
jumlah total 5,833,174.64 - 5,833,174.64
26 1 M3 Plat Lantai
1.000 m3 Beton K-250 1,944,446.00 1,944,446.00
15.800 kg Besi Tulangan Dia. 16 mm 19,471.45 307,648.91
165.900 kg Wiremesh M-8 18,112.00 3,004,780.80
30.000 bh Stud Pengaku Ø 16 mm - 50 cm 6,500.00 195,000.00
10.000 m2 Floor Deck 123,000.00 1,230,000.00
jumlah total 6,681,875.71 - 6,681,875.71
27 1 M3 Plat Lantai
1.000 m3 Beton K-250 18,112.00 18,112.00
15.800 kg Besi Tulangan Dia. 16 mm 6,500.00 102,700.00
165.900 kg Wiremesh M-8 168,000.00 27,871,200.00
30.000 bh Stud Pengaku Ø 16 mm - 50 cm 6,500.00 195,000.00
10.000 m2 Floor Deck 2,700,000.00 27,000,000.00
jumlah total 55,187,012.00 - 55,187,012.00
AHS Page 9
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEMBANGUNAN DAN REHAP BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
1 Pekerja OH 80,500.00
2 Tukang OH 115,000.00
3 Kepala tukang OH 126,500.00
4 Mandor OH 138,000.00
C BAHAN LOGAM
1 Paku biasa Kg 20,150.00
2 Seng gelombang Lbr 55,000.00
3 Paku playwood Kg 26,000.00
4 Besi Tulangan Kg 16,000.00
5 Wiremesh M-8 kg 18,112.00
6 Kawat bendrat Kg 24,150.00
7 Kawat 4mm Kg 45,000.00
8 Besi Hollow 4x4 m' 18,500.00
9 Angkur baja Ø 25 mm pjg 60 cm bh 244,000.00
10 Angkur baja Ø 16 mm pjg 60 cm bh 168,000.00
11 Baja WF kg 22,050.00
12 Baut HTB M-16 ASTM A.325 bh 12,500.00
13 Baut HTB M-22 ASTM A.325 bh 13,750.00
14 Base plat baja Kg 27,000.00
15 Floor Deck m2 123,000.00
Page 10 of 18
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEMBANGUNAN DAN REHAP BANGUNAN PROGRAM STUDI TEKNOLOGI INFORMASI
KAMPUS POLITEKNIK NEGERI SAMARINDA
E BAHAN ATAP
1 Genteng Metal KW 2 Lbr 67,971.75
2 Bubungan Atap Metal Lbr 68,589.68
3 Plat seng Lbr 54,000.00
4 Genteng beton keramik Bh 12,500.00
5 Nok genteng keramik Bh 12,000.00
Page 11 of 18
RENCANA HARGA BAHAN PER ITEM PEKERJAAN
REHAB MASJID DAN MUSHOLA KKM 2017
MAKROMAN
NO ITEM PEKERJAAN UTAMA BAHAN VOLUME SATUAN HARGA SATUAN JUMLAH KETERANGAN
( Rp )
14 Pekerjaan Lain-Lain 1 Ls
Pintu PVC WC 2 BH 450,000.00 900,000.00
Plang Nama Masjid 1 BH 1,700,000.00 1,700,000.00
Beduk Masjid 1 BH 3,000,000.00 3,000,000.00
5,600,000.00 Rp 5,600,000.00
15 Material Pelengkap 1 Ls
Pahat 2 bh 20,000.00 40,000.00
Lem pipa 3 bh 40,000.00 120,000.00
Pipa PVC 1/2in 4 Btg 45,000.00 180,000.00
Pipa PVC 2in 4 Btg 60,000.00 240,000.00
Selotip 3 bh 4,000.00 12,000.00
Baut 20cm 5 bh 5,000.00 25,000.00
Tee 5 bh 4,000.00 20,000.00
Knee 8 bh 4,000.00 32,000.00
Paku Biasa 1in 5 kg 20,000.00 100,000.00
Paku Biasa 2in 5 kg 25,000.00 125,000.00
Paku Biasa 3in 5 kg 35,000.00 175,000.00
Paku Ulin 3in 2 kg 42,000.00 84,000.00
Paku Beton 1in 1 ktk 42,000.00 42,000.00
Mata Bor beton 2 bh 35,000.00 70,000.00
Mata Bor Kayu 2 bh 30,000.00 60,000.00
Kuas 4in 5 bh 13,000.00 65,000.00
Kuas 3in 5 bh 10,000.00 50,000.00
Kuas 2.5in 5 bh 7,000.00 35,000.00
Roll Cat 4 bh 40,000.00 160,000.00
GRC 4mm 2 Lmbr 90,000.00 180,000.00
Kirir gergaji 1 bh 7,000.00 7,000.00
isolasi 2 bh 3,000.00 6,000.00
Amplas 20 m1 5,000.00 100,000.00
Kapi seng 5 bh 10,000.00 50,000.00
Kapi Plastik 5 bh 8,000.00 40,000.00
Penggaris siku 1 bh 15,000.00 15,000.00
Ember Cor 20 bh 10,000.00 200,000.00
Lot 1 bh 10,000.00 10,000.00
Benang 2 bh 5,000.00 10,000.00
Plastik Cor 10 m1 35,000.00 350,000.00
Sapu Biasa 2 bh 30,000.00 60,000.00
Sapu Ijuk 2 bh 20,000.00 40,000.00
Alat Pel 1 bh 50,000.00 40,000.00
Sewa scapolding 5 set 60,000.00 50,000.00
2,793,000.00 Rp 2,793,000.00
JUMLAH 20,450,500.00
Di Buat oleh
Zamratul Rizky
Kordinator Proyek
Zamratul Rizky
Kordinator Proyek
TIME SCHEDULE
PEKERJAAN : REHAB MASJID DAN MUSHOLA KKM 2017 l
LOKASI : MAKROMAN
TAHUN : 2017
JANGKA WAKTU PELAKSANAAN 120 HARI KALENDER
Jumlah Harga Pekerjaan BOBOT
No. Uraian %
juni juli agustus september KET.
(Rp) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
100%
1 Persiapan Alat Dan Material Rp 2,793,000.00 13.66 4.55 4.55 4.55
2 Pekerjaan Cor Rabat Halaman Masjid, T=10 cm Rp 3,675,000.00 17.97 5.99 5.99 5.99
3 Pekerjaan Pas. Bata (WC Masjid) Rp 292,500.00 1.43 0.72 0.72
4 Pekerjaan Plesteran + Acian (WC Masjid) Rp 195,000.00 0.95 0.32 0.32 0.32
5 Pekerjaan Plesteran + Acian (Dinding Masjid) Rp 735,000.00 3.59 1.80 1.80
6 Pekerjaan Perbaikan T. Wudhu Rp 495,000.00 2.42 0.81 0.81 0.81
7 Pekerjaan Plesteran + Acian (Dinding Masjid) Rp 735,000.00 3.59 1.20 1.20 1.20
8 Pekerjaan Pengecatan Exterior Masjid dan WC Rp 1,020,000.00 4.99 1.66 1.66 1.66 50%
9 Pekerjaan Pengecatan Interior Masjid dan WC Rp 850,000.00 4.16 2.08 2.08
10 Pekerjaan Pengecatan Exterior Mushola Rp 595,000.00 2.91 1.45 1.45
11 Pekerjaan Pengecatan Interior Mushola Rp 595,000.00 2.91 1.45 1.45
12 Pekerjaan Pengecatan Kusen dan Daun Pintu Masjid Rp 485,000.00 2.37 2.37
13 Pekerjaan Pengecatan Kusen dan Daun Pintu Mushola Rp 370,000.00 1.81 0.60 0.60 0.60
14 Pekerjaan Listplang Rp 2,015,000.00 9.85 3.28 3.28 3.28
15 Pekerjaan Lain-Lain Rp 5,600,000.00 27.38 9.13 9.13 9.13
s
Zamratul Rizki
Kordinator Proyek
TIME SCHEDULE
PEKERJAAN : REHAB MASJID DAN MUSHOLA KKM 2017
LOKASI : MAKROMAN
TAHUN : 2016
JANGKA WAKTU PELAKSANAAN 120 HARI KALENDER
Jumlah Harga Pekerjaan BOBOT
No. Uraian BULAN 1 BULAN 2 BULAN 3 BULAN 4 KET.
(Rp) %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
100%
1 Pekerjaan Pas. Bata (WC Masjid) Rp 1,125,000.00 #REF! #REF! #REF!
2 Pekerjaan Plesteran + Acian (WC Masjid) Rp #REF! #REF! #REF! #REF! #REF!
3 0.00 Rp 75,000.00 #REF! #REF! #REF!
4 0.00 Rp 375,000.00 #REF! #REF! #REF!
5 #REF! Rp #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! Rp 180,000.00 #REF! #REF! #REF! #REF! 50%
7 Pekerjaan Pengecatan Interior Mushola Rp - #REF! #REF! #REF! #REF!
8 0.00 Rp #REF! #REF! #REF! #REF! #REF!
9 0.00 Rp 595,000.00 #REF! #REF! #REF! #REF! #REF! #REF!
10 0.00 Rp #REF! #REF! #REF! #REF! #REF!
11 #REF! Rp - #REF! #REF! #REF! #REF! #REF! #REF!
12 Pekerjaa Pelengkap Rp 350,000.00 #REF! #REF! #REF! #REF!
#REF!
#REF! Rizki Oktavian Saputra
Kordinator Proyek
HARGA BAHAN PER ITEM PEKERJAAN
REHAB MASJID DAN MUSHOLA KKM 2017
MAKROMAN