Anda di halaman 1dari 1

PEMBANGUNAN TERMINAL LPG PRESSURIZED DI

BALI KAPASITAS 3000 MT (2X1500 MT)

PEMBONGKARAN TANKI DI SANGGARAN


PT. INTIMARINDO PRIMACON
Documen No: Rev. 0
JSA halaman
MGS-IP-80-PR-008-A4 ( JOB SAFETY ANALYSIS ) 1 dari 51
`

PEMBERI KERJA : PT. PERTAMINA (PERSERO)


KONTRAKTOR : PT.INTIMARINDO PRIMACON
NAMA PROYEK : PEMBANGUNAN TERMINAL LPG PRESSURIZED
KAPASITAS 3000 MT(2X1500 MT)
LOKASI : MANGGIS-BALI
NOMER SPB : SPB-076/F00000/2016-S0
TANGGAL : 14 SEPTEMBER 2016

0 21/06/2016 Issued For Review

Prepared Checked Approved Checked Approved


Rev. Date Description
PT. INTIMARINDO PRIMACON PERTAMINA

Anda mungkin juga menyukai