CBR Rendaman (15 Mpa)
CBR Rendaman (15 Mpa)
Laboratory CBR
Proyek : Pemeriksa :
No. Contoh : Tanggal :
STANDAR / MODIFIED
PENETRASI
Waktu Penurunan Jumlah Pukulan 7.5 15 30
Beban
(menit) (in) Brt Tanah+Cetakan 8332 8675 8493
30 15 7.5 Berat Cetakan 4015 4028 3999
¼ 0.0175 0.3 7.77 0.9 23.31 0.7 18.13 Berat Tanah Basah 4317 4647 4494
½ 0.0250 0.8 20.72 1.3 33.67 1.2 31.08 Volume cetakan 2133.09 2103.65 2133.09
1 0.0500 1.1 28.49 1.8 46.62 1.8 46.62 Berat Volume Basah 2.0238248 2.2090207 2.106803
1½ 0.0750 2 51.8 2.2 56.98 2.3 59.57 Berat Volume Kering 1.6658617 1.8408506 1.7511348
120
NILAI CBR 0,1" 0,2"
10 x 0.021 0.01444
2.0667 1.44444 100
25 x 0.0332 0.02356
3.3167 2.35556
55 x 0.021 0.02533 80
2.1 2.53333
Berat Volume Kering
60
1.9
1.84085055697621
1.8
1.75113476971317 40
1.7
1.66586167459506
1.6
1.5 20
1.4
1.3
0
1.2 0 0.1 0.2 0.3 0.4 0.5
Penurunan
1.1
1
CBR (%)
0 1 2 3 4 5 6 7 8 9 10
TEKANANAN 7,5
diameter 15.306
tinggi 11.593
angka kalibrasi 25.9
= 1.665861675
diameter 15.2
tinggi 11.593
angka kalibrasi 25.9
= 1.84085056
diameter 15.306
tinggi 11.593
angka kalibrasi 25.9
= 1.75113477