Data Pengambilan Sampel Karet Pada Setiap Al

No. Nama Alat Karet Basah (gram) Karet Kering (gram) Sampel karet (gram)
1 Bokar 1580 1120 10
2 Slab Cutter 1560 1030 10
3 Hammermill 1 1340 880 10
4 Hammermill 2 1060 710 10
5 Macerator 1280 910 10
6 Creeper Finisher 990 660 10
7 Pre-Drying 500 300 10
8 Shreeder 1040 720 10
9 Dryer 500 310 10
10 Pengempaan 500 310 10
mbilan Sampel Karet Pada Setiap Alat
Saringan Kosong (gram) Sampel + Saringan (gram) KKK (gram) Kotoran (gram) Air (gram) Total
15.048 15.0664 70.88607595 0.184 28.9299241 100
15.7534 15.7622 66.02564103 0.088 33.886359 100
23.2786 23.2847 70.88607595 0.061 29.0529241 100
15.6575 15.6622 66.98113208 0.047 32.9718679 100
15.501 15.5047 71.09375 0.037 28.86925 100
15.0485 15.0522 66.66666667 0.037 33.2963333 100
21.5282 21.5317 60 0.035 39.965 100
24.1898 24.1931 69.23076923 0.033 30.7362308 100
24.1898 24.1925 62 0.027 37.973 100
23.9992 24.001 62 0.018 37.982 100
koagulan

Pace 75/250

Analisa PRI Analisis Kadar Abu

Pengulangan Pa Po PRI (%) Pengulangan Sampel (gr)


Pace Pengenceran
1 44.5 52 85.57692307692 1 5.0032
2 46 60 76.66666666667 2 5.0049
3 34.5 51 67.64705882353 3 5.0033
Pace Tanpa Pengenceran (Murni) Pace Ta
1 44 57 77.19298245614 1 5.0023
2 44 58 75.86206896552 2 5.0003
3 29 37 78.37837837838 3 5.0012
Cuka Karet
1 16 21 76.19047619048 1 5.0018
2 17 27 62.96296296296 2 5.0027
3 15 20 75 3 5.0039
Cawan Kosong (gr) Cawan + Sampel (gr) Cawan + Sampel (Kering) (gr) Kadar Abu (%)
Pace Pengenceran
33.408 38.4112 33.4211 0.2618324272466
34.7524 39.7573 34.7648 0.247757197946
35.3607 40.364 35.3752 0.2898087262406
Pace Tanpa Pengenceran (Murni)
34.0977 39.1 34.1168 0.3818243607939
42.7672 47.7675 42.786 0.3759774413535
34.509 39.5102 34.5268 0.3559145805007
Cuka Karet
29.9069 34.9087 29.9262 0.3858610900076
34.7057 39.7084 34.725 0.3857916724969
36.4056 41.4095 36.4233 0.3537240952057
Kadar Kotoran

Pengulangan Sampel (gr) Saringan Kosong (gr) Saringan + Kotoran (gr)


Pace Pengenceran
1 10.0033 15.5009 15.5022
2 10.0018 15.5089 15.5105
3 10.0045 15.0793 15.0803
Pace Tanpa Pengenceran (Murni)
1 10.0041 14.2901 14.2961
2 10.0022 16.2503 16.2645
3 10.004 15.3005 15.3011
Cuka Karet
1 10.002 24.0303 24.0451
2 10.003 25.0265 25.0298
3 10.0028 22.0102 22.0117
Kadar Zat Menguap

Kadar Kotoran (%) Pengulangan Sampel (gr) Cawan Kosong (gr)


Pace Pengencera
0.012995711415238 1 10.0011 28.0008
0.015997120518305 2 10.0014 34.3724
0.009995502024084 3 10.0033 30.626
Pace Tanpa Pengenceran
0.059975410081851 1 10 30.7576
0.141968766871313 2 10.0031 27.479
0.00599760095962 3 10.0039 30.6987
Cuka Karet
0.147970405918827 1 10.0032 28.7974
0.032990102969139 2 10.0047 28.5058
0.014995801175671 3 10.0024 30.9404
Cawan + Sampel (gr) Cawan + Sampel (Pengovenan) (gr) Kadar Zat Menguap (%)
Pace Pengenceran
38.0019 37.9711 0.307966123726383
44.3738 44.3359 0.378946947427365
40.6293 40.596 0.332890146251778
Pace Tanpa Pengenceran (Murni)
40.7576 40.725 0.325999999999951
37.4821 37.4368 0.452859613519854
40.7026 40.652 0.505802736932554
Cuka Karet
38.8006 38.4466 3.5388675623801
38.5105 38.1126 3.97713074854818
40.9428 40.8716 0.711829161001335
Data Pengambilan Sampel Karet Pad
Nama Alat Karet Basah (gram) Karet Kering (gram) Sampel karet (gram)
Bokar 2000 1940 10
Slab Cutter 2000 1940 10
Hammermill 1 1960 1900 10
Hammermill 2 1940 1880 10
Macerator 1930 1870 10
Creeper Finisher 1930 1870 10
Pre-Drying 1930 1700 10
Shreeder 1920 1860 10
Dryer 1920 1920 10
Pengempaan 1920 1920 10

note : FP 70% yang digunakan di PTPN 7 REPA

Nama Alat Karet awal (gram) karet setelah giling (gram) KKK (gram)
Gudang Bokar 2000 1990 69.65
Slab Cutter 1990 1975 69.47
Hammermill 1 1980 1960 69.29
Hammermill 2 1970 1949 69.25
Macerator 1960 1938 69.21
Creeper Finisher 1957 1933 69.14
Pre-Drying 1954 1929 69.10
Shreeder 1950 1924 69.07
Dryer 1947 1920 69.03
Pengempaan 1947 1918 68.96

Nama Alat AIR UMPAN (m3/ton KK)


Bokar 0.411
Slab Cutter 0.54
Hammermill 1 3.659
Hammermill 2 4.285
Macerator 2.219
Creeper Finisher 1.153
Pre-Drying 0
Shreeder 3.121
Dryer 0
Pengempaan 0
Sampel Karet Pada Setiap Alat
Saringan Kosong (gram) Sampel + Saringan (gram)
15.048 15.0664
15.7534 15.7622
23.2786 23.2847
15.6575 15.6622
15.501 15.5047
15.0485 15.0522
21.5282 21.5317
24.1898 24.1931
24.1898 24.1925
23.9992 24.001

Air karet Sampel karet (gram)


30.17 69.47 10
30.44 69.38 10
30.65 69.23 10
30.70 69.21 10
30.75 69.18 10
30.82 69.10 10
30.87 69.08 10
30.91 69.04 10
30.95 69.01 10
31.03 68.95 10
`
KKK (gram) Kotoran (gram) Air (gram) Total
97.00 0.183999999999998 2.82 100
97.00 0.088000000000008 2.91 100
96.94 0.061 3.00 100
96.91 0.046999999999997 3.05 100.00
96.89 0.037000000000003 3.07 100.00
96.89 0.036999999999985 3.07 100.00
88.08 0.035000000000025 11.88 100.00
96.88 0.032999999999994 3.09 100.00
100.00 0.026999999999973 (0.03) 100.00
100.00 0.018000000000029 (0.02) 100.00

Saringan Kosong (gram) Saringan + kotoran (gram) Kotoran (gram)


15.048 15.0664 0.18
15.7534 15.7622 0.09
23.2786 23.2847 0.06
15.6575 15.6622 0.05
15.501 15.5047 0.04
15.0485 15.0522 0.04
21.5282 21.5311 0.03
24.1898 24.1922 0.02
24.1898 24.1915 0.017
23.9992 24 0.008
Data Pengambilan Sampel Karet Pada Setiap Alat
Nama Karet
Alat Basah
Karet
(gram)
Kering
Sampel
(gram)
karet
Saringan
(gram)
Kosong
Sampel +(gram)
SaringanKKK
(gram)
(gram)
Kotoran (gram)
Air (gram) Total
Bokar 1580 1100 10 15.048 15.0664 69.62 0.184 30.20 100
Slab Cutter 1560 1030 10 15.7534 15.7622 66.03 0.088 33.89 100
Hammermil 1340 890 10 23.2786 23.2847 66.42 0.061 33.52 100
Hammermil 1060 710 10 15.6575 15.6622 66.98 0.047 32.97 100
Macerator 1280 845 10 15.501 15.5047 66.02 0.037 33.95 100
Creeper Fin 990 660 10 15.0485 15.0522 66.67 0.037 33.30 100
Pre-Drying 500 450 10 21.5282 21.5317 90.00 0.035 9.96 100
Shreeder 1040 720 10 24.1898 24.1931 69.23 0.033 30.74 100
Dryer 500 495 10 24.1898 24.1925 99.00 0.027 0.97 100
Pengempa 500 495 10 23.9992 24.001 99.00 0.018 0.98 100
Slab Cutter Bak Blending 1 Hammer Mil
Komponen
F1 F2 F3 F4 F4 F5 F6 F7 F7
Karet
Air
Kotoran

B FEQASSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
Hammer Mill 1 Bak Blending 2 Hammer Mill 2
F8 F9 F10 F10 F11 F12 F13 F13 F14 F15

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS1````````````````````````````````````````````````````````````222Q
er Mill 2 Bak Blending 3 Macerator Creeper 1 - 4
F16 F16 F17 F18 F19 F19 F20 F21 F22 F22
Creeper 1 - 4 Creeper Finisher Pre-Drying
F23 F24 F25 F25 F26 F27 F28 F28 F29 F30
Drying Schreeder Dryer Pengempaan
F31 F31 F32 F33 F34 F34 F35 F36 F37 F37
Pengempaan
F38 F39 F40