Anda di halaman 1dari 224

Variabel

Ÿ Stripping Ratio = 4.501

Ÿ Target OB Removal = 90,099,078 BCM

Ÿ Target Coal Getting = 20,017,569 Ton

Ÿ Operator skill/Efficiency = 88 %
75 %
Ÿ Machine Availability = 85 %

Ÿ General Operational Efficiency = 90 %


67 %

Ÿ Specific Gravity of OB (insitu) = 2.40 BCM

Ÿ Specific Gravity of OB (loose) = 1.92 LCM

Ÿ Specific Gravity of Coal (loose)= 0.9

Ÿ Swell Factor = 80 %

Ÿ Effective Working Hours = 365 Available WD/year


0 Sunday/dayoff
0 Public Holiday
365 Working Days/year
12 Month/year
30 Working Days/month
0.2 Loss time due to Rainy (%)
6 Loss time due to Rainy (days)
120
1440 20 Available Working Hours
1 General Operations Eff.
20 hrs/day

24 Scheduled WD/month
480.0 hrs/month
5760 hrs/year
0.95 MA (%)
0.88 Opr. Eff. (%)
0.84 Job Eff. (Average)
TP TgP WD WH SR Prod/Hour
Tahun 1 500,000 365 7300 6.1 68.49
Tahun 2 750,405 365 7300 5.4 102.80
Tahun 3 1,006,113 365 7300 5.2 137.82
Tahun 4 1,017,785 365 7300 4.89 139.42
Tahun 5 1,021,663 365 7300 4.35 139.95
Tahun 6 1,026,023 365 7300 4.02 140.55
Tahun 7 1,029,221 365 7300 3.92 140.99
Tahun 8 1,031,998 365 7300 3.91 141.37
Tahun 9 1,052,234 365 7300 4.18 144.14
Tahun 10 1,125,123 365 7300 4.21 154.13
Tahun 11 1,500,000 365 7300 4.35 205.48
Tahun 12 1,377,889 365 7300 4.48 188.75
Tahun 13 1,250,000 365 7300 4.56 171.23
Tahun 14 1,123,456 365 7300 4.51 153.90
Tahun 15 1,110,221 365 7300 4.48 152.09
Tahun 16 1,025,123 365 7300 4.37 140.43
Tahun 17 976,123 365 7300 4.56 133.72
Tahun 18 843,993 365 7300 4.32 115.62
Tahun 19 750,199 365 7300 4.12 102.77
Tahun 20 500,000 365 7300 4.09 68.49
Prod/Hour (OB) Tahun Coal OB SR
417.81 4,295,966 Tahun 1 500,000 3050000 6.1
555.09 21755177 Tahun 2 750,405 4052187 5.4
716.68 Tahun 3 1,006,113 5231787.6 5.2
681.78 Tahun 4 1,017,785 4976968.65 4.89
608.80 Tahun 5 1,021,663 4444234.05 4.35
565.02 5,264,599 Tahun 6 1,026,023 4124612.46 4.02
552.68 21329377 Tahun 7 1,029,221 4034546.32 3.92
552.76 Tahun 8 1,031,998 4035112.18 3.91
602.51 Tahun 9 1,052,234 4398338.12 4.18
648.87 7,486,689 Tahun 10 1,125,123 4736767.83 4.21
893.84 28438519 Tahun 11 1,500,000 6525000 4.35
845.61 Tahun 12 1,377,889 6172942.72 4.48
780.82 Tahun 13 1,250,000 5700000 4.56
694.08 Tahun 14 1,123,456 5066786.56 4.51
681.34 Tahun 15 1,110,221 4973790.08 4.48
613.67 4,095,438 Tahun 16 1,025,123 4479787.51 4.37
609.74 17712778 Tahun 17 976,123 4451120.88 4.56
499.46 Tahun 18 843,993 3646049.76 4.32
423.40 Tahun 19 750,199 3090819.88 4.12
280.14 Tahun 20 500,000 2045000 4.09
20,017,569 89235851.6 4.501

1600000

1400000

1200000

1000000

800000

600000

400000

200000

0
Tahun 1 Tahun 2 Tahun 3 Tahun 4 Tahun 5
200000

0
Tahun 1 Tahun 2 Tahun 3 Tahun 4 Tahun 5
Pit To ROM Recovery ROM To Port Recovery Result From Production Unit Recovery
495000 490050 485149.5
742900.95 735471.9405 728117.221095
996051.87 986091.3513 976230.437787
1007607.15 997531.0785 987555.767715
1011446.37 1001331.9063 991318.587237
1015762.77 1005605.1423 995549.090877
1018928.79 1008739.5021 998652.107079
1021678.02 1011461.2398 1001346.627402
1041711.66 1031294.5434 1020981.597966
1113871.77 1102733.0523 1091705.721777
1485000 1470150 1455448.5
1364110.11 1350469.0089 1336964.318811
1237500 1225125 1212873.75
1112221.44 1101099.2256 1090088.233344
1099118.79 1088127.6021 1077246.326079
1014871.77 1004723.0523 994675.821777
966361.77 956698.1523 947131.170777
835553.07 827197.5393 818925.563907
742697.01 735270.0399 727917.339501
495000 490050 485149.5
19817393.310 19619219.377 19423027.183

Chart Title

Column L
Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8 Tahun 9 TahunColumn
10 N Tahun 11 Tahun 12 Tahun 13 Tahun 1
Column L
Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8 Tahun 9 TahunColumn
10 N Tahun 11 Tahun 12 Tahun 13 Tahun 1
OB SR
3050000 6.1
4052187 5.4
5231788 5.2
4976969 4.89
4444234 4.35
4124612 4.02
4034546 3.92
4035112 3.91
4398338 4.18
4736768 4.21
6525000 4.35
6172943 4.48
5700000 4.56
5066787 4.51
4973790 4.48
4479788 4.37
4451121 4.56
3646050 4.32
3090820 4.12
2045000 4.09
4.501

Tahun 12 Tahun 13 Tahun 14 Tahun 15 Tahun 16 Tahun 17 Tahun 18 Tahun 19 Tahun 20


Tahun 12 Tahun 13 Tahun 14 Tahun 15 Tahun 16 Tahun 17 Tahun 18 Tahun 19 Tahun 20
TAHUN 1
1. EXCAVATOR
Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Hari
: 141707.82 BCM/bulan
Sasaran Produksi : 529.51 BCM/Jam
661.89 LCM/Jam
Jumlah Loader yang dibutuhkan : 1.8 unit
: 2.0 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 124.46 BCM/Hari
Sasaran Produksi : 529.51 Ton/hari
Target Produksi : 26.48 Ton/jam
Jumlah Alat : 10.21 unit
: 11 unit
Jumlah alat yang disediakan : 12.94
: 13
:
Jumlah alat PC 240 : 3
Jumlah Alat DT : 13
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 0.86
TAHUN 1
1. EXCAVATOR

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 2.4
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 2

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 2.35294117647059
3

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

11
Target Produksi Tahun 1
BCM 3,050,000
Total \ Keterangan
Kapasitas Bucket :
Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 3050000 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Bulan / BCM Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 254166.6666667 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Hari / BCM :
Target Produksi Tahun / Hari :
BCM 12708.33 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Perjam / BCM :
Target Produksi 1 Tahun / Jam :
BCM 529.5138888889 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 2
1. EXCAVATOR
Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Hari Jumlah Alat yang disediakan
141707.82 BCM/bulan KOMATSU PC 380-LC 7
703.50 BCM/Jam Banyak Unit
879.38 LCM/Jam
2.4 unit Persentase Kapasitas Alat Angkut
3.0 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
124.46 BCM/Hari
703.50 Ton/hari 14
35.18 Ton/jam
13.57 unit
14 unit
16.47
17

4
17
1.95
9.80
0.85
Target Produksi Tahun 2
BCM 4,052,187
Total \

Keterangan
Tahun/ BCM
Target Produksi Tahun 1
BCM 4052187
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Bulan / BCM
1440 Target Produksi Tahun 1/Bulan
2.4 BCM 337682.25
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Hari / BCM
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 16884.11
Total
91.6%
480.00 Perjam / BCM
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 703.5046875
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

14
TAHUN 3
1. EXCAVATOR
Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Hari
: 141707.82 BCM/bulan
Sasaran Produksi : 908.30 BCM/Jam
1135.37 LCM/Jam
Jumlah Loader yang dibutuhkan : 3.1 unit
: 4.0 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 124.46 BCM/Hari
Sasaran Produksi : 908.30 Ton/hari
Target Produksi : 45.41 Ton/jam
Jumlah Alat : 17.52 unit
: 18 unit
Jumlah alat yang disediakan : 21.18
: 22
:
Jumlah alat PC 240 : 5
Jumlah Alat DT : 22
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 0.88
TAHUN 3
1. EXCAVATOR

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 2.4
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 4

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 4.70588235294118
5

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

18
Target Produksi Tahun 3
BCM 5,231,788
Total \ Keterangan
Kapasitas Bucket :
Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 5231788 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Bulan / BCM Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 435982.3 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Hari / BCM :
Target Produksi Tahun / Hari :
BCM 21799.12 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Perjam / BCM :
Target Produksi 1 Tahun / Jam :
BCM 908.2964583333 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 4
1. EXCAVATOR
Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Hari Jumlah Alat yang disediakan
141707.82 BCM/bulan KOMATSU PC 380-LC 7
864.06 BCM/Jam Banyak Unit
1080.07 LCM/Jam
2.9 unit Persentase Kapasitas Alat Angkut
3.0 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
124.46 BCM/Hari
864.06 Ton/hari 17
43.20 Ton/jam
16.66 unit
17 unit
20.00
20

4
20
1.95
9.80
1.00
Target Produksi Tahun 4
BCM 4,976,969
Total \

Keterangan
Tahun/ BCM
Target Produksi Tahun 1
BCM 4976969
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Bulan / BCM
1440 Target Produksi Tahun 1/Bulan
2.4 BCM 414747.3875
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Hari / BCM
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 20737.37
Total
91.6%
480.00 Perjam / BCM
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 864.0570572917
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

17
TAHUN 5
1. EXCAVATOR
Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Hari
: 141707.82 BCM/bulan
Sasaran Produksi : 771.57 BCM/Jam
964.46 LCM/Jam
Jumlah Loader yang dibutuhkan : 2.6 unit
: 3.0 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 124.46 BCM/Hari
Sasaran Produksi : 771.57 Ton/hari
Target Produksi : 38.58 Ton/jam
Jumlah Alat : 14.88 unit
: 15 unit
Jumlah alat yang disediakan : 17.65
: 18
:
Jumlah alat PC 240 : 4
Jumlah Alat DT : 18
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 0.90
TAHUN 5
1. EXCAVATOR

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 2.4
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 3

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 3.52941176470588
4

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

15
Target Produksi Tahun 5
BCM 4,444,234
Total \ Keterangan
Kapasitas Bucket :
Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 4444234 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Bulan / BCM Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 370352.8375 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Hari / BCM :
Target Produksi Tahun / Hari :
BCM 18517.64 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Perjam / BCM :
Target Produksi 1 Tahun / Jam :
BCM 771.5684114583 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 6
1. EXCAVATOR
Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Hari Jumlah Alat yang disediakan
141707.82 BCM/bulan KOMATSU PC 380-LC 7
716.08 BCM/Jam Banyak Unit
895.10 LCM/Jam
2.4 unit Persentase Kapasitas Alat Angkut
3.0 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
124.46 BCM/Hari
716.08 Ton/hari 14
35.80 Ton/jam
13.81 unit
14 unit
16.47
17

4
17
1.95
9.80
0.85
Target Produksi Tahun 6
BCM 4,124,612
Total \

Keterangan
Tahun/ BCM
Target Produksi Tahun 1
BCM 4124612
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Bulan / BCM
1440 Target Produksi Tahun 1/Bulan
2.4 BCM 343717.705
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Hari / BCM
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 17185.89
Total
91.6%
480.00 Perjam / BCM
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 716.0785520833
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

14
TAHUN 7
1. EXCAVATOR
Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Hari
: 141707.82 BCM/bulan
Sasaran Produksi : 700.44 BCM/Jam
875.55 LCM/Jam
Jumlah Loader yang dibutuhkan : 2.4 unit
: 3.0 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 124.46 BCM/Hari
Sasaran Produksi : 700.44 Ton/hari
Target Produksi : 35.02 Ton/jam
Jumlah Alat : 13.51 unit
: 14 unit
Jumlah alat yang disediakan : 16.47
: 17
:
Jumlah alat PC 240 : 4
Jumlah Alat DT : 17
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 0.85
TAHUN 7
1. EXCAVATOR

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 2.4
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 3

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 3.52941176470588
4

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

14
Target Produksi Tahun 7
BCM 4,034,546
Total \ Keterangan
Kapasitas Bucket :
Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 4034546 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Bulan / BCM Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 336212.1933333 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Hari / BCM :
Target Produksi Tahun / Hari :
BCM 16810.61 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Perjam / BCM :
Target Produksi 1 Tahun / Jam :
BCM 700.4420694444 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 8
1. EXCAVATOR
Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Hari Jumlah Alat yang disediakan
141707.82 BCM/bulan KOMATSU PC 380-LC 7
700.54 BCM/Jam Banyak Unit
875.68 LCM/Jam
2.4 unit Persentase Kapasitas Alat Angkut
3.0 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
124.46 BCM/Hari
700.54 Ton/hari 14
35.03 Ton/jam
13.51 unit
14 unit
16.47
17

4
17
1.95
9.80
0.85
Target Produksi Tahun 8
BCM 4,035,112
Total \

Keterangan
Tahun/ BCM
Target Produksi Tahun 1
BCM 4035112
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Bulan / BCM
1440 Target Produksi Tahun 1/Bulan
2.4 BCM 336259.3483333
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Hari / BCM
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 16812.97
Total
91.6%
480.00 Perjam / BCM
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 700.5403090278
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

14
TAHUN 9
1. EXCAVATOR
Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Hari
: 141707.82 BCM/bulan
Sasaran Produksi : 763.60 BCM/Jam
954.50 LCM/Jam
Jumlah Loader yang dibutuhkan : 2.6 unit
: 3.0 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 124.46 BCM/Hari
Sasaran Produksi : 763.60 Ton/hari
Target Produksi : 38.18 Ton/jam
Jumlah Alat : 14.72 unit
: 15 unit
Jumlah alat yang disediakan : 17.65
: 18
:
Jumlah alat PC 240 : 4
Jumlah Alat DT : 18
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 0.90
TAHUN 9
1. EXCAVATOR

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 2.4
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 3

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 3.52941176470588
4

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

15
Target Produksi Tahun 9
BCM 4,398,338
Total \ Keterangan
Kapasitas Bucket :
Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 4398338 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Bulan / BCM Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 366528.1766667 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Hari / BCM :
Target Produksi Tahun / Hari :
BCM 18326.41 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Perjam / BCM :
Target Produksi 1 Tahun / Jam :
BCM 763.6003680556 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 10
1. EXCAVATOR
Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Hari Jumlah Alat yang disediakan
141707.82 BCM/bulan KOMATSU PC 380-LC 7
822.36 BCM/Jam Banyak Unit
1027.94 LCM/Jam
2.8 unit Persentase Kapasitas Alat Angkut
3.0 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
124.46 BCM/Hari
822.36 Ton/hari 16
41.12 Ton/jam
15.86 unit
16 unit
18.82
19

4
19
1.95
9.80
0.95
Target Produksi Tahun 10
BCM 4,736,768
Total \

Keterangan
Tahun/ BCM
Target Produksi Tahun 1
BCM 4736768
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Bulan / BCM
1440 Target Produksi Tahun 1/Bulan
2.4 BCM 394730.6525
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Hari / BCM
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 19736.53
Total
91.6%
480.00 Perjam / BCM
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 822.3555260417
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

16
TAHUN 11

Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 2340% Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Jam
: 2834156.31 BCM/bulan
Sasaran Produksi : 1132.81 BCM/Jam
1416.02 LCM/Jam
Jumlah Loader yang dibutuhkan : 3.8 unit
: 4 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 51.86 BCM/Hari
Sasaran Produksi : 1132.81 Ton/hari
Target Produksi : 56.64 Ton/jam
Jumlah Alat : 21.84 unit
: 22 unit
Jumlah alat yang disediakan : 25.88
: 26
:
Jumlah alat PC 240 : 4
Jumlah Alat DT : 22
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 1.09
TAHUN 11

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 1
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 4

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 4.70588235294118
5

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

22
Target Produksi Tahun 11
Tonase 6,525,000
Total \ Keterangan
Kapasitas Bucket :
Push Back 5 Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 6525000 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Push Back 5 Tahun/ BCM Perbulan Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 543750 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Push Back 8 Tahun/ BCM Perhari :
Target Produksi Tahun / Hari :
BCM 27187.50 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Push Back 8 Tahun/ BCM Perjam :
Target Produksi 1 Tahun / Jam :
BCM 1132.8125 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 12

Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Jam Jumlah Alat yang disediakan
2834156.31 BCM/bulan KOMATSU PC 380-LC 7
1071.69 BCM/Jam Banyak Unit
1339.61 LCM/Jam
3.6 unit Persentase Kapasitas Alat Angkut
4 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
51.86 BCM/Hari
1071.69 Ton/hari 21
53.58 Ton/jam
20.67 unit
21 unit
24.71
25

4
21
1.95
9.80
1.05
Target Produksi Tahun 12
Tonase 6,172,943
Total \

Keterangan
Push Back 5 Tahun/ BCM
Target Produksi Tahun 1
BCM 6172943
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Push Back 5 Tahun/ BCM Perbulan
1440 Target Produksi Tahun 1/Bulan
1 BCM 514411.8933333
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Push Back 8 Tahun/ BCM Perhari
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
4 BCM 25720.59
Total
91.6%
480.00 Push Back 8 Tahun/ BCM Perjam
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 1071.691444444
2.00 Total
4.70588235294118
5

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

21
TAHUN 13

Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Jam
: 2834156.31 BCM/bulan
Sasaran Produksi : 989.58 BCM/Jam
1236.98 LCM/Jam
Jumlah Loader yang dibutuhkan : 3.4 unit
: 4 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 51.86 BCM/Hari
Sasaran Produksi : 989.58 Ton/hari
Target Produksi : 49.48 Ton/jam
Jumlah Alat : 19.08 unit
: 20 unit
Jumlah alat yang disediakan : 23.53
: 24
:
Jumlah alat PC 240 : 4
Jumlah Alat DT : 20
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 1.00
TAHUN 13

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 1
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 4

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 4.70588235294118
5

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

20
Target Produksi Tahun 13
Tonase 5,700,000
Total \ Keterangan
Kapasitas Bucket :
Push Back 5 Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 5700000 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Push Back 5 Tahun/ BCM Perbulan Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 475000 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Push Back 8 Tahun/ BCM Perhari :
Target Produksi Tahun / Hari :
BCM 23750.00 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Push Back 8 Tahun/ BCM Perjam :
Target Produksi 1 Tahun / Jam :
BCM 989.5833333333 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 14

Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Jam Jumlah Alat yang disediakan
2834156.31 BCM/bulan KOMATSU PC 380-LC 7
879.65 BCM/Jam Banyak Unit
1099.56 LCM/Jam
3.0 unit Persentase Kapasitas Alat Angkut
3 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
51.86 BCM/Hari
879.65 Ton/hari 17
43.98 Ton/jam
16.96 unit
17 unit
20.00
20

3
17
1.95
9.80
1.13
Target Produksi Tahun 14
Tonase 5,066,787
Total \

Keterangan
Push Back 5 Tahun/ BCM
Target Produksi Tahun 1
BCM 5066787
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Push Back 5 Tahun/ BCM Perbulan
1440 Target Produksi Tahun 1/Bulan
1 BCM 422232.2133333
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Push Back 8 Tahun/ BCM Perhari
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 21111.61
Total
91.6%
480.00 Push Back 8 Tahun/ BCM Perjam
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 879.6504444444
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

17
TAHUN 15

Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Jam
: 2834156.31 BCM/bulan
Sasaran Produksi : 863.51 BCM/Jam
1079.38 LCM/Jam
Jumlah Loader yang dibutuhkan : 2.9 unit
: 3 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 51.86 BCM/Hari
Sasaran Produksi : 863.51 Ton/hari
Target Produksi : 43.18 Ton/jam
Jumlah Alat : 16.65 unit
: 17 unit
Jumlah alat yang disediakan : 20.00
: 20
:
Jumlah alat PC 240 : 3
Jumlah Alat DT : 17
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 1.13
TAHUN 15

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 1
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 3

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 3.52941176470588
4

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

17
Target Produksi Tahun 15
Tonase 4,973,790
Total \ Keterangan
Kapasitas Bucket :
Push Back 5 Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 4973790 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Push Back 5 Tahun/ BCM Perbulan Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 414482.5066667 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Push Back 8 Tahun/ BCM Perhari :
Target Produksi Tahun / Hari :
BCM 20724.13 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Push Back 8 Tahun/ BCM Perjam :
Target Produksi 1 Tahun / Jam :
BCM 863.5052222222 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 16

Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Jam Jumlah Alat yang disediakan
2834156.31 BCM/bulan KOMATSU PC 380-LC 7
777.74 BCM/Jam Banyak Unit
972.18 LCM/Jam
2.6 unit Persentase Kapasitas Alat Angkut
3 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
51.86 BCM/Hari
777.74 Ton/hari 15
38.89 Ton/jam
15.00 unit
15 unit
17.65
18

3
15
1.95
9.80
1.00
Target Produksi Tahun 16
Tonase 4,479,788
Total \

Keterangan
Push Back 5 Tahun/ BCM
Target Produksi Tahun 1
BCM 4479788
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Push Back 5 Tahun/ BCM Perbulan
1440 Target Produksi Tahun 1/Bulan
1 BCM 373315.6258333
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Push Back 8 Tahun/ BCM Perhari
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 18665.78
Total
91.6%
480.00 Push Back 8 Tahun/ BCM Perjam
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 777.7408871528
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

15
TAHUN 17

Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Jam
: 2834156.31 BCM/bulan
Sasaran Produksi : 772.76 BCM/Jam
965.96 LCM/Jam
Jumlah Loader yang dibutuhkan : 2.6 unit
: 3 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 51.86 BCM/Hari
Sasaran Produksi : 772.76 Ton/hari
Target Produksi : 38.64 Ton/jam
Jumlah Alat : 14.90 unit
: 15 unit
Jumlah alat yang disediakan : 17.65
: 18
:
Jumlah alat PC 240 : 3
Jumlah Alat DT : 15
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 1.00
TAHUN 17

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 1
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 3

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 3.52941176470588
4

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

15
Target Produksi Tahun 17
Tonase 4,451,121
Total \ Keterangan
Kapasitas Bucket :
Push Back 5 Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 4451121 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Push Back 5 Tahun/ BCM Perbulan Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 370926.74 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Push Back 8 Tahun/ BCM Perhari :
Target Produksi Tahun / Hari :
BCM 18546.34 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Push Back 8 Tahun/ BCM Perjam :
Target Produksi 1 Tahun / Jam :
BCM 772.7640416667 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 18

Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Jam Jumlah Alat yang disediakan
2834156.31 BCM/bulan KOMATSU PC 380-LC 7
632.99 BCM/Jam Banyak Unit
791.24 LCM/Jam
2.1 unit Persentase Kapasitas Alat Angkut
3 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
51.86 BCM/Hari
632.99 Ton/hari 13
31.65 Ton/jam
12.21 unit
13 unit
15.29
16

3
13
1.95
9.80
0.86
Target Produksi Tahun 18
Tonase 3,646,050
Total \

Keterangan
Push Back 5 Tahun/ BCM
Target Produksi Tahun 1
BCM 3646050
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Push Back 5 Tahun/ BCM Perbulan
1440 Target Produksi Tahun 1/Bulan
1 BCM 303837.48
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Push Back 8 Tahun/ BCM Perhari
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
3 BCM 15191.87
Total
91.6%
480.00 Push Back 8 Tahun/ BCM Perjam
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 632.99475
2.00 Total
3.52941176470588
4

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

13
TAHUN 19

Keterangan Unit
Kapasitas Bucket : 3.3 m³
Bucket Fill Factor (FF) : 85%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 295.22 BCM/Jam
: 5904.49 BCM/Jam
: 2834156.31 BCM/bulan
Sasaran Produksi : 536.60 BCM/Jam
670.75 LCM/Jam
Jumlah Loader yang dibutuhkan : 1.8 unit
: 2 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 18.13 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 3.3 m³
Faktor Pengisian (Fill Factor) : 85%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 2.0 km
Cycle time truck (menit/trip) : 9.80 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.75 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2.666666666667 menit
jumlah trip/jam : 6 trip/jam
Produktivitas dump truck : 51.86 BCM/jam
: 51.86 BCM/Hari
Sasaran Produksi : 536.60 Ton/hari
Target Produksi : 26.83 Ton/jam
Jumlah Alat : 10.35 unit
: 11 unit
Jumlah alat yang disediakan : 12.94
: 13
:
Jumlah alat PC 240 : 2
Jumlah Alat DT : 11
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 9.80
Match Faktor 1.09
TAHUN 19

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 1
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 380-LC 7
Banyak Unit 2

Persentase Kapasitas Alat Angkut 91.6%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 2.35294117647059
3

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

NISSAN CWB 52 ALDN


* 1 DT = 5 Buckets Excavator

11
Target Produksi Tahun 5
Tonase 3,090,820
Total \ Keterangan
Kapasitas Bucket :
Push Back 5 Tahun/ BCM Bucket Fill Factor (FF) :
Target Produksi Tahun 1 Swell Factor (SF) :
BCM 3090820 Cycle Time (CT) :
Total Waktu gali :
Waktu swing :
Push Back 5 Tahun/ BCM Perbulan Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
BCM 257568.3233333 Machine Avability (MA) :
Total Jam Kerja Efektif :
Efisiensi Kerja (EU) :
Produktivitas Alat :
Push Back 8 Tahun/ BCM Perhari :
Target Produksi Tahun / Hari :
BCM 12878.42 Sasaran Produksi :
Total
Jumlah Loader yang dibutuhkan :
Push Back 8 Tahun/ BCM Perjam :
Target Produksi 1 Tahun / Jam :
BCM 536.6006736111 :
Total :
Banyak Pengisian :
Waktu pengisian hauler :

Kapasitas bak (vessel) alat angkut :


Jumlah pengisian (n) :
Kapasitas bucket (Bucket Capacity) :
Faktor Pengisian (Fill Factor) :
Faktor Pengembangan (Swell Factor) :
Kecepatan truck isi :
kecepatan truck kosong :
EU :
MA :
Jam Kerja :
Jarak Angkut :
Cycle time truck (menit/trip) :
- Waktu pengisian :
- Waktu tunggu, dumping, manuver :
- Waktu tempuh bermuatan :
- Waktu kembali kosong :
jumlah trip/jam :
Produktivitas dump truck :
:
Sasaran Produksi :
Target Produksi :
Jumlah Alat :
:
Jumlah alat yang disediakan :
:
:
Jumlah alat PC 240 :
Jumlah Alat DT :
Waktu pengisian hauler :
Cycle Time Alat Angkut :
Match Faktor
TAHUN 20

Unit
3.3 m³
Keterangan
85%
80%
23.4 Detik/bucket
Detik Prod. Alat
Detik Jam Kerja
Detik Jam Kerja Efektif ( W )
Detik Jam Repairs ( R )
85% Mat.Density
20.00 Jam/hari Kesediaan Mekanis (MA)
75% Efisiensi Kerja (EU)
295.22 BCM/Jam Jumlah Alat yang dibutuhkan
5904.49 BCM/Jam Jumlah Alat yang disediakan
2834156.31 BCM/bulan KOMATSU PC 380-LC 7
355.03 BCM/Jam Banyak Unit
443.79 LCM/Jam
1.2 unit Persentase Kapasitas Alat Angkut
2 unit Effective Working Hours/Month
Effective Working Hours/Year
Effective Working Hour/Day
Effective Shift/Day
5 kali Jumlah Alat Yang Disediakan
1.95 menit

2. Dump Truck
2. Dump Truck
18.13 m³
5 kali
3.3 m³ Keterangan
85%
80%
35 km/jam Prod. Alat
45 km/jam Jam Kerja
75% Jam Kerja Efektif
85% Jumlah Alat
20.00 jam/hari
2.0 km
9.80 menit Jumlah trip
1.95 menit Prod. Truck
1.75 menit Jumlah pengisian ke bak (swing)
3 menit
2.666666666667 menit NISSAN CWB 52 ALDN
6 trip/jam
51.86 BCM/jam * 1 DT = 5 Buckets Excavator
51.86 BCM/Hari
355.03 Ton/hari 7
17.75 Ton/jam
6.85 unit
7 unit
8.24
9

2
9
1.95
9.80
0.90
Target Produksi Tahun 20
Tonase 2,045,000
Total \

Keterangan
Push Back 5 Tahun/ BCM
Target Produksi Tahun 1
BCM 2045000
: 3600/CT x EA xFF x Ek x Kp. Bucket Total
: 12 jam/shift ; 2 shift/day
5,760.00 Push Back 5 Tahun/ BCM Perbulan
1440 Target Produksi Tahun 1/Bulan
1 BCM 170416.6666667
W/(W+R) x 100% Total
W/(W+R+S) x 100%
Target Produksi/Produktivitas Alat
Jumlah alat bekerja dilapangan/MA Push Back 8 Tahun/ BCM Perhari
KOMATSU PC 380-LC 7 Target Produksi Tahun / Hari
2 BCM 8520.83
Total
91.6%
480.00 Push Back 8 Tahun/ BCM Perjam
5,760.00 Target Produksi 1 Tahun / Jam
20.00 BCM 355.0347222222
2.00 Total
2.35294117647059
3

Keterangan

: 60/CT x Kt x Ek
: 8 jam/shift ; 3 shift/day
20.00
: sasaran produksi/produktivitas alat

: 60 menit/ CT truck
: Kap. Bak x jumlah trip x EU x MA
5

NISSAN CWB 52 ALDN


1 DT = 5 Buckets Excavator

7
FORMULA PERHITUNGAN MAN POWER

JUMLAH MAN POWER = FAKTOR SHIFT x JUMLAH UNIT x FAKTOR KOEFISIEN x M

Tahun 1

NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO


1 KOMATSU PC 228US-3 1 2.108 2 1
2 KOMATSU PC 380-LC 7 3 6.324 6 2
3 HINO 130 HD 4 8.432 8 3
4 NISSAN CWB 52 ALDN 13 27.404 27 4
5 Wheel Loader 1 2.108 2 5
6 Bulldozer 4 8.432 8 6
7 Grader 2 4.216 4 7
8 Fuel Truck 2 4.216 4 8
9 Water Truck 2 4.216 4 9
Total 67

Tahun 11

NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO


1 KOMATSU PC 228US-3 2 4.216 4 1
2 KOMATSU PC 380-LC 7 4 8.432 8 2
3 HINO 130 HD 9 18.972 19 3
4 NISSAN CWB 52 ALDN 22 46.376 46 4
5 Wheel Loader 1 2.108 2 5
6 Bulldozer 4 8.432 8 6
7 Grader 2 4.216 4 7
8 Fuel Truck 2 4.216 4 8
9 Water Truck 2 4.216 4 9
Total 101

Faktor Koefisien
- cuti periodik
- cuti tahunan
- Izin, sakit, alpa
- Training
- sistem Rooster
- Faktor Konstanta (1)
atau
NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN
( Orang )
PC 750 3 6.324 7
PC 400 3 6.324 7
PC 1250 2 4.216 5
A40E 15 31.62 32
HD 465 8 16.864 17
Bulldozer 2 4.216 5
Grader 1 2.108 3
Fuel Truck 2 4.216 5
Water Truck 2 4.216 5

Total 86

No. Jabatan Keterangan Jumlah karyawan Gaji Jumlah Total


1 KTT
2 (Kepala Teknik Tambang)
Manager KTT
Manager 1 Rp30,000,000.00
Rp20,000,000.00 Rp30,000,000.00
Rp20,000,000.00
1
- Mine Division Kepala Divisi 1 Rp15,000,000.00 Rp15,000,000.00
Coal Preparation Plant
Kepala Bagian Anggota 1 Rp12,500,000.00 Rp12,500,000.00
Quality Control Anggota 3 Rp7,000,000.00 Rp21,000,000.00
Analisis & Enginer Anggota 5 Rp7,000,000.00 Rp35,000,000.00
Staf Administrasi Anggota 6 Rp4,000,000.00 Rp24,000,000.00
Teknisi Anggota 5 Rp5,000,000.00 Rp25,000,000.00
Pembanutu Umum Anggota 5 Rp25,000,000.00 Rp125,000,000.00
- Mine Operation
General Foreman Anggota 1 Rp8,000,000.00 Rp8,000,000.00
Foreman Anggota 10 Rp4,500,000.00 Rp45,000,000.00
Sr. Equipment Operator Anggota 5 Rp8,000,000.00 Rp40,000,000.00
UnskilledLabour Anggota 6 Rp3,000,000.00 Rp18,000,000.00
- Perencanaan & Engineering
Mine Engineer Anggota 7 Rp8,500,000.00 Rp59,500,000.00
Geologist Anggota 8 Rp8,000,000.00 Rp64,000,000.00
Computer Analisis Anggota 6 Rp6,000,000.00 Rp36,000,000.00
Technician Anggota 7 Rp7,000,000.00 Rp49,000,000.00
Drafting Anggota 5 Rp4,500,000.00 Rp22,500,000.00
Surveyor Anggota 8 Rp6,000,000.00 Rp48,000,000.00
Scretary Anggota 4 Rp5,000,000.00 Rp20,000,000.00
Clerk Anggota 4 Rp5,000,000.00 Rp20,000,000.00
3 Maintenance & Logistic Kepala Divisi 1 Rp15,000,000.00 Rp15,000,000.00
Engineer Anggota 10 Rp8,000,000.00 Rp80,000,000.00
Mechanics Anggota 9 Rp8,000,000.00 Rp72,000,000.00
Electrican Anggota 7 Rp7,000,000.00 Rp49,000,000.00
Welder Anggota 6 Rp5,000,000.00 Rp30,000,000.00
Skilled Welder Anggota 5 Rp8,000,000.00 Rp40,000,000.00
Unskilled Labour Anggota 7 Rp3,000,000.00 Rp21,000,000.00
4 Finance & Administration Division Kepala Divisi 1 Rp15,000,000.00 Rp15,000,000.00
Marketing Staff Anggota 6 Rp3,500,000.00 Rp21,000,000.00
Scretary Anggota 3 Rp5,000,000.00 Rp15,000,000.00
Clerk Anggota 4 Rp5,000,000.00 Rp20,000,000.00
Safety, Environment, Community
5 Kepala Divisi 1 Rp15,000,000.00 Rp15,000,000.00
Development Division
HRD Anggota 3 Rp6,000,000.00 Rp18,000,000.00
Accountant Anggota 5 Rp5,000,000.00 Rp25,000,000.00
Admint Person Anggota 4 Rp3,000,000.00 Rp12,000,000.00
Staff K3 Anggota 6 Rp5,000,000.00 Rp30,000,000.00
Staff Lingkungan Anggota 7 Rp5,000,000.00 Rp35,000,000.00
Staff Com Anggota 5 Rp5,000,000.00 Rp25,000,000.00
Development Anggota 8 Rp5,000,000.00 Rp40,000,000.00
Scretary Anggota 3 Rp5,000,000.00 Rp15,000,000.00
Supir LV Anggota 20 Rp4,500,000.00 Rp90,000,000.00
Scurity Guard Anggota 5 Rp4,000,000.00 Rp20,000,000.00
Jumlah 225 Rp344,000,000.00 Rp1,440,500,000.00
WER

KTOR KOEFISIEN x MA UNIT

Tahun 2 Tahun 3

MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL


KOMATSU PC 228US-3 1 2.108 2 1 KOMATSU PC 228US-3
KOMATSU PC 380-LC 7 4 8.432 8 2 KOMATSU PC 380-LC 7
HINO 130 HD 5 10.54 11 3 HINO 130 HD
NISSAN CWB 52 ALDN 17 35.836 36 4 NISSAN CWB 52 ALDN
Wheel Loader 1 2.108 2 5 Wheel Loader
Bulldozer 4 8.432 8 6 Bulldozer
Grader 2 4.216 4 7 Grader
Fuel Truck 2 4.216 4 8 Fuel Truck
Water Truck 2 4.216 4 9 Water Truck
Total 80

Tahun 12 Tahun 13

MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL


KOMATSU PC 228US-3 2 4.216 4 1 KOMATSU PC 228US-3
KOMATSU PC 380-LC 7 4 8.432 8 2 KOMATSU PC 380-LC 7
HINO 130 HD 9 18.972 19 3 HINO 130 HD
NISSAN CWB 52 ALDN 21 44.268 44 4 NISSAN CWB 52 ALDN
Wheel Loader 1 2.108 2 5 Wheel Loader
Bulldozer 4 8.432 8 6 Bulldozer
Grader 2 4.216 4 7 Grader
Fuel Truck 2 4.216 4 8 Fuel Truck
Water Truck 2 4.216 4 9 Water Truck
Total 99

Operator
Tahun Jumlah Gaji Total
1 67 Rp7,000,000.00 Rp472,192,000.00
2 80 Rp7,000,000.00 Rp560,728,000.00
3 97 Rp7,000,000.00 Rp678,776,000.00
4 91 Rp7,000,000.00 Rp634,508,000.00
5 86 Rp7,000,000.00 Rp604,996,000.00
6 84 Rp7,000,000.00 Rp590,240,000.00
7 84 Rp7,000,000.00 Rp590,240,000.00
8 84 Rp7,000,000.00 Rp590,240,000.00
9 86 Rp7,000,000.00 Rp604,996,000.00
10 93 Rp7,000,000.00 Rp649,264,000.00
11 101 Rp7,000,000.00 Rp708,288,000.00
12 99 Rp7,000,000.00 Rp693,532,000.00
13 95 Rp7,000,000.00 Rp664,020,000.00
14 86 Rp7,000,000.00 Rp604,996,000.00
15 84 Rp7,000,000.00 Rp590,240,000.00
16 80 Rp7,000,000.00 Rp560,728,000.00
17 80 Rp7,000,000.00 Rp560,728,000.00
18 70 Rp7,000,000.00 Rp486,948,000.00
19 63 Rp7,000,000.00 Rp442,680,000.00
20 57 Rp7,000,000.00 Rp398,412,000.00
Tahun 3 Tahun 4

JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN
2 4.216 4 1 KOMATSU PC 228US-3 2 4.216 4
5 10.54 11 2 KOMATSU PC 380-LC 7 4 8.432 8
6 12.648 13 3 HINO 130 HD 6 12.648 13
22 46.376 46 4 NISSAN CWB 52 ALDN 20 42.16 42
1 2.108 2 5 Wheel Loader 1 2.108 2
4 8.432 8 6 Bulldozer 4 8.432 8
2 4.216 4 7 Grader 2 4.216 4
2 4.216 4 8 Fuel Truck 2 4.216 4
2 4.216 4 9 Water Truck 2 4.216 4
Total 97 Total 91

Tahun 13 Tahun 14

JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN
2 4.216 4 1 KOMATSU PC 228US-3 2 4.216 4
4 8.432 8 2 KOMATSU PC 380-LC 7 3 6.324 6
8 16.864 17 3 HINO 130 HD 8 16.864 17
20 42.16 42 4 NISSAN CWB 52 ALDN 17 35.836 36
1 2.108 2 5 Wheel Loader 1 2.108 2
4 8.432 8 6 Bulldozer 4 8.432 8
2 4.216 4 7 Grader 2 4.216 4
2 4.216 4 8 Fuel Truck 2 4.216 4
2 4.216 4 9 Water Truck 2 4.216 4
Total 95 Total 86
Tahun 5 Tahun 6

NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER
1 KOMATSU PC 228US-3 2 4.216 4 1 KOMATSU PC 228US-3 2 4.216
2 KOMATSU PC 380-LC 7 4 8.432 8 2 KOMATSU PC 380-LC 7 4 8.432
3 HINO 130 HD 6 12.648 13 3 HINO 130 HD 6 12.648
4 NISSAN CWB 52 ALDN 18 37.944 38 4 NISSAN CWB 52 ALDN 17 35.836
5 Wheel Loader 1 2.108 2 5 Wheel Loader 1 2.108
6 Bulldozer 4 8.432 8 6 Bulldozer 4 8.432
7 Grader 2 4.216 4 7 Grader 2 4.216
8 Fuel Truck 2 4.216 4 8 Fuel Truck 2 4.216
9 Water Truck 2 4.216 4 9 Water Truck 2 4.216
Total 86 Total

Tahun 15 Tahun 16

NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER
1 KOMATSU PC 228US-3 2 4.216 4 1 KOMATSU PC 228US-3 2 4.216
2 KOMATSU PC 380-LC 7 3 6.324 6 2 KOMATSU PC 380-LC 7 3 6.324
3 HINO 130 HD 7 14.756 15 3 HINO 130 HD 7 14.756
4 NISSAN CWB 52 ALDN 17 35.836 36 4 NISSAN CWB 52 ALDN 15 31.62
5 Wheel Loader 1 2.108 2 5 Wheel Loader 1 2.108
6 Bulldozer 4 8.432 8 6 Bulldozer 4 8.432
7 Grader 2 4.216 4 7 Grader 2 4.216
8 Fuel Truck 2 4.216 4 8 Fuel Truck 2 4.216
9 Water Truck 2 4.216 4 9 Water Truck 2 4.216
Total 84 Total
Tahun 7

PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL


4 1 KOMATSU PC 228US-3 2 4.216 4 1 KOMATSU PC 228US-3
8 2 KOMATSU PC 380-LC 7 4 8.432 8 2 KOMATSU PC 380-LC 7
13 3 HINO 130 HD 6 12.648 13 3 HINO 130 HD
36 4 NISSAN CWB 52 ALDN 17 35.836 36 4 NISSAN CWB 52 ALDN
2 5 Wheel Loader 1 2.108 2 5 Wheel Loader
8 6 Bulldozer 4 8.432 8 6 Bulldozer
4 7 Grader 2 4.216 4 7 Grader
4 8 Fuel Truck 2 4.216 4 8 Fuel Truck
4 9 Water Truck 2 4.216 4 9 Water Truck
84 Total 84

Tahun 17 T

PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL


4 1 KOMATSU PC 228US-3 2 4.216 4 1 KOMATSU PC 228US-3
6 2 KOMATSU PC 380-LC 7 3 6.324 6 2 KOMATSU PC 380-LC 7
15 3 HINO 130 HD 7 14.756 15 3 HINO 130 HD
32 4 NISSAN CWB 52 ALDN 15 31.62 32 4 NISSAN CWB 52 ALDN
2 5 Wheel Loader 1 2.108 2 5 Wheel Loader
8 6 Bulldozer 4 8.432 8 6 Bulldozer
4 7 Grader 2 4.216 4 7 Grader
4 8 Fuel Truck 2 4.216 4 8 Fuel Truck
4 9 Water Truck 2 4.216 4 9 Water Truck
80 Total 80
Tahun 8 Tahun 9

JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN
2 4.216 4 1 KOMATSU PC 228US-3 2 4.216 4
4 8.432 8 2 KOMATSU PC 380-LC 7 4 8.432 8
6 12.648 13 3 HINO 130 HD 6 12.648 13
17 35.836 36 4 NISSAN CWB 52 ALDN 18 37.944 38
1 2.108 2 5 Wheel Loader 1 2.108 2
4 8.432 8 6 Bulldozer 4 8.432 8
2 4.216 4 7 Grader 2 4.216 4
2 4.216 4 8 Fuel Truck 2 4.216 4
2 4.216 4 9 Water Truck 2 4.216 4
Total 84 Total 86

Tahun 18 Tahun 19

JUMLAH UNIT MAN POWER PEMBULATAN NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN
1 2.108 2 1 KOMATSU PC 228US-3 1 2.108 2
3 6.324 6 2 KOMATSU PC 380-LC 7 2 4.216 4
5 10.54 11 3 HINO 130 HD 5 10.54 11
13 27.404 27 4 NISSAN CWB 52 ALDN 11 23.188 23
1 2.108 2 5 Wheel Loader 1 2.108 2
4 8.432 8 6 Bulldozer 4 8.432 8
2 4.216 4 7 Grader 2 4.216 4
2 4.216 4 8 Fuel Truck 2 4.216 4
2 4.216 4 9 Water Truck 2 4.216 4
Total 70 Total 63
Tahun 10

NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN


1 KOMATSU PC 228US-3 2 4.216 4
2 KOMATSU PC 380-LC 7 4 8.432 8
3 HINO 130 HD 8 16.864 17
4 NISSAN CWB 52 ALDN 19 40.052 40
5 Wheel Loader 1 2.108 2
6 Bulldozer 4 8.432 8
7 Grader 2 4.216 4
8 Fuel Truck 2 4.216 4
9 Water Truck 2 4.216 4
Total 93

Tahun 20

NO MODEL JUMLAH UNIT MAN POWER PEMBULATAN


1 KOMATSU PC 228US-3 1 2.108 2
2 KOMATSU PC 380-LC 7 2 4.216 4
3 HINO 130 HD 4 8.432 8
4 NISSAN CWB 52 ALDN 9 18.972 19
5 Wheel Loader 1 2.108 2
6 Bulldozer 4 8.432 8
7 Grader 2 4.216 4
8 Fuel Truck 2 4.216 4
9 Water Truck 2 4.216 4
Total 57
TAHUN 1
1. EXCAVATOR
Keterangan Unit
Kapasitas Bucket : 1.7 m³
Bucket Fill Factor (FF) : 80%
Swell Factor (SF) : 80%
Cycle Time (CT) : 23.4 Detik/bucket
Waktu gali : Detik
Waktu swing : Detik
Waktu buang : Detik
Waktu swing kosong : Detik
Machine Avability (MA) : 85%
Jam Kerja Efektif : 20.00 Jam/hari
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60 BCM/Jam
: 182.78 Ton/Jam
: 87736.32 Ton/bulan
Sasaran Produksi : 86.81 Ton/Jam

Jumlah Loader yang dibutuhkan : 0.5 unit


: 1.0 unit
:
:
:
Banyak Pengisian : 5 kali
Waktu pengisian hauler : 1.95 menit

2. Dump Truck
2. Dump Truck
Kapasitas bak (vessel) alat angkut : 9.1 m³
Jumlah pengisian (n) : 5 kali
Kapasitas bucket (Bucket Capacity) : 1.7 m³
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35 km/jam
kecepatan truck kosong : 45 km/jam
EU : 75%
MA : 85%
Jam Kerja : 20.00 jam/hari
Jarak Angkut : 1.5 km
Cycle time truck (menit/trip) : 8.10 menit
- Waktu pengisian : 1.95 menit
- Waktu tunggu, dumping, manuver : 1.575 menit
- Waktu tempuh bermuatan : 3 menit
- Waktu kembali kosong : 2 menit
jumlah trip/jam : 7 trip/jam
Produktivitas dump truck : 29.88 BCM/jam
: 38.84 Ton/Hari
Sasaran Produksi : 86.81 Ton/Jam
Target Produksi : 4.34 Ton/jam
Jumlah Alat : 2.23 unit
: 3 unit
Jumlah alat yang disediakan : 3.53
: 4
:
Jumlah alat PC 240 : 1.0
Jumlah Alat DT : 4
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.96
TAHUN 1
1. EXCAVATOR

Keterangan

Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket


Jam Kerja : 12 jam/shift ; 2 shift/day
Jam Kerja Efektif ( W ) 5,760.00
Jam Repairs ( R ) 1440
Mat.Density 1.3
Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
KOMATSU PC 228US-3
Banyak Unit 1

Persentase Kapasitas Alat Angkut 92.3%


Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
Jumlah Alat Yang Disediakan 1.17647058823529
2

2. Dump Truck
2. Dump Truck

Keterangan

Prod. Alat : 60/CT x Kt x Ek


Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat

Jumlah trip : 60 menit/ CT truck


Prod. Truck : Kap. Bak x jumlah trip x EU x MA
Jumlah pengisian ke bak (swing) 5

HINO 130 HD
* 1 DT = 5 Buckets Excavator

3
Target Produksi Tahun 1
Tonase 500,000 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 500000 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 41666.66666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 2083.33 Sasaran Produksi : 130.28
Total
Jumlah Loader yang dibutuhkan : 0.7
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 86.80555555556 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 130.28
Target Produksi : 6.51
Jumlah Alat : 3.35
: 4
Jumlah alat yang disediakan : 4.71
: 5
:
Jumlah alat PC 240 : 1.0
Jumlah Alat DT : 5
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 1.20
TAHUN 2
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 4
Ton/jam
unit
unit
Target Produksi Tahun 2
Tonase 750,405 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 750405 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 62533.75 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 3126.69 Sasaran Produksi : 174.67
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 130.2786458333 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 174.67
Target Produksi : 8.73
Jumlah Alat : 4.50
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 6
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.72
TAHUN 3
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 3
Tonase 1,006,113 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1006113 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 83842.75 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4192.14 Sasaran Produksi : 176.70
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 174.6723958333 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 176.70
Target Produksi : 8.83
Jumlah Alat : 4.55
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 6
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.72
TAHUN 4
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 4
Tonase 1,017,785 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1017785 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 84815.41666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4240.77 Sasaran Produksi : 177.37
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 176.6987847222 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 177.37
Target Produksi : 8.87
Jumlah Alat : 4.57
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 6
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.72
TAHUN 5
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 5
Tonase 1,021,663 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1021663 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 85138.58333333 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4256.93 Sasaran Produksi : 178.13
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 177.3720486111 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 178.13
Target Produksi : 8.91
Jumlah Alat : 4.59
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 6
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.72
TAHUN 6
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 6
Tonase 1,026,023 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1026023 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 85501.91666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4275.10 Sasaran Produksi : 178.68
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 178.1289930556 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 178.68
Target Produksi : 8.93
Jumlah Alat : 4.60
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 6
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.72
TAHUN 7
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 7
Tonase 1,029,221 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1029221 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 85768.41666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4288.42 Sasaran Produksi : 179.17
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 178.6842013889 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 179.17
Target Produksi : 8.96
Jumlah Alat : 4.61
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 6
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.72
TAHUN 8
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 8
Tonase 1,031,998 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1031998 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 85999.83333333 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4299.99 Sasaran Produksi : 182.68
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 179.1663194444 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 182.68
Target Produksi : 9.13
Jumlah Alat : 4.70
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 6
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.72
TAHUN 9
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 9 T
Tonase 1,052,234 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1052234 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 87686.16666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4384.31 Sasaran Produksi : 195.33
Total
Jumlah Loader yang dibutuhkan : 1.1
Jam / Ton : 2.0
Target Produksi 1 Tahun / Jam :
Tonase 182.6795138889 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 195.33
Target Produksi : 9.77
Jumlah Alat : 5.03
: 6
Jumlah alat yang disediakan : 7.06
: 8
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 8
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.96
TAHUN 10
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 2

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 2.35294117647059
menit 3

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 6
Ton/jam
unit
unit
Target Produksi Tahun 10 T
Tonase 1,125,123 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1125123 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 93760.25 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4688.01 Sasaran Produksi : 260.42
Total
Jumlah Loader yang dibutuhkan : 1.4
Jam / Ton : 2.0
Target Produksi 1 Tahun / Jam :
Tonase 195.3338541667 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 260.42
Target Produksi : 13.02
Jumlah Alat : 6.70
: 7
Jumlah alat yang disediakan : 8.24
: 9
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 9
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 1.08
TAHUN 11
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 2

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 2.35294117647059
menit 3

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 7
Ton/jam
unit
unit
Target Produksi Tahun 11 T
Tonase 1,500,000 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1500000 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 125000 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 6250.00 Sasaran Produksi : 239.22
Total
Jumlah Loader yang dibutuhkan : 1.3
Jam / Ton : 2.0
Target Produksi 1 Tahun / Jam :
Tonase 260.4166666667 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 239.22
Target Produksi : 11.96
Jumlah Alat : 6.16
: 7
Jumlah alat yang disediakan : 8.24
: 9
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 9
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 1.08
TAHUN 12
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 2

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 2.35294117647059
menit 3

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 7
Ton/jam
unit
unit
Target Produksi Tahun 12 T
Tonase 1,377,889 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1377889 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 114824.0833333 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 5741.20 Sasaran Produksi : 217.01
Total
Jumlah Loader yang dibutuhkan : 1.2
Jam / Ton : 2.0
Target Produksi 1 Tahun / Jam :
Tonase 239.2168402778 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 217.01
Target Produksi : 10.85
Jumlah Alat : 5.59
: 6
Jumlah alat yang disediakan : 7.06
: 8
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 8
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.96
TAHUN 13
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 2

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 2.35294117647059
menit 3

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 6
Ton/jam
unit
unit
Target Produksi Tahun 13 T
Tonase 1,250,000 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1250000 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 104166.6666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 5208.33 Sasaran Produksi : 195.04
Total
Jumlah Loader yang dibutuhkan : 1.1
Jam / Ton : 2.0
Target Produksi 1 Tahun / Jam :
Tonase 217.0138888889 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 195.04
Target Produksi : 9.75
Jumlah Alat : 5.02
: 6
Jumlah alat yang disediakan : 7.06
: 8
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 8
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.96
TAHUN 14
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 2

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 2.35294117647059
menit 3

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 6
Ton/jam
unit
unit
Target Produksi Tahun 14 T
Tonase 1,123,456 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1123456 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 93621.33333333 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4681.07 Sasaran Produksi : 192.75
Total
Jumlah Loader yang dibutuhkan : 1.1
Jam / Ton : 2.0
Target Produksi 1 Tahun / Jam :
Tonase 195.0444444444 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 192.75
Target Produksi : 9.64
Jumlah Alat : 4.96
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 7
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.84
TAHUN 15
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 2

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 2.35294117647059
menit 3

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 15 T
Tonase 1,110,221 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1110221 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 92518.41666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4625.92 Sasaran Produksi : 177.97
Total
Jumlah Loader yang dibutuhkan : 1.0
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 192.7467013889 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 177.97
Target Produksi : 8.90
Jumlah Alat : 4.58
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 7
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.84
TAHUN 16
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 16 T
Tonase 1,025,123 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 1025123 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 85426.91666667 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4271.35 Sasaran Produksi : 169.47
Total
Jumlah Loader yang dibutuhkan : 0.9
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 177.9727430556 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 169.47
Target Produksi : 8.47
Jumlah Alat : 4.36
: 5
Jumlah alat yang disediakan : 5.88
: 6
:
Jumlah alat PC 240 : 2.0
Jumlah Alat DT : 7
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.84
TAHUN 17
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 5
Ton/jam
unit
unit
Target Produksi Tahun 17 T
Tonase 976,123 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 976123 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 81343.58333333 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 4067.18 Sasaran Produksi : 146.53
Total
Jumlah Loader yang dibutuhkan : 0.8
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 169.4657986111 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 146.53
Target Produksi : 7.33
Jumlah Alat : 3.77
: 4
Jumlah alat yang disediakan : 4.71
: 5
:
Jumlah alat PC 240 : 1.0
Jumlah Alat DT : 5
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 1.20
TAHUN 18
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 4
Ton/jam
unit
unit
Target Produksi Tahun 18 T
Tonase 843,993 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 843993 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 70332.75 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 3516.64 Sasaran Produksi : 130.24
Total
Jumlah Loader yang dibutuhkan : 0.7
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 146.5265625 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 130.24
Target Produksi : 6.51
Jumlah Alat : 3.35
: 4
Jumlah alat yang disediakan : 4.71
: 5
:
Jumlah alat PC 240 : 1.0
Jumlah Alat DT : 5
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 1.20
TAHUN 19
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 4
Ton/jam
unit
unit
Target Produksi Tahun 19 T
Tonase 750,199 1. E
Total \ Keterangan
Kapasitas Bucket : 1.7
Tahun / Ton Bucket Fill Factor (FF) : 80%
Target Produksi Tahun 1 Swell Factor (SF) : 80%
Tonase 750199 Cycle Time (CT) : 23.4
Total Waktu gali :
Waktu swing :
Bulan / Ton Waktu buang :
Target Produksi Tahun 1/Bulan Waktu swing kosong :
Tonase 62516.58333333 Machine Avability (MA) : 85%
Total Jam Kerja Efektif : 20.00
Efisiensi Kerja (EU) : 75%
Produktivitas Alat : 140.60
Hari / Ton : 182.78
Target Produksi Tahun / Hari : 87736.32
Tonase 3125.83 Sasaran Produksi : 86.81
Total
Jumlah Loader yang dibutuhkan : 0.5
Jam / Ton : 1.0
Target Produksi 1 Tahun / Jam :
Tonase 130.2428819444 :
Total :
Banyak Pengisian : 5
Waktu pengisian hauler : 1.95

2. D
2. D
Kapasitas bak (vessel) alat angkut : 9.1
Jumlah pengisian (n) : 5
Kapasitas bucket (Bucket Capacity) : 1.7
Faktor Pengisian (Fill Factor) : 80%
Faktor Pengembangan (Swell Factor) : 80%
Kecepatan truck isi : 35
kecepatan truck kosong : 45
EU : 75%
MA : 85%
Jam Kerja : 20.00
Jarak Angkut : 1.5
Cycle time truck (menit/trip) : 8.10
- Waktu pengisian : 1.95
- Waktu tunggu, dumping, manuver : 1.575
- Waktu tempuh bermuatan : 3
- Waktu kembali kosong : 2
jumlah trip/jam : 7
Produktivitas dump truck : 29.88
: 38.84
Sasaran Produksi : 86.81
Target Produksi : 4.34
Jumlah Alat : 2.23
: 3
Jumlah alat yang disediakan : 3.53
: 4
:
Jumlah alat PC 240 : 1.0
Jumlah Alat DT : 4
Waktu pengisian hauler : 1.95
Cycle Time Alat Angkut : 8.10
Match Faktor 0.96
TAHUN 20
1. EXCAVATOR
Unit

Keterangan

Detik/bucket
Detik Prod. Alat : 3600/CT x EA xFF x Ek x Kp. Bucket
Detik Jam Kerja : 12 jam/shift ; 2 shift/day
Detik Jam Kerja Efektif ( W ) 5,760.00
Detik Jam Repairs ( R ) 1440
Mat.Density 1.3
Jam/hari Kesediaan Mekanis (MA) W/(W+R) x 100%
Efisiensi Kerja (EU) W/(W+R+S) x 100%
BCM/Jam Jumlah Alat yang dibutuhkan Target Produksi/Produktivitas Alat
Ton/Jam Jumlah Alat yang disediakan Jumlah alat bekerja dilapangan/MA
Ton/bulan KOMATSU PC 228US-3
Ton/Jam Banyak Unit 1

unit Persentase Kapasitas Alat Angkut 92.3%


unit Effective Working Hours/Month 480.00
Effective Working Hours/Year 5,760.00
Effective Working Hour/Day 20.00
Effective Shift/Day 2.00
kali Jumlah Alat Yang Disediakan 1.17647058823529
menit 2

2. Dump Truck
2. Dump Truck

kali
m³ Keterangan

km/jam Prod. Alat : 60/CT x Kt x Ek


km/jam Jam Kerja : 8 jam/shift ; 3 shift/day
Jam Kerja Efektif 20.00
Jumlah Alat : sasaran produksi/produktivitas alat
jam/hari
km
menit Jumlah trip : 60 menit/ CT truck
menit Prod. Truck : Kap. Bak x jumlah trip x EU x MA
menit Jumlah pengisian ke bak (swing) 5
menit
menit HINO 130 HD
trip/jam
BCM/jam * 1 DT = 5 Buckets Excavator
Ton/Hari
Ton/Jam 3
Ton/jam
unit
unit
Target Produksi Tahun 20
Tonase 500,000
Total \

Tahun / Ton
Target Produksi Tahun 1
Tonase 500000
Total

Bulan / Ton
Target Produksi Tahun 1/Bulan
Tonase 41666.66666667
Total

Hari / Ton
Target Produksi Tahun / Hari
Tonase 2083.33
Total

Jam / Ton
Target Produksi 1 Tahun / Jam
Tonase 86.80555555556
Total
Basic Calculation of Excavator productivity

Brand : Komatsu Swing angle


Type : Excavator PC 1250 Standard cycle time Æ 45°- 90°
Bucket Cap'ty (cum) : 7.5 16 - 19
Cycle time (Second) : 24.0 20
Cycle per hour : 150
Efficiency : 0.85 Conversion factor (Rather Difficult)
Bucket fill factor : 0.85 (Average) Mechanical Availability 85%
Mat. Density : 2.40 (Overburden) Job Efficiency (Average)
Swell factor : 0.8
Productivity/hour (lcm) : 719 Cycle time 24.0
Productivity/hour (bcm) : 576 0.40
Productivity/hour (mt) : 1381 Cycle per hour 150.0

Brand : Komatsu Swing angle


Type : Excavator PC 750 Standard cycle time Æ 45°- 90°
Bucket Cap'ty (cum) : 4.6 16 - 19
Cycle time (Second) : 21.0 21
Cycle per hour : 171
Efficiency : 0.85 Conversion factor (Rather Difficult)
Bucket fill factor : 0.85 (Average) Mechanical Availability 95%
Mat. Density : 2.40 (Overburden) Job Efficiency (Average)
Swell factor : 0.8
Productivity/hour (lcm) : 504 Cycle time 21.0
Productivity/hour (bcm) : 403 0.35
Productivity/hour (mt) : 968 Cycle per hour 171.4

Brand : Komatsu Swing angle


Type : Excavator PC 400 Standard cycle time Æ 45°- 90°
Bucket Cap'ty (cum) : 2.2 16 - 19
Cycle time (Second) : 21.0 21
Cycle per hour : 171
Efficiency : 0.85 Conversion factor (Rather Difficult)
Bucket fill factor : 0.85 (Average) Mechanical Availability 85%
Mat. Density : 2.40 (Overburden) Job Efficiency (Average)
Swell factor : 0.8
Productivity/hour (lcm) : 241 Cycle time 21.0
Productivity/hour (bcm) : 193 0.35
Productivity/hour (mt) : 463 Cycle per hour 171.4
Page 2a of 11

Brand : Komatsu Swing angle


Type : Excavator PC 300 Standard cycle time Æ 45°- 90°
Bucket Cap'ty (cum) : 1.8 15 - 18
Cycle time (Second) : 27.3 18
Cycle per hour : 132
Efficiency : 0.8 Conversion factor (Rather difficult)
Bucket fill factor : 0.8 (Average) Mechanical Availability 0.8
Mat. Density : 1 (Coal) Job Efficiency (Average)
Swell factor : 0.9
Productivity/hour (lcm) : 128 Cycle time 23.4 / 27.3
Productivity/hour (bcm) : 115 0.46
Productivity/hour (mt) : 115 Cycle per hour 131.9

Brand : Komatsu Swing angle


Type : Excavator PC 200 Standard cycle time Æ 45°- 90°
Bucket Cap'ty (cum) : 0.93 13 - 17
Cycle time (Second) : 26.0 20
Cycle per hour : 138
Efficiency : 0.75 Conversion factor (Rather difficult)
Bucket fill factor : 0.9 (Average) Mechanical Availability 0.85
Mat. Density : 1 (Coal Getting/Expose) Job Efficiency (Average)
Swell factor : 0.8
Productivity/hour (lcm) : 87 Cycle time 26.0
Productivity/hour (bcm) : 69 0.43
Productivity/hour (mt) : 69 Cycle per hour 138.5

Target of Production

OB Removal (bcm) : 90,099,078 monthly SR =4.501


3,754,128 daily @ 25 days/month; 2.5 rainy day.
187,706 hourly @ 18hrs/day 90% General Operational Efficiency

Coal Getting (mt) : 20,017,569 monthly


834,065 daily @ 25 days/month; 2.5 rainy day.
41,703 hourly @ 18 hrs/day 90% General Operational Efficiency
Page 2 of 11

Swing angle
90°- 180°
19 - 22
20

1.2
(Average)
0.84
0.9
second
minutes

Swing angle
90°- 180°
19 - 22
21

1.0
(Average)
0.84
0.9
second
minutes

Swing angle
90°- 180°
19 - 22
21

1.0
(Average)
0.84
0.9
second
minutes
Page 2a of 11

Swing angle
90°- 180°
18 - 21
21

1.3
(Average)
0.75
0.9
second
minutes

Swing angle
90°- 180°
17 - 20
20

1.3
(Average)
0.75

second
minutes

neral Operational Efficiency

neral Operational Efficiency


Basic Calculation of Dump Truck productivity Page 4 of 11
Brand : Komatsu Loader : Excavator Komatsu PC 1250
Type : HD - 465 1. Loading Time 1.6 minutes
Vessel Cap'ty (cum) : 23.4 45.0 t 2. Hauling Time 12.0 minutes 20 km/hr Avg. Travel speed
Hauling distance (km) : 4 3. Dumping Time 1.00 minutes
Cycle time (minutes) : 15.9 4. Returning Time 0.5 minutes 30 km/hr Avg. Travel speed
Cycle per hour : 3.8 5. Spot & Delay Time 0.8 minutes
Efficiency : 0.85 Average TOTAL CYCLE TIME 15.9 minutes
Mat. Density : 2.40 OB (insitu) Number of Bucket 4 passes
Swell factor : 0.8 Job Efficiency (Average) 0.85
Productivity/hour (lcm) : 75 Cycle time 951 second
Productivity/hour (bcm) : 60 15.9 minutes
Productivity/hour (mt) : 145 Cycle per hour 3.8

Brand : Caterpillar Loader : Excavator Komatsu PC 750


Type : ADT - A40E 1. Loading Time 1.8 minutes
Vessel Cap'ty (cum) : 18.2 35.0 t 2. Hauling Time 12.0 minutes 20 km/hr Avg. Travel speed
Hauling distance (km) : 4 3. Dumping Time 0.25 minutes
Cycle time (minutes) : 15.3 4. Returning Time 0.5 minutes 30 km/hr Avg. Travel speed
Cycle per hour : 3.9 5. Spot & Delay Time 0.8 minutes
Efficiency : 0.85 Average TOTAL CYCLE TIME 15.3 minutes
Mat. Density : 2.40 OB (insitu) Number of Bucket 5 passes
Swell factor : 0.8 Job Efficiency (Average) 0.85
Productivity/hour (lcm) : 61 Cycle time 915 second
Productivity/hour (bcm) : 49 15.3 minutes
Productivity/hour (mt) : 117 Cycle per hour 3.9

Brand : Nissan OB Loader : Excavator Komatsu PC 400


Type : CWB 52 ALDN 1. Loading Time 1.8 minutes
Vessel Cap'ty (cum) : 18.13 14.50 t 2. Hauling Time 2.4 minutes 25 km/hr Avg. Travel speed
Hauling distance (km) : 1 3. Dumping Time 0.25 minutes
Cycle time (minutes) : 5.7 4. Returning Time 0.5 minutes 35 km/hr Avg. Travel speed
Cycle per hour : 10.5 5. Spot & Delay Time 0.8 minutes
Efficiency : 0.85 Average TOTAL CYCLE TIME 5.7 minutes
Mat. Density : 1.00 Coal Number of Bucket 10 passes
Swell factor : 0.8 Job Efficiency (Average) 0.75
Productivity/hour (lcm) : 143 Cycle time 342 second
Productivity/hour (bcm) : 114 5.7 minutes
Productivity/hour (mt) : 114 Cycle per hour 10.5

Brand : Nissan Coal Hauling Loader : Excavator Komatsu PC 400


Type : CWB 52 ALDN 1. Loading Time 5.9 minutes
Vessel Cap'ty (cum) : 31 25 t 2. Hauling Time 21.6 minutes 35 km/hr Avg. Travel speed
Hauling distance (km) : 12.58 3. Dumping Time 1.15 minutes
Cycle time (minutes) : 47.4 4. Returning Time 16.8 minutes 45 km/hr Avg. Travel speed
Cycle per hour : 1.3 5. Spot & Delay Time 2.0 minutes
Efficiency : 0.75 Average TOTAL CYCLE TIME 47.4 minutes
Mat. Density : 1.00 Coal Number of Bucket 36 passes
Swell factor : 0.8 Job Efficiency (Average) 0.73
Productivity/hour (lcm) : 29 Cycle time 2,843 second
Productivity/hour (bcm) : 23 47.4 minutes
Productivity/hour (mt) : 23 Cycle per hour 1.3
Basic Calculation of Bulldozer productivity Page 3 of 11

Brand : Komatsu Haul dist. (Avg.) 20 m


Type : D 85ESS-2 (Angle Dozer)
Blade cap'ty (cum) : 3.6 Forward Speed 83.33 m/min 5 km/hr
Blade fill factor : 0.9 (Average) Reverse Speed 117 m/min 7 km/hr
Cycle Time (minutes) : 0.5 Gear Shifting Time 0.05 min
Grade factor : 1 Fuel Consumption 25.2 ltr/hr
Efficiency : 0.75 Operating weight 21,490 kg
Mat. Density : 2.40 Ground pressure 0.52 kg/cm2
Swell factor : 0.8 Job Efficiency (Average) 0.75
Productivity/hour (lcm) : 316 Cycle time 27.7 second
Productivity/hour (bcm) : 253 0.46 minutes
Productivity/hour (mt) : 607 Cycle per hour 130.0

Brand : Komatsu Haul dist. (Avg.) 20 m


Type : D 155A-5 (Angle Dozer)
Blade cap'ty (cum) : 4.9 Forward Speed 83.33 m/min 5 km/hr
Blade fill factor : 0.9 (Average) Reverse Speed 117 m/min 7 km/hr
Cycle Time (minutes) : 0.5 Gear Shifting Time 0.05 min
Grade factor : 1 Fuel consumption 37.2 ltr/hr
Efficiency : 0.85 Operating weight 33,040 kg
Mat. Density : 2.40 Ground pressure 0.92 kg/cm2
Swell factor : 0.8 Job Efficiency (Average) 0.75
Productivity/hour (lcm) : 487 Cycle time 27.7 second
Productivity/hour (bcm) : 390 0.46 minutes
Productivity/hour (mt) : 936 Cycle per hour 130.0

Brand : Komatsu Haul dist. (Avg.) 20 m


Type : D 155A-5
Blade cap'ty (cum) : 600 Giant ripper Forward Speed 66.67 m/min 4 km/hr
Seismic wave velocity : 1,000 m/s Reverse Speed 100 m/min 6 km/hr
Cycle Time (minutes) : 0.6 Gear Shifting Time 0.05 min
Grade factor : 1 Fuel consumption 37.2 ltr/hr
Efficiency : 0.85 Operating weight 33,040 kg
Mat. Density : 2.40 Ground pressure 0.92 kg/cm2
Swell factor : 0.8 Job Efficiency (Average) 0.75
Productivity/hour (lcm) : 510 Cycle time 33.0 second
Productivity/hour (bcm) : 408 0.55 minutes
Productivity/hour (mt) : 979 Cycle per hour 109.1

Brand : Cat Haul dist. (Avg.) 20 m


Type : D 9 R (Angle Dozer)
Blade cap'ty (cum) : 13.5 Forward Speed 66.67 m/min 4 km/hr
Blade fill factor : 0.9 (Average) Reverse Speed 100 m/min 6 km/hr
Cycle Time (minutes) : 0.6 Gear Shifting Time 0.05 min
Grade factor : 1 Fuel consumption 37.2 ltr/hr
Efficiency : 0.85 Operating weight 33,040 kg
Mat. Density : 2.40 Ground pressure 0.92 kg/cm2
Swell factor : 0.8 Job Efficiency (Average) 0.75
Productivity/hour (lcm) : 1,127 Cycle time 33.0 second
Productivity/hour (bcm) : 901 0.55 minutes
Productivity/hour (mt) : 2,163 Cycle per hour 109.1

Brand : Komatsu Haul dist. (Avg.) 20 m


Type : D 65 P
Blade cap'ty (cum) : 3.4 Forward Speed 83.33 m/min 5 km/hr
Blade fill factor : 0.9 (Average) Reverse Speed 117 m/min 7 km/hr
Cycle Time (minutes) : 0.5 Gear Shifting Time 0.05 min
Grade factor : 1 Fuel Consumption 25.2 ltr/hr
Efficiency : 0.75 Operating weight 21,490 kg
Mat. Density : 2.40 Ground pressure 0.52 kg/cm2
Swell factor : 0.8 Job Efficiency (Average) 0.75
Productivity/hour (lcm) : 298 Cycle time 27.7 second
Productivity/hour (bcm) : 239 0.46 minutes
Productivity/hour (mt) : 573 Cycle per hour 130.0
Penggalian dan Pengangkutan Batubara
Aktivitas Unit
Alat Gali Muat
Alat Angkut
Alat Bantu
Basic Calculation of Motor Grader productivity Page 5 of 11

Brand : Caterpilar
Type : Cat 120 H
Blade Length (m) : 3.6
Working distance (km) : 5
Haul Road Width (m) : 10
Working area (sqm) : 50,000
Blade Angle (°) : 45
Effective Blade Length : 3.0
Width of Overlap (m) : 0.3
Working Speed (km/hr) : 5
Efficiency : 0.75
Mat. Density : 2.40
Swell factor : 0.8
Productivity/hour (sqm) : 10,125
Working Hrs to accomplished (hour) : 5

Brand : Komatsu
Type : GD 705
Blade Length (m) : 4.3
Working distance (km) : 9
Haul Road Width (m) : 10
Working area (sqm) : 90,000
Blade Angle (°) : 45
Effective Blade Length : 3.8
Width of Overlap (m) : 0.3
Working Speed (km/hr) : 5
Efficiency : 0.85
Mat. Density : 2.40
Swell factor : 0.8
Productivity/hour (sqm) : 14,875
Working Hrs to accomplished (hour) : 6
KAPASITAS DAN KETERSEDIAAN ALAT UNTUK TARGET OB REMOVAL
§ I. OB Removal : 1000000 bcm/hr (Target) Jml Kap. Bucket Prod. Per jam TOTAL Keterangan
A. Excavator
1. Komatsu PC 400 3 3.2 193 579
2. Komatsu PC 1250 2 6.7 576 1,151
3. Komatsu PC 750 2 5.2 403 807
2,537
Target produksi per jam (bcm) ð 187,706 ð 1000.000 bcm/bulan
197,092
B. Hauler
1. ADT A40E 15 18.2 49 732
2. DT NISSAN CWB 20 18.1 114 2,289

3,021
Target produksi per jam (bcm) ð 187,706 ð 1000.000 bcm/bulan

C. Hauler
1. ADT A40E 15 18.2 49 732
2. HD 465 8 23.4 60 483

1,214
Target produksi per jam (bcm) ð 187,706 ð 1000.000 bcm/bulan

D. Bulldozer
Bulldozer Komatsu D 155 A 1 4.9 323 323 ð Disposal + Ripping
Bulldozer Komatsu D 85ESS 1 3.4 253 253 ð Disposal + General

575
Target produksi per jam (bcm) ð 187,706

Catatan : Jumlah Unit berdasarkan kesediaan unit yang sudah ada


Pilihan Pemakaian alat
First Option :
} [(3 x PC 750 + 15 x ADT-A40E) + (5 x PC 400 + 25 x CWB 52)] ð for OB RemovalAtau
} [(3 x PC 750 + 5 x PC 400 + 15 x ADT-A40E) + ( 2 x PC 1250 + 8 x HD 465 )] ð for OB Removal
} Supporting Units :
1 x D 155 - 2 Giant Ripper
1 x D85 E-SS Disposal
1 x Grader 511 General
2 x Fuel Truck dan 2 x Water Truck
10 x Tower Light
4 x Fuel Storage 25.000 Liter
10 x LV Strada DC
2 x Genset 50 kVA
2 x Service Truck
2 x Bus Karyawan dan 1 x Elf

Production Target of OB Removal, bcm/month 90,099,078


Production Target of Coal Getting, Ton/month 20,017,569
Effective Working Hours, hr/month 480
Mechanical Availability, % 95%
Operator Efficiency, % 88%
Job Efficiency, % 84%
Swell Factor, % 80%

The Fleets : Loader Hauler Loader


Ÿ Overburden Removal, max. 1 km haul dist. 3 x PC 750 15 x ADT - 740 5 x PC 400
§ Hourly Capacity, bcm/hr 1210 732 965
§ Monthly Capacity, bcm/month 580,980 351,148 463,100
§ Monthly Target, bcm/hr 187,706 187,706 187,706
§ Monthly Target, bcm/month 90,099,078 90,099,078 90,099,078
§ The Fleets capability, bcm/month 1,596,643 1,724,832
4,789,928.02 5,174,495.25
Ÿ Supporting unit for Overburden Removal 1 x D 155 A
1 x D 85 E-SS
1 x GD 511 A
6 x Tower Light
10 x Light Vehicle
or OB Removal

Hauler
25 x NISSAN CWB 52
2862
1,373,684
187,706
90,099,078

MF
Gen. Eff 0.90 MA 0.90
Job Eff 0.75 Opr. Eff 0.83 Caterpillar's standard:
0.68 0.75 Operator skill/Efficiency
Machine Availability
Job Efficiency : MA 0.85 General Operational Efficiency
¬ Mechanical Availability Opr. Eff 0.88
¬ Operator Efficiency 0.75
ü Komatsu : 100 Ton Excavator
Bucket 5.1 cum; 27.5 second.
680 Est'ed Hrly Prod.
1.0 Bucket Fill Factor
0.75 Job Eff
510 LCM/Hr
0.90
0.95
0.83 (50'/60')

0.71
L / HR FULL DAY
JENIS MODEL FULL TANK
LITER OPERATION
EXCAVATOR PC 3000 4500 161.4 3873.6
PC 2000 3500 ( Estimasi ) 161.4 3873.6
PC 1800 2750 116.12 2786.88
PC 1600 2050 103.33 2479.92
PC 1250 1360 83.26 1998.24
EX 1200 1400 83.26 1998.24
PC 750 700 40.0 960.0
PC 400 650 42.2 1012.8
PC 200 400 18.28 438.72
HEAVY DUMTRUCK EH 1700 1003 76.73 1841.52
HD 785 1250 67.14 1611.36
TR 100 1090 67.14 1611.36
TR 60 606 42.0 1008
A 40 D 480 26.85 644.4
ACTROS 410 14.39 345.36
HD 465 780 45.72 1097.28
CWB 520 130 17.00 408.00
WHEEL LOADER WL 992 C 1136 84.41 2025.84
WA 800 1425 76.85 1844.4
WA 500 465 48.7 1168.8
GRADER G 825 A - 2 500 26.85 644.4
GD 511 200 17 408
BULLDOZER D 375 A - 5 1050 67.14 1611.36
D 85 E- SS 406 27.5 660
WD 600 670 45 1080
D 155 A 625 40 960
TOWER LIGHT Ingersol 50 7 168

Catatan : Perhitungan Estimasi


PERHITUNGAN JAM LEMBUR

Nama JOB : OPR PC 400


Nrp :
Perioda: 16 November - 15 Desember '08 JANGAN DIHAPUS/ DI DE

SHIFT I SHIFT II jam HARI BIASA HARI MINGGU/LIBUR HOUR


DAYS DATE JML IST EFF LBR TOTAL L'BUR
START STOP START STOP kerja 1 x 1.5 Sisa x 2 7x2 1x3 Sisa x 4 START STOP

16 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00


17 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
S 18 6:45 17:45 11.0 0.5 10.5 5 5.5 1 4.5 10.5 11.00
M 19 18:00 6:00 12.0 1 11.0 0 11 7 1 3 29
20 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
21 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
22 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
23 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
24 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
S 25 18:00 6:00 12.0 1 11.0 5 6 1 5 11.5
M 26 OFF
27 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
28 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
29 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
30 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
1 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
S 2 6:45 17:45 11.0 0.5 10.5 5 5.5 1 4.5 10.5 11.00
M 3 18:00 6:00 12.0 1 11.0 0 11 7 1 3 29
4 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
5 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
6 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
7 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
8 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5
S 9 18:00 6:00 12.0 1 11.0 5 6 1 5 11.5
M 10 OFF
11 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
12 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
13 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
14 6:45 17:45 11.0 0.5 10.5 7 3.5 1 2.5 6.5 11.00
15 18:00 6:00 12.0 1 11.0 6 5 1 4 9.5

Hari Hadir 28 To t a l TOTAL LEMBUR 278

CATATAN : LEMBUR DENGAN HARI NORMAL


N DIHAPUS/ DI DELETE !!!

MINUTE HARI BIASA HARI MINGGU/LIBUR

START STOP 1 x 1.5 Sisa x 2 7x2 1x3 Sisa x 4

1.5 5
1.5 5
1.5 9
12.00 14 3 12
12.00 1.5 8
12.00 1.5 8
12.00 1.5 8
12.00 1.5 8
12.00 1.5 8
12.00 1.5 10

1.5 5
1.5 5
1.5 5
1.5 5
1.5 5
1.5 9
12.00 14 3 12
12.00 1.5 8
12.00 1.5 8
12.00 1.5 8
12.00 1.5 8
12.00 1.5 8
12.00 1.5 10

1.5 5
1.5 5
1.5 5
1.5 5

12.00 1.5 8
ESTIMASI GAJI KARYAWAN
RAB

NO NAMA HARI GP JAM U. LBR INST. SUB TOT UANG TOTAL


KERJA LEMBUR PROD. HADIR
A B E F G H I J K ( J+K)

1 OPERATOR PC 750 28 1,175,000 278.0 1,888,150 1,390,000 4,453,150 266,000 4,719,150


2 OPERATOR PC 400 28 1,175,000 278.0 1,888,150 1,112,000 4,175,150 266,000 4,441,150
3 OPERATOR HD 465 28 1,175,000 278.0 1,888,150 1,668,000 4,731,150 266,000 4,997,150
4 OPERATOR NISAN CWB 28 1,175,000 278.0 1,888,150 834,000 3,897,150 266,000 4,163,150
5 CHEKER 28 1,175,000 278.0 1,888,150 - 3,063,150 266,000 3,329,150
6 HERLPER MEKANIK 28 1,175,000 278.0 1,888,150 - 3,063,150 266,000 3,329,150
RATA-RATA 4,163,150
PERHITUNGAN INSENTIF PRODUKSI
PERIODE 16 DESEMBER - 15 JANUARI 2008
OPERATOR A2B

NO NAMA UNIT COST/JAM JML JAM INST. PRODUKSI TOTAL REMAKS

PC 1250 6000 - 1,390,000 MAKSIMAL JAM KERJA


PC 750 5000 278 1,390,000
1 OPERATOR EXCAVATOR
PC 400 4000 -
PC 300 3000 -
TOTAL 278.0 1,390,000
HD 465 6000 278 1,668,000 1,668,000 MAKSIMAL JAM KERJA
2 OPERATOR DUMPTRUCKA 40 E 5000 -
NISAN CWB 520 3000 -
TOTAL 278.0 1,668,000
HD 465 6000 - 834,000
3 OPERATOR DUMPTRUCKA 40 E 5000 -
NISAN CWB 520 3000 278 834,000
TOTAL 278.0 834,000
PC 750 5000 - 1,112,000
4 OPERATOR EXCAVATOR PC 400 4000 278 1,112,000
PC 300 3000 -
TOTAL 278.0 1,112,000

CATATAN
1. NOVIAN HENDRO HM Yang Seharusnya PC 2000 = 132.5 Jam, PC 3000 = 14 Jam Tetapi Dimasukan 146.5 Jam ke PC 2000
2. SUGENG PRAYITNO HM Yang Seharusnya PC 2000 = 176.5 Jam, PC 3000 = 8 Jam Tetapi Dimasukan 184.5 Jam ke PC 2000
3. SUGENG WAHYUDI HM Yang Seharusnya PC 1250 = 84.5 Jam, Tetapi Dimasukan 84.5 Jam ke PC 400
4. BUDI DHARMO S HM Yang Seharusnya PC 2000 = 112 Jam, PC 3000 = 16 Jam Tetapi Dimasuan 128 jam ke PC 2000
ESTIMASI PENGGUNAAN SOLAR

No. Model Jumlah Pemakaian Solar Total Pemakaian Solar


( Unit ) Full Day Operation ( Liter )

1 Komatsu PC 400 3 1,013 3,038


2 Komatsu PC 1250 2 1,998 3,996 18,621
3 Komatsu PC 750 2 960 1,920
4 ADT A40E 15 644 9,666 28,821
5 Nisan CWB 25 408 10,200
6 HD 465 8 1,097 8,778 12,534
7 D 85 E-SS 1 660 660 3,756
8 D 155 A 1 960 960
9 GRADER 511 1 408 408
10 Tower Light 6 168 1,008
11 Support Lainnya 12 60 720

TOTAL FLEET ADT A40E DAN HD 465 31,155 LITER / HARI


TOTAL FLEET ADT A40E DAN DT NISAN 32,577 LITER / HARI

Anda mungkin juga menyukai