VOLUME PEKERJAAN
B PEKERJAAN STRUKTUR
(Mutu besi beton : dia ≥ 13mm = U39 (Ulir) dia < 13mm = U24 (Polos))
B1 PEKERJAAN SIPIL
1 Pekerjaan Pancang 25x25, H=12M titik #NAME? 1569.00
2 Pekerjaan Timbunan
Pemadatan tanah asli CBR 4% s/d 5% m2 #NAME? 4628.34
Timbunan dan Pemadatan tanah CBR 6% m3 #NAME? 2310.11
#NAME? m3 #NAME? 782.82
Pekerjaan Dinding
Bekisting m2 #NAME? 582.40
Beton Cor f'c 25 Mpa m3 #NAME? 140.13
Pembesian
Dia. ≥ 13 mm, U39 kg #NAME? 28520.25
B1 PEKERJAAN BAJA
1 Pekerjaan Kolom
WF500.200.10.16 kg #NAME? 136742.14
WF600.200.11.17 kg #NAME? 19253.84
WF300.150.6,5.9 kg #NAME? 1512.04
WF150.75.5.7 kg #NAME? 2184.00
Siku 70.70.7 kg #NAME? 2879.50
Plate 16mm 4' x 8' kg #NAME? 7917.96
Plate 10mm 4' x 8' kg #NAME? 137.73
Baut Angker D19mm pcs #NAME? 664.00
Baut D19mm pcs #NAME? 1280.00
9 Pekerjaan Bracing
Pipa Besi D 5" kg #NAME? 7940.30
Plate 10 mm kg #NAME? 4247.40
Baut Sambungan Bracing pcs #NAME? 336.00
10 Pekerjaan Canopy
Siku 60.60.6 kg #NAME? 1300.00
siku 50.50.5 kg #NAME? 535.34
Plate 5mm kg #NAME? 65.00
Atap Seng Galvalume o.4mm m2 #NAME? 228.00
CNP 125.50.20.2,3 kg #NAME? 1201.43
11 Pekerjaan Clading
Clading Depan
WF250.125.6.9 kg #NAME? 402.56
WF200.100.5,5.8 kg #NAME? 1616.67
CNP100.50.20.2,3 kg #NAME? 2218.33
Seng Clading Galvalum 0.4mm m2 #NAME? 582.68
Clading Belakang
HB300.300.10.15 kg #NAME? 2378.20
WF200.100.5,5.8 kg #NAME? 604.92
CNP100.50.20.2,3 kg #NAME? 1791.33
Seng Clading Galvalum 0.4mm m2 #NAME? 495.94
12 Pekerjaan Atap
HC600.200.8.13
WF400.200.8.13 kg #NAME? 8342.08
WF500.200.10.16 kg #NAME? 4910.08
WF200.100.5,5.8 kg #NAME? 2262.32
Plate 15mm 4' x 8' kg #NAME? 1020.83
Plate 10mm 4 'x 8' kg #NAME? 1854.36
Plate 20mm 4' x 8' kg #NAME? 4595.28
Plate 16mm 4' x 8' kg #NAME? 300.47
Plate 5mm 4' x 8' kg #NAME? 546.00
Baut D25 pcs #NAME? 832.00
Baut D19 pcs #NAME? 48.00
Baut D16 pcs #NAME? 224.00
CNP125.50.20.2,3 kg #NAME? 23703.47
Trek Stang D13 pcs #NAME? 1728.00
Tarikan Angin D16 kg #NAME? 846.01
Seng m2 #NAME? 4592.00
Pekerjaan Talang m' #NAME? 328.00
BILL OF QUANTITY
Satuan Volume
A PEKERJAAN PERSIAPAN
1 Pek. Bowplank m' 518.06
B PEKERJAAN STRUKTUR
B1 PEKERJAAN SIPIL
8 Pekerjaan Parit
Galian Tanah m3 128.070
Pasir urug m3 6.404
Lantai Kerja m3 6.404
Bekisting m2 455.360
Beton Cor m3 22.768
Pembesian
Wiremesh M8 kg 1731.776
B2 PEKERJAAN BAJA
1 Pekerjaan Kolom
WF350x175x7x11 kg 14770.880
Base Plate 250x400 thk 15mm kg 631.944
Baut Angkur D19 pcs 416
2 Pekerjaan Balok Lantai 2
WF300x150x6,5x9 kg 6512.2315
WF250x125x6x9 kg 2841.6
Plate 12mm 300x200 233.333
Baut D19 pcs 320
3 Pekerjaan Atap
WF300x150x6,5x9 kg 13151.0119
WF250x125x6x9 kg 7222.4
Plate 12mm thk kg 1133.611
Baut D19 pcs 1128
CNP 125.50.20.2,3 kg 8811.203
Trek Stang D13 pcs 532
Tarikan angin D16 kg 1212.088
Rabung m' 66
Atap Zincalume m2 1899.1025
Plate 6mm Tupai-tupai 145.833
Baut 1/2" pcs 460
4 Pekerjaan Lisplank
L50.50.5 kg 3934.372
Seng Zincalume m2 118.928
5 Pekerjaan Talang
L50.50.5 kg 72.384
Plate seng 0.3mm m2 117.6
Pipa PVC 3" m' 256