Anda di halaman 1dari 36

LAMP0RAN TEHNIK

HASIL PEMELIHARAAN
BAY TRAFO 2 - 150/20 KV 60 MVA

NO SPK : 32/GI-CRG-/00/02/088

Hari /Tanggal :SABTU, 20 FEBRUARI 2016.

LOKASI

GARDU INDUK CURUG

TRAFO 2 - 150/20 KV 60 MVA

PT PLN (PERSERO) P3B JAWA BALI


AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
Jl. Raya Pasar Kemis, Desa Pasir Gadung Cikupa - Tangerang Telp. (021) 5927305
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1_1/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

NO SPK : 32 / GI - CRG / 00 / 02 / 088


PEMELIHARAAN 2 TAHUNAN TRAFO TENAGA
TANGGAL : 20 FEBRUARI 2016

Bay : TRAFO 2 -150/20 KV 60 MVA Merk : UNINDO


No.Serie PO60LEC531-06
Lokasi GI : CURUG Type : CONTINUOUS SERVICE
No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir

7 Pemeliharaan Relai jansen :


a. Membersihkan terminal √ kotor bersih kotor √ bersih
b. Mengukur tahanan isolasi wiring *F ) √ normal abnormal √ normal abnormal
c. Mengukur tahanan kontak bantu *F ) √ normal abnormal √ normal abnormal
d. Mengganti seal - - ya √ tidak
e. Menguji fungsi relai jansen *F ) √ normal abnormal √ normal abnormal

8 Pemeliharaan relai sudden pressure:


a. Membersihkan terminal √ kotor bersih kotor √ bersih
b. Mengukur tahanan isolasi wiring *F ) normal abnormal normal abnormal
c. Mengukur tahanan kontak limit switch *F ) normal abnormal normal abnormal
d. Mengganti seal - - ya √ tidak
e. Menguji fungsi Sudden Pressure *F ) √ normal abnormal √ normal abnormal

9 Pemeliharaan temperatur rele:


a. Membersihkan thermo couple √ kotor bersih kotor √ bersih
b. Mengkalibrasi *F ) √ normal abnormal √ normal abnormal
c. Menguji fungsi kipas *F ) √ normal abnormal √ normal abnormal
d. Menguji fungsi alarm *F ) √ normal abnormal √ normal √ abnormal
e. Menguji fungsi trip *F ) √ normal abnormal √ normal √ abnormal
f. Memeriksa Kabel-kabel kontrol dan pipa-pipa kapiler √ baik tidak baik √ baik tidak baik

10 Pengujian sistem pendingin:


a. Menguji arus motor sirkulasi minyak *F ) √ baik √ tidak baik √ baik √ tidak baik
b. Menguji isolasi motor sirkulasi minyak *F ) √ baik √ tidak baik √ baik √ tidak baik
c. Menguji arus motor kipas/fan *F ) √ baik tidak baik √ baik tidak baik
d. Menguji isolasi motor kipas/fan *F ) baik tidak baik baik tidak baik
e. Memeriksa dan membersihkan Sirip-sirip Radiator √ kotor bersih kotor √ bersih
f. Memeriksa Kebocoran minyak ada √ tidak ada ada √ tidak ada

11 Memeriksa Diafragma √ normal abnormal √ normal abnormal

12 Pengujian Minyak ( dilakukan di Lab ):


Menguji karakteristik minyak *F ) normal abnormal normal abnormal
Menguji Kandungan gas dalam minyak *F ) normal abnormal normal abnormal
Mengukur tegangan
Mengganti tembusSwitch
minyak Diverter minyak. *F )
OLTC. √ normal abnormal √ normal abnormal
( kecuali untuk type banyak minyak) - - ya tidak

13 Pemeriksaan dan pengujian oil level:


Konservator main tank √ normal abnormal √ normal abnormal
Konservator tap changer √ normal abnormal √ normal abnormal

Dikerjakan : Supervisi :
HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )

Catatan: *F ) Formulir terlampir Halaman 2


PT. PLN (PERSERO) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : APP-DKSBI-ENG/F.1-14/R.01
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN TRANSMATOR


PENGUJIAN / PENGUKURAN TANGEN DELTA TRANSFORMATOR

APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SERVICE PERALATAN : TRANSFORMATOR 2


LOKASI GI : CURUG TEG / DAYA : 170 KV / 30 VA TANGGAL : 20 FEBRUARI 2016.

NO URAIAN KEGIATAN ACUAN HASIL SEBELUMNYA KONDISI AWAL TINDAKAN KONDISI ACHIR KESIMPULAN PELAKSANA

A B C D E G H I J K

TANGEN DELTA <2% TAN ( % ) CAP (µf) TAN ( % ) CAP (µf) IX(mA) TAN ( % ) CAP (µf)

1 PRIMER SEKUNDER 0.33 6,992,62 21.953 0.33 6,992,62 ACHMAD H


<2%
2 PRIMER TERSIER 0.62 106.22 0.203 0.62 106.22 FELIX

3 PRIMER GRAUND 0.33 3,917,07 12.298 0.33 3,917,07


<2%
4 SEKUNDER TERSIER 0.39 19,307,19 60.607 0.39 19,307,19

5 SEKUNDER GRAUND 1.00 1,218,90 3.809 1 1,218,90


<2%
6 TERSIER GRAUND 0.39 10,856,40 20.379 0.39 10,856,40

CATATAN : A1=S1

A2=S2

Dikerjakan SUPERVISOR
HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )
PT. PLN (PERSERO) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : APP-DKSBI-ENG/F.1-13/R.01
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI BASE CAMP
CIKUPA

LEMBAR HASIL PEMELIHARAAN TRANSMATOR


PENGUJIAN / PENGUKURAN TANGEN DELTA BUSHING TRANSFORMATOR

APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SERVICE PERALATAN : TRANSFORMATOR 2


LOKASI GI : TIGARAKSA TEG / DAYA : 20-150 KV / 60 MVA TANGGAL : 14 FEBRUARI 2016

NO URAIAN KEGIATAN ACUAN HASIL SEBELUMNYA KONDISI AWAL TINDAKAN KONDISI ACHIR KESIMPULAN PELAKSANA

A B C D E G H I J K

1 PRIMER Capasitansi TAN ( % ) CAP (pF) TAN ( % ) CAP (pF) IX(mA) TAN ( % ) CAP (pF)

C1
øR 10 KV 0.28 201.59 0.632 0.28 201.59 ACHMAD H

øS 10 KV <1% 0.26 201.02 0.630 0.26 201.02 TUENG K

øT 10 KV 0.14 190.64 0.626 0.14 190.64

C2
øR 10 KV 0.58 301.96 0.047 0.58 301.96

øS 10 KV <1% 0.57 301.98 0.047 0.57 301.98


3
øT 10 KV 0.58 302 0.047 0.58 302

CATATAN : A1=S1

A2=S2

Dikerjakan SUPERVISOR
HAR APP DURIKOSAMBI GI BALARAJA
BASE CAMP CIKUPA

( SUPARDI W ) ( NANANG HADI )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1_1/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

NO SPK : 32 / GI - JTK / 00 / 02 / 088


PEMELIHARAAN 2 TAHUNAN TRAFO TENAGA
TANGGAL : 20 FEBRUARI 2016

Bay : TRAFO 2 - 150/20 KV 60 MVA Merk : UNINDO


No.Serie : PO60LEC531-06
Lokasi : GI CURUG Type : DO60LEC 531-06

No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir


8 Pemeliharaan relai sudden pressure:
a. Membersihkan terminal kotor √ bersih kotor √ bersih
b. Mengukur tahanan isolasi wiring *F ) √ normal abnormal √ normal abnormal
c. Mengukur tahanan kontak limit switch *F ) √ normal abnormal √ normal abnormal
d. Mengganti seal - - ya tidak
e. Menguji fungsi Sudden Pressure *F ) √ normal abnormal √ normal abnormal

9 Pemeliharaan temperatur rele:


a. Membersihkan thermo couple kotor √ bersih kotor √ bersih
b. Mengkalibrasi *F ) √ normal abnormal √ normal abnormal
c. Menguji fungsi kipas *F ) √ normal abnormal √ normal abnormal
d. Menguji fungsi alarm *F ) √ normal abnormal √ normal abnormal
e. Menguji fungsi trip *F ) √ normal abnormal √ normal abnormal
f. Memeriksa Kabel-kabel kontrol dan pipa-pipa kapiler √ baik tidak baik √ baik tidak baik

10 Pengujian sistem pendingin:


a. Menguji arus motor sirkulasi minyak *F ) √ baik tidak baik √ baik tidak baik
b. Menguji isolasi motor sirkulasi minyak *F ) √ baik tidak baik √ baik tidak baik
c. Menguji arus motor kipas/fan *F ) √ baik tidak baik √ baik tidak baik
d. Menguji isolasi motor kipas/fan *F ) √ baik tidak baik √ baik tidak baik
e. Memeriksa dan membersihkan Sirip-sirip Radiator kotor √ bersih kotor √ bersih
f. Memeriksa Kebocoran minyak ada √ tidak ada ada √ tidak ada

11 Memeriksa Diafragma normal abnormal normal abnormal

12 Pengujian Minyak ( dilakukan di Lab ):


Menguji karakteristik minyak *F ) √ normal abnormal √ normal abnormal
Menguji Kandungan gas dalam minyak *F ) √ normal abnormal √ normal abnormal
Mengukur tegangan tembus minyak. *F ) √ normal abnormal √ normal abnormal
Mengganti minyak Diverter Switch OLTC.
( kecuali untuk type banyak minyak) - - ya tidak

13 Pemeriksaan dan pengujian oil level:


Konservator main tank √ normal abnormal √ normal abnormal
Konservator tap changer √ normal abnormal √ normal abnormal

Dikerjakan : Supervisi :
HAR UPT TANGERANG GI JATAKE

( SUPARDI W ) ( ADELIN DP )

Catatan: *F ) Formulir terlampir Halaman 2


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARA Nomor Formulir : OPHAR/F.1-2/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR
PENGUJIAN / PENGUKURAN TAHANAN ISOLASI BELITAN TRAFO

APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SERVICE NO TRAFO : 2 ( DUA )


LOKASI GI : GI CURUG TEG / DAYA : 20-150 KV / 1650-231 A TANGGAL : 20 FEBRUARI 2016
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN IP IP TINDAKAN IP KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I Y K L
1 mnt 10 mnt 1 mnt 10 mnt 1 mnt 10 mnt

1 SETELAH TRAFO OFF


( Pada suhu : 67 oC )
PRIMER - TANAH (MΩ) 889 1270 1.43 889 1270 1.43 FELIX
SEKUNDER - TANAH (MΩ) 1090 2170 1.99 1090 2170 1.99 FAUZAN
Standar VDE
TERTIER - TANAH (MΩ) ( Catalogue 998 2460 2.46 998 2460 2.46
228/4)
PRIMER - SEKUNDER (MΩ) 1450 2750 1.90 1450 2750 1.90
PRIMER - TERTIER (MΩ) 1970 3560 1.81 1970 3560 1.81
SEKUNDER - TERTIER (MΩ) 1 KV / 1 M.Ω 1400 2780 1.99 1400 2780 1.99
PRIMER & SEKUNDER - TERTIER (MΩ)

PRIMER & SEKUNDER - TANAH (MΩ)

2 SETELAH PEMELIHARAAN
( Pada suhu : o
C)
PRIMER - TANAH (MΩ)

SEKUNDER - TANAH (MΩ)


Standar VDE
TERTIER - TANAH (MΩ) ( Catalogue
228/4)
PRIMER - SEKUNDER (MΩ)

PRIMER - TERTIER (MΩ)

SEKUNDER - TERTIER (MΩ) 1 KV / 1 M.Ω

PRIMER & SEKUNDER - TERTIER (MΩ)

PRIMER & SEKUNDER - TANAH (MΩ)

CATATAN : TRAFO TIDAK DIMEGER , KARENA HUJAN DARI JAM 09: 00 WIB SAMPAI 15 : 30 WIB
Standar SD Meyrs Dikerjakan Supervisi
Kondisi : IP HAR APP DURIKOSAMBI GI CURUG
Bahaya : < 1.0 BASE CAMP CIKUPA
Buruk : 1.0 - 1.1

Dipertanyakan : 1.1 - 1.25

Baik : 1.25 - 2.0 ( SUPARDI W ) ( ADELIN DP )


Sangat Baik : >2
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-3a/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR


PENGUJIAN / PENGUKURAN MINYAK ISOLASI
APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SERVICE NO TRAFO : 2 ( DUA )
LOKASI GI : CURUG TEG / DAYA : 20-150 KV / 1650 - 231 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

1 TEGANGAN TEMBUS MINYAK STANDARD IEC 156 ( kV / 2,5 mm )


( diukur pada suhu ..C ) TEG. TEMBUS Selang Waktu
TEGANGAN
YG. DIIJINKAN 5 Menit
1 = 67.1 KV/2.5 mm
2 = 83.3 KV/2.5 mm
< 70 kV > = 30 kV/2,5 mm 3 = 82.4 KV/2.5 mm
- MINYAK BAGIAN ATAS 70 - 170 kV > = 40 kV/2,5 mm 4 = 97.7 KV/2.5 mm AHAMAD
( diukur pada suhu …….0 C ) > 170 kV > = 50 kV/2,5 mm 5 = 84.3 KV/2.5 mm RIAN
6 = 84.3 KV/2.5 mm
Rata 2 = 83.183333
1 = 70.9 KV/2.5 mm
2 = 74.5 KV/2.5 mm
< 70 kV > = 30 kV/2,5 mm 3 = 70.6 KV/2.5 mm
- MINYAK BAGIAN BAWAH 70 - 170 kV > = 40 kV/2,5 mm 4 = 57.5 KV/2.5 mm
( diukur pada suhu …….0 C ) > 170 kV > = 50 kV/2,5 mm 5 = 70.9 KV/2.5 mm
6 = 67.1 KV/2.5 mm
Rata 2 = 68.583333
1 = 69.9 KV/2.5 mm
2 = 43.7 KV/2.5 mm
< 70 kV > = 30 kV/2,5 mm 3 = 36.4 KV/2.5 mm
- MINYAK OLTC 70 - 170 kV > = 40 kV/2,5 mm 4 = 42.8 KV/2.5 mm
( diukur pada suhu …….0 C ) > 170 kV > = 50 kV/2,5 mm 5 = 30.6 KV/2.5 mm
6 = 48.3 KV/2.5 mm
Rata 2 = 45.283

CATATAN : Dikerjakan Supervisi


HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................


.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-4/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR
PENGUJIAN / PENGUKURAN PENTANAHAN PERALATAN
APP : DURIKOSAMBI MERK/TYPE : UNINDO / CONTINUOUS SERVICE NO TRAFO : 2 ( DUA )
LOKASI GI : CURUG TEG / DAYA : 20-150 KV / 1650-231 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

* Grounding Trafo R < 1 Ω

1 - TRAFO 2 0.1 Ω 0.1 Ω BAYU


2 - RESISTEN TRAFO 2 0.1 Ω 0.1 Ω FAUZAN
3 - LA TRAFO 2 øR 0.2 Ω 0.2 Ω
øS 0.2 Ω 0.2 Ω
øT 0.2 Ω 0.2 Ω
4 - CT 150 KV TRAFO 2 øR 0.2 Ω 0.2 Ω
øS 0.1 Ω 0.1 Ω BAYU
øT 0.1 Ω 0.1 Ω RIAN
5 - PMT 150 KV TRAFO 2 øR 0.2 Ω 0.2 Ω
øS 0.2 Ω 0.2 Ω
øT 0.2 Ω 0.2 Ω
6 - PMS 150 KV REL 1 TRAFO 2 øR 0.2 Ω 0.2 Ω
øS 0.2 Ω 0.2 Ω
øT 0.2 Ω 0.2 Ω
7 - PMS 150 KV REL 2 TRAFO 2 øR 0.2 Ω 0.2 Ω
øS 0.2 Ω 0.2 Ω
øT 0.2 Ω 0.2 Ω
CATATAN : Dikerjakan
.................. ................. ................ HAR APP DURIKOSAMBI Supervisi
.................. ................. ................ BASE CAMP CIKUPA GI CURUG
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-5/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR


PENGUJIAN / PENGUKURAN RELAI JANSEN, BUCHOLZ & SUDDEN PRESSURE

APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SERVICE NO TRAFO : 2 ( DUA )


LOKASI GI : CURUG TEG / DAYA : 20 - 150 KV / 1650 - 231 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

1 PENGUJIAN ISOLASI
BUCHOLZ Phasa - Ground Tegangan alat ukur 500 Volt - -

Phasa - Phasa Manual Book Trafo Hyundai - -

- -

JANSEN Phasa - Ground R > 2 MΩ - -

Phasa - Phasa - -

- -

SUDDEN PRESSURE Phasa - Ground - -

Phasa - Phasa - -

- -

SERGI Phasa - Ground - -

Phasa - Phasa - -

2 UJI FUNGSI Alarm Trip Alarm Trip Alarm Trip


BUCHOLZ Memberikan indikasi, timbul BAIK BAIK BAIK BAIK AHMAD H

JANSEN alarm dan trip pada PMT BAIK BAIK BAIK BAIK FELIX

SUDDEN PRESSURE BAIK BAIK BAIK BAIK


SUDDEN PRESSURE (OLTC) BAIK BAIK BAIK BAIK
BAIK BAIK BAIK BAIK
3 PENGUJIAN TAHANAN KONTAK
BANTU - -

BUCHOLZ - -

JANSEN - -

SUDDEN PRESSURE - -

SUDDEN PRESSURE (OLTC) - -


- -

CATATAN : Dikerjakan
HAR APP DURIKOSAMBI Supervisi
.................. ................. ................ BASE CAMP CIKUPA GI CURUG
.................. ................. ................
.................. ................. ................
.................. ................. ................
.................. ................. ................ ( SUPARDI W ) ( SUKARDI )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.1-6/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR


PENGUJIAN / PENGUKURAN KALIBRASI THERMOMETER
APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOPUS SER NO TRAFO : 2 ( DUA )
LOKASI GI : CURUG TEG / DAYA : 20 - 150 KV / 1650 - 231 A TANGGAL : 20 FEBRUARI 2016 .
URAIAN
NO ACUAN HASIL SEBELUMNYA HASIL AWAL TINDAKAN HASIL AKHIR KESIMPULAN PELAKSANA
KEGIATAN
A B C D E F G H I
THERMOMETER Thermometer Thermometer Thermometer Thermometer Thermometer Thermometer

STANDAR ( C )0
Winding Oil Winding Oil Winding Oil

HV LV HV LV HV LV
1 30 SETTING KERJA KERJA

2 40 Thermometer SUPARDI W

3 50 Standard TUENG K

4 60 Penyimpangan

5 70 +/- 2,5 %
6 80 88 88
7 90

100 100 102 102 102 102 102


8 110

120
130

9 140

10 150

CATATAN : Dikerjakan Supervisi


.................. ................. .......... HAR APP DURIKOSAMBI GI CURUG
.................. ................. .......... BASE CAMP CIKUPA
.................. ................. ..........

.................. ................. .......... ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSEO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-7/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR


PENGUJIAN / PENGUKURAN MOTOR KIPAS

APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SER NO TRAFO : 2 ( DUA )


LOKASI GI : CURUG TEG / DAYA : 20-150 KV / 1650 -231 A TANGGAL : 20 FEBRUARI 2016
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

KIPAS 1 924 924 AHMAD H


KIPAS 2 932 932 FELIX

Name Plate 950 KIPAS 3 938 938


KIPAS 4 942 942
1 PUTARAN MOTOR (rpm)
KIPAS 5 932 932

KIPAS 1 0.93 0.93 AHMAD H


KIPAS 2 0.95 0.95 FELIX
KIPAS 3 0.97 0.97
2 ARUS (Ampere) Name Plate 1 A
KIPAS 4 0.98 0.98
KIPAS 5 0.95 0.95

3 TEGANGAN (kV) Name Plate 400 V 381 V 381 V

Manual Book Trafo Hyundai R - G R-G R-G


R > 2 M Ohm S-G S-G S-G
4 TAHANAN ISOLASI ( M OHM )
Dengan Megger 500 Volt T-G T-G T-G

5 ARAH PUTARAN Name Plate NORMAL NORMAL

CATATAN :
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dikerjakan Supervisi
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HAR APP DURIKOSAMBI GI CURUG
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BASE CAMP CIKUPA
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ( SUPARDI W ) ( ADELIN DP )

Penanggung jawab:
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-8/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR
PENGUJIAN / PENGUKURAN MOTOR SIRKULASI

APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SER NO TRAFO : 2 ( DUA )


LOKASI GI : CURUIG TEG / DAYA : 20-150 KV / 1650-231A TANGGAL : 20 FEBRUARI 2016
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

1 PUTARAN MOTOR (rpm) Name Plate

R : R : R :
S : S : S :
2 ARUS (Ampere) Name Plate
T : T : T :

3 TEGANGAN (kV) Name Plate

Manual Book Trafo Hyundai R - G R-G R-G


R > 2 M Ohm S-G S-G S-G
4 TAHANAN ISOLASI ( M OHM )
Dengan Megger 500 Volt T-G T-G T-G

5 ARAH PUTARAN Name Plate

CATATAN : Dikerjakan
TIDAK DILAKUKAN PENGUKURAN ,KARENA KONDISINYA SULIT HAR APP DURIKOSAMBI Supervisi
.................. ................. ................ BASE CAMP CIKUPA GI CURUG
.................. ................. ................
.................. ................. ................
.................. ................. ................
.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-9/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR
PENGUJIAN / PENGUKURAN MOTOR OLTC

APP : DURIKOSAMBI MERK / TYPE : UNINDO / CONTINUOUS SER NO TRAFO : 2 ( DUA )


LOKASI GI : CURUG TEG / DAYA : 20-150 KV / 1650-321 A TANGGAL : 20 FEBRUARI 2016
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

1 PUTARAN MOTOR (rpm) Name Plate

R : R : R :
S : S : S :
2 ARUS (Ampere) Name Plate
T : T : T :

3 TEGANGAN (kV) Name Plate

Manual Book Trafo Hyundai R - G R-G R-G


R > 2 M Ohm S-G S-G S-G
4 TAHANAN ISOLASI (M OHM)
Dengan Megger 500 Volt T-G T-G T-G

5 ARAH PUTARAN Name Plate

CATATAN : Dikerjakan
TIDAK DILAKUKAN PENGUKURAN ,KARENA TIDAK BISA TEST ( SULIT ) HAR APP DURIKOSAMBI Supervisi
.................. ................. ................ BASE CAMP CIKUPA GI CURUG
.................. ................. ................
.................. ................. ................
.................. ................. ................
.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-10/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR
PENGUJIAN / PENGUKURAN KONTINUITAS
APP : DURIKOSAMBI MERK/TYPE :UNINDO / CONTINUOUS SERVICE NO TRAFO : 2 ( DUA )
LOKASI GI : CURUG TEG/ DAYA :20-150 KV / 1650 - 321 A TANGGAL : 20 FEBRUARI 2016
NO
ACUAN HASIL SEBELUMNYA / NAME PLATE HASIL AWAL TINDAKAN HASIL AKHIR KESIMPULAN PELAKSANA
TAP
A B C D E F G H

Primer Primer Primer


IR IS IT IR IS IT IR IS IT
-4
-3
-2
-1
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
CATATAN : Dikerjakan Supervisi
KONTINUITAS TIDAK DILAKSANAKAN ,KARENA ALAT RUSAK HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................
.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.1-11/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN TRANSFORMATOR
PENGUJIAN / PENGUKURAN TEMPERATURE RELAI
UJI FUNGSI KIPAS DAN ALARM

APP : DURIKOSAMBI MERK/TYPE : MEIDEN / BORSL NO TRAFO : 2 ( DUA )


LOKASI GI : CURUG TEG /DAYA : 20-150 KV / 1650-231 A TANGGAL : 20 FEBRUARI 2016 .

NO URAIAN KEGIATAN ACUAN SETTING TINDAKAN KERJA KESIMPULAN PELAKSANA

A B C D F G H I

1 UJI FUNGSI Alarm Trip Alarm Trip


Temperature relai Memberikan indikasi, timbul OIL 88 ̊ C 102 ̊ C 88 ̊ C 102 ̊ C NORMAL AHMAD H

( fungsi Alarm / Trip ) alarm temperature dan alarm HV 100 ̊ C 110 ̊ C 100 ̊ C 110 ̊ C FELIX
trip Trafo LV 102 ̊ C 110 ̊ C 102 ̊ C 110 ̊ C
- - - -
- - - -
- - - -

Start Stop Start Stop Start Stop


2 UJI FUNGSI Memberikan indikasi
SETTING TAHAP 1 TAHAP 2
Fungsi Kipas temperature start kipas dan
stop kipas

1 72 ̊ C 68 ̊ C 72 ̊ C 68 ̊ C 68 ̊ C 90 ̊ C
2 72 ̊ C 68 ̊ C 72 ̊ C 68 ̊ C 68 ̊ C 90 ̊ C
3 72 ̊ C 68 ̊ C 72 ̊ C 68 ̊ C 68 ̊ C 90 ̊ C
4 72 ̊ C 68 ̊ C 72 ̊ C 68 ̊ C 68 ̊ C 90 ̊ C
5
6 - - - -

CATATAN : Dikerjakan
HAR APP DURIKOSAMBI Supervisi
.................. ................. ................ BASE CAMP CIKUPA GI CURUG
.................. ................. ................
.................. ................. ................
.................. ................. ................
.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.3-1/R.00
AREA PELAKSANAPEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

NO SPK : 32 /GI-CRG /00/02/088


PEMELIHARAAN 2 TAHUNAN PMT 20 KV
TANGGAL : 20 FEBRUARI 2016 .

Bay : TRAFO 2 - 150/20 KV 60 MVA Merk : MEIDEN


No.Serie : 8E 8786 - DS - 6
Lokasi : GI CURUG Type : VJ - 22
No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir

1. Pentanahan (Grounding)
a. Memeriksa Kawat Pentanahan √ baik tidak baik √ baik tidak baik
b. Memeriksa kekencangan mur baut Terminal longgar √ kencang longgar √ kencang
c. Mengukur tahanan pentanahan * F ) √ baik tidak baik √ baik tidak baik
2 Lemari/box Kontrol
a. Memeriksa kekencangan mur baut longgar √ kencang longgar √ kencang
b. Membersihkan Elemen Pemanas (Heater) kotor √ bersih kotor √ bersih
d. Membersihkan Kontaktor kotor √ bersih kotor √ bersih
e. Membersihkan limit switch kotor √ bersih kotor √ bersih
c. Membersihkan box kotor √ bersih kotor √ bersih
f. Memeriksa Sumber tegangan AC / DC √ normal abnormal √ normal abnormal
3 Box Mekanik
a. Memeriksa kekencangan mur baut longgar √ kencang longgar √ kencang
b. Membersihkan dan melumasi roda gigi kotor √ bersih kotor √ bersih
c. Membersihkan dan melumasi pegas kotor √ bersih kotor √ bersih
d. Membersihkan box kotor √ bersih kotor √ bersih
4 Isolator, body dan bushing (bulk oil)
a. Membersihkan permukaan isolator √ kotor bersih kotor √ bersih
b. Membersihkan permukaan chamber √ kotor bersih kotor √ bersih
c. Memeriksa keadaan fisik PMT (Retak / Pecah) ada √ tidak ada ada √ tidak ada
d. Memeriksa alat pernafasan/ventilasi √ baik tidak baik √ baik tidak baik
e. Memeriksa kekencangan baut terminal utama √ longgar kencang longgar √ kencang
5 Minyak (khusus jenis LOC)
a. Memeriksa Level minyak normal abnormal normal abnormal
b. Memeriksa kondisi minyak (warna) kotor bersih kotor bersih
c. Memeriksa kebocoran / rembes ada tidak ada ada tidak ada
d. Menguji dielektrik minyak * F ) baik tidak baik baik tidak baik
6 Percobaan ON / OFF PMT
a. Posisi On √ normal abnormal √ normal abnormal
b. Posisi Off √ normal abnormal √ normal abnormal
c. Indikator posisi ON / OFF √ ada tidak ada √ ada tidak ada
d. Menguji keserempakan keluar masuk PMT * F ) √ baik tidak baik √ baik tidak baik
e. Mengukur tahanan kontak * F ) √ baik tidak baik √ baik tidak baik
9 Pondasi
a. Memeriksa Keretakan ada √ tidak ada ada √ tidak ada
b. Memeriksa Kemiringan ada √ tidak ada ada √ tidak ada
7 Mengukur Partial Discharge* baik tidak baik baik tidak baik
8 Menguji Tegangan Tinggi DC (vacuum tube)* baik tidak baik baik tidak baik
9 Mengukur kapasitas capasitif* baik tidak baik baik tidak baik
10 Mengukur Tahanan resistor* baik tidak baik baik tidak baik

Dikerjakan oleh : Supervisi :


HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )

Catatan : * Dilakukan tergantung kebutuhan


* F ) Formulir Terlampir
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.3-2/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN PMT


PENGUJIAN / PENGUKURAN PMT

APP : DURIKOSAMBI TYPE / MERK : MEIDENSHA / VJ - 22 PERALATAN : PMT 20 KV TRAFO 2


LOKASI GI : CURUG TEG / DAYA : 24 KV / 2000 A TANGGAL : 20 FEBRUARI 2016 .

R S T
NO TITIK UKUR ACUAN
Awal Akhir Awal Akhir Awal Akhir
A B C D E F G H I

1 TAHANAN ISOLASI
a. Atas - Bawah PMT Off > 100000 MΩ > 100000 MΩ > 100000 MΩ > 100000 MΩ > 100000 MΩ > 100000 MΩ
b. Atas - Tanah PMT Off > 100000 MΩ > 100000 MΩ > 100000 MΩ > 100000 MΩ 4 820 MΩ 4 820 MΩ
c. Bawah - Tanah PMT Off > 100000 MΩ > 100000 MΩ > 100000 MΩ > 100000 MΩ > 100000 MΩ > 100000 MΩ
d. Fasa - Tanah PMT On - - - - - -
2 TAHANAN KONTAK PMT On
Atas - Bawah PMT On 21 μ Ω 21 μ Ω 25 μ Ω 25 μ Ω 15 μ Ω 15 μ Ω

3 TEGANGAN TEMBUS MINYAK


Minyak PMT - - - - - -
4 TEKANAN GAS N2
Presure Gauge ( Visual ) - - - - - -
5 TEKANAN GAS SF6
Presure Gauge ( Visual ) - - - - - -
6 TAHANAN PENTANAHAN
Terminal Pentanahan 0.2 Ω 0.2 Ω 0.2 Ω 0.2 Ω 0.2 Ω 0.2 Ω
CATATAN :
.................. ................. ................ Dikerjakan Supervisi
.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.3-3/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN BAY


PENGUJIAN / PENGUKURAN BREAKER ANALYZER PMT
APP : DURIKOSAMBI TYPE / MERK : MEIDENSHA / VJ - 22 PERALATAN : PMT 20 KV TRAFO 2
LOKASI GI : CURUG TEG / DAYA : 24 KV / 2000 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI KESIMPULA
NO URAIAN KEGIATAN ACUAN TINDAKAN PELAKSANA
SEBELUMNYA AWAL AKHIR N
A B C D E F G H I

CLOSE OPEN CLOSE OPEN CLOSE OPEN

PHASE R (ms) Disesuaikan 37,7 ms 36,4 ms 37,7 ms 36,4 ms AHMAD H


PHASE S (ms) manual book 36,6 ms 36,6 ms 36,6 ms 36,6 ms FELIX
PHASE T (ms) 37,5 ms 36,4 ms 37,5 ms 36,4 ms

CATATAN :

.................. ................. ................ Dikerjakan Supervisi


.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.3-1/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

NO SPK : 32 /GI-CRG /00/02/088


PEMELIHARAAN 2 TAHUNAN PMT 150 KV
TANGGAL : 20 FEBRUARI 2016 .

Bay : TRAFO 2 - 150/20 KV 60 MVA Merk : GEC ALSTHOM


No.Serie : L18-045-01 006
Lokasi : GI CURUG Type : FXT 13F
No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir

1. Pentanahan (Grounding)
a. Memeriksa Kawat Pentanahan √ baik tidak baik √ baik tidak baik
b. Memeriksa kekencangan mur baut Terminal longgar √ kencang longgar √ kencang
c. Mengukur tahanan pentanahan * F ) √ baik tidak baik √ baik tidak baik
2 Lemari/box Kontrol
a. Memeriksa kekencangan mur baut longgar √ kencang longgar √ kencang
b. Membersihkan Elemen Pemanas (Heater) kotor √ bersih kotor √ bersih
d. Membersihkan Kontaktor kotor √ bersih kotor √ bersih
e. Membersihkan limit switch kotor √ bersih kotor √ bersih
c. Membersihkan box kotor √ bersih kotor √ bersih
f. Memeriksa Sumber tegangan AC / DC √ normal abnormal √ normal abnormal
3 Box Mekanik
a. Memeriksa kekencangan mur baut longgar √ kencang longgar √ kencang
b. Membersihkan dan melumasi roda gigi kotor √ bersih kotor √ bersih
c. Membersihkan dan melumasi pegas kotor √ bersih kotor √ bersih
d. Membersihkan box kotor √ bersih kotor √ bersih
4 Isolator, body dan bushing (bulk oil)
a. Membersihkan permukaan isolator √ kotor bersih kotor √ bersih
b. Membersihkan permukaan chamber √ kotor bersih kotor √ bersih
c. Memeriksa keadaan fisik PMT (Retak / Pecah) ada √ tidak ada ada tidak ada
d. Memeriksa alat pernafasan/ventilasi √ baik tidak baik √ baik tidak baik
e. Memeriksa kekencangan baut terminal utama longgar √ kencang longgar √ kencang
5 Minyak (khusus jenis LOC)
a. Memeriksa Level minyak √ normal abnormal √ normal abnormal
b. Memeriksa kondisi minyak (warna) kotor √ bersih kotor √ bersih
c. Memeriksa kebocoran / rembes ada √ tidak ada ada √ tidak ada
d. Menguji dielektrik minyak * F ) √ baik tidak baik √ baik tidak baik
6 Percobaan ON / OFF PMT
a. Posisi On √ normal abnormal √ normal abnormal
b. Posisi Off √ normal abnormal √ normal abnormal
c. Indikator posisi ON / OFF √ ada tidak ada √ ada tidak ada
d. Menguji keserempakan keluar masuk PMT * F ) √ baik tidak baik √ baik tidak baik
e. Mengukur tahanan kontak * F ) √ baik tidak baik √ baik tidak baik
9 Pondasi
a. Memeriksa Keretakan ada √ tidak ada ada √ tidak ada
b. Memeriksa Kemiringan ada √ tidak ada ada √ tidak ada
7 Mengukur Partial Discharge* baik tidak baik baik tidak baik
8 Menguji Tegangan Tinggi DC (vacuum tube)* baik tidak baik baik tidak baik
9 Mengukur kapasitas capasitif* baik tidak baik baik tidak baik
10 Mengukur Tahanan resistor* baik tidak baik baik tidak baik

Dikerjakan oleh : Supervisi :


HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )

Catatan : * Dilakukan tergantung kebutuhan


* F ) Formulir Terlampir
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.3-2/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN PMT


PENGUJIAN / PENGUKURAN PMT

APP : DURIKOSAMBI TYPE / MERK : GEC ALSTHOM / FXT 13 F PERALATAN : PMT 150 KV TRAFO 2
LOKASI GI : CURUG TEG / DAYA : 170 KV / 60 MVA TANGGAL : 20 FEBRUARI 2016 .

R S T
NO TITIK UKUR ACUAN
Awal Akhir Awal Akhir Awal Akhir
A B C D E F G H I

1 TAHANAN ISOLASI
a. Atas - Bawah PMT Off - - - - - -
b. Atas - Tanah PMT Off - - - - - -
c. Bawah - Tanah PMT Off - - - - - -
d. Fasa - Tanah PMT On - - - - - -
2 TAHANAN KONTAK PMT On
Atas - Bawah PMT On 30 μ Ω 30 μ Ω 33 μ Ω 33 μ Ω 32 μ Ω 32 μ Ω

3 TEGANGAN TEMBUS MINYAK


Minyak PMT - - - - - -
4 TEKANAN GAS N2
Presure Gauge ( Visual ) - - - - - -
5 TEKANAN GAS SF6
Presure Gauge ( Visual ) - - - - - -
6 TAHANAN PENTANAHAN
Terminal Pentanahan 0.2 Ω 0.2 Ω 0.2 Ω 0.2 Ω 0.2 Ω 0.2 Ω
CATATAN :

.................. ................. ................ Dikerjakan Supervisi


.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.3-3/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN BAY


PENGUJIAN / PENGUKURAN BREAKER ANALYZER PMT
APP : DURIKOSAMBI MERK / TYPE :GEC ALSTHOM / FXT - 13 F PERALATAN : PMT 150 KV TRAFO 2
LOKASI GI : CURUG TEG / DAYA : 170 KV / 1250 A TANGGAL : 20 FEBRUARI 2016.
HASIL KONDISI KONDISI KESIMPULA
NO URAIAN KEGIATAN ACUAN TINDAKAN PELAKSANA
SEBELUMNYA AWAL AKHIR N
A B C D E F G H I

CLOSE OPEN CLOSE OPEN CLOSE OPEN

PHASE R (ms) Disesuaikan 130.1 ms 22,0 ms 130.1 ms 22,0 ms AHMAD H


PHASE S (ms) manual book 127,8 ms 22.0 ms 127,8 ms 22.0 ms FELIX
PHASE T (ms) 129,7 ms 21,9 ms 129,7 ms 21,9 ms

CATATAN :

.................. ................. ................ Dikerjakan Supervisi


.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT. PLN (PERSERO) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.4-1/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

NOMOR : 32 / GI - CRG /00/ 02 / 088


PEMELIHARAAN 2 TAHUNAN PMS
TANGGAL : 20 FEBRUARI 2016 .

Bay : TRAFO 2 - 150/20 KV 60 MVA Merk : GEC ALSTHOM : I = A 07935


No.Serie
Lokasi : GI CURUG Type : S2DA : II = A 07933

No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir

1. Pentanahan (Grounding)
a. Memeriksa Kawat Pentanahan √ baik tidak baik √ baik tidak baik
b. Memeriksa kekencangan mur baut Terminal longgar √ kencang longgar √ kencang
c. Mengukur tahanan pentanahan*F ) √ baik tidak baik √ baik tidak baik

2 Isolator
a. Membersihkan permukaan isolator √ kotor bersih kotor √ bersih
b. Memeriksa keadaan fisik PMS (Retak / Pecah) ada √ tidak ada ada √ tidak ada

3 Tangkai Penggerak
a. Memeriksa keadaan sambungan √ baik tidak baik √ baik tidak baik
b. Memeriksa kekencangan baut terminal utama longgar √ kencang longgar √ kencang
c. Memeriksa kekencangan baut tangkai penggerak longgar √ kencang longgar √ kencang
d. Membersihkan pisau kontak kotor √ bersih kotor √ bersih
e. Memeriksa keadaan sambungan √ baik tidak baik √ baik tidak baik
f. Melumasi kontak dengan kontak grease - - ya tidak
g. Mengukur tahanan kontak*F ) √ baik tidak baik √ baik tidak baik

4 Pengujian keluar masuk PMS


a. Posisi keluar (Remote dan Lokal) √ normal abnormal √ normal abnormal
b. Posisi masuk (Remote dan Lokal) √ normal abnormal √ normal abnormal
c. Menguji keserempakan keluar masuk PMS * ) *F ) √ baik tidak baik √ baik tidak baik
d. Mengukur arus motor penggerak*F ) √ baik tidak baik √ baik tidak baik

5 Pengujian fungsi Interlock PMS


a. Menguji interlock PMS dengan PMT √ baik tidak baik √ baik tidak baik
b. Menguji interlock PMS Line dengan pentanahan √ baik tidak baik √ baik tidak baik

6 Sumber Tegangan AC / DC
a. Memeriksa Tegangan AC √ normal abnormal √ normal abnormal
b. Memeriksa Tegangan DC √ normal abnormal √ normal abnormal
c. Memeriksa Tekanan Udara pneumatic kontrol √ normal abnormal √ normal abnormal

7 Box Mekanik
a. Memeriksa dan membersihkan Roda gigi kotor √ bersih kotor √ bersih
b. Membersihkan box kotor √ bersih kotor √ bersih
c. Melumasi roda gigi dengan grease - - ya √ tidak

8 Box Terminal/kontrol
a. Membersihkan box bersih √ kotor √ bersih kotor
b. Menutup celah celah ada √ tidak ada ada √ tidak ada
c. Memeriksa kekencangan mur baut longgar √ kencang longgar √ kencang
d. Memeriksa dan membersihkan kontak bantu √ bersih kotor √ bersih kotor

9 Pondasi
a. Memeriksa Keretakan ada √ tidak ada ada √ tidak ada
b. Memeriksa Kemiringan ada √ tidak ada ada √ tidak ada

Dikerjakan oleh : Supervisi :


HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

(SUPARDI W ) ( ADELIN DP )

Catatan : * Hanya untuk 500 kV


*F ) Formulir terlampir
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.4-2/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN PMS


PENGUJIAN / PENGUKURAN PENTANAHAN PMS

APP : DURIKOSAMBI MERK / TYPE : GEC ALSTHOM / S2DA PERALATAN : PMS REL 1 TRAFO 2
LOKASI : GI CURUG TEG / DAYA : 170 KV / 1250 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI KESIMPUL
NO URAIAN KEGIATAN ACUAN TINDAKAN PELAKSANA
SEBELUMNYA AWAL AKHIR AN
A B C D E F G H I

Phasa R R<1Ω 0.2 Ω 0.2 Ω FAUZAN


Phasa S R<1Ω 0.2 Ω 0.2 Ω BAYU
Phasa T R<1Ω 0.2 Ω 0.2 Ω

CATATAN :

.................. ................. ................ Dikerjakan Supervisi


.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.4-3/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN PMS


PENGUJIAN / PENGUKURAN TAHANAN KONTAK

APP : DURIKOSAMBI MERK / TYPE : GEC ALSTHOM / S2DA PERALATAN : PMS REL 1 TRAFO 2
LOKASI : GI CURUG TEG / DAYA : 170 KV / 1250 A TANGGAL : 20 FEBRUARI 2016 .

HASIL KONDISI KONDISI


NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I
RJKB

Phasa R R < 50 µΩ - -
Phasa S R < 50 µΩ - -
Phasa T R < 50 µΩ - -

CATATAN :
TIDAK DITEST KARENA BERTEGANGAN Dikerjakan Supervisi
.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.4-4/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN PMS


PENGUJIAN / PENGUKURAN WAKTU KELUAR MASUK PMS

APP : DURIKOSAMBI MERK / TYPE : GEC ALSTHOM / S2DA PERALATAN : PMS 150 KV TRAFO 2
LOKASI GI : CURUG TEG / DAYA : 170 KV / 1250 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

WAKTU MASUK
Phasa R t < 14 s - -
Phasa S t < 14 s - -
Phasa T t < 14 s - -
WAKTU KELUAR
Phasa R t < 13 s - -
Phasa S t < 13 s - -
Phasa T t < 13 s - -

CATATAN :

TIDAK DILAKSANAKAN WAKTU MASUK & KELUARNYA PMS Dikerjakan Supervisi


.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................


.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.4-5/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN PMS


PENGUJIAN / PENGUKURAN MOTOR PENGGERAK

APP : DURIKOSAMBI MERK / TYPE : GEC ALSTHOM / S2DA PERALATAN : PMS 150 KV TRAFO 2
LOKASI GI : CURUG TEG / DAYA : 170 KV / 1250 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

1 PUTARAN MOTOR (rpm) Name Plate

R : R : R :
2 ARUS (Ampere) S : S : S :
Name Plate 1.2 A
T : T : T :

3 TEGANGAN (kV) Name Plate 230 volt 219 VOLT 219 VOLT AHMAD H

4 TAHANAN ISOLASI Manual Book Trafo Hyundai R-G R-G R-G


( M Ohm ) R > 2 M Ohm S-G S-G S-G
Dengan Megger 500 Volt T-G T-G T-G

5 ARAH PUTARAN Name Plate NORMAL NORMAL

CATATAN :

.................. ................. ................ Dikerjakan Supervisi


.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


Nomor Formulir : OPHAR/F.7-1/R.00
PT. PLN (PERSERO) TRANSMISI JAWA BAGIAN BARAT
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

NOMOR : 32 / GI - CRG / 00 / 02/ 088


PEMELIHARAAN 2 TAHUNAN LA
TANGGAL : 20 FEBRUARI 2016 .

Bay : TRAFO 2 - 150/20 KV 60 MVA Merk :SIEMENS


No.Serie :K350 389 20/53/50
Lokasi : GI CURUG Type :3EP2150 3PD

No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir

1. Pentanahan (Grounding)
a. Memeriksa Kawat Pentanahan √ baik tidak baik √ baik tidak baik
b. Memeriksa kekencangan mur baut Terminal longgar √ kencang longgar √ kencang
c. Mengukur tahanan pentanahan *F ) √ baik tidak baik √ baik tidak baik
2 Isolator
a. Membersihkan permukaan √ kotor bersih kotor √ bersih
b. Memeriksa keadaan fisik LA (Retak / Pecah) ada √ tidak ada ada √ tidak ada
3 Memeriksa kekencangan mur baut
Terminal Utama longgar √ kencang longgar √ kencang
4 Pondasi
a. Memeriksa Keretakan ada √ tidak ada ada √ tidak ada
b. Memeriksa Kemiringan ada √ tidak ada ada √ kencang

5 Mengukur tahanan Isolasi * F ) √ baik tidak baik √ baik tidak baik

Dikerjakan oleh : Supervisi :


HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )

Catatan : * F ) Formulir terlampir


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT
No Formulir : RENEV/12/HAR/2007
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN LIGHTING ARRESTER


PENGUJIAN / PENGUKURAN TANGEN DELTA LIGHTING ARRESTERS ( LA )

APP : DURIKOSAMBI MERK/TYPE : SIEMENS /3E P2 150 3PD PERALATAN : CT 150 KV TRAFO 2
LOKASI GI : CURUG TEG / DAYA :170 KV / 4000A TANGGAL : 20 FEBRUARI 2016.

NO URAIAN KEGIATAN ACUAN HASIL SEBELUMNYA KONDISI AWAL TINDAKAN KONDISI AWAL KESIMPULAN PELAKSANA

A B C D E G H I J K

1 TAN ( % ) CAP (µf) TAN ( % ) CAP (µf) IX(mA) TAN ( % ) CAP (µf)

ACHMAD H ACHMAD H

Ø R=10 KV - - 3.9372 - - FELIX FELIX

2 TAN ( % ) CAP (µf) TAN ( % ) CAP (µf) TAN ( % ) CAP (µf)


Ø S=10 KV
- - 3.7640 - -

3 TAN ( % ) CAP (µf) TAN ( % ) CAP (µf) TAN ( % ) CAP (µf)

Ø T=10 KV
- - 3.7113 - -

CATATAN : A1=S1 DAN A2=S2 Dikerjakan Supervisor


HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.7-2/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN LA


PENGUJIAN / PENGUKURAN PENTANAHAN LA

APPP : DURIKOSAMBI MERK/TYPE : SIEMENS /3E P2 150 3PD PERALATAN : LA 150 KV TRAFO 2
LOKASI GI : CURUG TEG / DAYA : 170 KV / 10 KA TANGGAL : 20 FEBRUARI 2016 .

HASIL KONDISI KONDISI


NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

Phasa R R<1Ω 0.1 Ω 0.1 Ω BAYU


Phasa S R<1Ω 0.1 Ω 0.1 Ω RIAN
Phasa T R<1Ω 0.1 Ω 0.1 Ω

CATATAN :
.................. ................. ................ Dikerjakan Supervisi
.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................
.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.7-3/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN LA
PENGUJIAN / PENGUKURAN TAHANAN ISOLASI LA

APPP : DURIKOSAMBI MERK/TYPE : SIEMENS /3E P2 150 3PD PERALATAN : LA 150 KV TRAFO 2

LOKASI GI : CURUG TEG / DAYA : 170 KV / 10 KA TANGGAL : 20 FEBRUARI 2016 .

R S T
NO TITIK UKUR ACUAN
Awal Akhir Awal Akhir Awal Akhir
A B C D E F G H I

- Atas – Ground ( MW ) * 7 310 MΩ 7 310 MΩ 8 200 MΩ 8 200 MΩ 8 700 MΩ 8 700 MΩ


- Atas - Bawah ( MW ) * 1520 MΩ 1520 MΩ 5 750 MΩ 5 750 MΩ 4 800 MΩ 4 800 MΩ
- Tengah – Ground ( MW ) - - - - - -
- Bawah – Ground ( MW ) 6 830 MΩ 6 830 MΩ 2 400 MΩ 2 400 MΩ 3 540 MΩ 3 540 MΩ

CATATAN :
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dikerjakan Supervisi
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HAR APP DURIKOSAMBI GI CURUG
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BASE CAMP CIKUPA
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ( SUPARDI W ) ( ADELIN DP )
PT. PLN (PERSERO) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.5-1/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

NOMOR : 32 / GI - CRG / 00 / 02 / 088


PEMELIHARAAN 2 TAHUNAN CT
TANGGAL : 20 FEBRUARI 2016 .

Bay : TRAFO 2 - 150 /20KV 60 MVA Merk : GEC ALSTHOM


No.Serie : R = 16 S =15 T= 14
Lokasi : GI CURUG Type : QDR 170

No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir

1. Pentanahan (Grounding)
a. Memeriksa Kawat Pentanahan √ baik tidak baik √ baik tidak baik
b. Memeriksa kekencangan mur baut Terminal longgar √ kencang longgar √ kencang
c. Mengukur tahanan pentanahan * F ) √ baik tidak baik √ baik tidak baik

2 Lemari / Box Terminal


a. Membersihkan box bersih √ kotor √ bersih kotor
b. Memeriksa celah celah ada √ tidak ada ada √ tidak ada
c. Memeriksa kekencangan mur baut longgar √ kencang longgar √ kencang
3 Body dan Bushing
a. Membersihkan permukaan body dan bushing √ kotor bersih kotor √ bersih
b. Memeriksa keadaan fisik (keretakan) ada √ tidak ada ada √ tidak ada
c. Memeriksa Kaca Penduga √ baik tidak baik √ baik tidak baik
4 Memeriksa kekencangan mur baut
Terminal Utama longgar √ kencang longgar √ kencang
5 Uji Fungsi Limit Switch
a. Menguji Indikator √ normal abnormal √ normal abnormal
b. Alarm Low Presure SF6 √ normal abnormal √ normal abnormal
(Khusus untuk CT dengan media SF6)

6 Pondasi
a. Memeriksa Keretakan ada √ tidak ada ada √ tidak ada
b. Memeriksa Kemiringan ada √ tidak ad ada √ tidak ada

7 Mengukur tahanan Isolasi * F ) √ ada tidak baik √ baik tidak baik

Dikerjakan oleh : Supervisi :


HAR APP DURUKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )

Catatan : * F ) Formulir terlampir


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BAR Nomor Formulir : OPHAR/F.5-2/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA
LEMBAR HASIL PEMELIHARAAN CT
PENGUJIAN / PENGUKURAN PENTANAHAN TRAFO ARUS ( CT )

APPP : DURIKOSAMBI MERK/TYPE : GEC ALSTHOM / QDR 170 PERALATAN : CT 150 KV TRF 2
LOKASI GI : CURUG TEG / DAYA : 170 KV / 1600 A TANGGAL : 20 FEBRUARI 2016
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

Phasa R R<1Ω 0.1 Ω 0.1 Ω BAYU


Phasa S R<1Ω 0.1 Ω 0.1 Ω RIAN
Phasa T R<1Ω 0.1 Ω 0.1 Ω

CATATAN :

.................. ................. ................ Dikerjakan Supervisi


.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................


.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.5-3/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN CT


PENGUJIAN / PENGUKURAN TAHANAN ISOLASI TRAFO ARUS ( CT )

APPP : DURIKOSAMBI MERK/TYPE : GEC ALSTHOM / QDR 170 PERALATAN : CT 150 KV TRF 2
LOKASI GI : CURUG TEG / DAYA : 170 KV / 1600 A TANGGAL : 20 FEBRUARI 2016

R S T
NO TITIK UKUR ACUAN
Awal Akhir Awal Akhir Awal Akhir
A B C D E F G H I

a. Primer - Tanah 9 900 MΩ 9 900 MΩ 9 800 MΩ 9 800 MΩ 6190 MΩ 6190 MΩ


b. Sekunder - Tanah
1S1 – tanah > 100 000 MΩ > 100 000 MΩ 77 600 MΩ 77 600 MΩ > 100 000 MΩ > 100 000 MΩ
2S1 – tanah > 100 000 MΩ > 100 000 MΩ 68 900 MΩ 68 900 MΩ > 100 000 MΩ > 100 000 MΩ
3S1 – tanah > 100 000 MΩ > 100 000 MΩ 92 900 MΩ 92 900 MΩ > 100 000 MΩ > 100 000 MΩ
4S1 – tanah > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ
5S1 – tanah - - - - - -
c. Primer - Sekunder
P – 1s1 78 000 MΩ 78 000 MΩ > 100 000 MΩ > 100 000 MΩ 60 400 MΩ 60 400 MΩ
P – 2s1 33 800 MΩ 33 800 MΩ > 100 000 MΩ > 100 000 MΩ 42 100 MΩ 42 100 MΩ
P – 3S1 53 500 MΩ 53 500 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ
P – 4S1 34 900 MΩ 34 900 MΩ > 100 000 MΩ > 100 000 MΩ 85 900 MΩ 85 900 MΩ
P – 5S1 - - - - - -
d. Sekunder - Sekunder
1s1 – 2s1 > 100 000 MΩ > 100 000 MΩ 66 930 MΩ 66 930 MΩ 98 600 MΩ 98 600 MΩ
1s1 – 3s1 > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ
1s1 – 4S1 > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ
2s1 – 3S1 > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ
2s1 – 4S1 > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ
3s1 – 4S1 > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ > 100 000 MΩ
CATATAN :
.................. ................. ................ Dikerjakan Supervisi
.................. ................. ................ HAR APP DURIKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................


.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )
PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT No Formulir : RENEV/12/HAR/2007
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN CT


PENGUJIAN / PENGUKURAN TANGEN DELTA TRAFO ARUS ( CT )

APP : DURIKOSAMBI MERK/TYPE : GEC ALTHOM/QDR170 PERALATAN : CT 150 KV TRAFO 2


LOKASI GI : CURUG TEG / DAYA :170 KV / 1600 A TANGGAL : 20 FEBRUARI 2016

NO URAIAN KEGIATAN ACUAN HASIL SEBELUMNYA KONDISI AWAL TINDAKAN KONDISI AWAL KESIMPULAN PELAKSANA

A B C D E G H I J K

1 PRIMER Capasitansi TAN ( % ) CAP (µf) TAN ( % ) CAP (µf) IX(mA) TAN ( % ) CAP (µf)

UST A P - A1 ACHMAD H

UST B P - A2 Ø R=10 KV 0.57 1,254,44 3.928 0.57 1,254,44 TUENG K

GSTg A + B P - N

2 SEKUNDER 1 (CORE 1 ) TAN ( % ) CAP (µf) TAN ( % ) CAP (µf) TAN ( % ) CAP (µf)
Ø S=10 KV
UST A A1 - A2
0.52 1,199,55 3.766 0.52 1,199,55
GSTg A + B A1 - N

3 SEKUNDER 2 (CORE 2 ) TAN ( % ) CAP (µf) TAN ( % ) CAP (µf) TAN ( % ) CAP (µf)
Ø T=10 KV
GSTg A + B A2 - N
0.56 1,199,35 3.764 0.56 1,199,35

CATATAN : A1=S1 DAN A2=S2 Dikerjakan Supervisor


HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )
Nomor Formulir : OPHAR/F.8-1/R.00
PT. PLN (PERSERO) TRANSMISI JAWA BAGIAN BARAT
AREA PELAKSANA PEMELIHARAANDURIKOSAMBI
BASE CAMP CIKUPA

NOMOR : 32 / GI - CRG / 00 / 02 / 088


PEMELIHARAAN 2 TAHUNAN NGR
TANGGAL : 20 FEBRUARI 2016 .

BAY : TRAFO 2 - 150/20 KV 60 MVA MERK : MS RASISTANCES


NO SERI : A 07933/I35
LOKASI : GI CURUG Type : G20-1000-5-LV - a- TT

No Peralatan yang diperiksa Kondisi Awal Kondisi Akhir

1. Pentanahan (Grounding)
a. Memeriksa Kawat Pentanahan √ baik tidak baik √ baik tidak baik
b. Memeriksa kekencangan mur baut Terminal √ baik tidak baik √ baik tidak baik
c. Mengukur tahanan pentanahan * F ) √ baik tidak baik √ baik tidak baik
2 Isolator
a. Membersihkan permukaan √ kotor bersih kotor √ bersih
b. Memeriksa keadaan fisik (Retak / Pecah) ada √ tidak ada ada √ tidak ada

3 NGR
a. Membersihkan body/elemen NGR √ baik tidak baik √ baik tidak baik
b. Mengukur level air ( u/ NGR jenis liquid ) - baik - tidak baik - baik - tidak baik
c. Mengukur tahanan NGR * F ) √ baik tidak baik √ baik tidak baik

4 Memeriksa kekencangan mur baut


Terminal Utama longgar √ kencang longgar √ kencang

5 Mengukur Tahanan Isolasi * F ) √ baik tidak baik √ baik tidak baik

Dikerjakan oleh : Supervisi :


HAR APP DURIKOSAMBI GI CURUG
BASE CAMP CIKUPA

( SUPARDI W ) ( ADELIN DP )

Catatan : * F ) Formulir Terlampir


PT PLN ( PERSERO ) TRANSMISI JAWA BAGIAN BARAT Nomor Formulir : OPHAR/F.8-2/R.00
AREA PELAKSANA PEMELIHARAAN DURIKOSAMBI
BASE CAMP CIKUPA

LEMBAR HASIL PEMELIHARAAN NGR


PENGUJIAN / PENGUKURAN TAHANAN PENTANAHAN & NGR

APP : DURIKOSAMBI MERK / TYPE : MS RASISTANCES / G20-1000-10-5NO TRAFO : 2 ( NGR )


LOKASI GI : CURUG TEG / DAYA : 20 KV / 1000 A TANGGAL : 20 FEBRUARI 2016 .
HASIL KONDISI KONDISI
NO URAIAN KEGIATAN ACUAN TINDAKAN KESIMPULAN PELAKSANA
SEBELUMNYA AWAL AKHIR
A B C D E F G H I

1 Pengukuran Tahanan
- Isolasi - Elemen - Body MΩ High resistance 1490 M Ω 1490 M Ω MULYADI
- Isolasi Body - Ground MΩ 200 / 500 Ohm - - KRISNOAJI
- Pentanahan Ω Low resistance 0.2 Ω 0.2 Ω
- Elemen Ω 12 / 24 Ohm 12.2 Ω 12.2 Ω

2 Check Tinggi Air Antara Min. - Max.

CATATAN :
.................. ................. ................ Dikerjakan Supervisi
.................. ................. ................ HAR APP DURUKOSAMBI GI CURUG
.................. ................. ................ BASE CAMP CIKUPA
.................. ................. ................

.................. ................. ................

.................. ................. ................ ( SUPARDI W ) ( ADELIN DP )

Anda mungkin juga menyukai