NAMA LUQMAN HAKIM

NPM 21 111 003

MINGGU KE -
NO URAIAN PEKERJAAN BOBOT
1 2 3 4 5 6 7 8 9
22 agt 26 agt 2 sept 9 sept 07 okt 14 okt
- 25 -1 -8 - 15 16 sept - 23 sept- 30 sept - - 13 - 20
agt sept sept sept 22 sept 29 sept 06 0kt okt okt
1 SD IMPRES 1 KOTA JAYAPURA 15,93 0.2 0.5 0.5 0.5 0.5 0.5 0.5

2 SD IMPRES 2 KOTA JAYAPURA 11,81 0.2 0.5 0.5 0.5 0.5 0.5 0.5

3 SD IMPRES 3 KOTA JAYAPURA 11,52 0.2 0.5 0.5 0.5 0.5 0.5 1
4 SD IMPRES 4 KOTA JAYAPURA 3,77 0.2 0.2 0.2 0.2 0.2 0.5 0.5
5 SD IMPRES 5 KOTA JAYAPURA 5,62 0.2 0.3 0.3 0.3 0.6 0.6 0.6

6 SD IMPRES 6 KOTA JAYAPURA 6,54 0.2 0.4 0.4 0.4 0.4 1 0.94

7 SD IMPRES 7 KOTA JAYAPURA 29,42 0.2 1 1 1 1 2 2

8 SD IMPRES 8 KOTA JAYAPURA 9,94 0.2 0.5 0.5 0.5 0.5 0.5 0.6

9 SD IMPRES 9 KOTA JAYAPURA 3,00 0.2 0.15 0.15 0.15 0.3 0.3 0.3

10 SMKK3 2,44 0.8 1.28 0.09 0.09

RENCANA PROGRES MINGGUAN 0.8 1.28 1.8 4.14 4.05 4.05 4.5 6.4 7.03
RENCANA KUMULATIF 0.8 2.08 3.88 8.02 12.07 16.12 20.62 27.02 34.05
REALISASI PROGRESS MINGGUAN 0 0 0 0.59 4.37 4.97 7.82 7.43 6.25
REALISASI KUMULATIF 0 0 0 58.02 4.95 9.94 14.85 102.02 28.65
DEVIASI -0.8 -2.08 -3.88 -50 -7.12 -6.18 -5.77 -75 -5.4

2 0 1 1 1 0 5 5
A B
MINGGU KE -
10 11 12 13 14 15 16 17 18
KET
21 okt 11 nov 18 nov
- 27 28 okt 4 nov- - 17 - 24 25 nov 2 des - 9 des - 16 des -
okt - 3 nov 10 nov nov nov - 1 des 8 des 15 des 22 des
50 1 2 2 2 2 2 1.2 0.03 100

0.5 0.5 2 1 1 1 1 1 0.61 90

1 1 1 1 1 0.82 0.5 0.5 1 80


0.37 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 70
0.52 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.2 60

0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2 0.2 50

2 2 2 2 3 3 4 3 0.22 40

1 1 1 1 0.84 0.6 0.6 0.3 0.3 30

0.25 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 20

0.09 0.09 10

0
6.54 6.55 9.05 8.05 8.98 8.27 8.95 6.65 2.9
40.59 47.14 56.19 64.24 73.23 81.5 90.45 97.1 100
5.89 6.85 7.54 8.12 9.17
36.14 43.38 31.19 60.68 68.99
-4.45 -3.76 -25 -3.56 0
KONTRAK AWAL
harga satuan (Rp)
Item pekerjaan
set. volume jumblah Total Keterangan

SD INPRES 1 KOTA JAYAPURA


Bongkar atap m2 237.57 19,305.00 4586288.85 PEKRJAAN PEMBONGKARAN GEDUNG (A)
Bongkar plafond m2 215.3 16,115.00 3469559.5 PEKRJAAN PEMBONGKARAN GEDUNG (A)
Bongkar lantai m2 88 8,030.00 706640 PEKRJAAN PEMBONGKARAN GEDUNG (A)
Pembersihan bekas bongkaran ls 1 49,500.00 49500 PEKRJAAN PEMBONGKARAN GEDUNG (A)
Pasan atap seng gelombang BJLS 0,2 mm m2 237.57 207,163.00 49215713.91 PEKERJAAN PASANGAN GEDUNG (A)
Pasan nok atap m 7 204,490.00 1431430 PEKERJAAN PASANGAN GEDUNG (A)
Pasan plafond tripleks 6 mm m2 215.3 75,680.00 16293904 PEKERJAAN PASANGAN GEDUNG (A)
Pasan keramiklantai 30x30 cm m2 88 341,825.00 30080600 PEKERJAAN PASANGAN GEDUNG (A)
pengecetan atap m2 235.57 40,711.00 9590290.27 PEKERJAAN PENGECETAN GEDUNG (A)
Cat plafond tripleks m2 215.3 22,398.20 4822332.46 PEKERJAAN PENGECETAN GEDUNG (A)
Pengecetan kusen, pintu dan jendela m2 35.54 105,094.00 3735040.76 PEKERJAAN PENGECETAN GEDUNG (A)
Pengecetan dinding m2 173.65 23,498.20 4080462.43 PEKERJAAN PENGECETAN GEDUNG (A)
Cat lisplant m2 12.06 105,094.00 1267433.64 PEKERJAAN PENGECETAN GEDUNG (A)
Bongkar atap m2 254.16 19,305.00 4906558.8 PEKERJAAN PEMBONGKARAN GEDUNG (B)
Bongkar plafond m2 404.44 16,115.00 6517550.6 PEKERJAAN PEMBONGKARAN GEDUNG (B)
Bongkar lantai m2 145.6 8,030.00 1169168 PEKERJAAN PEMBONGKARAN GEDUNG (B)
Pembersihan bekas bongkaran ls 1 49,500.00 49500 PEKERJAAN PEMBONGKARAN GEDUNG (B)
Pasan atap seng gelombang BJLS 0,2 mm m2 254.16 207,163.00 52652548.08 PEKERJAAN PASANGAN GEDUNG (B)
Pasan nok atap m 12 204,490.00 2453880 PEKERJAAN PASANGAN GEDUNG (B)
Pasan plafond tripleks 6 mm m2 404.44 75,680.00 30608019.2 PEKERJAAN PASANGAN GEDUNG (B)
Pasan keramiklantai 30x30 cm m2 145.6 341,825.00 49769720 PEKERJAAN PASANGAN GEDUNG (B)
pengecetan atap m2 254.16 40,711.00 10347107.76 PEKERJAAN PENGECETAN GEDUNG (B)
Cat plafond tripleks m2 404.44 22,398.20 9058728.008 PEKERJAAN PENGECETAN GEDUNG (B)
Pengecetan kusen, pintu dan jendela m2 52.72 105,094.00 5540555.68 PEKERJAAN PENGECETAN GEDUNG (B)
Pengecetan dinding m2 28.707 23,498.20 674562.8274 PEKERJAAN PENGECETAN GEDUNG (B)
Cat lisplant m2 11.71 105,094.00 1230650.74 PEKERJAAN PENGECETAN GEDUNG (B)
Bongkar atap m2 21.8 19,305.00 420849 PEKERJAAN PEMBONGKARAN TOILET (D)
Bongkar plafond m2 16.26 16,115.00 262029.9 PEKERJAAN PEMBONGKARAN TOILET (D)
Bongkar lantai m2 11.01 8,030.00 88410.3 PEKERJAAN PEMBONGKARAN TOILET (D)
Pembersihan bekas bongkaran ls 1 49,500.00 49500 PEKERJAAN PEMBONGKARAN TOILET (D)
Pasan atap seng gelombang BJLS 0,2 mm m2 21.8 207,163.00 4516153.4 PEKERJAAN PEMASANGAN TOILET (D)
Pasan nok atap m 4 204,490.00 817960 PEKERJAAN PEMASANGAN TOILET (D)
Pasan plafond tripleks 6 mm m2 16.26 75,680.00 1230556.8 PEKERJAAN PEMASANGAN TOILET (D)
Rabat beton lantai tebal 7 cm m3 0.77 2,509,087.69 1931997.5213 PEKERJAAN PEMASANGAN TOILET (D)
Pasang daun pintu panil bh 1 1,067,660.00 1067660 PEKERJAAN PEMASANGAN TOILET (D)
Pasang engsel pintu bh 3 81,888.40 245665.2 PEKERJAAN PEMASANGAN TOILET (D)
Pasang haldle pintu bh 1 415,250.00 415250 PEKERJAAN PEMASANGAN TOILET (D)
Pasang gerendel pintu bh 1 83,314.00 83314 PEKERJAAN PEMASANGAN TOILET (D)
Pengecatan atap m2 21.8 40,711.00 887499.8 PEKERJAAN PENGECETAN TOILET (D)
Cat plafond tripleks m2 16.26 22,398.20 364194.732 PEKERJAAN PENGECETAN TOILET (D)
Pengecetan kusen, pintu dan jendela m2 3.02 105,094.00 317383.88 PEKERJAAN PENGECETAN TOILET (D)
Pengecetan dinding m2 43.98 23,498.20 1033450.836 PEKERJAAN PENGECETAN TOILET (D)
Cat lisplant m2 3.78 105,094.00 397255.32 PEKERJAAN PENGECETAN TOILET (D)
318436876.205
KAJIAN TEKNIS
Mutual ADDENDIUM 1
Check PEKERJAAN TAMBAHAN (+) PEKERJAAN KURANG (-) Keterangan
0% volume Jumblah Harga Jumblah Harga Jumblah Harga
Volume Volume
(Rp.) (Rp.) (Rp.)
AYAPURA
122.07 0 115.5 2229727.5 122.07 2356561.35 KURANG 2 0
121 0 94.3 1519644.5 121 1949915 KURANG
90.65 2.65 21279.5 20 160600 90.65 727919.5 TAMBAH
1 0 20 990000 1 49500 TETAP NAMA LUQMAN HAKIM
122.07 0 115.5 23927326.5 122.07 25288387.41 KURANG NPM 21 111 003
20.384 13.384 2736894.16 20 4089800 20.38 4167506.2 TAMBAH
121 0 94.3 7136624 121 9157280 KURANG
90.65 2.65 905836.25 20 6836500 90.65 30986436.25 TAMBAH
122.07 0 113.5 4620698.5 122.07 4969591.77 KURANG
121 0 94.3 2112150.26 121 2710182.2 KURANG
67.33 31.79 3340938.26 20 2101880 67.33 7075979.02 TAMBAH
335.24 161.59 3797074.138 20 469964 335.24 7877536.568 TAMBAH
13.2 1.14 119807.16 20 2101880 13.2 1387240.8 TAMBAH
245.16 0 0 20 386100 254.16 4906558.8 TETAP
202.22 0 0 202.22 3258775.3 202.22 3258775.3 KURANG
145.6 0 0 20 160600 145.6 1169168 TETAP
1 0 0 20 990000 1 49500 TETAP
254.16 0 0 20 4143260 254.16 52652548.08 TETAP
25.5 13.5 2760615 20 4089800 25.5 5214495 TAMBAH
202.22 0 0 202.22 15304009.6 202.22 15304009.6 KURANG
145.6 0 0 20 6836500 145.6 49769720 TETAP
254.16 0 0 20 814220 254.16 10347107.76 TETAP
202.22 0 0 202.22 4529364.004 202.22 4529364.004 KURANG
68.45 15.73 1653128.62 20 2101880 68.45 7193684.3 TAMBAH
317.31 30.24 710585.568 20 469964 317.31 7456213.842 TAMBAH
11.7 0 0 0.01 1050.94 11.7 1229599.8 KURANG
21.8 0 0 20 386100 21.8 420849 TETAP
20.67 4.41 71067.15 20 322300 20.67 333097.05 TAMBAH
0.72 0 0 10.29 82628.7 0.72 5781.6 KURANG
1 0 0 20 990000 1 49500 TETAP
21.8 0 0 20 4143260 21.8 4516153.4 TETAP
4 0 0 20 4089800 4 817960 TETAP
20.67 4.41 333748.8 20 1513600 20.67 1564305.6 TAMBAH
0.0504 0 0 0.7196 1805539.501724 0.05 125454.3845 KURANG
1 0 0 20 21353200 1 1067660 TETAP
3 0 0 20 1637768 3 245665.2 TETAP
1 0 0 20 8305000 1 415250 TETAP
1 0 0 20 1666280 1 83314 TETAP
21.8 0 0 20 814220 21.8 887499.8 TETAP
20.67 4.41 98776.062 20 447964 20.67 462970.794 TAMBAH
3.43 0.41 43088.54 20 2101880 3.43 360472.42 TAMBAH
43.72 0 0 0.26 6109.532 43.72 1027341.304 KURANG
3.78 0 0 20 2101880 3.78 397255.32 TETAP
153149848.8377 274565310.4265
1 1 1 0 5 5
A B

LUQMAN HAKIM
21 111 003

Anda mungkin juga menyukai