VOLUME PEKERJAAN
0 1.275 TOT
0 6.15
0 3.8 NO DAERAH SEGMEN
0 5.925
0 4.05 1 7--10
0 2.85 2 4--12
0 13.25 3 5--14
0 4.05 4 10--15
VERTIKAL
71.755 5 11--16
6 12--17
LUBANG KUSEN LUAS BERSIH 7 13--18
m2 m2 8 14--19
0.35 2 TOT
0 0.6
1.225 1.55
0 1.475
0.875 5.5
0 3.15
0.9 1.875
0 2.7
2.45 2
0.14 1.51
0.9 1.75
0.9 0.75
1.72 6.53
0.875 7.375
0 4.45
0.9 0.75
1.72 3.53
0.45 4.8
52.295
Pasangan Bata 1:4
Luas Dinding Lantai 2
LUBANG KUSEN LUAS BERSIH
NO DAERAH SEGMEN
m2 m2
2.8 2 1 3--5
2.8 8.3 2 8--9
2.4 4.4 3 10--11
0 1.2 4 HORIZONTAL 12--13
0 7.1 6 15--16
8.025 2.675 7 16--17
2.08 0.62 8 17--18
0 2.55 TOT
0 7.6
0 5.7 NO DAERAH SEGMEN
0 26.5
68.645 1 7--10
2 4--12
LUBANG KUSEN LUAS BERSIH 3 5--14
VERTIKAL
m2 m2 4 10--15
2.8 1.9 5 11--16
0 1.2 6 12--17
1.075 4.475 TOTAL
0 2.95
1.44 4.11
0 5.4
5.6 3.3
1.12 2.18
1.44 3.86
1.44 1.86
0 8.9
1.44 1.86
41.995
PANJANG TINGGI KOLOM LUAS KOTOR LUBANG KUSEN LUAS BERSIH
m m m m2 m2 m2
9.85 1 0.9 8.95 0.84 8.11
3.7 1 0.15 3.55 0 3.55
4.25 1 0.375 3.875 0.9 2.975
2.2 1 0.225 1.975 0.9 1.075
1.5 3 0.15 4.05 0 4.05
4.25 1 0.3 3.95 0.14 3.81
3.7 1 0.3 3.4 0.35 3.05
2.2 1 0.15 2.05 0.9 1.15
1.5 3 0.15 4.05 0 4.05
TOTAL 31.82
- 42,169
- 14,766
- 9,859
25,861 25,861
9,519 9,519
1,096 1,096
1,860 1,860
38,336 105,130
- 42,169
- 14,766
- 9,859
25,861 25,861
9,519 9,519
1,096 1,096
1,860 1,860
38,336 105,130
- 13,128
- 4,586
24,244 24,244
14,279 14,279
1,644 1,644
1,860 1,860
42,027 59,740
2675
- 8,012
- 5,503
24,244 24,244
14,279 14,279
1,644 1,644
1,860 1,860
42,027 55,542
- 1,068,300
- 14,612
- 9,630
- 4,815
50,105 50,105
31,414 31,414
3,836 3,836
3,720 3,720
89,074 1,186,431
- 1,068,300
- 14,612
- 9,630
- 4,815
50,105 50,105
31,414 31,414
3,836 3,836
3,720 3,720
89,074 1,186,431
- 4,173
16,163 16,163
9,519 9,519
1,096 1,096
1,240 1,240
28,018 32,191
TABEL 3. RENCANA ANGGARAN BIAYA
HARGA SATUAN
NO URUTAN PEKERJAAN VOL SAT
BAHAN UPAH
1 2 3 4 5 6
E Pekerjaan Dinding
E1 Pekerjaan Pasangan Bata Merah 1 Pc : 4 Ps 182.10 m2 66,794 38,336
E2 Pekerjaan Pasangan Bata Merah 1 Pc : 2 Ps 187.72 m2 66,794 38,336
E3 Pekerjaan Plesteran Trasram 1 Pc : 2 Ps 375.43 m 2
17,713 42,027
E4 Pekerjaan Plesteran 1 Pc : 4 Ps 364.19 m2 13,515 42,027
E5 Pekerjaan Keramik Dinding Kamar Mandi 70.09 m2 1,097,357 89,074
E6 Pekerjaan Keramik Dinding Dapur 7.10 m 3
1,097,357 89,074
E7 Pekerjaan Acian 739.62 m2 4,173 28,018
Jumlah
AN BIAYA
13140.05 7,915,698
2158.72 2,771,800
8.07 1,850,712
12,538,210
3838.40 4,928,501
7.51 1,721,593
6,650,094
2272.55 2,917,949
8.74 2,004,060
4,922,009
831.97 74,877,147
797.62 1,024,149
2.94 674,958
105.14 337,483
76,913,738
84.28 7,584,930
80.80 103,745
0.30 68,372
10.65 34,187
7,791,233
2403.77 3,086,434
3,086,434
124,064,546
TABEL 5. REKAPITULASI KEBUTUHAN BAHAN
60.07 4,854,458
18.77 1,786,907
1.88 205,730
2.82 349,117
7,196,212
112.63 9,102,108
56.31 5,360,721
5.63 617,189
5.63 698,234
15,778,253
109.26 8,829,600
54.63 5,200,226
5.46 598,711
5.46 677,330
15,305,868
43.46 3,511,879
23.13 2,201,775
2.45 268,858
2.10 260,710
6,243,222
4.40 355,747
2.34 223,036
0.25 27,235
0.21 26,410
632,428
147.92 11,954,472
73.96 7,040,631
7.40 810,601
7.40 917,043
20,722,747
72,859,493
EKAPITULASI KEBUTUHAN TENAGA KERJA