CHECK LIST PROGRESS PEKERJAAN

Unit : A-11

NO DESKRIPSI PEKERJAAN VOLUME SATUAN BOBOT CHECK LIST

A PEKERJAAN STRUKTUR
1 Galian pondasi 13.10 m2 0.37%
2 Pancang Ulin 1 Meter 15.00 Btg
3 Pondasi batu gunung + incl pondasi turap pagar kavling 16.54 m3 7.91%
4 Sloof beton 15 x 20 & 15 x 15
a Pembesian 337.74 kg 2.69%
b Bekesting 12.0355 m2 0.67%
c Beton sitemix 1:2:3 1.81 m3 0.93%
5 Urugan leveling lantai 15.432 m3 0.86%
6 Rabat beton 1.929 m3 0.59%
7 Kolom praktis 13 x 13
a Pembesian 293.47 kg 2.34%
b Bekesting 15.6 m2 0.87%
c Beton sitemix 1:2:3 1.12 m3 0.58%
8 Ring balc 13 x 13
a Pembesian 130.45 kg 1.04%
b Bekesting 2.91 m2 0.16%
c Beton sitemix 1:2:3 0.63 m3 0.33%
9 Pekerjaan atap
a Atap Multiroof + rangka atap baja ringan 66.8 m2 7.45%
b Bubungan Multiroof 7 m1 0.22%
c List plank GTC 1 x 20 + cat 18 m1 0.72%
10 Kanopi fasade
a Pembesian 17.70 kg 0.14%
b Bekesting 6.01 m2 0.34%
c Beton sitemix 1:2:3 0.45 m3 0.23%
B PEKERJAAN ARSITEKTUR
1 Dinding
a Dinding bata 158.06 m2 10.08%
b Plesteran t=15 mm 316.11 m2 5.04%
c Acian 316.11 m2 2.77%
2 Lantai
a Keramik 40 x 40 polished ruang utama 30.6 m2 3.90%
b Keramik 40 x 40 unpolished teras depan & belakang 6.15 m2 0.78%
c Keramik 20 x 20 lantai toilet 1.83 m2 0.25%
d Keramik dinding toilet 20 x 25 polished 11.80 m2 1.79%
e Keramik dinding meja dapur 20 x 25 polished 2.88 m2 0.39%
3 Plafon gypsumboard + rangka hollow 47.2 m2 5.27%
4 Pengecatan eksterior 140.71 m2 5.61%
5 Pengecatan interior dinding & plafon 176.89 m2 4.93%
6 Batu alam 7.00 m2 1.28%
7 Pekerjaan kusen dan pintu:
a Pintu Jendela utama PJ 1 1 unit 1.83%
b Pintu standar P1 2 unit 2.23%
c Pintu jendela PJ2 1 unit 1.43%
d Jendela standar J1 3 unit 1.91%
e Jendela standar J2 1 unit 1.24%
f Pintu toilet PVC 1 unit 0.78%
g Boven toilet Bv1 1 unit 0.32%
h Boven fasade Bv2 1 unit 0.60%
8 Meja dapur:
a Pembesian 4.74 kg 0.04%
b Bekesting 1.72 m2 0.10%
c Beton sitemix 1:2:3 0.12 m3 0.06%
d Kitchen sink 1 unit 0.49%
9 Pasangan Batu alam fasade 12.6 m2 5.02%
NO DESKRIPSI PEKERJAAN VOLUME SATUAN BOBOT CHECK LIST

C PEKERJAAN MEKANIKAL ELEKTRIKAL


1 MCB 1 phase 3 jalur 1 unit 0.23%
2 Kabel toevoer (bila diperlukan) m
3 Grounding system 1 unit 0.46%
4 Kabel distribusi 3x2.5 mm2 100 m 1.35%
5 Fitting Lampu 6 titik 0.57%
6 Stop kontak 4 titik 0.24%
7 Stop kontak AC 2 titik 0.12%
8 Saklar single 3 titik 0.18%
9 Saklar double 2 titik 0.12%
10 Pipa PVC 1/2" distr air bersih 24 m 0.23%
11 Pipa PVC 3" drainase air kotor 8 m 0.69%
12 Pipa PVC 4" drainase air kotor 20 M 2.12%
13 Pipa PVC 4" Closet ke septictank 4 m 0.42%
14 Closet duduk + jet washer 1 unit 1.51%
15 Floor drain 1 unit 0.49%
16 Kran air bersih toilet 1 unit 0.10%
17 Kran air bersih taman 1 unit 0.10%
18 Kran air bersih kitchen sink 1 unit 0.34%
19 Septiktank
a Galian septic tank dan buis beton 2.8 m3 0.08%
b Rabat beton 0.06 m3 0.02%
c Dinding bata merah + plester 6.48 m2 0.52%
d Tulangan besi 9.48 kg 0.08%
e Beton sitemix 1:2:3 0.192 m3 0.10%
f Sumur resapan buis beton 3 unit 0.23%
D PEKERJAAN LANSDSCAPE & PELENGKAP
1 Beton rabat carport
a Pembesian 41.48 kg 0.33%
b Beton rabat 1.26 m3 0.40%
2 a pagar pembatas rumah 9 m1 1.51%
b pagar belakang 7 m1 0.67%

JUMLAH TOTAL 100%

Catatan : _______________________________________________________
_______________________________________________________
_______________________________________________________
_______________________________________________________

Balikpapan, 06 Maret 2021

___________ ____________ __________________


Developer Team Tukang Konsumen