Structure Standard

( Standarisasi Struktur )
1. Material Standard (Standarisasi Material)
2. Tool Standard (Standarisasi Peralatan)
3. Installation Standard Method (Standarisasi Metode Pelaksanaan)
4. Key Checkpoint (Kunci setiap titik pengecekan)
Structure Standard/Standarisasi Struktur
(1. Material Standard/Standarisasi Bahan)
No. Scope of Work Specification Brand Notes
( Lingkup Pekerjaan ) ( Spesifikasi ) ( Merek ) ( Catatan )-
Inside 1 cm /
Covered Concrete Thickness Plate
1 Outside 1.5 cm/ SCG
(Tebal Selimut Pelat Beton)
In Ground 2 cm
Inside 1.5 cm /
Covered Concrete Thickness Wall
2 Outside 2 cm/ SCG
(Tebal Selimut Dinding Beton)
In Ground 2.5 cm
Inside 2 cm /
Covered Concrete Thickness Beam
3 Outside 2.5 cm/ SCG
(Tebal Selimut Balok Beton)
In Ground 3 cm
Inside 2.5 cm /
Covered Concrete Thickness Column
4 Outside 3 cm/ SCG
(Tebal Selimut Kolom Beton)
In Ground 3.5 cm
Plain Steel Dispensing Length with
Bending for For concrete K-225 until
K - 350
5 35D SNI Steel
(Untuk Tulangan Polos dengan
lekukan
dengan mutu K-225 sampai K - 350)
Plain Steel Dispensing Length with
Bending for concrete K-150 until K -
225
6 45 D SNI Steel
(Untuk Tulangan Polos dengan
lekukan
dengan mutu K- 150 sampai K - 225
Structure Standard/Standarisasi Struktur
(1. Material Standard/Standarisasi Bahan)
No. Scope of Work Specification Brand Notes
( Lingkup Pekerjaan ) ( Spesifikasi ) ( Merek ) ( Catatan )-
S Steel Dispensing Length with
Bending
7 for K-225 until K - 350 40 D SNI Steel
(Untuk Tulangan Ulir dengan lekukan
dengan mutu K - 225 sampai K - 350 )
S Steel Dispensing Length with
Bending for concrete K-150 until K -
8 225 35D or 45 D SNI Steel
(Untuk Tulangan Ulir dengan lekukan
dengan mutu K - 150 sampai K - 225 )

Steel for Wall Thickness 12 cm Horizontal : D10 - @200


9 SNI Steel
(Tulangan untuk Tebal Dinding 12 cm) Vertical : D10 - @ 200

Steel for Wall Thickness 18 cm Horizontal : D10 - @200


10 SNI Steel
(Tulangan untuk Tebal Dinding 18 cm) Vertical : D10 - @ 200

Steel for Wall Thickness 20 cm Horizontal : D10 - @200


11 SNI Steel
(Tulangan untuk Tebal Dinding 20 cm) Vertical : D10 - @ 200
Structure Standard/Standarisasi Struktur
(1. Material Standard/Standarisasi Bahan)
No. Scope of Work Specification Brand Notes
( Lingkup Pekerjaan ) ( Spesifikasi ) ( Merek ) ( Catatan )-
Horizontal : D10 - @200
Steel for Wall Thickness 25 cm
12 Vertical : D10 - @ 200 SNI Steel
(Tulangan untuk Tebal Dinding 25 cm)
Horizontal : D10 - @200
Steel for Wall Thickness 30 cm
13 Vertical : D10 - @ 200 SNI Steel
(Tulangan untuk Tebal Dinding 30 cm)
Horizontal : D10 - @200
Vertical : D10 - @ 200
Steel for Wall Thickness 35 cm
14 SNI Steel
(Tulangan untuk Tebal Dinding 35 cm)

Horizontal : D13 - @200


Steel for Wall Thickness 40 cm
15 Vertical : D10 13 SNI Steel
(Tulangan untuk Tebal Dinding 40 cm)
Structure Standard/Standarisasi Struktur
(2. Tool Standard/Standarisasi Alat)

TOOLS NAME IMAGE


(NAMA ALAT) (GAMBAR)

Selang Timbang ( Water tube )

Benang ( String )

Roskam ( Trowel )
Structure Standard/Standarisasi Struktur
(2. Tool Standard/Standarisasi Alat)

TOOLS NAME IMAGE


(NAMA ALAT) (GAMBAR)

Kunci Pembembok Besi ( Steel


Bender Key )

Paku Beton ( Concrete Nail )

Penggaris siku ( 90 Degree Ruller )


Structure Standard/Standarisasi Struktur
(2. Tool Standard/Standarisasi Alat)

TOOLS NAME IMAGE


(NAMA ALAT) (GAMBAR)

Waterpass

Palu( Hammer)

Ember ( Bucket )

Sendok semen ( Scoop )


Standar Toilet
(3. Standar Metode Pelaksanaan )

a. Persiapan ( Preparation )
b. Pembuatan bekisting ( Making Formwork )
c. Pengecoran ( Pouring )
d. Perawatan ( Curing )
Structure Standard/Standarisasi Struktur
(3. Installation Standard Metode/Standarisasi Metode Pelaksanaan)

No. Tahapan Pekerjaan Standar Titik Pengecekan Catatan Foto


(Works Systematic) (Key Standard Checkpoint) (Notes) (Image)
1 Persiapan • Gambar detail telah dimiliki ( • Gambar menginformasikan detail
( Preparation ) Has Detailed Shopdrawing ) dimensi tulangan. ( Drawing
informed details dimention of
steel )
• Gambar menginformasikan jarak
tulangan ( Drawing informed
distance of steel )
• Gambar menginformasikan detail
– detail potongan ( Drawing
informed details of sectional
pieces )
• Material telah terkonfirmasi • Merek ( Brand )
sebelum memulainya • Mutu ( Quality )
pekerjaan (Materials already • Kuantitas ( Quantity )
Confirmed before starting
the work )

• Alat-alat yang dibutuhkan


sudah tersedia (all required
Structure Standard/Standarisasi Struktur
(3. Installation Standard Metode/Standarisasi Metode Pelaksanaan)

No. Tahapan Pekerjaan Standar Titik Pengecekan Catatan Foto


(Works Systematic) (Key Standard Checkpoint) (Notes) (Image)
2 Pembuatan Bekisting • Kuat ( Strong ) • Diuji terlebih dahulu
(Making Formwork) • Tidak ada rongga ( No gap ) untuk cek bocoran ( Need
• Ukuran ( Size ) be tested first to check if
there are any leakage ) 90◦

3 Pengecoran ( Pouring ) • Beton padat ( The concrete • Apabila cuaca hujan


has solid density ) harus dikonfirmasi
• Tidak ada kebocoran ( No kepada QA untuk
Leakage ) pengecoran (If the
• Cuaca ( Weather ) weather is rainy should
confirmed with QA for
doing pouring )
Structure Standard/Standarisasi Struktur
(3. Installation Standard Metode/Standarisasi Metode Pelaksanaan)

No. Tahapan Pekerjaan Standar Titik Pengecekan Catatan Foto


(Works Systematic) (Key Standard Checkpoint) (Notes) (Image)
4 Perawatan Beton ( Curing • Perawatan dilakukan seluruh • Untuk metode curing
Concrete ) area beton ( Curing should dapat didiskusikan ( For
be covered all concrete area curing method could be
) discussed )

90◦
Structure Standard/Standarisasi Struktur
(4. Key Checkpoint Standard/Standarisasi Kunci Pengecekan)

No. Item Pekerjaan Material Titik Pengecekan Catatan


1. Kolom ( Column ) - Beton Instan - Kuat ( Strong ) Penyesuaian dengan rumus yang
- Besi Polos - Siku ( Simetrical ) diberikan, dan penyesuaian dengan
- Besi Ulir - Dimensi ( Dimension ) rumus dan kondisi yang terdapat SNI
- Titik Koordinat ( Coordinate Point) 2847,SNI 1729, PBI
- Kehalusan Permukaan ( ( Adjusment with formula dan already
Smoothness Surface ) given, and adjustment with formula and
condition in SNI 2847,SNI 1729,PBI )
2. Balok ( Beam ) - Beton Instan - Kuat ( Strong ) Penyesuaian dengan rumus yang
- Besi Polos - Siku ( Simetrical ) diberikan, dan penyesuaian dengan
- Besi Ulir - Dimensi ( Dimension ) rumus yang terdapat SNI 2847
- Lendutan ( Deformasi ) ( Adjusment with formula dan already
- Titik Koordinat ( Coordinate Point) given, and adjustment with formula and
- Kehalusan Permukaan ( condition in SNI 2847,SNI 1729,PBI )
Smoothness Surface )
3. Pelat Lantai ( Floor Plate ) - Beton Instan - Kuat ( Strong ) Penyesuaian dengan rumus yang
- Besi Polos - Siku ( Simetrical ) diberikan, dan penyesuaian dengan
- Besi Ulir - Dimensi ( Dimension ) rumus dan kondisi yang terdapat SNI
- Lendutan ( Deformasi ) 2847,SNI 1729,PBI
- Titik Koordinat ( Coordinate Point) ( Adjusment with formula dan already
- Kehalusan Permukaan ( given, and adjustment with formula and
Smoothness Surface ) condition in SNI 2847,SNI 1729,PBI )