Harga Satuan
No URAIAN Satuan Volume Total Biaya
(Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5)
1 BAHAN
1. ...................
2. ...................
3. ...................
4. ...................
5. dst.
Sub Total Upah (1)
2 ALAT BANTU
1. ....................
2. dst
Sub Total Bahan (2)
Jumlah Total Biaya (1+2)
Disusun oleh :
(..........................................................
(......................................................... ..)
)
Mengetahui
Lurah ................................................
(..................................................................
)
NIP. ......................................................
FORMAT RENCANA ANGGARAN BIAYA BIDANG SOSIAL
RENCANA ANGGARAN BIAYA
Harga Satuan
No URAIAN Satuan Volume Total Biaya
(Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5)
1 BAHAN
1. ...................
2. ...................
3. ...................
4. ...................
5. dst.
Sub Total Upah (1)
2 ALAT BANTU
1. ....................
2. dst
Sub Total Bahan (2)
Jumlah Total Biaya (1+2)
Disusun oleh :
(..........................................................
(......................................................... ..)
)
Mengetahui
Lurah ................................................
(..................................................................)
NIP. ...........................................................
Opsi 1 *)
FORMAT RENCANA ANGGARAN BIAYA BIDANG INFRASTRUKTUR
RENCANA ANGGARAN BIAYA
Harga Satuan
No URAIAN Satuan Volume Total Biaya
(Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5)
1 UPAH KERJA
1. Tukang HOK
2. Pekerja HOK
Sub Total Upah (1)
2 BAHAN
1. Semen 50 kg Zak
2. Pasir beton M3
3. Agregat Kasar M3
4. Agregat Halus M3
5. Wermes roll
6. dst
Sub Total Bahan (2)
3 ALAT BANTU
1. Alat Bantu
LS
(lungsum)
2. dst
Sub Total Alat (3)
Jumlah Total Biaya (1+2+3)
Disusun oleh :
(..........................................................
(......................................................... ..)
)
Mengetahui
Lurah ................................................
(..................................................................)
NIP. ...........................................................
Opsi 2 *)
FORMAT RENCANA ANGGARAN BIAYA BIDANG INFRASTRUKTUR
Jenis
Kota Kediri
: Kegiatan : Infrastruktur (Jalan Paving)
Kelurahan : ........... Volume : ........m2
Kecamatan : ........... RT : ..........