Contoh format RAB

FORMAT RENCANA ANGGARAN BIAYA BIDANG EKONOMI


RENCANA ANGGARAN BIAYA

Kota : Kediri Jenis Kegiatan : Ekonomi


Kecamatan: ....................... Volume : .....................
Kelurahan : ....................... Lokasi RT : .....................

Harga Satuan
No URAIAN Satuan Volume Total Biaya
(Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5)
1 BAHAN
1. ...................
2. ...................
3.   ...................
4.   ...................
5.   dst.
Sub Total Upah (1)
2 ALAT BANTU
1. ....................
2. dst
Sub Total Bahan (2)
Jumlah Total Biaya (1+2)

Disusun oleh :

Kepala Seksi Ekonomi dan Pendamping


Pembangunan
Kelurahan.................................

(..........................................................
(......................................................... ..)
)

Mengetahui

Lurah ................................................

(..................................................................
)
NIP. ......................................................
FORMAT RENCANA ANGGARAN BIAYA BIDANG SOSIAL
RENCANA ANGGARAN BIAYA

Kota : Kediri Jenis Kegiatan : Sosial


Kecamatan: ....................... Volume : .....................
Kelurahan : ....................... Lokasi RT : .....................

Harga Satuan
No URAIAN Satuan Volume Total Biaya
(Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5)
1 BAHAN
1. ...................
2. ...................
3.   ...................
4.   ...................
5.   dst.
Sub Total Upah (1)
2 ALAT BANTU
1. ....................
2. dst
Sub Total Bahan (2)
Jumlah Total Biaya (1+2)

Disusun oleh :

Kepala Seksi Ekonomi dan Pendamping


Pembangunan
Kelurahan.................................

(..........................................................
(......................................................... ..)
)

Mengetahui

Lurah ................................................

(..................................................................)
NIP. ...........................................................
Opsi 1 *)

 FORMAT RENCANA ANGGARAN BIAYA  BIDANG INFRASTRUKTUR

RENCANA ANGGARAN BIAYA

Kota : Kediri Jenis Kegiatan : Infrastruktur


Kecamatan: ....................... Volume : .....................
Kelurahan : ....................... Lokasi RT : .....................

Harga Satuan
No URAIAN Satuan Volume Total Biaya
(Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5)
1 UPAH KERJA
1. Tukang HOK
2. Pekerja HOK
Sub Total Upah (1)
2 BAHAN
1. Semen 50 kg Zak
2. Pasir beton M3
3. Agregat Kasar M3
4. Agregat Halus M3
5. Wermes roll
6. dst
Sub Total Bahan (2)
3 ALAT BANTU
1. Alat   Bantu
LS
(lungsum)
2. dst
Sub Total Alat (3)
Jumlah Total Biaya (1+2+3)

Disusun oleh :

Kepala Seksi Ekonomi dan Pendamping


Pembangunan
Kelurahan.................................

(..........................................................
(......................................................... ..)
)

Mengetahui

Lurah ................................................
(..................................................................)
NIP. ...........................................................

Opsi 2 *)

 FORMAT RENCANA ANGGARAN BIAYA  BIDANG INFRASTRUKTUR

RENCANA ANGGARAN BIAYA

Jenis
Kota Kediri
: Kegiatan : Infrastruktur (Jalan Paving)
Kelurahan : ........... Volume : ........m2
Kecamatan : ........... RT : ..........

NOMOR HARGA JUMLAH


NO. URAIAN PEKERJAAN VOLUME SAT.
ANALISA SATUAN (Rp.) (Rp.)
1 2 3 4 5 6 7
I. ALAT
80.0
1 Cangkul 3 bh 240.000,00
00
80.0
2 Sekop 3 bh 240.000,00
00
47.0
3 Palu besar/bodem 2 bh 94.000,00
00
6.0
4 Timba Kecil 6 bh 36.000,00
00
Jumlah Sub I 610.000,00
II. PEKERJAAN TANAH
1 Menggali tanah biasa B6.1 25,00 m3 31.500,00 787.500,00
2 Mengurug pasir urug B6.11 5,00 m3 72.600,00 363.000,00
3 Membuang Tanah B6.8 25,00 m3 13.800,00 345.000,00
Jumlah Sub II 1.495.500,00
III. PEKERJAAN PASANGAN
1 Pasang dinding bata merah t= 1/2 bata, 1 PC : 4 PP D6.11 60,00 m2 73.800,00 4.428.000,00
2 Pasang plesteran 1 PC : 5 PP, tebal 15 mm E6.5 60,00 m2 32.300,00 1.938.000,00
3 Memasang 1 m2 paving blok abu-abu hexagonal Ls.3a 250,00 m2 61.200,00 15.300.000,00
21.666.000,0
Jumlah Sub III
0
23.771.500,0
JUMLAH I+II+III
0
23.771.000,0
DIBULATKAN
0
CATATAN :

Yang Harus Tertuang di dalam RAB dan sebagai Acuan


dalam Penyusunan RKA

(tidak bisa dirubah ketika dalam pelaksanaan kegiatan):

 Judul / Jenis Kegiatan


 Lokasi
 Volume
 Anggaran / Nilai / Biaya

*) Pilih salah satu format penyusunan RAB INFRASTRUKTUR dari


2 OPSI diatas.